| title = Indian Point Energy Center Emergency Plan Procedure IPEC-EP 17-01, Revision 20
| title = Emergency Plan Procedure IPEC-EP 17-01, Revision 20
| author name =  
| author name =  
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:---Entergy Indian Point Energy Center Document Control 450 Broadway  
{{#Wiki_filter:--- Entergy Indian Point Energy Center                             CONTROLLED DOCUMENT Document Control                                                   TRANSMITTAL 450 Broadway Buchanan, NY 10511 TO:     DISTRIBUTION                                                     DATE: November 14, 2017 FROM: IPEC DOCUMENT CONTROL -           3RD FLOOR ADMIN BLDG             PHONE#: 914-254-6835 TRANSMITTAL#:     EP-17-0026 The Document(s) identified below are forwarded for use. Please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, voided, or inactive document(s).
: Buchanan, NY 10511 TO: DISTRIBUTION CONTROLLED DOCUMENT TRANSMITTAL FROM: IPEC DOCUMENT CONTROL -3RD FLOOR ADMIN BLDG DATE: November 14, 2017 PHONE#: 914-254-6835 TRANSMITTAL#:
Sign and return the receipt acknowledgement below within ten (10) working days.
EP-17-0026 The Document(s) identified below are forwarded for use. Please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, voided, or inactive document(s).
AFFECTED DOCUMENT:           IPEC EMERGENCY PLAN PROCEDURE DOC#         REV#                         TITLE                                       INSTRUCTIONS PLEASE INCORPORATE INTO YOUR BOOKS THE FOLLOWING UPDATED PROCEDURES OR DRAWINGS:
Sign and return the receipt acknowledgement below within ten (10) working days. AFFECTED DOCUMENT:
I, NOV 15 2017.
IPEC EMERGENCY PLAN PROCEDURE DOC# REV# TITLE INSTRUCTIONS PLEASE INCORPORATE INTO YOUR BOOKS THE FOLLOWING UPDATED PROCEDURES OR DRAWINGS:
IPEC-EP 17-01 REVm20 RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S)
I, IPEC-EP 17-01 REVm20 NOV 15 2017. RECEIPT OF THE ABOVE LISTED DOCUMENT(S)
(IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S).                                                             \::x>
IS HEREBY ACKNOWLEDGED.
NAME (PRINT)             SIGNATURE                 DATE                     COPY LOCATION
I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S)
 
IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE)
ATIACHMENT 9.2                                                                             10 CFR 50.54(0)(3) SCREENING SHEET1 OF5
AS SHOWN ON THE DOCUMENT(S).  
* Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)
\::x> NAME (PRINT) SIGNATURE DATE COPY LOCATION
 
* *
==Title:==
* ATIACHMENT 9.2 10 CFR 50.54(0)(3)
Indian Point Energy Center Emergency Plan I Revision:    17-01 (MERLIN Revision 20)
SCREENING SHEET1 OF5 Procedure/Document Number: IPEC-EP I Revision:
Part I. Description of Activity Being Reviewed (This is generally changes to the emergency plan. EALs, EAL bases, etc. - refer to step 3.0[6]):
17-01 (MERLIN Revision
The activity being reviewed is a revision to IPEC Emergency Plan. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01.
: 20) Equipment/Facility/Other:
Part II. Activity Previously Reviewed?                                                       DYES            !8J NO Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or                 50.54(q)(3)      Continue to Evaluation is    next part Alert and Notification System Design Report?                                                 NOT required.
Indian Point Energy Center (IPEC) Title: Indian Point Energy Center Emergency Plan Part I. Description of Activity Being Reviewed (This is generally changes to the emergency plan. EALs, EAL bases, etc. -refer to step 3.0[6]):
Enter If YES, identify bounding source document number/approval reference and                     justification ensure the basis for concluding the source document fully bounds the                         below and complete Part proposed change is documented below:                                                         VI.
The activity being reviewed is a revision to IPEC Emergency Plan. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision.
Justification:
In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01. Part II. Activity Previously Reviewed?
Is this activity fully bounded by an NRC approved 1 O CFR 50.90 submittal or Alert and Notification System Design Report? If YES, identify bounding source document number/approval reference and ensure the basis for concluding the source document fully bounds the proposed change is documented below: Justification:
D Bounding document attached (optional)
D Bounding document attached (optional)
Part Ill. Applicability of Other Regulatory Change Control Processes DYES !8J NO 50.54(q)(3)
Part Ill. Applicability of Other Regulatory Change Control Processes Check if any other regulatory change processes control the proposed activity.(Refer to EN-Ll-100)
Continue to Evaluation is next part NOT required.
* APPLICABILITY CONCLUSION
Enter justification below and complete Part VI. Check if any other regulatory change processes control the proposed activity.(Refer to EN-Ll-100)
    !8l If there are no other controlling change processes, continue the 50.54(q)(3) Screening.
APPLICABILITY CONCLUSION  
D One or more controlling change processes are selected, however, some portion of the activity involves the emergency plan or affects the implementation of the emergency plan; continue the 50.54(q)(3) Screening for that portion of the activity. Identify the applicable controlling change processes below.
!8l If there are no other controlling change processes, continue the 50.54(q)(3)
D One or more controlling change processes are selected and fully bounds all aspects of the activity. 50.54(q)(3)
Screening.
Evaluation is NOT reouired. Identify controllinA chan11e processes below and complete Part VI.
D One or more controlling change processes are selected,  
CONTROLLING CHANGE PROCESSES 10 CFR 50.54(q) Only Part IV. Editorial Change                                                                   DYES            [gi NO 50.54(q)(3)      Co111inue 10 nexl Is this activity an editorial or typographical change such as formatting, paragraph         Evalualion is    part numbering, spelling, or punctuation that does not change intent?                             NOT required.
: however, some portion of the activity involves the emergency plan or affects the implementation of the emergency plan; continue the 50.54(q)(3)
En1cr Justification:                                                                             juslificalion and 1,2,3,4,5,6, 7,8,9,10,11,12,13,14,15,16, 17,19,20,21,22,23,25,26,27,28,                     conlinue 10 nexl 29,30,31,32,33,34,35,36,37,38,39,41,42,44,45,47,48;49,51,52,53, 54,55,                     part or 56, 57,58, 59,60,61,62,63,64, 66,67, 68,69, 70,71, 72, 74, 75, 76, 77, 78,80,81,           complelc Part 82,83,84,85,86,88,89,90,92,93,97,98,99,100,101,102, 103,104,106,107,                       VI as applicable.
Screening for that portion of the activity.
108, 109, 110, 111, 112, 113, 114, 116, 117, 122 per the attached revision matrix are considered editorial changes per EN-AD-101.
Identify the applicable controlling change processes below. D One or more controlling change processes are selected and fully bounds all aspects of the activity.
    "NO" is checked because the procedure revision contains non-editorial changes per the attached revision matrix.
50.54(q)(3)
EN-EP-305 REV 5
Evaluation is NOT reouired.
 
Identify controllinA chan11e processes below and complete Part VI. CONTROLLING CHANGE PROCESSES 10 CFR 50.54(q)
ATIACHMENT 9.2                                                                                 10 CFR 50.54(Q)(3) SCREENING*
Only Part IV. Editorial Change Is this activity an editorial or typographical change such as formatting, paragraph numbering,  
: spelling, or punctuation that does not change intent? Justification:
1,2,3,4,5,6, 7,8,9,10,11,12,13,14,15,16, 17,19,20,21,22,23,25,26,27,28, 29,30,31,32,33,34,35,36,37,38,39,41,42,44,45,47,48;49,51,52,53, 54,55, 56, 57,58, 59,60,61,62,63,64, 66,67, 68,69, 70,71, 72, 74, 75, 76, 77, 78,80,81, 82,83,84,85,86,88,89,90,92,93,97,98,99,100,101,102, 103,104,106,107, 108, 109, 110, 111, 112, 113, 114, 116, 117, 122 per the attached revision matrix are considered editorial changes per EN-AD-101.  
"NO" is checked because the procedure revision contains non-editorial changes per the attached revision matrix. DYES 50.54(q)(3)
Evalualion is NOT required.
En1cr juslificalion and conlinue 10 nexl part or complelc Part VI as applicable.
[gi NO Co111inue 10 nexl part EN-EP-305 REV 5 ATIACHMENT 9.2 10 CFR 50.54(Q)(3)
SCREENING*
SHEET2 OF5
SHEET2 OF5
* Procedure/Document Number: IPEC-EP I Revision:
* Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)
17-01 (MERLIN Revision
 
: 20) Equipment/Facility/Other:
==Title:==
Indian Point Energy Center (IPEC) Title: Indian Point Energy Center Emergency Plan Part V. Emergency Planning Element/Function Screen (Associated 10 CFR 50.47(b) planning standard function identified in brackets)
Indian Point Energy Center Emergency Plan I Revision:    17-01 (MERLIN Revision 20)
Does this activity affect any of the following, including program elements from NUREG-0654/FEMA REP-1 Section II? 1. Responsibility for emergency response is assigned.  
Part V. Emergency Planning Element/Function Screen (Associated 10 CFR 50.47(b) planning standard function identified in brackets) Does this activity affect any of the following, including program elements from NUREG-0654/FEMA REP-1 Section II?
[1) D 2. The response organization has the staff to respond and to augment staff on a continuing basis (24/7 D staffing) in accordance with the emergency plan. (1) 3. The process ensures that on shift emergency response responsibilities are staffed and assigned.  
: 1. Responsibility for emergency response is assigned. [1)                                                       D
[2] D 4. The process for timely augmentation of onshift staff is established and maintained.  
: 2. The response organization has the staff to respond and to augment staff on a continuing basis (24/7           D staffing) in accordance with the emergency plan. (1)
(2] t8l 5. Arrangements for requesting and using off site assistance have been made. [3J D 6. State and local staff can be accommodated at the EOF in accordance with the emergency plan. [3] D 7. A standard scheme of emergency classification and action levels is in use. [4] D 8. Procedures for notification of State and local governmental agencies are capable of alerting them of D the declared emergency within 15 minute( after declaration of an emergency and providing follow-up notifications.  
: 3. The process ensures that on shift emergency response responsibilities are staffed and assigned. [2]           D
[5] 9. Administrative and physical means have been established for alerting and providing prompt D instructions to the public within the plume exposure pathway.  
: 4. The process for timely augmentation of onshift staff is established and maintained. (2]                       t8l
[5] 10. The public ANS meets the design requirements of FEMA-REP-10, Guide for Evaluation of Alert and LJ Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS design report and supporting FEMA approval letter. [5J
: 5. Arrangements for requesting and using off site assistance have been made. [3J                                 D
* 11. Systems are established for prompt communication among principal emergency response D organizations.  
: 6. State and local staff can be accommodated at the EOF in accordance with the emergency plan. [3]               D
[6J 12. Systems are established for prompt communication to emergency response personnel.  
: 7. A standard scheme of emergency classification and action levels is in use. [4]                               D
(6J D 13. Emergency preparedness information is made available to the public on a periodic basis within the D plume exposure pathway emergency planning zone (EPZ). (7) 14. Coordinated dissemination of public information during emergencies is established.  
: 8. Procedures for notification of State and local governmental agencies are capable of alerting them of         D the declared emergency within 15 minute( after declaration of an emergency and providing follow-up notifications. [5]
[7] D 15. Adequate facilities are maintained to support emergency response.  
: 9. Administrative and physical means have been established for alerting and providing prompt                     D instructions to the public within the plume exposure pathway. [5]
[8J D 16. Adequate equipment is maintained to support emergency response.  
: 10. The public ANS meets the design requirements of FEMA-REP-10, Guide for Evaluation of Alert and                 LJ Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS design report and supporting FEMA approval letter. [5J
[8] D 17. Methods,  
* 11. Systems are established for prompt communication among principal emergency response organizations. [6J
: systems, and equipment for assessment of radioactive releases are in use. [9J LJ 18. A range of public PARs is available for implementation during emergencies.  
: 12. Systems are established for prompt communication to emergency response personnel. (6J
[10] D 19. Evacuation time estimates for the population located in the plume exposure pathway EPZ are D available to support the formulation of PARs and have been provided to State and local governmental authorities.  
: 13. Emergency preparedness information is made available to the public on a periodic basis within the plume exposure pathway emergency planning zone (EPZ). (7)
[1 OJ 20. A range of protective actions is available for plant emergency workers during emergencies, including D those for hostile action events.[1 OJ 21. The resources for controlling radiological exposures for emergency workers are established.  
: 14. Coordinated dissemination of public information during emergencies is established. [7]
[11] D 22. Arrangements are made for medical services for contaminated, injured individuals.  
D D
[12] D 23. Plans for recovery and reentry are developed.  
D D
[13] D 24. A drill and exercise program (including radiological,  
: 15. Adequate facilities are maintained to support emergency response. [8J                                         D
: medical, health physics and other program D areas) is established.  
: 16. Adequate equipment is maintained to support emergency response. [8]                                           D
[14] 25. Drills, exercises, and training evolutions that provide performance opportunities to develop, D EN-EP-305 REV 5
: 17. Methods, systems, and equipment for assessment of radioactive releases are in use. [9J                         LJ
* *
: 18. A range of public PARs is available for implementation during emergencies. [10]                               D
* ATTACHMENT 9.2 10 CFR 50.54(0)(3)
: 19. Evacuation time estimates for the population located in the plume exposure pathway EPZ are                     D available to support the formulation of PARs and have been provided to State and local governmental authorities. [1 OJ
SCREENING SHEET3 OF5 Procedure/Document Number: IPEC-EP I Revision:
: 20. A range of protective actions is available for plant emergency workers during emergencies, including           D those for hostile action events.[1 OJ
17-01 (MERLIN Revision
: 21. The resources for controlling radiological exposures for emergency workers are established. [11]               D
: 20) Equipment/Facility/Other:
: 22. Arrangements are made for medical services for contaminated, injured individuals. [12]                         D
Indian Point Energy Center (IPEC) Title: Indian Point Energy Center Emergency Plan maintain.
: 23. Plans for recovery and reentry are developed. [13]                                                             D
and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses.  
: 24. A drill and exercise program (including radiological, medical, health physics and other program                 D areas) is established. [14]
[14] 26. Identified weaknesses are corrected.  
: 25. Drills, exercises, and training evolutions that provide performance opportunities to develop,                 D EN-EP-305 REV 5
[14] 27. Training is provided to emergency responders.  
 
[15) 28. Responsibility for emergency plan development and review is established.  
ATTACHMENT 9.2                                                                           10 CFR 50.54(0)(3) SCREENING SHEET3 OF5
[16] 29. Planners responsible for emergency plan development and maintenance are properly trained.  
* Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)
[16] APPLICABILITY CONCLUSION D D D D D If no Part V criteria are checked, a 50.54(q)(3)
 
Evaluation is NOT required; document the basis for conclusion below and complete Part VI. D If any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3)
==Title:==
Evaluation.
Indian Point Energy Center Emergency Plan IRevision: 17-01 (MERLIN Revision 20) maintain. and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses. [14]
BASIS FOR CONCLUSION Change 18-Change made to more clearly describe emergency notification methods during working and non-working hours. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
: 26. Identified weaknesses are corrected. [14]                                                                       D
No further evaluation is required for this change. Change 40-Change made to clarify where the Public Information Liaison reports.
: 27. Training is provided to emergency responders. [15)                                                             D
Also used abbreviations for "JIC", "ED", "ERO" and "EOF" because they are previously defined in Section B. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
: 28. Responsibility for emergency plan development and review is established. [16]                                   D
No further evaluation is required for this change. Change 43 -Change made to clarify that LOAs were previously removed from Appendix  
: 29. Planners responsible for emergency plan development and maintenance are properly trained. [16]                 D APPLICABILITY CONCLUSION D If no Part V criteria are checked, a 50.54(q)(3) Evaluation is NOT required; document the basis for conclusion below and complete Part VI.
: 2. This was I evaluated for prior revision 15-02. Also, abbreviations for "TSC" and "ED" are sufficient because they were previously defined in Section B. These changes do not change the meaning or intent of a description, does I not change facilities or equipment, and does not change a process.
D If any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3) Evaluation.
No further evaluation is required for this change. Change 46 -Change made to clarify that LOAs were previously removed from Appendix  
BASIS FOR CONCLUSION Change 18- Change made to more clearly describe emergency notification methods during working and non-working hours. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
: 2. This was evaluated for prior revision 15-02. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
Change 40- Change made to clarify where the Public Information Liaison reports. Also used abbreviations for "JIC", "ED", "ERO" and "EOF" because they are previously defined in Section B. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
No further evaluation is required for this change. Change 50-Removed box to reflect previously evaluated change from SAMG Evaluator to Reactor Engineer.
* Change 43 - Change made to clarify that LOAs were previously removed from Appendix 2. This was evaluated for prior revision 15-02. Also, abbreviations for "TSC" and "ED" are sufficient because they were previously defined in Section B. These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
SAMG Evaluator position was deleted from the Emergency Response Organization (ERO). The removal of this position was previously 50.54(q) evaluated for Revision 15 of IP-EP-220, Technical Support Center. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
Change 46 - Change made to clarify that LOAs were previously removed from Appendix 2. This was I
No further evaluation is required for this change. Change 65 -changed site assembly alarm to lower case and Public Address System to upper case. In I addition, clarified wording regarding who the control room operators contact.
I evaluated for prior revision 15-02. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
Change 50- Removed box to reflect previously evaluated change from SAMG Evaluator to Reactor Engineer. SAMG Evaluator position was deleted from the Emergency Response Organization (ERO). The removal of this position was previously 50.54(q) evaluated for Revision 15 of IP-EP-220, Technical Support Center. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
No further evaluation is required for this change. Change 73 -Clarification of wording to denote that additional positions are assigned to CR as required.
Change 65 - changed site assembly alarm to lower case and Public Address System to upper case. In                     I addition, clarified wording regarding who the control room operators contact. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Revised ERO. These chanqes do not chanqe the meanina or intent of a descriotion, does not chanqe I EN-EP-305 REV 5
Change 73 - Clarification of wording to denote that additional positions are assigned to CR as required.
* *
Revised ERO. These chanqes do not chanqe the meanina or intent of a descriotion, does not chanqe                       I EN-EP-305 REV 5
* ATTACHMENT 9.2 10 CFR 50.54(a)(3)
 
SCREENING SHEET40F 5 Procedure/Document Number: IPEC-EP I Revision:
ATTACHMENT 9.2                                                                       10 CFR 50.54(a)(3) SCREENING SHEET40F 5
17-01 (MERLIN Revision
* Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)
: 20) Equipment/Facility/Other:
 
Indian Point Energy Center (IPEC) Title: Indian Point Energy Center Emergency Plan facilities or equipment, and does not change a process.
==Title:==
No further evaluation is required for this change. Change 79 -Clarification of wording to reflect Appendix 2's reference to letters of agreement.
Indian Point Energy Center Emergency Plan I Revision:    17-01 (MERLIN Revision 20) facilities or equipment, and does not change a process. No further evaluation is required for this change.
During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed.
Change 79 - Clarification of wording to reflect Appendix 2's reference to letters of agreement. During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
Change 91- Change in wording to clarify that offsite authorities are responsible for protective action decision not IPEC. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
No further evaluation is required for this change. Change 91-Change in wording to clarify that offsite authorities are responsible for protective action decision not IPEC. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
Change 94 - During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
No further evaluation is required for this change. Change 94 -During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed.
Change 95 - During the EPLAN revision 15-02, all the written agreements/ Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
Change 96 - Added Radiation Emergency Assistance Center/Training Site (REAC/TS) which has become the national source to contact to receive guidance given the scenario of a patient that has received massive radiation exposure. During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a             I description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change
No further evaluation is required for this change. Change 95 -During the EPLAN revision 15-02, all the written agreements/
* Change 105 - Changed the word from All to Additional to better define the actions that would be taken regarding utilizing plant personnel during the recovery effort. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Letters of Agreement were removed from the EPLAN and 50.54q reviewed.
Change 115 - . Procedures IP-SMM-AD-102 and IP-EP-AD2 establishes requirements for the preparation, review, and approval of site-specific implementing procedures. Both procedures list a technical review as a review from someone who has the expertise to ensure technical accuracy. Neither requires the individual to be qualified. Per IP-EP~AD2, Safety reviews are completed to determine if prior NRC approval is required.
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
This is performed by the 50.54Q process in EN-EP-305. In 305 you are required to be qualified. Removing this statement: "Individuals that conduct the technical review and safety review shall be qualified in accordance with station requirements." does not change the meaning or intent of a description, d9es not change facilities or equipment, and does not change a process. Technical review does not require qualifications and still will be completed. Safety reviews are still to be completed and the 5054Q process will ensure the qualifications are obtained prior to anyone being assigned to complete. No further evaluation is required for this change.
No further evaluation is required for this change. Change 96 -Added Radiation Emergency Assistance Center/Training Site (REAC/TS) which has become the national source to contact to receive guidance given the scenario of a patient that has received massive radiation exposure.
Change 118 -Added a new Memorandum of Understanding (MOU) with the Department of Energy for additional radiological assistance if needed depending on the radiological emergency at Indian Point.
During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed.
This MOU is an enhancement to the EPLAN and support for Indian Point. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
This change does not change the meaning or intent of a I description, does not change facilities or equipment, and does not change a process.
No further evaluation is required for this change.
No further evaluation is required for this change
EN-EP-305 REV 5
* Change 105 -Changed the word from All to Additional to better define the actions that would be taken regarding utilizing plant personnel during the recovery effort. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
No further evaluation is required for this change. Change 115 -. Procedures IP-SMM-AD-102 and IP-EP-AD2 establishes requirements for the preparation, review, and approval of site-specific implementing procedures.
Both procedures list a technical review as a review from someone who has the expertise to ensure technical accuracy.
Neither requires the individual to be qualified.
Per IP-EP~AD2, Safety reviews are completed to determine if prior NRC approval is required.
This is performed by the 50.54Q process in EN-EP-305.
In 305 you are required to be qualified.
Removing this statement:  
"Individuals that conduct the technical review and safety review shall be qualified in accordance with station requirements."
does not change the meaning or intent of a description, d9es not change facilities or equipment, and does not change a process.
Technical review does not require qualifications and still will be completed.
Safety reviews are still to be completed and the 5054Q process will ensure the qualifications are obtained prior to anyone being assigned to complete.
No further evaluation is required for this change. Change 118 -Added a new Memorandum of Understanding (MOU) with the Department of Energy for additional radiological assistance if needed depending on the radiological emergency at Indian Point. This MOU is an enhancement to the EPLAN and support for Indian Point. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
No further evaluation is required for this change. EN-EP-305 REV 5
* *
* ATTACHMENT 9.2
* ATTACHMENT 9.2
* 10 CFR 50,S4(Q}(3)
* SHEET50F5 Procedure/Document Number: IPEC-EP EqulpmenUFaclllty/Dther: Indian Point Energy Center (IPEC)
Sc:RE&NING SHEET50F5 Procedure/Document Number: IPEC-EP I Revision:
Tltle: Indian Point Energy Center Emergency Plan 10 CFR 50,S4(Q}(3) Sc:RE&NING I Revision: 17-01 (MERLIN Revision 20)
17-01 (MERLIN Revision  
Change 119
: 20) EqulpmenUFaclllty/Dther:
* Changed the wording from added to llst&d as Ille Letters of Agreement were o telally removed   r,om the EPLAN during the 2015 15-02 revision. A 50.54q was perfonned. Unfortunately, this Item was missed during last year's EPLAN revision. This change does not change the meaning or intent of a description, does net change facilities or equipment, and does not change a process. No further evaluation is required for lhls change.
Indian Point Energy Center (IPEC) Tltle: Indian Point Energy Center Emergency Plan Change 119
Change 120 - Added the common fleet Emergency Planning procedures to the list of existing IPEC procedures. Fleet Procedures added Include:
* Changed the wording from added to llst&d as Ille Letters of Agreement were o telally removed r,om the EPLAN during the 2015 15-02 revision.
EN-EP-609, EN-EP-610, EN-EP-611, EN-EP-900, These changes do not change lhe meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation Is required for this change.
A 50.54q was perfonned.
Change 121
Unfortunately, this Item was missed during last year's EPLAN revision.
* NSRAC - Nuclear Safety Review and Audit Committee no longer exists as It was replaced OSRC - On-Sile Safely Review Committee In 15-02 rev. This change does not change lhe meaning or b1 intent of a deseription, does net change fac:illUes or equipment. and does not change a process. No further evaluation Is required for !his change.
This change does not change the meaning or intent of a description, does net change facilities or equipment, and does not change a process.
Emergency Plannlng Element 4 in Part V of lhls form Is potenUally affected by Iha remaining Change 24 described In the Revision Matrix. A 10CfR50.54 (q) evatuatlon will be performed to determine if the effectlvaness of the IPEC Emergency Plan Is reduced and prior NRC approval Is required *
No further evaluation is required for lhls change. Change 120 -Added the common fleet Emergency Planning procedures to the list of existing IPEC procedures.
Fleet Procedures added Include:
EN-EP-609, EN-EP-610, EN-EP-611, EN-EP-900, These changes do not change lhe meaning or intent of a description, does not change facilities or equipment, and does not change a process.
No further evaluation Is required for this change. Change 121
* NSRAC -Nuclear Safety Review and Audit Committee no longer exists as It was replaced b1 OSRC -On-Sile Safely Review Committee In 15-02 rev. This change does not change lhe meaning or intent of a deseription, does net change fac:illUes or equipment.
and does not change a process.
No further evaluation Is required for !his change. Emergency Plannlng Element 4 in Part V of lhls form Is potenUally affected by Iha remaining Change 24 described In the Revision Matrix. A 10CfR50.54 (q) evatuatlon will be performed to determine if the effectlvaness of the IPEC Emergency Plan Is reduced and prior NRC approval Is required
* Part VI. Signatures:
* Part VI. Signatures:
Preparer Name (Print) Pr~arer Slgnalure Dale: Rebecca A. Martin .. c,() It> 'q Sr. Project Manager r (OpUcnal)
Preparer Name (Print)
Reviewer Name (Prinl) Reviewer Signature Dale: Rel/k!Wer Name (Prlnl) Reviewer Signature Date* Tlmalhy Garvey -r&A-lo\\a_\l"1 Nuclear EP Project Manager Approver Name (Print) *-;;~ oa1a* Frank Mltchell 1u/t1 Managar, Emergency Planning or d&slgnee EN-EP-305 REV 5
Rebecca A. Martin Sr. Project Manager Pr~arer Slgnalure
* *
                                                      . .c,()
* ATTACHMENT 9.3 10 CFR 50.54(Q)(3)
Dale:
EVALUATION SHEET1 OF 3 Procedure/Document Number: IPEC-EP I Revision:
It> 'q   r (OpUcnal) Reviewer Name (Prinl)                   Reviewer Signature                     Dale:
17-01 (MERLIN Revision
Rel/k!Wer Name (Prlnl)                           Reviewer Signature                     Date*
: 20) Equipment/Facility/Other:
Tlmalhy Garvey Nuclear EP Project Manager                  -r&A-                                       lo\\a_\l"1 Approver Name (Print)
Indian Point Energy Center (IPEC) Title: Indian Point Energy Center Emergency Plan Part I. Description of Proposed Change: The activity being reviewed is a revision to IPEC Emergency Plan. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision.
Frank Mltchell Managar, Emergency Planning or d&slgnee
In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01. All changes have been screened out with the exception of item number 24. Part II. Description and Review of Licensing Basis Affected by the Proposed Change: The IPEC Emergency Plan has been reviewed through the Process Applicability Determination (PAD) in accordance with the criteria described in NEI 96-07 and EN-LI-100.
                                                      *-;;~                                   oa1a*
This proposed change does not(]) change the facility or procedures as described in the UFSAR or (2) create a test or equipment not described in the UFSAR and is governed under the Emergency Plan 10 CFR 50.54(q) screening process in accordance with EN-EP-305.
1u/t1 EN-EP-305 REV 5
These proposed changes do not involve structures, systems or components controlled by I 0 CFR 50.59 or 72.48 and do not have the potential to impact any of the License Basis Documents (LBDs) on the PAD form, except for the Emergency Plan. All responses to the questions contained in sections III and IV of the PAD form were determined to be *'no impact".
 
Since these proposed changes do not contain any requirements that could affect any LBDs other than the Emergency Plan, it is detennined to be fully governed under IO CFR 50.54(q).
ATTACHMENT 9.3                                                                           10 CFR 50.54(Q)(3) EVALUATION SHEET1 OF 3
In addition to those reviewed for the PAD, each of the following documents/relevant  
* Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)
.sections was reviewed:
 
==Title:==
Indian Point Energy Center Emergency Plan Part I. Description of Proposed Change:
I Revision:  17-01 (MERLIN Revision 20)
The activity being reviewed is a revision to IPEC Emergency Plan. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01.
All changes have been screened out with the exception of item number 24.
Part II. Description and Review of Licensing Basis Affected by the Proposed Change:
The IPEC Emergency Plan has been reviewed through the Process Applicability Determination (PAD) in accordance with the criteria described in NEI 96-07 and EN-LI-100. This proposed change does not(])
change the facility or procedures as described in the UFSAR or (2) create a test or equipment not described in the UFSAR and is governed under the Emergency Plan 10 CFR 50.54(q) screening process in accordance with EN-EP-305. These proposed changes do not involve structures, systems or components controlled by I 0 CFR 50.59 or 72.48 and do not have the potential to impact any of the License Basis Documents (LBDs) on the PAD form, except for the Emergency Plan. All responses to the questions contained in sections III and IV of the PAD form were determined to be *'no impact". Since these proposed changes do not contain any requirements that could affect any LBDs other than the Emergency Plan, it is detennined to be fully governed under IO CFR 50.54(q). In addition to those reviewed for the PAD, each of the following documents/relevant
  .sections was reviewed:
a) Reviewed current Plan, all sections Part I and Part 2. No additional relevant or affected Plan content was identified.
a) Reviewed current Plan, all sections Part I and Part 2. No additional relevant or affected Plan content was identified.
b) The original Plans, U2 1970 and U3 1973, were not available for review . c) Historical I OCFR50.54 (q) documents were manually reviewed dating back to 2005 for significant changes:
* b) The original Plans, U2 1970 and U3 1973, were not available for review .
No differences related to the need .to compensate for preparedness or response constraints or vulnerabilities specific to the facility, EPZ or jurisdiction were found for the historical search period. Some items associated with the current proposed changes were identified as described below: Reviewed NSIR/DPR-ISG-0 I for applicability to Plan changes that were both evaluated and screened out. n EN-EP-305 REV 5
c) Historical I OCFR50.54 (q) documents were manually reviewed dating back to 2005 for significant changes: No differences related to the need .to compensate for preparedness or response constraints or vulnerabilities specific to the facility, EPZ or jurisdiction were found for the historical search period. Some items associated with the current proposed changes were identified as described below:
* *
Reviewed NSIR/DPR-ISG-0 I for applicability to Plan changes that were both evaluated and screened out.
* ATIACHMENT 9.3 10 CFR 50.54(Q)(3)
n EN-EP-305 REV 5
EVALUATION SHEET20F 3 Procedure/Document Number: IPEC-EP I Revision:
 
17-01 (MERLIN Revision
ATIACHMENT 9.3                                                                     10 CFR 50.54(Q)(3) EVALUATION SHEET20F 3
: 20) Equipment/Facility/Other:
* Procedure/Document Number: IPEC-EP                     I Revision:
Indian Point Energy Center (IPEC) Title: Indian Point Energy Center Emergency Plan Part Ill. Describe How the Proposed Change Complies with Relevant Emergency Preparedness Regulation(s) and Previous Commitment(s)
Equipment/Facility/Other: Indian Point Energy Center (IPEC)
Made to the NRC: 10 CFR 50.47(b)(2)-0nsite Emergency Organization (Item 24 in the matrix)
 
==Title:==
Indian Point Energy Center Emergency Plan 17-01 (MERLIN Revision 20)
Part Ill. Describe How the Proposed Change Complies with Relevant Emergency Preparedness Regulation(s) and Previous Commitment(s) Made to the NRC:
10 CFR 50.47(b)(2)-0nsite Emergency Organization (Item 24 in the matrix)
* The process for timely augmentation of on shift staff is established and maintained.
* The process for timely augmentation of on shift staff is established and maintained.
Site Compliance:
Site Compliance: The Plan wording changes to accommodate the transfer of command and control from the Emergency Director to the CCR if the Emergency Director is unavailable or if the EOF is being transfe1Ted to the AEOF. This change does not change required timeliness, minimum staffing, ability to perform facility assigned functions, or equipment requirements as they relate to the emergency response facility activation and command and control.
The Plan wording changes to accommodate the transfer of command and control from the Emergency Director to the CCR if the Emergency Director is unavailable or if the EOF is being transfe1Ted to the AEOF. This change does not change required timeliness, minimum staffing, ability to perform facility assigned functions, or equipment requirements as they relate to the emergency response facility activation and command and control.
Part IV. Description of Emergency Plan Planning Standards, Functions and Program Elements Affected by the Proposed Change:
Part IV. Description of Emergency Plan Planning Standards, Functions and Program Elements Affected by the Proposed Change: 10 CFR 50.47(b)(2)-0nsite Emergency Organization (Item 24 in the matrix) Function:
10 CFR 50.47(b)(2)-0nsite Emergency Organization (Item 24 in the matrix)
Function:
* The process for timely augmentation of on shift staff is established and maintained.
* The process for timely augmentation of on shift staff is established and maintained.
Program Elements:
Program Elements:
IO CFR Part 50, Appendix E, Section IV .A.2.a provides supporting requirements.
IO CFR Part 50, Appendix E, Section IV .A.2.a provides supporting requirements.
Informing criteria appear in Section 11.8 ofNUREG -0654 and in the Emergency Plan. EN-EP-305 REV 5
Informing criteria appear in Section 11.8 ofNUREG -0654 and in the Emergency Plan.
* *
EN-EP-305 REV 5
* ATTACHMl!NT 9.3 10 CFR 50.54(Q)C3)
* ATTACHMl!NT 9.3 SHl!E1' 3 OF 3 PracedureJDocument Number: IPEC-EP Equipmant/F1cllltyl0ther: Indian Point Energy Center OPEC)
EVALUATION SHl!E1' 3 OF 3 PracedureJDocument Number: IPEC-EP I Ravlalon:
TIU*: Indian Point Enorgy Canter Emarguncy Plan I Ravlalon:
17-01 (MERLIN Revision 20l Equipmant/F1cllltyl0ther:
10 CFR 50.54(Q)C3) EVALUATION 17-01 (MERLIN Revision 20l Part V. Description of Impact of the Proposed Change on the Effectiveness of Emergency Plan functions:
Indian Point Energy Center OPEC) TIU*: Indian Point Enorgy Canter Emarguncy Plan Part V. Description of Impact of the Proposed Change on the Effectiveness of Emergency Plan functions:
* Change 24
* Change 24
* The Plan wording c:hllnges to accommodate the tlllnsfcr ofcommund and control lhlm lhu Em~ncy Director lo the CCR Ir the Emu;enc:y Director Is unavailabli:
* The Plan wording c:hllnges to accommodate the tlllnsfcr ofcommund and control lhlm lhu Em~ncy Director lo the CCR Ir the Emu;enc:y Director Is unavailabli: or irthe EOF Is being transfc:m:d to the AEOF. This change docs not choni.-e required timeliness, minimum staffing. ability 10 pcrfonn f11ellhy 11Sslgned functions, or equipment TllqUin:ntenlS 115 lhcy relate to 1hc emcr1,oeni:y response racllity ocrlwtion and comffl4nd and c:oncrol.
or irthe EOF Is being transfc:m:d to the AEOF. This change docs not choni.-e required timeliness, minimum staffing.
Thu changi= docs not represent D reduction In the elTc:ctivcnr:ss of the errn:rycncy phln. conllnlll!$ to 111e111 planning stamlard 10 CFR S0.47(b) (?I and l OCFRSO Appendix E S~c:tion IV.A.l.11 and can be incorporutcd wllhcut prior NRC approval beClluse the change did.not change required limelincs,, minimum Slllffing. ability to perfonn fllcility assignt:d ftlnctlons. or equipment rcquir111111:nts 115 they n:late 10 the cmi:rpncy n:sponsc racllky 11ctlvation 11nd command and control.
ability 10 pcrfonn f11ellhy 11Sslgned functions, or equipment TllqUin:ntenlS 115 lhcy relate to 1hc emcr1,oeni:y response racllity ocrlwtion and comffl4nd and c:oncrol.
CondusJon Regnrdjnu Jmnpc1 The proposed changes 101he IPEC EPLAN Rev 17.01. continue to mcctlhe phinningstondllrds outlined in 10 cr:R 50.47(b) (2). This revision does not rcprcsenl Dn:duccion In elTcctivmess 10 the IPl:C Emergency Plml ilnd can he inco'flOratcd wilhoul prior NRC approval.
Thu changi= docs not represent D reduction In the elTc:ctivcnr:ss of the errn:rycncy phln. conllnlll!$
Part VI. EvaluaUan Conclusion Answer 1h11 followlng questions about the proposed change.
to 111e111 planning stamlard 10 CFR S0.47(b)  
I. Does the proposed change comply with 10 CFR 50.47(b) and 10 CFR 50 Appendix E?                                 Dl:)Yl:S [] NO
(?I and l OCFRSO Appendix E S~c:tion IV.A.l.11 and can be incorporutcd wllhcut prior NRC approval beClluse the change did.not change required limelincs,,
  .?. Does the proposed change maintain the effectiveness of lhe emergency plan (i.e., no                         @YES ONO reduction in effectiveness)?
minimum Slllffing.
l,   Does the proposed change constitute an emergency action level scheme change?                                 0YES1EJNO If questions 1 or 2 are answered NO, or question 3 answered YES, reject lhe proposed change, modify the proposed change and perfonn a new avaluafion or oblaln prior NRC approval U11der provisions of 10 CFR 50.90. If quesUons 1 and 2 are answered YES, and question 3 aMwered NO, implement applicable change prace~es). Refer to step 5.9[8].
ability to perfonn fllcility assignt:d ftlnctlons.
Part VII. Signatures EN-EP-305 REV 5
or equipment rcquir111111:nts 115 they n:late 10 the cmi:rpncy n:sponsc racllky 11ctlvation 11nd command and control.
 
CondusJon Regnrdjnu Jmnpc1 The proposed changes 101he IPEC EPLAN Rev 17.01. continue to mcctlhe phinningstondllrds outlined in 10 cr:R 50.47(b)  
ATTACHMENT 9.1                                               PROCESS APPLICABILITY DETERMINATION FORM Sheet 1 of 7 I.       OVERVIEW                                                                   PAD Rev.#:   _o__
(2). This revision does not rcprcsenl D n:duccion In elTcctivmess 10 the IPl:C Emergency Plml ilnd can he inco'flOratcd wilhoul prior NRC approval.
Facility: Indian Point Energy Center (IPEC)
Part VI. EvaluaUan Conclusion Answer 1h11 followlng questions about the proposed change. I. Does the proposed change comply with 10 CFR 50.47(b) and 10 CFR 50 Appendix E? Dl:)Yl:S  
Proposed Activity / Document: IPEC Emergency Plan               Change/Rev.#: 17-01 (Merlin Rev. 20)
[] NO .?. Does the proposed change maintain the effectiveness of lhe emergency plan (i.e., no @YES ONO reduction in effectiveness)?
Description of Proposed Activity: Revision to IPEC Emergency Plan II.     DOCUMENT REVIEW METHOD Provide the requested information for each item below.
l, Does the proposed change constitute an emergency action level scheme change? 0YES1EJNO If questions 1 or 2 are answered NO, or question 3 answered YES, reject lhe proposed change, modify the proposed change and perfonn a new avaluafion or oblaln prior NRC approval U11der provisions of 10 CFR 50.90. If quesUons 1 and 2 are answered YES, and question 3 aMwered NO, implement applicable change prace~es).
: 1. For documents available electronically:
Refer to step 5.9[8]. Part VII. Signatures EN-EP-305 REV 5
: a. List search engine or documents searched, and keywords used:
* *
U2/U3 Technical Specifications, U2/U3 UFSARs, NRC Orders, LRS Commitments, and the IPEC Emergency Plan: Keywords: Emergency, Plan, Emergency Plan.
* ATTACHMENT 9.1 PROCESS APPLICABILITY DETERMINATION FORM Sheet 1 of 7 I. OVERVIEW PAD Rev.#: _o __ Facility:
: b. List relevant sections of controlled electronic documents reviewed:
Indian Point Energy Center (IPEC) Proposed Activity  
All Licensing Basis Document sections were searched electronically: U2/U3 Technical Specifications, U2/U3 UFSARs, NRC Orders, LRS Commitments. Review determined no relevant hits and no impact from proposed changes .
/ Document:
* 2. Documents reviewed manually (hardcopy):
IPEC Emergency Plan Change/Rev.#:
3.
17-01 (Merlin Rev. 20) Description of Proposed Activity:
None For those documents that are not reviewed either electronically or manually, use the specific questions provided in Sections Ill and IV of Attachment 9.2 of EN-Ll-100 as needed. Document, below, the extent to which the Attachment 9.2 questions were used.
Revision to IPEC Emergency Plan II. DOCUMENT REVIEW METHOD Provide the requested information for each item below. 1. For documents available electronically:  
Reviewed complete Att. 9.2 of EN-Ll-100 Revision 20. Emergency Plan (10 CFR 50.54(q) / (EN-EP-305) section is applicable due to change being controlled by 10 CFR 50.54 (q) .
: a. List search engine or documents  
* EN-Ll-100 REV. 20
: searched, and keywords used: U2/U3 Technical Specifications, U2/U3 UFSARs, NRC Orders, LRS Commitments, and the IPEC Emergency Plan: Keywords:
 
Emergency, Plan, Emergency Plan. b. List relevant sections of controlled electronic documents reviewed:
                                                      ,_ _ _ _ _ _ _ _ _ ,._ _ _ _ _ _ _                                a, ''
All Licensing Basis Document sections were searched electronically:
ATTACH~~~m9.1                                                                 PROCESS APPLICASlLITY DETER:.,i~lATION Fem.,
U2/U3 Technical Specifications, U2/U3 UFSARs, NRC Orders, LRS Commitments.
Sh;et2oi7
Review determined no relevant hits and no impact from proposed changes . 2. Documents reviewed manually (hardcopy):
* m.         PROCESS REVIEW Does the proposed activity affect, invalidate, or render Incorrect, OR have the potential to affect, invalidate, or render Incorrect, information contained in any of the following processes? Contact Program Owner if needed. Associated regulations and procedures are identified with each process below.
None 3. For those documents that are not reviewed either electronically or manually, use the specific questions provided in Sections Ill and IV of Attachment 9.2 of EN-Ll-100 as needed. Document, below, the extent to which the Attachment 9.2 questions were used. Reviewed complete Att. 9.2 of EN-Ll-100 Revision  
PROCESS (Regulations I Procedures)                           YES   NO         REVIEW RESULTS Chemistry/ Effluents                                                               D   181 Radwaste / Process Control Program (PCP)                                         D   181 (EN*R~-105 or contact the Radiation Protection Dept.)
: 20. Emergency Plan (10 CFR 50.54(q)  
Radiation Protection / ALARA                                                       D   181 (10 CFR 20 I EN-RP-110 or contact tha Radiation Protection Dept.)
/ (EN-EP-305) section is applicable due to change being controlled by 10 CFR 50.54 ( q) . EN-Ll-100 REV. 20
lnservlce Inspection Program (10 CFR 50.SSa/ EN-DC-120. *333, -342,               D   181
* * * , _________
    -351, -352) lnservice Testing Program (10 CFR 50.55a / EN-DC-332)                             D   181 Maintenance Rule Program (10 CFR 50.65 I EN*DC-203, -204. *205, -206,             D   181
,. _______ a, ŽŽ ATTACH~~~m9.1 Sh;et2oi7 PROCESS APPLICASlLITY DETER:.,i~lATION Fem., m. PROCESS REVIEW Does the proposed activity affect, invalidate, or render Incorrect, OR have the potential to affect, invalidate, or render Incorrect, information contained in any of the following processes?
    -207)
Contact Program Owner if needed. Associated regulations and procedures are identified with each process below. PROCESS (Regulations I Procedures)
Containment Leakage Rate Testing (Appendix J) Program (10 CFA 50                   D   181 Appendix J / EN-DC-334)
YES NO REVIEW RESULTS Chemistry/
PROCESS (Regulations/Procedures)                           YES NO   NIA     REVIEW RESULTS FLEX Program (NRC Order EA*12-49/FLEX Program) (10 CFR 50.59 /                   D   ~    D Contact Design Engineering)
Effluents D 181 Radwaste  
NOTE: The date for Individual site implementation of the FLEX Program is not the same for all sites. All sites are required to implement a FLEX program per NRC Order EA-12-49. NIA may be used for this process by sites that have not completed implementatlon ol a FLEX program. Contact Design Engineering If further assistance is needed.
/ Process Control Program (PCP) D 181 (EN*R~-105 or contact the Radiation Protection Dept.) Radiation Protection  
IF any box is checked "Yes," I!:!fil:! contact the appropriate department to ensure that the proposed change is acceptable and document the results in the REVIEW RESULTS column.
/ ALARA D 181 (10 CFR 20 I EN-RP-110 or contact tha Radiation Protection Dept.) lnservlce Inspection Program (10 CFR 50.SSa/ EN-DC-120.  
(
*333, -342, D 181 -351, -352) lnservice Testing Program (10 CFR 50.55a / EN-DC-332)
* EN-Ll-100 REV. 20
D 181 Maintenance Rule Program (10 CFR 50.65 I EN*DC-203,  
 
-204. *205, -206, D 181 -207) Containment Leakage Rate Testing (Appendix J) Program (10 CFA 50 D 181 Appendix J / EN-DC-334)
                                                            ~~~~~~~~~~-~~                                                          ~
PROCESS (Regulations/Procedures)
ATTACHMENT9.1                                                                           APPLICASILITY DETEm.,mATION Fam.,
YES NO NIA REVIEW RESULTS FLEX Program (NRC Order EA*12-49/FLEX Program)  
Sheet3 of7
(10 CFR 50.59 / D D Contact Design Engineering)
                                                                    ----------l;>ll'°~------
NOTE: The date for Individual site implementation of the FLEX Program is not the same for all sites. All sites are required to implement a FLEX program per NRC Order EA-12-49.
PROCESS
NIA may be used for this process by sites that have not completed implementatlon ol a FLEX program.
* IV.       LICENSING BASIS DOCUMENT REVIEW Does the proposed activity affect, invalidate, or render incorrect, OR have the potential to affect, invalidate, or render incorrect, information contained in any of the following Licensing Basis Document(s)? Contact LBD Owner if needed. Associated regulations and procedures are identified with each Licensing Basis Document below.
Contact Design Engineering If further assistance is needed. IF any box is checked "Yes," I!:!fil:!
LICENSING BASIS DOCUMENTS                                             REVIEW RESULTS OR SECTIONS (Regulatlons / Procedures)
contact the appropriate department to ensure that the proposed change is acceptable and document the results in the REVIEW RESULTS column. ( EN-Ll-100 REV. 20
YES    NO AFFECTED OR LBDCR #
* *
Quality Assurance Program Manual (QAPM)
* ATTACHMENT9.1 PROCESS APPLICASILITY DETEm.,mATION Fam., ----------l;>ll'°~------
(10 CFR 50.54(a), 10 CFA 50 Appendix 8 / EN-QV-104]                         D      181 Fire Protection Program (FPP) [Includes the Fire Safety Analysis/Fire Hazards Analysis (FSA/FHA)]                                                 o' 181 OL Condition, 10 CFA 50.48 / EN*DC-128)                                                                                           I Emergency Plan (Includes the On-Shift Staffing Analysls)                                   Emergency Plan: 10 CFR 50.54(q)
Sheet3 of7 IV. LICENSING BASIS DOCUMENT REVIEW Does the proposed activity affect, invalidate, or render incorrect, OR have the potential to affect, invalidate, or render incorrect, information contained in any of the following Licensing Basis Document(s)?
(10 CFA 50.54(q) / 10 CFA 50.47 / EN*EP-305)                                 181     D       screen and evaluation completed.
Contact LBD Owner if needed. Associated regulations and procedures are identified with each Licensing Basis Document below. LICENSING BASIS DOCUMENTS YES NO REVIEW RESULTS OR SECTIONS (Regulatlons  
Environmental Protection Plan                                                                                                     I (Appendix B of the OL, Environmental Evaluation/ EN-EV*l 15, EN-EV-117,     D   I 181                                         I EN*Ll-103)                                                                                                                       I Security Plan (10 CFA 50.54(p) / EN-NS-210 or contact site Security Dept.)                 D      181                                        I I
/ Procedures)
Cyber Security Plan
AFFECTED OR LBDCR # Quality Assurance Program Manual (QAPM) D 181 (10 CFR 50.54(a),
[10 CFR 50.54 (p) /10 CFR 73.54 / EN-IT-103 or EN*IT-103-01]                 D      183                                          l Operating License (OL) / Technical Specifications {TS)
10 CFA 50 Appendix 8 / EN-QV-104]
(10 CFR 50.90/ EN-Ll-103)                                                   o*      181 TS Bases (10 CFR 50.59 / EN*Ll-100 / EN*Ll-101)                               0       181 Technical Requirements Manual (TAM) (Including TRM Bases)
Fire Protection Program (FPP) [Includes the Fire Safety Analysis/Fire o' Hazards Analysis (FSA/FHA)]
(10 CFR 50.59 / EN-Ll-100 / EN*Ll*101)                                       D      181 Core Operating Limits Report (COLR), and Pressure and Temperature Limits Report (PTLA) (TS Administrative Controls, EN*Ll-113, EN-Ll-100,       D     181 EN*L1*101)
181 OL Condition, 10 CFA 50.48 / EN*DC-128)
Offslte Dose Calculation Manual (ODCM)
Emergency Plan (Includes the On-Shift Staffing Analysls)
(TS Administralive Controls or 10 CFA 50.59 / EN*Ll*113 or EN-Ll-100 /       0     181 EN*Ll-101)
Emergency Plan: 10 CFR 50.54(q)  
Updated Final Safety Analysis Report (UFSAR}
(10 CFA 50.54(q)  
(10 CFR 50.71 (e) / EN*Ll-113, EN*Ll-100, EN*Ll-101 l                         D      t8I Storage Cask Certificate of Compliance (10 CFR 72.244 / EN-Ll-113)           o* 181 Cask FSAR (CFSAR} (Including the CTS Bases)                                                 '
/ 10 CFA 50.47 / EN*EP-305) 181 D screen and evaluation completed.
(10 CFA 72.70 or 72.248 / EN*L1*113, EN*Ll-100,EN*Ll*l 12)
Environmental Protection Plan (Appendix B of the OL, Environmental Evaluation/
D     181                                         I 10 CFR 72,212 Evaluation Report (212 Report)
EN-EV*l 15, EN-EV-117, D I 181 EN*Ll-103)
(10 CFR 72.48 / EN*Ll-100, EN*Ll-112)                                         D      181 NRC Orders (10 CFR 50.90 I EN-Ll-103 or as directed by the Order)           o*     181 NRC Commitments and Obligations (EN*Ll*l 10)                                 o*     181 Site-Specific CFR Exemption (10CFR 50.12, 10 CFR 55.11, 10CFA55.13, 10 CFR72.7)                         o*      181                                          I
Security Plan D 181 (10 CFA 50.54(p)  
                                                                      *contact the site Regulatory Assurance Department if needed.
/ EN-NS-210 or contact site Security Dept.) Cyber Security Plan D 183 [10 CFR 50.54 (p) /10 CFR 73.54 / EN-IT-103 or EN*IT-103-01]
IF any box is checked "Yes," THEN ensure that any required regulatory reviews are performed in accordance with the referenced procedures. Prepare an LBDCR per procedure EN-Ll~113, as required, if a LBD is to be changed, and document any affected sections or the LBDCR #. Briefly discuss how the LBD Is affected in Section Vil.A *
Operating License (OL) / Technical Specifications  
* EN-Ll-100 REV. 20
{TS) o* 181 (10 CFR 50.90/ EN-Ll-103)
 
TS Bases (10 CFR 50.59 / EN*Ll-100  
PROCESS A!'PLICA91LITY DETERMl~lATION Fom.,
/ EN*Ll-101) 0 181 Technical Requirements Manual (TAM) (Including TRM Bases) D 181 (10 CFR 50.59 / EN-Ll-100  
* v.       10 CFR 50.59 / 10 CFR 72.48 APPLICABILITY
/ EN*Ll*101)
* Can the proposed activity be disposltioned by one or more of the following criteria? Check the appropriate box (if any).
Core Operating Limits Report (COLR), and Pressure and Temperature Limits Report (PTLA) (TS Administrative  
r-                                                                                                   *--,1
: Controls, EN*Ll-113, EN-Ll-100, D 181 EN*L1*101)
  'D     An approved, valid 50.59ll2.48 Evaluation covering associated aspects of the proposed activity already exists. Reference 50.59ll2.48 Evaluation #                       (if applicable) or attach documentation. Verify the previous 50.59ll2.48 Evaluation remains valid.
Offslte Dose Calculation Manual (ODCM) (TS Administralive Controls or 10 CFA 50.59 / EN*Ll*113 or EN-Ll-100  
D     The NRC has approved the proposed activity or portions thereof in a license amendment or a safety evaluation, or is being reviewed by the NRC in a submittal that addresses the proposed activity. Implementation of change requires NRC approval. Reference the approval document or the amendment in review.:
/ 0 181 EN*Ll-101)
181   The proposed activity is controlled by one or more applicable regulations.
Updated Final Safety Analysis Report (UFSAR} D t8I (10 CFR 50.71 (e) / EN*Ll-113, EN*Ll-100, EN*Ll-101 l Storage Cask Certificate of Compliance (10 CFR 72.244 / EN-Ll-113) o* 181 Cask FSAR (CFSAR} (Including the CTS Bases) ' (10 CFA 72.70 or 72.248 / EN*L1*113, EN*Ll-100,EN*Ll*l  
: 12) D 181 10 CFR 72,212 Evaluation Report (212 Report) D 181 (10 CFR 72.48 / EN*Ll-100, EN*Ll-112)
NRC Orders (10 CFR 50.90 I EN-Ll-103 or as directed by the Order) o* 181 NRC Commitments and Obligations (EN*Ll*l  
: 10) o* 181 Site-Specific CFR Exemption o* 181 I I I I I I l I I (10CFR 50.12, 10 CFR 55.11, 10CFA55.13, 10 CFR72.7)  
-' *contact the site Regulatory Assurance Department if needed. IF any box is checked "Yes," THEN ensure that any required regulatory reviews are performed in accordance with the referenced procedures.
Prepare an LBDCR per procedure EN-Ll~113, as required, if a LBD is to be changed, and document any affected sections or the LBDCR #. Briefly discuss how the LBD Is affected in Section Vil.A
* EN-Ll-100 REV. 20
* *
* PROCESS A!'PLICA91LITY DETERMl~lATION Fom., v. 10 CFR 50.59 / 10 CFR 72.48 APPLICABILITY
* Can the proposed activity be disposltioned by one or more of the following criteria?
Check the appropriate box (if any). r-*--, ' D An approved, valid 50.59ll2.48 Evaluation covering associated aspects of the proposed 1 activity already exists. Reference 50.59ll2.48 Evaluation  
# (if applicable) or attach documentation.
Verify the previous 50.59ll2.48 Evaluation remains valid. D The NRC has approved the proposed activity or portions thereof in a license amendment or a safety evaluation, or is being reviewed by the NRC in a submittal that addresses the proposed activity.
Implementation of change requires NRC approval.
Reference the approval document or the amendment in review.:
181 The proposed activity is controlled by one or more applicable regulations.
Examples of programs controlled by regulations that establish specific criteria are:
Examples of programs controlled by regulations that establish specific criteria are:
* Maintenance Rule (50.65) (EN-DC-203)
* Maintenance Rule (50.65) (EN-DC-203)
* Quality Assurance Program (10 CFR 50 Appendix B)
* Quality Assurance Program (10 CFR 50 Appendix B)
* Security Plan [50.54(p)]  
* Security Plan [50.54(p)] (EN-NS-210)
(EN-NS-210)
* Cyber Security Plan [73.54] (EN-IT-103)
* Cyber Security Plan [73.54] (EN-IT-103)
* Emergency Plan [50.54(q)]  
* Emergency Plan [50.54(q)] {EN-EP-305) o   Fire Protection Program (operating license condition)
{EN-EP-305) o Fire Protection Program (operating license condition)
* lnservice Inspection Program (50.55a) {EN-DC-351, *352)
* lnservice Inspection Program (50.55a)  
* lnservice Testing Program (50.55a) (EN-DC-332) j     I See NEI 96-07 Section 4.1 for additional guidance on specific regulati.ons.
{EN-DC-351,  
  ~eference the controlling specific regulation(s): 10CFR50.54(q)                       ,_.______j IF the entire proposed activity can be dispositioned by one of the criteria in Section V, THEN 50.59 and 72.48 Screenings are not required. Proceed to Section VII and provide basis for conclusion in Section VII.A.
*352)
Otherwise, continue to Section VI to perform a 50.59 and a 72.48 Screening, or perform a 50.59 and/or72.48 Evaluation in accordance with EN-Ll-101 and/or EN*Ll-112.
* lnservice Testing Program (50.55a)  
Changes to the IPEC Unit 1 Decommissioning Plan are to be evaluated in accordance with the 50.59 process, as allowed by the NRC in a letter to IPEC dated January 31 1 1996. [Merlin Document ID:
(EN-DC-332) j I See NEI 96-07 Section 4.1 for additional guidance on specific regulati.ons.  
RA-96-0141
~eference the controlling specific regulation(s):
* EN-Ll-100 REV. 20
10CFR50.54(q)  
 
,_. _____ _j IF the entire proposed activity can be dispositioned by one of the criteria in Section V, THEN 50.59 and 72.48 Screenings are not required.
______,_______H-------~=~-------~-*----
Proceed to Section VII and provide basis for conclusion in Section VII.A. Otherwise, continue to Section VI to perform a 50.59 and a 72.48 Screening, or perform a 50.59 and/or72.48 Evaluation in accordance with EN-Ll-101 and/or EN*Ll-112.
ATTAcm.,1rnT 9.1                                                   PROCESS APPLICASlLITY DETER~.ml:.Tlon FoRr.,
Changes to the IPEC Unit 1 Decommissioning Plan are to be evaluated in accordance with the 50.59 process, as allowed by the NRC in a letter to IPEC dated January 311 1996. [Merlin Document ID: RA-96-0141 EN-Ll-100 REV. 20
Sheet 5 of 7
* *
                                    '-----,-----~*~--
* ______ , _______ H-------~=~-------~-*----
* VI.
ATTAcm.,1rnT 9.1 PROCESS APPLICASlLITY DETER~.ml:.Tlon FoRr., '-----,-----~*~--
VI.A 50.59 / 72.48 SCREENING REVIEW (All proposed activities must be evaluated to determine if 50.59, 72.48 or both apply. Check the applicable boxes) 50.59 SCREENING D     50.59 applies to the proposed activity, and all of the following 10 CFR 50.59 screening criteria are met; therefore, the proposed activity requires no further 50.59 review.
Sheet 5 of 7 VI. 50.59 / 72.48 SCREENING REVIEW (All proposed activities must be evaluated to determine if 50.59, 72.48 or both apply. Check the applicable boxes) VI.A 50.59 SCREENING D 50.59 applies to the proposed  
The proposed activity:
: activity, and all of the following 10 CFR 50.59 screening criteria are met; therefore, the proposed activity requires no further 50.59 review. The proposed activity:
* Does not adversely affect the design function of an SSC as described in the UFSAR; AtiQ.
* Does not adversely affect the design function of an SSC as described in the UFSAR; AtiQ.
* Does not adversely affect a method of performing or controlling a design function of an SSC as described In the UFSAR; AND
* Does not adversely affect a method of performing or controlling a design function of an SSC as described In the UFSAR; AND
* Does not adversely affect a method of evaluation that demonstrates intended design function(s) of an SSC will be accomplished as described In the UFSAR; AND
* Does not adversely affect a method of evaluation that demonstrates intended design function(s) of an SSC will be accomplished as described In the UFSAR; AND
* Does not involve a test or experiment not described in the UFSAR
* Does not involve a test or experiment not described in the UFSAR
* Document the basis for meeting the screening criteria in Section VI.C, then proceed to Section VII. ) r10 CFR 50.59(c)(1ll D The proposed activity does not meet the above criteria.
* Document the basis for meeting the screening criteria in Section VI.C, then proceed to Section VII.       )
Perform a 50.59 Evaluation in accordance with EN-Ll-101.
r10 CFR 50.59(c)(1ll D   The proposed activity does not meet the above criteria. Perform a 50.59 Evaluation in accordance with EN-Ll-101. Attach a copy of the Evaluation to this form and proceed to Section VII.
Attach a copy of the Evaluation to this form and proceed to Section VII. VI.B 72.48 SCREENING D 72.48 applies to the proposed  
VI.B     72.48 SCREENING D   72.48 applies to the proposed activity, and all of the following 10 CFR 72.48 screening criteria are met; therefore, the proposed activity requires no further 72.48 review.
: activity, and all of the following 10 CFR 72.48 screening criteria are met; therefore, the proposed activity requires no further 72.48 review. The proposed activity:
The proposed activity:
* Does not adversely affect the design function of an SSC as described in the CFSAR;
* Does not adversely affect the design function of an SSC as described in the CFSAR;   ~
* Does not adversely affect a method of performing or controlling a design function of an SSC as described in the CFSAR; MfQ
* Does not adversely affect a method of performing or controlling a design function of an SSC as described in the CFSAR; MfQ
* Does not adversely affect a method of evaluation that demonstrates intended design function(s) of an SSC will be accomplished as described in the CFSAR; AND
* Does not adversely affect a method of evaluation that demonstrates intended design function(s) of an SSC will be accomplished as described in the CFSAR; AND
* Does not involve a test or experiment not described in the CFSAA, I Document the basis for meeting the screening criteria In Section VI.C, then proceed to Section VII. [10 CFR 72.48(c)(1)1 D The proposed activity does not meet the above criteria.
* Does not involve a test or experiment not described in the CFSAA, I
Perform a 72.48 Evaluation In accordance with EN-Ll-112.
Document the basis for meeting the screening criteria In Section VI.C, then proceed to Section VII.
Attach a copy of the Evaluation to this form and proceed to Section VII
[10 CFR 72.48(c)(1)1 D   The proposed activity does not meet the above criteria. Perform a 72.48 Evaluation In accordance with EN-Ll-112. Attach a copy of the Evaluation to this form and proceed to Section VII *
* EN-Ll-100 REV. 20 ATTAC~lr.1ENT 9.1 PROCESS APPLICAS!LITY DETERMINAT!mi Fom., ------~=--*~-----
* EN-Ll-100 REV. 20
Sheet 6 of 7
 
* VI.C BASIS *
ATTAC~lr.1ENT 9.1                                                                                       Fom.,
* Provide a clear, concise basis for determining the proposed activity may be screened out such that a party reviewer can reach the same conclusions.
  ------~=--*~-----
Identify the relevant design function, as appropriate.
Sheet 6 of 7 PROCESS APPLICAS!LITY DETERMINAT!mi
Refer to NEI 96-07 Section 4.2 for guidance.
* VI.C     BASIS Provide a clear, concise basis for determining the proposed activity may be screened out such that a third-party reviewer can reach the same conclusions. Identify the relevant design function, as appropriate. Refer to NEI 96-07 Section 4.2 for guidance. Refer lo NED 12*06 Section 11.4 for guidance regarding FLEX. Provide supporting documentation or references as appropriate.
Refer lo NED 12*06 Section 11.4 for guidance regarding FLEX. Provide supporting documentation or references as appropriate.
Go to Section VII.A General Review Comments below.
Go to Section VII.A General Review Comments below. VII. REGULATORY REVIEW SUMMARY VII.A GENERAL REVIEW COMMENTS (Provide pertinent review details and basis for conclusions if not addressed elsewhere In form.) The Indian Point Energy Center Emergency Plan {Plan), Revision 17-01 (Merlin Revision 20), describes the emergency preparedness program for the Indian Point Energy Center 1 , 2, and 3 Generating Stations  
VII.     REGULATORY REVIEW  
. The Plan outlines the basis for response actions that would be implemented in an emergency.
 
This . revision incorporates changes throughout the document.
==SUMMARY==
In all cases. no change has resulted in a reduction in effectiveness of the Plan. Specific details regarding each change are included in the 10 CFR 50.54{q)
 
Screen and Evaluation and associated Revision Matrix. The overall 10 CFR S0.54(ql Evaluation conclusion determined that the proposed changes to the IPEC Emergency Plan. Revision 17-01. continues to meet the planning standards outlined in 10 CFR 50.47(b).
VII.A     GENERAL REVIEW COMMENTS (Provide pertinent review details and basis for conclusions if not addressed elsewhere In form.)
This revision does not represent a reduction in effectiveness to the IPEC Emergency Plan and can be incorporated without prior NRC approval.
The Indian Point Energy Center Emergency Plan {Plan), Revision 17-01 (Merlin Revision 20), describes the emergency preparedness program for the Indian Point Energy Center 1, 2, and 3 Generating Stations .
See completed 1 O CFR 50.54(9)
The Plan outlines the basis for response actions that would be implemented in an emergency. This .
Screen and Evaluation.
revision incorporates changes throughout the document. In all cases. no change has resulted in a reduction in effectiveness of the Plan. Specific details regarding each change are included in the 10 CFR 50.54{q) Screen and Evaluation and associated Revision Matrix. The overall 10 CFR S0.54(ql Evaluation conclusion determined that the proposed changes to the IPEC Emergency Plan. Revision 17-01. continues to meet the planning standards outlined in 10 CFR 50.47(b). This revision does not represent a reduction in effectiveness to the IPEC Emergency Plan and can be incorporated without prior NRC approval. See completed 10 CFR 50.54(9) Screen and Evaluation.
VII.B CONCLUSIONS  
VII.B   CONCLUSIONS
: 1. Is a change to an LBD being initiated?
: 1. Is a change to an LBD being initiated?                                               l2J Yes IF "Yes," !t!.fil! enter the appropriate change control process and include           D   No this form with the change package.
l2J Yes IF "Yes," !t!.fil!
: 2. Is a 10 CFR 50.59 Evaluation required?                                               D   Yes
enter the appropriate change control process and include D No this form with the change package.  
                !E "Yes," THEN complete a 50.59 Evaluation in accordance with EN-Ll-101               ~  No and attach a copy to the change activity.
: 2. Is a 10 CFR 50.59 Evaluation required?
: 3. Is a 10 CFR 72.48 Evaluation required?                                               D   Yes IF "Yes/' THEN complete a 72.48 Evaluation in accordance with EN*Ll-112             181 No and attach a copy to the change activity.
D Yes !E "Yes," THEN complete a 50.59 Evaluation in accordance with EN-Ll-101 No and attach a copy to the change activity.  
* EN-Ll-100 REV. 20
: 3. Is a 10 CFR 72.48 Evaluation required?
 
D Yes IF "Yes/' THEN complete a 72.48 Evaluation in accordance with EN*Ll-112 181 No and attach a copy to the change activity  
ATTACHMENT 9.1                                                         PROCESS APPLICABILITY DETEm.~IMATlOrl Fem.,
. EN-Ll-100 REV. 20
Sheet7 of 7
*
                    ----""''"-~~---~*=*=-----~~
* ATTACHMENT 9.1 PROCESS APPLICABILITY DETEm.~IMATlOrl Fem., ----""''"-~~---~*=*=-
1 VIII. SIGNATURES Preparer:                                                                 /Entergy/Emergency Planning/ /   o/2-.r~?
----~~ Sheet7 of 7 VIII. SIGNATURES 1 Preparer:  
Name (print) / Sig a Reviewer:           R,c~ArJ         L,£A./e...                       ~  ENTE12c.   {213-4 flssvr2..
/Entergy/Emergency Planning/  
Process Applicability Exclusion Site Procedure Champion or           Name (print)/ Signature/ Company/ Department/ Date Owner:
/ o/2-.r~?
Upon completion, forward this PAD form to the appropriate organization for record storage. If the PAD form is part of a process that requires transmittal of documentation, including PAD forms, for record storage, then the PAD form need not be forwarded separately*
Name (print) / Sig a Reviewer:
1 The printed name, company, department, and date must be included on the form. Signatures may be obtained via electronic processes (e.g., PCRS, ER processes, Asset Suite signature), manual methods (e.g., ink signature), e-mail, or telecommunication. If using an e-mail, attach it to this fonn.
R,c~ArJ L,£A./e... ENTE12c.  
EN-Ll-100 REV. 20
{213-4 flssvr2..
 
Process Applicability Exclusion Site Procedure Champion or Owner: Name (print)/
Emergency Planning Document Change Checklist Form (All sections must be completed, N/A or place a check on the line where applicable)
Signature/
Section 1 Doc/Procedure Type: (circle one) Administrative/ Implementing I EPLAN Doc/Procedure No: IPEC-EP       C/A: Yes_ No _X_ C/A No. Due Date C/A No.       Due Date: _ __
Company/
Doc/Procedure
Department/
 
Date Upon completion, forward this PAD form to the appropriate organization for record storage.
==Title:==
If the PAD form is part of a process that requires transmittal of documentation, including PAD forms, for record storage, then the PAD form need not be forwarded separately
Indian Point Energy Center Emergency Plan Rev No: 20(17-01) Rev Dist Date: 11/15/17 Reason for EPDCC:             New   _....,_X-'---_ Revision       Cancel Date of EPDCC: 10/31/2017 Section 2 Change Description
* 1 The printed name, company, department, and date must be included on the form. Signatures may be obtained via electronic processes (e.g., PCRS, ER processes, Asset Suite signature),
: 1.     Originator: A. l r a o l a ~                 11d_,/n
manual methods (e.g., ink signature), mail, or telecommunication.
: 2.     Class of Change:     Technical Correction           New Commitment__ Other _X._ __
If using an e-mail, attach it to this fonn. EN-Ll-100 REV. 20
: 3.     Page numbers affected and reason for change: Refer to the attached matrix of changes attached to completed 50.54(q)screen and evaluation
* *
: 4.      Emergeqcy Planning Documents Affected: ~N--'-o~ne-'----------------
* Emergency Planning Document Change Checklist Form (All sections must be completed, N/A or place a check on the line where applicable)
: 5.      Emergency Planning Procedures Affected: None_ _ _ _ _ _ _ _ _ _ _ _ __
Section 1 Doc/Procedure Type: (circle one) Administrative/
: 6.     
Implementing I EPLAN Doc/Procedure No: IPEC-EP C/A: Yes_ No _X_ C/A No. Due Date C/A No. Due Date: __ _ Doc/Procedure Title: Indian Point Energy Center Emergency Plan Rev No: 20(17-01)
Rev Dist Date: 11/15/17 Reason for EPDCC: New _....,_X-'---_
Revision Cancel Date of EPDCC: 10/31/2017 Section 2 Change Description  
: 1. Originator:
A. lraola~ 11d_,/n 2. Class of Change: Technical Correction New Commitment
__ Other _X. __ _ 3. 4. 5. 6 . 7. 8. 9. Page numbers affected and reason for change: Refer to the attached matrix of changes attached to completed 50.54(q)screen and evaluation Emergeqcy Planning Documents Affected:  
~N--'-o~ne-'----------------
Emergency Planning Procedures Affected:
None _____________
_


==References:==
==References:==
Other Procedure(s) # _ _N/A._ _ _ Regulatory Document #_NIA_
Other: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
: 7.      Reviewed training requirements with department training coordinator N/A date:
: 8.      The following are complete, or are not applicable and are so marked.
Tech Review _X_ 50.54q _X_ ENN-Ll-100;1LPL-155 _N/A_ SMM-AD-102 _X_
Manager approval _X_ SRC _N/A_
: 9. Both table of contents and transmittals are complete _ _ _ _ _ date - - - - - - -
: 10. Approved doc/procedure delivered to Document Control for distribution ___ date_ __
: 11. Position Binders updated if applicable: _ _ _ _ _ _ _ _ _ _ _ _ __ date
: 12. Copy of EPDCC and document/procedure placed in EP file_ _ _ _ _ _ _date_ __
Sheet 1 of 1                      Form EP-AD2-1 Rev. 0


Other Procedure(s)
CHANGE MANAGEMENT NOTICE IPEC EPLAN Rev. 17-01 (Merlin Rev. #20)
# __ N/A. ___ Regulatory Document
WHO is affected?
#_NIA_ Other: ___________________________
IPEC Emergency Planning Department Personnel WHAT is the change?
_ Reviewed training requirements with department training coordinator N/A date: The following are complete, or are not applicable and are so marked. Tech Review _X_ 50.54q _X_ ENN-Ll-100;1LPL-155
A total of 48 changes were made of which 52% were editorial along with minor program changes.
_N/A_ SMM-AD-102
_X_ Manager approval
_X_ SRC _N/A_ Both table of contents and transmittals are complete
_____ date -------10. Approved doc/procedure delivered to Document Control for distribution
___ date __ _ 11. Position Binders updated if applicable:
_____________
_ date 12. Copy of EPDCC and document/procedure placed in EP file _______ date __ _ Sheet 1 of 1 Form EP-AD2-1 Rev. 0 
* *
* CHANGE MANAGEMENT NOTICE IPEC EPLAN Rev. 17-01 (Merlin Rev. #20) WHO is affected?
IPEC Emergency Planning Department Personnel WHAT is the change? A total of 48 changes were made of which 52% were editorial along with minor program changes.
Please see the attached matrix for a summary of all the changes.
Please see the attached matrix for a summary of all the changes.
This revision is of "Low Risk/Complexity."
This revision is of "Low Risk/Complexity."
WHY is the change occurring?
WHY is the change occurring?
This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision.
This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01 .
In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01 . WHEN is the change effective?
* WHEN is the change effective?
Nov. 15,2017 CONTACTS:
Nov. 15,2017 CONTACTS:
Tony lraola, Sr. Emergency  
Tony lraola, Sr. Emergency Planner, x 7704 Frank Mitchell, EP Manager, x 8410
: Planner, x 7704 Frank Mitchell, EP Manager, x 8410
 
* *
IPEC IMPLEMENTING PROCEDURE                                                        IP-SMM-AD-102                                           Rev: ,15 PREPARATION, REVIEW, AND APPROVAL                                                                                 Page 35 of 43 ATTACHMENT         10.2                                                     IPEC PROCEDURE REVIEW AND APPROVAL Procedure
* I P-SMM-AD-102 Rev: ,15 IPEC IMPLEMENTING PROCEDURE PREPARATION, REVIEW, AND APPROVAL Page 35 of 43 ATTACHMENT 10.2 IPEC PROCEDURE REVIEW AND APPROVAL Procedure Title: Emergency Plan Procedure No. IPEC-EP Existing Rev: 16-01 New Rev: 17-01 ORN/EC No: 17-01168 Procedure Activi~ D Converted To IPEC, Replaces:
 
Temi;ioran(
==Title:==
Procedure Change (MARK Applicable)  
Emergency Plan Procedure No.       IPEC-EP               Existing Rev: 16-01   New Rev:         17-01       ORN/EC No:                                 17-01168 Procedure Activi~                 D Converted To IPEC, Replaces:                       Temi;ioran( Procedure Change (MARK Applicable)                                                                                 (MARK Applicable)
(MARK Applicable)
D NEW PROCEDURE                             Unit 1 Procedure No.                       EDITORIAL Temporary Procedure Change D
D NEW PROCEDURE Unit 1 Procedure No. D EDITORIAL Temporary Procedure Change D GENERAL REVISION D ADVANCE Temporary Procedure Change [&I PARTIAL REVISION Unit 2 Procedure No: D CONDITIONAL Temporary Procedure Change D EDITORIAL REVISION D VOID PROCEDURE Terminating Condition:
D GENERAL REVISION                                                             D       ADVANCE Temporary Procedure Change
D SUPERSEDED Unit 3 Procedure No: D RAPID REVISION Document in Microsoft Word: D VOID DRN/TPC No(s): D Yes D No Revision Summan( D N/A -See Revision Summary page. Refer to the attached summary of changes in the attached matrix. lmi;ilementation Reguirements Implementation Plan? D Yes [&)No Formal Training?
[&I PARTIAL REVISION D EDITORIAL REVISION                        Unit 2 Procedure No:               D       CONDITIONAL Temporary Procedure Change D VOID PROCEDURE                                                               Terminating Condition:
D Yes !BlNo Special Handling?
D SUPERSEDED                               Unit 3 Procedure No:
D Ye .[&)No / i RPO Dept: Emergency Planning Writer: (Print Name/Ext/Sign):J.A~  
Document in Microsoft Word:
. ..!Jlr@ag_ol@af2/x[_j7[17'..()0~4:.........l_::J~~-:t:::_=:_.!.'':_:':_J~,!...J
D RAPID REVISION                                                              D      VOID DRN/TPC No(s):
___ _ Review and Ai;ii;iroval (Per Attachment 10.1, IPEC Revie :;?~ts) 1. !Bl Technical Reviewer:
D Yes       D No Revision Summan(             D N/A - See Revision Summary page.
F. Mitchell/  
Refer to the attached summary of changes in the attached matrix.
(Print Name/ Signature/
lmi;ilementation Reguirements Implementation Plan? D Yes [&)No Formal Training? D Yes !BlNo Special Handling? D Ye .[&)No                                             /         i RPO Dept: Emergency Planning           Writer: (Print Name/Ext/Sign):J.A~...!Jlr@ag_ol@af2/x[_j7[17'..()0~4:.........l_::J~~-:t:::_=:_.!.'':_:':_J~,!...J_ _ __
Date) 2. D Cross-Disciplinary Reviewers:  
Review and Ai;ii;iroval (Per Attachment 10.1, IPEC Revie
: 3. [&I 4. D Dept: Reviewer:
:;?~ts)
Print Name/ Signature/
: 1. !Bl     Technical Reviewer:     F. Mitchell/
Date) Dept: Reviewer:
(Print Name/ Signature/ Date)
RPO-Responsibilities/Checklist:  
: 2. D         Cross-Disciplinary Reviewers:
(Print Name/ Signature/
Dept:                                         Reviewer:
Date) [&)PAD required and is complete (PAD Approver and Reviewer qualifications have been verified)
Print Name/ Signature/ Date)
D Previous exclusion from further Ll-100 Review is still valid D PAD not required due to type of change as defined in 4.6 Non-Intent Determination Complete:  
Dept:                                         Reviewer:
---------------------------
: 3. [&I      RPO- Responsibilities/Checklist:
NO change of purpose or scope NO reduction in the level of nuclear safety NO voiding or canceling of a procedure, unless requirements are incorporated into another procedure or the need for the procedure was eliminated (Print Name/ Signature/
(Print Name/ Signature/ Date)
Date) NO change to less restrictive acceptance criteria NO change to steps previously identified as commitment steps NO deviation from the Quality Assurance Program Manual NO change that may result in deviations from Technical Specifications, FSAR, plant design requirements,  
[&)PAD required and is complete (PAD Approver and Reviewer qualifications have been verified)
: 5. D On-Shift Shift Manager/CRS:  
D Previous exclusion from further Ll-100 Review is still valid D PAD not required due to type of change as defined in 4.6
: 6. D User Validation:
: 4. D        Non-Intent Determination Complete:
User: 7. D Special Handling Requirements Understood:  
                                                      --------------------------- (Print Name/ Signature/ Date)
(Print Name/ Signature/
NO change of purpose or scope                             NO change to less restrictive acceptance criteria NO reduction in the level of nuclear safety               NO change to steps previously identified as commitment steps NO voiding or canceling of a procedure, unless             NO deviation from the Quality Assurance Program Manual requirements are incorporated into another procedure      NO change that may result in deviations from Technical or the need for the procedure was eliminated              Specifications, FSAR, plant design requirements,
Date) Validator:
: 5. D       On-Shift Shift Manager/CRS:
(Print Name/ Signature/
(Print Name/ Signature/ Date)
Date) 
: 6. D       User Validation:  User:                                          Validator:
* * *
: 7. D       Special Handling Requirements Understood:
* NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6 ~Entergy MANAGEMENT PROCEDURE MANUAL INFORMATIONAL USE PAGE 1 of4 Entergy Nuclear Change Management ATTACHMENT 7.1 CHANGE IMPACT CHECKLIST Sheet 1 of 3 This Checklist assists the change lead with identifying the specific impacts on people and processes.
(Print Name/ Signature/ Date)
The checklist provides details of specific actions required to implement the change. The Change Owner /Lead completes the Change Impact Checklist to identify the needed forms identified in Section IV for the Impact Level of the change. Additionally, the Change Owner/Lead uses additional forms and references identified in section II to analyze the change. This form is completed by following Section 3.3 in the procedure.
 
See section 3.8 for documentation requirements.
          *~Entergy                NUCLEAR                 FLEET ADMINISTRATIVE       EN-FAP-OM-023               REV.6 PROCEDURE MANAGEMENT MANUAL                     INFORMATIONAL USE                     PAGE 1 of4 Entergy Nuclear Change Management ATTACHMENT 7.1                                                                           CHANGE IMPACT CHECKLIST Sheet 1 of 3 This Checklist assists the change lead with identifying the specific impacts on people and processes. The checklist provides details of specific actions required to implement the change. The Change Owner /Lead completes the Change Impact Checklist to identify the needed forms identified in Section IV for the Impact Level of the change.
If the change is a personnel change ONLY, use Attachment 7.4. Section I -Define the Change: Reference 3.3[1] Title of Change: Emergency Plan Revision 17-01 Change Owner: F. Mitchell Change Sponsor:
Additionally, the Change Owner/Lead uses additional forms and references identified in section II to analyze the change. This form is completed by following Section 3.3 in the procedure. See section 3.8 for documentation requirements.
F. Mitchell Change Lead: A. lrao!a Project Manager:
If the change is a personnel change ONLY, use Attachment 7.4.
N/A Whe1t is the Change? (Provide a brief description of what will be different and change scope.) Revised the Indian Point Emergency Plan of which 52% were editorial changes.
Section I - Define the Change: Reference 3.3[1]
Refer to the attached matrix for a summary of editorial.
Title of Change:             Emergency Plan Revision 17-01 Change Owner:                   F. Mitchell                       Change Sponsor:           F. Mitchell Change Lead:                     A. lrao!a                         Project Manager:         N/A Whe1t is the Change? (Provide a brief description of what will be different and change scope.)
This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision.
* Revised the Indian Point Emergency Plan of which 52% were editorial changes. Refer to the attached matrix for a summary of editorial. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-
In addition several new changes were made as part of independent review. Who and What groups/departments are impacted by the change? (Identify employees/groups,  
: 02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review.
: programs, processes, regulations, equipment, facilities, etc. affected by the change.)
Who and What groups/departments are impacted by the change? (Identify employees/groups, programs, processes, regulations, equipment, facilities, etc. affected by the change.)
Emergency Planning Why is the Change necessary?  
Emergency Planning Why is the Change necessary? (Proyide a reason for the change, the benefit gained or consequence avoided.)
(Proyide a reason for the change, the benefit gained or consequence avoided.)
This change was required to correctly update the Emergency Plan having used the incorrect revision to update the 2016 revision When is the proposed or desired Date for Change? {Identify timeline or effective date for change.)
This change was required to correctly update the Emergency Plan having used the incorrect revision to update the 2016 revision When is the proposed or desired Date for Change? {Identify timeline or effective date for change.)
Nov. 15, 2017 Where is the Change being Implemented?  
Nov. 15, 2017 Where is the Change being Implemented? (check as applicable; double click box to select)
(check as applicable; double click box to select) D Fleet-Wide  
D Fleet-Wide       *D   Echelon     D   White Plains       0 ANO     D GGNS     ~ IPEC     D   PAL 0 PIL               D   RBS         D VY                   0   WF3     D Other                                           -
*D Echelon D White Plains 0 ANO D GGNS IPEC D PAL 0 PIL D RBS D VY 0 WF3 D Other -What SHOULD NOT be affected as a result of this change? (Identify any areas affected employees/groups might likely assume would be affected, but are not included.)
What SHOULD NOT be affected as a result of this change? (Identify any areas affected employees/groups might likely assume would be affected, but are not included.)
* NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6 -===-Entergy MANAGEMENT PROCEDURE MANUAL INFORMATIONAL USE PAGE 2 of4 Entergy Nuclear Change Management ATTACHMENT 7.1 CHANGE IMPACT CHECKLIST Sheet 2 of 3 Yes No Unsure Section II -Impact Evaluation:
 
Reference 3.3[2] Notes D [21 D Impact Nuclear, Radiological, Industrial Safety or Equipment Reliability?  
      ~                      NUCLEAR               FLEET ADMINISTRATIVE       EN-FAP-OM-023             REV.6
[21 D D Impact Licensing:
      -===- Entergy         MANAGEMENT PROCEDURE MANUAL                   INFORMATIONAL USE                   PAGE     2 of4 Entergy Nuclear Change Management ATTACHMENT 7.1                                                                       CHANGE IMPACT CHECKLIST Sheet 2 of 3 Yes     No Unsure Section II - Impact Evaluation: Reference 3.3[2]                                       Notes D       [21   D   Impact Nuclear, Radiological, Industrial Safety or Equipment Reliability?
FSAR/Technical Specifications/QA Program/Commitments?  
Impact Licensing: FSAR/Technical Specifications/QA
(i.e., ANSI, 50.59, 50.54, etc.) Perform evaluation in accordance with EN-L/-100  
[21    D      D    Program/Commitments? (i.e., ANSI, 50.59, 50.54, etc.) Perform evaluation in accordance with EN-L/-100 Impact E-Plan, Security Plan, QA Manual? Perform evaluation in
[21 D D Impact E-Plan, Security Plan, QA Manual? Perform evaluation in accordance with EN-L/-100 D [21 D Impact to Procedures/Policies?  
[21    D      D    accordance with EN-L/-100 Impact to Procedures/Policies?
(e.g., non-editorial  
D      [21    D    (e.g., non-editorial changes, change that affects multiple procedures, etc.)
: changes, change that affects multiple procedures, etc.) D [21 D Impact scheduled Plant Work Activities or Operating Schedule?
D       [21   D   Impact scheduled Plant Work Activities or Operating Schedule?
D [21 D Impact computer programs/applications software?
Impact computer programs/applications software?
If Yes, evaluate need for an SQA-Reference EN-IT-104.
D      [21    D    If Yes, evaluate need for an SQA- Reference EN-IT-104.
Impact Accredited Training Job Task or Qualifications of Personnel?
Impact Accredited Training Job Task or Qualifications of Personnel?
D [21 D If Yes, an action !!1!1§! be initiated in accordance with EN-TQ-201.
D       [21   D   If Yes, an action !!1!1§! be initiated in accordance with EN-TQ-201. Contact Training management for additional information.
Contact Training management for additional information.
* D D
* D [21 D Impact ANSI 3.1 Qualification Requirements (See EN-HR-137)
[21
Perform evaluation in accordance with EN-HR-137 Impact organizational responsibility, e.g., require transfer of responsibility from one organization to another?
[21 D
D [21 D If Yes, reference EN-HR-134 during change planning.
D Impact ANSI 3.1 Qualification Requirements (See EN-HR-137) Perform evaluation in accordance with EN-HR-137 Impact organizational responsibility, e.g., require transfer of responsibility from one organization to another?
Note: transferring responsibilities between organizations may impact the QAPM. Evaluate in accordance with aoolicable Licensing (EN-LI) procedures.
If Yes, reference EN-HR-134 during change planning. Note: transferring responsibilities between organizations may impact the QAPM. Evaluate in accordance with aoolicable Licensing (EN-LI) procedures.
Impact resources or physical workload in other departments or D [21 D organizations?  
Impact resources or physical workload in other departments or D       [21   D   organizations?
(e.g., work activities, process time, employee schedules?)
(e.g., work activities, process time, employee schedules?)
Impact contractor resources which are working under Entergy procedures?
Impact contractor resources which are working under Entergy procedures?
D [21 D (e.g., contractors working under Entergy procedures require additional notification beyond normal communication channels)
D       [21   D   (e.g., contractors working under Entergy procedures require additional notification beyond normal communication channels)
D [21 D Impact of other Areas, Processes or Facilities to support the change? (Internal or External?)
Impact of other Areas, Processes or Facilities to support the change?
Potential for new equipment or system not to function properly at D [21 D implementation?
D      [21    D    (Internal or External?)
Consider use of Contingency/Prevention Worksheet, Attachment  
Potential for new equipment or system not to function properly at D       [21   D   implementation? Consider use of Contingency/Prevention Worksheet, Attachment 7. 6 Change requires specific skills, experience and subject matter experts for D      [21    D    successful plan development and implementation? Use Team Skill Matrix, Attachment 7. 5 Change involves a temporary or permanent employee change due to":
: 7. 6 D [21 D Change requires specific skills, experience and subject matter experts for successful plan development and implementation?
Promotion, Transfer, New Hire, Resignation, Retirement, Staffing D      [21    D    Restructuring or Termination Leave of Absence, Medical Leave or Temporary Work Assignment. Use Personnel Change Checklist, Attachment 7.4
Use Team Skill Matrix, Attachment  
 
: 7. 5 Change involves a temporary or permanent employee change due to": D [21 D Promotion,  
A                       NUCLEAR                 FLEET ADMINISTRATIVE       EN-FAP-OM-023               REV.6
: Transfer, New Hire, Resignation, Retirement, Staffing Restructuring or Termination Leave of Absence, Medical Leave or Temporary Work Assignment.
            ~Entergy                MANAGEMENT PROCEDURE MANUAL                   INFORMATIONAL USE                       Page 3 of4 Entergy Nuclear Change Management ATTACHMENT7.1                                                                               CHANGE IMPACT CHECKLIST SHEET3 OF3 Section Ill - Identify the Change Impact Level: (Reference 3.3[3])                                       Medium       High Refer to Section 3.3[3} for guidance.
Use Personnel Change Checklist, Attachment 7.4
* *
* l __ A ~Entergy NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6 MANAGEMENT PROCEDURE MANUAL INFORMATIONAL USE Page 3 of4 Entergy Nuclear Change Management ATTACHMENT7.1 SHEET3 OF3 CHANGE IMPACT CHECKLIST Section Ill -Identify the Change Impact Level: (Reference 3.3[3]) Medium High Refer to Section 3.3[3} for guidance.
Checked "Yes" to any of the above questions in Section II? Ensure all "Yes" responses were factored into the impact level evaluation.
Checked "Yes" to any of the above questions in Section II? Ensure all "Yes" responses were factored into the impact level evaluation.
Checked "Unsure" to any of the above questions in Section II? Review all notes and evaluate for followup actions.
Checked "Unsure" to any of the above questions in Section II? Review all notes and evaluate for followup actions.
SECTION IV -CHANGE MANAGEMENT PROCESS STEPS BY IMPACT TYPE (FOLLOW THE PROCEDURE GUIDANCE IDENTIFIED BELOW FOR THE IMPACT LEVEL OF THE CHANGE) PROCESS ~lfflil~'5"11""~'--~aiM~E~D~IU~M~~~--,-~~~---,-;H~IG~H:---~~~-m,i:;:
SECTION IV - CHANGE MANAGEMENT PROCESS STEPS BY IMPACT TYPE (FOLLOW THE PROCEDURE GUIDANCE IDENTIFIED BELOW FOR THE IMPACT LEVEL OF THE CHANGE)
ASSIGN CHANGE CHANGE OWNER, SPONSOR,CHANGE SPONSOR,CHANGE  
PROCESS                 ~lfflil~'5"11""~'--~aiM~E~D~IU~M~~~--,-~~~---,-;H~IG~H:---~~~-m,i:;:
: SPONSOR, CHANGE OWNER, ROLES {REF. 3.3[5]) CHANGE LEAD OWNER, CHANGE LEAD OWNER, CHANGE LEAD, CHANGELEAD,PROJECT PROJECT MANAGER OPT. MANAGER ANALYZE THE CHANGE DEVELOP ATT. 7.2 ATT. 7.2 (FLEET AND SITE LEVEL) (REF. 3.4) COMMUNICATIONS ATT. 7.4 (OPT) ATT. 7.4 (OPT) RESOURCE-TO-WORKLOAD RATIO ANALYSIS (3.4[1](G))
ASSIGN CHANGE           CHANGE OWNER,         SPONSOR,CHANGE             SPONSOR,CHANGE                 SPONSOR, CHANGE OWNER, ROLES {REF. 3.3[5])   CHANGE LEAD           OWNER, CHANGE LEAD         OWNER, CHANGE LEAD,           CHANGELEAD,PROJECT PROJECT MANAGER OPT.           MANAGER
PLAN THE CHANGE ATT. 7.3 ATT. 7.3 (FLEET AND SITE LEVEL) (REF. 3.5) ATT. 7.6 ATT. 7.7 PLAN ACTIONS FOR EFFECTIVENESS REVIEW IMPLEMENT THE IMPLEMENT&
* ANALYZE THE CHANGE     DEVELOP               ATT. 7.2                   ATT. 7.2 (FLEET AND SITE LEVEL)
ATT. 7.3 COMPLETED ATT. 7.3 COMPLETED (FLEET AND SITE LEVEL) CHANGE REF. 3.6 COMMUNICATE REVIEW THE CHANGE CHANGE ATT. 7.7 (OPT) ATT. 7.7 {REF. 3.7) ATT. 7.8 OPT ATT. 7.8 DOCUMENT THE DEPT STORED PCRS (OPT) PCRS (ATT. 7.1, ATT. 7.2, ATT. 7.3, ATT. 7.6, ATT. 7.7) CHANGE REF. 3.8 Concurrence of Phase 1 Review Com letion for Ma'or and Hi ROLE NAME CHANGE OWNER/LEAD F.MITCHELLIA.
(REF. 3.4)             COMMUNICATIONS       ATT. 7.4 (OPT)             ATT. 7.4 (OPT)
IRAOL SPONSOR F. MITCHELL GOVERNANCE OWNER SITE PROCESS OWNER
RESOURCE-TO-WORKLOAD RATIO ANALYSIS (3.4[1](G))
* A FLEET ADMINISTRATIVE EN-F AP-0 M-023 REV.6 . NUCLEAR --=-Entergy MANAGEMENT PROCEDURE*
PLAN THE CHANGE                             ATT. 7.3                   ATT. 7.3 (FLEET AND SITE LEVEL)
MANUAL INFORMATIONAL USE Page 4 of 4 Entergy Nuclear Change Management  
(REF. 3.5)                                                             ATT. 7.6 ATT. 7.7 PLAN ACTIONS FOR EFFECTIVENESS REVIEW IMPLEMENT THE           IMPLEMENT&           ATT. 7.3 COMPLETED         ATT. 7.3 COMPLETED (FLEET AND SITE LEVEL)
* * 
CHANGE REF. 3.6         COMMUNICATE REVIEW THE CHANGE       CHANGE               ATT. 7.7 (OPT)             ATT. 7.7
* *
{REF. 3.7)                                   ATT. 7.8 OPT               ATT. 7.8 DOCUMENT THE           DEPT STORED           PCRS (OPT)                 PCRS (ATT. 7.1, ATT. 7.2, ATT. 7.3, ATT. 7.6, ATT. 7.7)
* a NUCLEAR QUALITY RELATED EN-Ll-113 I REV.12 , ~Entergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 1 OF 3 Licensing Basis Document Change Process ATTACHMENT 9.1 LBDCR FORM =~=======~=====~~=======-=~~======
CHANGE REF. 3.8 Concurrence of Phase 1 Review Com letion for Ma'or and Hi ROLE                                     NAME CHANGE OWNER/LEAD                       F.MITCHELLIA. IRAOL SPONSOR                                       F. MITCHELL GOVERNANCE OWNER SITE PROCESS OWNER
 
A .
  -=-Entergy NUCLEAR        FLEET ADMINISTRATIVE EN-F AP-0 M-023       REV.6 PROCEDURE*
MANAGEMENT MANUAL         INFORMATIONAL USE             Page 4 of 4 Entergy Nuclear Change Management
 
a~Entergy NUCLEAR QUALITY RELATED           EN-Ll-113 I   REV.12 MANAGEMENT MANUAL                       INFORMATIONAL USE               PAGE 1 OF 3 Licensing Basis Document Change Process ATTACHMENT 9.1                                                                                           LBDCR FORM
  =~=======~=====~~=======-=~~======
Sheet 1 of 3 (TYPICAL)
Sheet 1 of 3 (TYPICAL)
I. LBDCR INITIATION Tony lraola Emergency 7704 1,2,3 Nov. 15, EPLAN Planning 2017 17-01 INITIATOR'S NAME DEPARTMENT PHONE UNIT DATE LBDCR# (print or type) DESCRIPTION OF THE CHANGE (Attach additional pages if necessary; may also refere~ce PAD Form) This new revision incorporates changes that were missed In 16-01 to due an incorrect revision (15-01 vs 15-02) beinq used to update the annual 2016 revision.
I.     LBDCR INITIATION Emergency                                          Nov. 15,      EPLAN Tony lraola                                             7704           1,2,3 Planning                                           2017         17-01 INITIATOR'S NAME DEPARTMENT               PHONE             UNIT       DATE       LBDCR#
In addition, several new editorial chanqes were made. LICENSING DOCUMENT(S)
(print or type)
AFFECTED AFFECTED SECTION/PAGE(S)  
DESCRIPTION OF THE CHANGE (Attach additional pages if necessary; may also refere~ce PAD Form)
(Attach marl<ed-up pages) D Operating License (OL) D Technical Specifications (TS) D Environmental Protection Plan (EPP) D Anti-Trust Conditions (Appendix of OL) D NRC Orders D Updated Final Safety Analysis Report (UFSAR) D TS Bases D Technical Requirements Manual (TRM) (including TRM Bases) D Quality Assurance Program Manual (QAPM) D Security Plan/Cyber Security Plan (CSP) r8] Emergency Plan (EP) See attached matrix D Offsite Dose Calculation Manual (ODCM) D Spent Fuel Storage Cask Final Safety Analysis Report (CFSAR) D Spent Fuel Storage Cask Certificate of Compliance (CoC) D Spent Fuel Storage Cask CoC Bases D 10 CFR 72.212 Evaluation Report (212 Report) D Fire Protection Program (FPP)/Fire Hazards Analysis (FHA) D Core Operating Limits Report (COLR) D Other (Specify)
This new revision incorporates changes that were missed In 16-01 to due an incorrect revision (15-01 vs 15-02) beinq used to update the annual 2016 revision. In addition, several new editorial chanqes were made.
* * * -------------------------------------~
AFFECTED SECTION/PAGE(S)
* ~Entergy NUCLEAR MANAGEMENT MANUAL QUALITY RELATED INFORMATIONAL USE EN-Ll-113 REV.12 PAGE 20F3 Licensing Basis Document Change Process ATIACHMENT9.1 LBDCRFORM Sheet 2 of 3 METHOD(S)
LICENSING DOCUMENT(S) AFFECTED (Attach marl<ed-up pages)
ALLOWING THE CHANGE D PAD Review (Attach a copy) D 10 CFR 50.48 / EN-DC-128 Review (Attach a copy) D 10 CFR 50.59 Evaluation (Attach a copy) 10 CFR 50.54 Review (Attach a copy) D 10 CFR 72.48 Evaluation (Attach a copy) D Environmental Evaluation (Attach a copy) D Approved NRC Change (Attach a copy of D Editorial Change (LBDs controlled under 50.59 or NRC Letter or reference NRC letter number) 72.48, only) D NRC Approval is Required D Other Approval (Attach a copy of supporting documents)
D     Operating License (OL)
D "UFSAR-only" Change (NEI 98-03) Check the appropriate box below: D Reformatting  
D     Technical Specifications (TS)
\ D Replacing Detailed Drawing \D Referencing other Documents Check the appropriate box below and provide a basis for removing information, if applicable:
D     Environmental Protection Plan (EPP)
D Removing Excessive Detail D Removing Obsolete Information D Removing Redundant Information D Removing Commitments Removal Basis: II. LBDCR IMPLEMENTATION 1 ACTIONS SUPPORTING IMPLEMENTATION LSD SECTION See attached matrix REQUIRED ACTIONS ACTION Issuance of the EPLAN scheduled for Nov.15, 2017 RESP. DEPT EP ACTION TAKEN OR TRACKING METHOD Entry into Merlin on Nov. 15, 2017 
* D D
* * * ------------------------NUCLEAR QUALITY RELATED EN-Ll-113 I REV.12 ~Entergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 3 OF 3 Licensing Basis Document Change Process ATTACHMENT9.1 LBDCRFORM Sheet 3 of 3 Ill. LBDCR REVIEW AND APPROVAL 1 Department UFSAR Section Owner3 Peer Review4 LBD Owner REVIEW AND APPROVAL of LBDCR (see Attachment 9.2) Approved2 N/A A lraola / F. Mitchell/
D D
1 Add additional table rows as needed. 2 The printed name should be included on the form when using electronic means for signature.
D Anti-Trust Conditions (Appendix of OL)
Signatures may be obtained via electronic processes (e.g., PCRS, ER processes, Asset Suite signature),
NRC Orders Updated Final Safety Analysis Report (UFSAR)
manual methods (e.g., ink signature),
TS Bases Technical Requirements Manual (TRM) (including TRM Bases)
e-mail, or telecommunication.
D     Quality Assurance Program Manual (QAPM)
If using an mail, attach it to this form. 3 UFSAR Section Owners should refer to EN-Ll-113-01, "Updated Final Safety Analysis Report Change Process,"
D     Security Plan/Cyber Security Plan (CSP) r8]   Emergency Plan (EP)                                                               See attached matrix D     Offsite Dose Calculation Manual (ODCM)
for review expectations.
D     Spent Fuel Storage Cask Final Safety Analysis Report (CFSAR)
N/A if change does not update the UFSAR. 4 Administrative peer review intended to verify changes have been incorporated correctly into revised LBD prior to issuance.
D     Spent Fuel Storage Cask Certificate of Compliance (CoC)
t
D     Spent Fuel Storage Cask CoC Bases D     10 CFR 72.212 Evaluation Report (212 Report)
* Date 
D     Fire Protection Program (FPP)/Fire Hazards Analysis (FHA)
* *
D     Core Operating Limits Report (COLR)
* IPEC Emergency Plan Revision 17 -01 (Merlin Revision  
D     Other (Specify)
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial*
* NUCLEAR QUALITY RELATED        EN-Ll-113          REV.12
Effect on 10 CFR 50.47(b)
    ~Entergy                MANAGEMENT MANUAL                INFORMATIONAL USE              PAGE 20F3 Licensing Basis Document Change Process ATIACHMENT9.1                                                                              LBDCRFORM Sheet 2 of 3 METHOD(S) ALLOWING THE CHANGE D    PAD Review (Attach a copy)                D  10 CFR 50.48 / EN-DC-128 Review (Attach a copy)
Planning No. Change Standards or NUREG-0654 program elements?
D    10 CFR 50.59 Evaluation (Attach a copy)    ~ 10 CFR 50.54 Review (Attach a copy)
Justify if NO. 1. COVER PAGE Rev 16-01 Rev 17-01 Yes No-This is an editorial change to the Revision number and effective Note: New Note: used 15-02 as the base date. document and incorporated 16-01 This change does not change the revisions.
D   10 CFR 72.48 Evaluation (Attach a copy)   D   Environmental Evaluation (Attach a copy)
meaning or intent of a description, List Of Effective Pages, 16-01 17-01 does not change facilities or equipment, and does not change i a process.
D   Approved NRC Change (Attach a copy of      D   Editorial Change (LBDs controlled under 50.59 or NRC Letter or reference NRC letter number)     72.48, only)
No further evaluation is required for this change. Part 1: Part 1: Karsten 2. Section 0.2, 2&deg;0 ... Emergency Director.  
D   NRC Approval is Required                   D   Other Approval (Attach a copy of supporting documents)
.. ... Emergency Director (ED) ... Yes No-Added (ED) to define term sentence and re-use again in later portions Note: New of the Plan. Page 5 This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
D   "UFSAR-only" Change (NEI 98-03)
No further evaluation is reauired for this chanae. Part 2: SECTION A: Karsten
Check the appropriate box below:
* *
D Reformatting                                                 \
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
D Replacing Detailed Drawing
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
      \D   Referencing other Documents Check the appropriate box below and provide a basis for removing information, if applicable:
Planning No. Change Standards or NUREG-0654 program elements?
* D Removing Excessive Detail D Removing Obsolete Information D Removing Redundant Information D Removing Commitments Removal Basis:
Justify if NO. 3. Section 1, a, 2&deg;d bullet ... Emergency Director.  
1 II. LBDCR IMPLEMENTATION ACTIONS SUPPORTING IMPLEMENTATION REQUIRED ACTIONS ACTION TAKEN OR LSD SECTION TRACKING METHOD ACTION              RESP. DEPT See attached         Issuance of the EPLAN                 EP        Entry into Merlin on Nov. 15, matrix              scheduled for Nov.15, 2017                       2017
.. . .. ED ... Yes No-Removed Emergency Director and replaced with ED as Note: New Page A-1 previously defined.
 
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
  ~
No further evaluation is required for this change. 4. Section 1, County The four (4) counties that are The four (4) counties located Yes No -added wording that the involved  
  ~Entergy NUCLEAR QUALITY RELATED      EN-Ll-113 I REV.12 MANAGEMENT MANUAL                   INFORMATIONAL USE         PAGE 3 OF 3 Licensing Basis Document Change Process ATTACHMENT9.1                                                                                   LBDCRFORM Sheet 3 of 3 Ill. LBDCR REVIEW AND APPROVAL1 REVIEW AND APPROVAL of LBDCR (see Attachment 9.2) 2 Department                                        Approved                              Date 3
.... within the 10 mile Emergency counties are located in the 1 O mile Note: New Offices of Disaster  
UFSAR Section Owner                N/A 4
... Planning Zone {EPZ) that are EPZ. Page A-2 involved  
Peer Review                        A lraola /
.... This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
LBD Owner                          F. Mitchell/
No further evaluation is required for this chanae. 5. Section 1.b 1*1 sentence  
1 Add additional table rows as needed.
..... Emergency Response  
2 The printed name should be included on the form when using electronic means for signature.
... ERO ... Yes No-Removed Emergency Response Organization and kept Note: New Page A-3 Organization
Signatures may be obtained via electronic processes (e.g., PCRS, ER processes, Asset Suite signature), manual methods (e.g., ink signature), e-mail, or telecommunication. If using an e-mail, attach it to this form.
..... ERO as previously defined.
3 UFSAR Section Owners should refer to EN-Ll-113-01, "Updated Final Safety Analysis Report Change Process," for review expectations. N/A if change does not update the UFSAR.
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
4 Administrative peer review intended to verify changes have been incorporated correctly into revised LBD prior to issuance.       t                                       *
No further evaluation is required for this change.
 
* *
*Change  Page/Section                Previous Version IPEC Emergency Plan Revision 17 -01 (Merlin Revision 20) REVISION MATRIX New Version Editorial* Effect on 10 CFR 50.47(b) Planning No.                                                                                                           Change     Standards or NUREG-0654 program elements? Justify if NO.
* IPEC Emergenc i Plan Revision 17-01 (Merlin Revision  
: 1.             COVER PAGE                 Rev 16-01                           Rev 17-01                           Yes         No- This is an editorial change to the Revision number and effective Note: New                                     Note: used 15-02 as the base                                                       date.
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
document and incorporated 16-01 This change does not change the revisions.
Planning No. Change Standards or NUREG-0654 program elements?
meaning or intent of a description, does not change facilities or List Of Effective Pages,   16-01                               17-01 equipment, and does not change i
Justify if NO. 6. Section 1.d .... Emergency Director
a process. No further evaluation is required for this change.
.... . ... ED .... Yes No-Removed Emergency Director and kept ED, Emergency Note: New . . . Emergency Response  
Part 1:
.... ERO ... Response Organization and kept Page A-3 Organization  
Part 1: Karsten 0
..... ERO as previously defined.
: 2.             Section 0.2, 2&deg;           ... Emergency Director. ..         ... Emergency Director (ED) ...     Yes         No- Added (ED) to define term sentence                                                                                                       and re-use again in later portions Note: New                                                                                                                           of the Plan.
These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
Page 5 This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is reauired for this chanae.
No further evaluation is required for this change. 7. Section 4 3rd sentence
Part 2:
... Emergency Director
SECTION A: Karsten
... . .. ED ... Yes No-Removed Emergency Director and replaced with ED as Note: New Page A-4 previously defined.
 
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
*Change    Page/Section                Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version                           Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                             Change     Standards or NUREG-0654 program elements? Justify if NO.
No further evaluation is required for this chanqe. 8. -. ... ERO ...... Yes No-Removed Emergency Section 41"1 and last ..... Emergency Response sentence Organization  
: 3.                                                                               . .. ED ...                          Yes        No- Removed Emergency Director Section 1, a, 2&deg;d bullet   ... Emergency Director. ..
..... Response Organization and kept Note: New ERO as previously defined.
and replaced with ED as Note: New           Page A-1                                                                                                         previously defined.
Page A-4 This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
No further evaluation is required for this change. 
: 4.                                         The four (4) counties that are       The four (4) counties located         Yes       No - added wording that the Section 1, County involved ....                       within the 10 mile Emergency                     counties are located in the 1O mile Offices of Disaster...
* *
Note: New                                                                          Planning Zone {EPZ) that are                     EPZ.
* IPEC E mergenc1 V Pl an R ev1s1on 17 01 (M I" R -erm ev1s1on 20) REVISION MATRIX L Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
Page A-2                                                       involved ....
Planning Change Standards or NUREG-0654 program elements?
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this chanae.
Justify if NO. 9. Figure A-1 Note1& 2 . .... Emergency Response
: 5.                                                                               ... ERO ...                          Yes        No- Removed Emergency Section 1.b 1*1 sentence   ..... Emergency Response Response Organization and kept Organization .....
... ERO ... Yes No-Removed Emergency Response Organization and kept Note: New Page A-5 Organization  
Note: New           Page A-3                                                                                                         ERO as previously defined.
..... ERO as previously defined.
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
. . . Emergency Director
 
.... ... ED ... No -Removed Emergency Director and replaced with ED as previously defined.
*Change  Page/Section                Previous Version IPEC Emergenc i Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version              Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                               Change     Standards or NUREG-0654 program elements? Justify if NO.
These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
: 6.                                                                               .... ED ....           Yes        No- Removed Emergency Director Section 1.d                .... Emergency Director....
No further evaluation is required for this change. SECTION B: WATTS 10. SECTION B This section describes the Indian This section describes the Indian Yes No-Removed Emergency Point Emergency Response Point ERO, their key positions Response Organization and kept Note: 16-01, item 2 1st paragraph Organizations, their key positions and associated responsibilities.
and kept ED, Emergency Note: New                                     ... Emergency Response               .... ERO ...                       Response Organization and kept Organization .....                                                     ERO as previously defined.
Page A-3 These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
: 7.                                                                               . .. ED ...             Yes        No- Removed Emergency Director Section 4 3rd sentence    ... Emergency Director ...
and replaced with ED as Note: New           Page A-4                                                                                           previously defined.
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this chanqe.
: 8.                                                                             -
1                                                    .... ERO ......         Yes       No- Removed Emergency Section 41" and last       ..... Emergency Response Response Organization and kept Note: New           sentence                  Organization .....
ERO as previously defined.
ERO as previously defined.
and associated responsibilities.
Page A-4                                                                                            This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
This change does not change the Page B-1 meaning or intent of a description, does not change facilities or equipment, and does not change a process.
* IPEC Emergenc V Pl an Rev1s1on 17 01 (M erm 1
No further evaluation is required for this change.
* I" Rev1s1on 20) REVISION MATRIX
* *
~
* IPEC Emergency e1an Revision 17-01 (Merlin Revision
Page/Section               Previous Version                     New Version                           Editorial Effect on 10 CFR 50.47(b) Planning Change     Standards or NUREG-0654 program L                                                                                                                            elements? Justify if NO.
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
: 9.                                                                              ... ERO ...                           Yes        No- Removed Emergency Figure A-1 Note1& 2      . .... Emergency Response Response Organization and kept Organization .....
Planning No. Change Standards or NUREG-0654 program elements?
Note: New          Page A-5                                                                                                        ERO as previously defined.
Justify if NO. 11. SECTION 8.1 Figures B-1.2a-d illustrates the full Figures B-1.2a-d illustrate the full Yes No-Abbreviation for "ERO" as previously defined.
                                              . . . Emergency Director....          ... ED ...
Note: 16-01, item 3 Section 1.0, 1st Emergency Response ERO. Also corrected the word. Also paragraph Organization (ERO). corrected word "illustrate" to agree Page B-1 with plural "Figures-B-1.2a-d".
No - Removed Emergency Director and replaced with ED as previously defined.
These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
No further evaluation is required for this change. 12. SECTION 8.1.a One [1) Control Room Supervisor, One [1) Control Room Supervisor, Yes No-Added semi-colon at end of sentence as a formatting change Note: 16-01, item 4 41h paragraph who holds a Senior Reactor who holds a Senior Reactor for consistency within the Operator's license and is Operator's license and is Page B-1 responsible for safe operation of responsible for safe operation of document.
SECTION B: WATTS
the unit within the requirements of the unit within the requirements of This change does not change the the Technical Specifications.
: 10.                                       This section describes the Indian    This section describes the Indian    Yes       No- Removed Emergency SECTION B Point Emergency Response              Point ERO, their key positions                  Response Organization and kept Note: 16-01, item 2 1st paragraph             Organizations, their key positions    and associated responsibilities.                ERO as previously defined.
the Technical Specifications; meaning or intent of a description, does not change facilities or equipment, and does not change a process.
and associated responsibilities.                                                       This change does not change the Page B-1                                                                                                        meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
No further evaluation is required for this change.
 
* *
*Change    Page/Section              Previous Version IPEC Emergency e1an Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version                              Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                              Change     Standards or NUREG-0654 program elements? Justify if NO.
* IPEC Erner Plan Revision 17 -01 (Merlin Revision  
: 11.                                                                                                                     Yes        No- Abbreviation for "ERO" as SECTION 8.1                Figures B-1.2a-d illustrates the full Figures B-1.2a-d illustrate the full previously defined.
: 20) REVISION MATRIX ,C~~ Page/Section L.~ Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
Emergency Response                    ERO.
Planning Change Standards or NUREG-0654 program elements?
Note: 16-01, item 3  Section 1.0, 1st                                                                                                  Also corrected the word. Also Organization (ERO).
Justify if NO. 13. Section 8.1.a One [1] Unit 3 SRO is assigned as One [1] Unit 3 SRO is assigned Yes No-Spelled out Fire Brigade Leader to define term for "FBL". Note: 16-01, item 5 3rd paragraph FBL for both units as Fire Brigade Leader (FBL) for Added semi-colon at end of both units; sentence as a formatting change Page 8-2 -for consistency within the document.  
paragraph                                                                                                         corrected word "illustrate" to agree with plural "Figures- B-1.2a-d".
-These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
Page B-1 These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
No further evaluation is required for this change. 14. Section 8.1.a One [1] Unit 2 NPO is assigned to One [1] Unit 2 NPO is assigned to Yes No-Spelled out Safe Shutdown to / Unit 1 and SSD and one Unit 3 Unit 1 and Safe Shutdown (SSD), define term for "SSD" and added Note: 16-01, item 6 4th paragraph, 2"d NPO is the Communicator for and one Unit 3 NPO is the comma in sentence.
: 12.                                                                                                                     Yes        No- Added semi-colon at end of SECTION 8.1.a             One [1) Control Room Supervisor,      One [1) Control Room Supervisor, sentence as a formatting change who holds a Senior Reactor            who holds a Senior Reactor Note: 16-01, item 4  41h paragraph                                                                                                     for consistency within the Operator's license and is             Operator's license and is document.
Added semi-sentence notifications for both units. communicator for notifications for colon at end of sentence as a formatting change for consistency Page B-2 both units; within the document.
Page B-1                  responsible for safe operation of    responsible for safe operation of the unit within the requirements of  the unit within the requirements of              This change does not change the the Technical Specifications.        the Technical Specifications;                    meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Changed "C" to "c" for communicator.
 
These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
*,C~~        IPEC Erner Page/Section                Previous Version Plan Revision 17 -01 (Merlin Revision 20) REVISION MATRIX New Version                           Editorial Effect on 10 CFR 50.47(b) Planning Change     Standards or NUREG-0654 program L.~                                                                                                                            elements? Justify if NO.
No further evaluation is required for this change.
: 13.                                                                                                                     Yes        No- Spelled out Fire Brigade Section 8.1.a              One [1] Unit 3 SRO is assigned as    One [1] Unit 3 SRO is assigned Leader to define term for "FBL".
* *
FBL for both units                    as Fire Brigade Leader (FBL) for Note: 16-01, item 5  3rd paragraph                                                                                                   Added semi-colon at end of both units; sentence as a formatting change Page 8-2
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
                                                                                                              -                        for consistency within the document.
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
                              -                                                                                                        These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Planning No. Change Standards or NUREG-0654 program elements?
: 14.                                                                                                                     Yes        No- Spelled out Safe Shutdown to Section 8.1.a              One [1] Unit 2 NPO is assigned to     One [1] Unit 2 NPO is assigned to
Justify if NO. 15. Section 8.1.b The Emergency Response The ERO is established to assure Yes No-Abbreviation for "ERO" as Organization (ERO) is established that a sufficient number of previously defined.
                                      /                                                                                                define term for "SSD" and added Unit 1 and SSD and one Unit 3        Unit 1 and Safe Shutdown (SSD),
Note: 16-01, item 7 1st paragraph, 1st to assure that a sufficient number appropriately qualified personnel This change does not change the sentence of appropriately qualified are available each day, 24 hours . meaning or intent of a description, personnel are available each day, a day to deal with any emergency does not change facilities or Page 8-2 24 hours a day to deal with any* situation.
Note: 16-01, item 6  4th paragraph, 2"d                                                                                                comma in sentence. Added semi-NPO is the Communicator for           and one Unit 3 NPO is the sentence                                                                                                          colon at end of sentence as a notifications for both units.         communicator for notifications for formatting change for consistency Page B-2                                                          both units; within the document. Changed "C" to "c" for communicator.
equipment, and does not change emergency situation.
These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
a process.
 
No further evaluation is required for this change. 16. Section 8.1.b The Watch Force, depicted in The Watch Force, depicted in Yes No-Corrected word "accord" to Figure 8-1.1, satisfies the Figure B-1.1, satisfies the "accordance" to match the intent Note: 16-01, item 8 last paragraph, 2nd NUREG-0654 requirements for on-NUREG-0654 requirements for of sentence.
*Change    Page/Section              Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version                            Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                            Change    Standards or NUREG-0654 program elements? Justify if NO.
sentence shift personnel and on-shift staffing on-shift personnel and on-shift This change does not change the in accord with guidance of NRC's staffing in accordance with meaning or intent of a description, Page 8-2 NSIR/DPR-ISG-01 interim staff guidance of NRC's NSIR/DPR-does not change facilities or guidance and NEI 10-05 ISG-01 interim staff guidance and equipment, and does not change Assessment of On-Shift NEI 10-05 Assessment of On-a process.
: 15.              Section 8.1.b            The Emergency Response               The ERO is established to assure      Yes        No- Abbreviation for "ERO" as Organization (ERO) is established    that a sufficient number of                      previously defined.
No further evaluation is Emergency Response Shift Emergency Response required for this change. Organization Staffing and Organization Staffing and Caoabilities.
Note: 16-01, item 7 1st paragraph, 1st        to assure that a sufficient number    appropriately qualified personnel              This change does not change the sentence                  of appropriately qualified            are available each day, 24 hours .               meaning or intent of a description, personnel are available each day,    a day to deal with any emergency                does not change facilities or Page 8-2                 24 hours a day to deal with any*      situation.                                      equipment, and does not change emergency situation.                                                                  a process. No further evaluation is required for this change.
Caoabilities.  
: 16.              Section 8.1.b            The Watch Force, depicted in          The Watch Force, depicted in          Yes        No- Corrected word "accord" to Figure 8-1.1, satisfies the          Figure B-1.1, satisfies the                      "accordance" to match the intent Note: 16-01, item 8 last paragraph, 2nd      NUREG-0654 requirements for on-      NUREG-0654 requirements for                      of sentence.
: 17. Section 8.1.b The analysis resulted in a total of The analysis resulted in a total of Yes No-Corrected word "person's" to thirteen person's on-shift at each thirteen persons on-shift at each "persons" to indicate plural instead Note: 16-01, item 9 last paragraph, last unit. unit. of possessive.
sentence                  shift personnel and on-shift staffing on-shift personnel and on-shift                  This change does not change the in accord with guidance of NRC's      staffing in accordance with                      meaning or intent of a description, Page 8-2                  NSIR/DPR-ISG-01 interim staff        guidance of NRC's NSIR/DPR-                      does not change facilities or guidance and NEI 10-05                ISG-01 interim staff guidance and                equipment, and does not change Assessment of On-Shift                NEI 10-05 Assessment of On-                      a process. No further evaluation is Emergency Response                    Shift Emergency Response                        required for this change.
sentence This change does not change the Page 8-2 meaning or intent of a description, does not change facilities or equipment, and does not change a process.
Organization Staffing and            Organization Staffing and Caoabilities.                        Caoabilities.
No further evaluation is required for this change.
: 17.             Section 8.1.b             The analysis resulted in a total of   The analysis resulted in a total of   Yes       No- Corrected word "person's" to thirteen person's on-shift at each    thirteen persons on-shift at each                "persons" to indicate plural instead Note: 16-01, item 9 last paragraph, last      unit.                                unit.                                            of possessive.
* *
sentence                                                                                                        This change does not change the meaning or intent of a description, Page 8-2                                                                                                        does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
* IPEC E mergenc*
* Change IPEC Emergenc*V Pl an Rev1s1on 17 -01 (M erm Page/Section                Previous Version
V Pl an R ev1s1on -erm 17 01 (M I" R ev1s1on 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
* I" Rev1s1on 20) REVISION MATRIX New Version                            Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                              Change    Standards or NUREG-0654 program elements? Justify if NO.
Planning No. Change Standards or NUREG-0654 program elements?
: 18.              Section B.1.b              These personnel are immediately      These personnel are notified by        No        No- Change made to more clearly available during normal working      an electronic notification system                describe emergency notification Note: 16-01, item    2nd paragraph              hours or are contacted by an          and public address                                methods during working and non-10                                    *,      electronic notification system        announcements, and are                          working hours.
Justify if NO. 18. Section B.1.b These personnel are immediately These personnel are notified by No No-Change made to more clearly available during normal working an electronic notification system describe emergency notification Note: 16-01, item 2nd paragraph hours or are contacted by an and public address methods during working and non-10 *, electronic notification system announcements, and are working hours. Page B-3 during non-working hours. The immediately available during This change does not change the electronic notification system is normal working hours. These meaning or intent of a description, backed up with an automated personnel are notified by an does not change facilities or telephone notification system. electronic notification system equipment, and does not change during non-working hours. An a process.
Page B-3                  during non-working hours. The        immediately available during                      This change does not change the electronic notification system is    normal working hours. These                      meaning or intent of a description, backed up with an automated          personnel are notified by an                      does not change facilities or telephone notification system.        electronic notification system                    equipment, and does not change during non-working hours. An                      a process. No further evaluation is alternate notification system using              required for this change.
No further evaluation is alternate notification system using required for this change. an automated telephone notification process is used in the event that the normal electronic notification svstem is unavailable.  
an automated telephone notification process is used in the event that the normal electronic notification svstem is unavailable.
: 19. Section B.1.b The activation phase consists of The activation phase consists of Yes No-Abbreviation for "ERO" as Emergency Response ERO activation.
: 19.              Section B.1.b              The activation phase consists of      The activation phase consists of      Yes       No- Abbreviation for "ERO" as Emergency Response                    ERO activation.                                  previously defined.
previously defined.
Note: 16-01, item   3rd paragraph, first      Organization (ERO) activation.                                                          This change does not change the 11                  sentence                                                                                                          meaning or intent of a description, does not change facilities or Page B-3                                                                                                          equipment, and does not change a process. No further evaluation is required for this change.
Note: 16-01, item 3rd paragraph, first Organization (ERO) activation.
: 20.                                                                                                                      Yes        No- Removed Emergency Director Section B.1.b              Activation of the ERO gives the Activation of the ERO gives the                   and left ED as previously defined.
This change does not change the 11 sentence meaning or intent of a description, does not change facilities or Page B-3 equipment, and does not change a process.
Emergency Director full access to Note: 16-01, item    5th paragraph, first                                            ED full access to the resources of                This change does not change the the resources of Entergy.
No further evaluation is required for this change. 20. Section B.1.b Activation of the ERO gives the Yes No-Removed Emergency Director Activation of the ERO gives the and left ED as previously defined.
12                  sentence                                                        Entergy.                                          meaning or intent of a description, does not change facilities or Page B-3 equipment, and does not change a process. No further evaluation is reauired for this chanae.
Note: 16-01, item 5th paragraph, first Emergency Director full access to ED full access to the resources of This change does not change the 12 sentence the resources of Entergy.
 
Entergy.
*Change    Page/Section            Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version                            Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                           Change    Standards or NUREG-0654 program elements? Justify if NO.
meaning or intent of a description, Page B-3 does not change facilities or equipment, and does not change a process.
: 21.                                                                           Figures 8-1.2a-d illustrate the        Yes       No- Corrected word "illustrates" to 6th paragraph          Figures B-1.2a-d illustrates the Indian Point ERO.                                "illustrate" because of multiple Indian Point ERO.
No further evaluation is reauired for this chanae. 
Note: 16-01, item   Page 8-3                                                                                                      figures cited.
* *
13                                                                                                                                  This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
* IPEC Emergency Plan Revision 17-01 (Merlin Revision
: 22.                                                                           The Shift Manager (or the Control      Yes        No- Abbreviations for "ED" and Section B.2            The Shift Manager (or the Control Room Supervisor in the event that                "ERO" are sufficient because they Room Supervisor in the event that Note: 16-01, item  Section 2, 1st                                                the Shift Manager is unavailable),                are previously defined in Section the Shift Manager is unavailable),
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
14                  paragraph                                                    acting as the ED, has the                        B.
Planning No. Change Standards or NUREG-0654 program elements?
acting as the Emergency Director, authority to declare an                          These changes do not change the Page 8-3                has the authority to declare an emergency, immediately takes                      meaning or intent of a description, emergency, immediately takes charge of the emergency                          does not change facilities or charge of the emergency response response effort and is responsible                equipment, and does not change effort and is responsible for offsite for offsite dose assessment until __ .            a process. No further evaluation is dose assessment until relieved by relieved by another qualified ED.                required for this change.
Justify if NO. ---**--*
another qualified Emergency He/she activates the ERO as Director. He/she activates the necessary and continues to direct Emergency Response the emergency response until Organization (ERO) as necessary relieved by another qualified ED.
: 21. 6th paragraph Figures B-1.2a-d illustrates the Figures 8-1.2a-d illustrate the Yes No-Corrected word "illustrates" to Indian Point ERO. "illustrate" because of multiple Note: 16-01, item Page 8-3 Indian Point ERO. figures cited. 13 This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
and continues to direct the emergency response until relieved by another qualified Emergency Director.
No further evaluation is required for this change. 22. Section B.2 The Shift Manager (or the Control The Shift Manager (or the Control Yes No-Abbreviations for "ED" and Room Supervisor in the event that Room Supervisor in the event that "ERO" are sufficient because they Note: 16-01, item Section 2, 1st the Shift Manager is unavailable),
 
the Shift Manager is unavailable),
  *Change    Page/Section               Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version                            Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                              Change    Standards or NUREG-0654 program elements? Justify if NO.
are previously defined in Section 14 paragraph acting as the ED, has the B. acting as the Emergency
: 23.                                                                                                                    Yes        No- Abbreviations for "ED", "POM" Section 8.2              The relieving Emergency             The relieving ED/Plant Operations and "ERO" are sufficient because Director/Plant Operations Manager    Manager (POM) takes charge of Note: 16-01, item    1st paragraph, 1*t, 2"d &                                                                                        they are previously defined in (POM) takes charge of the overall    the overall emergency response, 15                    3rd sentence and 2"d                                                                                            Section B. Added abbreviation emergency response, thus freeing    thus freeing the Shift Manager to paragraph                                                                                                        "EPM" for Emergency Plant the Shift Manager to direct his/her  direct his/her attention towards Manager.
: Director, authority to declare an These changes do not change the Page 8-3 has the authority to declare an emergency, immediately takes emergency, immediately takes charge of the emergency meaning or intent of a description, charge of the emergency response response effort and is responsible does not change facilities or effort and is responsible for offsite for offsite dose assessment until __ equipment, and does not change dose assessment until relieved by . a process.
Page B-4                  attention towards the mitigation of  the mitigation of the accident the accident using the emergency    using the emergency operating                    These changes do not change the operating procedures. The Plant      procedures.
No further evaluation is another qualified Emergency relieved by another qualified ED. required for this change. He/she activates the ERO as Director.
* The POM holds this                  meaning or intent of a description, Operations Manager holds this        position until the on-call ED                    does not change facilities or position until the on-call          arrives. Overall control of the                  equipment, and does not change Emergency Director arrives.         Onsite ERO is maintained by the                  a process. No further evaluation is Overall control of the Onsite        Emergency Plant Manager (EPM)                    required for this change.
He/she activates the necessary and continues to direct Emergency Response Organization (ERO) as necessary the emergency response until and continues to direct the relieved by another qualified ED. emergency response until relieved by another qualified Emergency Director.
Emergency Response                  in the TSC.
* *
Organization is maintained by the Although the ERO described ..... ,
* IPEC Emergency Plan Revision 17-01 (Merlin Revision
Emergency Plant Manager in the it may be altered by the ED.
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
TSC.
Planning No. Change Standards or NUREG-0654 program elements?
: 24.                                                                                                                    No        YES- Refer to the "10 CFR 50.54 Section 8.2              After command and control is         After command and control is (Q) (3) Evaluation" document.
Justify if NO. 23. Section 8.2 The relieving Emergency Yes No-Abbreviations for "ED", "POM" The relieving ED/Plant Operations and "ERO" are sufficient because Note: 16-01, item 1st paragraph, 1*t, 2"d & Director/Plant Operations Manager Manager (POM) takes charge of they are previously defined in 15 3rd sentence and 2"d (POM) takes charge of the overall the overall emergency
transferred to the Emergency        transferred to the ED in the Note: 16-01, item    .1st paragraph, 4th & 5th Director in the EOF/AEOF, it          EOF/AEOF, it remains there until 16                    sentence remains there until the event is     the event is terminated. In the Page 8-4                  terminated.                           event that the ED becomes unavailable or personnel at the EOF are required to transfer to the AEOF, command and control may be transferred to the CCR until such time as a new ED assumes command and control or the ED assumes command and control upon arrival at the AEOF.
: response, Section B. Added abbreviation paragraph emergency
L
: response, thus freeing thus freeing the Shift Manager to "EPM" for Emergency Plant the Shift Manager to direct his/her direct his/her attention towards Page B-4 attention towards the mitigation of the mitigation of the accident Manager.
 
the accident using the emergency using the emergency operating These changes do not change the operating procedures.
*Change    Page/Section              Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version                            Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                          Change    Standards or NUREG-0654 program elements? Justify if NO.
The Plant procedures.
: 25.                                                                                                                 Yes        No- Abbreviation for "ED" as Section B.3              The duties and responsibilities of  The duties and responsibilities of previously defined.
* The POM holds this meaning or intent of a description, Operations Manager holds this position until the on-call ED does not change facilities or position until the on-call arrives.
51        the Emergency Director (ED) are    the ED are initially assumed by Note: 16-01, item    1st paragraph, 1                                                                                              This change does not change the initially assumed by the Shift      the Shift Manager (CR Supervisor 17                  sentence and 2"d                                                                                              meaning or intent of a description, Manager (CR Supervisor in his/her  in his/her absence).
Overall control of the equipment, and does not change Emergency Director arrives.
paragraph                                                                                                      does not change facilities or absence).
Onsite ERO is maintained by the a process.
The position of the on-call ED is                equipment, and does not change Page B-4 normally staffed by high level                  a process. No further evaluation is station management personnel.                    required for this change.
No further evaluation is Overall control of the Onsite Emergency Plant Manager (EPM) required for this change. Emergency Response in the TSC. Organization is maintained by the Although the ERO described
 
..... , Emergency Plant Manager in the TSC. it may be altered by the ED. 24. Section 8.2 After command and control is No YES-Refer to the "10 CFR 50.54 After command and control is (Q) (3) Evaluation" document.
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX
Note: 16-01, item .1st paragraph, 4th & 5th transferred to the Emergency transferred to the ED in the 16 sentence Director in the EOF/AEOF, it EOF/AEOF, it remains there until remains there until the event is the event is terminated.
                                                                                                                                                                ~
In the Page 8-4 terminated.
Change  Page/Section              Previous Version                      New Version                              Editorial  Effect on 10 CFR 50.47(b) Plan No.                                                                                                              Change    Standards or NUREG-0654 pro elements? Justify if NO.
event that the ED becomes unavailable or personnel at the EOF are required to transfer to the AEOF, command and control may be transferred to the CCR until such time as a new ED assumes command and control or the ED assumes command and control upon arrival at the AEOF.
                                                                                                                                                                =-J
* *
,. 26.            Section B.4              The Emergency Director is            The ED is responsible for Yes        No- Abbreviations for "ED" and "EOF" as previously defined.
* IPEC Emergency Plan Revision 17-01 (Merlin Revision
responsible for directing and        directing and coordinating the Note: 16-01, item  1st & 2"d paragraph coordinating the integrated          integrated emergency response 18                                                                                                                                    This change does not change the Page B-4                  emergency response effort of all      effort of all Company activities Company activities during the        during the emergency including                    meaning or intent of a description, emergency including those which      those which originate from                        does not change facilities or originate from Corporate              Corporate Headquarters.                            equipment, and does not change Headquarters. Personnel trained      Personnel trained in accordance                    a process. No further evaluation is in accordance with this plan and      with this plan and qualified as                    required for this change.
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
qualified as Emergency Directors      EDs are designated in an                                                              '
Planning No. Change Standards or NUREG-0654 program elements?
are designated in an Emergency       Emergency Telephone Directory.
Justify if NO. 25. Section B.3 The duties and responsibilities of The duties and responsibilities of Yes No-Abbreviation for "ED" as previously defined.
Telephone Directory. The             The ED is stationed in the EOF Emergency Director is stationed in   during an Alert, Site Area the Emergency Operations Facility     Emergency or General during an Alert, Site Area           Emergency and is the interface Emergency or General Emergency       between the onsite and offsite and is the interface between the     authorities. He/she has the onsite and offsite authorities.       responsibility and authority to He/she has the responsibility and     provide Protective Action authority to provide Protective       Recommendations (PARs) to the Action Recommendations (PARs)         authorities responsible for to the authorities responsible for   implementing offsite emergency implementing offsite emergency         measures.
Note: 16-01, item 1st paragraph, 151 the Emergency Director (ED) are the ED are initially assumed by This change does not change the 17 sentence and 2"d initially assumed by the Shift the Shift Manager (CR Supervisor meaning or intent of a description, paragraph Manager (CR Supervisor in his/her in his/her absence).
absence).
does not change facilities or Page B-4 The position of the on-call ED is equipment, and does not change normally staffed by high level a process.
No further evaluation is station management personnel.
required for this change.
* Change No. 26. ,. *
* IPEC Emergency Plan Revision 17-01 (Merlin Revision
: 20) REVISION MATRIX Page/Section Previous Version New Version Section B.4 The Emergency Director is The ED is responsible for Editorial Change Effect on 10 CFR 50.47(b)
Plan Standards or NUREG-0654 pro elements?
Justify if NO. =-J Yes No-Abbreviations for "ED" and "EOF" as previously defined.
Note: 16-01, item 1st & 2"d paragraph responsible for directing and directing and coordinating the coordinating the integrated integrated emergency response 18 This change does not change the Page B-4 emergency response effort of all effort of all Company activities Company activities during the during the emergency including meaning or intent of a description, emergency including those which those which originate from does not change facilities or originate from Corporate Corporate Headquarters.
equipment, and does not change Headquarters.
Personnel trained Personnel trained in accordance a process.
No further evaluation is in accordance with this plan and with this plan and qualified as required for this change. qualified as Emergency Directors EDs are designated in an are designated in an Emergency Emergency Telephone Directory.
Telephone Directory.
The The ED is stationed in the EOF Emergency Director is stationed in during an Alert, Site Area the Emergency Operations Facility Emergency or General during an Alert, Site Area Emergency and is the interface Emergency or General Emergency between the onsite and offsite and is the interface between the authorities.
He/she has the onsite and offsite authorities.
responsibility and authority to He/she has the responsibility and provide Protective Action authority to provide Protective Recommendations (PARs) to the Action Recommendations (PARs) authorities responsible for to the authorities responsible for implementing offsite emergency implementing offsite emergency measures.
measures.
measures.
Specific responsibilities of the ED ' Specific responsibilities of the include:
Specific responsibilities of the ED                               '
Emergency Director include:  
Specific responsibilities of the     include:
Emergency Director include:
* *
 
* IPEC Emeraencv Plan Revision 17-01 (Merlin Revision  
*Change      Page/Section              Previous Version IPEC Emeraencv Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version                             Editorial Effect on 10 CFR 50.47{b) Planning No.*                                                                                                               Change     Standards or NUREG-0654 program elements? Justify if NO.
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47{b)
: 27.                                                                                                                       Yes       No- Abbreviation for "JIC" is Section 8.4              Review all radiological,               Review all radiological, meteorological and operational         meteorological and operational                   sufficient because it is previously Note: 16-01, item      2nd bullet                                                                                                      defined.
Planning No.* Change Standards or NUREG-0654 program elements?
data and update the offsite           data and update the offsite 19 Page 8-5                 authorities and the Joint             authorities and the JIC;                         This change does not change the Information Center (JIC);                                                               meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Justify if NO. 27. Section 8.4 Review all radiological, Yes No-Abbreviation for "JIC" is Review all radiological, Note: 16-01, item 2nd bullet meteorological and operational meteorological and operational sufficient because it is previously 19 data and update the offsite data and update the offsite defined.
: 28.                                                                                                                       Yes       No- Abbreviation for "ED" as Section 8.4              The Emergency Director is              The ED is assisted in these previously defined.
Page 8-5 authorities and the Joint authorities and the JIC; This change does not change the Information Center (JIC); meaning or intent of a description, does not change facilities or equipment, and does not change a process.
assisted in these activities by the   activities by the entire ERO.
No further evaluation is required for this change. 28. Section 8.4 The Emergency Director is Yes No-Abbreviation for "ED" as The ED is assisted in these Note: *1 s-01, item assisted in these activities by the activities by the entire ERO. previously defined.
Note: *1 s-01, item    Last paragraph                                                                                                   This change does not change the entire ERO. Although the               Although the ED may delegate 20                                                                                                                                       meaning or intent of a description, Page 8-5                 Emergency Director may delegate       some of these responsibilities, some of these responsibilities,       he/she may not delegate the                       does not change facilities or he/she may not delegate the           responsibility to classify events or             equipment, and does not change responsibility to classify events or   for the decision to notify                       a process. No further evaluation is for the decision to notify authorities authorities and recommend offsite                 required for this change.
Last paragraph entire ERO. Although the Although the ED may delegate This change does not change the 20 Page 8-5 Emergency Director may delegate some of these responsibilities, meaning or intent of a description, some of these responsibilities, he/she may not delegate the does not change facilities or he/she may not delegate the responsibility to classify events or equipment, and does not change responsibility to classify events or for the decision to notify a process.
and recommend offsite protective       protective actions.
No further evaluation is for the decision to notify authorities authorities and recommend offsite required for this change. and recommend offsite protective protective actions.
actions.
actions.
* Change    Page/Section              Previous Version IPEC Emergency Plan Revision 17 -01 (Merlin Revision 20) REVISION MATRIX New Version                             Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                               Change     Standards or NUREG-0654 program elements? Justify if NO.
* *
: 29.                                                                                                                     Yes        No-Abbreviations for "ED", "ERO" Section 8.5.a             The EPM reports directly to the       The EPM reports directly to the and "TSC" are sufficient because Emergency Director. He/she             ED. He/she directs and Note: 16-01, item    1*1 paragraph                                                                                                    they are previously defined.
* IPEC Emergency Plan Revision 17 -01 (Merlin Revision  
directs and coordinates the           coordinates the operational 21                                                                                                                                      These changes do not change the Page 8-5                 operational aspects of the In-Plant   aspects of the In-Plant ERO.
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
Emergency Organization. He/she         He/she assures proper                             meaning or intent of a description, assures proper coordination and       coordination and direction of the                 does not change facilities or direction of the efforts of each       efforts of each element of the In-               equipment, and does not change element of the In-Plant Emergency     Plant ERO in returning the plant                 a process. No further evaluation is Organization in ret!,.lrning the plant to and maintaining it in a safe and               required for this change.
Planning No. Change Standards or NUREG-0654 program elements?
to and maintaining it in a safe and   stable condition. The EPM is stable condition. The EPM is           located in the TSC. Specific located in the Technical Support       responsibilities include:
Justify if NO. 29. Section 8.5.a The EPM reports directly to the The EPM reports directly to the Yes No-Abbreviations for "ED", "ERO" and "TSC" are sufficient because Note: 16-01, item 1*1 paragraph Emergency Director.
Center. Specific responsibilities include:
He/she ED. He/she directs and they are previously defined.
: 30.                                                                                                                     Yes        No- Abbreviation for "ED" as Section 8.5.b             The EOF Manager reports directly       The EOF Manager reports directly previously defined. Also added to the Emergency Director.            to the ED. Specific Note: 16-01, item   1*1 paragraph & 1*1                                                                                               semi-colon at end of sentence as Specific Responsibilities of the       responsibilities of the EOF 22                  bullet                                                                                                            a formatting change for EOF Manager include:                   Manager include:
21 directs and coordinates the coordinates the operational Page 8-5 operational aspects of the In-Plant aspects of the In-Plant ERO. These changes do not change the Emergency Organization.
consistency within the document.
He/she He/she assures proper meaning or intent of a description, assures proper coordination and coordination and direction of the does not change facilities or direction of the efforts of each efforts of each element of the In-equipment, and does not change element of the In-Plant Emergency Plant ERO in returning the plant a process.
Page 8-5
No further evaluation is Organization in ret!,.lrning the plant to and maintaining it in a safe and required for this change. to and maintaining it in a safe and stable condition.
The EPM is stable condition.
The EPM is located in the TSC. Specific located in the Technical Support responsibilities include:
Center. Specific responsibilities include:  
: 30. Section 8.5.b The EOF Manager reports directly The EOF Manager reports directly Yes No-Abbreviation for "ED" as previously defined.
Also added Note: 16-01, item 1*1 paragraph  
& 1*1 to the Emergency Director.
to the ED. Specific semi-colon at end of sentence as 22 bullet Specific Responsibilities of the responsibilities of the EOF a formatting change for EOF Manager include:
Manager include:
Page 8-5 consistency within the document.
* Coordination of Entergy's
* Coordination of Entergy's
* Coordination of Entergy's Changed "Responsibilities" to emergency response efforts emergency response efforts lower case to be grammatically outside the Protected Area outside the Protected Area correct.
* Coordination of Entergy's                   Changed "Responsibilities" to emergency response efforts             emergency response efforts                   lower case to be grammatically outside the Protected Area             outside the Protected Area                   correct.
Fence, Fence; These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
Fence,                                 Fence; These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is reauired for this chanae.
No further evaluation is reauired for this chanae.
 
I * *
I
* I IPEC Emergenc Plan Revision 17-01 (Merlin Revision  
* I Change    Page/Section                Previous Version IPEC Emergenc ~ Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version                           Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                               Change     Standards or NUREG-0654 program elements? Justify if NO.
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
: 31.                                                                                                                       Yes        No- Abbreviation for "ED" as Section 8.5.b             Assist the Emergency Director in       Assist the ED in the interpretation previously defined.
Planning No. Change Standards or NUREG-0654 program elements?
the interpretation of offsite          of offsite radiological Note: 16-01, item   1st bullet                                                                                                       This change does not change the radiological assessments for           assessments for emergency 23                                                                                                                                      meaning or intent of a description, Page 8-6                   emergency classifications and         classifications and Protective Protective Action                     Action Recommendations in                       does not change facilities or Recommendations in terms of both       terms of both real-time                         equipment, and does not change real-time measurements and             measurements and projected                       a process. No further evaluation is projected radiological exposures;     radiological exposures;                         required for this change.
Justify if NO. ----*----
: 32.                                                                                                                       Yes        No- Added semi-colon at end of Section 8.5.b             Ensure proper communications           Ensure proper communications sentence as a formatting change 2nd bullet                 between the Indian Point ERO and       between the Indian Point ERO Note: 16-01, item                                                                                                                       for consistency within the offsite response organizations, and   and offsite response 24                                                                                                                                       document.
: 31. Section 8.5.b Assist the Emergency Director in Assist the ED in the interpretation Yes No-Abbreviation for "ED" as previously defined.
Page 8-6                                                         organizations; and These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required forthis change.
Note: 16-01, item 1st bullet the interpretation of offsite of offsite radiological This change does not change the 23 radiological assessments for assessments for emergency Page 8-6 emergency classifications and classifications and Protective meaning or intent of a description, Protective Action Action Recommendations in does not change facilities or Recommendations in terms of both terms of both real-time equipment, and does not change -real-time measurements and measurements and projected a process.
: 33.                                                                                                                       Yes        No- Added semi-colon at end of Section 8.5.c             With assistance from the JIC           With assistance from the JIC sentences as a formatting change Manager, coordination of Entergy's     Manager, coordination of Note: 16-01, item     2nd paragraph, 151 bullet                                                                                        for consistency within the public information response           Entergy's public information 25                                                                                                                                      document.
No further evaluation is projected radiological exposures; radiological exposures; required for this change. 32. Section 8.5.b Ensure proper communications Ensure proper communications Yes No-Added semi-colon at end of 2nd bullet between the Indian Point ERO and between the Indian Point ERO sentence as a formatting change Note: 16-01, item offsite response organizations, and and offsite response for consistency within the 24 document.
Page 8-6                   efforts,                               response efforts; This change does not change the Act as the official Entergy           Act as the official Entergy                     meaning or intent of a description, representative to the media, and       representative to the media; and                 does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Page 8-6 organizations; and These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
0
No further evaluation is required forthis change. 33. Section 8.5.c With assistance from the JIC With assistance from the JIC Yes No-Added semi-colon at end of 2nd paragraph, 151 bullet Manager, coordination of Entergy's  
* Change    Page/Section                Previo~s Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version                                Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                               Change     Standards or NUREG-0654 program elements? Justify if NO.
: Manager, coordination of sentences as a formatting change Note: 16-01, item for consistency within the 25 public information response Entergy's public information document.
: 34.                                                                                                                     Yes        No- Abbreviation for "TSC" as Section 8.5.d.1)           Technical support is performed in       Technical support is performed in previously defined .
Page 8-6 efforts, response efforts; This change does not change the Act as the official Entergy Act as the official Entergy meaning or intent of a description, representative to the media, and representative to the media; and does not change facilities or equipment, and does not change a process.
1st & 2nd paragraph       the Technical Support Center           the TSC under the direction of the Note: 16-01, item                                                                                                                        This change does not change the under the direction of the             TSC Manager. It is the central 26                                                                                                                                        meaning or intent of a description, Page 8-6                   Technical Support Center               facility for the accumulation and Manager. It is the central facility for re-transmittal of plant parameters;             does not change facilities or the accumulation and re-                                                                 equipment, and does not change Specific functions of the TSC                    a process. No further evaluation is transmittal of plant parameters; include;                                         required for this change.
No further evaluation is required for this change. 0
Specific functions of the Technical Support Center include;
* *
: 35.                                                                                                                     Yes        No- Abbreviations for "ED" and
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
    '*                                          Keeping the Emergency Director         Keeping the ED apprised of plant Section 8.5.d.1)                                                                                                   "TSC" as previously defined.
: 20) REVISION MATRIX Change Page/Section Previo~s Version New Version Editorial Effect on 10 CFR 50.47(b)
apprised of plant conditions; and       conditions; and Note: 16-01, item 27                  last 2 bullets             Interfacing with NRC personnel in       Interfacing with NRC personnel in               These changes do not change the the Technical Support Center.           the TSC.                                         meaning or intent of a description, Page 8-6                                                                                                             does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Planning No. Change Standards or NUREG-0654 program elements?
 
Justify if NO. 34. Section 8.5.d.1)
*Change    Page/Section              Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                                   Change . Standards or NUREG-0654 program elements? Justify if NO.
Technical support is performed in Technical support is performed in Yes No-Abbreviation for "TSC" as previously defined . Note: 16-01, item 1st & 2nd paragraph the Technical Support Center the TSC under the direction of the 26 under the direction of the TSC Manager.
                ~*-                                                     ------ ..__
It is the central This change does not change the Page 8-6 Technical Support Center facility for the accumulation and meaning or intent of a description, Manager.
I
It is the central facility for re-transmittal of plant parameters; does not change facilities or the accumulation and re-Specific functions of the TSC equipment, and does not change transmittal of plant parameters; a process.
: 36.                                                                                                                           Yes       No- Abbreviations for "ERO", "ED" Section B.5.d.3)           The Control Room communication           The Control Room communication and "EOF" as previously defined.
No further evaluation is include; required for this change. Specific functions of the Technical Support Center include;  
links with offsite authorities are        links with offsite authorities are Note: 16-01, item   Page B-7                                                                                                               Also removed ""'s from available each day 24-hours a day.       available each day 24-hours a 28                                                                                                                                         "Communicator" and made lower The initial notification of offsite       day. The initial notification of case for consistency with other authorities and emergency                 offsite authorities and ERO wording.
: 35. Keeping the Emergency Director Keeping the ED apprised of plant Yes No-Abbreviations for "ED" and '* Section 8.5.d.1)  
response organization personnel is       personnel is initiated by the Shift initiated by the Shift Manager           Manager and/or Control Room                     These changes do not change the and/or Control Room                       communicator. Communications                     meaning or intent of a description, communicator. Communications             with offsite authorities are                     does not change facilities or with offsite authorities are             maintained from the Control                       equipment, and does not change maintained from the Control Room         Room until the ED takes over the                 a process. No further evaluation is until the Emergency Director takes       responsibility at the EOF. A                     required for this change.
"TSC" as previously defined.
over the responsibility at the           communicator is designated at Emergency Operations Facility. A         the EOF to establish/maintain "Communicator'' is designated at         communication links.
Note: 16-01, item apprised of plant conditions; and conditions; and 27 last 2 bullets Interfacing with NRC personnel in Interfacing with NRC personnel in These changes do not change the the Technical Support Center. the TSC. meaning or intent of a description, Page 8-6 does not change facilities or equipment, and does not change a process.
the Emergency Operations Facility to establish/maintain communication links.
No further evaluation is required for this change.
: 37.                                                                                                                           Yes      No- Abbreviation for "OSC" is Section B.5.d.6)           Maintenance mechanics, l&C               Maintenance mechanics, l&C sufficient because it is previously Technicians and operations               Technicians and operations Note: 16-01, item    2nd paragraph                                                                                                          defined.
* *
personnel (NPOs) who respond to           personnel (NPOs) who respond to 29                                                                                                                                          This change does not change the Page B-7                   the Operations Support Center             the OSC perform repair and perform repair and corrective             corrective actions directed by the               meaning or intent of a description, actions directed by the Operations       OSC Manager.                                     does not change facilities or Support Cent~r Manager.                                                                     equipment, and does not change a process. No further evaluation is required for this change.
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
 
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
*Change IPEC Erner Page/Section               Previo us Version Pia n Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version                            Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                              Change    Standards or NUREG-0654 program elements? Justify if NO.
Planning No. Change . Standards or NUREG-0654 program elements?
: 38.                                                                                                                    Yes        No- Abbreviation for "ED as Section B.5.d.9)            Search and rescue jurisdiction      Search and rescue jurisdiction previously defined.
Justify if NO. ~*-------..__ 36. I Yes No-Abbreviations for "ERO", "ED" Section B.5.d.3)
1st paragraph, 1st        during an emergency is divided      during an emergency is divided Note: 16-01, item                                                                                                                    This change does not change the between the in-plant area (inside    between the in-plant area (inside 30                  sentence                                                                                                          meaning or intent of a description, the protected area fence), which is  the protected area fence), which Page 8-8                    handled by the Shift                is handled by the Shift                          does not change facilities or Manager/POM or EPM and the           Manager/POM or EPM and the                       equipment, and does not change rest of the onsite area which is     rest of the onsite area which is                a process. No further evaluation is handled by the Emergency            handled by the ED.                              required for this change.
The Control Room communication The Control Room communication Note: 16-01, item Page B-7 links with offsite authorities are links with offsite authorities are and "EOF" as previously defined.
Director.
available each day 24-hours a day. available each day 24-hours a Also removed ""'s from 28 "Communicator" and made lower The initial notification of offsite day. The initial notification of authorities and emergency offsite authorities and ERO case for consistency with other response organization personnel is personnel is initiated by the Shift wording.
: 39.                                                                                                                    Yes        No- Abbreviation for "JIC" is Section 8.5.d.11)          To assure that only factual and     To assure that only factual and sufficient because it is previously consistent information is released;  consistent information is released; Note: 16-01, item    Page 8-8                                                                                                          defined in Section B.
initiated by the Shift Manager Manager and/or Control Room These changes do not change the and/or Control Room communicator.
statements concerning the           statements concerning the 31                                                                                                                                    This change does not change the emergency are the responsibility of  emergency are the responsibility Indian Point Energy Center          of Indian Point Energy Center                    meaning or intent of a description, communications personnel and/or      communications personnel and/or                  does not change facilities or individuals assigned to the Joint    individuals assigned to the JIC. A              equipment, and does not change Information Center. A Press          Press Release Writer is available                a process. No further evaluation is Release Writer is available on call  on call 24 hours a day and is                    required for this change.
Communications meaning or intent of a description, communicator.
24 hours a day and is responsible    responsible for interfacing with the for interfacing with the news media  news media for release of any for release of any public            public statements prior to the JIC statements prior to the Joint        being operational.
Communications with offsite authorities are does not change facilities or with offsite authorities are maintained from the Control equipment, and does not change maintained from the Control Room Room until the ED takes over the a process.
Information Center being operational.
No further evaluation is until the Emergency Director takes responsibility at the EOF. A required for this change. over the responsibility at the communicator is designated at Emergency Operations Facility.
 
A the EOF to establish/maintain "Communicator''
*Change    Page/Section                Previous Version IPEC Emergenc*t Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version                              Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                                Change    Standards or NUREG-0654 program elements? Justify if NO.
is designated at communication links. the Emergency Operations Facility to establish/maintain communication links. 37. Section B.5.d.6)
: 40.                                                                                                                      No        No- Change made to clarify where Section B.5.d.11)          The Joint Information Center, (JIC)   The JIC Manager is responsible the Public Information Liaison 1                        Manager is responsible for            for providing accurate and timely Note: 16-01, item    1" paragraph                                                                                                        reports.
Yes No-Abbreviation for "OSC" is Maintenance mechanics, l&C Maintenance mechanics, l&C Note: 16-01, item 2nd paragraph Technicians and operations Technicians and operations sufficient because it is previously 29 personnel (NPOs) who respond to personnel (NPOs) who respond to defined.
providing accurate and timely        information to the public through 32                                                                                                                                      Also used abbreviations for "JIC",
Page B-7 the Operations Support Center the OSC perform repair and This change does not change the perform repair and corrective corrective actions directed by the meaning or intent of a description, actions directed by the Operations OSC Manager.
Page 8-9                  information to the public through    the news media and coordinating "ED", "ERO" and "EOF" because the news media and coordinating      with Federal, State and local they are previously defined.
does not change facilities or Support Cent~r Manager.
with Federal, State and local public  public information officials to information officials to assure      assure timely exchange and These changes do not change the timely exchange and release of        release of information. Both the meaning or intent of a description, information. Both the Press          Press Release Writer and the JIC does not change facilities or Release Writer and the Joint          Manager have access to all equipment, and does not change Information Center Manager have      necessary information, either a process. No further evaluation is access to all necessary              directly available to them or required for this change.
equipment, and does not change a process.
information, either directly         available through the onsite ERO.
No further evaluation is required for this change.
available to them or available       A Public Information Liaison through the onsite emergency         reports to the EOF with the initial organization. A Public Information   augmentation of the watch force Liaison at the Emergency             to facilitate information flow Operation Facility reports to the     regarding the emergency to the plant with the initial augmentation   JIC Technical Advisor. The ED of the watch force to facilitate     prior to the activation of the JIC information flow between the plant   approves information that is used personnel and the JIC Technical       to notify the public. Once the JIC Advisor. The Emergency Director       is operational, the JIC Press prior to the activation of the Joint   Release Writer prepares the Information Center approves           press release, and once approved information that is used to notify     by the ED, disseminates the the public. Once the Joint             information to the public.
* IPEC Erner Change Page/Section No. 38. Section B.5.d.9)
Information Center is operational, the JIC Press Release Writer prepares the press release, and once approved by the ED, disseminates the information to the public.
Pia Previo Note: 16-01, item 1st paragraph, 1st 30 sentence Page 8-8 39. Section 8.5.d.11)
 
Note: 16-01, item Page 8-8 31 *
*Change    Page/Section          Previous Version IPEC Eme~r~-_Plan Revision 1?-01 (Merlin Revision 20LREVISION MATRIX New Version                             Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                           Change     Standards or NUREG-0654 program elements? Justify if NO.
* n Revision 17-01 (Merlin Revision
: 41.                                                                                                                   Yes        No- Abbreviation for "ERO" as Section 8.6          Figures B-1.1, B-1.2a thru 8-1.2d     Figures 8-1.1, 8-1.2a thru 8-1.2d previously defined.
: 20) REVISION MATRIX us Version New Version Editorial Effect on 10 CFR 50.47(b)
illustrates the positions of the      illustrate the positions of the Note: 16-01, item   1*1 sentence                                                                                                   Section 8. Corrected word Indian Point Emergency Response       Indian Point ERO and supporting 33                                                                                                                                  "illustrates" to "illustrate" because Page 8-9             Organization and supporting           positions.
Planning Change Standards or NUREG-0654 program elements?
of multiple figures cited.
Justify if NO. Yes No-Abbreviation for "ED as Search and rescue jurisdiction Search and rescue jurisdiction during an emergency is divided during an emergency is divided previously defined.
positions.
between the in-plant area (inside between the in-plant area (inside This change does not change the the protected area fence), which is the protected area fence), which meaning or intent of a description, handled by the Shift is handled by the Shift does not change facilities or Manager/POM or EPM and the Manager/POM or EPM and the equipment, and does not change rest of the onsite area which is rest of the onsite area which is a process.
These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
No further evaluation is handled by the Emergency handled by the ED. required for this change. Director.
: 42.                                                                                                                   Yes        No- Abbreviations for "ERO" and Section 8.7           The Admin & Logistics Coordinator     The Admin & Logistics "ED" as previously defined; also and/or the Corporate Duty             Coordinator and/or the Corporate Note: 16-01, item    Page 8-9                                                                                                        added missing "the" before ERO.
Yes No-Abbreviation for "JIC" is To assure that only factual and To assure that only factual and consistent information is released; consistent information is released; sufficient because it is previously statements concerning the statements concerning the defined in Section B. emergency are the responsibility of emergency are the responsibility This change does not change the Indian Point Energy Center of Indian Point Energy Center meaning or intent of a description, communications personnel and/or communications personnel and/or does not change facilities or individuals assigned to the Joint individuals assigned to the JIC. A equipment, and does not change Information Center. A Press Press Release Writer is available a process.
Manager coordinates corporate           Duty Manager coordinates 34                                                                                                                                  These changes do not change the support into the Emergency             corporate support into the ERO Response Organization once the         once the on call ERO is activated.                 meaning or intent of a description, on call ERO is activated. With the    With the full activation of the                    does not change facilities or full activation of Emergency            ERO, Entergy is capable of                        equipment, and does not change Response Organization, Entergy is      continuous (24 hour) operations                    a process. No further evaluation is capable of continuous (24 hour)        for a protracted period. The ED                    required for this change.
No further evaluation is Release Writer is available on call on call 24 hours a day and is required for this change. 24 hours a day and is responsible responsible for interfacing with the for interfacing with the news media news media for release of any for release of any public public statements prior to the JIC statements prior to the Joint being operational.
operations for a protracted period. will ensure the continuity of The Emergency Director will             resources (technical, ensure the continuity of resources     administrative and logistics) to (technical, administrative and         support the emergency response.
Information Center being operational. 
* *
* IPEC Emergenc*t Plan Revision 17-01 (Merlin Revision
: 20) REVISION MATRIX --Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
Planning No. Change Standards or NUREG-0654 program elements?
Justify if NO. 40. Section B.5.d.11)
The Joint Information Center, (JIC) The JIC Manager is responsible No No-Change made to clarify where the Public Information Liaison Note: 16-01, item 1"1 paragraph Manager is responsible for for providing accurate and timely reports.
32 providing accurate and timely information to the public through Also used abbreviations for "JIC", Page 8-9 information to the public through the news media and coordinating "ED", "ERO" and "EOF" because the news media and coordinating with Federal, State and local they are previously defined.
with Federal, State and local public public information officials to information officials to assure assure timely exchange and These changes do not change the timely exchange and release of release of information.
Both the meaning or intent of a description, information.
Both the Press Press Release Writer and the JIC Release Writer and the Joint Manager have access to all does not change facilities or equipment, and does not change Information Center Manager have necessary information, either a process.
No further evaluation is access to all necessary directly available to them or required for this change. information, either directly available through the onsite ERO. available to them or available A Public Information Liaison through the onsite emergency reports to the EOF with the initial organization.
A Public Information augmentation of the watch force Liaison at the Emergency to facilitate information flow Operation Facility reports to the regarding the emergency to the plant with the initial augmentation JIC Technical Advisor.
The ED of the watch force to facilitate prior to the activation of the JIC information flow between the plant approves information that is used personnel and the JIC Technical to notify the public. Once the JIC Advisor.
The Emergency Director is operational, the JIC Press prior to the activation of the Joint Release Writer prepares the Information Center approves press release, and once approved information that is used to notify by the ED, disseminates the the public. Once the Joint information to the public. Information Center is operational, the JIC Press Release Writer prepares the press release, and once approved by the ED, disseminates the information to the public.
* *
* IPEC Eme~r ~-_Plan Revision 1 ?-01 (Merlin Revision 20L REVISION MATRIX __ Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
Planning No. Change Standards or NUREG-0654 program elements?
Justify if NO. 41. Section 8.6 Figures B-1.1, B-1.2a thru 8-1.2d Figures 8-1.1, 8-1.2a thru 8-1.2d Yes No-Abbreviation for "ERO" as previously defined.
Note: 16-01, item 1*1 sentence illustrates the positions of the illustrate the positions of the Section 8. Corrected word 33 Indian Point Emergency Response Indian Point ERO and supporting "illustrates" to "illustrate" because Page 8-9 Organization and supporting positions.
of multiple figures cited. positions.
These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
No further evaluation is required for this change. 42. Section 8.7 The Admin & Logistics Coordinator The Admin & Logistics Yes No-Abbreviations for "ERO" and "ED" as previously defined; also Note: 16-01, item Page 8-9 and/or the Corporate Duty Coordinator and/or the Corporate added missing "the" before ERO. 34 Manager coordinates corporate Duty Manager coordinates These changes do not change the support into the Emergency corporate support into the ERO Response Organization once the once the on call ERO is activated.
meaning or intent of a description, on call ERO is activated.
With the With the full activation of the does not change facilities or full activation of Emergency ERO, Entergy is capable of equipment, and does not change Response Organization, Entergy is continuous (24 hour) operations a process.
No further evaluation is capable of continuous (24 hour) for a protracted period. The ED required for this change. operations for a protracted period. will ensure the continuity of The Emergency Director will resources (technical, ensure the continuity of resources administrative and logistics) to (technical, administrative and support the emergency response.
logistics) to support the emergency response.
logistics) to support the emergency response.
* IPEC Erner Change Page/Section No. 43. Section 8.8.b Note: 16-01, item 1st paragraph 35 Page 8-10 44. Section 8.8.b *
 
* Plan Revision 17-01 Merlin Revision 20 REVISION MATRIX Previous Version New Version Editorial Change If the need for additional technical If the need for additional technical No assistance is identified, this may assistance is identified, this may be obtained by the Technical be obtained by the TSC Manager Support Center Manager and the and the ED. Assistance of this Emergency Director.
*Change IPEC Erner Page/Section             Previous Version Plan Revision 17-01 Merlin Revision 20 REVISION MATRIX New Version                             Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                                Change     Standards or NUREG-0654 program elements? Justify if NO.
Assistance type could include that from the of this type could include that from NSSS Supplier (Westinghouse),
: 43.                                      If the need for additional technical   If the need for additional technical   No         No- Change made to clarify that Section 8.8.b assistance is identified, this may     assistance is identified, this may                 LOAs were previously removed Note: 16-01, item    1st paragraph            be obtained by the Technical           be obtained by the TSC Manager                     from Appendix 2. This was 35                                            Support Center Manager and the         and the ED. Assistance of this                     evaluated for prior revision 15-02.
the NSSS Supplier architect engineer and (Westinghouse),
Page 8-10 Emergency Director. Assistance         type could include that from the                   Also, abbreviations for "TSC" and of this type could include that from   NSSS Supplier (Westinghouse),                     "ED" are sufficient because they the NSSS Supplier                       architect engineer and                           were previously defined in Section (Westinghouse), architect engineer     consultants. A copy of the letter                 B.
architect engineer consultants.
and consultants. A copy of the         of agreement with Westinghouse                     These changes do not change the letter of agreement with               is referenced in Appendix 2.                       meaning or intent of a description, Westinghouse is contained in           Other assistance is also available                 does not change facilities or Appendix 2. Other assistance is         using existing contracts, i.e.:                   equipment, and does not change also available using existing           Radiation Protection support.                     a process. No further evaluation is contracts, i.e.: Radiation Protection                                                     required for this change.
A copy of the letter and consultants.
support.
A copy of the of agreement with Westinghouse letter of agreement with is referenced in Appendix  
: 44.                                       One of the roles of the Institute of    One of the roles of INPO is to          Yes        No- Abbreviation for "INPO" is Section 8.8.b Nuclear Power Operations (INPO)        assist affected utilities by quickly              sufficient because it previously Note: 16-01, item    2nd paragraph, 2nd      is to assist affected utilities by      applying the resources of the                     defined in the paragraph heading.
: 2. Westinghouse is contained in Other assistance is also available Appendix  
36                  sentence                quickly applying the resources of       nuclear industry to meet the                      This change does not change the the nuclear industry to meet the         needs of an emergency.                            meaning or intent of a description, Page 8-10 needs of an emergency.                                                                     does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
: 2. Other assistance is using existing contracts, i.e.: also available using existing Radiation Protection support.
* Change    Page/Section              Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version                           Editorial Effect on 10 CFR 50.47(b) Planning No.                                                                                                             Change     Standards or NUREG-0654 program elements? Justify if NO.
contracts, i.e.: Radiation Protection support.
                                      ~----
Effect on 10 CFR 50.47(b)
: 45.                                       American Nuclear Insurers (ANI):     American Nuclear Insurers (ANI):     Yes       No- Corrected word "have"*to Section B.8.b In the event of an extraordinary     In the event of an extraordinary               "has" for word agreement.
Planning Standards or NUREG-0654 program elements?
Note: 16-01, item   3rd paragraph, 1st       nuclear occurrence (as defined in     nuclear occurrence (as defined in This change does not change the 37                   sentence                 the Price- Anderson Law) ANI         the Price-Anderson Law) ANI has meaning or intent of a description, have plans prepared to provide       plans prepared to provide prompt does not change facilities or Page B-10                 prompt emergency funding to           emergency funding to affected equipment, and does not change affected members of the public.       members of the public.
Justify if NO. No-Change made to clarify that LOAs were previously removed from Appendix
a process. No further evaluation is required for this change.
: 2. This was evaluated for prior revision 15-02. Also, abbreviations for "TSC" and "ED" are sufficient because they were previously defined in Section B. These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
: 46.                                                                                                                   No        No- Change made to clarify that Section B.9               The availability of local support   The availability of local support 51                        services to assist the emergency     services to assist the emergency                 LOAs were previously removed Note: 16-01, item    1 paragraph                                                                                                      from Appendix 2. This was forces has been ascertained and      forces has been ascertained and 38                                                                                                                                   evaluated for prior revision 15-02.
No further evaluation is required for this change. One of the roles of the Institute of One of the roles of INPO is to Yes No-Abbreviation for "INPO" is Nuclear Power Operations (INPO) assist affected utilities by quickly sufficient because it previously Note: 16-01, item 2nd paragraph, 2nd is to assist affected utilities by applying the resources of the defined in the paragraph heading.
Page B-10                 agreement letters from each         agreement letters from each organization in this section have   organization in this section have               This change does not change the been solicited. These letters are   been solicited. These letters are               meaning or intent of a description, contained in Appendix 2.             referenced in Appendix 2.                       does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
36 sentence quickly applying the resources of nuclear industry to meet the This change does not change the Page 8-10 the nuclear industry to meet the needs of an emergency.
: 47.                                                                                                                   Yes        No- added "EMS" abbreviation for Section B.9.a, 2nd         Mutual aid backup from other         Mutual aid backup from other sentence                   ambulance services provides for       ambulance services provides for                 emergency medical services.
meaning or intent of a description, needs of an emergency.
Note: 16-01, item additional emergency medical         additional emergency medical                   This change does not change the 39                  Page B-10 services, ambulances and EMS         services.(EMS), ambulances and                 meaning or intent of a description, personnel.                           EMS personnel.                                 does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
does not change facilities or equipment, and does not change a process.
* Change No.
No further evaluation is required for this change.
IPEC E mergency Pl an Rev1s1on 17 -01 (M erm Page/Section               Previous Version r Revasion 20) REVISION M New Version Editorial Change EffE Stai ele;
* *
: 48.                                                                                                                    Yes Section B.9.d, 1st         When notified that assistance is     When notified that assistance is sentence                   required, IPEC Security will notify   required, IPEC Security will notify Note: 16-01, item the New York State Police which       the New York State Police which 40                  Page B-11 is the lead Local Law                 is the lead LLEA.
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
Enforcement Agency {LLEA).
: 20) REVISION MATRIX Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b)
: 49.                                                                                                                   Yes Figure B-1.2b             Box containing Emergency Plant         Box containing Emergency Plant Manager and Radiological              Manager and Radiological Note: 16-01, item   Page B-14 Coordinator                           Coordinator (corrected box 41 & new border)
Planning No. Change Standards or NUREG-0654 program elements?
Figure B-1.2b ... Onsite statement was in the header                     Moved the statement in the box of the diagram
Justify if NO. ~----45. Section B.8.b American Nuclear Insurers (ANI): American Nuclear Insurers (ANI): Yes No-Corrected word "have"*to In the event of an extraordinary In the event of an extraordinary "has" for word agreement.
 
Note: 16-01, item 3rd paragraph, 1st nuclear occurrence (as defined in nuclear occurrence (as defined in This change does not change the 37 sentence the Price-Anderson Law) ANI the Price-Anderson Law) ANI has have plans prepared to provide plans prepared to provide prompt meaning or intent of a description, Page B-10 prompt emergency funding to emergency funding to affected does not change facilities or affected members of the public. members of the public. equipment, and does not change a process.
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) _REVISION M Change     Page/Section             Previous Version                     New Version                         Editorial Effe No.                                                                                                       Change     Stai eler
No further evaluation is required for this change. -46. Section B.9 The availability of local support The availability of local support No No-Change made to clarify that Note: 16-01, item 151 paragraph services to assist the emergency services to assist the emergency LOAs were previously removed forces has been ascertained and forces has been ascertained and from Appendix
: 50.                                                                                                              No Table 8-5                                                  (Deleted)
: 2. This was 38 Page B-10 agreement letters from each agreement letters from each evaluated for prior revision 15-02. organization in this section have organization in this section have This change does not change the been solicited.
Note:                 Page 8-25 16-01, item 42                               SAMG     TSC     Assist EPM in Evaluator MGR     implementation of Severe Accident Management Guidelines
These letters are been solicited.
: 51.                                                                                                             Yes Figures 8-1.2b-d       Some of the figures had Figure or   Moved Figure or Table# out of Table# in the Header                the header Note: New             Figure 8-1.3 Table 8-1 1.2.c - no Figure# or Title         Added Figure # and Title
These letters are meaning or intent of a description, contained in Appendix  
                                            --~--------------------
: 2. referenced in Appendix  
* Change No.
: 2. does not change facilities or equipment, and does not change a process.
IPEC Erner
No further evaluation is required for this change. 47. Section B.9.a, 2nd Mutual aid backup from other Mutual aid backup from other Yes No-added "EMS" abbreviation for Note: 16-01, item sentence ambulance services provides for ambulance services provides for emergency medical services.
  .----~--------""'--_,.,_-
39 Page B-10 additional emergency medical additional emergency medical This change does not change the services, ambulances and EMS services.(EMS),
Page/Section Plan Revision 17-01 Merlin Revision 20 REVISION Previous Version                   New Version                           Editorial Change r~
ambulances and meaning or intent of a description, personnel.
Eff St~
EMS personnel.
ele
does not change facilities or equipment, and does not change a process.
: 52.                                                                                                            Yes Figure B-1.3
No further evaluation is required for this change.
 
* IPEC E 20) REVISION M R 17 01 (M r R Pl mergency an ev1s1on -erm evasion Change Page/Section Previous Version New Version Editorial EffE No. Change Stai ele; --------*------*
==Title:==
*-* 48. Section B.9.d, 1st When notified that assistance is When notified that assistance is Yes Note: 16-01, item sentence  
Normal Figure B-1.3
: required, IPEC Security will notify required, IPEC Security will notify 40 Page B-11 the New York State Police which the New York State Police which is the lead Local Law is the lead LLEA. Enforcement Agency {LLEA). 49. Figure B-1.2b Box containing Emergency Plant Box containing Emergency Plant Yes Note: 16-01, item Page B-14 Manager and Radiological Manager and Radiological 41 & new Coordinator Coordinator (corrected box Figure B-1.2b ... Onsite statement border) was in the header Moved the statement in the box of the diagram * *
 
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
==Title:==
: 20) _REVISION M Change Page/Section Previous Version New Version Editorial Effe No. Change Stai eler -----------------
Figure B-1.3 Normal Station Organization              Station Organization Note: 16-01, item     Page B-17 43 SECTION C: lraola l
: 50. Table 8-5 (Deleted)
: 53.                                                                         . ..... Emergency Telephone         Yes Section 4                ...... Emergency Telephone Directory (ETD) .......
No Note: Page 8-25 16-01, item 42 SAMG TSC Assist EPM in Evaluator MGR implementation of Severe Accident Management Guidelines  
Directory ........
: 51. Figures 8-1.2b-d Some of the figures had Figure or Moved Figure or Table# out of Yes
Note: 15-02, item   Page C-2 21 - did not carry over ETD and 16-01 stated emergency phone list SECTION D: Karsten
* Note: New Figure 8-1.3 Table# in the Header the header Table 8-1 1.2.c -no Figure# or Title Added Figure # and Title --~--------------------
* Change No'.
*
IPEC Emergency Plan Revisioi"! 17-01 (Merlin Revision 20) REVISION Page/Section                 Previous Version                     New Version                             Editorial Change E
* *
St ele
* IPEC Erner Plan Revision 17-01 Merlin Revision 20 REVISION r~ .----~--------""'--_,.,_-
: 54.             15 ' paragraph, 3ra         . .... Emergency Response             ... ERO ....                           Yes sentence                     Organization .....
Change Page/Section Previous Version New Version No. 52. Figure B-1.3 Title: Normal Figure B-1.3 Title: Figure B-1.3 Normal Note: 16-01, item Page B-17 Station Organization Station Organization 43 SECTION C: lraola l 53. Section 4 ...... Emergency Telephone  
Note: New Page D-1 1, NUE 2"d paragraph         ... Emergency Director...             . .. ED ...
. ..... Emergency Telephone Directory (ETD) ....... Note: 15-02, item Page C-2 Directory
Page D-2
........
: 55.             1. NUE 1st paragraph         ... events that are in process ...     ... events that are in progress... Yes Note: 15-02, item Page D-1 23
21 -did not carry over ETD and 16-01 stated emergency phone list SECTION D: Karsten Editorial Eff Change St~ ele Yes Yes
* No.
* IPEC Emergency Plan Revisioi"!
IPEC Erner                           Plan Revision 17-01 LM~rlin Revisio1;1 20 REVISION 1\#
17-01 (Merlin Revision  
r-=-C:-ha_n_g_e-.-=P-ag-e-:/=s-ec-:t-=--io-n-------,,~P,.....re-v....,i-ou_s_V~ers-io-n--------,- New Version                         Editorial Change Effi Sta ele1
: 20) REVISION Change Page/Section Previous Version New Version Editorial E No'. Change St el e 54. 15' paragraph, 3ra . .... Emergency Response  
: 56.                 Section 1, Alert                       .. . .Emergency Director ...               ... ED ....                       Yes Note: New               Page D-2                                                                         Added page brake Section 1, Alert,     1st             .... Emergency Director ...               ...ED ....
... ERO .... Yes sentence Organization  
paragraph & a)
..... Note: New Page D-1 1, NUE 2"d paragraph  
                                                                  .... Emergency Response                     ... ERO ...
... Emergency Director  
Page D-3                             Organization ....
... . .. ED ... Page D-2 55. 1. NUE 1st paragraph  
: 57.                 Section 1, Site Area                 A Site Emergency .....                     A Site Area Emergency ...         Yes Emergency, 1st Note: New               paragraph                             ... the public or.....                     ... the public, or....
... events that are in process ... . .. events that are in progress  
Page D-3                             ... malicious acts: ...                     ... malicious acts; ...
... Yes Note: 15-02, item Page D-1 23 * *
* Change No.
* IPEC Erner Plan Revision 17-01 LM~rlin Revisio1;1 20 REVISION 1\# r-=-C:-ha_n_g_e-.-=P-ag-e-:/=s-ec-:t-=--io-n-------,,~P,.....re-v....,i-ou_s_V~ers-io-n--------,-
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION Page/Section Previous Version New Version               Editorial Change 1\1 Eff, Sta ele
New Version Editorial Effi No. Change Sta ele1 56. Section 1, Alert .. . . Emergency Director  
: 58.             Section 1, SAE, 1st       WHICH                               which                   Yes paragraph Note: New Page D-4
... ... ED .... Yes Note: New Page D-2 Added page brake Section 1, Alert, 1st .... Emergency Director  
: 59.             Section 1, SAE, 4m       . .. Emergency Director...         . .. ED ....             Yes paragraph & a)
... ...ED .... paragraph  
Note: New                                     .... Emergency Response Page D-4                 Organization ....                   ... ERO ....
& a) .... Emergency Response  
I
... ERO ... Page D-3 Organization  
* Change No.
.... 57. Section 1, Site Area A Site Emergency  
IPEC E mergency Pl an Rev1saon 17-01 (M erm Page/Section               Previous Version r Revis1on 20) REVISION M New Version               Editorial Change Effe Stai eler
..... A Site Area Emergency  
: 60.             Section 1, GE, 3ra         ... Emergency Director. ..         . .. ED ....             Yes paragraph & a)
... Yes Emergency, 1st Note: New paragraph  
Note: New                                     .... Emergency Response Page D-5                   Organization ....                   . .. ERO ....
... the public or ..... ... the public, or .... Page D-3 ... malicious acts: ... ... malicious acts; ... * *
SECTION E: Karsten                                                           '
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
                                                                                                      ,I
: 20) REVISION 1\1 Change Page/Section Previous Version New Version Editorial Eff, No. Change Sta ele .. -58. Section 1, SAE, 1st WHICH which Yes paragraph Note: New Page D-4 59. Section 1, SAE, 4m . .. Emergency Director  
: 61.             Section 1, a, 3             . ... Emergency Response           ... ERO ....           Yes Organization ....
... . .. ED .... Yes paragraph  
Note: New           Page E-1
& a) Note: New .... Emergency Response Page D-4 Organization  
* Change No.
.... ... ERO .... * '-, I *
iPEC Erne rgencv Plan Revision 17-01 (Merlin Revision 20) REVISION M Page/Section               Previous Version                     New Version                             Editorial Change Effe Sta, eler
* IPEC E 20) REVISION M Pl R 17 01 (M r R mergency an ev1saon -erm evis1on Change Page/Section Previous Version New Version Editorial Effe No. Change Stai eler 60. Section 1, GE, 3ra ... Emergency Director.  
: 62.             Section 1, b Alert 1), 2"" ... Emergency Director ...           . .. ED ...                           Yes sentence Note: New Page E-2
.. . .. ED .... Yes paragraph  
: 63.             Section 1.b.4             During normal working hours, the     During normal working hours, the     Yes necessary personnel are available     necessary personnel are Note: 15-02, item   Page E-2                   in the plant and are contacted by     available in the plant and are 35 - did not delete                             the Public Address System, or         contacted by the Public Address a coma                                         electronic notification system.       System or electronic notification During off-hours, individuals can   system. During off-hours, be contacted at their homes by       individuals can be centacted at telephone or electronic notification their homes by telephone or system .                             electronic notification system.
& a) Note: New .... Emergency Response Page D-5 Organization  
___J
.... . .. ERO .... SECTION E: Karsten ' 61. Section 1, a, 3 . ... Emergency Response  
* Change No.
... ERO .... ,I Yes Organization  
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS~ON fJ Page/Section               Previous Version                       New Version                               Editorial Change Eff, Sta ele
.... Note: New Page E-1 * * 
: 64.             Section 1,b.8 & 1,c.1,   . .. Emergency Director...             ... ED ...                             Yes 1.c.5 Note: New Section 1, c.1           ... condition listed in Section D .... ... condition listed in the Section D ....
* *
Page E-3 Section 1c.8             ... Emergency Director...               . .. ED ...
* iPEC Erne rgencv Plan Revision 17-01 (Merlin Revision  
Page E-4
: 20) REVISION M Change Page/Section No. Previous Version New Version Editorial Effe Change Sta, eler 62. Section 1, b Alert 1 ), 2"" ... Emergency Director  
: 65.             Section 1.c.2             Notification of site personnel is       Notification of site personnel is       No accomplished by the Control             accomplished by the Control Note: 15-02 item   Page E-3                 Room Operator initiating the Site       Room Operator initiating the site 41 & new                                     Assembly Alarm or use of the           assembly alarm or use of the public address system.                 Public Address System.
... . .. ED ... Yes sentence Note: New Page E-2 i i i 63. Section 1.b.4 During normal working hours, the During normal working hours, the Yes necessary personnel are available necessary personnel are Note: 15-02, item Page E-2 in the plant and are contacted by available in the plant and are 35 -did not delete the Public Address System, or contacted by the Public Address a coma electronic notification system. System or electronic notification During off-hours, individuals can system. During off-hours, be contacted at their homes by individuals can be centacted at telephone or electronic notification their homes by telephone or system . electronic notification system. __ _J
Accountability of personnel located     Accountability of personnel within the Protected Area is           located within the Protected Area performed. In addition the             is performed. In addition, the unaffected Control Room                 affected unit's Control Room Personnel are contacted by the         Operators also contact the affected Control Room Operators.       unaffected unit's Control Room personnel.
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
* Change No.
: 20) REVIS~ON fJ Change Page/Section Previous Version New Version Editorial Eff, No. Change Sta ele 64. Section 1,b.8 & 1,c.1, . .. Emergency Director  
            ~PEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION l\J Page/Section                 Previous Version                   New Version                             Editorial Change Eff, Sta ele
... ... ED ... Yes 1.c.5 Note: New Section 1, c.1 ... condition listed in Section D .... . .. condition listed in the Section D .... Page E-3 Section 1c.8 ... Emergency Director  
: 66.             Section 1.d.1 &                                                                                         Yes Section 2 15 \ 2nd and 3rd ... Emergency Director ...         . .. ED ....
... . .. ED ... Page E-4 65. Section 1.c.2 Notification of site personnel is Notification of site personnel is No accomplished by the Control accomplished by the Control Note: 15-02 item Page E-3 Room Operator initiating the Site Room Operator initiating the site 41 & new Assembly Alarm or use of the assembly alarm or use of the public address system. Public Address System. Accountability of personnel located Accountability of personnel within the Protected Area is located within the Protected Area performed.
Note: New           paragraphs
In addition the is performed.
                                                  .... Emergency Response Organization ....                   ... ERO ...
In addition, the unaffected Control Room affected unit's Control Room
Section 1.d.1               ...listed in Section D...           ... listed in the Section D....
* Personnel are contacted by the Operators also contact the affected Control Room Operators.
Page E-4
unaffected unit's Control Room personnel.  
: 67.             Section 3, 1st             .. Remaining ...                     ... remaining ...                     Yes paragraph, last Note: New           sentence                   Emergency Alert System               Emergency Alert System (EAS)
*
Page E-6
* ~PEC Emergency Plan Revision 17-01 (Merlin Revision  
* Change No.
: 20) REVISION l\J Change Page/Section Previous Version New Version Editorial Eff, No. Change Sta ele 66. Section 1.d.1 & Yes Section 2 15\ 2nd and 3rd ... Emergency Director  
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS!ON N Page/Section               Previous Version                   New Version            Editorial Change Eff1 Sta ele
... . .. ED .... Note: New paragraphs  
: 68.              Section 4, 1** paragraph   ... Emergency Director...         ... ED ...            Yes Note: New          Page E-6 SECTION F: Martin
.... Emergency Response Organization  
: 69.              1"' paragraph & 1"'       . ... Emergency Response           ... ERO ....         Yes bullet                    Organization ....
.... ... ERO ... Section 1.d.1 . . .listed in Section D ... . .. listed in the Section D .... Page E-4 67. Section 3, 1st .. Remaining  
Note: New Page F-1
... ... remaining  
* Change No.
... Yes paragraph, last
iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION M Page/Section                Previous Version
* Note: New sentence Emergency Alert System Emergency Alert System (EAS) Page E-6
  ~---~---------~-------------~---------*---*----~---~-*
* *
New Version                           Editorial Change Effe Star elen
* Change No. 68. Note: New 69. Note: New IPEC Emergency Plan Revision 17-01 (Merlin Revision  
: 70.              Section 1, Direct Line    ... respective responses            ... respective organization          Yes Phones, 2nd bullet        organization ....                  responses ...
: 20) REVIS!ON N Page/Section Previous Version Section 4, 1 ** paragraph  
Note: New 3rd bullet                                                    Fixed font Page F-2                  ... Emergency Director ...          . .. ED ...
... Emergency Director  
: 71.             Section 1. Additional     .... Emergency Response              . .. ERO ....                      Yes Communications, 1*1       Organization ....
... Page E-6 SECTION F: Martin 1"' paragraph  
Note: New          paragraph, a & c Page F-3
& 1"' bullet Page F-1 . ... Emergency Response Organization
* 72.
.... New Version ... ED ... ... ERO .... Editorial Eff1 Change Sta ele Yes Yes 
Note: New Medical Communications Page F-4 Hudson Valley Hospital Phelps Memorial New York-Presbyterian/Hudson Valley Hospital Phelps Memorial Hospital Center Yes SECTION G: lraola No changes l
* * * ---------------------------
 
-----------iPEC Emergency Plan Revision 17-01 (Merlin Revision
IPEC Emergency Plain Revision 17-01 (Merlin Revision 20) REVISION Nj Change    Page/Section              Previous Version                    New Version                            Editorial  Eff1:
: 20) REVISION M Change Page/Section Previous Version New Version Editorial Effe No. Change Star elen ~---~---------~-------------~---------*---*----~---~-*
No.                                                                                                           Change    Sta elei SECTION H: Ambrose
: 70. Note: New 71. Note: New 72. Note: New l Section 1, Direct Line Phones, 2nd bullet 3rd bullet Page F-2 Section 1. Additional Communications, 1*1 paragraph, a & c Page F-3 Medical Communications Page F-4 SECTION G: lraola No changes ... respective responses organization
: 73.             Section H.1              Once the entire Emergency            Once the entire ERO is                No Second paragraph          Response Organization is            operational, if required, additional Note: 16-01, item                            operational additional positions are positions are assigned to the CR.
.... ... Emergency Director
44                  Page H-1                  assigned to the CR.
... .... Emergency Response Organization
: 74.            Section 1, CR, 2"a & 3'a .... Emergency Response               ... ERO ...                           Yes paragraph                Organization ....
.... Hudson Valley Hospital Phelps Memorial  
Note: New Page H-1                  ... Emergency Director ...           . .. ED ...
. .. respective organization responses
* iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION M Change   Page/Section               Previous Version                   New Version           Editorial EffE No.                                                                         I Change     Sta ele1
... Fixed font . .. ED ... . .. ERO .... Yes Yes New York-Presbyterian/Hudson Yes Valley Hospital Phelps Memorial Hospital Center  
: 75.             Section 1, TSC, 2"u       ... Emergency Director ...         . .. ED ...           Yes bullet Note: New Page H-2
* *
: 76.             Section 2, EOF, 3*u       ... Emergency Director...           ... ED ...           Yes paragraph Note: New Page H-3
* IPEC Emergency Plain Revision 17-01 (Merlin Revision
: 77.             Section 2, EOF, last       ... Emergency Director...           ... ED ...           Yes paragraph Note: New                                     ... Emergency Response             . .. ERO ...
: 20) REVISION Nj Change Page/Section Previous Version New Version Editorial Eff1: No. Change Sta 73. Note: 16-01, item 44 74. Note: New SECTION H: Ambrose Section H.1 Second paragraph Page H-1 Section 1, CR, 2"a & 3'a paragraph Page H-1 Once the entire Emergency Response Organization is operational additional positions are assigned to the CR. .... Emergency Response Organization  
Page H-4                   Organization ...
.... ... Emergency Director  
* Change No.
... Once the entire ERO is operational, if required, additional positions are assigned to the CR. ... ERO ... . .. ED ... elei No Yes 
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION Page/Section               Previous Version                     New Version                           Editorial Change n
'
Efl St, ele
* iPEC Emergency Plan Revision 17-01 (Merlin Revision  
: 78.             Section 7.b, last         .. .Emergency Response               ... ERO ...                           Yes paragraph                 Organization ...
: 20) REVISION M Change Page/Section Previous Version New Version Editorial EffE No. I Change Sta ele1 75. Section 1, TSC, 2"u ... Emergency Director  
Note: New Page H-6
... . .. ED ... Yes bullet Note: New Page H-2 76. Section 2, EOF, 3*u ... Emergency Director  
: 79.             Section H.8.c             Backup radiological monitoring       Backup radiological monitoring       No equipment and assistance can be     equipment and assistance can be Note: 16-01, item   Page H-8                   obtained from other utilities       obtained from other utilities 45                                             through INPO or the Department       through INPO or the Department of Energy's Brookhaven Area         of Energy's Brookhaven Area Office. Letters of agreement for     Office. Letters of agreement for these services can be found in       these services are referenced in Appendix 2 of this plan .             Appendix 2 of this plan.
... ... ED ... Yes paragraph Note: New Page H-3 77. Section 2, EOF, last ... Emergency Director  
* SECTION I: Karsten
... ... ED ... Yes
* Change No.
* paragraph Note: New ... Emergency Response  
            ~PEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Page/Section               Previous Version                         New Version                                 Editorial Change EffG Sta ele1
. .. ERO ... Page H-4 Organization  
: 80.               Alert, 151 & 2&deg;~         ... Emergency Director ...                     . .. ED ...                           Yes
... *
                      ,paragraph Note: New Page 1-2
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
: 81.               SAE&GE, 1s, paragraph     . . . Emergency Director...                   ... ED ...                             Yes Note: New           2&deg;d paragraph             .. .in accordance with a Plan                 ... in accordance with an Implementing Procedure ...                     Implementing Procedure ...
: 20) REVISION n Change Page/Section Previous Version New Version Editorial Efl No. Change St, ele 78. Section 7.b, last . . . Emergency Response  
Page 1-2
... ERO ... Yes I paragraph Organization  
* 82 .
... Note: New Page H-6 79. Section H.8.c Backup radiological monitoring Backup radiological monitoring No equipment and assistance can be equipment and assistance can be Note: 16-01, item Page H-8 obtained from other utilities obtained from other utilities 45 through INPO or the Department through INPO or the Department of Energy's Brookhaven Area of Energy's Brookhaven Area Office. Letters of agreement for Office. Letters of agreement for these services can be found in these services are referenced in Appendix 2 of this plan . Appendix 2 of this plan.
Note: New SAE & GE, 1st & 3rd paragraph 5th paragraph Page 1-3
* SECTION I: Karsten *
                                                  . . . Emergency Director...
---------------------------------* ~PEC Emergency Plan Revision 17-01 (Merlin Revision
                                                  .. .in accordance with a Plan Implementing Procedure ...
: 20) REVISION N Change Page/Section Previous Version New Version Editorial EffG No. Change Sta ele1 80. Alert, 151 & 2&deg;~ ... Emergency Director  
                                                                                                ... ED ...
... . .. ED ... Yes ,paragraph Note: New , Page 1-2 ' 81. SAE&GE, 1 s, paragraph  
                                                                                                ... in accordance with an Implementing Procedure ...
. . . Emergency Director  
Yes
... ... ED ... Yes Note: New 2&deg;d paragraph  
* IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change   Page/Section               Previous Version                     New Version . .                     Editorial Efft No.                                                                                                         Change     Sta ele1
.. .in accordance with a Plan ... in accordance with an Implementing Procedure  
: 83.             Section 5                 .. .locals, State, and ...           . .. locals, State and ...         Yes Note: New           Page 1-5
... Implementing Procedure  
: 84.             Section 8, last           ... Emergency Director...             ... ED ...                       Yes paragraph Note: New Page 1-6 SECTION J: Robinson 5
... Page 1-2
: 85.             Section 2, 1 ' paragraph                                         Fixed spacing issues             Yes Note: New                                       . .. Emergency Director...           . .. ED ...
* 82 . SAE & GE, 1st & 3rd . . . Emergency Director  
Page J-1
... ... ED ... Yes paragraph Note: New 5th paragraph
* Change No..
.. .in accordance with a Plan ... in accordance with an Implementing Procedure  
            !PEC EmergenC'i Plan Revasion 17-01 (Merlin Revision 20) REVISION I\
... Implementing Procedure
Page/Section                 Previous Version                     New Version Editorial Change Eft St, ele
... Page 1-3 ' *
: 86.             Section 4, last             . .. Emergency Director. ..         ... ED ...         Yes paragraph Note: New           Section 5, 1*1 paragraph, last sentence Page J-2 87.
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
Not used
: 20) REVISION N Change Page/Section Previous Version New Version .. Editorial Efft No. Change Sta ele1 I 83. Section 5 .. .locals, State, and ... . .. locals, State and ... Yes Note: New Page 1-5 84. Section 8, last ... Emergency Director  
: 88.             Section 6, c, last         ... Emergency Director...             ...ED ...         Yes sentence Note: New Page J-3
... ... ED ... Yes paragraph Note: New Page 1-6 SECTION J: Robinson  
* 89.
: 85. Section 2, 15' paragraph Fixed spacing issues Yes
Note: New Section 7, 2nd paragraph, last sentence Page J-4
* Note: New . .. Emergency Director  
                                                  ... Emergency Director ....           ...ED ...         Yes
... . .. ED ... Page J-1 *
* IPEC Emergency Plan Revision 17-01 (Merten Revision 20) REVISION l\l Change   Page/Section               Previous Version                       New Version                             Editorial Eff No.                                                                                                                Change    Sta ele
* !PEC EmergenC'i Plan Revasion 17-01 (Merlin Revision  
: 90.            Section J.10.f, last      ... Pre and Post...                    ... pre and post. ..                    Yes sentence Note: New Page J-5
: 20) REVISION I\ Change Page/Section Previous Version New Version Editorial Eft No .. Change St, ele ... 86. Section 4, last . .. Emergency Director.  
                                              \
.. ... ED ... Yes Note: New paragraph Section 5, 1*1 paragraph, last sentence Page J-2 87. Not used 88. Section 6, c, last ... Emergency Director  
: 91.             Section .J.10.m           The basis for dose driven             The basis for dose driven               No protective action recommendations     protective action decisions by Note: 16-01, item   Page J-5                   are as follows:                         offsite authorities would include 47                                                                                     several of the above factors as well as the following considerations:
... ...ED ... Yes sentence Note: New Page J-3
* 89. Section 7, 2nd ... Emergency Director  
.... ...ED ... Yes paragraph, last Note: New sentence Page J-4 *
* IPEC Emergency Plan Revision 17-01 (Merten Revision  
: 20) REVISION l\l Change Page/Section Previous Version New Version Editorial Eff No. Change Sta ele 90. Section J.10.f, last ... Pre and Post... ... pre and post. .. Yes sentence Note: New Page J-5 \ I 91. Section .J.10.m The basis for dose driven The basis for dose driven No protective action recommendations protective action decisions by Note: 16-01, item Page J-5 are as follows:
offsite authorities would include 47 several of the above factors as well as the following considerations:
SECTION K: Martin
SECTION K: Martin
* 92. Section 4 ... rests with the State & local. .. ... rests with the respective State & Yes local...
* 92.
Note: New Page K-3 * 
Note: New Section 4 Page K-3
* *
                                                ... rests with the State & local. ..   ... rests with the respective State &
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
local...
: 20) REVISION n Change Page/Section Previous Version New Version Editorial EH No. Change St, 93. Note: New 94. Note: 16-01, item 48 Section 7, 4th sentence  
Yes
.... emergency worker monitoring and decontamination center .... Page K-4 SECTION L: lraola 1. Hospital  
 
: Services, 151 paragraph Page L-1 A written agreement is contained in Appendix
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION                                             n Change   Page/Section               Previous Version                   New Version                           Editorial EH No.                                                                                                       Change     St, eh
: 2. ... emergency worker personnel monitoring center ... eh Yes A written agreement is referenced No in Appendix  
: 93.             Section 7, 4th sentence   .... emergency worker monitoring   ... emergency worker personnel      Yes and decontamination center.... monitoring center...
: 2.
Note: New          Page K-4 SECTION L: lraola
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
: 94.            1. Hospital Services,     A written agreement is contained   A written agreement is referenced   No 151 paragraph            in Appendix 2.                      in Appendix 2.
: 20) REVISION N Change Page/Section Previous Version New Version Editorial Effl No. Change Sta ele1 *-95. 1. Hospital  
Note: 16-01, item 48                  Page L-1
: Services, A written agreement is contained A written agreement is referenced No 2"d paragraph in Appendix  
 
: 2. in Appendix  
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change   Page/Section               Previous Version                     New Version                             Editorial Effl No.                                                                                                             Change     Sta ele1
: 2. Note: 16-01, item 49 Page L-1 96. 1. Hospital  
: 95.             1. Hospital Services,     A written agreement is contained     A written agreement is referenced     No 2"d paragraph             in Appendix 2.                       in Appendix 2.
: Services, 3,a In the event that a patient should In the event that a patient should No paragraph receive a massive radiation receive a massive radiation Note: 16-01, item exposure, an expert medical exposure, then Radiation 50 Page L-1 consultant specializing on the Emergency Assistance management of radiation injuries Center/Training Site (REAC/TS),
Note: 16-01, item 49                 Page L-1
would be available.
                                              ,a
A written available 24 hours/day, would be agreement is contained in contacted for guidance.
: 96.             1. Hospital Services, 3   In the event that a patient should   In the event that a patient should   No paragraph                 receive a massive radiation         receive a massive radiation Note: 16-01, item                             exposure, an expert medical           exposure, then Radiation 50                 Page L-1                   consultant specializing on the       Emergency Assistance management of radiation injuries     Center/Training Site (REAC/TS),
A written Appendix  
would be available. A written         available 24 hours/day, would be agreement is contained in           contacted for guidance. A written Appendix 2.                         agreement is referenced in Appendix 2 .
: 2. agreement is referenced in Appendix 2 . * *
 
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION i'ti Change   Page/Section               Previous Version                       New Version                           Editorial Ef'if No.                                                                                                             Change     St:.
: 20) REVISION i'ti Change Page/Section Previous Version New Version Editorial Ef'if No. Change St:. ele 97. Section 2, Onsite First These facilities consist of a These facilities consist of a Yes Aid Capability, 2"d stainless steel interior with stainless steel interior with Note: 16-01, item paragraph decontamination table, showers decontamination table, showers 51 and sinks draining into a holdup and sinks draining into holdup Page L-1 tanks. These facilities contain tanks. These facilities contain general first aid equipment and general first aid equipment and medical supplies for treatment of medical supplies for treatment of injuries.
ele
injuries.  
: 97.             Section 2, Onsite First   These facilities consist of a         These facilities consist of a         Yes Aid Capability, 2"d       stainless steel interior with         stainless steel interior with Note: 16-01, item   paragraph                 decontamination table, showers         decontamination table, showers 51                                             and sinks draining into a holdup       and sinks draining into holdup Page L-1                   tanks. These facilities contain       tanks. These facilities contain general first aid equipment and       general first aid equipment and medical supplies for treatment of     medical supplies for treatment of injuries.                             injuries.
: 98. Section 4, 2"" The Verplanck Fire Department The Verplanck Fire District Yes paragraph Ambulance, or other backup (Fire/Ambulance),
: 98.             Section 4, 2""             The Verplanck Fire Department           The Verplanck Fire District         Yes paragraph                 Ambulance, or other backup             (Fire/Ambulance), or other backup Note: 15-02, item                             ambulance agency, participates in     ambulance agency, participates in 110                 Page L-2                   annual medical emergency drills         annual medical emergency drills as described in Section N.             as described in Section N.
or other backup Note: 15-02, item ambulance agency, participates in ambulance agency, participates in 110 Page L-2 annual medical emergency drills annual medical emergency drills as described in Section N. as described in Section N. (work with items 166,167,and 205 for MOU)
(work with items 166,167,and 205 for MOU)
* SECTION M: lraola
* SECTION M: lraola
* *
* Change No.
* IPEC Erner Plan Revision 17-01 Merlin Revision  
IPEC Erner Page/Section Plan Revision 17-01 Merlin Revision 20) REVISION Previous Version                   New Version           Editorial Change Eff<<
: 20) REVISION Change Page/Section No. Previous Version New Version Editorial Eff<< Change Sta ele1 99. Section 1, Recovery, 2"u ... Emergency Director  
Sta ele1
... ...ED ... Yes paragraph Note: New M-2 100. Section 1, Recovery  
: 99.             Section 1, Recovery, 2"u ... Emergency Director...           ...ED ...           Yes paragraph Note: New M-2 100.             Section 1, Recovery     . ... Emergency Response           ... ERO ....         Yes 151 bullet               Organization ....
. ... Emergency Response  
Note: New Page M-3                                                                   I 101.           Section 2, Recovery       . .. .Emergency Response           ... ERO ....         Yes Org                       Organization ....
... ERO .... Yes 151 bullet Organization  
Note: New           2nd bullet Page M-3
.... Note: New Page M-3 I 101. Section 2, Recovery  
 
. .. . Emergency Response  
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change     Page/Section               Previous Version                   New Version           Editorial Eff1 No.                                                                                           Change     Sta ele1 102.           Section 2.b, 3'" bullet   .... Emergency Response           . .. ERO ....         Yes Organization ....
... ERO .... Yes Org Organization  
Note: New           Page M-4 103.           Section 2.e, 4th bullet   . ... Emergency Response           ... ERO ....         Yes Organization ....
.... Note: New 2nd bullet Page M-3
Note: New           Page M-5 104.           Section 3, 1s, sentence     . ... Emergency Response           ... ERO ....         Yes Organization ....
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
Note: New           Page M-6
: 20) REVISION N Change Page/Section Previous Version New Version Editorial Eff1 No. Change Sta ele1 --102. Section 2.b, 3'" bullet .... Emergency Response  
* Change No.
. .. ERO .... Yes Organization  
IPEC Emergencv Page/Section an Rev1s1on 17-01 (M erm Previous Version r Rev1s1on 20) REVISION New Version                               Editorial Change
.... Note: New Page M-4 103. Section 2.e, 4th bullet . ... Emergency Response  
                                                                                                                                      ~
... ERO .... Yes Organization  
Eft St; elE 105.           Section 3, 2"a sentence   All Indian Point Energy Center         Additional Indian Point Energy           No personnel are instructed of their     Center personnel are instructed of Note: 16-01, item   Page M-6                   roles in relation to the Indian Point their roles in relation to the Indian 52                                             Recovery Organization and their       Point Recovery Organization and responsibilities to the recovery       their responsibilities to the effort.                               recovery effort.
.... Note: New Page M-5 104. Section 3, 1 s, sentence  
106.           Section 4, 3ra sentence     . ... Emergency Response               ... ERO ....                           Yes
. ... Emergency Response  
(                 Organization ....
... ERO .... Yes Organization  
Note: New           Page M-6
....
* SECTION N: Karsten                                   ',
* Note: New Page M-6 *
 
* IPEC E 17 01 (M r R 20) REVISION R mergencv an ev1s1on -erm ev1s1on Change Page/Section Previous Version New Version Editorial Eft No. Change St; elE 105. Section 3, 2"a sentence All Indian Point Energy Center Additional Indian Point Energy No personnel are instructed of their Center personnel are instructed of Note: 16-01, item Page M-6 roles in relation to the Indian Point their roles in relation to the Indian 52 Recovery Organization and their Point Recovery Organization and responsibilities to the recovery their responsibilities to the effort. recovery effort. 106. Section 4, 3ra sentence  
IPEC Emergency P!an Revision 17-01 (MerUn Revision 20) REVISION                                     ru Change   Page/Section               Previous Version                   New Version               Editorial Eff1 No.                                                                   I                           Change     Sta ele 107.             2nu bullet                 .... Emergency Response             ...ERO ....             Yes Organization ....
. ... Emergency Response  
Note: New           Page N-1 SECTION O: Ambrose I
... ERO .... Yes ( Organization  
I 108.           1, Assurance of -           .... Emergency Response             ... ERO ....           Yes Training, 1*t paragraph   Organization....
.... Note: New Page M-6
* Note: New Page 0-1
* SECTION N: Karsten ', *
 
* IPEC Emergency P!an Revision 17-01 (MerUn Revision  
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS~ON                                               ~
: 20) REVISION ru Change Page/Section Previous Version New Version Editorial Eff1 No. I Change Sta ele 107. 2nu bullet .... Emergency Response  
Change   Page/Section               Previous Version                   New Version                         Editorial Ef No.                                                                                                       Change     S!
...ERO .... Yes Organization  
0!1 109.             Section 2                 2. Methods of Training was on       Moved to page 0-2                 Yes page 0-1 Note: New           Page 0-1 110.             Section 4, a             Personnel Responsible for           Personnel responsible for         Yes Management. .....                   management. ...
.... Note: New Page N-1 i I I SECTION O: Ambrose I I 108. 1, Assurance of -.... Emergency Response  
Note: New           Page 0-3
... ERO .... Yes Training, 1*t paragraph Organization....
                                                ... Emergency Director ...           . .. ED ...
* Note: New
111.           5.b, 2"" sentence         .... Emergency Response             ... ERO ....                     Yes Organization ....
* Page 0-1 "* *
Note: New 5.b, last paragraph       ... ERO Roster...                   ... ERO roster ...
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
Page 0-6
: 20) REVIS~ON Change Page/Section Previous Version New Version Editorial Ef No. Change S! 0!1 109. Section 2 2. Methods of Training was on Moved to page 0-2 Yes page 0-1 ' Note: New Page 0-1 110. Section 4, a Personnel Responsible for Personnel responsible for Yes Management.  
 
..... management.  
IPEC Emergency Plan Revision 17-01 (Merlan Revision 20) REV!SION I\J Change   Page/Section             Previous Version                     New Version                           Editorial Eff No.                                                                                                         Change     Sta ele 112.             5.c, 2"" bullet         .... Emergency Response             ... ERO ....                         Yes Organization ....
... Note: New Page 0-3 ... Emergency Director  
Note: New           Page 0-7 SECTION P: Martin 5
... . .. ED ... 111. 5.b, 2"" sentence  
113.             Section 2, 1 '           .... Emergency Response               . .. ERO ....                       Yes paragraph, last         Organization ....
.... Emergency Response  
Note: New           sentence Page P-1
... ERO .... Yes Organization  
* 114.             Section 3, 1st paragraph Page P-1
.... Note: New
                                                ... Indian Point Preparedness ...   . .. Indian Point Emergency Preparedness ...
* 5.b, last paragraph  
Yes J
... ERO Roster ... ... ERO roster ... Page 0-6 *
 
* IPEC Emergency Plan Revision 17-01 (Merlan Revision  
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION                                               1\1 Change     Page/Section             Previous Version                   New Version                             Editorial Eff No.                                                                                                         Change     St;i ele 115.             Section 4,             Technical reviews of the Plan and   Technical reviews of the Plan and     No 5th Paragraph         procedures shall be conducted in   procedures shall be conducted in Note: 16-01, item                           accordance with station             accordance with station 53                   Page P-3               procedures. Individuals that       procedures. The reviewer shall conduct the technical review and   determine the need for cross-safety review shall be qualified in disciplinary reviews.
: 20) REV!SION I\J Change Page/Section Previous Version New Version Editorial Eff No. Change Sta ele 112. 5.c, 2"" bullet .... Emergency Response  
accordance with station requirements. The reviewer shall   Note: Removed the statement:
... ERO .... Yes Organization  
determine the need for cross-disciplinary review.               "Individuals that conduct the technical review and safety review shall be qualified in accordance with station requirements."
.... Note: New Page 0-7 SECTION P: Martin 113. Section 2, 15' .... Emergency Response  
 
. .. ERO .... Yes paragraph, last Organization  
IPEC E mergencv Pl an Rev1s1on 17 01 (M erm Rev1s1on 20l REVISIONr                            ru Eff, Change   Page/Section               Previous Version                 New Version           Editorial No.                                                                                         Change     Sta ele 116.             Section 5, 3rd sentence   . ... Emergency Response         ... ERO ....         Yes Organization ....
.... Note: New sentence Page P-1
Note: New           Page P-3 117.             Section 10               .... Emergency Response           ... ERO ....         Yes Organization ....
* 114. Section 3, 1st ... Indian Point Preparedness  
Note: New           Page P-5 APPENDIX 1:
... . .. Indian Point Emergency Yes paragraph Preparedness  
No changes APPENDIX 2: lraola I
... Page P-1 J *
* Change No.
* IPEC Emergency Plan Revision 17-01 (Merlin Revision  
IPEC Emergency Plan Revision 17-01 (MerUn Revision 20) REVISION Page/Section               Previous Version                   New Version
: 20) REVISION 1\1 Change Page/Section Previous Version New Version Editorial Eff No. Change St;i ele 115. Section 4, Technical reviews of the Plan and Technical reviews of the Plan and No 5th Paragraph procedures shall be conducted in procedures shall be conducted in Note: 16-01, item accordance with station accordance with station 53 Page P-3 procedures.
____________._______________,.....________________.._______~__,
Individuals that procedures.
Editorial Change
The reviewer shall conduct the technical review and determine the need for cross-safety review shall be qualified in disciplinary reviews.
                                                                                                                                        ~
accordance with station requirements.
Efl St elE 118.               Page: Appendix 2-1        NIA                                10. Department of Energy-              No Radiological Assistance Program Note: 16-01, item                                                                       Region 1 ( Brookhaven) 54 119.               Page: Appendix 2-1       As Letters of Agreements are        As Letters of Agreements are           No received they will be added to this received they will be listed in this Note: 16-01, item                                  section.                           section.          -
The reviewer shall Note: Removed the statement:
55
determine the need for cross-disciplinary review. "Individuals that conduct the technical review and safety review shall be qualified in accordance with station requirements."  
 
* ' * 
l iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION            ~
--------------
Change   Page/Section           Previous Version   New Version         Editorial Eft No.                                                                     Change     St, elE 120.           APPENDIX 3: lraola     IP-EP-115           IP-EP-115           No EN-EP-900 IP-EP-120 Note: 16-01, item                                             IP-EP-120 56                                         IP-EP-210 IP-EP-220           IP-EP-210 IP-EP-221           IP-EP-220 IP-EP-230           IP-EP-221 IP-EP-231           IP-EP-230 IP-EP-250           IP-EP-231 IP-EP-251           IP-EP-250 IP-EP-260           IP-EP-251 IP-EP-260 IP-EP-210           EN-EP-609 EN-EP-610 IP-EP-220           EN-EP-611 IP-EP-221           EN-EP-900 IP-EP-230           IP-EP-210 IP-EP-231 IP-EP-220 IP-EP-250           IP-EP-221 IP-EP-251           EN-EP-610 (Twice)
* IPEC E 17 01 (M r R 20l REVISION ru Pl R mergencv an ev1s1on -erm ev1s1on Change Page/Section Previous Version New Version Editorial Eff, No. Change Sta ele 116. Section 5, 3rd sentence  
IP-EP-230 IP-EP-231 IP-EP-230           EN-EP-611 IP-EP-250 IP-EP-350           IP-EP-250 IP-EP-251 IP-EP-250           EN-EP-609 IP-EP-320 IP-EP-230 IP-EP-250 IP-EP-350 EN-EP-611 IP-EP-250 IP-EP-320 EN-EP-609
. ... Emergency Response  
 
... ERO .... Yes Organization  
IPEC Emergenc i Pian Revision 17-01 (Merlin Revision 20) REVISION                                               ~
.... Note: New Page P-3 117. Section 10 .... Emergency Response  
1Change   Page/Section             Previous Version                     New Version                             Editorial Ef No.                                                                                                           Change     St eh IP-EP-230                               IP-EP-230 IP-EP-430                               IP-EP-430 EN-EP-611 APPENDIX 4:
... ERO .... Yes Organization  
121.           Appendix 4,                                                                                         No page 4-2 Note: new                                   NSRAC - Nuclear Safety Review           Deleted and Audit Committee 122.           Appendix 4, page 4-8     Radiation Area - ... five millirem .... Radiation Area -... 5mRem ..     Yes Note: 15-02, item 199 APPENDIX 5: No changes Not used
.... Note: New Page P-5 APPENDIX 1:
 
* No changes I APPENDIX 2: lraola
IPEC EMERGENCY PLAN DISTRIBUTION LIST Page 1 of 2 DELIVERED BY IP3 CONTROL ROOM                                          IP3 53FT. CCR              1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP3 SHIFT MANAGER                                     IP3 53FT. ELEVATION            1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 CONTROL ROOM                                         IP2 53FT. CCR              1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IPEC TSC                                             IP2 53FT. ELEVATION            1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 SIMULATOR                                      IP2 SIMULATOR BLDG.              1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 SIMULATOR - CLASSROOM 4                         IP2 SIMULATOR BLDG.              1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY                                        3 COPIES OF ALL EP'S IP2 SIMULATOR - CLASSROOM 5                         IP2 SIMULATOR BLDG.
* *
DOCUMENTS                                              EXCEPT E-PLAN NRC RESIDENT INSPECTOR             NRC               IP2 88FT. ELEVATION            1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND NRC - ROCKVILLE, MD DOC CONTROL DESK                                              OFFSITE                GENERAL RECORDS ADDRESS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND NRC                            JAMES DANNA                     OFFSITE              GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND NRC                          DEPUTY DIRECTOR                   OFFSITE              GENERAL RECORDS EXCEPT IP-EP-115
* IPEC Emergency Plan Revision 17-01 (MerUn Revision  
                                                                        . ; *.~'*
: 20) REVISION Change Page/Section Previous Version New Version Editorial Efl No. Change St elE ,....._ __ _,._ __________
1 COPY OF THE FOLLOWING:
__.__ _____________
                                                      .LENORE TO ~PDATE '
,....._ ____________
E-PLAN, IP-EP-115, 120, NEW YORK STATE OEM              TED FISCH              ... 'WEBSITE .
___.. _______ ~__, 118. Note: 16-01, item 54 119. Note: 16-01, item 55 Page: Appendix 2-1 Page: Appendix 2-1 NIA As Letters of Agreements are received they will be added to this section.  
210,220,230,250,310, N.O MAIL;COPIES 320,340,360,410,420, 430, 620 & IP-1055 1 COPY OF E-PLAN, WESTCHESTER COUNTY OEM      DENNIS DELBORGO                    OFFSITE IP-EP-310 & 340 ROCKLAND COUNTY FIRE AND                                                              1 COPY OF E-PLAN, NICHOLAS LONGO                    OFFSITE EMERGENCY SERVICES                                                                      IP-EP-310, & 340 ORANGE COUNTY EMERGENCY                                                              1 COPY OF E-PLAN, SHANNON FISHER                  OFFSITE SERVICES CENTER                                                                        IP-EP-310 & 340 PUTNAM COUNTY BUREAU OF                                                              1 COPY OF E-PLAN, ANTHONY SUTION                    OFFSITE EMERGENCY SERVICES                                              "                    IP-EP-310 & 340 NOV 15 2017
: 10. Department of Radiological Assistance Program Region 1 ( Brookhaven)
_ ______.J}}
As Letters of Agreements are received they will be listed in this section.
-No No l
* iPEC Emergency Plan Revision 17-01 (Merlin Revision
: 20) REVISION Change Page/Section Previous Version New Version Editorial Eft No. Change St, elE 120. APPENDIX 3: lraola IP-EP-115 IP-EP-115 No EN-EP-900 Note: 16-01, item IP-EP-120 IP-EP-120 56 IP-EP-210 IP-EP-220 IP-EP-210 IP-EP-221 IP-EP-220 IP-EP-230 IP-EP-221 IP-EP-231 IP-EP-230 IP-EP-250 IP-EP-231 I IP-EP-251 IP-EP-250 IP-EP-260 IP-EP-251 IP-EP-260 IP-EP-210 EN-EP-609 EN-EP-610 IP-EP-220 EN-EP-611 IP-EP-221 EN-EP-900 IP-EP-230 IP-EP-210 IP-EP-231 IP-EP-220 IP-EP-250 IP-EP-221 IP-EP-251 EN-EP-610 (Twice) IP-EP-230 IP-EP-231 IP-EP-230 EN-EP-611
* IP-EP-250 IP-EP-350 IP-EP-250 IP-EP-251 IP-EP-250 EN-EP-609 IP-EP-320 IP-EP-230 IP-EP-250 IP-EP-350 EN-EP-611 IP-EP-250 IP-EP-320 EN-EP-609  
*
* IPEC Emergenc i Pian Revision 17-01 (Merlin Revision  
: 20) REVISION 1Change Page/Section Previous Version New Version Editorial Ef No. Change St eh IP-EP-230 IP-EP-230 IP-EP-430 IP-EP-430 EN-EP-611 APPENDIX 4: 121. Appendix 4, No page 4-2 Note: new NSRAC -Nuclear Safety Review Deleted and Audit Committee 122. Appendix 4, page 4-8 Radiation Area -... five millirem  
.... Radiation Area -... 5mRem .. Yes Note: 15-02, item
* 199 APPENDIX 5: No changes Not used
--------------------------------------~
IPEC EMERGENCY PLAN DISTRIBUTION LIST IP3 CONTROL ROOM IP3 SHIFT MANAGER IP2 CONTROL ROOM IPEC TSC IP2 SIMULATOR IP2 SIMULATOR
-CLASSROOM 4 IP2 SIMULATOR  
-CLASSROOM 5 NRC RESIDENT INSPECTOR DOC CONTROL DESK NRC NRC NEW YORK STATE OEM WESTCHESTER COUNTY OEM ROCKLAND COUNTY FIRE AND EMERGENCY SERVICES ORANGE COUNTY EMERGENCY SERVICES CENTER PUTNAM COUNTY BUREAU OF EMERGENCY SERVICES Page 1 of 2 DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS DELIVERED BY DOCUMENTS NRC NRC -ROCKVILLE, MD ADDRESS JAMES DANNA DEPUTY DIRECTOR TED FISCH DENNIS DELBORGO NICHOLAS LONGO SHANNON FISHER ANTHONY SUTION IP3 53FT. CCR IP3 53FT. ELEVATION IP2 53FT. CCR IP2 53FT. ELEVATION IP2 SIMULATOR BLDG. IP2 SIMULATOR BLDG. IP2 SIMULATOR BLDG. IP2 88FT. ELEVATION OFFSITE OFFSITE OFFSITE . ; *.~'* . . . . . .LENORE TO ~PDATE ' ... 'WEBSITE
. N.O MAIL;COPIES OFFSITE OFFSITE OFFSITE OFFSITE " NOV 15 2017 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S 3 COPIES OF ALL EP'S EXCEPT E-PLAN 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF THE FOLLOWING:
E-PLAN, IP-EP-115, 120, 210,220,230,250,310, 320,340,360,410,420, 430, 620 & IP-1055 1 COPY OF E-PLAN, IP-EP-310  
& 340 1 COPY OF E-PLAN, IP-EP-310,
& 340 1 COPY OF E-PLAN, IP-EP-310
& 340 1 COPY OF E-PLAN, IP-EP-310
& 340 _ ______.J}}

Latest revision as of 01:16, 4 February 2020

Emergency Plan Procedure IPEC-EP 17-01, Revision 20
ML17333A126
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 11/14/2017
From:
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML17333A126 (82)


Text

--- Entergy Indian Point Energy Center CONTROLLED DOCUMENT Document Control TRANSMITTAL 450 Broadway Buchanan, NY 10511 TO: DISTRIBUTION DATE: November 14, 2017 FROM: IPEC DOCUMENT CONTROL - 3RD FLOOR ADMIN BLDG PHONE#: 914-254-6835 TRANSMITTAL#: EP-17-0026 The Document(s) identified below are forwarded for use. Please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, voided, or inactive document(s).

Sign and return the receipt acknowledgement below within ten (10) working days.

AFFECTED DOCUMENT: IPEC EMERGENCY PLAN PROCEDURE DOC# REV# TITLE INSTRUCTIONS PLEASE INCORPORATE INTO YOUR BOOKS THE FOLLOWING UPDATED PROCEDURES OR DRAWINGS:

I, NOV 15 2017.

IPEC-EP 17-01 REVm20 RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S)

(IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S). \::x>

NAME (PRINT) SIGNATURE DATE COPY LOCATION

ATIACHMENT 9.2 10 CFR 50.54(0)(3) SCREENING SHEET1 OF5

  • Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)

Title:

Indian Point Energy Center Emergency Plan I Revision: 17-01 (MERLIN Revision 20)

Part I. Description of Activity Being Reviewed (This is generally changes to the emergency plan. EALs, EAL bases, etc. - refer to step 3.0[6]):

The activity being reviewed is a revision to IPEC Emergency Plan. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01.

Part II. Activity Previously Reviewed? DYES !8J NO Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or 50.54(q)(3) Continue to Evaluation is next part Alert and Notification System Design Report? NOT required.

Enter If YES, identify bounding source document number/approval reference and justification ensure the basis for concluding the source document fully bounds the below and complete Part proposed change is documented below: VI.

Justification:

D Bounding document attached (optional)

Part Ill. Applicability of Other Regulatory Change Control Processes Check if any other regulatory change processes control the proposed activity.(Refer to EN-Ll-100)

  • APPLICABILITY CONCLUSION

!8l If there are no other controlling change processes, continue the 50.54(q)(3) Screening.

D One or more controlling change processes are selected, however, some portion of the activity involves the emergency plan or affects the implementation of the emergency plan; continue the 50.54(q)(3) Screening for that portion of the activity. Identify the applicable controlling change processes below.

D One or more controlling change processes are selected and fully bounds all aspects of the activity. 50.54(q)(3)

Evaluation is NOT reouired. Identify controllinA chan11e processes below and complete Part VI.

CONTROLLING CHANGE PROCESSES 10 CFR 50.54(q) Only Part IV. Editorial Change DYES [gi NO 50.54(q)(3) Co111inue 10 nexl Is this activity an editorial or typographical change such as formatting, paragraph Evalualion is part numbering, spelling, or punctuation that does not change intent? NOT required.

En1cr Justification: juslificalion and 1,2,3,4,5,6, 7,8,9,10,11,12,13,14,15,16, 17,19,20,21,22,23,25,26,27,28, conlinue 10 nexl 29,30,31,32,33,34,35,36,37,38,39,41,42,44,45,47,48;49,51,52,53, 54,55, part or 56, 57,58, 59,60,61,62,63,64, 66,67, 68,69, 70,71, 72, 74, 75, 76, 77, 78,80,81, complelc Part 82,83,84,85,86,88,89,90,92,93,97,98,99,100,101,102, 103,104,106,107, VI as applicable.

108, 109, 110, 111, 112, 113, 114, 116, 117, 122 per the attached revision matrix are considered editorial changes per EN-AD-101.

"NO" is checked because the procedure revision contains non-editorial changes per the attached revision matrix.

EN-EP-305 REV 5

ATIACHMENT 9.2 10 CFR 50.54(Q)(3) SCREENING*

SHEET2 OF5

  • Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)

Title:

Indian Point Energy Center Emergency Plan I Revision: 17-01 (MERLIN Revision 20)

Part V. Emergency Planning Element/Function Screen (Associated 10 CFR 50.47(b) planning standard function identified in brackets) Does this activity affect any of the following, including program elements from NUREG-0654/FEMA REP-1 Section II?

1. Responsibility for emergency response is assigned. [1) D
2. The response organization has the staff to respond and to augment staff on a continuing basis (24/7 D staffing) in accordance with the emergency plan. (1)
3. The process ensures that on shift emergency response responsibilities are staffed and assigned. [2] D
4. The process for timely augmentation of onshift staff is established and maintained. (2] t8l
5. Arrangements for requesting and using off site assistance have been made. [3J D
6. State and local staff can be accommodated at the EOF in accordance with the emergency plan. [3] D
7. A standard scheme of emergency classification and action levels is in use. [4] D
8. Procedures for notification of State and local governmental agencies are capable of alerting them of D the declared emergency within 15 minute( after declaration of an emergency and providing follow-up notifications. [5]
9. Administrative and physical means have been established for alerting and providing prompt D instructions to the public within the plume exposure pathway. [5]
10. The public ANS meets the design requirements of FEMA-REP-10, Guide for Evaluation of Alert and LJ Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS design report and supporting FEMA approval letter. [5J
  • 11. Systems are established for prompt communication among principal emergency response organizations. [6J
12. Systems are established for prompt communication to emergency response personnel. (6J
13. Emergency preparedness information is made available to the public on a periodic basis within the plume exposure pathway emergency planning zone (EPZ). (7)
14. Coordinated dissemination of public information during emergencies is established. [7]

D D

D D

15. Adequate facilities are maintained to support emergency response. [8J D
16. Adequate equipment is maintained to support emergency response. [8] D
17. Methods, systems, and equipment for assessment of radioactive releases are in use. [9J LJ
18. A range of public PARs is available for implementation during emergencies. [10] D
19. Evacuation time estimates for the population located in the plume exposure pathway EPZ are D available to support the formulation of PARs and have been provided to State and local governmental authorities. [1 OJ
20. A range of protective actions is available for plant emergency workers during emergencies, including D those for hostile action events.[1 OJ
21. The resources for controlling radiological exposures for emergency workers are established. [11] D
22. Arrangements are made for medical services for contaminated, injured individuals. [12] D
23. Plans for recovery and reentry are developed. [13] D
24. A drill and exercise program (including radiological, medical, health physics and other program D areas) is established. [14]
25. Drills, exercises, and training evolutions that provide performance opportunities to develop, D EN-EP-305 REV 5

ATTACHMENT 9.2 10 CFR 50.54(0)(3) SCREENING SHEET3 OF5

  • Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)

Title:

Indian Point Energy Center Emergency Plan IRevision: 17-01 (MERLIN Revision 20) maintain. and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses. [14]

26. Identified weaknesses are corrected. [14] D
27. Training is provided to emergency responders. [15) D
28. Responsibility for emergency plan development and review is established. [16] D
29. Planners responsible for emergency plan development and maintenance are properly trained. [16] D APPLICABILITY CONCLUSION D If no Part V criteria are checked, a 50.54(q)(3) Evaluation is NOT required; document the basis for conclusion below and complete Part VI.

D If any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3) Evaluation.

BASIS FOR CONCLUSION Change 18- Change made to more clearly describe emergency notification methods during working and non-working hours. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

Change 40- Change made to clarify where the Public Information Liaison reports. Also used abbreviations for "JIC", "ED", "ERO" and "EOF" because they are previously defined in Section B. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

  • Change 43 - Change made to clarify that LOAs were previously removed from Appendix 2. This was evaluated for prior revision 15-02. Also, abbreviations for "TSC" and "ED" are sufficient because they were previously defined in Section B. These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

Change 46 - Change made to clarify that LOAs were previously removed from Appendix 2. This was I

I evaluated for prior revision 15-02. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

Change 50- Removed box to reflect previously evaluated change from SAMG Evaluator to Reactor Engineer. SAMG Evaluator position was deleted from the Emergency Response Organization (ERO). The removal of this position was previously 50.54(q) evaluated for Revision 15 of IP-EP-220, Technical Support Center. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

Change 65 - changed site assembly alarm to lower case and Public Address System to upper case. In I addition, clarified wording regarding who the control room operators contact. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

Change 73 - Clarification of wording to denote that additional positions are assigned to CR as required.

Revised ERO. These chanqes do not chanqe the meanina or intent of a descriotion, does not chanqe I EN-EP-305 REV 5

ATTACHMENT 9.2 10 CFR 50.54(a)(3) SCREENING SHEET40F 5

  • Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)

Title:

Indian Point Energy Center Emergency Plan I Revision: 17-01 (MERLIN Revision 20) facilities or equipment, and does not change a process. No further evaluation is required for this change.

Change 79 - Clarification of wording to reflect Appendix 2's reference to letters of agreement. During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

Change 91- Change in wording to clarify that offsite authorities are responsible for protective action decision not IPEC. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

Change 94 - During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

Change 95 - During the EPLAN revision 15-02, all the written agreements/ Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

Change 96 - Added Radiation Emergency Assistance Center/Training Site (REAC/TS) which has become the national source to contact to receive guidance given the scenario of a patient that has received massive radiation exposure. During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a I description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change

  • Change 105 - Changed the word from All to Additional to better define the actions that would be taken regarding utilizing plant personnel during the recovery effort. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

Change 115 - . Procedures IP-SMM-AD-102 and IP-EP-AD2 establishes requirements for the preparation, review, and approval of site-specific implementing procedures. Both procedures list a technical review as a review from someone who has the expertise to ensure technical accuracy. Neither requires the individual to be qualified. Per IP-EP~AD2, Safety reviews are completed to determine if prior NRC approval is required.

This is performed by the 50.54Q process in EN-EP-305. In 305 you are required to be qualified. Removing this statement: "Individuals that conduct the technical review and safety review shall be qualified in accordance with station requirements." does not change the meaning or intent of a description, d9es not change facilities or equipment, and does not change a process. Technical review does not require qualifications and still will be completed. Safety reviews are still to be completed and the 5054Q process will ensure the qualifications are obtained prior to anyone being assigned to complete. No further evaluation is required for this change.

Change 118 -Added a new Memorandum of Understanding (MOU) with the Department of Energy for additional radiological assistance if needed depending on the radiological emergency at Indian Point.

This MOU is an enhancement to the EPLAN and support for Indian Point. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.

No further evaluation is required for this change.

EN-EP-305 REV 5

  • ATTACHMENT 9.2
  • SHEET50F5 Procedure/Document Number: IPEC-EP EqulpmenUFaclllty/Dther: Indian Point Energy Center (IPEC)

Tltle: Indian Point Energy Center Emergency Plan 10 CFR 50,S4(Q}(3) Sc:RE&NING I Revision: 17-01 (MERLIN Revision 20)

Change 119

  • Changed the wording from added to llst&d as Ille Letters of Agreement were o telally removed r,om the EPLAN during the 2015 15-02 revision. A 50.54q was perfonned. Unfortunately, this Item was missed during last year's EPLAN revision. This change does not change the meaning or intent of a description, does net change facilities or equipment, and does not change a process. No further evaluation is required for lhls change.

Change 120 - Added the common fleet Emergency Planning procedures to the list of existing IPEC procedures. Fleet Procedures added Include:

EN-EP-609, EN-EP-610, EN-EP-611, EN-EP-900, These changes do not change lhe meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation Is required for this change.

Change 121

  • NSRAC - Nuclear Safety Review and Audit Committee no longer exists as It was replaced OSRC - On-Sile Safely Review Committee In 15-02 rev. This change does not change lhe meaning or b1 intent of a deseription, does net change fac:illUes or equipment. and does not change a process. No further evaluation Is required for !his change.

Emergency Plannlng Element 4 in Part V of lhls form Is potenUally affected by Iha remaining Change 24 described In the Revision Matrix. A 10CfR50.54 (q) evatuatlon will be performed to determine if the effectlvaness of the IPEC Emergency Plan Is reduced and prior NRC approval Is required *

  • Part VI. Signatures:

Preparer Name (Print)

Rebecca A. Martin Sr. Project Manager Pr~arer Slgnalure

. .c,()

Dale:

It> 'q r (OpUcnal) Reviewer Name (Prinl) Reviewer Signature Dale:

Rel/k!Wer Name (Prlnl) Reviewer Signature Date*

Tlmalhy Garvey Nuclear EP Project Manager -r&A- lo\\a_\l"1 Approver Name (Print)

Frank Mltchell Managar, Emergency Planning or d&slgnee

  • -;;~ oa1a*

1u/t1 EN-EP-305 REV 5

ATTACHMENT 9.3 10 CFR 50.54(Q)(3) EVALUATION SHEET1 OF 3

  • Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)

Title:

Indian Point Energy Center Emergency Plan Part I. Description of Proposed Change:

I Revision: 17-01 (MERLIN Revision 20)

The activity being reviewed is a revision to IPEC Emergency Plan. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01.

All changes have been screened out with the exception of item number 24.

Part II. Description and Review of Licensing Basis Affected by the Proposed Change:

The IPEC Emergency Plan has been reviewed through the Process Applicability Determination (PAD) in accordance with the criteria described in NEI 96-07 and EN-LI-100. This proposed change does not(])

change the facility or procedures as described in the UFSAR or (2) create a test or equipment not described in the UFSAR and is governed under the Emergency Plan 10 CFR 50.54(q) screening process in accordance with EN-EP-305. These proposed changes do not involve structures, systems or components controlled by I 0 CFR 50.59 or 72.48 and do not have the potential to impact any of the License Basis Documents (LBDs) on the PAD form, except for the Emergency Plan. All responses to the questions contained in sections III and IV of the PAD form were determined to be *'no impact". Since these proposed changes do not contain any requirements that could affect any LBDs other than the Emergency Plan, it is detennined to be fully governed under IO CFR 50.54(q). In addition to those reviewed for the PAD, each of the following documents/relevant

.sections was reviewed:

a) Reviewed current Plan, all sections Part I and Part 2. No additional relevant or affected Plan content was identified.

  • b) The original Plans, U2 1970 and U3 1973, were not available for review .

c) Historical I OCFR50.54 (q) documents were manually reviewed dating back to 2005 for significant changes: No differences related to the need .to compensate for preparedness or response constraints or vulnerabilities specific to the facility, EPZ or jurisdiction were found for the historical search period. Some items associated with the current proposed changes were identified as described below:

Reviewed NSIR/DPR-ISG-0 I for applicability to Plan changes that were both evaluated and screened out.

n EN-EP-305 REV 5

ATIACHMENT 9.3 10 CFR 50.54(Q)(3) EVALUATION SHEET20F 3

  • Procedure/Document Number: IPEC-EP I Revision:

Equipment/Facility/Other: Indian Point Energy Center (IPEC)

Title:

Indian Point Energy Center Emergency Plan 17-01 (MERLIN Revision 20)

Part Ill. Describe How the Proposed Change Complies with Relevant Emergency Preparedness Regulation(s) and Previous Commitment(s) Made to the NRC:

10 CFR 50.47(b)(2)-0nsite Emergency Organization (Item 24 in the matrix)

  • The process for timely augmentation of on shift staff is established and maintained.

Site Compliance: The Plan wording changes to accommodate the transfer of command and control from the Emergency Director to the CCR if the Emergency Director is unavailable or if the EOF is being transfe1Ted to the AEOF. This change does not change required timeliness, minimum staffing, ability to perform facility assigned functions, or equipment requirements as they relate to the emergency response facility activation and command and control.

Part IV. Description of Emergency Plan Planning Standards, Functions and Program Elements Affected by the Proposed Change:

10 CFR 50.47(b)(2)-0nsite Emergency Organization (Item 24 in the matrix)

Function:

  • The process for timely augmentation of on shift staff is established and maintained.

Program Elements:

IO CFR Part 50, Appendix E,Section IV .A.2.a provides supporting requirements.

Informing criteria appear in Section 11.8 ofNUREG -0654 and in the Emergency Plan.

EN-EP-305 REV 5

  • ATTACHMl!NT 9.3 SHl!E1' 3 OF 3 PracedureJDocument Number: IPEC-EP Equipmant/F1cllltyl0ther: Indian Point Energy Center OPEC)

TIU*: Indian Point Enorgy Canter Emarguncy Plan I Ravlalon:

10 CFR 50.54(Q)C3) EVALUATION 17-01 (MERLIN Revision 20l Part V. Description of Impact of the Proposed Change on the Effectiveness of Emergency Plan functions:

  • Change 24
  • The Plan wording c:hllnges to accommodate the tlllnsfcr ofcommund and control lhlm lhu Em~ncy Director lo the CCR Ir the Emu;enc:y Director Is unavailabli: or irthe EOF Is being transfc:m:d to the AEOF. This change docs not choni.-e required timeliness, minimum staffing. ability 10 pcrfonn f11ellhy 11Sslgned functions, or equipment TllqUin:ntenlS 115 lhcy relate to 1hc emcr1,oeni:y response racllity ocrlwtion and comffl4nd and c:oncrol.

Thu changi= docs not represent D reduction In the elTc:ctivcnr:ss of the errn:rycncy phln. conllnlll!$ to 111e111 planning stamlard 10 CFR S0.47(b) (?I and l OCFRSO Appendix E S~c:tion IV.A.l.11 and can be incorporutcd wllhcut prior NRC approval beClluse the change did.not change required limelincs,, minimum Slllffing. ability to perfonn fllcility assignt:d ftlnctlons. or equipment rcquir111111:nts 115 they n:late 10 the cmi:rpncy n:sponsc racllky 11ctlvation 11nd command and control.

CondusJon Regnrdjnu Jmnpc1 The proposed changes 101he IPEC EPLAN Rev 17.01. continue to mcctlhe phinningstondllrds outlined in 10 cr:R 50.47(b) (2). This revision does not rcprcsenl Dn:duccion In elTcctivmess 10 the IPl:C Emergency Plml ilnd can he inco'flOratcd wilhoul prior NRC approval.

Part VI. EvaluaUan Conclusion Answer 1h11 followlng questions about the proposed change.

I. Does the proposed change comply with 10 CFR 50.47(b) and 10 CFR 50 Appendix E? Dl:)Yl:S [] NO

.?. Does the proposed change maintain the effectiveness of lhe emergency plan (i.e., no @YES ONO reduction in effectiveness)?

l, Does the proposed change constitute an emergency action level scheme change? 0YES1EJNO If questions 1 or 2 are answered NO, or question 3 answered YES, reject lhe proposed change, modify the proposed change and perfonn a new avaluafion or oblaln prior NRC approval U11der provisions of 10 CFR 50.90. If quesUons 1 and 2 are answered YES, and question 3 aMwered NO, implement applicable change prace~es). Refer to step 5.9[8].

Part VII. Signatures EN-EP-305 REV 5

ATTACHMENT 9.1 PROCESS APPLICABILITY DETERMINATION FORM Sheet 1 of 7 I. OVERVIEW PAD Rev.#: _o__

Facility: Indian Point Energy Center (IPEC)

Proposed Activity / Document: IPEC Emergency Plan Change/Rev.#: 17-01 (Merlin Rev. 20)

Description of Proposed Activity: Revision to IPEC Emergency Plan II. DOCUMENT REVIEW METHOD Provide the requested information for each item below.

1. For documents available electronically:
a. List search engine or documents searched, and keywords used:

U2/U3 Technical Specifications, U2/U3 UFSARs, NRC Orders, LRS Commitments, and the IPEC Emergency Plan: Keywords: Emergency, Plan, Emergency Plan.

b. List relevant sections of controlled electronic documents reviewed:

All Licensing Basis Document sections were searched electronically: U2/U3 Technical Specifications, U2/U3 UFSARs, NRC Orders, LRS Commitments. Review determined no relevant hits and no impact from proposed changes .

  • 2. Documents reviewed manually (hardcopy):

3.

None For those documents that are not reviewed either electronically or manually, use the specific questions provided in Sections Ill and IV of Attachment 9.2 of EN-Ll-100 as needed. Document, below, the extent to which the Attachment 9.2 questions were used.

Reviewed complete Att. 9.2 of EN-Ll-100 Revision 20. Emergency Plan (10 CFR 50.54(q) / (EN-EP-305) section is applicable due to change being controlled by 10 CFR 50.54 (q) .

  • EN-Ll-100 REV. 20

,_ _ _ _ _ _ _ _ _ ,._ _ _ _ _ _ _ a,

ATTACH~~~m9.1 PROCESS APPLICASlLITY DETER:.,i~lATION Fem.,

Sh;et2oi7

  • m. PROCESS REVIEW Does the proposed activity affect, invalidate, or render Incorrect, OR have the potential to affect, invalidate, or render Incorrect, information contained in any of the following processes? Contact Program Owner if needed. Associated regulations and procedures are identified with each process below.

PROCESS (Regulations I Procedures) YES NO REVIEW RESULTS Chemistry/ Effluents D 181 Radwaste / Process Control Program (PCP) D 181 (EN*R~-105 or contact the Radiation Protection Dept.)

Radiation Protection / ALARA D 181 (10 CFR 20 I EN-RP-110 or contact tha Radiation Protection Dept.)

lnservlce Inspection Program (10 CFR 50.SSa/ EN-DC-120. *333, -342, D 181

-351, -352) lnservice Testing Program (10 CFR 50.55a / EN-DC-332) D 181 Maintenance Rule Program (10 CFR 50.65 I EN*DC-203, -204. *205, -206, D 181

-207)

Containment Leakage Rate Testing (Appendix J) Program (10 CFA 50 D 181 Appendix J / EN-DC-334)

PROCESS (Regulations/Procedures) YES NO NIA REVIEW RESULTS FLEX Program (NRC Order EA*12-49/FLEX Program) (10 CFR 50.59 / D ~ D Contact Design Engineering)

NOTE: The date for Individual site implementation of the FLEX Program is not the same for all sites. All sites are required to implement a FLEX program per NRC Order EA-12-49. NIA may be used for this process by sites that have not completed implementatlon ol a FLEX program. Contact Design Engineering If further assistance is needed.

IF any box is checked "Yes," I!:!fil:! contact the appropriate department to ensure that the proposed change is acceptable and document the results in the REVIEW RESULTS column.

(

  • EN-Ll-100 REV. 20

~~~~~~~~~~-~~ ~

ATTACHMENT9.1 APPLICASILITY DETEm.,mATION Fam.,

Sheet3 of7


l;>ll'°~------

PROCESS

  • IV. LICENSING BASIS DOCUMENT REVIEW Does the proposed activity affect, invalidate, or render incorrect, OR have the potential to affect, invalidate, or render incorrect, information contained in any of the following Licensing Basis Document(s)? Contact LBD Owner if needed. Associated regulations and procedures are identified with each Licensing Basis Document below.

LICENSING BASIS DOCUMENTS REVIEW RESULTS OR SECTIONS (Regulatlons / Procedures)

YES NO AFFECTED OR LBDCR #

Quality Assurance Program Manual (QAPM)

(10 CFR 50.54(a), 10 CFA 50 Appendix 8 / EN-QV-104] D 181 Fire Protection Program (FPP) [Includes the Fire Safety Analysis/Fire Hazards Analysis (FSA/FHA)] o' 181 OL Condition, 10 CFA 50.48 / EN*DC-128) I Emergency Plan (Includes the On-Shift Staffing Analysls) Emergency Plan: 10 CFR 50.54(q)

(10 CFA 50.54(q) / 10 CFA 50.47 / EN*EP-305) 181 D screen and evaluation completed.

Environmental Protection Plan I (Appendix B of the OL, Environmental Evaluation/ EN-EV*l 15, EN-EV-117, D I 181 I EN*Ll-103) I Security Plan (10 CFA 50.54(p) / EN-NS-210 or contact site Security Dept.) D 181 I I

Cyber Security Plan

[10 CFR 50.54 (p) /10 CFR 73.54 / EN-IT-103 or EN*IT-103-01] D 183 l Operating License (OL) / Technical Specifications {TS)

(10 CFR 50.90/ EN-Ll-103) o* 181 TS Bases (10 CFR 50.59 / EN*Ll-100 / EN*Ll-101) 0 181 Technical Requirements Manual (TAM) (Including TRM Bases)

(10 CFR 50.59 / EN-Ll-100 / EN*Ll*101) D 181 Core Operating Limits Report (COLR), and Pressure and Temperature Limits Report (PTLA) (TS Administrative Controls, EN*Ll-113, EN-Ll-100, D 181 EN*L1*101)

Offslte Dose Calculation Manual (ODCM)

(TS Administralive Controls or 10 CFA 50.59 / EN*Ll*113 or EN-Ll-100 / 0 181 EN*Ll-101)

Updated Final Safety Analysis Report (UFSAR}

(10 CFR 50.71 (e) / EN*Ll-113, EN*Ll-100, EN*Ll-101 l D t8I Storage Cask Certificate of Compliance (10 CFR 72.244 / EN-Ll-113) o* 181 Cask FSAR (CFSAR} (Including the CTS Bases) '

(10 CFA 72.70 or 72.248 / EN*L1*113, EN*Ll-100,EN*Ll*l 12)

D 181 I 10 CFR 72,212 Evaluation Report (212 Report)

(10 CFR 72.48 / EN*Ll-100, EN*Ll-112) D 181 NRC Orders (10 CFR 50.90 I EN-Ll-103 or as directed by the Order) o* 181 NRC Commitments and Obligations (EN*Ll*l 10) o* 181 Site-Specific CFR Exemption (10CFR 50.12, 10 CFR 55.11, 10CFA55.13, 10 CFR72.7) o* 181 I

  • contact the site Regulatory Assurance Department if needed.

IF any box is checked "Yes," THEN ensure that any required regulatory reviews are performed in accordance with the referenced procedures. Prepare an LBDCR per procedure EN-Ll~113, as required, if a LBD is to be changed, and document any affected sections or the LBDCR #. Briefly discuss how the LBD Is affected in Section Vil.A *

  • EN-Ll-100 REV. 20

PROCESS A!'PLICA91LITY DETERMl~lATION Fom.,

  • Can the proposed activity be disposltioned by one or more of the following criteria? Check the appropriate box (if any).

r- *--,1

'D An approved, valid 50.59ll2.48 Evaluation covering associated aspects of the proposed activity already exists. Reference 50.59ll2.48 Evaluation # (if applicable) or attach documentation. Verify the previous 50.59ll2.48 Evaluation remains valid.

D The NRC has approved the proposed activity or portions thereof in a license amendment or a safety evaluation, or is being reviewed by the NRC in a submittal that addresses the proposed activity. Implementation of change requires NRC approval. Reference the approval document or the amendment in review.:

181 The proposed activity is controlled by one or more applicable regulations.

Examples of programs controlled by regulations that establish specific criteria are:

  • lnservice Inspection Program (50.55a) {EN-DC-351, *352)
  • lnservice Testing Program (50.55a) (EN-DC-332) j I See NEI 96-07 Section 4.1 for additional guidance on specific regulati.ons.

~eference the controlling specific regulation(s): 10CFR50.54(q) ,_.______j IF the entire proposed activity can be dispositioned by one of the criteria in Section V, THEN 50.59 and 72.48 Screenings are not required. Proceed to Section VII and provide basis for conclusion in Section VII.A.

Otherwise, continue to Section VI to perform a 50.59 and a 72.48 Screening, or perform a 50.59 and/or72.48 Evaluation in accordance with EN-Ll-101 and/or EN*Ll-112.

Changes to the IPEC Unit 1 Decommissioning Plan are to be evaluated in accordance with the 50.59 process, as allowed by the NRC in a letter to IPEC dated January 31 1 1996. [Merlin Document ID:

RA-96-0141

  • EN-Ll-100 REV. 20

______,_______H-------~=~-------~-*----

ATTAcm.,1rnT 9.1 PROCESS APPLICASlLITY DETER~.ml:.Tlon FoRr.,

Sheet 5 of 7

'-----,-----~*~--

  • VI.

VI.A 50.59 / 72.48 SCREENING REVIEW (All proposed activities must be evaluated to determine if 50.59, 72.48 or both apply. Check the applicable boxes) 50.59 SCREENING D 50.59 applies to the proposed activity, and all of the following 10 CFR 50.59 screening criteria are met; therefore, the proposed activity requires no further 50.59 review.

The proposed activity:

  • Does not adversely affect the design function of an SSC as described in the UFSAR; AtiQ.
  • Does not adversely affect a method of performing or controlling a design function of an SSC as described In the UFSAR; AND
  • Does not adversely affect a method of evaluation that demonstrates intended design function(s) of an SSC will be accomplished as described In the UFSAR; AND
  • Does not involve a test or experiment not described in the UFSAR
  • Document the basis for meeting the screening criteria in Section VI.C, then proceed to Section VII. )

r10 CFR 50.59(c)(1ll D The proposed activity does not meet the above criteria. Perform a 50.59 Evaluation in accordance with EN-Ll-101. Attach a copy of the Evaluation to this form and proceed to Section VII.

VI.B 72.48 SCREENING D 72.48 applies to the proposed activity, and all of the following 10 CFR 72.48 screening criteria are met; therefore, the proposed activity requires no further 72.48 review.

The proposed activity:

  • Does not adversely affect the design function of an SSC as described in the CFSAR; ~
  • Does not adversely affect a method of performing or controlling a design function of an SSC as described in the CFSAR; MfQ
  • Does not adversely affect a method of evaluation that demonstrates intended design function(s) of an SSC will be accomplished as described in the CFSAR; AND
  • Does not involve a test or experiment not described in the CFSAA, I

Document the basis for meeting the screening criteria In Section VI.C, then proceed to Section VII.

[10 CFR 72.48(c)(1)1 D The proposed activity does not meet the above criteria. Perform a 72.48 Evaluation In accordance with EN-Ll-112. Attach a copy of the Evaluation to this form and proceed to Section VII *

  • EN-Ll-100 REV. 20

ATTAC~lr.1ENT 9.1 Fom.,


~=--*~-----

Sheet 6 of 7 PROCESS APPLICAS!LITY DETERMINAT!mi

  • VI.C BASIS Provide a clear, concise basis for determining the proposed activity may be screened out such that a third-party reviewer can reach the same conclusions. Identify the relevant design function, as appropriate. Refer to NEI 96-07 Section 4.2 for guidance. Refer lo NED 12*06 Section 11.4 for guidance regarding FLEX. Provide supporting documentation or references as appropriate.

Go to Section VII.A General Review Comments below.

VII. REGULATORY REVIEW

SUMMARY

VII.A GENERAL REVIEW COMMENTS (Provide pertinent review details and basis for conclusions if not addressed elsewhere In form.)

The Indian Point Energy Center Emergency Plan {Plan), Revision 17-01 (Merlin Revision 20), describes the emergency preparedness program for the Indian Point Energy Center 1, 2, and 3 Generating Stations .

The Plan outlines the basis for response actions that would be implemented in an emergency. This .

revision incorporates changes throughout the document. In all cases. no change has resulted in a reduction in effectiveness of the Plan. Specific details regarding each change are included in the 10 CFR 50.54{q) Screen and Evaluation and associated Revision Matrix. The overall 10 CFR S0.54(ql Evaluation conclusion determined that the proposed changes to the IPEC Emergency Plan. Revision 17-01. continues to meet the planning standards outlined in 10 CFR 50.47(b). This revision does not represent a reduction in effectiveness to the IPEC Emergency Plan and can be incorporated without prior NRC approval. See completed 10 CFR 50.54(9) Screen and Evaluation.

VII.B CONCLUSIONS

1. Is a change to an LBD being initiated? l2J Yes IF "Yes," !t!.fil! enter the appropriate change control process and include D No this form with the change package.
2. Is a 10 CFR 50.59 Evaluation required? D Yes

!E "Yes," THEN complete a 50.59 Evaluation in accordance with EN-Ll-101 ~ No and attach a copy to the change activity.

3. Is a 10 CFR 72.48 Evaluation required? D Yes IF "Yes/' THEN complete a 72.48 Evaluation in accordance with EN*Ll-112 181 No and attach a copy to the change activity.
  • EN-Ll-100 REV. 20

ATTACHMENT 9.1 PROCESS APPLICABILITY DETEm.~IMATlOrl Fem.,

Sheet7 of 7


"""-~~---~*=*=-----~~

1 VIII. SIGNATURES Preparer: /Entergy/Emergency Planning/ / o/2-.r~?

Name (print) / Sig a Reviewer: R,c~ArJ L,£A./e... ~ ENTE12c. {213-4 flssvr2..

Process Applicability Exclusion Site Procedure Champion or Name (print)/ Signature/ Company/ Department/ Date Owner:

Upon completion, forward this PAD form to the appropriate organization for record storage. If the PAD form is part of a process that requires transmittal of documentation, including PAD forms, for record storage, then the PAD form need not be forwarded separately*

1 The printed name, company, department, and date must be included on the form. Signatures may be obtained via electronic processes (e.g., PCRS, ER processes, Asset Suite signature), manual methods (e.g., ink signature), e-mail, or telecommunication. If using an e-mail, attach it to this fonn.

EN-Ll-100 REV. 20

Emergency Planning Document Change Checklist Form (All sections must be completed, N/A or place a check on the line where applicable)

Section 1 Doc/Procedure Type: (circle one) Administrative/ Implementing I EPLAN Doc/Procedure No: IPEC-EP C/A: Yes_ No _X_ C/A No. Due Date C/A No. Due Date: _ __

Doc/Procedure

Title:

Indian Point Energy Center Emergency Plan Rev No: 20(17-01) Rev Dist Date: 11/15/17 Reason for EPDCC: New _....,_X-'---_ Revision Cancel Date of EPDCC: 10/31/2017 Section 2 Change Description

1. Originator: A. l r a o l a ~ 11d_,/n
2. Class of Change: Technical Correction New Commitment__ Other _X._ __
3. Page numbers affected and reason for change: Refer to the attached matrix of changes attached to completed 50.54(q)screen and evaluation
4. Emergeqcy Planning Documents Affected: ~N--'-o~ne-'----------------
5. Emergency Planning Procedures Affected: None_ _ _ _ _ _ _ _ _ _ _ _ __
6.

References:

Other Procedure(s) # _ _N/A._ _ _ Regulatory Document #_NIA_

Other: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

7. Reviewed training requirements with department training coordinator N/A date:
8. The following are complete, or are not applicable and are so marked.

Tech Review _X_ 50.54q _X_ ENN-Ll-100;1LPL-155 _N/A_ SMM-AD-102 _X_

Manager approval _X_ SRC _N/A_

9. Both table of contents and transmittals are complete _ _ _ _ _ date - - - - - - -
10. Approved doc/procedure delivered to Document Control for distribution ___ date_ __
11. Position Binders updated if applicable: _ _ _ _ _ _ _ _ _ _ _ _ __ date
12. Copy of EPDCC and document/procedure placed in EP file_ _ _ _ _ _ _date_ __

Sheet 1 of 1 Form EP-AD2-1 Rev. 0

CHANGE MANAGEMENT NOTICE IPEC EPLAN Rev. 17-01 (Merlin Rev. #20)

WHO is affected?

IPEC Emergency Planning Department Personnel WHAT is the change?

A total of 48 changes were made of which 52% were editorial along with minor program changes.

Please see the attached matrix for a summary of all the changes.

This revision is of "Low Risk/Complexity."

WHY is the change occurring?

This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01 .

  • WHEN is the change effective?

Nov. 15,2017 CONTACTS:

Tony lraola, Sr. Emergency Planner, x 7704 Frank Mitchell, EP Manager, x 8410

IPEC IMPLEMENTING PROCEDURE IP-SMM-AD-102 Rev: ,15 PREPARATION, REVIEW, AND APPROVAL Page 35 of 43 ATTACHMENT 10.2 IPEC PROCEDURE REVIEW AND APPROVAL Procedure

Title:

Emergency Plan Procedure No. IPEC-EP Existing Rev: 16-01 New Rev: 17-01 ORN/EC No: 17-01168 Procedure Activi~ D Converted To IPEC, Replaces: Temi;ioran( Procedure Change (MARK Applicable) (MARK Applicable)

D NEW PROCEDURE Unit 1 Procedure No. EDITORIAL Temporary Procedure Change D

D GENERAL REVISION D ADVANCE Temporary Procedure Change

[&I PARTIAL REVISION D EDITORIAL REVISION Unit 2 Procedure No: D CONDITIONAL Temporary Procedure Change D VOID PROCEDURE Terminating Condition:

D SUPERSEDED Unit 3 Procedure No:

Document in Microsoft Word:

D RAPID REVISION D VOID DRN/TPC No(s):

D Yes D No Revision Summan( D N/A - See Revision Summary page.

Refer to the attached summary of changes in the attached matrix.

lmi;ilementation Reguirements Implementation Plan? D Yes [&)No Formal Training? D Yes !BlNo Special Handling? D Ye .[&)No / i RPO Dept: Emergency Planning Writer: (Print Name/Ext/Sign):J.A~...!Jlr@ag_ol@af2/x[_j7[17'..()0~4:.........l_::J~~-:t:::_=:_.!.:_:':_J~,!...J_ _ __

Review and Ai;ii;iroval (Per Attachment 10.1, IPEC Revie

?~ts)
1. !Bl Technical Reviewer: F. Mitchell/

(Print Name/ Signature/ Date)

2. D Cross-Disciplinary Reviewers:

Dept: Reviewer:

Print Name/ Signature/ Date)

Dept: Reviewer:

3. [&I RPO- Responsibilities/Checklist:

(Print Name/ Signature/ Date)

[&)PAD required and is complete (PAD Approver and Reviewer qualifications have been verified)

D Previous exclusion from further Ll-100 Review is still valid D PAD not required due to type of change as defined in 4.6

4. D Non-Intent Determination Complete:

(Print Name/ Signature/ Date)

NO change of purpose or scope NO change to less restrictive acceptance criteria NO reduction in the level of nuclear safety NO change to steps previously identified as commitment steps NO voiding or canceling of a procedure, unless NO deviation from the Quality Assurance Program Manual requirements are incorporated into another procedure NO change that may result in deviations from Technical or the need for the procedure was eliminated Specifications, FSAR, plant design requirements,

5. D On-Shift Shift Manager/CRS:

(Print Name/ Signature/ Date)

6. D User Validation: User: Validator:
7. D Special Handling Requirements Understood:

(Print Name/ Signature/ Date)

  • ~Entergy NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6 PROCEDURE MANAGEMENT MANUAL INFORMATIONAL USE PAGE 1 of4 Entergy Nuclear Change Management ATTACHMENT 7.1 CHANGE IMPACT CHECKLIST Sheet 1 of 3 This Checklist assists the change lead with identifying the specific impacts on people and processes. The checklist provides details of specific actions required to implement the change. The Change Owner /Lead completes the Change Impact Checklist to identify the needed forms identified in Section IV for the Impact Level of the change.

Additionally, the Change Owner/Lead uses additional forms and references identified in section II to analyze the change. This form is completed by following Section 3.3 in the procedure. See section 3.8 for documentation requirements.

If the change is a personnel change ONLY, use Attachment 7.4.

Section I - Define the Change: Reference 3.3[1]

Title of Change: Emergency Plan Revision 17-01 Change Owner: F. Mitchell Change Sponsor: F. Mitchell Change Lead: A. lrao!a Project Manager: N/A Whe1t is the Change? (Provide a brief description of what will be different and change scope.)

  • Revised the Indian Point Emergency Plan of which 52% were editorial changes. Refer to the attached matrix for a summary of editorial. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-
02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review.

Who and What groups/departments are impacted by the change? (Identify employees/groups, programs, processes, regulations, equipment, facilities, etc. affected by the change.)

Emergency Planning Why is the Change necessary? (Proyide a reason for the change, the benefit gained or consequence avoided.)

This change was required to correctly update the Emergency Plan having used the incorrect revision to update the 2016 revision When is the proposed or desired Date for Change? {Identify timeline or effective date for change.)

Nov. 15, 2017 Where is the Change being Implemented? (check as applicable; double click box to select)

D Fleet-Wide *D Echelon D White Plains 0 ANO D GGNS ~ IPEC D PAL 0 PIL D RBS D VY 0 WF3 D Other -

What SHOULD NOT be affected as a result of this change? (Identify any areas affected employees/groups might likely assume would be affected, but are not included.)

~ NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6

-===- Entergy MANAGEMENT PROCEDURE MANUAL INFORMATIONAL USE PAGE 2 of4 Entergy Nuclear Change Management ATTACHMENT 7.1 CHANGE IMPACT CHECKLIST Sheet 2 of 3 Yes No Unsure Section II - Impact Evaluation: Reference 3.3[2] Notes D [21 D Impact Nuclear, Radiological, Industrial Safety or Equipment Reliability?

Impact Licensing: FSAR/Technical Specifications/QA

[21 D D Program/Commitments? (i.e., ANSI, 50.59, 50.54, etc.) Perform evaluation in accordance with EN-L/-100 Impact E-Plan, Security Plan, QA Manual? Perform evaluation in

[21 D D accordance with EN-L/-100 Impact to Procedures/Policies?

D [21 D (e.g., non-editorial changes, change that affects multiple procedures, etc.)

D [21 D Impact scheduled Plant Work Activities or Operating Schedule?

Impact computer programs/applications software?

D [21 D If Yes, evaluate need for an SQA- Reference EN-IT-104.

Impact Accredited Training Job Task or Qualifications of Personnel?

D [21 D If Yes, an action !!1!1§! be initiated in accordance with EN-TQ-201. Contact Training management for additional information.

  • D D

[21

[21 D

D Impact ANSI 3.1 Qualification Requirements (See EN-HR-137) Perform evaluation in accordance with EN-HR-137 Impact organizational responsibility, e.g., require transfer of responsibility from one organization to another?

If Yes, reference EN-HR-134 during change planning. Note: transferring responsibilities between organizations may impact the QAPM. Evaluate in accordance with aoolicable Licensing (EN-LI) procedures.

Impact resources or physical workload in other departments or D [21 D organizations?

(e.g., work activities, process time, employee schedules?)

Impact contractor resources which are working under Entergy procedures?

D [21 D (e.g., contractors working under Entergy procedures require additional notification beyond normal communication channels)

Impact of other Areas, Processes or Facilities to support the change?

D [21 D (Internal or External?)

Potential for new equipment or system not to function properly at D [21 D implementation? Consider use of Contingency/Prevention Worksheet, Attachment 7. 6 Change requires specific skills, experience and subject matter experts for D [21 D successful plan development and implementation? Use Team Skill Matrix, Attachment 7. 5 Change involves a temporary or permanent employee change due to":

Promotion, Transfer, New Hire, Resignation, Retirement, Staffing D [21 D Restructuring or Termination Leave of Absence, Medical Leave or Temporary Work Assignment. Use Personnel Change Checklist, Attachment 7.4

A NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6

~Entergy MANAGEMENT PROCEDURE MANUAL INFORMATIONAL USE Page 3 of4 Entergy Nuclear Change Management ATTACHMENT7.1 CHANGE IMPACT CHECKLIST SHEET3 OF3 Section Ill - Identify the Change Impact Level: (Reference 3.3[3]) Medium High Refer to Section 3.3[3} for guidance.

Checked "Yes" to any of the above questions in Section II? Ensure all "Yes" responses were factored into the impact level evaluation.

Checked "Unsure" to any of the above questions in Section II? Review all notes and evaluate for followup actions.

SECTION IV - CHANGE MANAGEMENT PROCESS STEPS BY IMPACT TYPE (FOLLOW THE PROCEDURE GUIDANCE IDENTIFIED BELOW FOR THE IMPACT LEVEL OF THE CHANGE)

PROCESS ~lfflil~'5"11""~'--~aiM~E~D~IU~M~~~--,-~~~---,-;H~IG~H:---~~~-m,i:;:

ASSIGN CHANGE CHANGE OWNER, SPONSOR,CHANGE SPONSOR,CHANGE SPONSOR, CHANGE OWNER, ROLES {REF. 3.3[5]) CHANGE LEAD OWNER, CHANGE LEAD OWNER, CHANGE LEAD, CHANGELEAD,PROJECT PROJECT MANAGER OPT. MANAGER

  • ANALYZE THE CHANGE DEVELOP ATT. 7.2 ATT. 7.2 (FLEET AND SITE LEVEL)

(REF. 3.4) COMMUNICATIONS ATT. 7.4 (OPT) ATT. 7.4 (OPT)

RESOURCE-TO-WORKLOAD RATIO ANALYSIS (3.4[1](G))

PLAN THE CHANGE ATT. 7.3 ATT. 7.3 (FLEET AND SITE LEVEL)

(REF. 3.5) ATT. 7.6 ATT. 7.7 PLAN ACTIONS FOR EFFECTIVENESS REVIEW IMPLEMENT THE IMPLEMENT& ATT. 7.3 COMPLETED ATT. 7.3 COMPLETED (FLEET AND SITE LEVEL)

CHANGE REF. 3.6 COMMUNICATE REVIEW THE CHANGE CHANGE ATT. 7.7 (OPT) ATT. 7.7

{REF. 3.7) ATT. 7.8 OPT ATT. 7.8 DOCUMENT THE DEPT STORED PCRS (OPT) PCRS (ATT. 7.1, ATT. 7.2, ATT. 7.3, ATT. 7.6, ATT. 7.7)

CHANGE REF. 3.8 Concurrence of Phase 1 Review Com letion for Ma'or and Hi ROLE NAME CHANGE OWNER/LEAD F.MITCHELLIA. IRAOL SPONSOR F. MITCHELL GOVERNANCE OWNER SITE PROCESS OWNER

A .

-=-Entergy NUCLEAR FLEET ADMINISTRATIVE EN-F AP-0 M-023 REV.6 PROCEDURE*

MANAGEMENT MANUAL INFORMATIONAL USE Page 4 of 4 Entergy Nuclear Change Management

a~Entergy NUCLEAR QUALITY RELATED EN-Ll-113 I REV.12 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 1 OF 3 Licensing Basis Document Change Process ATTACHMENT 9.1 LBDCR FORM

~=======~=====~~=======-=~~=====

Sheet 1 of 3 (TYPICAL)

I. LBDCR INITIATION Emergency Nov. 15, EPLAN Tony lraola 7704 1,2,3 Planning 2017 17-01 INITIATOR'S NAME DEPARTMENT PHONE UNIT DATE LBDCR#

(print or type)

DESCRIPTION OF THE CHANGE (Attach additional pages if necessary; may also refere~ce PAD Form)

This new revision incorporates changes that were missed In 16-01 to due an incorrect revision (15-01 vs 15-02) beinq used to update the annual 2016 revision. In addition, several new editorial chanqes were made.

AFFECTED SECTION/PAGE(S)

LICENSING DOCUMENT(S) AFFECTED (Attach marl<ed-up pages)

D Operating License (OL)

D Technical Specifications (TS)

D Environmental Protection Plan (EPP)

  • D D

D D

D Anti-Trust Conditions (Appendix of OL)

NRC Orders Updated Final Safety Analysis Report (UFSAR)

TS Bases Technical Requirements Manual (TRM) (including TRM Bases)

D Quality Assurance Program Manual (QAPM)

D Security Plan/Cyber Security Plan (CSP) r8] Emergency Plan (EP) See attached matrix D Offsite Dose Calculation Manual (ODCM)

D Spent Fuel Storage Cask Final Safety Analysis Report (CFSAR)

D Spent Fuel Storage Cask Certificate of Compliance (CoC)

D Spent Fuel Storage Cask CoC Bases D 10 CFR 72.212 Evaluation Report (212 Report)

D Fire Protection Program (FPP)/Fire Hazards Analysis (FHA)

D Core Operating Limits Report (COLR)

D Other (Specify)

  • NUCLEAR QUALITY RELATED EN-Ll-113 REV.12

~Entergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 20F3 Licensing Basis Document Change Process ATIACHMENT9.1 LBDCRFORM Sheet 2 of 3 METHOD(S) ALLOWING THE CHANGE D PAD Review (Attach a copy) D 10 CFR 50.48 / EN-DC-128 Review (Attach a copy)

D 10 CFR 50.59 Evaluation (Attach a copy) ~ 10 CFR 50.54 Review (Attach a copy)

D 10 CFR 72.48 Evaluation (Attach a copy) D Environmental Evaluation (Attach a copy)

D Approved NRC Change (Attach a copy of D Editorial Change (LBDs controlled under 50.59 or NRC Letter or reference NRC letter number) 72.48, only)

D NRC Approval is Required D Other Approval (Attach a copy of supporting documents)

D "UFSAR-only" Change (NEI 98-03)

Check the appropriate box below:

D Reformatting \

D Replacing Detailed Drawing

\D Referencing other Documents Check the appropriate box below and provide a basis for removing information, if applicable:

  • D Removing Excessive Detail D Removing Obsolete Information D Removing Redundant Information D Removing Commitments Removal Basis:

1 II. LBDCR IMPLEMENTATION ACTIONS SUPPORTING IMPLEMENTATION REQUIRED ACTIONS ACTION TAKEN OR LSD SECTION TRACKING METHOD ACTION RESP. DEPT See attached Issuance of the EPLAN EP Entry into Merlin on Nov. 15, matrix scheduled for Nov.15, 2017 2017

~

~Entergy NUCLEAR QUALITY RELATED EN-Ll-113 I REV.12 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 3 OF 3 Licensing Basis Document Change Process ATTACHMENT9.1 LBDCRFORM Sheet 3 of 3 Ill. LBDCR REVIEW AND APPROVAL1 REVIEW AND APPROVAL of LBDCR (see Attachment 9.2) 2 Department Approved Date 3

UFSAR Section Owner N/A 4

Peer Review A lraola /

LBD Owner F. Mitchell/

1 Add additional table rows as needed.

2 The printed name should be included on the form when using electronic means for signature.

Signatures may be obtained via electronic processes (e.g., PCRS, ER processes, Asset Suite signature), manual methods (e.g., ink signature), e-mail, or telecommunication. If using an e-mail, attach it to this form.

3 UFSAR Section Owners should refer to EN-Ll-113-01, "Updated Final Safety Analysis Report Change Process," for review expectations. N/A if change does not update the UFSAR.

4 Administrative peer review intended to verify changes have been incorporated correctly into revised LBD prior to issuance. t *

  • Change Page/Section Previous Version IPEC Emergency Plan Revision 17 -01 (Merlin Revision 20) REVISION MATRIX New Version Editorial* Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
1. COVER PAGE Rev 16-01 Rev 17-01 Yes No- This is an editorial change to the Revision number and effective Note: New Note: used 15-02 as the base date.

document and incorporated 16-01 This change does not change the revisions.

meaning or intent of a description, does not change facilities or List Of Effective Pages, 16-01 17-01 equipment, and does not change i

a process. No further evaluation is required for this change.

Part 1:

Part 1: Karsten 0

2. Section 0.2, 2° ... Emergency Director. .. ... Emergency Director (ED) ... Yes No- Added (ED) to define term sentence and re-use again in later portions Note: New of the Plan.

Page 5 This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is reauired for this chanae.

Part 2:

SECTION A: Karsten

  • Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
3. . .. ED ... Yes No- Removed Emergency Director Section 1, a, 2°d bullet ... Emergency Director. ..

and replaced with ED as Note: New Page A-1 previously defined.

This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

4. The four (4) counties that are The four (4) counties located Yes No - added wording that the Section 1, County involved .... within the 10 mile Emergency counties are located in the 1O mile Offices of Disaster...

Note: New Planning Zone {EPZ) that are EPZ.

Page A-2 involved ....

This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this chanae.

5. ... ERO ... Yes No- Removed Emergency Section 1.b 1*1 sentence ..... Emergency Response Response Organization and kept Organization .....

Note: New Page A-3 ERO as previously defined.

This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

  • Change Page/Section Previous Version IPEC Emergenc i Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
6. .... ED .... Yes No- Removed Emergency Director Section 1.d .... Emergency Director....

and kept ED, Emergency Note: New ... Emergency Response .... ERO ... Response Organization and kept Organization ..... ERO as previously defined.

Page A-3 These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

7. . .. ED ... Yes No- Removed Emergency Director Section 4 3rd sentence ... Emergency Director ...

and replaced with ED as Note: New Page A-4 previously defined.

This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this chanqe.

8. -

1 .... ERO ...... Yes No- Removed Emergency Section 41" and last ..... Emergency Response Response Organization and kept Note: New sentence Organization .....

ERO as previously defined.

Page A-4 This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

  • IPEC Emergenc V Pl an Rev1s1on 17 01 (M erm 1
  • I" Rev1s1on 20) REVISION MATRIX

~

Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b) Planning Change Standards or NUREG-0654 program L elements? Justify if NO.

9. ... ERO ... Yes No- Removed Emergency Figure A-1 Note1& 2 . .... Emergency Response Response Organization and kept Organization .....

Note: New Page A-5 ERO as previously defined.

. . . Emergency Director.... ... ED ...

No - Removed Emergency Director and replaced with ED as previously defined.

These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

SECTION B: WATTS

10. This section describes the Indian This section describes the Indian Yes No- Removed Emergency SECTION B Point Emergency Response Point ERO, their key positions Response Organization and kept Note: 16-01, item 2 1st paragraph Organizations, their key positions and associated responsibilities. ERO as previously defined.

and associated responsibilities. This change does not change the Page B-1 meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

  • Change Page/Section Previous Version IPEC Emergency e1an Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
11. Yes No- Abbreviation for "ERO" as SECTION 8.1 Figures B-1.2a-d illustrates the full Figures B-1.2a-d illustrate the full previously defined.

Emergency Response ERO.

Note: 16-01, item 3 Section 1.0, 1st Also corrected the word. Also Organization (ERO).

paragraph corrected word "illustrate" to agree with plural "Figures- B-1.2a-d".

Page B-1 These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

12. Yes No- Added semi-colon at end of SECTION 8.1.a One [1) Control Room Supervisor, One [1) Control Room Supervisor, sentence as a formatting change who holds a Senior Reactor who holds a Senior Reactor Note: 16-01, item 4 41h paragraph for consistency within the Operator's license and is Operator's license and is document.

Page B-1 responsible for safe operation of responsible for safe operation of the unit within the requirements of the unit within the requirements of This change does not change the the Technical Specifications. the Technical Specifications; meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

  • ,C~~ IPEC Erner Page/Section Previous Version Plan Revision 17 -01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning Change Standards or NUREG-0654 program L.~ elements? Justify if NO.
13. Yes No- Spelled out Fire Brigade Section 8.1.a One [1] Unit 3 SRO is assigned as One [1] Unit 3 SRO is assigned Leader to define term for "FBL".

FBL for both units as Fire Brigade Leader (FBL) for Note: 16-01, item 5 3rd paragraph Added semi-colon at end of both units; sentence as a formatting change Page 8-2

- for consistency within the document.

- These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

14. Yes No- Spelled out Safe Shutdown to Section 8.1.a One [1] Unit 2 NPO is assigned to One [1] Unit 2 NPO is assigned to

/ define term for "SSD" and added Unit 1 and SSD and one Unit 3 Unit 1 and Safe Shutdown (SSD),

Note: 16-01, item 6 4th paragraph, 2"d comma in sentence. Added semi-NPO is the Communicator for and one Unit 3 NPO is the sentence colon at end of sentence as a notifications for both units. communicator for notifications for formatting change for consistency Page B-2 both units; within the document. Changed "C" to "c" for communicator.

These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

  • Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
15. Section 8.1.b The Emergency Response The ERO is established to assure Yes No- Abbreviation for "ERO" as Organization (ERO) is established that a sufficient number of previously defined.

Note: 16-01, item 7 1st paragraph, 1st to assure that a sufficient number appropriately qualified personnel This change does not change the sentence of appropriately qualified are available each day, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> . meaning or intent of a description, personnel are available each day, a day to deal with any emergency does not change facilities or Page 8-2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day to deal with any* situation. equipment, and does not change emergency situation. a process. No further evaluation is required for this change.

16. Section 8.1.b The Watch Force, depicted in The Watch Force, depicted in Yes No- Corrected word "accord" to Figure 8-1.1, satisfies the Figure B-1.1, satisfies the "accordance" to match the intent Note: 16-01, item 8 last paragraph, 2nd NUREG-0654 requirements for on- NUREG-0654 requirements for of sentence.

sentence shift personnel and on-shift staffing on-shift personnel and on-shift This change does not change the in accord with guidance of NRC's staffing in accordance with meaning or intent of a description, Page 8-2 NSIR/DPR-ISG-01 interim staff guidance of NRC's NSIR/DPR- does not change facilities or guidance and NEI 10-05 ISG-01 interim staff guidance and equipment, and does not change Assessment of On-Shift NEI 10-05 Assessment of On- a process. No further evaluation is Emergency Response Shift Emergency Response required for this change.

Organization Staffing and Organization Staffing and Caoabilities. Caoabilities.

17. Section 8.1.b The analysis resulted in a total of The analysis resulted in a total of Yes No- Corrected word "person's" to thirteen person's on-shift at each thirteen persons on-shift at each "persons" to indicate plural instead Note: 16-01, item 9 last paragraph, last unit. unit. of possessive.

sentence This change does not change the meaning or intent of a description, Page 8-2 does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

  • Change IPEC Emergenc*V Pl an Rev1s1on 17 -01 (M erm Page/Section Previous Version
  • I" Rev1s1on 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
18. Section B.1.b These personnel are immediately These personnel are notified by No No- Change made to more clearly available during normal working an electronic notification system describe emergency notification Note: 16-01, item 2nd paragraph hours or are contacted by an and public address methods during working and non-10 *, electronic notification system announcements, and are working hours.

Page B-3 during non-working hours. The immediately available during This change does not change the electronic notification system is normal working hours. These meaning or intent of a description, backed up with an automated personnel are notified by an does not change facilities or telephone notification system. electronic notification system equipment, and does not change during non-working hours. An a process. No further evaluation is alternate notification system using required for this change.

an automated telephone notification process is used in the event that the normal electronic notification svstem is unavailable.

19. Section B.1.b The activation phase consists of The activation phase consists of Yes No- Abbreviation for "ERO" as Emergency Response ERO activation. previously defined.

Note: 16-01, item 3rd paragraph, first Organization (ERO) activation. This change does not change the 11 sentence meaning or intent of a description, does not change facilities or Page B-3 equipment, and does not change a process. No further evaluation is required for this change.

20. Yes No- Removed Emergency Director Section B.1.b Activation of the ERO gives the Activation of the ERO gives the and left ED as previously defined.

Emergency Director full access to Note: 16-01, item 5th paragraph, first ED full access to the resources of This change does not change the the resources of Entergy.

12 sentence Entergy. meaning or intent of a description, does not change facilities or Page B-3 equipment, and does not change a process. No further evaluation is reauired for this chanae.

  • Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
21. Figures 8-1.2a-d illustrate the Yes No- Corrected word "illustrates" to 6th paragraph Figures B-1.2a-d illustrates the Indian Point ERO. "illustrate" because of multiple Indian Point ERO.

Note: 16-01, item Page 8-3 figures cited.

13 This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

22. The Shift Manager (or the Control Yes No- Abbreviations for "ED" and Section B.2 The Shift Manager (or the Control Room Supervisor in the event that "ERO" are sufficient because they Room Supervisor in the event that Note: 16-01, item Section 2, 1st the Shift Manager is unavailable), are previously defined in Section the Shift Manager is unavailable),

14 paragraph acting as the ED, has the B.

acting as the Emergency Director, authority to declare an These changes do not change the Page 8-3 has the authority to declare an emergency, immediately takes meaning or intent of a description, emergency, immediately takes charge of the emergency does not change facilities or charge of the emergency response response effort and is responsible equipment, and does not change effort and is responsible for offsite for offsite dose assessment until __ . a process. No further evaluation is dose assessment until relieved by relieved by another qualified ED. required for this change.

another qualified Emergency He/she activates the ERO as Director. He/she activates the necessary and continues to direct Emergency Response the emergency response until Organization (ERO) as necessary relieved by another qualified ED.

and continues to direct the emergency response until relieved by another qualified Emergency Director.

  • Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
23. Yes No- Abbreviations for "ED", "POM" Section 8.2 The relieving Emergency The relieving ED/Plant Operations and "ERO" are sufficient because Director/Plant Operations Manager Manager (POM) takes charge of Note: 16-01, item 1st paragraph, 1*t, 2"d & they are previously defined in (POM) takes charge of the overall the overall emergency response, 15 3rd sentence and 2"d Section B. Added abbreviation emergency response, thus freeing thus freeing the Shift Manager to paragraph "EPM" for Emergency Plant the Shift Manager to direct his/her direct his/her attention towards Manager.

Page B-4 attention towards the mitigation of the mitigation of the accident the accident using the emergency using the emergency operating These changes do not change the operating procedures. The Plant procedures.

  • The POM holds this meaning or intent of a description, Operations Manager holds this position until the on-call ED does not change facilities or position until the on-call arrives. Overall control of the equipment, and does not change Emergency Director arrives. Onsite ERO is maintained by the a process. No further evaluation is Overall control of the Onsite Emergency Plant Manager (EPM) required for this change.

Emergency Response in the TSC.

Organization is maintained by the Although the ERO described ..... ,

Emergency Plant Manager in the it may be altered by the ED.

TSC.

24. No YES- Refer to the "10 CFR 50.54 Section 8.2 After command and control is After command and control is (Q) (3) Evaluation" document.

transferred to the Emergency transferred to the ED in the Note: 16-01, item .1st paragraph, 4th & 5th Director in the EOF/AEOF, it EOF/AEOF, it remains there until 16 sentence remains there until the event is the event is terminated. In the Page 8-4 terminated. event that the ED becomes unavailable or personnel at the EOF are required to transfer to the AEOF, command and control may be transferred to the CCR until such time as a new ED assumes command and control or the ED assumes command and control upon arrival at the AEOF.

L

  • Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
25. Yes No- Abbreviation for "ED" as Section B.3 The duties and responsibilities of The duties and responsibilities of previously defined.

51 the Emergency Director (ED) are the ED are initially assumed by Note: 16-01, item 1st paragraph, 1 This change does not change the initially assumed by the Shift the Shift Manager (CR Supervisor 17 sentence and 2"d meaning or intent of a description, Manager (CR Supervisor in his/her in his/her absence).

paragraph does not change facilities or absence).

The position of the on-call ED is equipment, and does not change Page B-4 normally staffed by high level a process. No further evaluation is station management personnel. required for this change.

IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX

~

Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b) Plan No. Change Standards or NUREG-0654 pro elements? Justify if NO.

=-J

,. 26. Section B.4 The Emergency Director is The ED is responsible for Yes No- Abbreviations for "ED" and "EOF" as previously defined.

responsible for directing and directing and coordinating the Note: 16-01, item 1st & 2"d paragraph coordinating the integrated integrated emergency response 18 This change does not change the Page B-4 emergency response effort of all effort of all Company activities Company activities during the during the emergency including meaning or intent of a description, emergency including those which those which originate from does not change facilities or originate from Corporate Corporate Headquarters. equipment, and does not change Headquarters. Personnel trained Personnel trained in accordance a process. No further evaluation is in accordance with this plan and with this plan and qualified as required for this change.

qualified as Emergency Directors EDs are designated in an '

are designated in an Emergency Emergency Telephone Directory.

Telephone Directory. The The ED is stationed in the EOF Emergency Director is stationed in during an Alert, Site Area the Emergency Operations Facility Emergency or General during an Alert, Site Area Emergency and is the interface Emergency or General Emergency between the onsite and offsite and is the interface between the authorities. He/she has the onsite and offsite authorities. responsibility and authority to He/she has the responsibility and provide Protective Action authority to provide Protective Recommendations (PARs) to the Action Recommendations (PARs) authorities responsible for to the authorities responsible for implementing offsite emergency implementing offsite emergency measures.

measures.

Specific responsibilities of the ED '

Specific responsibilities of the include:

Emergency Director include:

  • Change Page/Section Previous Version IPEC Emeraencv Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47{b) Planning No.* Change Standards or NUREG-0654 program elements? Justify if NO.
27. Yes No- Abbreviation for "JIC" is Section 8.4 Review all radiological, Review all radiological, meteorological and operational meteorological and operational sufficient because it is previously Note: 16-01, item 2nd bullet defined.

data and update the offsite data and update the offsite 19 Page 8-5 authorities and the Joint authorities and the JIC; This change does not change the Information Center (JIC); meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

28. Yes No- Abbreviation for "ED" as Section 8.4 The Emergency Director is The ED is assisted in these previously defined.

assisted in these activities by the activities by the entire ERO.

Note: *1 s-01, item Last paragraph This change does not change the entire ERO. Although the Although the ED may delegate 20 meaning or intent of a description, Page 8-5 Emergency Director may delegate some of these responsibilities, some of these responsibilities, he/she may not delegate the does not change facilities or he/she may not delegate the responsibility to classify events or equipment, and does not change responsibility to classify events or for the decision to notify a process. No further evaluation is for the decision to notify authorities authorities and recommend offsite required for this change.

and recommend offsite protective protective actions.

actions.

  • Change Page/Section Previous Version IPEC Emergency Plan Revision 17 -01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
29. Yes No-Abbreviations for "ED", "ERO" Section 8.5.a The EPM reports directly to the The EPM reports directly to the and "TSC" are sufficient because Emergency Director. He/she ED. He/she directs and Note: 16-01, item 1*1 paragraph they are previously defined.

directs and coordinates the coordinates the operational 21 These changes do not change the Page 8-5 operational aspects of the In-Plant aspects of the In-Plant ERO.

Emergency Organization. He/she He/she assures proper meaning or intent of a description, assures proper coordination and coordination and direction of the does not change facilities or direction of the efforts of each efforts of each element of the In- equipment, and does not change element of the In-Plant Emergency Plant ERO in returning the plant a process. No further evaluation is Organization in ret!,.lrning the plant to and maintaining it in a safe and required for this change.

to and maintaining it in a safe and stable condition. The EPM is stable condition. The EPM is located in the TSC. Specific located in the Technical Support responsibilities include:

Center. Specific responsibilities include:

30. Yes No- Abbreviation for "ED" as Section 8.5.b The EOF Manager reports directly The EOF Manager reports directly previously defined. Also added to the Emergency Director. to the ED. Specific Note: 16-01, item 1*1 paragraph & 1*1 semi-colon at end of sentence as Specific Responsibilities of the responsibilities of the EOF 22 bullet a formatting change for EOF Manager include: Manager include:

consistency within the document.

Page 8-5

  • Coordination of Entergy's
  • Coordination of Entergy's Changed "Responsibilities" to emergency response efforts emergency response efforts lower case to be grammatically outside the Protected Area outside the Protected Area correct.

Fence, Fence; These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is reauired for this chanae.

I

  • I Change Page/Section Previous Version IPEC Emergenc ~ Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
31. Yes No- Abbreviation for "ED" as Section 8.5.b Assist the Emergency Director in Assist the ED in the interpretation previously defined.

the interpretation of offsite of offsite radiological Note: 16-01, item 1st bullet This change does not change the radiological assessments for assessments for emergency 23 meaning or intent of a description, Page 8-6 emergency classifications and classifications and Protective Protective Action Action Recommendations in does not change facilities or Recommendations in terms of both terms of both real-time equipment, and does not change real-time measurements and measurements and projected a process. No further evaluation is projected radiological exposures; radiological exposures; required for this change.

32. Yes No- Added semi-colon at end of Section 8.5.b Ensure proper communications Ensure proper communications sentence as a formatting change 2nd bullet between the Indian Point ERO and between the Indian Point ERO Note: 16-01, item for consistency within the offsite response organizations, and and offsite response 24 document.

Page 8-6 organizations; and These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required forthis change.

33. Yes No- Added semi-colon at end of Section 8.5.c With assistance from the JIC With assistance from the JIC sentences as a formatting change Manager, coordination of Entergy's Manager, coordination of Note: 16-01, item 2nd paragraph, 151 bullet for consistency within the public information response Entergy's public information 25 document.

Page 8-6 efforts, response efforts; This change does not change the Act as the official Entergy Act as the official Entergy meaning or intent of a description, representative to the media, and representative to the media; and does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

0

  • Change Page/Section Previo~s Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
34. Yes No- Abbreviation for "TSC" as Section 8.5.d.1) Technical support is performed in Technical support is performed in previously defined .

1st & 2nd paragraph the Technical Support Center the TSC under the direction of the Note: 16-01, item This change does not change the under the direction of the TSC Manager. It is the central 26 meaning or intent of a description, Page 8-6 Technical Support Center facility for the accumulation and Manager. It is the central facility for re-transmittal of plant parameters; does not change facilities or the accumulation and re- equipment, and does not change Specific functions of the TSC a process. No further evaluation is transmittal of plant parameters; include; required for this change.

Specific functions of the Technical Support Center include;

35. Yes No- Abbreviations for "ED" and

'* Keeping the Emergency Director Keeping the ED apprised of plant Section 8.5.d.1) "TSC" as previously defined.

apprised of plant conditions; and conditions; and Note: 16-01, item 27 last 2 bullets Interfacing with NRC personnel in Interfacing with NRC personnel in These changes do not change the the Technical Support Center. the TSC. meaning or intent of a description, Page 8-6 does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

  • Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change . Standards or NUREG-0654 program elements? Justify if NO.

~*- ------ ..__

I

36. Yes No- Abbreviations for "ERO", "ED" Section B.5.d.3) The Control Room communication The Control Room communication and "EOF" as previously defined.

links with offsite authorities are links with offsite authorities are Note: 16-01, item Page B-7 Also removed ""'s from available each day 24-hours a day. available each day 24-hours a 28 "Communicator" and made lower The initial notification of offsite day. The initial notification of case for consistency with other authorities and emergency offsite authorities and ERO wording.

response organization personnel is personnel is initiated by the Shift initiated by the Shift Manager Manager and/or Control Room These changes do not change the and/or Control Room communicator. Communications meaning or intent of a description, communicator. Communications with offsite authorities are does not change facilities or with offsite authorities are maintained from the Control equipment, and does not change maintained from the Control Room Room until the ED takes over the a process. No further evaluation is until the Emergency Director takes responsibility at the EOF. A required for this change.

over the responsibility at the communicator is designated at Emergency Operations Facility. A the EOF to establish/maintain "Communicator is designated at communication links.

the Emergency Operations Facility to establish/maintain communication links.

37. Yes No- Abbreviation for "OSC" is Section B.5.d.6) Maintenance mechanics, l&C Maintenance mechanics, l&C sufficient because it is previously Technicians and operations Technicians and operations Note: 16-01, item 2nd paragraph defined.

personnel (NPOs) who respond to personnel (NPOs) who respond to 29 This change does not change the Page B-7 the Operations Support Center the OSC perform repair and perform repair and corrective corrective actions directed by the meaning or intent of a description, actions directed by the Operations OSC Manager. does not change facilities or Support Cent~r Manager. equipment, and does not change a process. No further evaluation is required for this change.

  • Change IPEC Erner Page/Section Previo us Version Pia n Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
38. Yes No- Abbreviation for "ED as Section B.5.d.9) Search and rescue jurisdiction Search and rescue jurisdiction previously defined.

1st paragraph, 1st during an emergency is divided during an emergency is divided Note: 16-01, item This change does not change the between the in-plant area (inside between the in-plant area (inside 30 sentence meaning or intent of a description, the protected area fence), which is the protected area fence), which Page 8-8 handled by the Shift is handled by the Shift does not change facilities or Manager/POM or EPM and the Manager/POM or EPM and the equipment, and does not change rest of the onsite area which is rest of the onsite area which is a process. No further evaluation is handled by the Emergency handled by the ED. required for this change.

Director.

39. Yes No- Abbreviation for "JIC" is Section 8.5.d.11) To assure that only factual and To assure that only factual and sufficient because it is previously consistent information is released; consistent information is released; Note: 16-01, item Page 8-8 defined in Section B.

statements concerning the statements concerning the 31 This change does not change the emergency are the responsibility of emergency are the responsibility Indian Point Energy Center of Indian Point Energy Center meaning or intent of a description, communications personnel and/or communications personnel and/or does not change facilities or individuals assigned to the Joint individuals assigned to the JIC. A equipment, and does not change Information Center. A Press Press Release Writer is available a process. No further evaluation is Release Writer is available on call on call 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day and is required for this change.

24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day and is responsible responsible for interfacing with the for interfacing with the news media news media for release of any for release of any public public statements prior to the JIC statements prior to the Joint being operational.

Information Center being operational.

  • Change Page/Section Previous Version IPEC Emergenc*t Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
40. No No- Change made to clarify where Section B.5.d.11) The Joint Information Center, (JIC) The JIC Manager is responsible the Public Information Liaison 1 Manager is responsible for for providing accurate and timely Note: 16-01, item 1" paragraph reports.

providing accurate and timely information to the public through 32 Also used abbreviations for "JIC",

Page 8-9 information to the public through the news media and coordinating "ED", "ERO" and "EOF" because the news media and coordinating with Federal, State and local they are previously defined.

with Federal, State and local public public information officials to information officials to assure assure timely exchange and These changes do not change the timely exchange and release of release of information. Both the meaning or intent of a description, information. Both the Press Press Release Writer and the JIC does not change facilities or Release Writer and the Joint Manager have access to all equipment, and does not change Information Center Manager have necessary information, either a process. No further evaluation is access to all necessary directly available to them or required for this change.

information, either directly available through the onsite ERO.

available to them or available A Public Information Liaison through the onsite emergency reports to the EOF with the initial organization. A Public Information augmentation of the watch force Liaison at the Emergency to facilitate information flow Operation Facility reports to the regarding the emergency to the plant with the initial augmentation JIC Technical Advisor. The ED of the watch force to facilitate prior to the activation of the JIC information flow between the plant approves information that is used personnel and the JIC Technical to notify the public. Once the JIC Advisor. The Emergency Director is operational, the JIC Press prior to the activation of the Joint Release Writer prepares the Information Center approves press release, and once approved information that is used to notify by the ED, disseminates the the public. Once the Joint information to the public.

Information Center is operational, the JIC Press Release Writer prepares the press release, and once approved by the ED, disseminates the information to the public.

  • Change Page/Section Previous Version IPEC Eme~r~-_Plan Revision 1?-01 (Merlin Revision 20LREVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
41. Yes No- Abbreviation for "ERO" as Section 8.6 Figures B-1.1, B-1.2a thru 8-1.2d Figures 8-1.1, 8-1.2a thru 8-1.2d previously defined.

illustrates the positions of the illustrate the positions of the Note: 16-01, item 1*1 sentence Section 8. Corrected word Indian Point Emergency Response Indian Point ERO and supporting 33 "illustrates" to "illustrate" because Page 8-9 Organization and supporting positions.

of multiple figures cited.

positions.

These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

42. Yes No- Abbreviations for "ERO" and Section 8.7 The Admin & Logistics Coordinator The Admin & Logistics "ED" as previously defined; also and/or the Corporate Duty Coordinator and/or the Corporate Note: 16-01, item Page 8-9 added missing "the" before ERO.

Manager coordinates corporate Duty Manager coordinates 34 These changes do not change the support into the Emergency corporate support into the ERO Response Organization once the once the on call ERO is activated. meaning or intent of a description, on call ERO is activated. With the With the full activation of the does not change facilities or full activation of Emergency ERO, Entergy is capable of equipment, and does not change Response Organization, Entergy is continuous (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) operations a process. No further evaluation is capable of continuous (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) for a protracted period. The ED required for this change.

operations for a protracted period. will ensure the continuity of The Emergency Director will resources (technical, ensure the continuity of resources administrative and logistics) to (technical, administrative and support the emergency response.

logistics) to support the emergency response.

  • Change IPEC Erner Page/Section Previous Version Plan Revision 17-01 Merlin Revision 20 REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
43. If the need for additional technical If the need for additional technical No No- Change made to clarify that Section 8.8.b assistance is identified, this may assistance is identified, this may LOAs were previously removed Note: 16-01, item 1st paragraph be obtained by the Technical be obtained by the TSC Manager from Appendix 2. This was 35 Support Center Manager and the and the ED. Assistance of this evaluated for prior revision 15-02.

Page 8-10 Emergency Director. Assistance type could include that from the Also, abbreviations for "TSC" and of this type could include that from NSSS Supplier (Westinghouse), "ED" are sufficient because they the NSSS Supplier architect engineer and were previously defined in Section (Westinghouse), architect engineer consultants. A copy of the letter B.

and consultants. A copy of the of agreement with Westinghouse These changes do not change the letter of agreement with is referenced in Appendix 2. meaning or intent of a description, Westinghouse is contained in Other assistance is also available does not change facilities or Appendix 2. Other assistance is using existing contracts, i.e.: equipment, and does not change also available using existing Radiation Protection support. a process. No further evaluation is contracts, i.e.: Radiation Protection required for this change.

support.

44. One of the roles of the Institute of One of the roles of INPO is to Yes No- Abbreviation for "INPO" is Section 8.8.b Nuclear Power Operations (INPO) assist affected utilities by quickly sufficient because it previously Note: 16-01, item 2nd paragraph, 2nd is to assist affected utilities by applying the resources of the defined in the paragraph heading.

36 sentence quickly applying the resources of nuclear industry to meet the This change does not change the the nuclear industry to meet the needs of an emergency. meaning or intent of a description, Page 8-10 needs of an emergency. does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

  • Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.

~----

45. American Nuclear Insurers (ANI): American Nuclear Insurers (ANI): Yes No- Corrected word "have"*to Section B.8.b In the event of an extraordinary In the event of an extraordinary "has" for word agreement.

Note: 16-01, item 3rd paragraph, 1st nuclear occurrence (as defined in nuclear occurrence (as defined in This change does not change the 37 sentence the Price- Anderson Law) ANI the Price-Anderson Law) ANI has meaning or intent of a description, have plans prepared to provide plans prepared to provide prompt does not change facilities or Page B-10 prompt emergency funding to emergency funding to affected equipment, and does not change affected members of the public. members of the public.

a process. No further evaluation is required for this change.

46. No No- Change made to clarify that Section B.9 The availability of local support The availability of local support 51 services to assist the emergency services to assist the emergency LOAs were previously removed Note: 16-01, item 1 paragraph from Appendix 2. This was forces has been ascertained and forces has been ascertained and 38 evaluated for prior revision 15-02.

Page B-10 agreement letters from each agreement letters from each organization in this section have organization in this section have This change does not change the been solicited. These letters are been solicited. These letters are meaning or intent of a description, contained in Appendix 2. referenced in Appendix 2. does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

47. Yes No- added "EMS" abbreviation for Section B.9.a, 2nd Mutual aid backup from other Mutual aid backup from other sentence ambulance services provides for ambulance services provides for emergency medical services.

Note: 16-01, item additional emergency medical additional emergency medical This change does not change the 39 Page B-10 services, ambulances and EMS services.(EMS), ambulances and meaning or intent of a description, personnel. EMS personnel. does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.

  • Change No.

IPEC E mergency Pl an Rev1s1on 17 -01 (M erm Page/Section Previous Version r Revasion 20) REVISION M New Version Editorial Change EffE Stai ele;

48. Yes Section B.9.d, 1st When notified that assistance is When notified that assistance is sentence required, IPEC Security will notify required, IPEC Security will notify Note: 16-01, item the New York State Police which the New York State Police which 40 Page B-11 is the lead Local Law is the lead LLEA.

Enforcement Agency {LLEA).

49. Yes Figure B-1.2b Box containing Emergency Plant Box containing Emergency Plant Manager and Radiological Manager and Radiological Note: 16-01, item Page B-14 Coordinator Coordinator (corrected box 41 & new border)

Figure B-1.2b ... Onsite statement was in the header Moved the statement in the box of the diagram

IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) _REVISION M Change Page/Section Previous Version New Version Editorial Effe No. Change Stai eler

50. No Table 8-5 (Deleted)

Note: Page 8-25 16-01, item 42 SAMG TSC Assist EPM in Evaluator MGR implementation of Severe Accident Management Guidelines

51. Yes Figures 8-1.2b-d Some of the figures had Figure or Moved Figure or Table# out of Table# in the Header the header Note: New Figure 8-1.3 Table 8-1 1.2.c - no Figure# or Title Added Figure # and Title

--~--------------------

  • Change No.

IPEC Erner

.----~--------""'--_,.,_-

Page/Section Plan Revision 17-01 Merlin Revision 20 REVISION Previous Version New Version Editorial Change r~

Eff St~

ele

52. Yes Figure B-1.3

Title:

Normal Figure B-1.3

Title:

Figure B-1.3 Normal Station Organization Station Organization Note: 16-01, item Page B-17 43 SECTION C: lraola l

53. . ..... Emergency Telephone Yes Section 4 ...... Emergency Telephone Directory (ETD) .......

Directory ........

Note: 15-02, item Page C-2 21 - did not carry over ETD and 16-01 stated emergency phone list SECTION D: Karsten

  • Change No'.

IPEC Emergency Plan Revisioi"! 17-01 (Merlin Revision 20) REVISION Page/Section Previous Version New Version Editorial Change E

St ele

54. 15 ' paragraph, 3ra . .... Emergency Response ... ERO .... Yes sentence Organization .....

Note: New Page D-1 1, NUE 2"d paragraph ... Emergency Director... . .. ED ...

Page D-2

55. 1. NUE 1st paragraph ... events that are in process ... ... events that are in progress... Yes Note: 15-02, item Page D-1 23
  • No.

IPEC Erner Plan Revision 17-01 LM~rlin Revisio1;1 20 REVISION 1\#

r-=-C:-ha_n_g_e-.-=P-ag-e-:/=s-ec-:t-=--io-n-------,,~P,.....re-v....,i-ou_s_V~ers-io-n--------,- New Version Editorial Change Effi Sta ele1

56. Section 1, Alert .. . .Emergency Director ... ... ED .... Yes Note: New Page D-2 Added page brake Section 1, Alert, 1st .... Emergency Director ... ...ED ....

paragraph & a)

.... Emergency Response ... ERO ...

Page D-3 Organization ....

57. Section 1, Site Area A Site Emergency ..... A Site Area Emergency ... Yes Emergency, 1st Note: New paragraph ... the public or..... ... the public, or....

Page D-3 ... malicious acts: ... ... malicious acts; ...

  • Change No.

IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION Page/Section Previous Version New Version Editorial Change 1\1 Eff, Sta ele

58. Section 1, SAE, 1st WHICH which Yes paragraph Note: New Page D-4
59. Section 1, SAE, 4m . .. Emergency Director... . .. ED .... Yes paragraph & a)

Note: New .... Emergency Response Page D-4 Organization .... ... ERO ....

I

  • Change No.

IPEC E mergency Pl an Rev1saon 17-01 (M erm Page/Section Previous Version r Revis1on 20) REVISION M New Version Editorial Change Effe Stai eler

60. Section 1, GE, 3ra ... Emergency Director. .. . .. ED .... Yes paragraph & a)

Note: New .... Emergency Response Page D-5 Organization .... . .. ERO ....

SECTION E: Karsten '

,I

61. Section 1, a, 3 . ... Emergency Response ... ERO .... Yes Organization ....

Note: New Page E-1

  • Change No.

iPEC Erne rgencv Plan Revision 17-01 (Merlin Revision 20) REVISION M Page/Section Previous Version New Version Editorial Change Effe Sta, eler

62. Section 1, b Alert 1), 2"" ... Emergency Director ... . .. ED ... Yes sentence Note: New Page E-2
63. Section 1.b.4 During normal working hours, the During normal working hours, the Yes necessary personnel are available necessary personnel are Note: 15-02, item Page E-2 in the plant and are contacted by available in the plant and are 35 - did not delete the Public Address System, or contacted by the Public Address a coma electronic notification system. System or electronic notification During off-hours, individuals can system. During off-hours, be contacted at their homes by individuals can be centacted at telephone or electronic notification their homes by telephone or system . electronic notification system.

___J

  • Change No.

IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS~ON fJ Page/Section Previous Version New Version Editorial Change Eff, Sta ele

64. Section 1,b.8 & 1,c.1, . .. Emergency Director... ... ED ... Yes 1.c.5 Note: New Section 1, c.1 ... condition listed in Section D .... ... condition listed in the Section D ....

Page E-3 Section 1c.8 ... Emergency Director... . .. ED ...

Page E-4

65. Section 1.c.2 Notification of site personnel is Notification of site personnel is No accomplished by the Control accomplished by the Control Note: 15-02 item Page E-3 Room Operator initiating the Site Room Operator initiating the site 41 & new Assembly Alarm or use of the assembly alarm or use of the public address system. Public Address System.

Accountability of personnel located Accountability of personnel within the Protected Area is located within the Protected Area performed. In addition the is performed. In addition, the unaffected Control Room affected unit's Control Room Personnel are contacted by the Operators also contact the affected Control Room Operators. unaffected unit's Control Room personnel.

  • Change No.

~PEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION l\J Page/Section Previous Version New Version Editorial Change Eff, Sta ele

66. Section 1.d.1 & Yes Section 2 15 \ 2nd and 3rd ... Emergency Director ... . .. ED ....

Note: New paragraphs

.... Emergency Response Organization .... ... ERO ...

Section 1.d.1 ...listed in Section D... ... listed in the Section D....

Page E-4

67. Section 3, 1st .. Remaining ... ... remaining ... Yes paragraph, last Note: New sentence Emergency Alert System Emergency Alert System (EAS)

Page E-6

  • Change No.

IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS!ON N Page/Section Previous Version New Version Editorial Change Eff1 Sta ele

68. Section 4, 1** paragraph ... Emergency Director... ... ED ... Yes Note: New Page E-6 SECTION F: Martin
69. 1"' paragraph & 1"' . ... Emergency Response ... ERO .... Yes bullet Organization ....

Note: New Page F-1

  • Change No.

iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION M Page/Section Previous Version

~---~---------~-------------~---------*---*----~---~-*

New Version Editorial Change Effe Star elen

70. Section 1, Direct Line ... respective responses ... respective organization Yes Phones, 2nd bullet organization .... responses ...

Note: New 3rd bullet Fixed font Page F-2 ... Emergency Director ... . .. ED ...

71. Section 1. Additional .... Emergency Response . .. ERO .... Yes Communications, 1*1 Organization ....

Note: New paragraph, a & c Page F-3

  • 72.

Note: New Medical Communications Page F-4 Hudson Valley Hospital Phelps Memorial New York-Presbyterian/Hudson Valley Hospital Phelps Memorial Hospital Center Yes SECTION G: lraola No changes l

IPEC Emergency Plain Revision 17-01 (Merlin Revision 20) REVISION Nj Change Page/Section Previous Version New Version Editorial Eff1:

No. Change Sta elei SECTION H: Ambrose

73. Section H.1 Once the entire Emergency Once the entire ERO is No Second paragraph Response Organization is operational, if required, additional Note: 16-01, item operational additional positions are positions are assigned to the CR.

44 Page H-1 assigned to the CR.

74. Section 1, CR, 2"a & 3'a .... Emergency Response ... ERO ... Yes paragraph Organization ....

Note: New Page H-1 ... Emergency Director ... . .. ED ...

  • iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION M Change Page/Section Previous Version New Version Editorial EffE No. I Change Sta ele1
75. Section 1, TSC, 2"u ... Emergency Director ... . .. ED ... Yes bullet Note: New Page H-2
76. Section 2, EOF, 3*u ... Emergency Director... ... ED ... Yes paragraph Note: New Page H-3
77. Section 2, EOF, last ... Emergency Director... ... ED ... Yes paragraph Note: New ... Emergency Response . .. ERO ...

Page H-4 Organization ...

  • Change No.

IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION Page/Section Previous Version New Version Editorial Change n

Efl St, ele

78. Section 7.b, last .. .Emergency Response ... ERO ... Yes paragraph Organization ...

Note: New Page H-6

79. Section H.8.c Backup radiological monitoring Backup radiological monitoring No equipment and assistance can be equipment and assistance can be Note: 16-01, item Page H-8 obtained from other utilities obtained from other utilities 45 through INPO or the Department through INPO or the Department of Energy's Brookhaven Area of Energy's Brookhaven Area Office. Letters of agreement for Office. Letters of agreement for these services can be found in these services are referenced in Appendix 2 of this plan . Appendix 2 of this plan.
  • SECTION I: Karsten
  • Change No.

~PEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Page/Section Previous Version New Version Editorial Change EffG Sta ele1

80. Alert, 151 & 2°~ ... Emergency Director ... . .. ED ... Yes

,paragraph Note: New Page 1-2

81. SAE&GE, 1s, paragraph . . . Emergency Director... ... ED ... Yes Note: New 2°d paragraph .. .in accordance with a Plan ... in accordance with an Implementing Procedure ... Implementing Procedure ...

Page 1-2

  • 82 .

Note: New SAE & GE, 1st & 3rd paragraph 5th paragraph Page 1-3

. . . Emergency Director...

.. .in accordance with a Plan Implementing Procedure ...

... ED ...

... in accordance with an Implementing Procedure ...

Yes

  • IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change Page/Section Previous Version New Version . . Editorial Efft No. Change Sta ele1
83. Section 5 .. .locals, State, and ... . .. locals, State and ... Yes Note: New Page 1-5
84. Section 8, last ... Emergency Director... ... ED ... Yes paragraph Note: New Page 1-6 SECTION J: Robinson 5
85. Section 2, 1 ' paragraph Fixed spacing issues Yes Note: New . .. Emergency Director... . .. ED ...

Page J-1

  • Change No..

!PEC EmergenC'i Plan Revasion 17-01 (Merlin Revision 20) REVISION I\

Page/Section Previous Version New Version Editorial Change Eft St, ele

86. Section 4, last . .. Emergency Director. .. ... ED ... Yes paragraph Note: New Section 5, 1*1 paragraph, last sentence Page J-2 87.

Not used

88. Section 6, c, last ... Emergency Director... ...ED ... Yes sentence Note: New Page J-3
  • 89.

Note: New Section 7, 2nd paragraph, last sentence Page J-4

... Emergency Director .... ...ED ... Yes

  • IPEC Emergency Plan Revision 17-01 (Merten Revision 20) REVISION l\l Change Page/Section Previous Version New Version Editorial Eff No. Change Sta ele
90. Section J.10.f, last ... Pre and Post... ... pre and post. .. Yes sentence Note: New Page J-5

\

91. Section .J.10.m The basis for dose driven The basis for dose driven No protective action recommendations protective action decisions by Note: 16-01, item Page J-5 are as follows: offsite authorities would include 47 several of the above factors as well as the following considerations:

SECTION K: Martin

  • 92.

Note: New Section 4 Page K-3

... rests with the State & local. .. ... rests with the respective State &

local...

Yes

IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION n Change Page/Section Previous Version New Version Editorial EH No. Change St, eh

93. Section 7, 4th sentence .... emergency worker monitoring ... emergency worker personnel Yes and decontamination center.... monitoring center...

Note: New Page K-4 SECTION L: lraola

94. 1. Hospital Services, A written agreement is contained A written agreement is referenced No 151 paragraph in Appendix 2. in Appendix 2.

Note: 16-01, item 48 Page L-1

IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change Page/Section Previous Version New Version Editorial Effl No. Change Sta ele1

95. 1. Hospital Services, A written agreement is contained A written agreement is referenced No 2"d paragraph in Appendix 2. in Appendix 2.

Note: 16-01, item 49 Page L-1

,a

96. 1. Hospital Services, 3 In the event that a patient should In the event that a patient should No paragraph receive a massive radiation receive a massive radiation Note: 16-01, item exposure, an expert medical exposure, then Radiation 50 Page L-1 consultant specializing on the Emergency Assistance management of radiation injuries Center/Training Site (REAC/TS),

would be available. A written available 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s/day, would be agreement is contained in contacted for guidance. A written Appendix 2. agreement is referenced in Appendix 2 .

IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION i'ti Change Page/Section Previous Version New Version Editorial Ef'if No. Change St:.

ele

97. Section 2, Onsite First These facilities consist of a These facilities consist of a Yes Aid Capability, 2"d stainless steel interior with stainless steel interior with Note: 16-01, item paragraph decontamination table, showers decontamination table, showers 51 and sinks draining into a holdup and sinks draining into holdup Page L-1 tanks. These facilities contain tanks. These facilities contain general first aid equipment and general first aid equipment and medical supplies for treatment of medical supplies for treatment of injuries. injuries.
98. Section 4, 2"" The Verplanck Fire Department The Verplanck Fire District Yes paragraph Ambulance, or other backup (Fire/Ambulance), or other backup Note: 15-02, item ambulance agency, participates in ambulance agency, participates in 110 Page L-2 annual medical emergency drills annual medical emergency drills as described in Section N. as described in Section N.

(work with items 166,167,and 205 for MOU)

  • SECTION M: lraola
  • Change No.

IPEC Erner Page/Section Plan Revision 17-01 Merlin Revision 20) REVISION Previous Version New Version Editorial Change Eff<<

Sta ele1

99. Section 1, Recovery, 2"u ... Emergency Director... ...ED ... Yes paragraph Note: New M-2 100. Section 1, Recovery . ... Emergency Response ... ERO .... Yes 151 bullet Organization ....

Note: New Page M-3 I 101. Section 2, Recovery . .. .Emergency Response ... ERO .... Yes Org Organization ....

Note: New 2nd bullet Page M-3

IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change Page/Section Previous Version New Version Editorial Eff1 No. Change Sta ele1 102. Section 2.b, 3'" bullet .... Emergency Response . .. ERO .... Yes Organization ....

Note: New Page M-4 103. Section 2.e, 4th bullet . ... Emergency Response ... ERO .... Yes Organization ....

Note: New Page M-5 104. Section 3, 1s, sentence . ... Emergency Response ... ERO .... Yes Organization ....

Note: New Page M-6

  • Change No.

IPEC Emergencv Page/Section an Rev1s1on 17-01 (M erm Previous Version r Rev1s1on 20) REVISION New Version Editorial Change

~

Eft St; elE 105. Section 3, 2"a sentence All Indian Point Energy Center Additional Indian Point Energy No personnel are instructed of their Center personnel are instructed of Note: 16-01, item Page M-6 roles in relation to the Indian Point their roles in relation to the Indian 52 Recovery Organization and their Point Recovery Organization and responsibilities to the recovery their responsibilities to the effort. recovery effort.

106. Section 4, 3ra sentence . ... Emergency Response ... ERO .... Yes

( Organization ....

Note: New Page M-6

  • SECTION N: Karsten ',

IPEC Emergency P!an Revision 17-01 (MerUn Revision 20) REVISION ru Change Page/Section Previous Version New Version Editorial Eff1 No. I Change Sta ele 107. 2nu bullet .... Emergency Response ...ERO .... Yes Organization ....

Note: New Page N-1 SECTION O: Ambrose I

I 108. 1, Assurance of - .... Emergency Response ... ERO .... Yes Training, 1*t paragraph Organization....

  • Note: New Page 0-1

IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS~ON ~

Change Page/Section Previous Version New Version Editorial Ef No. Change S!

0!1 109. Section 2 2. Methods of Training was on Moved to page 0-2 Yes page 0-1 Note: New Page 0-1 110. Section 4, a Personnel Responsible for Personnel responsible for Yes Management. ..... management. ...

Note: New Page 0-3

... Emergency Director ... . .. ED ...

111. 5.b, 2"" sentence .... Emergency Response ... ERO .... Yes Organization ....

Note: New 5.b, last paragraph ... ERO Roster... ... ERO roster ...

Page 0-6

IPEC Emergency Plan Revision 17-01 (Merlan Revision 20) REV!SION I\J Change Page/Section Previous Version New Version Editorial Eff No. Change Sta ele 112. 5.c, 2"" bullet .... Emergency Response ... ERO .... Yes Organization ....

Note: New Page 0-7 SECTION P: Martin 5

113. Section 2, 1 ' .... Emergency Response . .. ERO .... Yes paragraph, last Organization ....

Note: New sentence Page P-1

  • 114. Section 3, 1st paragraph Page P-1

... Indian Point Preparedness ... . .. Indian Point Emergency Preparedness ...

Yes J

IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION 1\1 Change Page/Section Previous Version New Version Editorial Eff No. Change St;i ele 115. Section 4, Technical reviews of the Plan and Technical reviews of the Plan and No 5th Paragraph procedures shall be conducted in procedures shall be conducted in Note: 16-01, item accordance with station accordance with station 53 Page P-3 procedures. Individuals that procedures. The reviewer shall conduct the technical review and determine the need for cross-safety review shall be qualified in disciplinary reviews.

accordance with station requirements. The reviewer shall Note: Removed the statement:

determine the need for cross-disciplinary review. "Individuals that conduct the technical review and safety review shall be qualified in accordance with station requirements."

IPEC E mergencv Pl an Rev1s1on 17 01 (M erm Rev1s1on 20l REVISIONr ru Eff, Change Page/Section Previous Version New Version Editorial No. Change Sta ele 116. Section 5, 3rd sentence . ... Emergency Response ... ERO .... Yes Organization ....

Note: New Page P-3 117. Section 10 .... Emergency Response ... ERO .... Yes Organization ....

Note: New Page P-5 APPENDIX 1:

No changes APPENDIX 2: lraola I

  • Change No.

IPEC Emergency Plan Revision 17-01 (MerUn Revision 20) REVISION Page/Section Previous Version New Version

____________._______________,.....________________.._______~__,

Editorial Change

~

Efl St elE 118. Page: Appendix 2-1 NIA 10. Department of Energy- No Radiological Assistance Program Note: 16-01, item Region 1 ( Brookhaven) 54 119. Page: Appendix 2-1 As Letters of Agreements are As Letters of Agreements are No received they will be added to this received they will be listed in this Note: 16-01, item section. section. -

55

l iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION ~

Change Page/Section Previous Version New Version Editorial Eft No. Change St, elE 120. APPENDIX 3: lraola IP-EP-115 IP-EP-115 No EN-EP-900 IP-EP-120 Note: 16-01, item IP-EP-120 56 IP-EP-210 IP-EP-220 IP-EP-210 IP-EP-221 IP-EP-220 IP-EP-230 IP-EP-221 IP-EP-231 IP-EP-230 IP-EP-250 IP-EP-231 IP-EP-251 IP-EP-250 IP-EP-260 IP-EP-251 IP-EP-260 IP-EP-210 EN-EP-609 EN-EP-610 IP-EP-220 EN-EP-611 IP-EP-221 EN-EP-900 IP-EP-230 IP-EP-210 IP-EP-231 IP-EP-220 IP-EP-250 IP-EP-221 IP-EP-251 EN-EP-610 (Twice)

IP-EP-230 IP-EP-231 IP-EP-230 EN-EP-611 IP-EP-250 IP-EP-350 IP-EP-250 IP-EP-251 IP-EP-250 EN-EP-609 IP-EP-320 IP-EP-230 IP-EP-250 IP-EP-350 EN-EP-611 IP-EP-250 IP-EP-320 EN-EP-609

IPEC Emergenc i Pian Revision 17-01 (Merlin Revision 20) REVISION ~

1Change Page/Section Previous Version New Version Editorial Ef No. Change St eh IP-EP-230 IP-EP-230 IP-EP-430 IP-EP-430 EN-EP-611 APPENDIX 4:

121. Appendix 4, No page 4-2 Note: new NSRAC - Nuclear Safety Review Deleted and Audit Committee 122. Appendix 4, page 4-8 Radiation Area - ... five millirem .... Radiation Area -... 5mRem .. Yes Note: 15-02, item 199 APPENDIX 5: No changes Not used

IPEC EMERGENCY PLAN DISTRIBUTION LIST Page 1 of 2 DELIVERED BY IP3 CONTROL ROOM IP3 53FT. CCR 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP3 SHIFT MANAGER IP3 53FT. ELEVATION 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 CONTROL ROOM IP2 53FT. CCR 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IPEC TSC IP2 53FT. ELEVATION 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 SIMULATOR IP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 SIMULATOR - CLASSROOM 4 IP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY 3 COPIES OF ALL EP'S IP2 SIMULATOR - CLASSROOM 5 IP2 SIMULATOR BLDG.

DOCUMENTS EXCEPT E-PLAN NRC RESIDENT INSPECTOR NRC IP2 88FT. ELEVATION 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND NRC - ROCKVILLE, MD DOC CONTROL DESK OFFSITE GENERAL RECORDS ADDRESS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND NRC JAMES DANNA OFFSITE GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND NRC DEPUTY DIRECTOR OFFSITE GENERAL RECORDS EXCEPT IP-EP-115

. ; *.~'*

1 COPY OF THE FOLLOWING:

.LENORE TO ~PDATE '

E-PLAN, IP-EP-115, 120, NEW YORK STATE OEM TED FISCH ... 'WEBSITE .

210,220,230,250,310, N.O MAIL;COPIES 320,340,360,410,420, 430, 620 & IP-1055 1 COPY OF E-PLAN, WESTCHESTER COUNTY OEM DENNIS DELBORGO OFFSITE IP-EP-310 & 340 ROCKLAND COUNTY FIRE AND 1 COPY OF E-PLAN, NICHOLAS LONGO OFFSITE EMERGENCY SERVICES IP-EP-310, & 340 ORANGE COUNTY EMERGENCY 1 COPY OF E-PLAN, SHANNON FISHER OFFSITE SERVICES CENTER IP-EP-310 & 340 PUTNAM COUNTY BUREAU OF 1 COPY OF E-PLAN, ANTHONY SUTION OFFSITE EMERGENCY SERVICES " IP-EP-310 & 340 NOV 15 2017

_ ______.J