ML17309A435: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/28/1989
| issue date = 12/28/1989
| title = Forwards Rev 15 to QA Program for Station Operation. Rev Involves Changes in Mgt,Engineering & Organizations
| title = Forwards Rev 15 to QA Program for Station Operation. Rev Involves Changes in Mgt,Engineering & Organizations
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = JOHNSON A R
| addressee name = Johnson A
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000244
| docket = 05000244
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:TIONSYSTEMREGULATORY INFORMATION DISTRIBUTION SYSTEM(RIDS)ACCESSION NBR:9001050036 DOC.DATE:
{{#Wiki_filter:TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
89/12/28NOTARXZED:
ACCESSION NBR:9001050036             DOC.DATE: 89/12/28    NOTARXZED: NO                        DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                           G  05000244 AUTH. NAME          AUTHOR AFFXLIATION MECREDY,R.C.         Rochester Gas & Electric Corp.
NODOCKETFACIL:50-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester G05000244AUTH.NAMEAUTHORAFFXLIATION MECREDY,R.C.
RECIP.NAME           RECIPIENT AFFILIATION Project Directorate I-3                          gG'OHNSON,A.R.
Rochester Gas&ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION gG'OHNSON,A.R.
R
ProjectDirectorate I-3R


==SUBJECT:==
==SUBJECT:==
ForwardsRev15to"QAProgramforStationOperation."
Forwards Rev 15 to "QA Program for Station Operation."                        "
"IDISTRIBUTION CODE:Q004DCOPIESRECEIVED:LTR ENCL-SIZE:TITLE:QATopicalReport,Amendment, orCorrespondencel(Docket/U z,stySpeciIRECIPIENT IDCODE/NAME PD1-3LACOPIESLTTRENCL11RECIPIENT IDCODE/NAME JOHNSON,A COPIESLTTRENCL11NOTES:License Expdateinaccordance with10CFR2,2.109(9/'19/72).
I DISTRIBUTION CODE: Q004D          COPIES RECEIVED:LTR       ENCL     -SIZE:
05000244/'D,XNTERNAL:
TITLE: QA Topical Report, Amendment, or Correspondencel(Docket/U                           z, sty Speci I
XRM/DCB(AMDTS)NUA%RACTEGFIL01EXTERNAL:
NOTES:License Exp date in accordance with 10CFR2,2.109(9/'19/72).                               05000244
LPDR11112211NRR/DLPQ/LPEB10 OC/LFMBRGN1FILENRCPDR22111111DRSNOTETOALL"RIDS"RECIPIENT:
                                                                                                            /'
PLEASEHELPUSTOREDUCEWAS'!CORI'ACI'HE.
RECIPIENT              COPIES          RECIPIENT          COPIES ID  CODE/NAME          LTTR ENCL      ID  CODE/NAME      LTTR ENCL PD1-3 LA                    1    1    JOHNSON,A              1                1 D,
DOCUMENTCONTROLDESK)ROOMPI-37(EXT.3579)TOELIMINATE YOURNAMEFROMDISHUBUTION LISISFORDOCUMENTS YOUDONTNEEDlTOTALNUMBEROFCOPIESREQUIRED:
XNTERNAL: XRM/DCB (AMDTS )             1    1    NRR/DLPQ/LPEB10       2                2 NU        A%  RACT        1    1    OC/LFMB                1                1              D EG  FIL        01        2    2    RGN1    FILE          1                1 EXTERNAL: LPDR                        1    1    NRC PDR                1                1 R
LTTR12ENCL12S 0IOO1g'I~c,  
S NOTE TO ALL "RIDS" RECIPIENT:
~0/)ZingAHPINIIIPIIPI IIIIIIIIII ROCHESTER GASANDELECTRICCORPORATION o89EASTAVENUE,ROCHESTER, N.Y.146490001TELEPHONE AREACODETle546.2700December28,1989U.S.NuclearRegulatory Commission DocumentControlDeskATTN:Mr.AllenR.JohnsonProjectDirectorate I-3Washington, DC20555
S PLEASE HELP US TO REDUCE WAS'! CORI'ACI'HE.DOCUMENT CONTROL DESK)
ROOM PI-37 (EXT. 3579) TO ELIMINATEYOUR NAME FROM DISHUBUTION LISIS FOR DOCUMENTS YOU DONT NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR            12  ENCL    12
 
0    I OO 1
g 'I ~   c,
 
                                                                  ~0
                    /)Zing AHP INIIIPIIPI  IIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 0001 TELEPHONE AREA CODE Tle 546.2700 December 28, 1989 U.S. Nuclear Regulatory Commission Document                Control Desk ATTN:           Mr.       Allen R. Johnson Project Directorate I-3 Washington,         DC  20555


==SUBJECT:==
==SUBJECT:==
Submittal ofQualityAssurance ProgramR.E.GinnaNuclearPowerPlantDocketNumber50-244
Submittal of Quality Assurance Program R. E. Ginna Nuclear Power      Plant Docket Number 50-244
 
==Dear Mr. Johnson:==
 
Xn      accordance with 50.54 of 10CFR Part 50, enclosed. is revision                15 to the Quality Assurance Program for Station Operation. The revision involves minor changes in the RG&E Management, Engineering and Ginna Station organizations.                                The realignment of the Materials Engineering and Inspection Services
'roup            from the Research and Science department to the Quality Assurance/Quality Control department organizations also recently occurred. Further details of these and other changes and related reasons are described in the following paragraphs.
Summar  .of Revision  15 Chan es Section              1    ualit    Assurance Pro ram
  ~            Overall direction of quality assurance policy implemen-tation changed from the President to the Senior Vice President, Production and Engineering as this re established position        has been    filled by  an individual qualified.to assume        these  responsibilities.
  ~            Group        title  Quality  Assurance/Quality Control renamed Quality        Performance.
  ~            Title of department head changed from theManager        Director Quality Assurance/Quality            Control  to  Department              Quality Performance          concurrent    with  reorganizing  the  department.
9001050036 S91228
,PDR.,        ADOCK 05000244 PDC
 
      ~ I  f i'd%
  ) f e~
EJ g
El
 
Of those various implementing procedures, Research and Science procedures have been retitled as Materials Engineering and Inspection Services (MEIS) consistent with the realignment of MEIS from Research and Science and recognition that MEIS had the total responsibility for implementing the procedures.
Section  2 Or anization
~    Changed  or added to the listing of positions responsible for the principle elements of the QA Program.
Senior Vice President, Production and Engineering (changed from Vice President)
Department Manager, Quality Performance (renamed from Director Quality Assurance/Quality Control)
Changed who NSARB advises from Vice President to Senior Vice President Production and Engineering consistent with the title change of the descriptions for the new and revised titles are officer.'osition included or revised to reflect the appropriate changes. The more significant among these is:
The combining of those responsibilities previously assigned to the President and the Vice President, Production and Engineering into the responsibilities of the Senior Vice President Production and Engineering. Also the movement of Materials Engineering and Inspection Services from Research and Science to the newly formed Quality Performance Department along with Quality Assurance and Nuclear Assurance to consolidate similar responsibilities.
The responsibilities of the Engineering Division Quality Services Coordinator position is revised to reflect a transfer of coordination responsibilities for Materials Engineering and Inspection Services to the Quality Perfor-mance Department. This is part of the consolidation efforts initiated with the establishment of the new Quality Performance Department.
Changed on Figure 2-1, the title of Emergency Planner to Director, Corporate Radiation Protection. This new position will be directing the Corporate Nuclear Emergency Planner and the Corporate Health Physicist.
Changed on Figure'2-3, the title Administrative Services Manager to the Manager, Materials Procurement and Budget consistent with the expanding procurement control programs at Ginna.
Inserted on Figure 2-1, Senior Vice President, Gas &
Electric Distribution and Corporate Planning between the Vice President,. Electric Transmission and Distribution and President to correct an inadvertent previous omission.
Deleted from Figure 2-1, Division Superintendent below the Vice President Electric Transmission and Distribution as the position  was eliminated. Responsibilities for this position were assigned  to others within the organization.
 
OO 4~I 4'
 
Clarified    on Figure 2-1 those functions for which the Managers    of Quality Assurance and Nuclear Assurance are responsible. Added to the Quality Assurance block describing functional responsibilities the QA surveillance function to augment the audit function.
In Figure 2-2, changes to the Quality Performance organiza-tion included:
(1) Inclusion of Materials Engineering and Inspection Services (MEIS) Organization which was deleted from Figure 2-5. Placing MEIS in the same department as QA/QC is promoting improved relations with the line organizations immediately by association and over the long term as MEIS's excellent "customer service" orientation, permeates the whole department. There is also a natural, close functional association between QA/QC and MEIS in the areas of inspection, nondestruc-tive examination, materials testing and dependence on effective quality  programs for success.
(2)    The  Quality Control Foreman position has been re-established in the Nuclear Assurance organization.
(3)    The  Quality Performance Analyses and Program Support position has been established for creating analysis of quality performance and other support tasks associated with training coordination and maintenance of procedures.
Section  3  Desi n Control No Change    other than title changes from Quality Assurance/Quality Control and Quality Assurance to Quality Performance in the appropriate locations.
Section  4  Procurement Control
~    The of title of the organizations responsible for the review procurement documents to determine adequacy of the quality requirements is    changed from Quality Control and Quality Assurance to Quality Performance. This is to support consolidation of responsibilities in the new department.
Section  5  Instructions Procedures and. Drawin s
~    The  title of  the organizations responsible for reviewing and  concurring with procedures written to implement the Quality 'Assurance Program is changed from Quality Assurance to Quality Performance. This is to support consolidation of responsibilities in the new department.
 
  ~0 1
 
Section 6 Document Control
~    Approval of the Quality Materials Engineering and Inspection Services Procedures Manual changed from Director Research and Science to the Manager, Materials Engineering and Inspection Services. This is consistent with the reassign-ment of Materials Engineering and Inspection Services to the Quality Performance Department.
~    Approval of the Quality Assurance/Quality Control procedures elevated from the Manager, Quality Assurance to the Department Manager, Quality Performance. This is the approval level deemed appropriate  for these  procedures.
Section 7 Control of Purchased Material E
~    Allowance for multiple approved i ment and Services suppliers'ists. This is to support the  establishment  of a Commercial  Grade Dedica-tion program.
~    Title changed from Quality Assurance/Quality Control to Quality Performance consistent with establishment of the new department.
~    Research and Science changed to Materials Engineering and Inspection Services. This is consistent with the reassign-ment of Materials Engineering and Inspection Services to the Quality Performance Department.
Section 9 Control of S ecial Processes
~    Title of Quality Assurance/Quality Control changed to Quality Performance.
Section 10 Ins ection Control
~    Changed responsibility for establishing the Inservice Inspection Program from the Director, Research and Science to the Manager, Materials Engineering and Inspection Services. This is consistent with the reassignment of Materials Engineering and Inspection Services, which is historically responsible for implementing this respon-sibility, to the, Quality Performance Department.
~    Changed responsibility for establishing the Inservice Pump and Valve Testing Program from Quality Assurance to Engineering. This is a result of the need for a separation of line and verification responsibilities identified during the IST Program upgrade.
Section  16 Correction Action
~    Classified distribution of CAR summary reports changed from Senior Vice President, Production and Engineering and departmental supervision to departmental supervision only with Senior management notification of the more significant problems. The content of routine status reports in general, contains no information useful to Senior Management that they do not otherwise receive.


==DearMr.Johnson:==
          ~ l  OO 1/
Xnaccordance with50.54of10CFRPart50,enclosed.
  ,J P
isrevision15totheQualityAssurance ProgramforStationOperation.
        '4
TherevisioninvolvesminorchangesintheRG&EManagement, Engineering andGinnaStationorganizations.
~8
Therealignment oftheMaterials Engineering andInspection Services'roupfromtheResearchandSciencedepartment totheQualityAssurance/Quality Controldepartment organizations alsorecentlyoccurred.
~ +
Furtherdetailsoftheseandotherchangesandrelatedreasonsaredescribed inthefollowing paragraphs.
 
Summar.ofRevision15ChanesSection1ualitAssurance Proram~Overalldirection ofqualityassurance policyimplemen-tationchangedfromthePresident totheSeniorVicePresident, Production andEngineering asthisreestablished positionhasbeenfilledbyanindividual qualified.to assumetheseresponsibilities.
Section  18 Audits
~GrouptitleQualityAssurance/Quality ControlrenamedQualityPerformance.
~     Distribution of audit reports to the Senior Vice President, Production and Engineering removed as he receives them as NSARB Chairman and related participation in an audit overview committee.
~Titleofdepartment headchangedfromtheDirectorQualityAssurance/Quality ControltoDepartment ManagerQualityPerformance concurrent withreorganizing thedepartment.
~     Added requirements for controlling Quality consistent with the establishment, of the Assurance'urveillances new program.
9001050036 S91228,PDR.,ADOCK05000244PDC f~Ii'd%)fe~EJgEl Ofthosevariousimplementing procedures, ResearchandScienceprocedures havebeenretitledasMaterials Engineering andInspection Services(MEIS)consistent withtherealignment ofMEISfromResearchandScienceandrecognition thatMEIShadthetotalresponsibility forimplementing theprocedures.
Table  1 -1 Tables of De artmental'Im lementin    Procedures
Section2Oranization
~     Revised to reflect the changes described,   for the                  18 sections.
~Changedoraddedtothelistingofpositions responsible fortheprinciple elementsoftheQAProgram.SeniorVicePresident, Production andEngineering fromVicePresident)
Table 18-1 Audit List
(changedDepartment Manager,QualityPerformance (renamedfromDirectorQualityAssurance/Quality Control)ChangedwhoNSARBadvisesfromVicePresident toSeniorVicePresident Production andEngineering consistent withthetitlechangeoftheofficer.'osition descriptions forthenewandrevisedtitlesareincludedorrevisedtoreflecttheappropriate changes.Themoresignificant amongtheseis:Thecombining ofthoseresponsibilities previously assignedtothePresident andtheVicePresident, Production andEngineering intotheresponsibilities oftheSeniorVicePresident Production andEngineering.
~     List of activities audited at each department revised to reflect the changes described for the 18 sections.
AlsothemovementofMaterials Engineering andInspection ServicesfromResearchandSciencetothenewlyformedQualityPerformance Department alongwithQualityAssurance andNuclearAssurance toconsolidate similarresponsibilities.
Theresponsibilities oftheEngineering DivisionQualityServicesCoordinator positionisrevisedtoreflectatransferofcoordination responsibilities forMaterials Engineering andInspection ServicestotheQualityPerfor-manceDepartment.
Thisispartoftheconsolidation effortsinitiated withtheestablishment ofthenewQualityPerformance Department.
ChangedonFigure2-1,thetitleofEmergency PlannertoDirector, Corporate Radiation Protection.
Thisnewpositionwillbedirecting theCorporate NuclearEmergency PlannerandtheCorporate HealthPhysicist.
ChangedonFigure'2-3, thetitleAdministrative ServicesManagertotheManager,Materials Procurement andBudgetconsistent withtheexpanding procurement controlprogramsatGinna.InsertedonFigure2-1,SeniorVicePresident, Gas&ElectricDistribution andCorporate PlanningbetweentheVicePresident,.
ElectricTransmission andDistribution andPresident tocorrectaninadvertent previousomission.
DeletedfromFigure2-1,DivisionSuperintendent belowtheVicePresident ElectricTransmission andDistribution asthepositionwaseliminated.
Responsibilities forthispositionwereassignedtootherswithintheorganization.
OO4~I4' Clarified onFigure2-1thosefunctions forwhichtheManagersofQualityAssurance andNuclearAssurance areresponsible.
AddedtotheQualityAssurance blockdescribing functional responsibilities theQAsurveillance functiontoaugmenttheauditfunction.
InFigure2-2,changestotheQualityPerformance organiza-tionincluded:
(1)Inclusion ofMaterials Engineering andInspection Services(MEIS)Organization whichwasdeletedfromFigure2-5.PlacingMEISinthesamedepartment asQA/QCispromoting improvedrelations withthelineorganizations immediately byassociation andoverthelongtermasMEIS'sexcellent "customer service"orientation, permeates thewholedepartment.
Thereisalsoanatural,closefunctional association betweenQA/QCandMEISintheareasofinspection, nondestruc-tiveexamination, materials testinganddependence oneffective qualityprogramsforsuccess.(2)TheQualityControlForemanpositionhasbeenre-established intheNuclearAssurance organization.
(3)TheQualityPerformance AnalysesandProgramSupportpositionhasbeenestablished forcreatinganalysisofqualityperformance andothersupporttasksassociated withtrainingcoordination andmaintenance ofprocedures.
Section3DesinControlNoChangeotherthantitlechangesfromQualityAssurance/Quality ControlandQualityAssurance toQualityPerformance intheappropriate locations.
Section4Procurement Control~Thetitleoftheorganizations responsible forthereviewofprocurement documents todetermine adequacyofthequalityrequirements ischangedfromQualityControlandQualityAssurance toQualityPerformance.
Thisistosupportconsolidation ofresponsibilities inthenewdepartment.
Section5Instructions Procedures and.Drawins~Thetitleoftheorganizations responsible forreviewing andconcurring withprocedures writtentoimplement theQuality'Assurance ProgramischangedfromQualityAssurance toQualityPerformance.
Thisistosupportconsolidation ofresponsibilities inthenewdepartment.
~01 Section6DocumentControl~ApprovaloftheQualityMaterials Engineering andInspection ServicesProcedures ManualchangedfromDirectorResearchandSciencetotheManager,Materials Engineering andInspection Services.
Thisisconsistent withthereassign-mentofMaterials Engineering andInspection ServicestotheQualityPerformance Department.
~ApprovaloftheQualityAssurance/Quality Controlprocedures elevatedfromtheManager,QualityAssurance totheDepartment Manager,QualityPerformance.
Thisistheapprovalleveldeemedappropriate fortheseprocedures.
Section7ControlofPurchased MaterialEimentandServices~Allowance formultipleapprovedsuppliers'ists.
Thisistosupporttheestablishment ofaCommercial GradeDedica-tionprogram.~TitlechangedfromQualityAssurance/Quality ControltoQualityPerformance consistent withestablishment ofthenewdepartment.
~ResearchandSciencechangedtoMaterials Engineering andInspection Services.
Thisisconsistent withthereassign-mentofMaterials Engineering andInspection ServicestotheQualityPerformance Department.
Section9ControlofSecialProcesses
~TitleofQualityAssurance/Quality ControlchangedtoQualityPerformance.
Section10InsectionControl~Changedresponsibility forestablishing theInservice Inspection ProgramfromtheDirector, ResearchandSciencetotheManager,Materials Engineering andInspection Services.
Thisisconsistent withthereassignment ofMaterials Engineering andInspection
: Services, whichishistorically responsible forimplementing thisrespon-sibility, tothe,QualityPerformance Department.
~Changedresponsibility forestablishing theInservice PumpandValveTestingProgramfromQualityAssurance toEngineering.
Thisisaresultoftheneedforaseparation oflineandverification responsibilities identified duringtheISTProgramupgrade.Section16Correction Action~Classified distribution ofCARsummaryreportschangedfromSeniorVicePresident, Production andEngineering anddepartmental supervision todepartmental supervision onlywithSeniormanagement notification ofthemoresignificant problems.
Thecontentofroutinestatusreportsingeneral,containsnoinformation usefultoSeniorManagement thattheydonototherwise receive.
~lOO1/,J'P'4~8~+
Section18Audits~Distribution ofauditreportstotheSeniorVicePresident, Production andEngineering removedashereceivesthemasNSARBChairmanandrelatedparticipation inanauditoverviewcommittee.
~Addedrequirements forcontrolling QualityAssurance'urveillances consistent withtheestablishment, ofthenewprogram.Table1-1TablesofDeartmental'Im lementinProcedures
~Revisedtoreflectthechangesdescribed, forthe18sections.
Table18-1AuditList~Listofactivities auditedateachdepartment revisedtoreflectthechangesdescribed forthe18sections.
Miscellaneous
Miscellaneous
~Whereapplicable inthevarioussectionstheDirector, QualityAssurance/Quality ControltitlechangedtoDepartment Manager,QualityPerformance.
~     Where  applicable in the various sections the Director, Quality Assurance/Quality Control title changed to Department Manager, Quality Performance.
~Whereapplicable inthevarioussections, QualityAssurance orQualityControl,changedtoQualityPerformance.
~     Where applicable in the various sections, Quality Assurance or Quality Control, changed to Quality Performance. This is to support consolidation of responsibilities in the new department.
Thisistosupportconsolidation ofresponsibilities inthenewdepartment.
~     Typographical and editorial changes incorporated throughout the document where deemed appropriate.
~Typographical andeditorial changesincorporated throughout thedocumentwheredeemedappropriate.
All changes from previous revision 14 are identified with a vertical line in the left hand margin of each page. Each page will be identified as revision. 15 since the entire document was reprinted in lieu of only the revised pages.
Allchangesfrompreviousrevision14areidentified withaverticallineinthelefthandmarginofeachpage.Eachpagewillbeidentified asrevision.
Tables and figures which contain changes are identified by a vertical line in the left margin next to -their reference in the index, page  ii.
15sincetheentiredocumentwasreprinted inlieuofonlytherevisedpages.Tablesandfigureswhichcontainchangesareidentified byaverticallineintheleftmarginnextto-theirreference intheindex,pageii.Thesechangeswillnotreducetheeffectiveness oftheGinnaStationQualityAssurance Programnorreduceanyofourpreviouscommitments.
These changes will not reduce the effectiveness of the Ginna Station Quality Assurance Program nor reduce any of our previous commitments. This. is based on the following considerations:
This.isbasedonthefollowing considerations:
The changes which have the Quality Performance department report to the Senior Vice President, Electric Production is consistent with the reporting relationship utilized prior to 1989 and suggested guidelines of ANS 3.2 regarding having access to responsible corporate management at a level where action appropriate to the mitigation of safety related quality assurance concerns can be accomplished.
ThechangeswhichhavetheQualityPerformance department reporttotheSeniorVicePresident, ElectricProduction isconsistent withthereporting relationship utilizedpriorto1989andsuggested guidelines ofANS3.2regarding havingaccesstoresponsible corporate management atalevelwhereactionappropriate tothemitigation ofsafetyrelatedqualityassurance concernscanbeaccomplished.
Recognition that the Materials Engineering and Inspection Services (MEIS) group performs independent quality verifica-tion services for the line organizations through the NDE and materials testing functions performed. For those services
Recognition thattheMaterials Engineering andInspection Services(MEIS)groupperformsindependent qualityverifica-tionservicesforthelineorganizations throughtheNDEandmaterials testingfunctions performed.
 
Forthoseservices
  ~0 e
~0elIJ I~considered otherthanindependent qualityverification recognition thatMEISwillfunctionmuchthesameasinthepastwithregardtoindependence.
l I
fromQualityAssurance andQualityControlgroups.MEISwillbegovernedbytheirownprocedures andbesubjected toperiodicauditandsurveillance.
J
Recognition thattheotherchangesoftheQualityPerformance organization resultfromorganization enhance-mentsadoptedtosupportongoingperformance objectives.
 
~Recognition thattheotherchangesarelargelydescriptive oftitlechangesandchangesinterminology eachofwhichisconsidered tohavenoimpacton.previouscommitments.
considered other than independent quality    verification recognition that MEIS will function much the same as in the past with regard to independence. from Quality Assurance and Quality Control groups. MEIS will be governed by their own procedures and be subjected to periodic audit and surveillance.
Verytrulyyours,RobertC.MeedyGeneralManag,NlearProduction RCMNcemh069 Enclosures xc:C.Marschall,
I ~    Recognition that the other changes of the Quality Performance organization result from organization enhance-ments adopted to support ongoing performance objectives.
.SeniorResidentXnspector Region1
  ~   Recognition that the other changes are largely descriptive of title changes and changes in terminology each of which is considered to have no impact on. previous commitments.
~0~0ItI~}}
Very truly yours, Robert C. Me edy General Manag , N    lear Production RCMNcemh069 Enclosures xc:   C. Marschall, .Senior Resident Xnspector Region  1
 
~0 ~0    I~
t I}}

Latest revision as of 04:31, 4 February 2020

Forwards Rev 15 to QA Program for Station Operation. Rev Involves Changes in Mgt,Engineering & Organizations
ML17309A435
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/28/1989
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Andrea Johnson
Office of Nuclear Reactor Regulation
Shared Package
ML17261A905 List:
References
NUDOCS 9001050036
Download: ML17309A435 (14)


Text

TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9001050036 DOC.DATE: 89/12/28 NOTARXZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFXLIATION MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION Project Directorate I-3 gG'OHNSON,A.R.

R

SUBJECT:

Forwards Rev 15 to "QA Program for Station Operation." "

I DISTRIBUTION CODE: Q004D COPIES RECEIVED:LTR ENCL -SIZE:

TITLE: QA Topical Report, Amendment, or Correspondencel(Docket/U z, sty Speci I

NOTES:License Exp date in accordance with 10CFR2,2.109(9/'19/72). 05000244

/'

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-3 LA 1 1 JOHNSON,A 1 1 D,

XNTERNAL: XRM/DCB (AMDTS ) 1 1 NRR/DLPQ/LPEB10 2 2 NU A% RACT 1 1 OC/LFMB 1 1 D EG FIL 01 2 2 RGN1 FILE 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 R

S NOTE TO ALL "RIDS" RECIPIENT:

S PLEASE HELP US TO REDUCE WAS'! CORI'ACI'HE.DOCUMENT CONTROL DESK)

ROOM PI-37 (EXT. 3579) TO ELIMINATEYOUR NAME FROM DISHUBUTION LISIS FOR DOCUMENTS YOU DONT NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 12

0 I OO 1

g 'I ~ c,

~0

/)Zing AHP INIIIPIIPI IIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 0001 TELEPHONE AREA CODE Tle 546.2700 December 28, 1989 U.S. Nuclear Regulatory Commission Document Control Desk ATTN: Mr. Allen R. Johnson Project Directorate I-3 Washington, DC 20555

SUBJECT:

Submittal of Quality Assurance Program R. E. Ginna Nuclear Power Plant Docket Number 50-244

Dear Mr. Johnson:

Xn accordance with 50.54 of 10CFR Part 50, enclosed. is revision 15 to the Quality Assurance Program for Station Operation. The revision involves minor changes in the RG&E Management, Engineering and Ginna Station organizations. The realignment of the Materials Engineering and Inspection Services

'roup from the Research and Science department to the Quality Assurance/Quality Control department organizations also recently occurred. Further details of these and other changes and related reasons are described in the following paragraphs.

Summar .of Revision 15 Chan es Section 1 ualit Assurance Pro ram

~ Overall direction of quality assurance policy implemen-tation changed from the President to the Senior Vice President, Production and Engineering as this re established position has been filled by an individual qualified.to assume these responsibilities.

~ Group title Quality Assurance/Quality Control renamed Quality Performance.

~ Title of department head changed from theManager Director Quality Assurance/Quality Control to Department Quality Performance concurrent with reorganizing the department.

9001050036 S91228

,PDR., ADOCK 05000244 PDC

~ I f i'd%

) f e~

EJ g

El

Of those various implementing procedures, Research and Science procedures have been retitled as Materials Engineering and Inspection Services (MEIS) consistent with the realignment of MEIS from Research and Science and recognition that MEIS had the total responsibility for implementing the procedures.

Section 2 Or anization

~ Changed or added to the listing of positions responsible for the principle elements of the QA Program.

Senior Vice President, Production and Engineering (changed from Vice President)

Department Manager, Quality Performance (renamed from Director Quality Assurance/Quality Control)

Changed who NSARB advises from Vice President to Senior Vice President Production and Engineering consistent with the title change of the descriptions for the new and revised titles are officer.'osition included or revised to reflect the appropriate changes. The more significant among these is:

The combining of those responsibilities previously assigned to the President and the Vice President, Production and Engineering into the responsibilities of the Senior Vice President Production and Engineering. Also the movement of Materials Engineering and Inspection Services from Research and Science to the newly formed Quality Performance Department along with Quality Assurance and Nuclear Assurance to consolidate similar responsibilities.

The responsibilities of the Engineering Division Quality Services Coordinator position is revised to reflect a transfer of coordination responsibilities for Materials Engineering and Inspection Services to the Quality Perfor-mance Department. This is part of the consolidation efforts initiated with the establishment of the new Quality Performance Department.

Changed on Figure 2-1, the title of Emergency Planner to Director, Corporate Radiation Protection. This new position will be directing the Corporate Nuclear Emergency Planner and the Corporate Health Physicist.

Changed on Figure'2-3, the title Administrative Services Manager to the Manager, Materials Procurement and Budget consistent with the expanding procurement control programs at Ginna.

Inserted on Figure 2-1, Senior Vice President, Gas &

Electric Distribution and Corporate Planning between the Vice President,. Electric Transmission and Distribution and President to correct an inadvertent previous omission.

Deleted from Figure 2-1, Division Superintendent below the Vice President Electric Transmission and Distribution as the position was eliminated. Responsibilities for this position were assigned to others within the organization.

OO 4~I 4'

Clarified on Figure 2-1 those functions for which the Managers of Quality Assurance and Nuclear Assurance are responsible. Added to the Quality Assurance block describing functional responsibilities the QA surveillance function to augment the audit function.

In Figure 2-2, changes to the Quality Performance organiza-tion included:

(1) Inclusion of Materials Engineering and Inspection Services (MEIS) Organization which was deleted from Figure 2-5. Placing MEIS in the same department as QA/QC is promoting improved relations with the line organizations immediately by association and over the long term as MEIS's excellent "customer service" orientation, permeates the whole department. There is also a natural, close functional association between QA/QC and MEIS in the areas of inspection, nondestruc-tive examination, materials testing and dependence on effective quality programs for success.

(2) The Quality Control Foreman position has been re-established in the Nuclear Assurance organization.

(3) The Quality Performance Analyses and Program Support position has been established for creating analysis of quality performance and other support tasks associated with training coordination and maintenance of procedures.

Section 3 Desi n Control No Change other than title changes from Quality Assurance/Quality Control and Quality Assurance to Quality Performance in the appropriate locations.

Section 4 Procurement Control

~ The of title of the organizations responsible for the review procurement documents to determine adequacy of the quality requirements is changed from Quality Control and Quality Assurance to Quality Performance. This is to support consolidation of responsibilities in the new department.

Section 5 Instructions Procedures and. Drawin s

~ The title of the organizations responsible for reviewing and concurring with procedures written to implement the Quality 'Assurance Program is changed from Quality Assurance to Quality Performance. This is to support consolidation of responsibilities in the new department.

~0 1

Section 6 Document Control

~ Approval of the Quality Materials Engineering and Inspection Services Procedures Manual changed from Director Research and Science to the Manager, Materials Engineering and Inspection Services. This is consistent with the reassign-ment of Materials Engineering and Inspection Services to the Quality Performance Department.

~ Approval of the Quality Assurance/Quality Control procedures elevated from the Manager, Quality Assurance to the Department Manager, Quality Performance. This is the approval level deemed appropriate for these procedures.

Section 7 Control of Purchased Material E

~ Allowance for multiple approved i ment and Services suppliers'ists. This is to support the establishment of a Commercial Grade Dedica-tion program.

~ Title changed from Quality Assurance/Quality Control to Quality Performance consistent with establishment of the new department.

~ Research and Science changed to Materials Engineering and Inspection Services. This is consistent with the reassign-ment of Materials Engineering and Inspection Services to the Quality Performance Department.

Section 9 Control of S ecial Processes

~ Title of Quality Assurance/Quality Control changed to Quality Performance.

Section 10 Ins ection Control

~ Changed responsibility for establishing the Inservice Inspection Program from the Director, Research and Science to the Manager, Materials Engineering and Inspection Services. This is consistent with the reassignment of Materials Engineering and Inspection Services, which is historically responsible for implementing this respon-sibility, to the, Quality Performance Department.

~ Changed responsibility for establishing the Inservice Pump and Valve Testing Program from Quality Assurance to Engineering. This is a result of the need for a separation of line and verification responsibilities identified during the IST Program upgrade.

Section 16 Correction Action

~ Classified distribution of CAR summary reports changed from Senior Vice President, Production and Engineering and departmental supervision to departmental supervision only with Senior management notification of the more significant problems. The content of routine status reports in general, contains no information useful to Senior Management that they do not otherwise receive.

~ l OO 1/

,J P

'4

~8

~ +

Section 18 Audits

~ Distribution of audit reports to the Senior Vice President, Production and Engineering removed as he receives them as NSARB Chairman and related participation in an audit overview committee.

~ Added requirements for controlling Quality consistent with the establishment, of the Assurance'urveillances new program.

Table 1 -1 Tables of De artmental'Im lementin Procedures

~ Revised to reflect the changes described, for the 18 sections.

Table 18-1 Audit List

~ List of activities audited at each department revised to reflect the changes described for the 18 sections.

Miscellaneous

~ Where applicable in the various sections the Director, Quality Assurance/Quality Control title changed to Department Manager, Quality Performance.

~ Where applicable in the various sections, Quality Assurance or Quality Control, changed to Quality Performance. This is to support consolidation of responsibilities in the new department.

~ Typographical and editorial changes incorporated throughout the document where deemed appropriate.

All changes from previous revision 14 are identified with a vertical line in the left hand margin of each page. Each page will be identified as revision. 15 since the entire document was reprinted in lieu of only the revised pages.

Tables and figures which contain changes are identified by a vertical line in the left margin next to -their reference in the index, page ii.

These changes will not reduce the effectiveness of the Ginna Station Quality Assurance Program nor reduce any of our previous commitments. This. is based on the following considerations:

The changes which have the Quality Performance department report to the Senior Vice President, Electric Production is consistent with the reporting relationship utilized prior to 1989 and suggested guidelines of ANS 3.2 regarding having access to responsible corporate management at a level where action appropriate to the mitigation of safety related quality assurance concerns can be accomplished.

Recognition that the Materials Engineering and Inspection Services (MEIS) group performs independent quality verifica-tion services for the line organizations through the NDE and materials testing functions performed. For those services

~0 e

l I

J

considered other than independent quality verification recognition that MEIS will function much the same as in the past with regard to independence. from Quality Assurance and Quality Control groups. MEIS will be governed by their own procedures and be subjected to periodic audit and surveillance.

I ~ Recognition that the other changes of the Quality Performance organization result from organization enhance-ments adopted to support ongoing performance objectives.

~ Recognition that the other changes are largely descriptive of title changes and changes in terminology each of which is considered to have no impact on. previous commitments.

Very truly yours, Robert C. Me edy General Manag , N lear Production RCMNcemh069 Enclosures xc: C. Marschall, .Senior Resident Xnspector Region 1

~0 ~0 I~

t I