ML17305A863: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:~~ AMENDED ~~ | ||
NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 DATE COMPLETED BY K F Porter OPERATING STATUS 1. | |||
2. | |||
3. | |||
4. | |||
Unit Name: | |||
II" Palo Verde Nuclear Generatin Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): ~140 Station Unit 2 | |||
: 5. Design Electrical Rating (Net MWe): ~12 0 | |||
: 6. Maximum Dependable Capacity (Gross MWe): 1303 | |||
: 7. Maximum Dependable Capacity (Net MWe): 1221 | |||
: 8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7) | |||
Since Last Report, Give Reasons: N A | |||
: 9. Power Level to Which Restricted, If Any (Net MWe): one | |||
: 10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative ll 12 Hours in Reporting Period Number of Hours Reactor 44 2 160 30 960 Was Critical 0 0 1 295 0 20 546 1 | |||
: 13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0 | |||
: 14. Hours Generator On-Line 0 0 1 295 0 20 042 2 | |||
: 15. Unit Reserve Shutdown Hours 0 0 0 0 0 0 | |||
: 16. Gross Thermal Energy Generated (MWH) 0 3 499 053 17 Gross Electrical Energy Generated (MWH) 0 1 712 500 25 682 370 | |||
: 18. Net Electrical Energy Generated (MWH) 0 1 614 008 23 996 820 I | |||
: 19. Unit Service Factor 45.0a 63.3a | |||
: 20. Unit Availability Factor 63.3a | |||
: 21. Unit Capacity Factor (Using MDC Net) 61.2a 63 5a 22 Unit Capacity Factor (Using DER Net) 61 0% | |||
: 23. Unit Forced Outage Rate 9 9a | |||
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): | |||
N A | |||
: 25. If Shutdown At End of Report Period, Estimated Date of Start-up: | |||
June 09 1990 Forecast Achieved INITIAL CRITICALITY ~03 86 ~04 18 86 INITIAL ELECTRICITY 06 86 05 20 86 COMMERCIAL OPERATION ~11 86 09 19 86 9006050340 900531 6-PDR ADOCK 05000529 R PDC | |||
0 gl I | |||
I I | |||
l i l l | |||
f}} |
Latest revision as of 05:00, 4 February 2020
ML17305A863 | |
Person / Time | |
---|---|
Site: | Palo Verde ![]() |
Issue date: | 03/31/1990 |
From: | Porter K ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
To: | |
Shared Package | |
ML17305A861 | List: |
References | |
NUDOCS 9006050340 | |
Download: ML17305A863 (2) | |
Text
~~ AMENDED ~~
NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 DATE COMPLETED BY K F Porter OPERATING STATUS 1.
2.
3.
4.
Unit Name:
II" Palo Verde Nuclear Generatin Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): ~140 Station Unit 2
- 5. Design Electrical Rating (Net MWe): ~12 0
- 6. Maximum Dependable Capacity (Gross MWe): 1303
- 7. Maximum Dependable Capacity (Net MWe): 1221
- 8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)
Since Last Report, Give Reasons: N A
- 9. Power Level to Which Restricted, If Any (Net MWe): one
- 10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative ll 12 Hours in Reporting Period Number of Hours Reactor 44 2 160 30 960 Was Critical 0 0 1 295 0 20 546 1
- 13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0
- 14. Hours Generator On-Line 0 0 1 295 0 20 042 2
- 15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 0 3 499 053 17 Gross Electrical Energy Generated (MWH) 0 1 712 500 25 682 370
- 18. Net Electrical Energy Generated (MWH) 0 1 614 008 23 996 820 I
- 19. Unit Service Factor 45.0a 63.3a
- 20. Unit Availability Factor 63.3a
- 21. Unit Capacity Factor (Using MDC Net) 61.2a 63 5a 22 Unit Capacity Factor (Using DER Net) 61 0%
- 23. Unit Forced Outage Rate 9 9a
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
N A
- 25. If Shutdown At End of Report Period, Estimated Date of Start-up:
June 09 1990 Forecast Achieved INITIAL CRITICALITY ~03 86 ~04 18 86 INITIAL ELECTRICITY 06 86 05 20 86 COMMERCIAL OPERATION ~11 86 09 19 86 9006050340 900531 6-PDR ADOCK 05000529 R PDC
0 gl I
I I
l i l l
f