ML17305A863: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/31/1990
| issue date = 03/31/1990
| title = Errata to Monthly Operating Rept for Mar 1990 for Palo Verde Nuclear Generating Station,Unit 2
| title = Errata to Monthly Operating Rept for Mar 1990 for Palo Verde Nuclear Generating Station,Unit 2
| author name = PORTER K F
| author name = Porter K
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:~~      AMENDED  ~~
NRC MONTHLY OPERATING REPORT DOCKET NO.      50-529 DATE COMPLETED BY K F      Porter OPERATING STATUS 1.
2.
3.
4.
Unit  Name:
II" Palo Verde Nuclear Generatin Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe):      ~140 Station    Unit  2
: 5. Design Electrical Rating (Net MWe): ~12 0
: 6. Maximum Dependable Capacity (Gross MWe): 1303
: 7. Maximum Dependable Capacity (Net MWe):      1221
: 8. If  Changes Occur In Capacity Ratings (Item Numbers      3  Through 7)
Since Last Report, Give Reasons:      N A
: 9. Power Level  to Which Restricted, If Any (Net    MWe):    one
: 10. Reasons For  Restrictions, If Any: N A This Month            Yr.-to-Date          Cumulative ll 12 Hours  in Reporting Period Number of Hours Reactor 44                    2 160                  30 960 Was  Critical                                0  0                1 295  0              20 546 1
: 13. Reactor Reserve Shutdown Hours                0  0                    0  0                  0 0
: 14. Hours Generator On-Line                      0  0                1 295  0              20 042 2
: 15. Unit Reserve  Shutdown Hours                0  0                    0  0                  0 0
: 16. Gross Thermal Energy Generated (MWH)                                  0                                      3  499 053 17  Gross Electrical Energy Generated (MWH)                                  0                  1 712 500          25 682 370
: 18. Net Electrical Energy Generated (MWH)                                  0                  1 614 008          23 996 820  I
: 19. Unit Service Factor                                                  45.0a                63.3a
: 20. Unit Availability Factor                                                                    63.3a
: 21. Unit Capacity Factor (Using  MDC  Net)                                                    61.2a                63 5a 22  Unit Capacity Factor (Using  DER Net)                                                                          61 0%
: 23. Unit Forced  Outage Rate                                                                    9 9a
: 24. Shutdowns Scheduled Over Next    6 Months (Type, Date and Duration          of  Each):
N A
: 25. If  Shutdown At End  of Report Period, Estimated  Date    of Start-up:
June 09 1990 Forecast                Achieved INITIAL CRITICALITY                          ~03 86                  ~04 18 86 INITIAL ELECTRICITY                              06 86                05 20 86 COMMERCIAL OPERATION                          ~11 86                  09 19 86 9006050340 900531                          6-PDR    ADOCK 05000529 R                    PDC
 
0 gl I
I I
l i l l
f}}

Latest revision as of 05:00, 4 February 2020

Errata to Monthly Operating Rept for Mar 1990 for Palo Verde Nuclear Generating Station,Unit 2
ML17305A863
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/31/1990
From: Porter K
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17305A861 List:
References
NUDOCS 9006050340
Download: ML17305A863 (2)


Text

~~ AMENDED ~~

NRC MONTHLY OPERATING REPORT DOCKET NO. 50-529 DATE COMPLETED BY K F Porter OPERATING STATUS 1.

2.

3.

4.

Unit Name:

II" Palo Verde Nuclear Generatin Licensed Thermal Power (MWt): 3800 Nameplate Rating (Gross MWe): ~140 Station Unit 2

5. Design Electrical Rating (Net MWe): ~12 0
6. Maximum Dependable Capacity (Gross MWe): 1303
7. Maximum Dependable Capacity (Net MWe): 1221
8. If Changes Occur In Capacity Ratings (Item Numbers 3 Through 7)

Since Last Report, Give Reasons: N A

9. Power Level to Which Restricted, If Any (Net MWe): one
10. Reasons For Restrictions, If Any: N A This Month Yr.-to-Date Cumulative ll 12 Hours in Reporting Period Number of Hours Reactor 44 2 160 30 960 Was Critical 0 0 1 295 0 20 546 1
13. Reactor Reserve Shutdown Hours 0 0 0 0 0 0
14. Hours Generator On-Line 0 0 1 295 0 20 042 2
15. Unit Reserve Shutdown Hours 0 0 0 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 3 499 053 17 Gross Electrical Energy Generated (MWH) 0 1 712 500 25 682 370
18. Net Electrical Energy Generated (MWH) 0 1 614 008 23 996 820 I
19. Unit Service Factor 45.0a 63.3a
20. Unit Availability Factor 63.3a
21. Unit Capacity Factor (Using MDC Net) 61.2a 63 5a 22 Unit Capacity Factor (Using DER Net) 61 0%
23. Unit Forced Outage Rate 9 9a
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

N A

25. If Shutdown At End of Report Period, Estimated Date of Start-up:

June 09 1990 Forecast Achieved INITIAL CRITICALITY ~03 86 ~04 18 86 INITIAL ELECTRICITY 06 86 05 20 86 COMMERCIAL OPERATION ~11 86 09 19 86 9006050340 900531 6-PDR ADOCK 05000529 R PDC

0 gl I

I I

l i l l

f