Line 3: Line 3:
| issue date = 12/31/1997
| issue date = 12/31/1997
| title = Monthly Operating Repts for Dec 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3
| title = Monthly Operating Repts for Dec 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3
| author name = FULTON J D
| author name = Fulton J
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| author affiliation = ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
{{#Wiki_filter:NRC MONTHLYOPERATING DATA REPORT DOCKET NO.:             I 50-528 UNIT NAME:                 PVNGS-1 DATE:                      1/14/98 COMPLETED BY:              J. D. Fulton TELEPHONE:                  602 250-3549 Reporting Period:             December 1997
50-528 I PVNGS-1 1/14/98 J.D.Fulton 602 250-3549 Reporting Period: December 1997 1.Design Electrical Rating (Net MWe): 1265 2.Maximum Dependable Capacity (Net MWe): 1243 Unit 1 Generatin Statistics 3.Hours Reactor was Critical 4.Hours Generator was On-Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Ener Generated MWh UNIT SHUTDOWNS This Month 744.0 744.0 0.0 934,524 Yr.,to Date 8,671.1 8,658.6 0.0 10,737,706 Cumulative 73,996.3 72,811.1 0.0 86,203,268 Outage Duration No.Date Type~Hours Reason~Method of Shutting Down Reactor3 Cause and Corrective Action to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.F-Forced S-Scheduled
: 1. Design Electrical Rating (Net MWe):         1265
: 2. Maximum Dependable Capacity (Net MWe):               1243 Unit 1 Generatin       Statistics                   This Month          Yr.,to Date        Cumulative
: 3. Hours Reactor was Critical                                               744.0              8,671.1          73,996.3
: 4. Hours Generator was On-Line                                               744.0              8,658.6          72,811.1
: 5. Unit Reserve Shutdown Hours                                                 0.0                  0.0                0.0
: 6. Net Electrical Ener       Generated   MWh                             934,524           10,737,706         86,203,268 UNIT SHUTDOWNS Outage                     Method of Duration                 Shutting Down              Cause and Corrective Action No.         Date         Type~       Hours       Reason~       Reactor3                   to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.
F-Forced         2Reason:                                            3Method:
S-Scheduled         A-Equipment Failure (Explain)                        1-Manual B-Maintenance or Test                              2-Manual Trip / Scram C-Refueling                                          3-Automatic Trip / Scram D-Regulatory Restriction                            4-Continuation E-Operator Training / License Examination          5-Other-(Explain)
F-Administrative 6-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
: 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative 6-Operational Error (Explain)H-Other (Explain)3Method: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain) 980i220042 980ii4 PDR AOQCK 05000528 R PDR e NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
980i220042 980ii4 PDR     AOQCK     05000528 R                         PDR
50-529 I PVNGS-2 1/1 4/98 J.D.Fulton 602 250-3549 Reporting Period: December 1997 1.Design Electrical Rating (Net MWe): 1265 2.Maximum Dependable Capacity(NetMWe):
 
1243 Unit 2 Generatin Statistics 3.Hours Reactor was Critical 4.Hours Generator was On-Line 5.Unit Reserve Shutdown Hours 6.Net Electrical Ener Generated MWh UNIT SHUTDOWNS This Month 744.0 744.0 0.0 948,014 Yr.to Date 7,692.0 7,661.9 0.0 9,322,667 Cumulative 73,425.7 72,232.8 0.0 86,429,559 Outage Method of Duration Shutting Down No.Date Type~Hours Reasons Reactor3 No reactor shutdowns occurred during the month of December 1997.Cause and Corrective Action to Prevent Occurrence F-Forced S-Scheduled
e NRC MONTHLYOPERATING DATA REPORT DOCKET NO.:             50-529 I
UNIT NAME:              PVNGS-2 DATE:                    1/1 4/98 COMPLETED BY:            J. D. Fulton TELEPHONE:                602 250-3549 Reporting Period:           December 1997
: 1. Design Electrical Rating (Net MWe):       1265
: 2. Maximum Dependable Capacity(NetMWe):               1243 Unit 2 Generatin     Statistics                   This Month          Yr. to Date        Cumulative
: 3. Hours Reactor was Critical                                             744.0              7,692.0          73,425.7
: 4. Hours Generator was On-Line                                             744.0              7,661.9          72,232.8
: 5. Unit Reserve Shutdown Hours                                               0.0                  0.0                0.0
: 6. Net Electrical Ener       Generated   MWh                           948,014           9,322,667         86,429,559 UNIT SHUTDOWNS Outage                     Method of Duration                 Shutting Down             Cause and Corrective Action No.       Date         Type~       Hours       Reasons       Reactor3                   to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.
F-Forced         2Reason:                                          sMethod:
S-Scheduled         A-Equipment Failure (Explain)                      1-Manual B-Maintenance or Test                              2-Manual Trip / Scram C-Refueling                                        3-Automatic Trip / Scram D-Regulatory Restriction                          4-Continuation E-Operator Training /License Examination          5-Other-(Explain)
F-Administrative G-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
: 2Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)sMethod: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain) t t NRC MONTHLY OPERATING DATA REPORT DOCKET NO.: UNIT NAME: DATE: COMPLETED BY: TELEPHONE:
t NRC MONTHLYOPERATING DATA REPORT t
50-530 PVNGS-3 1/14/98 J.D.Fulton 602 250-3549 Reporting Period: December 1997 1.Design Electrical Rating (Net MWe): 1269 2.Maximum Dependable Capacity(Net MWe): 1247 Unit 3 Generatin Statistics Hours Reactor was Critical Hours Generator was On-Line Unit Reserve Shutdown Hours Net Electrical Ener Generated MWh UNIT SHUTDOWNS This Month 744.0 744.0 0.0 933,789 Yr.to Date 7,868.9 7,822.1 0.0 9,453,826 Cumulative 69,325.7 68,499.6 0.0 82,752,971 Outage Method of Duration Shutting Down No.Date Types'ours Reason~Reactors No reactor shutdowns occurred during the month of December 1997.Cause and Corrective Action to Prevent Occurrence F-Forced S-Scheduled
DOCKET NO.:             50-530 UNIT NAME:             PVNGS-3 DATE:                  1/14/98 COMPLETED BY:          J. D. Fulton TELEPHONE:              602 250-3549 Reporting Period:         December 1997
: 1. Design Electrical Rating (Net MWe):         1269
: 2. Maximum Dependable Capacity(Net MWe):             1247 Unit 3 Generatin     Statistics                   This Month          Yr. to Date        Cumulative Hours Reactor was Critical                                               744.0              7,868.9            69,325.7 Hours Generator was On-Line                                             744.0              7,822.1            68,499.6 Unit Reserve Shutdown Hours                                                 0.0                 0.0                 0.0 Net Electrical Ener    Generated    MWh                              933,789           9,453,826         82,752,971 UNIT SHUTDOWNS Outage                     Method of Duration                 Shutting Down               Cause and Corrective Action No.       Date       Types'ours               Reason~       Reactors                     to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.
F-Forced         ~Reason:                                          s Method:
S-Scheduled         A-Equipment Failure (Explain)                      1-Manual B-Maintenance or Test                              2-Manual Trip / Scram C-Refueling                                        3-Automatic Trip / Scram D-Regulatory Restriction                            4-Continuation E-Operator Training / License Examination          5-Other-(Explain)
F-Administrative 6-Operational Error (Explain)
H-Other (Explain)


==SUMMARY==
==SUMMARY==
:~Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training/License Examination F-Administrative 6-Operational Error (Explain)H-Other (Explain)s Method: 1-Manual 2-Manual Trip/Scram 3-Automatic Trip/Scram 4-Continuation 5-Other-(Explain) }}
                                                              }}

Revision as of 02:28, 4 February 2020

Monthly Operating Repts for Dec 1997 for Palo Verde Nuclear Generating Station,Units 1,2 & 3
ML17313A181
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/31/1997
From: Fulton J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17313A180 List:
References
NUDOCS 9801220042
Download: ML17313A181 (3)


Text

NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: I 50-528 UNIT NAME: PVNGS-1 DATE: 1/14/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: December 1997

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity (Net MWe): 1243 Unit 1 Generatin Statistics This Month Yr.,to Date Cumulative
3. Hours Reactor was Critical 744.0 8,671.1 73,996.3
4. Hours Generator was On-Line 744.0 8,658.6 72,811.1
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Ener Generated MWh 934,524 10,737,706 86,203,268 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type~ Hours Reason~ Reactor3 to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.

F-Forced 2Reason: 3Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative 6-Operational Error (Explain)

H-Other (Explain)

SUMMARY

980i220042 980ii4 PDR AOQCK 05000528 R PDR

e NRC MONTHLYOPERATING DATA REPORT DOCKET NO.: 50-529 I

UNIT NAME: PVNGS-2 DATE: 1/1 4/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: December 1997

1. Design Electrical Rating (Net MWe): 1265
2. Maximum Dependable Capacity(NetMWe): 1243 Unit 2 Generatin Statistics This Month Yr. to Date Cumulative
3. Hours Reactor was Critical 744.0 7,692.0 73,425.7
4. Hours Generator was On-Line 744.0 7,661.9 72,232.8
5. Unit Reserve Shutdown Hours 0.0 0.0 0.0
6. Net Electrical Ener Generated MWh 948,014 9,322,667 86,429,559 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Type~ Hours Reasons Reactor3 to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.

F-Forced 2Reason: sMethod:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training /License Examination 5-Other-(Explain)

F-Administrative G-Operational Error (Explain)

H-Other (Explain)

SUMMARY

t NRC MONTHLYOPERATING DATA REPORT t

DOCKET NO.: 50-530 UNIT NAME: PVNGS-3 DATE: 1/14/98 COMPLETED BY: J. D. Fulton TELEPHONE: 602 250-3549 Reporting Period: December 1997

1. Design Electrical Rating (Net MWe): 1269
2. Maximum Dependable Capacity(Net MWe): 1247 Unit 3 Generatin Statistics This Month Yr. to Date Cumulative Hours Reactor was Critical 744.0 7,868.9 69,325.7 Hours Generator was On-Line 744.0 7,822.1 68,499.6 Unit Reserve Shutdown Hours 0.0 0.0 0.0 Net Electrical Ener Generated MWh 933,789 9,453,826 82,752,971 UNIT SHUTDOWNS Outage Method of Duration Shutting Down Cause and Corrective Action No. Date Types'ours Reason~ Reactors to Prevent Occurrence No reactor shutdowns occurred during the month of December 1997.

F-Forced ~Reason: s Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Trip / Scram C-Refueling 3-Automatic Trip / Scram D-Regulatory Restriction 4-Continuation E-Operator Training / License Examination 5-Other-(Explain)

F-Administrative 6-Operational Error (Explain)

H-Other (Explain)

SUMMARY