ML17312A805
| ML17312A805 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 05/31/1996 |
| From: | Fulton J, James M. Levine ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| 182-06143-JML-J, 182-6143-JML-J, NUDOCS 9606120158 | |
| Download: ML17312A805 (33) | |
Text
CATEGORY 1 REGULATOR NFORMATION DISTRIBUTION
'TEM (RIDS) i Cb Oi ACCESSION NBR:960 FACIL:STN-50-528 STN-50-529 STN-50-530 AUTH.NAME FULTON,J.D.
LEVINE,J.M.
RECIP.NAME DOCKET 05000528 05000529 05000530 6120158 DOC.DATE: 96/05/31 NOTARIZED: NO Palo Verde Nuclear Station, Unit 1, Arizona Publi Palo Verde Nuclear Station, Unit 2, Arizona Publi Palo Verde Nuclear Station, Unit 3, Arizona Publi AUTHOR AFFILIATION Arizona Public Service Co. (formerly Arizona Nuclear Power Arizona Public Service Co. (formerly Arizona Nuclear Power RECIPIENT AFFILIATION
SUBJECT:
Monthly operating repts for May 6 for P
o Verde Nuclear Generating Station Units 1,2
.W/9606 7 tr.
DISTRIBUTION CODE:
IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:STANDARDIZED PLANT Standardized, plant.
. Standardized plant.
05000528 05000529 05000530 RECIPIENT ID CODE/NAME PD4-2 PD CLIFFORD,J.
COPIES'ECIPIENT LTTR ENCL ID CODE/NAME 1
1 CLIFFORDgJ 1
1 COPIES LTTR ENCL 1
1 INTERNAL: A ILE CEN EXTERNAL: LITCO BRYCE,J H
NRC PDR 1
1 1
1 1
1 1
1 1
1 AEOD/SPD/RRAB NRR/DRPM/PECB NOAC 1
1 1
1 1
1 D
0 C
~
U E
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE!
CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D 5(EXT 415 2083)
TO ELIMINATE YOUR NAME FROM i DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL 11
Arizona Public Service Company PALO VEROE NUCLEAR GENERATING STATION P.O. BOX 52034
~
PHOENIX, ARIZONA85072-2034 JAMES M. LEVINE VICE PRESIDENT NUCLEAR PRODUCTION 182-06143-JML/J LT/JDF June 7, 1996 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555
Dear Sirs:
Subject:
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Monthly Operating Reports for MAY1996 Enclosed are the Monthly Operating Reports for MAY 1996, prepared and submitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the PVNGS Units 1, 2, and 3 Operating Licenses.
By copy of this letter, Arizona Public Service Company is also forwarding the Monthly Operating Reports to the Regional Administrator, NRC Region IV.
Ifyou have any questions, please contact Judy Fulton at (602) 393-5277.
Sincerely, JML/JLT/JDF/clj
Enclosures:
MAY1996 Monthly Operating Reports (all w/enclosures) cc:
L. J. Callan K. E. Perkins NRC Senior Resident Inspector INPO Records Center UtilityData Institute 9bObi20i58 qb053ii Ii, PDR ADQCK 05000528 R
P DR/
~
~
\\
~
~
I
'I li
AVERAGE DAILYUNITPOWER LEVEL DOCKET NO.
UNIT NAME
/VVII~
DATE QLELK COMPLETED BY ~l~gga MONTH: May 1996 DAY AVERAGE DAILYPOWER LEVEL II DAY AVERAGE DAILYPOWER LEVEL 128 17 1233 1094 18 1233 1230 19 1232 1229 20 1235 1231 21'235 6
1231 22 1234 1231 23 1237 1230 24 1238 1230 25 1240 10'233 26 1240 1233 27 1238 12 1234 28 1237 13 1233 29 1238 14 1231 30 1238 15 1231 1237 16 1232
II
'I
REFUELING INFORMATION DOCKET NO.
~gQ UNIT NAME MblGM DATE QLQK COMPLETED BY JJ3 ~Qn Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled to begin on 09/21/96.
Scheduled date for restart following refueling.
11/04/96.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Scheduled date for submitting proposed licensing action and supporting information.
5/20/96 Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis
- methods, significant changes in fuel design, and new operating procedures.
None.
The number of fuel assemblies.
1 b) In the spent fuel storage pool.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity.
~0I'rojected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
V C
qf Et
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
UNIT NAME LVbK~
DATE EZLK COMPLETED BY ~~~Ijfarl 05/01 0000 05/01 0352 05/01 1022 05/02 1238 05/31 2359 Unit began the month with in Mode 2, RX critical starting up from RCP outage.
Entered Mode 1.
Synchronized Main Generator to Grid.
RX at 100% power.
Unit ended the month in Mode 1 at 100% power.
c
\\
~
~
SHUTDOWNS AND POWER REDUCTIONS May 1996 DOCKET NO UNIT NAME DATE COMPLETED BY TELEPHONE g0-528
~PVN S-
~6/7/
J D~Fig~
602 3 No.
Date Outage Method of Duration Shutting Down Type" Hours Reason2 Reactor3 LER No.
System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence 96-02 04/16/96 S
367.0 N/A N/A
. N/A Manually tripped RX to perform repairs to Reactor Coolant Pump ~
2B. Unit returned to 100%
power on 5/2/96.
F-Forced S-Scheduled 2Reason:
A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain) 3Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F - Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source
J t
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
SLIER UNIT NAME LVHGR2 DATE GlZlK COMPLETED BY J D~Fig~
MONTH: May 1996 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL 17 1246 18 1242 19 1245 95 20 1247 281 21 1248 759 22 1243 983 23 1247 519 24 1259 1105 25 1271 10 1246 26 1276 1252 27 1273 12 1253 28 1273 13 1250 29 1274 14 1246 30 1275 15 1245 31 1274 16 1246
I
REFUELING INFORMATION DOCKET NO.
~39 UNIT NAME DATE EZLK COMPLETED BY ~~El Scheduled date for next refueling shutdown.
The 7th refueling outage is scheduled for 09/20/97.
Scheduled date for restart following refueling.
11/07/97.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Scheduled date for submitting proposed licensing action and supporting information.
N/A Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis
- methods, significant changes in fuel design, and new operating procedures.
N/A The number of fuel assemblies.
e)
In the core.~
b) In the spent fuel storage pool. ~g~
Licensed spent fuel storage capacity. ~29 Intended change in spent fuel storage capacity. ~~
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present
'capacity.
2005 (18 Month reloads and full core discharge capability).
U I J
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
UNIT NAME
/VVII~
DATE ERICK COMPLETED BY JJ3 ~~
ICRUHMK2 05/24 1600 05/01 0000 05/03 0449 05/03 0518 05/04 0156 05/04 0627 05/06 0900 05/07 0600 05/07 1645 05/07 2058 05/08 0034 05/08 0930 05/08 2154 05/09 1630 Unit began the month in Mode 3.
Entered Mode 2.
RX critical.
Entered Mode 1.
Synchronized Main Generator to Grid.
Reached 70% plateau for start up testing.
Commenced RX power increase to 90%.
RX power at 90%.
Commenced RX power increase to 100%.
RX power at 96.5%; commence decrease to 40% due to CW leak.
RX power at 45%.
Commence RX power increase.
RX power at 100%.
Unit power increased to new 100% power level (3876 MWt).
05/31 2359 Unit ended the month in Mode 1 at 100% RX power.
SHUTDOWNS AND POWER REDUCTIONS May 1996 DOCKET NO
~29 UNIT NAME
~Vi~
DATE
~I COMPLETED BY
~D Date Outage Method of Duration Shutting Down Type" Hours Reason Reactor3 LER No.
System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence 96-02 03/16/96 S
1182.4 N/A N/A N/A RX manually tripped to begin the ~
sixth refueling outage.
Unit returned to 100% power on 5/9/96.
1F-Forced S-Scheduled 2R A-Equipment Failure(Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8 License Examination F-Administrative G-Operational Error H-Other (Explain) 3Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F - Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source IP lg l
'I
U R
lt
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
%=539 UNIT NAME ElHGR2 DATE QllLK COMPLETED BY JJ2~fQQ MONTH: May 1996 DAY AVERAGE DAILYPOWER LEVEL
/
DAY AVERAGE DAILYPOWER LEVEL 1238 17 1237 1239 18 1237 1239 19 1237 1240 20 1239 1242 21 1231 1243 22 1230 1243 23 1241 1242 24 1244 1241 25 1249 10 1244 26 1258 1242 27 1258 12 1238 28 1259 13 1239 29 1258 14 1240 30 1265 15 1236 31 1265 16 1237
e P
I
REFUELING INFORMATION DOCKET NO.
~39 UNIT NAME MbK&2 DATE 5IZlK COMPLETED BY JJ2~tQll Scheduled date for next refueling shutdown.
The 6th refueling outage is scheduled for 2/22/97 Scheduled date for restart following refueling.
4/13/97.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
None.
Scheduled date for submitting proposed licensing action and supporting information.
None.
Important Licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or performance analysis
- methods, significant changes in fuel design, and new operating procedures.
None.
The number of fuel assemblies.
b) In the spent fuel storage pool.
Licensed spent fuel storage capacity.
Intended change in spent fuel storage capacity.
Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
2005 (18 Month reloads and full core discharge capability).
A 1
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.
UNIT NAME DATE.
COMPLETED BY TELEPHONE sMQ MKiR2 EZLK JJ2.~an h1axiR95 h
05/01 0000 Unit began the month in Mode 1 at 100% RX power 05/25 1526 Unit power increased to new 100% power level (3876 MWt).
N 05/30 2359 Unit ended the month in Mode 1 at 100% RX power.
fL
SHUTDOWNS AND POWER REDUCTIONS May 1996 DOCKET NO
~QQ UNITNAME
/VV(~
DATE
~6 COMPLETED BY
~JD Qgg E2lRMRII No.
Date Outage Method of Duration Shutting Down Type" Hours Reason2 Reactoi3 LER No.
System Component Cause and Corrective Action Code4 Code5 to Prevent Occurrence No reactor shutdowns or significant power reductions occurred during the month of May 1996.
1F-Forced S-Scheduled 2 Reason.
A-Equipment Failure(Explain) 8-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error H-Other (Explain) 3Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction of 20% or Greater in the Past 24 Hours 9-Other-(Explain) 4Exhibit F - Instructions for Preparation of the Data Entry Sheets for Licensee Event Report (LER) File (NUREG 0161)
Exhibit H-Same Source gO f
V lt