| title = Forwards Rev 15 to QA Program for Station Operation. Rev Involves Changes in Mgt,Engineering & Organizations
| title = Forwards Rev 15 to QA Program for Station Operation. Rev Involves Changes in Mgt,Engineering & Organizations
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = JOHNSON A R
| addressee name = Johnson A
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000244
| docket = 05000244
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9001050036 DOC.DATE: 89/12/28 NOTARXZED:
{{#Wiki_filter:TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFXLIATION MECREDY,R.C.
ACCESSION NBR:9001050036             DOC.DATE: 89/12/28   NOTARXZED: NO                         DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                           G   05000244 AUTH. NAME           AUTHOR AFFXLIATION MECREDY,R.C.         Rochester Gas & Electric Corp.
Rochester Gas&Electric Corp.RECIP.NAME RECIPIENT AFFILIATION gG'OHNSON,A.R.
RECIP.NAME           RECIPIENT AFFILIATION Project Directorate I-3                          gG'OHNSON,A.R.
Project Directorate I-3 R  
R


==SUBJECT:==
==SUBJECT:==
Forwards Rev 15 to"QA Program for Station Operation."" I DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR ENCL-SIZE: TITLE: QA Topical Report, Amendment, or Correspondencel(Docket/U z, sty Speci I RECIPIENT ID CODE/NAME PD1-3 LA COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME JOHNSON,A COPIES LTTR ENCL 1 1 NOTES:License Exp date in accordance with 10CFR2,2.109(9/'19/72).
Forwards Rev 15 to "QA Program for Station Operation."                         "
05000244/'D, XNTERNAL: XRM/DCB (AMDTS)NU A%RACT EG FIL 01 EXTERNAL: LPDR 1 1 1 1 2 2 1 1 NRR/DLPQ/LPEB10 OC/LFMB RGN1 FILE NRC PDR 2 2 1 1 1 1 1 1 D R S NOTE TO ALL"RIDS" RECIPIENT:
I DISTRIBUTION CODE: Q004D         COPIES RECEIVED:LTR       ENCL     -SIZE:
PLEASE HELP US TO REDUCE WAS'!CORI'ACI'HE.
TITLE: QA Topical Report, Amendment, or Correspondencel(Docket/U                           z, sty Speci I
DOCUMENT CONTROL DESK)ROOM PI-37 (EXT.3579)TO ELIMINATE YOUR NAME FROM DISHUBUTION LISIS FOR DOCUMENTS YOU DONT NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 12 S 0 I OO 1 g'I~c,  
NOTES:License Exp date in accordance with 10CFR2,2.109(9/'19/72).                               05000244
~0/)Zing AHP INIIIPIIPI IIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y.14649 0001 TELEPHONE AREA CODE Tle 546.2700 December 28, 1989 U.S.Nuclear Regulatory Commission Document Control Desk ATTN: Mr.Allen R.Johnson Project Directorate I-3 Washington, DC 20555  
                                                                                                            /'
RECIPIENT              COPIES          RECIPIENT          COPIES ID  CODE/NAME          LTTR ENCL      ID  CODE/NAME      LTTR ENCL PD1-3 LA                    1    1    JOHNSON,A              1                1 D,
XNTERNAL: XRM/DCB (AMDTS )             1    1    NRR/DLPQ/LPEB10        2                2 NU       A%   RACT         1     1     OC/LFMB                1                 1             D EG  FIL        01        2     2     RGN1   FILE           1                 1 EXTERNAL: LPDR                        1     1     NRC PDR                1                 1 R
S NOTE TO ALL "RIDS" RECIPIENT:
S PLEASE HELP US TO REDUCE WAS'! CORI'ACI'HE.DOCUMENT CONTROL DESK)
ROOM PI-37 (EXT. 3579) TO ELIMINATEYOUR NAME FROM DISHUBUTION LISIS FOR DOCUMENTS YOU DONT NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR             12   ENCL   12
 
0   I OO 1
g 'I ~   c,
 
                                                                  ~0
                    /)Zing AHP INIIIPIIPI IIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 0001 TELEPHONE AREA CODE Tle 546.2700 December 28, 1989 U.S. Nuclear Regulatory Commission Document               Control Desk ATTN:           Mr.       Allen R. Johnson Project Directorate I-3 Washington,         DC 20555


==SUBJECT:==
==SUBJECT:==
Submittal of Quality Assurance Program R.E.Ginna Nuclear Power Plant Docket Number 50-244  
Submittal of Quality Assurance Program R. E. Ginna Nuclear Power     Plant Docket Number 50-244
 
==Dear Mr. Johnson:==
 
Xn      accordance with 50.54 of 10CFR Part 50, enclosed. is revision                15 to the Quality Assurance Program for Station Operation. The revision involves minor changes in the RG&E Management, Engineering and Ginna Station organizations.                                The realignment of the Materials Engineering and Inspection Services
'roup            from the Research and Science department to the Quality Assurance/Quality Control department organizations also recently occurred. Further details of these and other changes and related reasons are described in the following paragraphs.
Summar  .of Revision  15 Chan es Section              1    ualit    Assurance Pro ram
  ~            Overall direction of quality assurance policy implemen-tation changed from the President to the Senior Vice President, Production and Engineering as this re established position        has been    filled by  an individual qualified.to assume        these  responsibilities.
  ~            Group        title  Quality  Assurance/Quality Control renamed Quality        Performance.
  ~            Title of department head changed from theManager        Director Quality Assurance/Quality            Control  to  Department              Quality Performance          concurrent    with  reorganizing  the  department.
9001050036 S91228
,PDR.,        ADOCK 05000244 PDC
 
      ~ I  f i'd%
  ) f e~
EJ g
El
 
Of those various implementing procedures, Research and Science procedures have been retitled as Materials Engineering and Inspection Services (MEIS) consistent with the realignment of MEIS from Research and Science and recognition that MEIS had the total responsibility for implementing the procedures.
Section  2 Or anization
~    Changed  or added to the listing of positions responsible for the principle elements of the QA Program.
Senior Vice President, Production and Engineering (changed from Vice President)
Department Manager, Quality Performance (renamed from Director Quality Assurance/Quality Control)
Changed who NSARB advises from Vice President to Senior Vice President Production and Engineering consistent with the title change of the descriptions for the new and revised titles are officer.'osition included or revised to reflect the appropriate changes. The more significant among these is:
The combining of those responsibilities previously assigned to the President and the Vice President, Production and Engineering into the responsibilities of the Senior Vice President Production and Engineering. Also the movement of Materials Engineering and Inspection Services from Research and Science to the newly formed Quality Performance Department along with Quality Assurance and Nuclear Assurance to consolidate similar responsibilities.
The responsibilities of the Engineering Division Quality Services Coordinator position is revised to reflect a transfer of coordination responsibilities for Materials Engineering and Inspection Services to the Quality Perfor-mance Department. This is part of the consolidation efforts initiated with the establishment of the new Quality Performance Department.
Changed on Figure 2-1, the title of Emergency Planner to Director, Corporate Radiation Protection. This new position will be directing the Corporate Nuclear Emergency Planner and the Corporate Health Physicist.
Changed on Figure'2-3, the title Administrative Services Manager to the Manager, Materials Procurement and Budget consistent with the expanding procurement control programs at Ginna.
Inserted on Figure 2-1, Senior Vice President, Gas &
Electric Distribution and Corporate Planning between the Vice President,. Electric Transmission and Distribution and President to correct an inadvertent previous omission.
Deleted from Figure 2-1, Division Superintendent below the Vice President Electric Transmission and Distribution as the position  was eliminated. Responsibilities for this position were assigned  to others within the organization.
 
OO 4~I 4'
 
Clarified    on Figure 2-1 those functions for which the Managers    of Quality Assurance and Nuclear Assurance are responsible. Added to the Quality Assurance block describing functional responsibilities the QA surveillance function to augment the audit function.
In Figure 2-2, changes to the Quality Performance organiza-tion included:
(1) Inclusion of Materials Engineering and Inspection Services (MEIS) Organization which was deleted from Figure 2-5. Placing MEIS in the same department as QA/QC is promoting improved relations with the line organizations immediately by association and over the long term as MEIS's excellent "customer service" orientation, permeates the whole department. There is also a natural, close functional association between QA/QC and MEIS in the areas of inspection, nondestruc-tive examination, materials testing and dependence on effective quality  programs for success.
(2)    The  Quality Control Foreman position has been re-established in the Nuclear Assurance organization.
(3)    The  Quality Performance Analyses and Program Support position has been established for creating analysis of quality performance and other support tasks associated with training coordination and maintenance of procedures.
Section  3  Desi n Control No Change    other than title changes from Quality Assurance/Quality Control and Quality Assurance to Quality Performance in the appropriate locations.
Section  4  Procurement Control
~    The of title of the organizations responsible for the review procurement documents to determine adequacy of the quality requirements is    changed from Quality Control and Quality Assurance to Quality Performance. This is to support consolidation of responsibilities in the new department.
Section  5  Instructions Procedures and. Drawin s
~    The  title of  the organizations responsible for reviewing and  concurring with procedures written to implement the Quality 'Assurance Program is changed from Quality Assurance to Quality Performance. This is to support consolidation of responsibilities in the new department.
 
  ~0 1
 
Section 6 Document Control
~    Approval of the Quality Materials Engineering and Inspection Services Procedures Manual changed from Director Research and Science to the Manager, Materials Engineering and Inspection Services. This is consistent with the reassign-ment of Materials Engineering and Inspection Services to the Quality Performance Department.
~    Approval of the Quality Assurance/Quality Control procedures elevated from the Manager, Quality Assurance to the Department Manager, Quality Performance. This is the approval level deemed appropriate  for these  procedures.
Section 7 Control of Purchased Material E
~    Allowance for multiple approved i ment and Services suppliers'ists. This is to support the  establishment  of a Commercial  Grade Dedica-tion program.
~    Title changed from Quality Assurance/Quality Control to Quality Performance consistent with establishment of the new department.
~    Research and Science changed to Materials Engineering and Inspection Services. This is consistent with the reassign-ment of Materials Engineering and Inspection Services to the Quality Performance Department.
Section 9 Control of S ecial Processes
~    Title of Quality Assurance/Quality Control changed to Quality Performance.
Section 10 Ins ection Control
~    Changed responsibility for establishing the Inservice Inspection Program from the Director, Research and Science to the Manager, Materials Engineering and Inspection Services. This is consistent with the reassignment of Materials Engineering and Inspection Services, which is historically responsible for implementing this respon-sibility, to the, Quality Performance Department.
~    Changed responsibility for establishing the Inservice Pump and Valve Testing Program from Quality Assurance to Engineering. This is a result of the need for a separation of line and verification responsibilities identified during the IST Program upgrade.
Section  16 Correction Action
~    Classified distribution of CAR summary reports changed from Senior Vice President, Production and Engineering and departmental supervision to departmental supervision only with Senior management notification of the more significant problems. The content of routine status reports in general, contains no information useful to Senior Management that they do not otherwise receive.


==Dear Mr.Johnson:==
          ~ OO 1/
Xn accordance with 50.54 of 10CFR Part 50, enclosed.is revision 15 to the Quality Assurance Program for Station Operation.
  ,J P
The revision involves minor changes in the RG&E Management, Engineering and Ginna Station organizations.
        '4
The realignment of the Materials Engineering and Inspection Services'roup from the Research and Science department to the Quality Assurance/Quality Control department organizations also recently occurred.Further details of these and other changes and related reasons are described in the following paragraphs.
~8
Summar.of Revision 15 Chan es Section 1 ualit Assurance Pro ram~Overall direction of quality assurance policy implemen-tation changed from the President to the Senior Vice President, Production and Engineering as this re established position has been filled by an individual qualified.to assume these responsibilities.
~ +
~Group title Quality Assurance/Quality Control renamed Quality Performance.
 
~Title of department head changed from the Director Quality Assurance/Quality Control to Department Manager Quality Performance concurrent with reorganizing the department.
Section   18 Audits
9001050036 S91228 ,PDR., ADOCK 05000244 PDC f~I i'd%)f e~EJ g El Of those various implementing procedures, Research and Science procedures have been retitled as Materials Engineering and Inspection Services (MEIS)consistent with the realignment of MEIS from Research and Science and recognition that MEIS had the total responsibility for implementing the procedures.
~     Distribution of audit reports to the Senior Vice President, Production and Engineering removed as he receives them as NSARB Chairman and related participation in an audit overview committee.
Section 2 Or anization~Changed or added to the listing of positions responsible for the principle elements of the QA Program.Senior Vice President, Production and Engineering from Vice President)(changed Department Manager, Quality Performance (renamed from Director Quality Assurance/Quality Control)Changed who NSARB advises from Vice President to Senior Vice President Production and Engineering consistent with the title change of the officer.'osition descriptions for the new and revised titles are included or revised to reflect the appropriate changes.The more significant among these is: The combining of those responsibilities previously assigned to the President and the Vice President, Production and Engineering into the responsibilities of the Senior Vice President Production and Engineering.
~     Added requirements for controlling Quality consistent with the establishment, of the Assurance'urveillances new program.
Also the movement of Materials Engineering and Inspection Services from Research and Science to the newly formed Quality Performance Department along with Quality Assurance and Nuclear Assurance to consolidate similar responsibilities.
Table   1 -1 Tables of De artmental'Im lementin   Procedures
The responsibilities of the Engineering Division Quality Services Coordinator position is revised to reflect a transfer of coordination responsibilities for Materials Engineering and Inspection Services to the Quality Perfor-mance Department.
~     Revised to reflect the changes described,   for the                 18 sections.
This is part of the consolidation efforts initiated with the establishment of the new Quality Performance Department.
Table 18-1 Audit List
Changed on Figure 2-1, the title of Emergency Planner to Director, Corporate Radiation Protection.
~     List of activities audited at each department revised to reflect the changes described for the 18 sections.
This new position will be directing the Corporate Nuclear Emergency Planner and the Corporate Health Physicist.
Miscellaneous
Changed on Figure'2-3, the title Administrative Services Manager to the Manager, Materials Procurement and Budget consistent with the expanding procurement control programs at Ginna.Inserted on Figure 2-1, Senior Vice President, Gas&Electric Distribution and Corporate Planning between the Vice President,.
~     Where applicable in the various sections the Director, Quality Assurance/Quality Control title changed to Department Manager, Quality Performance.
Electric Transmission and Distribution and President to correct an inadvertent previous omission.Deleted from Figure 2-1, Division Superintendent below the Vice President Electric Transmission and Distribution as the position was eliminated.
~     Where applicable in the various sections, Quality Assurance or Quality Control, changed to Quality Performance. This is to support consolidation of responsibilities in the new department.
Responsibilities for this position were assigned to others within the organization.
~     Typographical and editorial changes incorporated throughout the document where deemed appropriate.
OO 4~I 4' Clarified on Figure 2-1 those functions for which the Managers of Quality Assurance and Nuclear Assurance are responsible.
All changes from previous revision 14 are identified with a vertical line in the left hand margin of each page. Each page will be identified as revision. 15 since the entire document was reprinted in lieu of only the revised pages.
Added to the Quality Assurance block describing functional responsibilities the QA surveillance function to augment the audit function.In Figure 2-2, changes to the Quality Performance organiza-tion included: (1)Inclusion of Materials Engineering and Inspection Services (MEIS)Organization which was deleted from Figure 2-5.Placing MEIS in the same department as QA/QC is promoting improved relations with the line organizations immediately by association and over the long term as MEIS's excellent"customer service" orientation, permeates the whole department.
Tables and figures which contain changes are identified by a vertical line in the left margin next to -their reference in the index, page   ii.
There is also a natural, close functional association between QA/QC and MEIS in the areas of inspection, nondestruc-tive examination, materials testing and dependence on effective quality programs for success.(2)The Quality Control Foreman position has been re-established in the Nuclear Assurance organization.
These changes will not reduce the effectiveness of the Ginna Station Quality Assurance Program nor reduce any of our previous commitments. This. is based on the following considerations:
(3)The Quality Performance Analyses and Program Support position has been established for creating analysis of quality performance and other support tasks associated with training coordination and maintenance of procedures.
Section 3 Desi n Control No Change other than title changes from Quality Assurance/Quality Control and Quality Assurance to Quality Performance in the appropriate locations.
Section 4 Procurement Control~The title of the organizations responsible for the review of procurement documents to determine adequacy of the quality requirements is changed from Quality Control and Quality Assurance to Quality Performance.
This is to support consolidation of responsibilities in the new department.
Section 5 Instructions Procedures and.Drawin s~The title of the organizations responsible for reviewing and concurring with procedures written to implement the Quality'Assurance Program is changed from Quality Assurance to Quality Performance.
This is to support consolidation of responsibilities in the new department.
~0 1 Section 6 Document Control~Approval of the Quality Materials Engineering and Inspection Services Procedures Manual changed from Director Research and Science to the Manager, Materials Engineering and Inspection Services.This is consistent with the reassign-ment of Materials Engineering and Inspection Services to the Quality Performance Department.
~Approval of the Quality Assurance/Quality Control procedures elevated from the Manager, Quality Assurance to the Department Manager, Quality Performance.
This is the approval level deemed appropriate for these procedures.
Section 7 Control of Purchased Material E i ment and Services~Allowance for multiple approved suppliers'ists.
This is to support the establishment of a Commercial Grade Dedica-tion program.~Title changed from Quality Assurance/Quality Control to Quality Performance consistent with establishment of the new department.
~Research and Science changed to Materials Engineering and Inspection Services.This is consistent with the reassign-ment of Materials Engineering and Inspection Services to the Quality Performance Department.
Section 9 Control of S ecial Processes~Title of Quality Assurance/Quality Control changed to Quality Performance.
Section 10 Ins ection Control~Changed responsibility for establishing the Inservice Inspection Program from the Director, Research and Science to the Manager, Materials Engineering and Inspection Services.This is consistent with the reassignment of Materials Engineering and Inspection Services, which is historically responsible for implementing this respon-sibility, to the, Quality Performance Department.
~Changed responsibility for establishing the Inservice Pump and Valve Testing Program from Quality Assurance to Engineering.
This is a result of the need for a separation of line and verification responsibilities identified during the IST Program upgrade.Section 16 Correction Action~Classified distribution of CAR summary reports changed from Senior Vice President, Production and Engineering and departmental supervision to departmental supervision only with Senior management notification of the more significant problems.The content of routine status reports in general, contains no information useful to Senior Management that they do not otherwise receive.
~l OO 1/,J'P'4~8~+
Section 18 Audits~Distribution of audit reports to the Senior Vice President, Production and Engineering removed as he receives them as NSARB Chairman and related participation in an audit overview committee.
~Added requirements for controlling Quality Assurance'urveillances consistent with the establishment, of the new program.Table 1-1 Tables of De artmental'Im lementin Procedures
~Revised to reflect the changes described, for the 18 sections.Table 18-1 Audit List~List of activities audited at each department revised to reflect the changes described for the 18 sections.Miscellaneous
~Where applicable in the various sections the Director, Quality Assurance/Quality Control title changed to Department Manager, Quality Performance.
~Where applicable in the various sections, Quality Assurance or Quality Control, changed to Quality Performance.
This is to support consolidation of responsibilities in the new department.
~Typographical and editorial changes incorporated throughout the document where deemed appropriate.
All changes from previous revision 14 are identified with a vertical line in the left hand margin of each page.Each page will be identified as revision.15 since the entire document was reprinted in lieu of only the revised pages.Tables and figures which contain changes are identified by a vertical line in the left margin next to-their reference in the index, page ii.These changes will not reduce the effectiveness of the Ginna Station Quality Assurance Program nor reduce any of our previous commitments.
This.is based on the following considerations:
The changes which have the Quality Performance department report to the Senior Vice President, Electric Production is consistent with the reporting relationship utilized prior to 1989 and suggested guidelines of ANS 3.2 regarding having access to responsible corporate management at a level where action appropriate to the mitigation of safety related quality assurance concerns can be accomplished.
The changes which have the Quality Performance department report to the Senior Vice President, Electric Production is consistent with the reporting relationship utilized prior to 1989 and suggested guidelines of ANS 3.2 regarding having access to responsible corporate management at a level where action appropriate to the mitigation of safety related quality assurance concerns can be accomplished.
Recognition that the Materials Engineering and Inspection Services (MEIS)group performs independent quality verifica-tion services for the line organizations through the NDE and materials testing functions performed.
Recognition that the Materials Engineering and Inspection Services (MEIS) group performs independent quality verifica-tion services for the line organizations through the NDE and materials testing functions performed. For those services
For those services  
 
~0 e l I J I~considered other than independent quality verification recognition that MEIS will function much the same as in the past with regard to independence.
  ~0 e
from Quality Assurance and Quality Control groups.MEIS will be governed by their own procedures and be subjected to periodic audit and surveillance.
l I
Recognition that the other changes of the Quality Performance organization result from organization enhance-ments adopted to support ongoing performance objectives.
J
~Recognition that the other changes are largely descriptive of title changes and changes in terminology each of which is considered to have no impact on.previous commitments.
 
Very truly yours, Robert C.Me edy General Manag , N lear Production RCMNcemh069 Enclosures xc: C.Marschall,.Senior Resident Xnspector Region 1  
considered other than independent quality   verification recognition that MEIS will function much the same as in the past with regard to independence. from Quality Assurance and Quality Control groups. MEIS will be governed by their own procedures and be subjected to periodic audit and surveillance.
~0~0 I t I~}}
I ~    Recognition that the other changes of the Quality Performance organization result from organization enhance-ments adopted to support ongoing performance objectives.
  ~   Recognition that the other changes are largely descriptive of title changes and changes in terminology each of which is considered to have no impact on. previous commitments.
Very truly yours, Robert C. Me edy General Manag , N   lear Production RCMNcemh069 Enclosures xc:   C. Marschall, .Senior Resident Xnspector Region 1
 
~0 ~0     I~
t I}}

Latest revision as of 04:31, 4 February 2020

Forwards Rev 15 to QA Program for Station Operation. Rev Involves Changes in Mgt,Engineering & Organizations
ML17309A435
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/28/1989
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
Office of Nuclear Reactor Regulation
Shared Package
ML17261A905 List:
References
NUDOCS 9001050036
Download: ML17309A435 (14)


Text

TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9001050036 DOC.DATE: 89/12/28 NOTARXZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFXLIATION MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION Project Directorate I-3 gG'OHNSON,A.R.

R

SUBJECT:

Forwards Rev 15 to "QA Program for Station Operation." "

I DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR ENCL -SIZE:

TITLE: QA Topical Report, Amendment, or Correspondencel(Docket/U z, sty Speci I

NOTES:License Exp date in accordance with 10CFR2,2.109(9/'19/72). 05000244

/'

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 1 JOHNSON,A 1 1 D,

XNTERNAL: XRM/DCB (AMDTS ) 1 1 NRR/DLPQ/LPEB10 2 2 NU A% RACT 1 1 OC/LFMB 1 1 D EG FIL 01 2 2 RGN1 FILE 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 R

S NOTE TO ALL "RIDS" RECIPIENT:

S PLEASE HELP US TO REDUCE WAS'! CORI'ACI'HE.DOCUMENT CONTROL DESK)

ROOM PI-37 (EXT. 3579) TO ELIMINATEYOUR NAME FROM DISHUBUTION LISIS FOR DOCUMENTS YOU DONT NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 12

0 I OO 1

g 'I ~ c,

~0

/)Zing AHP INIIIPIIPI IIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 0001 TELEPHONE AREA CODE Tle 546.2700 December 28, 1989 U.S. Nuclear Regulatory Commission Document Control Desk ATTN: Mr. Allen R. Johnson Project Directorate I-3 Washington, DC 20555

SUBJECT:

Submittal of Quality Assurance Program R. E. Ginna Nuclear Power Plant Docket Number 50-244

Dear Mr. Johnson:

Xn accordance with 50.54 of 10CFR Part 50, enclosed. is revision 15 to the Quality Assurance Program for Station Operation. The revision involves minor changes in the RG&E Management, Engineering and Ginna Station organizations. The realignment of the Materials Engineering and Inspection Services

'roup from the Research and Science department to the Quality Assurance/Quality Control department organizations also recently occurred. Further details of these and other changes and related reasons are described in the following paragraphs.

Summar .of Revision 15 Chan es Section 1 ualit Assurance Pro ram

~ Overall direction of quality assurance policy implemen-tation changed from the President to the Senior Vice President, Production and Engineering as this re established position has been filled by an individual qualified.to assume these responsibilities.

~ Group title Quality Assurance/Quality Control renamed Quality Performance.

~ Title of department head changed from theManager Director Quality Assurance/Quality Control to Department Quality Performance concurrent with reorganizing the department.

9001050036 S91228

,PDR., ADOCK 05000244 PDC

~ I f i'd%

) f e~

EJ g

El

Of those various implementing procedures, Research and Science procedures have been retitled as Materials Engineering and Inspection Services (MEIS) consistent with the realignment of MEIS from Research and Science and recognition that MEIS had the total responsibility for implementing the procedures.

Section 2 Or anization

~ Changed or added to the listing of positions responsible for the principle elements of the QA Program.

Senior Vice President, Production and Engineering (changed from Vice President)

Department Manager, Quality Performance (renamed from Director Quality Assurance/Quality Control)

Changed who NSARB advises from Vice President to Senior Vice President Production and Engineering consistent with the title change of the descriptions for the new and revised titles are officer.'osition included or revised to reflect the appropriate changes. The more significant among these is:

The combining of those responsibilities previously assigned to the President and the Vice President, Production and Engineering into the responsibilities of the Senior Vice President Production and Engineering. Also the movement of Materials Engineering and Inspection Services from Research and Science to the newly formed Quality Performance Department along with Quality Assurance and Nuclear Assurance to consolidate similar responsibilities.

The responsibilities of the Engineering Division Quality Services Coordinator position is revised to reflect a transfer of coordination responsibilities for Materials Engineering and Inspection Services to the Quality Perfor-mance Department. This is part of the consolidation efforts initiated with the establishment of the new Quality Performance Department.

Changed on Figure 2-1, the title of Emergency Planner to Director, Corporate Radiation Protection. This new position will be directing the Corporate Nuclear Emergency Planner and the Corporate Health Physicist.

Changed on Figure'2-3, the title Administrative Services Manager to the Manager, Materials Procurement and Budget consistent with the expanding procurement control programs at Ginna.

Inserted on Figure 2-1, Senior Vice President, Gas &

Electric Distribution and Corporate Planning between the Vice President,. Electric Transmission and Distribution and President to correct an inadvertent previous omission.

Deleted from Figure 2-1, Division Superintendent below the Vice President Electric Transmission and Distribution as the position was eliminated. Responsibilities for this position were assigned to others within the organization.

OO 4~I 4'

Clarified on Figure 2-1 those functions for which the Managers of Quality Assurance and Nuclear Assurance are responsible. Added to the Quality Assurance block describing functional responsibilities the QA surveillance function to augment the audit function.

In Figure 2-2, changes to the Quality Performance organiza-tion included:

(1) Inclusion of Materials Engineering and Inspection Services (MEIS) Organization which was deleted from Figure 2-5. Placing MEIS in the same department as QA/QC is promoting improved relations with the line organizations immediately by association and over the long term as MEIS's excellent "customer service" orientation, permeates the whole department. There is also a natural, close functional association between QA/QC and MEIS in the areas of inspection, nondestruc-tive examination, materials testing and dependence on effective quality programs for success.

(2) The Quality Control Foreman position has been re-established in the Nuclear Assurance organization.

(3) The Quality Performance Analyses and Program Support position has been established for creating analysis of quality performance and other support tasks associated with training coordination and maintenance of procedures.

Section 3 Desi n Control No Change other than title changes from Quality Assurance/Quality Control and Quality Assurance to Quality Performance in the appropriate locations.

Section 4 Procurement Control

~ The of title of the organizations responsible for the review procurement documents to determine adequacy of the quality requirements is changed from Quality Control and Quality Assurance to Quality Performance. This is to support consolidation of responsibilities in the new department.

Section 5 Instructions Procedures and. Drawin s

~ The title of the organizations responsible for reviewing and concurring with procedures written to implement the Quality 'Assurance Program is changed from Quality Assurance to Quality Performance. This is to support consolidation of responsibilities in the new department.

~0 1

Section 6 Document Control

~ Approval of the Quality Materials Engineering and Inspection Services Procedures Manual changed from Director Research and Science to the Manager, Materials Engineering and Inspection Services. This is consistent with the reassign-ment of Materials Engineering and Inspection Services to the Quality Performance Department.

~ Approval of the Quality Assurance/Quality Control procedures elevated from the Manager, Quality Assurance to the Department Manager, Quality Performance. This is the approval level deemed appropriate for these procedures.

Section 7 Control of Purchased Material E

~ Allowance for multiple approved i ment and Services suppliers'ists. This is to support the establishment of a Commercial Grade Dedica-tion program.

~ Title changed from Quality Assurance/Quality Control to Quality Performance consistent with establishment of the new department.

~ Research and Science changed to Materials Engineering and Inspection Services. This is consistent with the reassign-ment of Materials Engineering and Inspection Services to the Quality Performance Department.

Section 9 Control of S ecial Processes

~ Title of Quality Assurance/Quality Control changed to Quality Performance.

Section 10 Ins ection Control

~ Changed responsibility for establishing the Inservice Inspection Program from the Director, Research and Science to the Manager, Materials Engineering and Inspection Services. This is consistent with the reassignment of Materials Engineering and Inspection Services, which is historically responsible for implementing this respon-sibility, to the, Quality Performance Department.

~ Changed responsibility for establishing the Inservice Pump and Valve Testing Program from Quality Assurance to Engineering. This is a result of the need for a separation of line and verification responsibilities identified during the IST Program upgrade.

Section 16 Correction Action

~ Classified distribution of CAR summary reports changed from Senior Vice President, Production and Engineering and departmental supervision to departmental supervision only with Senior management notification of the more significant problems. The content of routine status reports in general, contains no information useful to Senior Management that they do not otherwise receive.

~ l OO 1/

,J P

'4

~8

~ +

Section 18 Audits

~ Distribution of audit reports to the Senior Vice President, Production and Engineering removed as he receives them as NSARB Chairman and related participation in an audit overview committee.

~ Added requirements for controlling Quality consistent with the establishment, of the Assurance'urveillances new program.

Table 1 -1 Tables of De artmental'Im lementin Procedures

~ Revised to reflect the changes described, for the 18 sections.

Table 18-1 Audit List

~ List of activities audited at each department revised to reflect the changes described for the 18 sections.

Miscellaneous

~ Where applicable in the various sections the Director, Quality Assurance/Quality Control title changed to Department Manager, Quality Performance.

~ Where applicable in the various sections, Quality Assurance or Quality Control, changed to Quality Performance. This is to support consolidation of responsibilities in the new department.

~ Typographical and editorial changes incorporated throughout the document where deemed appropriate.

All changes from previous revision 14 are identified with a vertical line in the left hand margin of each page. Each page will be identified as revision. 15 since the entire document was reprinted in lieu of only the revised pages.

Tables and figures which contain changes are identified by a vertical line in the left margin next to -their reference in the index, page ii.

These changes will not reduce the effectiveness of the Ginna Station Quality Assurance Program nor reduce any of our previous commitments. This. is based on the following considerations:

The changes which have the Quality Performance department report to the Senior Vice President, Electric Production is consistent with the reporting relationship utilized prior to 1989 and suggested guidelines of ANS 3.2 regarding having access to responsible corporate management at a level where action appropriate to the mitigation of safety related quality assurance concerns can be accomplished.

Recognition that the Materials Engineering and Inspection Services (MEIS) group performs independent quality verifica-tion services for the line organizations through the NDE and materials testing functions performed. For those services

~0 e

l I

J

considered other than independent quality verification recognition that MEIS will function much the same as in the past with regard to independence. from Quality Assurance and Quality Control groups. MEIS will be governed by their own procedures and be subjected to periodic audit and surveillance.

I ~ Recognition that the other changes of the Quality Performance organization result from organization enhance-ments adopted to support ongoing performance objectives.

~ Recognition that the other changes are largely descriptive of title changes and changes in terminology each of which is considered to have no impact on. previous commitments.

Very truly yours, Robert C. Me edy General Manag , N lear Production RCMNcemh069 Enclosures xc: C. Marschall, .Senior Resident Xnspector Region 1