ML17313A179
| ML17313A179 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/14/1998 |
| From: | Overbeck G ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17313A180 | List: |
| References | |
| 035-00494-GRO-J, 35-494-GRO-J, NUDOCS 9801220031 | |
| Download: ML17313A179 (3) | |
Text
CATEGORY 1y REGULA'x RY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9801220031 DOC.DATE: 98/01/14 NOTARIZED: NO DOCKET FACIL:STN-50-528 Palo Verde Nuclear Station, Unit 1, Arizona Publi 05000528 STÃ-50~529 Palo Verde Nuclear Station, Unit 2, Arizona Publi 05000529 STN-50-530 Palo Verde Nuclear Station, Unit 3, Arizona Publi 05000530 AUTH.NAME AUTHOR AFFILIATION OVERBECK,G.R.
Arizona Public Service Co.
(formerly Arizona Nuclear Power RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards MOR for Dec 1997 for PVNGS,Units 1,2
& 3 8 revised MOR for Nov 1997 for PVNGS,Unit 3.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES: STANDARDIZED PLANT Standardized plant.
Standardized plant.
RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1
RECIPIENT'D CODE/NAME CLIFFORD,J COPIES LTTR ENCL 1
1 E
05000528 05000529@
05000530 0
R INTERNAL: ACRS RGN4 ER~O 1
1 1
1 1
1 AEOD/SPD/RRAB OC/DBA/PAD 1
1 1
1 EXTERNAL: LITCO BRYCE, J H
NRC PDR 1
1 1
1 NOAC 1
1
. D 0
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US'TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 10 ENCL 10
~ 'jf
'p4
Commirmonr. ImmrotlmL&ergy.
Palo Verde Nuclear Generating Station Greg g R. Overbeck Vice President Nuclear Production TEL 6029934148 FAX 602/39:~77 Mail Station 7602 P.O. Box 52034 Phoenix, AZ85072-2034 035-00494-6 RO/JDF January 14, 1998 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for DECEMBER 1997 Enclosed are the Monthly Operating Reports for December
- 1997, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
Also enclosed is one revised page to the November 1997 report.
The revision is to page 3. This correction is to Unit Shutdowns, although the reactor was not tripped, the main turbine was off line for 8.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to balance a coupling in bearing ¹6.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.
If you have any questions, please contact Judy Fulton at (602) 250-3549.
Sincerely, cc:
E. W. Merschoff K. E. Perkins INPO Records Center UtilityData Institute 9801220031 980ii4 PDR ADQCK 05000528 R
PDR (all w/enclosures)
<>1111II, ti/t>III/5 6RO/JDF/clj
Enclosures:
DECEMBER 1997 Monthly Operating Reports gqt