ATIACHMENT 9.2 10 CFR 50.54(0)(3) SCREENING SHEET1 OF5 | ATIACHMENT 9.2 10 CFR 50.54(0)(3) SCREENING SHEET1 OF5 | ||
* Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC) | * Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC) | ||
Title: Indian Point Energy Center Emergency Plan I Revision: 17-01 (MERLIN Revision 20) | |||
==Title:== | |||
Indian Point Energy Center Emergency Plan I Revision: 17-01 (MERLIN Revision 20) | |||
Part I. Description of Activity Being Reviewed (This is generally changes to the emergency plan. EALs, EAL bases, etc. - refer to step 3.0[6]): | Part I. Description of Activity Being Reviewed (This is generally changes to the emergency plan. EALs, EAL bases, etc. - refer to step 3.0[6]): | ||
The activity being reviewed is a revision to IPEC Emergency Plan. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01. | The activity being reviewed is a revision to IPEC Emergency Plan. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01. | ||
Part II. Activity Previously Reviewed? DYES !8J NO Is this activity fully bounded by an NRC approved | Part II. Activity Previously Reviewed? DYES !8J NO Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or 50.54(q)(3) Continue to Evaluation is next part Alert and Notification System Design Report? NOT required. | ||
Enter If YES, identify bounding source document number/approval reference and justification ensure the basis for concluding the source document fully bounds the below and complete Part proposed change is documented below: VI. | Enter If YES, identify bounding source document number/approval reference and justification ensure the basis for concluding the source document fully bounds the below and complete Part proposed change is documented below: VI. | ||
Justification: | Justification: | ||
Line 43: | Line 45: | ||
"NO" is checked because the procedure revision contains non-editorial changes per the attached revision matrix. | "NO" is checked because the procedure revision contains non-editorial changes per the attached revision matrix. | ||
EN-EP-305 REV 5 | EN-EP-305 REV 5 | ||
ATIACHMENT 9.2 10 CFR 50.54(Q)(3) SCREENING* | |||
SHEET2 OF5 | SHEET2 OF5 | ||
* Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC) | * Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC) | ||
Title: Indian Point Energy Center Emergency Plan I Revision: 17-01 (MERLIN Revision 20) | |||
==Title:== | |||
Indian Point Energy Center Emergency Plan I Revision: 17-01 (MERLIN Revision 20) | |||
Part V. Emergency Planning Element/Function Screen (Associated 10 CFR 50.47(b) planning standard function identified in brackets) Does this activity affect any of the following, including program elements from NUREG-0654/FEMA REP-1 Section II? | Part V. Emergency Planning Element/Function Screen (Associated 10 CFR 50.47(b) planning standard function identified in brackets) Does this activity affect any of the following, including program elements from NUREG-0654/FEMA REP-1 Section II? | ||
: 1. Responsibility for emergency response is assigned. [1) D | : 1. Responsibility for emergency response is assigned. [1) D | ||
Line 75: | Line 80: | ||
: 24. A drill and exercise program (including radiological, medical, health physics and other program D areas) is established. [14] | : 24. A drill and exercise program (including radiological, medical, health physics and other program D areas) is established. [14] | ||
: 25. Drills, exercises, and training evolutions that provide performance opportunities to develop, D EN-EP-305 REV 5 | : 25. Drills, exercises, and training evolutions that provide performance opportunities to develop, D EN-EP-305 REV 5 | ||
ATTACHMENT 9.2 10 CFR 50.54(0)(3) SCREENING SHEET3 OF5 | |||
* Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC) | * Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC) | ||
Title: Indian Point Energy Center Emergency Plan IRevision: 17-01 (MERLIN Revision 20) maintain. and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses. [14] | |||
==Title:== | |||
Indian Point Energy Center Emergency Plan IRevision: 17-01 (MERLIN Revision 20) maintain. and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses. [14] | |||
: 26. Identified weaknesses are corrected. [14] D | : 26. Identified weaknesses are corrected. [14] D | ||
: 27. Training is provided to emergency responders. [15) D | : 27. Training is provided to emergency responders. [15) D | ||
Line 92: | Line 100: | ||
Change 73 - Clarification of wording to denote that additional positions are assigned to CR as required. | Change 73 - Clarification of wording to denote that additional positions are assigned to CR as required. | ||
Revised ERO. These chanqes do not chanqe the meanina or intent of a descriotion, does not chanqe I EN-EP-305 REV 5 | Revised ERO. These chanqes do not chanqe the meanina or intent of a descriotion, does not chanqe I EN-EP-305 REV 5 | ||
ATTACHMENT 9.2 10 CFR 50.54(a)(3) SCREENING SHEET40F 5 | |||
* Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC) | * Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC) | ||
Title: Indian Point Energy Center Emergency Plan I Revision: 17-01 (MERLIN Revision 20) facilities or equipment, and does not change a process. No further evaluation is required for this change. | |||
==Title:== | |||
Indian Point Energy Center Emergency Plan I Revision: 17-01 (MERLIN Revision 20) facilities or equipment, and does not change a process. No further evaluation is required for this change. | |||
Change 79 - Clarification of wording to reflect Appendix 2's reference to letters of agreement. During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | Change 79 - Clarification of wording to reflect Appendix 2's reference to letters of agreement. During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
Change 91- Change in wording to clarify that offsite authorities are responsible for protective action decision not IPEC. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | Change 91- Change in wording to clarify that offsite authorities are responsible for protective action decision not IPEC. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
Change 94 - During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | Change 94 - During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
Change 95 - During the EPLAN revision 15-02, all the written agreements/ Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | Change 95 - During the EPLAN revision 15-02, all the written agreements/ Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
Change 96 - Added Radiation Emergency Assistance Center/Training Site (REAC/TS) which has become | Change 96 - Added Radiation Emergency Assistance Center/Training Site (REAC/TS) which has become the national source to contact to receive guidance given the scenario of a patient that has received massive radiation exposure. During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a I description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change | ||
* Change 105 - Changed the word from All to Additional to better define the actions that would be taken regarding utilizing plant personnel during the recovery effort. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | * Change 105 - Changed the word from All to Additional to better define the actions that would be taken regarding utilizing plant personnel during the recovery effort. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
Change 115 - . Procedures IP-SMM-AD-102 and IP-EP-AD2 establishes requirements for the preparation, review, and approval of site-specific implementing procedures. Both procedures list a technical review as a review from someone who has the expertise to ensure technical accuracy. Neither requires the individual to be qualified. Per IP-EP~AD2, Safety reviews are completed to determine if prior NRC approval is required. | Change 115 - . Procedures IP-SMM-AD-102 and IP-EP-AD2 establishes requirements for the preparation, review, and approval of site-specific implementing procedures. Both procedures list a technical review as a review from someone who has the expertise to ensure technical accuracy. Neither requires the individual to be qualified. Per IP-EP~AD2, Safety reviews are completed to determine if prior NRC approval is required. | ||
Line 108: | Line 118: | ||
No further evaluation is required for this change. | No further evaluation is required for this change. | ||
EN-EP-305 REV 5 | EN-EP-305 REV 5 | ||
* ATTACHMENT 9.2 | * ATTACHMENT 9.2 | ||
* SHEET50F5 Procedure/Document Number: IPEC-EP EqulpmenUFaclllty/Dther: Indian Point Energy Center (IPEC) | * SHEET50F5 Procedure/Document Number: IPEC-EP EqulpmenUFaclllty/Dther: Indian Point Energy Center (IPEC) | ||
Line 130: | Line 139: | ||
*-;;~ oa1a* | *-;;~ oa1a* | ||
1u/t1 EN-EP-305 REV 5 | 1u/t1 EN-EP-305 REV 5 | ||
ATTACHMENT 9.3 10 CFR 50.54(Q)(3) EVALUATION SHEET1 OF 3 | |||
* Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC) | * Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC) | ||
Title: Indian Point Energy Center Emergency Plan Part I. Description of Proposed Change: | |||
==Title:== | |||
Indian Point Energy Center Emergency Plan Part I. Description of Proposed Change: | |||
I Revision: 17-01 (MERLIN Revision 20) | I Revision: 17-01 (MERLIN Revision 20) | ||
The activity being reviewed is a revision to IPEC Emergency Plan. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01. | The activity being reviewed is a revision to IPEC Emergency Plan. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01. | ||
Line 145: | Line 157: | ||
Reviewed NSIR/DPR-ISG-0 I for applicability to Plan changes that were both evaluated and screened out. | Reviewed NSIR/DPR-ISG-0 I for applicability to Plan changes that were both evaluated and screened out. | ||
n EN-EP-305 REV 5 | n EN-EP-305 REV 5 | ||
ATIACHMENT 9.3 10 CFR 50.54(Q)(3) EVALUATION SHEET20F 3 | |||
* Procedure/Document Number: IPEC-EP I Revision: | * Procedure/Document Number: IPEC-EP I Revision: | ||
Equipment/Facility/Other: Indian Point Energy Center (IPEC) | Equipment/Facility/Other: Indian Point Energy Center (IPEC) | ||
Title: Indian Point Energy Center Emergency Plan 17-01 (MERLIN Revision 20) | |||
==Title:== | |||
Indian Point Energy Center Emergency Plan 17-01 (MERLIN Revision 20) | |||
Part Ill. Describe How the Proposed Change Complies with Relevant Emergency Preparedness Regulation(s) and Previous Commitment(s) Made to the NRC: | Part Ill. Describe How the Proposed Change Complies with Relevant Emergency Preparedness Regulation(s) and Previous Commitment(s) Made to the NRC: | ||
10 CFR 50.47(b)(2)-0nsite Emergency Organization (Item 24 in the matrix) | 10 CFR 50.47(b)(2)-0nsite Emergency Organization (Item 24 in the matrix) | ||
Line 155: | Line 170: | ||
Part IV. Description of Emergency Plan Planning Standards, Functions and Program Elements Affected by the Proposed Change: | Part IV. Description of Emergency Plan Planning Standards, Functions and Program Elements Affected by the Proposed Change: | ||
10 CFR 50.47(b)(2)-0nsite Emergency Organization (Item 24 in the matrix) | 10 CFR 50.47(b)(2)-0nsite Emergency Organization (Item 24 in the matrix) | ||
Function: | |||
* The process for timely augmentation of on shift staff is established and maintained. | * The process for timely augmentation of on shift staff is established and maintained. | ||
Program Elements: | Program Elements: | ||
Line 161: | Line 176: | ||
Informing criteria appear in Section 11.8 ofNUREG -0654 and in the Emergency Plan. | Informing criteria appear in Section 11.8 ofNUREG -0654 and in the Emergency Plan. | ||
EN-EP-305 REV 5 | EN-EP-305 REV 5 | ||
* ATTACHMl!NT 9.3 SHl!E1' 3 OF 3 PracedureJDocument Number: IPEC-EP Equipmant/F1cllltyl0ther: Indian Point Energy Center OPEC) | * ATTACHMl!NT 9.3 SHl!E1' 3 OF 3 PracedureJDocument Number: IPEC-EP Equipmant/F1cllltyl0ther: Indian Point Energy Center OPEC) | ||
TIU*: Indian Point Enorgy Canter Emarguncy Plan I Ravlalon: | TIU*: Indian Point Enorgy Canter Emarguncy Plan I Ravlalon: | ||
Line 170: | Line 184: | ||
CondusJon Regnrdjnu Jmnpc1 The proposed changes 101he IPEC EPLAN Rev 17.01. continue to mcctlhe phinningstondllrds outlined in 10 cr:R 50.47(b) (2). This revision does not rcprcsenl Dn:duccion In elTcctivmess 10 the IPl:C Emergency Plml ilnd can he inco'flOratcd wilhoul prior NRC approval. | CondusJon Regnrdjnu Jmnpc1 The proposed changes 101he IPEC EPLAN Rev 17.01. continue to mcctlhe phinningstondllrds outlined in 10 cr:R 50.47(b) (2). This revision does not rcprcsenl Dn:duccion In elTcctivmess 10 the IPl:C Emergency Plml ilnd can he inco'flOratcd wilhoul prior NRC approval. | ||
Part VI. EvaluaUan Conclusion Answer 1h11 followlng questions about the proposed change. | Part VI. EvaluaUan Conclusion Answer 1h11 followlng questions about the proposed change. | ||
I. Does the proposed change comply with 10 CFR 50.47(b) and 10 CFR 50 Appendix E? Dl:)Yl:S [] NO | |||
.?. Does the proposed change maintain the effectiveness of lhe emergency plan (i.e., no @YES ONO reduction in effectiveness)? | .?. Does the proposed change maintain the effectiveness of lhe emergency plan (i.e., no @YES ONO reduction in effectiveness)? | ||
l, Does the proposed change constitute an emergency action level scheme change? 0YES1EJNO If questions 1 or 2 are answered NO, or question 3 answered YES, reject lhe proposed change, modify the proposed change and perfonn a new avaluafion or oblaln prior NRC approval U11der provisions of 10 CFR 50.90. If quesUons 1 and 2 are answered YES, and question 3 aMwered NO, implement applicable change prace~es). Refer to step 5.9[8]. | l, Does the proposed change constitute an emergency action level scheme change? 0YES1EJNO If questions 1 or 2 are answered NO, or question 3 answered YES, reject lhe proposed change, modify the proposed change and perfonn a new avaluafion or oblaln prior NRC approval U11der provisions of 10 CFR 50.90. If quesUons 1 and 2 are answered YES, and question 3 aMwered NO, implement applicable change prace~es). Refer to step 5.9[8]. | ||
Part VII. Signatures EN-EP-305 REV 5 | Part VII. Signatures EN-EP-305 REV 5 | ||
ATTACHMENT 9.1 PROCESS APPLICABILITY DETERMINATION FORM Sheet 1 of 7 I. OVERVIEW PAD Rev.#: _o__ | |||
Facility: Indian Point Energy Center (IPEC) | Facility: Indian Point Energy Center (IPEC) | ||
Proposed Activity / Document: IPEC Emergency Plan Change/Rev.#: 17-01 (Merlin Rev. 20) | Proposed Activity / Document: IPEC Emergency Plan Change/Rev.#: 17-01 (Merlin Rev. 20) | ||
Line 200: | Line 214: | ||
-207) | -207) | ||
Containment Leakage Rate Testing (Appendix J) Program (10 CFA 50 D 181 Appendix J / EN-DC-334) | Containment Leakage Rate Testing (Appendix J) Program (10 CFA 50 D 181 Appendix J / EN-DC-334) | ||
PROCESS (Regulations/Procedures) YES NO NIA REVIEW RESULTS FLEX Program (NRC Order EA*12-49/FLEX Program) (10 CFR 50.59 / D ~ D Contact Design Engineering) | |||
NOTE: The date for Individual site implementation of the FLEX Program is not the same for all sites. All sites are required to implement a FLEX program per NRC Order EA-12-49. NIA may be used for this process by sites that have not completed implementatlon ol a FLEX program. Contact Design Engineering If further assistance is needed. | NOTE: The date for Individual site implementation of the FLEX Program is not the same for all sites. All sites are required to implement a FLEX program per NRC Order EA-12-49. NIA may be used for this process by sites that have not completed implementatlon ol a FLEX program. Contact Design Engineering If further assistance is needed. | ||
IF any box is checked "Yes," I!:!fil:! contact the appropriate department to ensure that the proposed change is acceptable and document the results in the REVIEW RESULTS column. | IF any box is checked "Yes," I!:!fil:! contact the appropriate department to ensure that the proposed change is acceptable and document the results in the REVIEW RESULTS column. | ||
Line 220: | Line 234: | ||
Cyber Security Plan | Cyber Security Plan | ||
[10 CFR 50.54 (p) /10 CFR 73.54 / EN-IT-103 or EN*IT-103-01] D 183 l Operating License (OL) / Technical Specifications {TS) | [10 CFR 50.54 (p) /10 CFR 73.54 / EN-IT-103 or EN*IT-103-01] D 183 l Operating License (OL) / Technical Specifications {TS) | ||
(10 CFR 50.90/ EN-Ll-103) o* 181 TS Bases (10 CFR 50.59 / EN*Ll-100 / EN*Ll-101) 0 181 | (10 CFR 50.90/ EN-Ll-103) o* 181 TS Bases (10 CFR 50.59 / EN*Ll-100 / EN*Ll-101) 0 181 Technical Requirements Manual (TAM) (Including TRM Bases) | ||
(10 CFR 50.59 / EN-Ll-100 / EN*Ll*101) D 181 Core Operating Limits Report (COLR), and Pressure and Temperature Limits Report (PTLA) (TS Administrative Controls, EN*Ll-113, EN-Ll-100, D 181 EN*L1*101) | (10 CFR 50.59 / EN-Ll-100 / EN*Ll*101) D 181 Core Operating Limits Report (COLR), and Pressure and Temperature Limits Report (PTLA) (TS Administrative Controls, EN*Ll-113, EN-Ll-100, D 181 EN*L1*101) | ||
Offslte Dose Calculation Manual (ODCM) | Offslte Dose Calculation Manual (ODCM) | ||
Line 230: | Line 243: | ||
D 181 I 10 CFR 72,212 Evaluation Report (212 Report) | D 181 I 10 CFR 72,212 Evaluation Report (212 Report) | ||
(10 CFR 72.48 / EN*Ll-100, EN*Ll-112) D 181 NRC Orders (10 CFR 50.90 I EN-Ll-103 or as directed by the Order) o* 181 NRC Commitments and Obligations (EN*Ll*l 10) o* 181 Site-Specific CFR Exemption (10CFR 50.12, 10 CFR 55.11, 10CFA55.13, 10 CFR72.7) o* 181 I | (10 CFR 72.48 / EN*Ll-100, EN*Ll-112) D 181 NRC Orders (10 CFR 50.90 I EN-Ll-103 or as directed by the Order) o* 181 NRC Commitments and Obligations (EN*Ll*l 10) o* 181 Site-Specific CFR Exemption (10CFR 50.12, 10 CFR 55.11, 10CFA55.13, 10 CFR72.7) o* 181 I | ||
*contact the site Regulatory Assurance Department if needed. | *contact the site Regulatory Assurance Department if needed. | ||
IF any box is checked "Yes," THEN ensure that any required regulatory reviews are performed in accordance with the referenced procedures. Prepare an LBDCR per procedure EN-Ll~113, as required, if a LBD is to be changed, and document any affected sections or the LBDCR #. Briefly discuss how the LBD Is affected in Section Vil.A * | IF any box is checked "Yes," THEN ensure that any required regulatory reviews are performed in accordance with the referenced procedures. Prepare an LBDCR per procedure EN-Ll~113, as required, if a LBD is to be changed, and document any affected sections or the LBDCR #. Briefly discuss how the LBD Is affected in Section Vil.A * | ||
Line 247: | Line 259: | ||
* Security Plan [50.54(p)] (EN-NS-210) | * Security Plan [50.54(p)] (EN-NS-210) | ||
* Cyber Security Plan [73.54] (EN-IT-103) | * Cyber Security Plan [73.54] (EN-IT-103) | ||
* Emergency Plan [50.54(q)] {EN-EP-305) | * Emergency Plan [50.54(q)] {EN-EP-305) o Fire Protection Program (operating license condition) | ||
* lnservice Inspection Program (50.55a) {EN-DC-351, *352) | * lnservice Inspection Program (50.55a) {EN-DC-351, *352) | ||
* lnservice Testing Program (50.55a) (EN-DC-332) j I See NEI 96-07 Section 4.1 for additional guidance on specific regulati.ons. | * lnservice Testing Program (50.55a) (EN-DC-332) j I See NEI 96-07 Section 4.1 for additional guidance on specific regulati.ons. | ||
Line 270: | Line 281: | ||
* Document the basis for meeting the screening criteria in Section VI.C, then proceed to Section VII. ) | * Document the basis for meeting the screening criteria in Section VI.C, then proceed to Section VII. ) | ||
r10 CFR 50.59(c)(1ll D The proposed activity does not meet the above criteria. Perform a 50.59 Evaluation in accordance with EN-Ll-101. Attach a copy of the Evaluation to this form and proceed to Section VII. | r10 CFR 50.59(c)(1ll D The proposed activity does not meet the above criteria. Perform a 50.59 Evaluation in accordance with EN-Ll-101. Attach a copy of the Evaluation to this form and proceed to Section VII. | ||
VI.B 72.48 SCREENING D 72.48 applies to the proposed activity, and all of the following 10 CFR 72.48 screening criteria are met; therefore, the proposed activity requires no further 72.48 review. | |||
The proposed activity: | The proposed activity: | ||
* Does not adversely affect the design function of an SSC as described in the CFSAR; ~ | * Does not adversely affect the design function of an SSC as described in the CFSAR; ~ | ||
Line 290: | Line 301: | ||
VII.A GENERAL REVIEW COMMENTS (Provide pertinent review details and basis for conclusions if not addressed elsewhere In form.) | VII.A GENERAL REVIEW COMMENTS (Provide pertinent review details and basis for conclusions if not addressed elsewhere In form.) | ||
The Indian Point Energy Center Emergency Plan {Plan), Revision 17-01 (Merlin Revision 20), describes the emergency preparedness program for the Indian Point Energy Center 1, 2, and 3 Generating Stations . | |||
The Plan outlines the basis for response actions that would be implemented in an emergency. This . | The Plan outlines the basis for response actions that would be implemented in an emergency. This . | ||
revision incorporates changes throughout the document. In all cases. no change has resulted in a reduction in effectiveness of the Plan. Specific details regarding each change are included in the 10 CFR 50.54{q) Screen and Evaluation and associated Revision Matrix. The overall 10 CFR S0.54(ql Evaluation conclusion determined that the proposed changes to the IPEC Emergency Plan. Revision 17-01. continues to meet the planning standards outlined in 10 CFR 50.47(b). This revision does not represent a reduction in effectiveness to the IPEC Emergency Plan and can be incorporated without prior NRC approval. See completed | revision incorporates changes throughout the document. In all cases. no change has resulted in a reduction in effectiveness of the Plan. Specific details regarding each change are included in the 10 CFR 50.54{q) Screen and Evaluation and associated Revision Matrix. The overall 10 CFR S0.54(ql Evaluation conclusion determined that the proposed changes to the IPEC Emergency Plan. Revision 17-01. continues to meet the planning standards outlined in 10 CFR 50.47(b). This revision does not represent a reduction in effectiveness to the IPEC Emergency Plan and can be incorporated without prior NRC approval. See completed 10 CFR 50.54(9) Screen and Evaluation. | ||
VII.B CONCLUSIONS | VII.B CONCLUSIONS | ||
: 1. Is a change to an LBD being initiated? l2J Yes IF "Yes," !t!.fil! enter the appropriate change control process and include D No this form with the change package. | : 1. Is a change to an LBD being initiated? l2J Yes IF "Yes," !t!.fil! enter the appropriate change control process and include D No this form with the change package. | ||
Line 307: | Line 318: | ||
Process Applicability Exclusion Site Procedure Champion or Name (print)/ Signature/ Company/ Department/ Date Owner: | Process Applicability Exclusion Site Procedure Champion or Name (print)/ Signature/ Company/ Department/ Date Owner: | ||
Upon completion, forward this PAD form to the appropriate organization for record storage. If the PAD form is part of a process that requires transmittal of documentation, including PAD forms, for record storage, then the PAD form need not be forwarded separately* | Upon completion, forward this PAD form to the appropriate organization for record storage. If the PAD form is part of a process that requires transmittal of documentation, including PAD forms, for record storage, then the PAD form need not be forwarded separately* | ||
1 The printed name, company, department, and date must be included on the form. Signatures may be obtained via electronic processes (e.g., PCRS, ER processes, Asset Suite signature), manual methods (e.g., ink signature), e-mail, or telecommunication. If using an e-mail, attach it to this fonn. | |||
EN-Ll-100 REV. 20 | EN-Ll-100 REV. 20 | ||
Emergency Planning Document Change Checklist Form (All sections must be completed, N/A or place a check on the line where applicable) | |||
Section 1 Doc/Procedure Type: (circle one) Administrative/ Implementing I EPLAN Doc/Procedure No: IPEC-EP C/A: Yes_ No _X_ C/A No. Due Date C/A No. Due Date: _ __ | Section 1 Doc/Procedure Type: (circle one) Administrative/ Implementing I EPLAN Doc/Procedure No: IPEC-EP C/A: Yes_ No _X_ C/A No. Due Date C/A No. Due Date: _ __ | ||
Doc/Procedure Title: Indian Point Energy Center Emergency Plan Rev No: 20(17-01) Rev Dist Date: 11/15/17 Reason for EPDCC: New _....,_X-'---_ Revision Cancel Date of EPDCC: 10/31/2017 Section 2 Change Description | Doc/Procedure | ||
==Title:== | |||
Indian Point Energy Center Emergency Plan Rev No: 20(17-01) Rev Dist Date: 11/15/17 Reason for EPDCC: New _....,_X-'---_ Revision Cancel Date of EPDCC: 10/31/2017 Section 2 Change Description | |||
: 1. Originator: A. l r a o l a ~ 11d_,/n | : 1. Originator: A. l r a o l a ~ 11d_,/n | ||
: 2. Class of Change: Technical Correction New Commitment__ Other _X._ __ | : 2. Class of Change: Technical Correction New Commitment__ Other _X._ __ | ||
Line 318: | Line 332: | ||
: 4. Emergeqcy Planning Documents Affected: ~N--'-o~ne-'---------------- | : 4. Emergeqcy Planning Documents Affected: ~N--'-o~ne-'---------------- | ||
: 5. Emergency Planning Procedures Affected: None_ _ _ _ _ _ _ _ _ _ _ _ __ | : 5. Emergency Planning Procedures Affected: None_ _ _ _ _ _ _ _ _ _ _ _ __ | ||
: 6. | : 6. | ||
Line 333: | Line 346: | ||
: 12. Copy of EPDCC and document/procedure placed in EP file_ _ _ _ _ _ _date_ __ | : 12. Copy of EPDCC and document/procedure placed in EP file_ _ _ _ _ _ _date_ __ | ||
Sheet 1 of 1 Form EP-AD2-1 Rev. 0 | Sheet 1 of 1 Form EP-AD2-1 Rev. 0 | ||
CHANGE MANAGEMENT NOTICE IPEC EPLAN Rev. 17-01 (Merlin Rev. #20) | |||
WHO is affected? | WHO is affected? | ||
IPEC Emergency Planning Department Personnel WHAT is the change? | IPEC Emergency Planning Department Personnel WHAT is the change? | ||
Line 345: | Line 358: | ||
Nov. 15,2017 CONTACTS: | Nov. 15,2017 CONTACTS: | ||
Tony lraola, Sr. Emergency Planner, x 7704 Frank Mitchell, EP Manager, x 8410 | Tony lraola, Sr. Emergency Planner, x 7704 Frank Mitchell, EP Manager, x 8410 | ||
IPEC IMPLEMENTING PROCEDURE IP-SMM-AD-102 Rev: ,15 PREPARATION, REVIEW, AND APPROVAL Page 35 of 43 ATTACHMENT 10.2 IPEC PROCEDURE REVIEW AND APPROVAL Procedure | |||
==Title:== | |||
Emergency Plan Procedure No. IPEC-EP Existing Rev: 16-01 New Rev: 17-01 ORN/EC No: 17-01168 Procedure Activi~ D Converted To IPEC, Replaces: Temi;ioran( Procedure Change (MARK Applicable) (MARK Applicable) | |||
D NEW PROCEDURE Unit 1 Procedure No. EDITORIAL Temporary Procedure Change D | D NEW PROCEDURE Unit 1 Procedure No. EDITORIAL Temporary Procedure Change D | ||
D GENERAL REVISION D ADVANCE Temporary Procedure Change | D GENERAL REVISION D ADVANCE Temporary Procedure Change | ||
Line 360: | Line 376: | ||
: 1. !Bl Technical Reviewer: F. Mitchell/ | : 1. !Bl Technical Reviewer: F. Mitchell/ | ||
(Print Name/ Signature/ Date) | (Print Name/ Signature/ Date) | ||
: 2. D Cross-Disciplinary Reviewers: | : 2. D Cross-Disciplinary Reviewers: | ||
Dept: Reviewer: | Dept: Reviewer: | ||
Line 377: | Line 392: | ||
: 7. D Special Handling Requirements Understood: | : 7. D Special Handling Requirements Understood: | ||
(Print Name/ Signature/ Date) | (Print Name/ Signature/ Date) | ||
*~Entergy NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6 | *~Entergy NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6 PROCEDURE MANAGEMENT MANUAL INFORMATIONAL USE PAGE 1 of4 Entergy Nuclear Change Management ATTACHMENT 7.1 CHANGE IMPACT CHECKLIST Sheet 1 of 3 This Checklist assists the change lead with identifying the specific impacts on people and processes. The checklist provides details of specific actions required to implement the change. The Change Owner /Lead completes the Change Impact Checklist to identify the needed forms identified in Section IV for the Impact Level of the change. | ||
Additionally, the Change Owner/Lead uses additional forms and references identified in section II to analyze the change. This form is completed by following Section 3.3 in the procedure. See section 3.8 for documentation requirements. | Additionally, the Change Owner/Lead uses additional forms and references identified in section II to analyze the change. This form is completed by following Section 3.3 in the procedure. See section 3.8 for documentation requirements. | ||
If the change is a personnel change ONLY, use Attachment 7.4. | If the change is a personnel change ONLY, use Attachment 7.4. | ||
Line 393: | Line 406: | ||
D Fleet-Wide *D Echelon D White Plains 0 ANO D GGNS ~ IPEC D PAL 0 PIL D RBS D VY 0 WF3 D Other - | D Fleet-Wide *D Echelon D White Plains 0 ANO D GGNS ~ IPEC D PAL 0 PIL D RBS D VY 0 WF3 D Other - | ||
What SHOULD NOT be affected as a result of this change? (Identify any areas affected employees/groups might likely assume would be affected, but are not included.) | What SHOULD NOT be affected as a result of this change? (Identify any areas affected employees/groups might likely assume would be affected, but are not included.) | ||
~ NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6 | ~ NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6 | ||
-===- Entergy MANAGEMENT PROCEDURE MANUAL INFORMATIONAL USE PAGE 2 of4 Entergy Nuclear Change Management ATTACHMENT 7.1 CHANGE IMPACT CHECKLIST Sheet 2 of 3 Yes No Unsure Section II - Impact Evaluation: Reference 3.3[2] Notes D [21 D Impact Nuclear, Radiological, Industrial Safety or Equipment Reliability? | -===- Entergy MANAGEMENT PROCEDURE MANUAL INFORMATIONAL USE PAGE 2 of4 Entergy Nuclear Change Management ATTACHMENT 7.1 CHANGE IMPACT CHECKLIST Sheet 2 of 3 Yes No Unsure Section II - Impact Evaluation: Reference 3.3[2] Notes D [21 D Impact Nuclear, Radiological, Industrial Safety or Equipment Reliability? | ||
Impact Licensing: FSAR/Technical Specifications/QA | Impact Licensing: FSAR/Technical Specifications/QA | ||
Line 420: | Line 431: | ||
Potential for new equipment or system not to function properly at D [21 D implementation? Consider use of Contingency/Prevention Worksheet, Attachment 7. 6 Change requires specific skills, experience and subject matter experts for D [21 D successful plan development and implementation? Use Team Skill Matrix, Attachment 7. 5 Change involves a temporary or permanent employee change due to": | Potential for new equipment or system not to function properly at D [21 D implementation? Consider use of Contingency/Prevention Worksheet, Attachment 7. 6 Change requires specific skills, experience and subject matter experts for D [21 D successful plan development and implementation? Use Team Skill Matrix, Attachment 7. 5 Change involves a temporary or permanent employee change due to": | ||
Promotion, Transfer, New Hire, Resignation, Retirement, Staffing D [21 D Restructuring or Termination Leave of Absence, Medical Leave or Temporary Work Assignment. Use Personnel Change Checklist, Attachment 7.4 | Promotion, Transfer, New Hire, Resignation, Retirement, Staffing D [21 D Restructuring or Termination Leave of Absence, Medical Leave or Temporary Work Assignment. Use Personnel Change Checklist, Attachment 7.4 | ||
A NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6 | |||
~Entergy MANAGEMENT PROCEDURE MANUAL INFORMATIONAL USE Page 3 of4 Entergy Nuclear Change Management ATTACHMENT7.1 CHANGE IMPACT CHECKLIST SHEET3 OF3 Section Ill - Identify the Change Impact Level: (Reference 3.3[3]) Medium High Refer to Section 3.3[3} for guidance. | ~Entergy MANAGEMENT PROCEDURE MANUAL INFORMATIONAL USE Page 3 of4 Entergy Nuclear Change Management ATTACHMENT7.1 CHANGE IMPACT CHECKLIST SHEET3 OF3 Section Ill - Identify the Change Impact Level: (Reference 3.3[3]) Medium High Refer to Section 3.3[3} for guidance. | ||
Checked "Yes" to any of the above questions in Section II? Ensure all "Yes" responses were factored into the impact level evaluation. | Checked "Yes" to any of the above questions in Section II? Ensure all "Yes" responses were factored into the impact level evaluation. | ||
Line 436: | Line 447: | ||
{REF. 3.7) ATT. 7.8 OPT ATT. 7.8 DOCUMENT THE DEPT STORED PCRS (OPT) PCRS (ATT. 7.1, ATT. 7.2, ATT. 7.3, ATT. 7.6, ATT. 7.7) | {REF. 3.7) ATT. 7.8 OPT ATT. 7.8 DOCUMENT THE DEPT STORED PCRS (OPT) PCRS (ATT. 7.1, ATT. 7.2, ATT. 7.3, ATT. 7.6, ATT. 7.7) | ||
CHANGE REF. 3.8 Concurrence of Phase 1 Review Com letion for Ma'or and Hi ROLE NAME CHANGE OWNER/LEAD F.MITCHELLIA. IRAOL SPONSOR F. MITCHELL GOVERNANCE OWNER SITE PROCESS OWNER | CHANGE REF. 3.8 Concurrence of Phase 1 Review Com letion for Ma'or and Hi ROLE NAME CHANGE OWNER/LEAD F.MITCHELLIA. IRAOL SPONSOR F. MITCHELL GOVERNANCE OWNER SITE PROCESS OWNER | ||
A . | A . | ||
-=-Entergy NUCLEAR FLEET ADMINISTRATIVE EN-F AP-0 M-023 REV.6 | -=-Entergy NUCLEAR FLEET ADMINISTRATIVE EN-F AP-0 M-023 REV.6 PROCEDURE* | ||
MANAGEMENT MANUAL INFORMATIONAL USE Page 4 of 4 Entergy Nuclear Change Management | MANAGEMENT MANUAL INFORMATIONAL USE Page 4 of 4 Entergy Nuclear Change Management | ||
a~Entergy NUCLEAR QUALITY RELATED EN-Ll-113 I REV.12 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 1 OF 3 Licensing Basis Document Change Process ATTACHMENT 9.1 LBDCR FORM | |||
NUCLEAR QUALITY RELATED EN-Ll-113 I REV.12 | |||
=~=======~=====~~=======-=~~====== | =~=======~=====~~=======-=~~====== | ||
Sheet 1 of 3 (TYPICAL) | Sheet 1 of 3 (TYPICAL) | ||
Line 472: | Line 477: | ||
D Core Operating Limits Report (COLR) | D Core Operating Limits Report (COLR) | ||
D Other (Specify) | D Other (Specify) | ||
* NUCLEAR QUALITY RELATED EN-Ll-113 REV.12 | * NUCLEAR QUALITY RELATED EN-Ll-113 REV.12 | ||
~Entergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 20F3 Licensing Basis Document Change Process ATIACHMENT9.1 LBDCRFORM Sheet 2 of 3 METHOD(S) ALLOWING THE CHANGE D PAD Review (Attach a copy) D 10 CFR 50.48 / EN-DC-128 Review (Attach a copy) | ~Entergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 20F3 Licensing Basis Document Change Process ATIACHMENT9.1 LBDCRFORM Sheet 2 of 3 METHOD(S) ALLOWING THE CHANGE D PAD Review (Attach a copy) D 10 CFR 50.48 / EN-DC-128 Review (Attach a copy) | ||
D 10 CFR 50.59 Evaluation (Attach a copy) ~ 10 CFR 50.54 Review (Attach a copy) | D 10 CFR 50.59 Evaluation (Attach a copy) ~ 10 CFR 50.54 Review (Attach a copy) | ||
Line 487: | Line 490: | ||
* D Removing Excessive Detail D Removing Obsolete Information D Removing Redundant Information D Removing Commitments Removal Basis: | * D Removing Excessive Detail D Removing Obsolete Information D Removing Redundant Information D Removing Commitments Removal Basis: | ||
1 II. LBDCR IMPLEMENTATION ACTIONS SUPPORTING IMPLEMENTATION REQUIRED ACTIONS ACTION TAKEN OR LSD SECTION TRACKING METHOD ACTION RESP. DEPT See attached Issuance of the EPLAN EP Entry into Merlin on Nov. 15, matrix scheduled for Nov.15, 2017 2017 | 1 II. LBDCR IMPLEMENTATION ACTIONS SUPPORTING IMPLEMENTATION REQUIRED ACTIONS ACTION TAKEN OR LSD SECTION TRACKING METHOD ACTION RESP. DEPT See attached Issuance of the EPLAN EP Entry into Merlin on Nov. 15, matrix scheduled for Nov.15, 2017 2017 | ||
~ | ~ | ||
~Entergy NUCLEAR QUALITY RELATED EN-Ll-113 I REV.12 | ~Entergy NUCLEAR QUALITY RELATED EN-Ll-113 I REV.12 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 3 OF 3 Licensing Basis Document Change Process ATTACHMENT9.1 LBDCRFORM Sheet 3 of 3 Ill. LBDCR REVIEW AND APPROVAL1 REVIEW AND APPROVAL of LBDCR (see Attachment 9.2) 2 Department Approved Date 3 | ||
UFSAR Section Owner N/A 4 | UFSAR Section Owner N/A 4 | ||
Peer Review A lraola / | Peer Review A lraola / | ||
LBD Owner F. Mitchell/ | LBD Owner F. Mitchell/ | ||
1 Add additional table rows as needed. | |||
2 The printed name should be included on the form when using electronic means for signature. | 2 The printed name should be included on the form when using electronic means for signature. | ||
Signatures may be obtained via electronic processes (e.g., PCRS, ER processes, Asset Suite signature), manual methods (e.g., ink signature), e-mail, or telecommunication. If using an e-mail, attach it to this form. | Signatures may be obtained via electronic processes (e.g., PCRS, ER processes, Asset Suite signature), manual methods (e.g., ink signature), e-mail, or telecommunication. If using an e-mail, attach it to this form. | ||
3 UFSAR Section Owners should refer to EN-Ll-113-01, "Updated Final Safety Analysis Report Change Process," for review expectations. N/A if change does not update the UFSAR. | 3 UFSAR Section Owners should refer to EN-Ll-113-01, "Updated Final Safety Analysis Report Change Process," for review expectations. N/A if change does not update the UFSAR. | ||
4 Administrative peer review intended to verify changes have been incorporated correctly into revised LBD prior to issuance. t * | 4 Administrative peer review intended to verify changes have been incorporated correctly into revised LBD prior to issuance. t * | ||
*Change Page/Section Previous Version | *Change Page/Section Previous Version IPEC Emergency Plan Revision 17 -01 (Merlin Revision 20) REVISION MATRIX New Version Editorial* Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 1. COVER PAGE Rev 16-01 Rev 17-01 Yes No- This is an editorial change to the Revision number and effective Note: New Note: used 15-02 as the base date. | : 1. COVER PAGE Rev 16-01 Rev 17-01 Yes No- This is an editorial change to the Revision number and effective Note: New Note: used 15-02 as the base date. | ||
document and incorporated 16-01 This change does not change the revisions. | document and incorporated 16-01 This change does not change the revisions. | ||
Line 516: | Line 514: | ||
SECTION A: Karsten | SECTION A: Karsten | ||
*Change Page/Section Previous Version | *Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 3. . .. ED ... Yes No- Removed Emergency Director Section 1, a, 2°d bullet ... Emergency Director. .. | : 3. . .. ED ... Yes No- Removed Emergency Director Section 1, a, 2°d bullet ... Emergency Director. .. | ||
and replaced with ED as Note: New Page A-1 previously defined. | and replaced with ED as Note: New Page A-1 previously defined. | ||
Line 530: | Line 526: | ||
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
*Change Page/Section Previous Version | *Change Page/Section Previous Version IPEC Emergenc i Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 6. .... ED .... Yes No- Removed Emergency Director Section 1.d .... Emergency Director.... | : 6. .... ED .... Yes No- Removed Emergency Director Section 1.d .... Emergency Director.... | ||
and kept ED, Emergency Note: New ... Emergency Response .... ERO ... Response Organization and kept Organization ..... ERO as previously defined. | and kept ED, Emergency Note: New ... Emergency Response .... ERO ... Response Organization and kept Organization ..... ERO as previously defined. | ||
Line 544: | Line 538: | ||
Page A-4 This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | Page A-4 This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
* IPEC Emergenc V Pl an Rev1s1on 17 01 (M erm 1 | * IPEC Emergenc V Pl an Rev1s1on 17 01 (M erm 1 | ||
* I" Rev1s1on 20) REVISION MATRIX | * I" Rev1s1on 20) REVISION MATRIX | ||
~ | ~ | ||
Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b) Planning Change Standards or NUREG-0654 program L elements? Justify if NO. | Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b) Planning Change Standards or NUREG-0654 program L elements? Justify if NO. | ||
Line 558: | Line 550: | ||
and associated responsibilities. This change does not change the Page B-1 meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | and associated responsibilities. This change does not change the Page B-1 meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
*Change Page/Section Previous Version | *Change Page/Section Previous Version IPEC Emergency e1an Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 11. Yes No- Abbreviation for "ERO" as SECTION 8.1 Figures B-1.2a-d illustrates the full Figures B-1.2a-d illustrate the full previously defined. | : 11. Yes No- Abbreviation for "ERO" as SECTION 8.1 Figures B-1.2a-d illustrates the full Figures B-1.2a-d illustrate the full previously defined. | ||
Emergency Response ERO. | Emergency Response ERO. | ||
Line 569: | Line 559: | ||
Page B-1 responsible for safe operation of responsible for safe operation of the unit within the requirements of the unit within the requirements of This change does not change the the Technical Specifications. the Technical Specifications; meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | Page B-1 responsible for safe operation of responsible for safe operation of the unit within the requirements of the unit within the requirements of This change does not change the the Technical Specifications. the Technical Specifications; meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
*,C~~ IPEC Erner Page/Section Previous Version | *,C~~ IPEC Erner Page/Section Previous Version Plan Revision 17 -01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning Change Standards or NUREG-0654 program L.~ elements? Justify if NO. | ||
: 13. Yes No- Spelled out Fire Brigade Section 8.1.a One [1] Unit 3 SRO is assigned as One [1] Unit 3 SRO is assigned Leader to define term for "FBL". | : 13. Yes No- Spelled out Fire Brigade Section 8.1.a One [1] Unit 3 SRO is assigned as One [1] Unit 3 SRO is assigned Leader to define term for "FBL". | ||
FBL for both units as Fire Brigade Leader (FBL) for Note: 16-01, item 5 3rd paragraph Added semi-colon at end of both units; sentence as a formatting change Page 8-2 | FBL for both units as Fire Brigade Leader (FBL) for Note: 16-01, item 5 3rd paragraph Added semi-colon at end of both units; sentence as a formatting change Page 8-2 | ||
Line 581: | Line 569: | ||
These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
*Change Page/Section Previous Version | *Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 15. Section 8.1.b The Emergency Response The ERO is established to assure Yes No- Abbreviation for "ERO" as Organization (ERO) is established that a sufficient number of previously defined. | : 15. Section 8.1.b The Emergency Response The ERO is established to assure Yes No- Abbreviation for "ERO" as Organization (ERO) is established that a sufficient number of previously defined. | ||
Note: 16-01, item 7 1st paragraph, 1st to assure that a sufficient number appropriately qualified personnel This change does not change the sentence of appropriately qualified are available each day, 24 hours . meaning or intent of a description, personnel are available each day, a day to deal with any emergency does not change facilities or Page 8-2 24 hours a day to deal with any* situation. equipment, and does not change emergency situation. a process. No further evaluation is required for this change. | Note: 16-01, item 7 1st paragraph, 1st to assure that a sufficient number appropriately qualified personnel This change does not change the sentence of appropriately qualified are available each day, 24 hours . meaning or intent of a description, personnel are available each day, a day to deal with any emergency does not change facilities or Page 8-2 24 hours a day to deal with any* situation. equipment, and does not change emergency situation. a process. No further evaluation is required for this change. | ||
Line 592: | Line 578: | ||
sentence This change does not change the meaning or intent of a description, Page 8-2 does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | sentence This change does not change the meaning or intent of a description, Page 8-2 does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
* Change IPEC Emergenc*V Pl an Rev1s1on 17 -01 (M erm Page/Section Previous Version | * Change IPEC Emergenc*V Pl an Rev1s1on 17 -01 (M erm Page/Section Previous Version | ||
* I" Rev1s1on 20) REVISION MATRIX New Version Editorial | * I" Rev1s1on 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 18. Section B.1.b These personnel are immediately These personnel are notified by No No- Change made to more clearly available during normal working an electronic notification system describe emergency notification Note: 16-01, item 2nd paragraph hours or are contacted by an and public address methods during working and non-10 *, electronic notification system announcements, and are working hours. | : 18. Section B.1.b These personnel are immediately These personnel are notified by No No- Change made to more clearly available during normal working an electronic notification system describe emergency notification Note: 16-01, item 2nd paragraph hours or are contacted by an and public address methods during working and non-10 *, electronic notification system announcements, and are working hours. | ||
Page B-3 during non-working hours. The immediately available during This change does not change the electronic notification system is normal working hours. These meaning or intent of a description, backed up with an automated personnel are notified by an does not change facilities or telephone notification system. electronic notification system equipment, and does not change during non-working hours. An a process. No further evaluation is alternate notification system using required for this change. | Page B-3 during non-working hours. The immediately available during This change does not change the electronic notification system is normal working hours. These meaning or intent of a description, backed up with an automated personnel are notified by an does not change facilities or telephone notification system. electronic notification system equipment, and does not change during non-working hours. An a process. No further evaluation is alternate notification system using required for this change. | ||
Line 603: | Line 588: | ||
12 sentence Entergy. meaning or intent of a description, does not change facilities or Page B-3 equipment, and does not change a process. No further evaluation is reauired for this chanae. | 12 sentence Entergy. meaning or intent of a description, does not change facilities or Page B-3 equipment, and does not change a process. No further evaluation is reauired for this chanae. | ||
*Change Page/Section Previous Version | *Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 21. Figures 8-1.2a-d illustrate the Yes No- Corrected word "illustrates" to 6th paragraph Figures B-1.2a-d illustrates the Indian Point ERO. "illustrate" because of multiple Indian Point ERO. | : 21. Figures 8-1.2a-d illustrate the Yes No- Corrected word "illustrates" to 6th paragraph Figures B-1.2a-d illustrates the Indian Point ERO. "illustrate" because of multiple Indian Point ERO. | ||
Note: 16-01, item Page 8-3 figures cited. | Note: 16-01, item Page 8-3 figures cited. | ||
Line 616: | Line 598: | ||
and continues to direct the emergency response until relieved by another qualified Emergency Director. | and continues to direct the emergency response until relieved by another qualified Emergency Director. | ||
*Change Page/Section Previous Version | *Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 23. Yes No- Abbreviations for "ED", "POM" Section 8.2 The relieving Emergency The relieving ED/Plant Operations and "ERO" are sufficient because Director/Plant Operations Manager Manager (POM) takes charge of Note: 16-01, item 1st paragraph, 1*t, 2"d & they are previously defined in (POM) takes charge of the overall the overall emergency response, 15 3rd sentence and 2"d Section B. Added abbreviation emergency response, thus freeing thus freeing the Shift Manager to paragraph "EPM" for Emergency Plant the Shift Manager to direct his/her direct his/her attention towards Manager. | : 23. Yes No- Abbreviations for "ED", "POM" Section 8.2 The relieving Emergency The relieving ED/Plant Operations and "ERO" are sufficient because Director/Plant Operations Manager Manager (POM) takes charge of Note: 16-01, item 1st paragraph, 1*t, 2"d & they are previously defined in (POM) takes charge of the overall the overall emergency response, 15 3rd sentence and 2"d Section B. Added abbreviation emergency response, thus freeing thus freeing the Shift Manager to paragraph "EPM" for Emergency Plant the Shift Manager to direct his/her direct his/her attention towards Manager. | ||
Page B-4 attention towards the mitigation of the mitigation of the accident the accident using the emergency using the emergency operating These changes do not change the operating procedures. The Plant procedures. | Page B-4 attention towards the mitigation of the mitigation of the accident the accident using the emergency using the emergency operating These changes do not change the operating procedures. The Plant procedures. | ||
Line 630: | Line 610: | ||
L | L | ||
*Change Page/Section Previous Version | *Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 25. Yes No- Abbreviation for "ED" as Section B.3 The duties and responsibilities of The duties and responsibilities of previously defined. | : 25. Yes No- Abbreviation for "ED" as Section B.3 The duties and responsibilities of The duties and responsibilities of previously defined. | ||
51 the Emergency Director (ED) are the ED are initially assumed by Note: 16-01, item 1st paragraph, 1 This change does not change the initially assumed by the Shift the Shift Manager (CR Supervisor 17 sentence and 2"d meaning or intent of a description, Manager (CR Supervisor in his/her in his/her absence). | 51 the Emergency Director (ED) are the ED are initially assumed by Note: 16-01, item 1st paragraph, 1 This change does not change the initially assumed by the Shift the Shift Manager (CR Supervisor 17 sentence and 2"d meaning or intent of a description, Manager (CR Supervisor in his/her in his/her absence). | ||
Line 638: | Line 616: | ||
The position of the on-call ED is equipment, and does not change Page B-4 normally staffed by high level a process. No further evaluation is station management personnel. required for this change. | The position of the on-call ED is equipment, and does not change Page B-4 normally staffed by high level a process. No further evaluation is station management personnel. required for this change. | ||
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX | |||
~ | ~ | ||
Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b) Plan No. Change Standards or NUREG-0654 pro elements? Justify if NO. | Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b) Plan No. Change Standards or NUREG-0654 pro elements? Justify if NO. | ||
Line 654: | Line 630: | ||
Emergency Director include: | Emergency Director include: | ||
*Change Page/Section Previous Version | *Change Page/Section Previous Version IPEC Emeraencv Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47{b) Planning No.* Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 27. Yes No- Abbreviation for "JIC" is Section 8.4 Review all radiological, Review all radiological, meteorological and operational meteorological and operational sufficient because it is previously Note: 16-01, item 2nd bullet defined. | : 27. Yes No- Abbreviation for "JIC" is Section 8.4 Review all radiological, Review all radiological, meteorological and operational meteorological and operational sufficient because it is previously Note: 16-01, item 2nd bullet defined. | ||
data and update the offsite data and update the offsite 19 Page 8-5 authorities and the Joint authorities and the JIC; This change does not change the Information Center (JIC); meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | data and update the offsite data and update the offsite 19 Page 8-5 authorities and the Joint authorities and the JIC; This change does not change the Information Center (JIC); meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
Line 664: | Line 638: | ||
and recommend offsite protective protective actions. | and recommend offsite protective protective actions. | ||
actions. | actions. | ||
* Change Page/Section Previous Version | * Change Page/Section Previous Version IPEC Emergency Plan Revision 17 -01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 29. Yes No-Abbreviations for "ED", "ERO" Section 8.5.a The EPM reports directly to the The EPM reports directly to the and "TSC" are sufficient because Emergency Director. He/she ED. He/she directs and Note: 16-01, item 1*1 paragraph they are previously defined. | : 29. Yes No-Abbreviations for "ED", "ERO" Section 8.5.a The EPM reports directly to the The EPM reports directly to the and "TSC" are sufficient because Emergency Director. He/she ED. He/she directs and Note: 16-01, item 1*1 paragraph they are previously defined. | ||
directs and coordinates the coordinates the operational 21 These changes do not change the Page 8-5 operational aspects of the In-Plant aspects of the In-Plant ERO. | directs and coordinates the coordinates the operational 21 These changes do not change the Page 8-5 operational aspects of the In-Plant aspects of the In-Plant ERO. | ||
Line 680: | Line 652: | ||
I | I | ||
* I Change Page/Section Previous Version | * I Change Page/Section Previous Version IPEC Emergenc ~ Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 31. Yes No- Abbreviation for "ED" as Section 8.5.b Assist the Emergency Director in Assist the ED in the interpretation previously defined. | : 31. Yes No- Abbreviation for "ED" as Section 8.5.b Assist the Emergency Director in Assist the ED in the interpretation previously defined. | ||
the interpretation of offsite of offsite radiological Note: 16-01, item 1st bullet This change does not change the radiological assessments for assessments for emergency 23 meaning or intent of a description, Page 8-6 emergency classifications and classifications and Protective Protective Action Action Recommendations in does not change facilities or Recommendations in terms of both terms of both real-time equipment, and does not change | the interpretation of offsite of offsite radiological Note: 16-01, item 1st bullet This change does not change the radiological assessments for assessments for emergency 23 meaning or intent of a description, Page 8-6 emergency classifications and classifications and Protective Protective Action Action Recommendations in does not change facilities or Recommendations in terms of both terms of both real-time equipment, and does not change real-time measurements and measurements and projected a process. No further evaluation is projected radiological exposures; radiological exposures; required for this change. | ||
real-time measurements and measurements and projected a process. No further evaluation is projected radiological exposures; radiological exposures; required for this change. | |||
: 32. Yes No- Added semi-colon at end of Section 8.5.b Ensure proper communications Ensure proper communications sentence as a formatting change 2nd bullet between the Indian Point ERO and between the Indian Point ERO Note: 16-01, item for consistency within the offsite response organizations, and and offsite response 24 document. | : 32. Yes No- Added semi-colon at end of Section 8.5.b Ensure proper communications Ensure proper communications sentence as a formatting change 2nd bullet between the Indian Point ERO and between the Indian Point ERO Note: 16-01, item for consistency within the offsite response organizations, and and offsite response 24 document. | ||
Page 8-6 organizations; and These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required forthis change. | Page 8-6 organizations; and These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required forthis change. | ||
Line 693: | Line 660: | ||
Page 8-6 efforts, response efforts; This change does not change the Act as the official Entergy Act as the official Entergy meaning or intent of a description, representative to the media, and representative to the media; and does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | Page 8-6 efforts, response efforts; This change does not change the Act as the official Entergy Act as the official Entergy meaning or intent of a description, representative to the media, and representative to the media; and does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
0 | 0 | ||
* Change Page/Section Previo~s Version | * Change Page/Section Previo~s Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 34. Yes No- Abbreviation for "TSC" as Section 8.5.d.1) Technical support is performed in Technical support is performed in previously defined . | : 34. Yes No- Abbreviation for "TSC" as Section 8.5.d.1) Technical support is performed in Technical support is performed in previously defined . | ||
1st & 2nd paragraph the Technical Support Center the TSC under the direction of the Note: 16-01, item This change does not change the under the direction of the TSC Manager. It is the central 26 meaning or intent of a description, Page 8-6 Technical Support Center facility for the accumulation and Manager. It is the central facility for re-transmittal of plant parameters; does not change facilities or the accumulation and re- equipment, and does not change Specific functions of the TSC a process. No further evaluation is transmittal of plant parameters; include; required for this change. | 1st & 2nd paragraph the Technical Support Center the TSC under the direction of the Note: 16-01, item This change does not change the under the direction of the TSC Manager. It is the central 26 meaning or intent of a description, Page 8-6 Technical Support Center facility for the accumulation and Manager. It is the central facility for re-transmittal of plant parameters; does not change facilities or the accumulation and re- equipment, and does not change Specific functions of the TSC a process. No further evaluation is transmittal of plant parameters; include; required for this change. | ||
Line 703: | Line 668: | ||
apprised of plant conditions; and conditions; and Note: 16-01, item 27 last 2 bullets Interfacing with NRC personnel in Interfacing with NRC personnel in These changes do not change the the Technical Support Center. the TSC. meaning or intent of a description, Page 8-6 does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | apprised of plant conditions; and conditions; and Note: 16-01, item 27 last 2 bullets Interfacing with NRC personnel in Interfacing with NRC personnel in These changes do not change the the Technical Support Center. the TSC. meaning or intent of a description, Page 8-6 does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
*Change Page/Section Previous Version | *Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change . Standards or NUREG-0654 program elements? Justify if NO. | ||
~*- ------ ..__ | ~*- ------ ..__ | ||
I | I | ||
Line 716: | Line 679: | ||
personnel (NPOs) who respond to personnel (NPOs) who respond to 29 This change does not change the Page B-7 the Operations Support Center the OSC perform repair and perform repair and corrective corrective actions directed by the meaning or intent of a description, actions directed by the Operations OSC Manager. does not change facilities or Support Cent~r Manager. equipment, and does not change a process. No further evaluation is required for this change. | personnel (NPOs) who respond to personnel (NPOs) who respond to 29 This change does not change the Page B-7 the Operations Support Center the OSC perform repair and perform repair and corrective corrective actions directed by the meaning or intent of a description, actions directed by the Operations OSC Manager. does not change facilities or Support Cent~r Manager. equipment, and does not change a process. No further evaluation is required for this change. | ||
*Change IPEC Erner Page/Section Previo us Version | *Change IPEC Erner Page/Section Previo us Version Pia n Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 38. Yes No- Abbreviation for "ED as Section B.5.d.9) Search and rescue jurisdiction Search and rescue jurisdiction previously defined. | : 38. Yes No- Abbreviation for "ED as Section B.5.d.9) Search and rescue jurisdiction Search and rescue jurisdiction previously defined. | ||
1st paragraph, 1st during an emergency is divided during an emergency is divided Note: 16-01, item This change does not change the between the in-plant area (inside between the in-plant area (inside 30 sentence meaning or intent of a description, the protected area fence), which is the protected area fence), which Page 8-8 handled by the Shift is handled by the Shift does not change facilities or Manager/POM or EPM and the Manager/POM or EPM and the equipment, and does not change rest of the onsite area which is rest of the onsite area which is a process. No further evaluation is handled by the Emergency handled by the ED. required for this change. | 1st paragraph, 1st during an emergency is divided during an emergency is divided Note: 16-01, item This change does not change the between the in-plant area (inside between the in-plant area (inside 30 sentence meaning or intent of a description, the protected area fence), which is the protected area fence), which Page 8-8 handled by the Shift is handled by the Shift does not change facilities or Manager/POM or EPM and the Manager/POM or EPM and the equipment, and does not change rest of the onsite area which is rest of the onsite area which is a process. No further evaluation is handled by the Emergency handled by the ED. required for this change. | ||
Line 727: | Line 688: | ||
Information Center being operational. | Information Center being operational. | ||
*Change Page/Section Previous Version | *Change Page/Section Previous Version IPEC Emergenc*t Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
No. Change Standards or NUREG-0654 program elements? Justify if NO. | |||
: 40. No No- Change made to clarify where Section B.5.d.11) The Joint Information Center, (JIC) The JIC Manager is responsible the Public Information Liaison 1 Manager is responsible for for providing accurate and timely Note: 16-01, item 1" paragraph reports. | : 40. No No- Change made to clarify where Section B.5.d.11) The Joint Information Center, (JIC) The JIC Manager is responsible the Public Information Liaison 1 Manager is responsible for for providing accurate and timely Note: 16-01, item 1" paragraph reports. | ||
providing accurate and timely information to the public through 32 Also used abbreviations for "JIC", | providing accurate and timely information to the public through 32 Also used abbreviations for "JIC", | ||
Line 740: | Line 697: | ||
Information Center is operational, the JIC Press Release Writer prepares the press release, and once approved by the ED, disseminates the information to the public. | Information Center is operational, the JIC Press Release Writer prepares the press release, and once approved by the ED, disseminates the information to the public. | ||
*Change Page/Section Previous Version | *Change Page/Section Previous Version IPEC Eme~r~-_Plan Revision 1?-01 (Merlin Revision 20LREVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
No. Change Standards or NUREG-0654 program elements? Justify if NO. | |||
: 41. Yes No- Abbreviation for "ERO" as Section 8.6 Figures B-1.1, B-1.2a thru 8-1.2d Figures 8-1.1, 8-1.2a thru 8-1.2d previously defined. | : 41. Yes No- Abbreviation for "ERO" as Section 8.6 Figures B-1.1, B-1.2a thru 8-1.2d Figures 8-1.1, 8-1.2a thru 8-1.2d previously defined. | ||
illustrates the positions of the illustrate the positions of the Note: 16-01, item 1*1 sentence Section 8. Corrected word Indian Point Emergency Response Indian Point ERO and supporting 33 "illustrates" to "illustrate" because Page 8-9 Organization and supporting positions. | illustrates the positions of the illustrate the positions of the Note: 16-01, item 1*1 sentence Section 8. Corrected word Indian Point Emergency Response Indian Point ERO and supporting 33 "illustrates" to "illustrate" because Page 8-9 Organization and supporting positions. | ||
Line 755: | Line 708: | ||
logistics) to support the emergency response. | logistics) to support the emergency response. | ||
*Change IPEC Erner Page/Section Previous Version | *Change IPEC Erner Page/Section Previous Version Plan Revision 17-01 Merlin Revision 20 REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
: 43. If the need for additional technical If the need for additional technical No No- Change made to clarify that Section 8.8.b assistance is identified, this may assistance is identified, this may LOAs were previously removed Note: 16-01, item 1st paragraph be obtained by the Technical be obtained by the TSC Manager from Appendix 2. This was 35 Support Center Manager and the and the ED. Assistance of this evaluated for prior revision 15-02. | : 43. If the need for additional technical If the need for additional technical No No- Change made to clarify that Section 8.8.b assistance is identified, this may assistance is identified, this may LOAs were previously removed Note: 16-01, item 1st paragraph be obtained by the Technical be obtained by the TSC Manager from Appendix 2. This was 35 Support Center Manager and the and the ED. Assistance of this evaluated for prior revision 15-02. | ||
Page 8-10 Emergency Director. Assistance type could include that from the Also, abbreviations for "TSC" and of this type could include that from NSSS Supplier (Westinghouse), "ED" are sufficient because they the NSSS Supplier architect engineer and were previously defined in Section (Westinghouse), architect engineer consultants. A copy of the letter B. | Page 8-10 Emergency Director. Assistance type could include that from the Also, abbreviations for "TSC" and of this type could include that from NSSS Supplier (Westinghouse), "ED" are sufficient because they the NSSS Supplier architect engineer and were previously defined in Section (Westinghouse), architect engineer consultants. A copy of the letter B. | ||
Line 764: | Line 715: | ||
: 44. One of the roles of the Institute of One of the roles of INPO is to Yes No- Abbreviation for "INPO" is Section 8.8.b Nuclear Power Operations (INPO) assist affected utilities by quickly sufficient because it previously Note: 16-01, item 2nd paragraph, 2nd is to assist affected utilities by applying the resources of the defined in the paragraph heading. | : 44. One of the roles of the Institute of One of the roles of INPO is to Yes No- Abbreviation for "INPO" is Section 8.8.b Nuclear Power Operations (INPO) assist affected utilities by quickly sufficient because it previously Note: 16-01, item 2nd paragraph, 2nd is to assist affected utilities by applying the resources of the defined in the paragraph heading. | ||
36 sentence quickly applying the resources of nuclear industry to meet the This change does not change the the nuclear industry to meet the needs of an emergency. meaning or intent of a description, Page 8-10 needs of an emergency. does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | 36 sentence quickly applying the resources of nuclear industry to meet the This change does not change the the nuclear industry to meet the needs of an emergency. meaning or intent of a description, Page 8-10 needs of an emergency. does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
* Change Page/Section Previous Version | * Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO. | ||
~---- | ~---- | ||
: 45. American Nuclear Insurers (ANI): American Nuclear Insurers (ANI): Yes No- Corrected word "have"*to Section B.8.b In the event of an extraordinary In the event of an extraordinary "has" for word agreement. | : 45. American Nuclear Insurers (ANI): American Nuclear Insurers (ANI): Yes No- Corrected word "have"*to Section B.8.b In the event of an extraordinary In the event of an extraordinary "has" for word agreement. | ||
Note: 16-01, item 3rd paragraph, 1st nuclear occurrence (as defined in nuclear occurrence (as defined in This change does not change the 37 sentence the Price- Anderson Law) ANI the Price-Anderson Law) ANI has meaning or intent of a description, have plans prepared to provide plans prepared to provide prompt does not change facilities or Page B-10 prompt emergency funding to emergency funding to affected equipment, and does not change affected members of the public. members of the public. | Note: 16-01, item 3rd paragraph, 1st nuclear occurrence (as defined in nuclear occurrence (as defined in This change does not change the 37 sentence the Price- Anderson Law) ANI the Price-Anderson Law) ANI has meaning or intent of a description, have plans prepared to provide plans prepared to provide prompt does not change facilities or Page B-10 prompt emergency funding to emergency funding to affected equipment, and does not change affected members of the public. members of the public. | ||
a process. No further evaluation is required for this change. | a process. No further evaluation is required for this change. | ||
: 46. No No- Change made to clarify that Section B.9 The availability of local support The availability of local support 51 services to assist the emergency services to assist the emergency LOAs were previously removed Note: 16-01, item 1 paragraph from Appendix 2. This was forces has been ascertained and forces has been ascertained and 38 evaluated for prior revision 15-02. | : 46. No No- Change made to clarify that Section B.9 The availability of local support The availability of local support 51 services to assist the emergency services to assist the emergency LOAs were previously removed Note: 16-01, item 1 paragraph from Appendix 2. This was forces has been ascertained and forces has been ascertained and 38 evaluated for prior revision 15-02. | ||
Page B-10 agreement letters from each agreement letters from each organization in this section have organization in this section have This change does not change the been solicited. These letters are been solicited. These letters are meaning or intent of a description, contained in Appendix 2. referenced in Appendix 2. does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | Page B-10 agreement letters from each agreement letters from each organization in this section have organization in this section have This change does not change the been solicited. These letters are been solicited. These letters are meaning or intent of a description, contained in Appendix 2. referenced in Appendix 2. does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
Line 777: | Line 725: | ||
Note: 16-01, item additional emergency medical additional emergency medical This change does not change the 39 Page B-10 services, ambulances and EMS services.(EMS), ambulances and meaning or intent of a description, personnel. EMS personnel. does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | Note: 16-01, item additional emergency medical additional emergency medical This change does not change the 39 Page B-10 services, ambulances and EMS services.(EMS), ambulances and meaning or intent of a description, personnel. EMS personnel. does not change facilities or equipment, and does not change a process. No further evaluation is required for this change. | ||
* Change No. | * Change No. | ||
IPEC E mergency Pl an Rev1s1on 17 -01 (M erm Page/Section Previous Version | IPEC E mergency Pl an Rev1s1on 17 -01 (M erm Page/Section Previous Version r Revasion 20) REVISION M New Version Editorial Change EffE Stai ele; | ||
r Revasion 20) REVISION M New Version | |||
Editorial Change EffE Stai ele; | |||
: 48. Yes Section B.9.d, 1st When notified that assistance is When notified that assistance is sentence required, IPEC Security will notify required, IPEC Security will notify Note: 16-01, item the New York State Police which the New York State Police which 40 Page B-11 is the lead Local Law is the lead LLEA. | : 48. Yes Section B.9.d, 1st When notified that assistance is When notified that assistance is sentence required, IPEC Security will notify required, IPEC Security will notify Note: 16-01, item the New York State Police which the New York State Police which 40 Page B-11 is the lead Local Law is the lead LLEA. | ||
Enforcement Agency {LLEA). | Enforcement Agency {LLEA). | ||
: 49. Yes Figure B-1.2b Box containing Emergency Plant Box containing Emergency Plant Manager and Radiological Manager and Radiological Note: 16-01, item Page B-14 Coordinator Coordinator (corrected box 41 & new border) | : 49. Yes Figure B-1.2b Box containing Emergency Plant Box containing Emergency Plant Manager and Radiological Manager and Radiological Note: 16-01, item Page B-14 Coordinator Coordinator (corrected box 41 & new border) | ||
Figure B-1.2b ... Onsite statement was in the header Moved the statement in the box of the diagram | Figure B-1.2b ... Onsite statement was in the header Moved the statement in the box of the diagram | ||
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) _REVISION M Change Page/Section Previous Version New Version Editorial Effe No. Change Stai eler | |||
: 50. No Table 8-5 (Deleted) | : 50. No Table 8-5 (Deleted) | ||
Note: Page 8-25 16-01, item 42 SAMG TSC Assist EPM in Evaluator MGR implementation of Severe Accident Management Guidelines | Note: Page 8-25 16-01, item 42 SAMG TSC Assist EPM in Evaluator MGR implementation of Severe Accident Management Guidelines | ||
: 51. Yes Figures 8-1.2b-d Some of the figures had Figure or Moved Figure or Table# out of | : 51. Yes Figures 8-1.2b-d Some of the figures had Figure or Moved Figure or Table# out of Table# in the Header the header Note: New Figure 8-1.3 Table 8-1 1.2.c - no Figure# or Title Added Figure # and Title | ||
--~-------------------- | --~-------------------- | ||
* Change No. | * Change No. | ||
IPEC Erner | IPEC Erner | ||
Line 802: | Line 742: | ||
Eff St~ | Eff St~ | ||
ele | ele | ||
: 52. Yes Figure B-1.3 | : 52. Yes Figure B-1.3 | ||
==Title:== | |||
Normal Figure B-1.3 | |||
==Title:== | |||
Figure B-1.3 Normal Station Organization Station Organization Note: 16-01, item Page B-17 43 SECTION C: lraola l | |||
: 53. . ..... Emergency Telephone Yes Section 4 ...... Emergency Telephone Directory (ETD) ....... | : 53. . ..... Emergency Telephone Yes Section 4 ...... Emergency Telephone Directory (ETD) ....... | ||
Directory ........ | Directory ........ | ||
Note: 15-02, item Page C-2 21 - did not carry over ETD and 16-01 stated emergency phone list | Note: 15-02, item Page C-2 21 - did not carry over ETD and 16-01 stated emergency phone list SECTION D: Karsten | ||
* Change No'. | * Change No'. | ||
IPEC Emergency Plan Revisioi"! 17-01 (Merlin Revision 20) REVISION Page/Section Previous Version New Version Editorial Change E | IPEC Emergency Plan Revisioi"! 17-01 (Merlin Revision 20) REVISION Page/Section Previous Version New Version Editorial Change E | ||
Line 815: | Line 759: | ||
Page D-2 | Page D-2 | ||
: 55. 1. NUE 1st paragraph ... events that are in process ... ... events that are in progress... Yes Note: 15-02, item Page D-1 23 | : 55. 1. NUE 1st paragraph ... events that are in process ... ... events that are in progress... Yes Note: 15-02, item Page D-1 23 | ||
* No. | * No. | ||
IPEC Erner Plan Revision 17-01 LM~rlin Revisio1;1 20 REVISION 1\# | IPEC Erner Plan Revision 17-01 LM~rlin Revisio1;1 20 REVISION 1\# | ||
Line 825: | Line 767: | ||
Page D-3 Organization .... | Page D-3 Organization .... | ||
: 57. Section 1, Site Area A Site Emergency ..... A Site Area Emergency ... Yes Emergency, 1st Note: New paragraph ... the public or..... ... the public, or.... | : 57. Section 1, Site Area A Site Emergency ..... A Site Area Emergency ... Yes Emergency, 1st Note: New paragraph ... the public or..... ... the public, or.... | ||
Page D-3 ... malicious acts: ... ... malicious acts; ... | |||
* Change No. | * Change No. | ||
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION Page/Section | IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION Page/Section Previous Version New Version Editorial Change 1\1 Eff, Sta ele | ||
Previous Version | |||
New Version Editorial Change 1\1 Eff, Sta ele | |||
: 58. Section 1, SAE, 1st WHICH which Yes paragraph Note: New Page D-4 | : 58. Section 1, SAE, 1st WHICH which Yes paragraph Note: New Page D-4 | ||
: 59. Section 1, SAE, 4m . .. Emergency Director... . .. ED .... Yes paragraph & a) | : 59. Section 1, SAE, 4m . .. Emergency Director... . .. ED .... Yes paragraph & a) | ||
Note: New .... Emergency Response Page D-4 Organization .... ... ERO .... | Note: New .... Emergency Response Page D-4 Organization .... ... ERO .... | ||
I | I | ||
* Change No. | * Change No. | ||
IPEC E mergency Pl an Rev1saon 17-01 (M erm Page/Section Previous Version r Revis1on 20) REVISION M New Version Editorial Change Effe Stai eler | IPEC E mergency Pl an Rev1saon 17-01 (M erm Page/Section Previous Version r Revis1on 20) REVISION M New Version Editorial Change Effe Stai eler | ||
Line 848: | Line 782: | ||
: 61. Section 1, a, 3 . ... Emergency Response ... ERO .... Yes Organization .... | : 61. Section 1, a, 3 . ... Emergency Response ... ERO .... Yes Organization .... | ||
Note: New Page E-1 | Note: New Page E-1 | ||
* Change No. | * Change No. | ||
iPEC Erne rgencv Plan Revision 17-01 (Merlin Revision 20) REVISION M Page/Section Previous Version New Version Editorial Change Effe Sta, eler | iPEC Erne rgencv Plan Revision 17-01 (Merlin Revision 20) REVISION M Page/Section Previous Version New Version Editorial Change Effe Sta, eler | ||
: 62. Section 1, b Alert 1), 2"" ... Emergency Director ... . .. ED ... Yes sentence Note: New Page E-2 | : 62. Section 1, b Alert 1), 2"" ... Emergency Director ... . .. ED ... Yes sentence Note: New Page E-2 | ||
: 63. Section 1.b.4 During normal working hours, the During normal working hours, the Yes necessary personnel are available necessary personnel are Note: 15-02, item Page E-2 in the plant and are contacted by available in the plant and are 35 - did not delete the Public Address System, or contacted by the Public Address a coma electronic notification system. System or electronic notification During off-hours, individuals can system. During off-hours, be contacted at their homes by individuals can be centacted at | : 63. Section 1.b.4 During normal working hours, the During normal working hours, the Yes necessary personnel are available necessary personnel are Note: 15-02, item Page E-2 in the plant and are contacted by available in the plant and are 35 - did not delete the Public Address System, or contacted by the Public Address a coma electronic notification system. System or electronic notification During off-hours, individuals can system. During off-hours, be contacted at their homes by individuals can be centacted at telephone or electronic notification their homes by telephone or system . electronic notification system. | ||
___J | |||
* Change No. | * Change No. | ||
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS~ON fJ Page/Section Previous Version New Version Editorial Change Eff, Sta ele | IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS~ON fJ Page/Section Previous Version New Version Editorial Change Eff, Sta ele | ||
Line 862: | Line 793: | ||
Page E-4 | Page E-4 | ||
: 65. Section 1.c.2 Notification of site personnel is Notification of site personnel is No accomplished by the Control accomplished by the Control Note: 15-02 item Page E-3 Room Operator initiating the Site Room Operator initiating the site 41 & new Assembly Alarm or use of the assembly alarm or use of the public address system. Public Address System. | : 65. Section 1.c.2 Notification of site personnel is Notification of site personnel is No accomplished by the Control accomplished by the Control Note: 15-02 item Page E-3 Room Operator initiating the Site Room Operator initiating the site 41 & new Assembly Alarm or use of the assembly alarm or use of the public address system. Public Address System. | ||
Accountability of personnel located Accountability of personnel within the Protected Area is located within the Protected Area performed. In addition the is performed. In addition, the unaffected Control Room affected unit's Control Room | Accountability of personnel located Accountability of personnel within the Protected Area is located within the Protected Area performed. In addition the is performed. In addition, the unaffected Control Room affected unit's Control Room Personnel are contacted by the Operators also contact the affected Control Room Operators. unaffected unit's Control Room personnel. | ||
* Change No. | * Change No. | ||
~PEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION l\J Page/Section Previous Version New Version Editorial Change Eff, Sta ele | ~PEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION l\J Page/Section Previous Version New Version Editorial Change Eff, Sta ele | ||
Line 872: | Line 801: | ||
Section 1.d.1 ...listed in Section D... ... listed in the Section D.... | Section 1.d.1 ...listed in Section D... ... listed in the Section D.... | ||
Page E-4 | Page E-4 | ||
: 67. Section 3, 1st .. Remaining ... ... remaining ... Yes paragraph, last | : 67. Section 3, 1st .. Remaining ... ... remaining ... Yes paragraph, last Note: New sentence Emergency Alert System Emergency Alert System (EAS) | ||
Page E-6 | Page E-6 | ||
* Change No. | * Change No. | ||
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS!ON N Page/Section Previous Version New Version Editorial Change Eff1 Sta ele | IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS!ON N Page/Section Previous Version New Version Editorial Change Eff1 Sta ele | ||
Line 881: | Line 808: | ||
: 69. 1"' paragraph & 1"' . ... Emergency Response ... ERO .... Yes bullet Organization .... | : 69. 1"' paragraph & 1"' . ... Emergency Response ... ERO .... Yes bullet Organization .... | ||
Note: New Page F-1 | Note: New Page F-1 | ||
* Change No. | * Change No. | ||
iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION M Page/Section Previous Version | iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION M Page/Section Previous Version | ||
Line 893: | Line 818: | ||
* 72. | * 72. | ||
Note: New Medical Communications Page F-4 Hudson Valley Hospital Phelps Memorial New York-Presbyterian/Hudson Valley Hospital Phelps Memorial Hospital Center Yes SECTION G: lraola No changes l | Note: New Medical Communications Page F-4 Hudson Valley Hospital Phelps Memorial New York-Presbyterian/Hudson Valley Hospital Phelps Memorial Hospital Center Yes SECTION G: lraola No changes l | ||
IPEC Emergency Plain Revision 17-01 (Merlin Revision 20) REVISION Nj Change Page/Section Previous Version New Version Editorial Eff1: | |||
No. Change Sta elei SECTION H: Ambrose | No. Change Sta elei SECTION H: Ambrose | ||
: 73. Section H.1 Once the entire Emergency Once the entire ERO is No Second paragraph Response Organization is operational, if required, additional Note: 16-01, item operational additional positions are positions are assigned to the CR. | : 73. Section H.1 Once the entire Emergency Once the entire ERO is No Second paragraph Response Organization is operational, if required, additional Note: 16-01, item operational additional positions are positions are assigned to the CR. | ||
Line 900: | Line 825: | ||
: 74. Section 1, CR, 2"a & 3'a .... Emergency Response ... ERO ... Yes paragraph Organization .... | : 74. Section 1, CR, 2"a & 3'a .... Emergency Response ... ERO ... Yes paragraph Organization .... | ||
Note: New Page H-1 ... Emergency Director ... . .. ED ... | Note: New Page H-1 ... Emergency Director ... . .. ED ... | ||
* iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION M Change Page/Section Previous Version New Version Editorial EffE No. I Change Sta ele1 | * iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION M Change Page/Section Previous Version New Version Editorial EffE No. I Change Sta ele1 | ||
: 75. Section 1, TSC, 2"u ... Emergency Director ... . .. ED ... Yes bullet Note: New Page H-2 | : 75. Section 1, TSC, 2"u ... Emergency Director ... . .. ED ... Yes bullet Note: New Page H-2 | ||
: 76. Section 2, EOF, 3*u ... Emergency Director... ... ED ... Yes paragraph Note: New Page H-3 | : 76. Section 2, EOF, 3*u ... Emergency Director... ... ED ... Yes paragraph Note: New Page H-3 | ||
: 77. Section 2, EOF, last ... Emergency Director... ... ED ... Yes | : 77. Section 2, EOF, last ... Emergency Director... ... ED ... Yes paragraph Note: New ... Emergency Response . .. ERO ... | ||
Page H-4 Organization ... | Page H-4 Organization ... | ||
* Change No. | * Change No. | ||
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION Page/Section Previous Version New Version Editorial Change n | IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION Page/Section Previous Version New Version Editorial Change n | ||
Line 918: | Line 837: | ||
: 79. Section H.8.c Backup radiological monitoring Backup radiological monitoring No equipment and assistance can be equipment and assistance can be Note: 16-01, item Page H-8 obtained from other utilities obtained from other utilities 45 through INPO or the Department through INPO or the Department of Energy's Brookhaven Area of Energy's Brookhaven Area Office. Letters of agreement for Office. Letters of agreement for these services can be found in these services are referenced in Appendix 2 of this plan . Appendix 2 of this plan. | : 79. Section H.8.c Backup radiological monitoring Backup radiological monitoring No equipment and assistance can be equipment and assistance can be Note: 16-01, item Page H-8 obtained from other utilities obtained from other utilities 45 through INPO or the Department through INPO or the Department of Energy's Brookhaven Area of Energy's Brookhaven Area Office. Letters of agreement for Office. Letters of agreement for these services can be found in these services are referenced in Appendix 2 of this plan . Appendix 2 of this plan. | ||
* SECTION I: Karsten | * SECTION I: Karsten | ||
* Change No. | * Change No. | ||
~PEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Page/Section Previous Version New Version Editorial Change EffG Sta ele1 | ~PEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Page/Section Previous Version New Version Editorial Change EffG Sta ele1 | ||
: 80. Alert, 151 & 2°~ ... Emergency Director ... . .. ED ... Yes | : 80. Alert, 151 & 2°~ ... Emergency Director ... . .. ED ... Yes | ||
,paragraph Note: New | ,paragraph Note: New Page 1-2 | ||
Page 1-2 | |||
: 81. SAE&GE, 1s, paragraph . . . Emergency Director... ... ED ... Yes Note: New 2°d paragraph .. .in accordance with a Plan ... in accordance with an Implementing Procedure ... Implementing Procedure ... | : 81. SAE&GE, 1s, paragraph . . . Emergency Director... ... ED ... Yes Note: New 2°d paragraph .. .in accordance with a Plan ... in accordance with an Implementing Procedure ... Implementing Procedure ... | ||
Page 1-2 | Page 1-2 | ||
Line 937: | Line 850: | ||
... in accordance with an Implementing Procedure ... | ... in accordance with an Implementing Procedure ... | ||
Yes | Yes | ||
* IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change Page/Section Previous Version New Version . . Editorial Efft No. Change Sta ele1 | * IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change Page/Section Previous Version New Version . . Editorial Efft No. Change Sta ele1 | ||
: 83. Section 5 .. .locals, State, and ... . .. locals, State and ... Yes Note: New Page 1-5 | : 83. Section 5 .. .locals, State, and ... . .. locals, State and ... Yes Note: New Page 1-5 | ||
: 84. Section 8, last ... Emergency Director... ... ED ... Yes paragraph Note: New Page 1-6 SECTION J: Robinson | : 84. Section 8, last ... Emergency Director... ... ED ... Yes paragraph Note: New Page 1-6 SECTION J: Robinson 5 | ||
: 85. Section 2, 1 ' paragraph Fixed spacing issues Yes Note: New . .. Emergency Director... . .. ED ... | : 85. Section 2, 1 ' paragraph Fixed spacing issues Yes Note: New . .. Emergency Director... . .. ED ... | ||
Page J-1 | Page J-1 | ||
* Change No.. | * Change No.. | ||
!PEC EmergenC'i Plan Revasion 17-01 (Merlin Revision 20) REVISION I\ | !PEC EmergenC'i Plan Revasion 17-01 (Merlin Revision 20) REVISION I\ | ||
Page/Section Previous Version New Version | Page/Section Previous Version New Version Editorial Change Eft St, ele | ||
Editorial Change Eft St, ele | |||
: 86. Section 4, last . .. Emergency Director. .. ... ED ... Yes paragraph Note: New Section 5, 1*1 paragraph, last sentence Page J-2 87. | : 86. Section 4, last . .. Emergency Director. .. ... ED ... Yes paragraph Note: New Section 5, 1*1 paragraph, last sentence Page J-2 87. | ||
Not used | Not used | ||
Line 957: | Line 864: | ||
Note: New Section 7, 2nd paragraph, last sentence Page J-4 | Note: New Section 7, 2nd paragraph, last sentence Page J-4 | ||
... Emergency Director .... ...ED ... Yes | ... Emergency Director .... ...ED ... Yes | ||
* IPEC Emergency Plan Revision 17-01 (Merten Revision 20) REVISION l\l Change Page/Section Previous Version New Version Editorial Eff No. Change Sta ele | * IPEC Emergency Plan Revision 17-01 (Merten Revision 20) REVISION l\l Change Page/Section Previous Version New Version Editorial Eff No. Change Sta ele | ||
: 90. Section J.10.f, last ... Pre and Post... ... pre and post. .. Yes sentence Note: New Page J-5 | : 90. Section J.10.f, last ... Pre and Post... ... pre and post. .. Yes sentence Note: New Page J-5 | ||
Line 968: | Line 874: | ||
local... | local... | ||
Yes | Yes | ||
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION n Change Page/Section Previous Version New Version Editorial EH No. Change St, eh | |||
: 93. Section 7, 4th sentence .... emergency worker monitoring ... emergency worker personnel Yes and decontamination center.... monitoring center... | : 93. Section 7, 4th sentence .... emergency worker monitoring ... emergency worker personnel Yes and decontamination center.... monitoring center... | ||
Note: New Page K-4 SECTION L: lraola | Note: New Page K-4 SECTION L: lraola | ||
: 94. 1. Hospital Services, A written agreement is contained A written agreement is referenced No 151 paragraph in Appendix 2. in Appendix 2. | : 94. 1. Hospital Services, A written agreement is contained A written agreement is referenced No 151 paragraph in Appendix 2. in Appendix 2. | ||
Note: 16-01, item 48 Page L-1 | Note: 16-01, item 48 Page L-1 | ||
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change Page/Section Previous Version New Version Editorial Effl No. Change Sta ele1 | |||
: 95. 1. Hospital Services, A written agreement is contained A written agreement is referenced No 2"d paragraph in Appendix 2. in Appendix 2. | : 95. 1. Hospital Services, A written agreement is contained A written agreement is referenced No 2"d paragraph in Appendix 2. in Appendix 2. | ||
Note: 16-01, item 49 Page L-1 | Note: 16-01, item 49 Page L-1 | ||
Line 983: | Line 887: | ||
: 96. 1. Hospital Services, 3 In the event that a patient should In the event that a patient should No paragraph receive a massive radiation receive a massive radiation Note: 16-01, item exposure, an expert medical exposure, then Radiation 50 Page L-1 consultant specializing on the Emergency Assistance management of radiation injuries Center/Training Site (REAC/TS), | : 96. 1. Hospital Services, 3 In the event that a patient should In the event that a patient should No paragraph receive a massive radiation receive a massive radiation Note: 16-01, item exposure, an expert medical exposure, then Radiation 50 Page L-1 consultant specializing on the Emergency Assistance management of radiation injuries Center/Training Site (REAC/TS), | ||
would be available. A written available 24 hours/day, would be agreement is contained in contacted for guidance. A written Appendix 2. agreement is referenced in Appendix 2 . | would be available. A written available 24 hours/day, would be agreement is contained in contacted for guidance. A written Appendix 2. agreement is referenced in Appendix 2 . | ||
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION i'ti Change Page/Section Previous Version New Version Editorial Ef'if No. Change St:. | |||
ele | ele | ||
: 97. Section 2, Onsite First These facilities consist of a These facilities consist of a Yes Aid Capability, 2"d stainless steel interior with stainless steel interior with Note: 16-01, item paragraph decontamination table, showers decontamination table, showers 51 and sinks draining into a holdup and sinks draining into holdup Page L-1 tanks. These facilities contain tanks. These facilities contain general first aid equipment and general first aid equipment and medical supplies for treatment of medical supplies for treatment of injuries. injuries. | : 97. Section 2, Onsite First These facilities consist of a These facilities consist of a Yes Aid Capability, 2"d stainless steel interior with stainless steel interior with Note: 16-01, item paragraph decontamination table, showers decontamination table, showers 51 and sinks draining into a holdup and sinks draining into holdup Page L-1 tanks. These facilities contain tanks. These facilities contain general first aid equipment and general first aid equipment and medical supplies for treatment of medical supplies for treatment of injuries. injuries. | ||
Line 991: | Line 894: | ||
(work with items 166,167,and 205 for MOU) | (work with items 166,167,and 205 for MOU) | ||
* SECTION M: lraola | * SECTION M: lraola | ||
* Change No. | * Change No. | ||
IPEC Erner Page/Section Plan Revision 17-01 Merlin Revision 20) REVISION Previous Version New Version Editorial Change Eff<< | IPEC Erner Page/Section Plan Revision 17-01 Merlin Revision 20) REVISION Previous Version New Version Editorial Change Eff<< | ||
Line 997: | Line 899: | ||
: 99. Section 1, Recovery, 2"u ... Emergency Director... ...ED ... Yes paragraph Note: New M-2 100. Section 1, Recovery . ... Emergency Response ... ERO .... Yes 151 bullet Organization .... | : 99. Section 1, Recovery, 2"u ... Emergency Director... ...ED ... Yes paragraph Note: New M-2 100. Section 1, Recovery . ... Emergency Response ... ERO .... Yes 151 bullet Organization .... | ||
Note: New Page M-3 I 101. Section 2, Recovery . .. .Emergency Response ... ERO .... Yes Org Organization .... | Note: New Page M-3 I 101. Section 2, Recovery . .. .Emergency Response ... ERO .... Yes Org Organization .... | ||
Note: New 2nd bullet Page M-3 | |||
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change Page/Section Previous Version New Version Editorial Eff1 No. Change Sta ele1 102. Section 2.b, 3'" bullet .... Emergency Response . .. ERO .... Yes Organization .... | |||
102. Section 2.b, 3'" bullet .... Emergency Response . .. ERO .... Yes Organization .... | |||
Note: New Page M-4 103. Section 2.e, 4th bullet . ... Emergency Response ... ERO .... Yes Organization .... | Note: New Page M-4 103. Section 2.e, 4th bullet . ... Emergency Response ... ERO .... Yes Organization .... | ||
Note: New Page M-5 104. Section 3, 1s, sentence . ... Emergency Response ... ERO .... Yes Organization .... | Note: New Page M-5 104. Section 3, 1s, sentence . ... Emergency Response ... ERO .... Yes Organization .... | ||
Note: New Page M-6 | |||
* Change No. | * Change No. | ||
IPEC Emergencv Page/Section an Rev1s1on 17-01 (M erm Previous Version r Rev1s1on 20) REVISION New Version Editorial Change | IPEC Emergencv Page/Section an Rev1s1on 17-01 (M erm Previous Version r Rev1s1on 20) REVISION New Version Editorial Change | ||
Line 1,014: | Line 913: | ||
Note: New Page M-6 | Note: New Page M-6 | ||
* SECTION N: Karsten ', | * SECTION N: Karsten ', | ||
IPEC Emergency P!an Revision 17-01 (MerUn Revision 20) REVISION ru Change Page/Section Previous Version New Version Editorial Eff1 No. I Change Sta ele 107. 2nu bullet .... Emergency Response ...ERO .... Yes Organization .... | |||
Note: New Page N-1 SECTION O: Ambrose I | Note: New Page N-1 SECTION O: Ambrose I | ||
I 108. 1, Assurance of - .... Emergency Response ... ERO .... Yes Training, 1*t paragraph Organization.... | I 108. 1, Assurance of - .... Emergency Response ... ERO .... Yes Training, 1*t paragraph Organization.... | ||
* Note: New | * Note: New Page 0-1 | ||
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS~ON ~ | |||
Change Page/Section Previous Version New Version Editorial Ef No. Change S! | Change Page/Section Previous Version New Version Editorial Ef No. Change S! | ||
0!1 109. Section 2 2. Methods of Training was on Moved to page 0-2 Yes page 0-1 Note: New Page 0-1 110. Section 4, a Personnel Responsible for Personnel responsible for Yes Management. ..... management. ... | 0!1 109. Section 2 2. Methods of Training was on Moved to page 0-2 Yes page 0-1 Note: New Page 0-1 110. Section 4, a Personnel Responsible for Personnel responsible for Yes Management. ..... management. ... | ||
Line 1,028: | Line 925: | ||
... Emergency Director ... . .. ED ... | ... Emergency Director ... . .. ED ... | ||
111. 5.b, 2"" sentence .... Emergency Response ... ERO .... Yes Organization .... | 111. 5.b, 2"" sentence .... Emergency Response ... ERO .... Yes Organization .... | ||
Note: New 5.b, last paragraph ... ERO Roster... ... ERO roster ... | |||
Page 0-6 | Page 0-6 | ||
IPEC Emergency Plan Revision 17-01 (Merlan Revision 20) REV!SION I\J Change Page/Section Previous Version New Version Editorial Eff No. Change Sta ele 112. 5.c, 2"" bullet .... Emergency Response ... ERO .... Yes Organization .... | |||
Note: New Page 0-7 SECTION P: Martin 5 | Note: New Page 0-7 SECTION P: Martin 5 | ||
113. Section 2, 1 ' .... Emergency Response . .. ERO .... Yes paragraph, last Organization .... | 113. Section 2, 1 ' .... Emergency Response . .. ERO .... Yes paragraph, last Organization .... | ||
Line 1,038: | Line 935: | ||
... Indian Point Preparedness ... . .. Indian Point Emergency Preparedness ... | ... Indian Point Preparedness ... . .. Indian Point Emergency Preparedness ... | ||
Yes J | Yes J | ||
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION 1\1 Change Page/Section Previous Version New Version Editorial Eff No. Change St;i ele 115. Section 4, Technical reviews of the Plan and Technical reviews of the Plan and No 5th Paragraph procedures shall be conducted in procedures shall be conducted in Note: 16-01, item accordance with station accordance with station 53 Page P-3 procedures. Individuals that procedures. The reviewer shall conduct the technical review and determine the need for cross-safety review shall be qualified in disciplinary reviews. | |||
accordance with station requirements. The reviewer shall Note: Removed the statement: | accordance with station requirements. The reviewer shall Note: Removed the statement: | ||
determine the need for cross-disciplinary review. "Individuals that conduct the technical review and safety review shall be qualified in accordance with station requirements." | determine the need for cross-disciplinary review. "Individuals that conduct the technical review and safety review shall be qualified in accordance with station requirements." | ||
IPEC E mergencv Pl an Rev1s1on 17 01 (M erm Rev1s1on 20l REVISIONr ru Eff, Change Page/Section Previous Version New Version Editorial No. Change Sta ele 116. Section 5, 3rd sentence . ... Emergency Response ... ERO .... Yes Organization .... | IPEC E mergencv Pl an Rev1s1on 17 01 (M erm Rev1s1on 20l REVISIONr ru Eff, Change Page/Section Previous Version New Version Editorial No. Change Sta ele 116. Section 5, 3rd sentence . ... Emergency Response ... ERO .... Yes Organization .... | ||
Note: New Page P-3 117. Section 10 .... Emergency Response ... ERO .... Yes Organization .... | Note: New Page P-3 117. Section 10 .... Emergency Response ... ERO .... Yes Organization .... | ||
Note: New Page P-5 APPENDIX 1: | Note: New Page P-5 APPENDIX 1: | ||
No changes APPENDIX 2: lraola I | |||
* Change No. | |||
* Change | |||
No. | |||
IPEC Emergency Plan Revision 17-01 (MerUn Revision 20) REVISION Page/Section Previous Version New Version | IPEC Emergency Plan Revision 17-01 (MerUn Revision 20) REVISION Page/Section Previous Version New Version | ||
____________._______________,.....________________.._______~__, | ____________._______________,.....________________.._______~__, | ||
Line 1,060: | Line 950: | ||
~ | ~ | ||
Efl St elE 118. Page: Appendix 2-1 NIA 10. Department of Energy- No Radiological Assistance Program Note: 16-01, item Region 1 ( Brookhaven) 54 119. Page: Appendix 2-1 As Letters of Agreements are As Letters of Agreements are No received they will be added to this received they will be listed in this Note: 16-01, item section. section. - | Efl St elE 118. Page: Appendix 2-1 NIA 10. Department of Energy- No Radiological Assistance Program Note: 16-01, item Region 1 ( Brookhaven) 54 119. Page: Appendix 2-1 As Letters of Agreements are As Letters of Agreements are No received they will be added to this received they will be listed in this Note: 16-01, item section. section. - | ||
55 | |||
l iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION ~ | |||
Change Page/Section Previous Version New Version Editorial Eft No. Change St, elE 120. APPENDIX 3: lraola IP-EP-115 IP-EP-115 No EN-EP-900 IP-EP-120 Note: 16-01, item IP-EP-120 56 IP-EP-210 IP-EP-220 IP-EP-210 IP-EP-221 IP-EP-220 IP-EP-230 IP-EP-221 IP-EP-231 IP-EP-230 IP-EP-250 IP-EP-231 IP-EP-251 IP-EP-250 IP-EP-260 IP-EP-251 IP-EP-260 IP-EP-210 EN-EP-609 EN-EP-610 IP-EP-220 EN-EP-611 IP-EP-221 EN-EP-900 IP-EP-230 IP-EP-210 IP-EP-231 IP-EP-220 IP-EP-250 IP-EP-221 IP-EP-251 EN-EP-610 (Twice) | Change Page/Section Previous Version New Version Editorial Eft No. Change St, elE 120. APPENDIX 3: lraola IP-EP-115 IP-EP-115 No EN-EP-900 IP-EP-120 Note: 16-01, item IP-EP-120 56 IP-EP-210 IP-EP-220 IP-EP-210 IP-EP-221 IP-EP-220 IP-EP-230 IP-EP-221 IP-EP-231 IP-EP-230 IP-EP-250 IP-EP-231 IP-EP-251 IP-EP-250 IP-EP-260 IP-EP-251 IP-EP-260 IP-EP-210 EN-EP-609 EN-EP-610 IP-EP-220 EN-EP-611 IP-EP-221 EN-EP-900 IP-EP-230 IP-EP-210 IP-EP-231 IP-EP-220 IP-EP-250 IP-EP-221 IP-EP-251 EN-EP-610 (Twice) | ||
IP-EP-230 IP-EP-231 | IP-EP-230 IP-EP-231 IP-EP-230 EN-EP-611 IP-EP-250 IP-EP-350 IP-EP-250 IP-EP-251 IP-EP-250 EN-EP-609 IP-EP-320 IP-EP-230 IP-EP-250 IP-EP-350 EN-EP-611 IP-EP-250 IP-EP-320 EN-EP-609 | ||
IPEC Emergenc i Pian Revision 17-01 (Merlin Revision 20) REVISION ~ | |||
1Change Page/Section Previous Version New Version Editorial Ef No. Change St eh IP-EP-230 IP-EP-230 IP-EP-430 IP-EP-430 EN-EP-611 APPENDIX 4: | 1Change Page/Section Previous Version New Version Editorial Ef No. Change St eh IP-EP-230 IP-EP-230 IP-EP-430 IP-EP-430 EN-EP-611 APPENDIX 4: | ||
121. Appendix 4, No page 4-2 Note: new NSRAC - Nuclear Safety Review Deleted and Audit Committee 122. Appendix 4, page 4-8 Radiation Area - ... five millirem .... Radiation Area -... 5mRem .. Yes Note: 15-02, item | 121. Appendix 4, No page 4-2 Note: new NSRAC - Nuclear Safety Review Deleted and Audit Committee 122. Appendix 4, page 4-8 Radiation Area - ... five millirem .... Radiation Area -... 5mRem .. Yes Note: 15-02, item 199 APPENDIX 5: No changes Not used | ||
IPEC EMERGENCY PLAN DISTRIBUTION LIST Page 1 of 2 DELIVERED BY IP3 CONTROL ROOM IP3 53FT. CCR 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP3 SHIFT MANAGER IP3 53FT. ELEVATION 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 CONTROL ROOM IP2 53FT. CCR 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IPEC TSC IP2 53FT. ELEVATION 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 SIMULATOR IP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 SIMULATOR - CLASSROOM 4 IP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY 3 COPIES OF ALL EP'S IP2 SIMULATOR - CLASSROOM 5 IP2 SIMULATOR BLDG. | IPEC EMERGENCY PLAN DISTRIBUTION LIST Page 1 of 2 DELIVERED BY IP3 CONTROL ROOM IP3 53FT. CCR 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP3 SHIFT MANAGER IP3 53FT. ELEVATION 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 CONTROL ROOM IP2 53FT. CCR 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IPEC TSC IP2 53FT. ELEVATION 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 SIMULATOR IP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 SIMULATOR - CLASSROOM 4 IP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY 3 COPIES OF ALL EP'S IP2 SIMULATOR - CLASSROOM 5 IP2 SIMULATOR BLDG. | ||
DOCUMENTS EXCEPT E-PLAN NRC RESIDENT INSPECTOR NRC IP2 88FT. ELEVATION 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND NRC - ROCKVILLE, MD DOC CONTROL DESK OFFSITE GENERAL RECORDS ADDRESS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND NRC JAMES DANNA OFFSITE GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND NRC DEPUTY DIRECTOR OFFSITE GENERAL RECORDS EXCEPT IP-EP-115 | DOCUMENTS EXCEPT E-PLAN NRC RESIDENT INSPECTOR NRC IP2 88FT. ELEVATION 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND NRC - ROCKVILLE, MD DOC CONTROL DESK OFFSITE GENERAL RECORDS ADDRESS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND NRC JAMES DANNA OFFSITE GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND NRC DEPUTY DIRECTOR OFFSITE GENERAL RECORDS EXCEPT IP-EP-115 | ||
. ; *.~'* | . ; *.~'* | ||
1 COPY OF THE FOLLOWING: | 1 COPY OF THE FOLLOWING: | ||
.LENORE TO ~PDATE ' | .LENORE TO ~PDATE ' |
Latest revision as of 00:16, 4 February 2020
ML17333A126 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 11/14/2017 |
From: | Entergy Nuclear Operations |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML17333A126 (82) | |
Text
--- Entergy Indian Point Energy Center CONTROLLED DOCUMENT Document Control TRANSMITTAL 450 Broadway Buchanan, NY 10511 TO: DISTRIBUTION DATE: November 14, 2017 FROM: IPEC DOCUMENT CONTROL - 3RD FLOOR ADMIN BLDG PHONE#: 914-254-6835 TRANSMITTAL#: EP-17-0026 The Document(s) identified below are forwarded for use. Please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, voided, or inactive document(s).
Sign and return the receipt acknowledgement below within ten (10) working days.
AFFECTED DOCUMENT: IPEC EMERGENCY PLAN PROCEDURE DOC# REV# TITLE INSTRUCTIONS PLEASE INCORPORATE INTO YOUR BOOKS THE FOLLOWING UPDATED PROCEDURES OR DRAWINGS:
I, NOV 15 2017.
IPEC-EP 17-01 REVm20 RECEIPT OF THE ABOVE LISTED DOCUMENT(S) IS HEREBY ACKNOWLEDGED. I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S) IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S)
(IF APPLICABLE) AS SHOWN ON THE DOCUMENT(S). \::x>
NAME (PRINT) SIGNATURE DATE COPY LOCATION
ATIACHMENT 9.2 10 CFR 50.54(0)(3) SCREENING SHEET1 OF5
- Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)
Title:
Indian Point Energy Center Emergency Plan I Revision: 17-01 (MERLIN Revision 20)
Part I. Description of Activity Being Reviewed (This is generally changes to the emergency plan. EALs, EAL bases, etc. - refer to step 3.0[6]):
The activity being reviewed is a revision to IPEC Emergency Plan. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01.
Part II. Activity Previously Reviewed? DYES !8J NO Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or 50.54(q)(3) Continue to Evaluation is next part Alert and Notification System Design Report? NOT required.
Enter If YES, identify bounding source document number/approval reference and justification ensure the basis for concluding the source document fully bounds the below and complete Part proposed change is documented below: VI.
Justification:
D Bounding document attached (optional)
Part Ill. Applicability of Other Regulatory Change Control Processes Check if any other regulatory change processes control the proposed activity.(Refer to EN-Ll-100)
- APPLICABILITY CONCLUSION
!8l If there are no other controlling change processes, continue the 50.54(q)(3) Screening.
D One or more controlling change processes are selected, however, some portion of the activity involves the emergency plan or affects the implementation of the emergency plan; continue the 50.54(q)(3) Screening for that portion of the activity. Identify the applicable controlling change processes below.
D One or more controlling change processes are selected and fully bounds all aspects of the activity. 50.54(q)(3)
Evaluation is NOT reouired. Identify controllinA chan11e processes below and complete Part VI.
CONTROLLING CHANGE PROCESSES 10 CFR 50.54(q) Only Part IV. Editorial Change DYES [gi NO 50.54(q)(3) Co111inue 10 nexl Is this activity an editorial or typographical change such as formatting, paragraph Evalualion is part numbering, spelling, or punctuation that does not change intent? NOT required.
En1cr Justification: juslificalion and 1,2,3,4,5,6, 7,8,9,10,11,12,13,14,15,16, 17,19,20,21,22,23,25,26,27,28, conlinue 10 nexl 29,30,31,32,33,34,35,36,37,38,39,41,42,44,45,47,48;49,51,52,53, 54,55, part or 56, 57,58, 59,60,61,62,63,64, 66,67, 68,69, 70,71, 72, 74, 75, 76, 77, 78,80,81, complelc Part 82,83,84,85,86,88,89,90,92,93,97,98,99,100,101,102, 103,104,106,107, VI as applicable.
108, 109, 110, 111, 112, 113, 114, 116, 117, 122 per the attached revision matrix are considered editorial changes per EN-AD-101.
"NO" is checked because the procedure revision contains non-editorial changes per the attached revision matrix.
EN-EP-305 REV 5
ATIACHMENT 9.2 10 CFR 50.54(Q)(3) SCREENING*
SHEET2 OF5
- Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)
Title:
Indian Point Energy Center Emergency Plan I Revision: 17-01 (MERLIN Revision 20)
Part V. Emergency Planning Element/Function Screen (Associated 10 CFR 50.47(b) planning standard function identified in brackets) Does this activity affect any of the following, including program elements from NUREG-0654/FEMA REP-1 Section II?
- 1. Responsibility for emergency response is assigned. [1) D
- 2. The response organization has the staff to respond and to augment staff on a continuing basis (24/7 D staffing) in accordance with the emergency plan. (1)
- 3. The process ensures that on shift emergency response responsibilities are staffed and assigned. [2] D
- 4. The process for timely augmentation of onshift staff is established and maintained. (2] t8l
- 5. Arrangements for requesting and using off site assistance have been made. [3J D
- 6. State and local staff can be accommodated at the EOF in accordance with the emergency plan. [3] D
- 7. A standard scheme of emergency classification and action levels is in use. [4] D
- 8. Procedures for notification of State and local governmental agencies are capable of alerting them of D the declared emergency within 15 minute( after declaration of an emergency and providing follow-up notifications. [5]
- 9. Administrative and physical means have been established for alerting and providing prompt D instructions to the public within the plume exposure pathway. [5]
- 10. The public ANS meets the design requirements of FEMA-REP-10, Guide for Evaluation of Alert and LJ Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA-approved ANS design report and supporting FEMA approval letter. [5J
- 11. Systems are established for prompt communication among principal emergency response organizations. [6J
- 12. Systems are established for prompt communication to emergency response personnel. (6J
- 13. Emergency preparedness information is made available to the public on a periodic basis within the plume exposure pathway emergency planning zone (EPZ). (7)
- 14. Coordinated dissemination of public information during emergencies is established. [7]
D D
D D
- 15. Adequate facilities are maintained to support emergency response. [8J D
- 16. Adequate equipment is maintained to support emergency response. [8] D
- 17. Methods, systems, and equipment for assessment of radioactive releases are in use. [9J LJ
- 18. A range of public PARs is available for implementation during emergencies. [10] D
- 19. Evacuation time estimates for the population located in the plume exposure pathway EPZ are D available to support the formulation of PARs and have been provided to State and local governmental authorities. [1 OJ
- 20. A range of protective actions is available for plant emergency workers during emergencies, including D those for hostile action events.[1 OJ
- 21. The resources for controlling radiological exposures for emergency workers are established. [11] D
- 22. Arrangements are made for medical services for contaminated, injured individuals. [12] D
- 23. Plans for recovery and reentry are developed. [13] D
- 24. A drill and exercise program (including radiological, medical, health physics and other program D areas) is established. [14]
- 25. Drills, exercises, and training evolutions that provide performance opportunities to develop, D EN-EP-305 REV 5
ATTACHMENT 9.2 10 CFR 50.54(0)(3) SCREENING SHEET3 OF5
- Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)
Title:
Indian Point Energy Center Emergency Plan IRevision: 17-01 (MERLIN Revision 20) maintain. and demonstrate key skills are assessed via a formal critique process in order to identify weaknesses. [14]
- 26. Identified weaknesses are corrected. [14] D
- 27. Training is provided to emergency responders. [15) D
- 28. Responsibility for emergency plan development and review is established. [16] D
- 29. Planners responsible for emergency plan development and maintenance are properly trained. [16] D APPLICABILITY CONCLUSION D If no Part V criteria are checked, a 50.54(q)(3) Evaluation is NOT required; document the basis for conclusion below and complete Part VI.
D If any Part V criteria are checked, complete Part VI and perform a 50.54(q)(3) Evaluation.
BASIS FOR CONCLUSION Change 18- Change made to more clearly describe emergency notification methods during working and non-working hours. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Change 40- Change made to clarify where the Public Information Liaison reports. Also used abbreviations for "JIC", "ED", "ERO" and "EOF" because they are previously defined in Section B. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- Change 43 - Change made to clarify that LOAs were previously removed from Appendix 2. This was evaluated for prior revision 15-02. Also, abbreviations for "TSC" and "ED" are sufficient because they were previously defined in Section B. These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Change 46 - Change made to clarify that LOAs were previously removed from Appendix 2. This was I
I evaluated for prior revision 15-02. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Change 50- Removed box to reflect previously evaluated change from SAMG Evaluator to Reactor Engineer. SAMG Evaluator position was deleted from the Emergency Response Organization (ERO). The removal of this position was previously 50.54(q) evaluated for Revision 15 of IP-EP-220, Technical Support Center. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Change 65 - changed site assembly alarm to lower case and Public Address System to upper case. In I addition, clarified wording regarding who the control room operators contact. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Change 73 - Clarification of wording to denote that additional positions are assigned to CR as required.
Revised ERO. These chanqes do not chanqe the meanina or intent of a descriotion, does not chanqe I EN-EP-305 REV 5
ATTACHMENT 9.2 10 CFR 50.54(a)(3) SCREENING SHEET40F 5
- Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)
Title:
Indian Point Energy Center Emergency Plan I Revision: 17-01 (MERLIN Revision 20) facilities or equipment, and does not change a process. No further evaluation is required for this change.
Change 79 - Clarification of wording to reflect Appendix 2's reference to letters of agreement. During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Change 91- Change in wording to clarify that offsite authorities are responsible for protective action decision not IPEC. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Change 94 - During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Change 95 - During the EPLAN revision 15-02, all the written agreements/ Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Change 96 - Added Radiation Emergency Assistance Center/Training Site (REAC/TS) which has become the national source to contact to receive guidance given the scenario of a patient that has received massive radiation exposure. During the EPLAN revision 15-02, all the written agreements/Letters of Agreement were removed from the EPLAN and 50.54q reviewed. This change does not change the meaning or intent of a I description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change
- Change 105 - Changed the word from All to Additional to better define the actions that would be taken regarding utilizing plant personnel during the recovery effort. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
Change 115 - . Procedures IP-SMM-AD-102 and IP-EP-AD2 establishes requirements for the preparation, review, and approval of site-specific implementing procedures. Both procedures list a technical review as a review from someone who has the expertise to ensure technical accuracy. Neither requires the individual to be qualified. Per IP-EP~AD2, Safety reviews are completed to determine if prior NRC approval is required.
This is performed by the 50.54Q process in EN-EP-305. In 305 you are required to be qualified. Removing this statement: "Individuals that conduct the technical review and safety review shall be qualified in accordance with station requirements." does not change the meaning or intent of a description, d9es not change facilities or equipment, and does not change a process. Technical review does not require qualifications and still will be completed. Safety reviews are still to be completed and the 5054Q process will ensure the qualifications are obtained prior to anyone being assigned to complete. No further evaluation is required for this change.
Change 118 -Added a new Memorandum of Understanding (MOU) with the Department of Energy for additional radiological assistance if needed depending on the radiological emergency at Indian Point.
This MOU is an enhancement to the EPLAN and support for Indian Point. This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process.
No further evaluation is required for this change.
EN-EP-305 REV 5
- ATTACHMENT 9.2
- SHEET50F5 Procedure/Document Number: IPEC-EP EqulpmenUFaclllty/Dther: Indian Point Energy Center (IPEC)
Tltle: Indian Point Energy Center Emergency Plan 10 CFR 50,S4(Q}(3) Sc:RE&NING I Revision: 17-01 (MERLIN Revision 20)
Change 119
- Changed the wording from added to llst&d as Ille Letters of Agreement were o telally removed r,om the EPLAN during the 2015 15-02 revision. A 50.54q was perfonned. Unfortunately, this Item was missed during last year's EPLAN revision. This change does not change the meaning or intent of a description, does net change facilities or equipment, and does not change a process. No further evaluation is required for lhls change.
Change 120 - Added the common fleet Emergency Planning procedures to the list of existing IPEC procedures. Fleet Procedures added Include:
EN-EP-609, EN-EP-610, EN-EP-611, EN-EP-900, These changes do not change lhe meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation Is required for this change.
Change 121
- NSRAC - Nuclear Safety Review and Audit Committee no longer exists as It was replaced OSRC - On-Sile Safely Review Committee In 15-02 rev. This change does not change lhe meaning or b1 intent of a deseription, does net change fac:illUes or equipment. and does not change a process. No further evaluation Is required for !his change.
Emergency Plannlng Element 4 in Part V of lhls form Is potenUally affected by Iha remaining Change 24 described In the Revision Matrix. A 10CfR50.54 (q) evatuatlon will be performed to determine if the effectlvaness of the IPEC Emergency Plan Is reduced and prior NRC approval Is required *
- Part VI. Signatures:
Preparer Name (Print)
Rebecca A. Martin Sr. Project Manager Pr~arer Slgnalure
. .c,()
Dale:
It> 'q r (OpUcnal) Reviewer Name (Prinl) Reviewer Signature Dale:
Rel/k!Wer Name (Prlnl) Reviewer Signature Date*
Tlmalhy Garvey Nuclear EP Project Manager -r&A- lo\\a_\l"1 Approver Name (Print)
Frank Mltchell Managar, Emergency Planning or d&slgnee
- -;;~ oa1a*
1u/t1 EN-EP-305 REV 5
ATTACHMENT 9.3 10 CFR 50.54(Q)(3) EVALUATION SHEET1 OF 3
- Procedure/Document Number: IPEC-EP Equipment/Facility/Other: Indian Point Energy Center (IPEC)
Title:
Indian Point Energy Center Emergency Plan Part I. Description of Proposed Change:
I Revision: 17-01 (MERLIN Revision 20)
The activity being reviewed is a revision to IPEC Emergency Plan. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01.
All changes have been screened out with the exception of item number 24.
Part II. Description and Review of Licensing Basis Affected by the Proposed Change:
The IPEC Emergency Plan has been reviewed through the Process Applicability Determination (PAD) in accordance with the criteria described in NEI 96-07 and EN-LI-100. This proposed change does not(])
change the facility or procedures as described in the UFSAR or (2) create a test or equipment not described in the UFSAR and is governed under the Emergency Plan 10 CFR 50.54(q) screening process in accordance with EN-EP-305. These proposed changes do not involve structures, systems or components controlled by I 0 CFR 50.59 or 72.48 and do not have the potential to impact any of the License Basis Documents (LBDs) on the PAD form, except for the Emergency Plan. All responses to the questions contained in sections III and IV of the PAD form were determined to be *'no impact". Since these proposed changes do not contain any requirements that could affect any LBDs other than the Emergency Plan, it is detennined to be fully governed under IO CFR 50.54(q). In addition to those reviewed for the PAD, each of the following documents/relevant
.sections was reviewed:
a) Reviewed current Plan, all sections Part I and Part 2. No additional relevant or affected Plan content was identified.
- b) The original Plans, U2 1970 and U3 1973, were not available for review .
c) Historical I OCFR50.54 (q) documents were manually reviewed dating back to 2005 for significant changes: No differences related to the need .to compensate for preparedness or response constraints or vulnerabilities specific to the facility, EPZ or jurisdiction were found for the historical search period. Some items associated with the current proposed changes were identified as described below:
Reviewed NSIR/DPR-ISG-0 I for applicability to Plan changes that were both evaluated and screened out.
n EN-EP-305 REV 5
ATIACHMENT 9.3 10 CFR 50.54(Q)(3) EVALUATION SHEET20F 3
- Procedure/Document Number: IPEC-EP I Revision:
Equipment/Facility/Other: Indian Point Energy Center (IPEC)
Title:
Indian Point Energy Center Emergency Plan 17-01 (MERLIN Revision 20)
Part Ill. Describe How the Proposed Change Complies with Relevant Emergency Preparedness Regulation(s) and Previous Commitment(s) Made to the NRC:
10 CFR 50.47(b)(2)-0nsite Emergency Organization (Item 24 in the matrix)
- The process for timely augmentation of on shift staff is established and maintained.
Site Compliance: The Plan wording changes to accommodate the transfer of command and control from the Emergency Director to the CCR if the Emergency Director is unavailable or if the EOF is being transfe1Ted to the AEOF. This change does not change required timeliness, minimum staffing, ability to perform facility assigned functions, or equipment requirements as they relate to the emergency response facility activation and command and control.
Part IV. Description of Emergency Plan Planning Standards, Functions and Program Elements Affected by the Proposed Change:
10 CFR 50.47(b)(2)-0nsite Emergency Organization (Item 24 in the matrix)
Function:
- The process for timely augmentation of on shift staff is established and maintained.
Program Elements:
IO CFR Part 50, Appendix E,Section IV .A.2.a provides supporting requirements.
Informing criteria appear in Section 11.8 ofNUREG -0654 and in the Emergency Plan.
EN-EP-305 REV 5
- ATTACHMl!NT 9.3 SHl!E1' 3 OF 3 PracedureJDocument Number: IPEC-EP Equipmant/F1cllltyl0ther: Indian Point Energy Center OPEC)
TIU*: Indian Point Enorgy Canter Emarguncy Plan I Ravlalon:
10 CFR 50.54(Q)C3) EVALUATION 17-01 (MERLIN Revision 20l Part V. Description of Impact of the Proposed Change on the Effectiveness of Emergency Plan functions:
- Change 24
- The Plan wording c:hllnges to accommodate the tlllnsfcr ofcommund and control lhlm lhu Em~ncy Director lo the CCR Ir the Emu;enc:y Director Is unavailabli: or irthe EOF Is being transfc:m:d to the AEOF. This change docs not choni.-e required timeliness, minimum staffing. ability 10 pcrfonn f11ellhy 11Sslgned functions, or equipment TllqUin:ntenlS 115 lhcy relate to 1hc emcr1,oeni:y response racllity ocrlwtion and comffl4nd and c:oncrol.
Thu changi= docs not represent D reduction In the elTc:ctivcnr:ss of the errn:rycncy phln. conllnlll!$ to 111e111 planning stamlard 10 CFR S0.47(b) (?I and l OCFRSO Appendix E S~c:tion IV.A.l.11 and can be incorporutcd wllhcut prior NRC approval beClluse the change did.not change required limelincs,, minimum Slllffing. ability to perfonn fllcility assignt:d ftlnctlons. or equipment rcquir111111:nts 115 they n:late 10 the cmi:rpncy n:sponsc racllky 11ctlvation 11nd command and control.
CondusJon Regnrdjnu Jmnpc1 The proposed changes 101he IPEC EPLAN Rev 17.01. continue to mcctlhe phinningstondllrds outlined in 10 cr:R 50.47(b) (2). This revision does not rcprcsenl Dn:duccion In elTcctivmess 10 the IPl:C Emergency Plml ilnd can he inco'flOratcd wilhoul prior NRC approval.
Part VI. EvaluaUan Conclusion Answer 1h11 followlng questions about the proposed change.
I. Does the proposed change comply with 10 CFR 50.47(b) and 10 CFR 50 Appendix E? Dl:)Yl:S [] NO
.?. Does the proposed change maintain the effectiveness of lhe emergency plan (i.e., no @YES ONO reduction in effectiveness)?
l, Does the proposed change constitute an emergency action level scheme change? 0YES1EJNO If questions 1 or 2 are answered NO, or question 3 answered YES, reject lhe proposed change, modify the proposed change and perfonn a new avaluafion or oblaln prior NRC approval U11der provisions of 10 CFR 50.90. If quesUons 1 and 2 are answered YES, and question 3 aMwered NO, implement applicable change prace~es). Refer to step 5.9[8].
Part VII. Signatures EN-EP-305 REV 5
ATTACHMENT 9.1 PROCESS APPLICABILITY DETERMINATION FORM Sheet 1 of 7 I. OVERVIEW PAD Rev.#: _o__
Facility: Indian Point Energy Center (IPEC)
Proposed Activity / Document: IPEC Emergency Plan Change/Rev.#: 17-01 (Merlin Rev. 20)
Description of Proposed Activity: Revision to IPEC Emergency Plan II. DOCUMENT REVIEW METHOD Provide the requested information for each item below.
- 1. For documents available electronically:
- a. List search engine or documents searched, and keywords used:
U2/U3 Technical Specifications, U2/U3 UFSARs, NRC Orders, LRS Commitments, and the IPEC Emergency Plan: Keywords: Emergency, Plan, Emergency Plan.
- b. List relevant sections of controlled electronic documents reviewed:
All Licensing Basis Document sections were searched electronically: U2/U3 Technical Specifications, U2/U3 UFSARs, NRC Orders, LRS Commitments. Review determined no relevant hits and no impact from proposed changes .
- 2. Documents reviewed manually (hardcopy):
3.
None For those documents that are not reviewed either electronically or manually, use the specific questions provided in Sections Ill and IV of Attachment 9.2 of EN-Ll-100 as needed. Document, below, the extent to which the Attachment 9.2 questions were used.
Reviewed complete Att. 9.2 of EN-Ll-100 Revision 20. Emergency Plan (10 CFR 50.54(q) / (EN-EP-305) section is applicable due to change being controlled by 10 CFR 50.54 (q) .
- EN-Ll-100 REV. 20
,_ _ _ _ _ _ _ _ _ ,._ _ _ _ _ _ _ a,
ATTACH~~~m9.1 PROCESS APPLICASlLITY DETER:.,i~lATION Fem.,
Sh;et2oi7
- m. PROCESS REVIEW Does the proposed activity affect, invalidate, or render Incorrect, OR have the potential to affect, invalidate, or render Incorrect, information contained in any of the following processes? Contact Program Owner if needed. Associated regulations and procedures are identified with each process below.
PROCESS (Regulations I Procedures) YES NO REVIEW RESULTS Chemistry/ Effluents D 181 Radwaste / Process Control Program (PCP) D 181 (EN*R~-105 or contact the Radiation Protection Dept.)
Radiation Protection / ALARA D 181 (10 CFR 20 I EN-RP-110 or contact tha Radiation Protection Dept.)
lnservlce Inspection Program (10 CFR 50.SSa/ EN-DC-120. *333, -342, D 181
-351, -352) lnservice Testing Program (10 CFR 50.55a / EN-DC-332) D 181 Maintenance Rule Program (10 CFR 50.65 I EN*DC-203, -204. *205, -206, D 181
-207)
Containment Leakage Rate Testing (Appendix J) Program (10 CFA 50 D 181 Appendix J / EN-DC-334)
PROCESS (Regulations/Procedures) YES NO NIA REVIEW RESULTS FLEX Program (NRC Order EA*12-49/FLEX Program) (10 CFR 50.59 / D ~ D Contact Design Engineering)
NOTE: The date for Individual site implementation of the FLEX Program is not the same for all sites. All sites are required to implement a FLEX program per NRC Order EA-12-49. NIA may be used for this process by sites that have not completed implementatlon ol a FLEX program. Contact Design Engineering If further assistance is needed.
IF any box is checked "Yes," I!:!fil:! contact the appropriate department to ensure that the proposed change is acceptable and document the results in the REVIEW RESULTS column.
(
- EN-Ll-100 REV. 20
~~~~~~~~~~-~~ ~
ATTACHMENT9.1 APPLICASILITY DETEm.,mATION Fam.,
Sheet3 of7
l;>ll'°~------
PROCESS
- IV. LICENSING BASIS DOCUMENT REVIEW Does the proposed activity affect, invalidate, or render incorrect, OR have the potential to affect, invalidate, or render incorrect, information contained in any of the following Licensing Basis Document(s)? Contact LBD Owner if needed. Associated regulations and procedures are identified with each Licensing Basis Document below.
LICENSING BASIS DOCUMENTS REVIEW RESULTS OR SECTIONS (Regulatlons / Procedures)
Quality Assurance Program Manual (QAPM)
(10 CFR 50.54(a), 10 CFA 50 Appendix 8 / EN-QV-104] D 181 Fire Protection Program (FPP) [Includes the Fire Safety Analysis/Fire Hazards Analysis (FSA/FHA)] o' 181 OL Condition, 10 CFA 50.48 / EN*DC-128) I Emergency Plan (Includes the On-Shift Staffing Analysls) Emergency Plan: 10 CFR 50.54(q)
(10 CFA 50.54(q) / 10 CFA 50.47 / EN*EP-305) 181 D screen and evaluation completed.
Environmental Protection Plan I (Appendix B of the OL, Environmental Evaluation/ EN-EV*l 15, EN-EV-117, D I 181 I EN*Ll-103) I Security Plan (10 CFA 50.54(p) / EN-NS-210 or contact site Security Dept.) D 181 I I
Cyber Security Plan
[10 CFR 50.54 (p) /10 CFR 73.54 / EN-IT-103 or EN*IT-103-01] D 183 l Operating License (OL) / Technical Specifications {TS)
(10 CFR 50.90/ EN-Ll-103) o* 181 TS Bases (10 CFR 50.59 / EN*Ll-100 / EN*Ll-101) 0 181 Technical Requirements Manual (TAM) (Including TRM Bases)
(10 CFR 50.59 / EN-Ll-100 / EN*Ll*101) D 181 Core Operating Limits Report (COLR), and Pressure and Temperature Limits Report (PTLA) (TS Administrative Controls, EN*Ll-113, EN-Ll-100, D 181 EN*L1*101)
Offslte Dose Calculation Manual (ODCM)
(TS Administralive Controls or 10 CFA 50.59 / EN*Ll*113 or EN-Ll-100 / 0 181 EN*Ll-101)
Updated Final Safety Analysis Report (UFSAR}
(10 CFR 50.71 (e) / EN*Ll-113, EN*Ll-100, EN*Ll-101 l D t8I Storage Cask Certificate of Compliance (10 CFR 72.244 / EN-Ll-113) o* 181 Cask FSAR (CFSAR} (Including the CTS Bases) '
(10 CFA 72.70 or 72.248 / EN*L1*113, EN*Ll-100,EN*Ll*l 12)
D 181 I 10 CFR 72,212 Evaluation Report (212 Report)
(10 CFR 72.48 / EN*Ll-100, EN*Ll-112) D 181 NRC Orders (10 CFR 50.90 I EN-Ll-103 or as directed by the Order) o* 181 NRC Commitments and Obligations (EN*Ll*l 10) o* 181 Site-Specific CFR Exemption (10CFR 50.12, 10 CFR 55.11, 10CFA55.13, 10 CFR72.7) o* 181 I
- contact the site Regulatory Assurance Department if needed.
IF any box is checked "Yes," THEN ensure that any required regulatory reviews are performed in accordance with the referenced procedures. Prepare an LBDCR per procedure EN-Ll~113, as required, if a LBD is to be changed, and document any affected sections or the LBDCR #. Briefly discuss how the LBD Is affected in Section Vil.A *
- EN-Ll-100 REV. 20
PROCESS A!'PLICA91LITY DETERMl~lATION Fom.,
- v. 10 CFR 50.59 / 10 CFR 72.48 APPLICABILITY
- Can the proposed activity be disposltioned by one or more of the following criteria? Check the appropriate box (if any).
r- *--,1
'D An approved, valid 50.59ll2.48 Evaluation covering associated aspects of the proposed activity already exists. Reference 50.59ll2.48 Evaluation # (if applicable) or attach documentation. Verify the previous 50.59ll2.48 Evaluation remains valid.
D The NRC has approved the proposed activity or portions thereof in a license amendment or a safety evaluation, or is being reviewed by the NRC in a submittal that addresses the proposed activity. Implementation of change requires NRC approval. Reference the approval document or the amendment in review.:
181 The proposed activity is controlled by one or more applicable regulations.
Examples of programs controlled by regulations that establish specific criteria are:
- Maintenance Rule (50.65) (EN-DC-203)
- Quality Assurance Program (10 CFR 50 Appendix B)
- Security Plan [50.54(p)] (EN-NS-210)
- Cyber Security Plan [73.54] (EN-IT-103)
- Emergency Plan [50.54(q)] {EN-EP-305) o Fire Protection Program (operating license condition)
- lnservice Inspection Program (50.55a) {EN-DC-351, *352)
- lnservice Testing Program (50.55a) (EN-DC-332) j I See NEI 96-07 Section 4.1 for additional guidance on specific regulati.ons.
~eference the controlling specific regulation(s): 10CFR50.54(q) ,_.______j IF the entire proposed activity can be dispositioned by one of the criteria in Section V, THEN 50.59 and 72.48 Screenings are not required. Proceed to Section VII and provide basis for conclusion in Section VII.A.
Otherwise, continue to Section VI to perform a 50.59 and a 72.48 Screening, or perform a 50.59 and/or72.48 Evaluation in accordance with EN-Ll-101 and/or EN*Ll-112.
Changes to the IPEC Unit 1 Decommissioning Plan are to be evaluated in accordance with the 50.59 process, as allowed by the NRC in a letter to IPEC dated January 31 1 1996. [Merlin Document ID:
- EN-Ll-100 REV. 20
______,_______H-------~=~-------~-*----
ATTAcm.,1rnT 9.1 PROCESS APPLICASlLITY DETER~.ml:.Tlon FoRr.,
Sheet 5 of 7
'-----,-----~*~--
- VI.
VI.A 50.59 / 72.48 SCREENING REVIEW (All proposed activities must be evaluated to determine if 50.59, 72.48 or both apply. Check the applicable boxes) 50.59 SCREENING D 50.59 applies to the proposed activity, and all of the following 10 CFR 50.59 screening criteria are met; therefore, the proposed activity requires no further 50.59 review.
The proposed activity:
- Does not adversely affect a method of performing or controlling a design function of an SSC as described In the UFSAR; AND
- Does not adversely affect a method of evaluation that demonstrates intended design function(s) of an SSC will be accomplished as described In the UFSAR; AND
- Does not involve a test or experiment not described in the UFSAR
- Document the basis for meeting the screening criteria in Section VI.C, then proceed to Section VII. )
r10 CFR 50.59(c)(1ll D The proposed activity does not meet the above criteria. Perform a 50.59 Evaluation in accordance with EN-Ll-101. Attach a copy of the Evaluation to this form and proceed to Section VII.
VI.B 72.48 SCREENING D 72.48 applies to the proposed activity, and all of the following 10 CFR 72.48 screening criteria are met; therefore, the proposed activity requires no further 72.48 review.
The proposed activity:
- Does not adversely affect a method of performing or controlling a design function of an SSC as described in the CFSAR; MfQ
- Does not adversely affect a method of evaluation that demonstrates intended design function(s) of an SSC will be accomplished as described in the CFSAR; AND
- Does not involve a test or experiment not described in the CFSAA, I
Document the basis for meeting the screening criteria In Section VI.C, then proceed to Section VII.
[10 CFR 72.48(c)(1)1 D The proposed activity does not meet the above criteria. Perform a 72.48 Evaluation In accordance with EN-Ll-112. Attach a copy of the Evaluation to this form and proceed to Section VII *
- EN-Ll-100 REV. 20
ATTAC~lr.1ENT 9.1 Fom.,
~=--*~-----
Sheet 6 of 7 PROCESS APPLICAS!LITY DETERMINAT!mi
- VI.C BASIS Provide a clear, concise basis for determining the proposed activity may be screened out such that a third-party reviewer can reach the same conclusions. Identify the relevant design function, as appropriate. Refer to NEI 96-07 Section 4.2 for guidance. Refer lo NED 12*06 Section 11.4 for guidance regarding FLEX. Provide supporting documentation or references as appropriate.
Go to Section VII.A General Review Comments below.
VII. REGULATORY REVIEW
SUMMARY
VII.A GENERAL REVIEW COMMENTS (Provide pertinent review details and basis for conclusions if not addressed elsewhere In form.)
The Indian Point Energy Center Emergency Plan {Plan), Revision 17-01 (Merlin Revision 20), describes the emergency preparedness program for the Indian Point Energy Center 1, 2, and 3 Generating Stations .
The Plan outlines the basis for response actions that would be implemented in an emergency. This .
revision incorporates changes throughout the document. In all cases. no change has resulted in a reduction in effectiveness of the Plan. Specific details regarding each change are included in the 10 CFR 50.54{q) Screen and Evaluation and associated Revision Matrix. The overall 10 CFR S0.54(ql Evaluation conclusion determined that the proposed changes to the IPEC Emergency Plan. Revision 17-01. continues to meet the planning standards outlined in 10 CFR 50.47(b). This revision does not represent a reduction in effectiveness to the IPEC Emergency Plan and can be incorporated without prior NRC approval. See completed 10 CFR 50.54(9) Screen and Evaluation.
VII.B CONCLUSIONS
- 1. Is a change to an LBD being initiated? l2J Yes IF "Yes," !t!.fil! enter the appropriate change control process and include D No this form with the change package.
- 2. Is a 10 CFR 50.59 Evaluation required? D Yes
!E "Yes," THEN complete a 50.59 Evaluation in accordance with EN-Ll-101 ~ No and attach a copy to the change activity.
- 3. Is a 10 CFR 72.48 Evaluation required? D Yes IF "Yes/' THEN complete a 72.48 Evaluation in accordance with EN*Ll-112 181 No and attach a copy to the change activity.
- EN-Ll-100 REV. 20
ATTACHMENT 9.1 PROCESS APPLICABILITY DETEm.~IMATlOrl Fem.,
Sheet7 of 7
"""-~~---~*=*=-----~~
1 VIII. SIGNATURES Preparer: /Entergy/Emergency Planning/ / o/2-.r~?
Name (print) / Sig a Reviewer: R,c~ArJ L,£A./e... ~ ENTE12c. {213-4 flssvr2..
Process Applicability Exclusion Site Procedure Champion or Name (print)/ Signature/ Company/ Department/ Date Owner:
Upon completion, forward this PAD form to the appropriate organization for record storage. If the PAD form is part of a process that requires transmittal of documentation, including PAD forms, for record storage, then the PAD form need not be forwarded separately*
1 The printed name, company, department, and date must be included on the form. Signatures may be obtained via electronic processes (e.g., PCRS, ER processes, Asset Suite signature), manual methods (e.g., ink signature), e-mail, or telecommunication. If using an e-mail, attach it to this fonn.
EN-Ll-100 REV. 20
Emergency Planning Document Change Checklist Form (All sections must be completed, N/A or place a check on the line where applicable)
Section 1 Doc/Procedure Type: (circle one) Administrative/ Implementing I EPLAN Doc/Procedure No: IPEC-EP C/A: Yes_ No _X_ C/A No. Due Date C/A No. Due Date: _ __
Doc/Procedure
Title:
Indian Point Energy Center Emergency Plan Rev No: 20(17-01) Rev Dist Date: 11/15/17 Reason for EPDCC: New _....,_X-'---_ Revision Cancel Date of EPDCC: 10/31/2017 Section 2 Change Description
- 1. Originator: A. l r a o l a ~ 11d_,/n
- 2. Class of Change: Technical Correction New Commitment__ Other _X._ __
- 3. Page numbers affected and reason for change: Refer to the attached matrix of changes attached to completed 50.54(q)screen and evaluation
- 4. Emergeqcy Planning Documents Affected: ~N--'-o~ne-'----------------
- 5. Emergency Planning Procedures Affected: None_ _ _ _ _ _ _ _ _ _ _ _ __
- 6.
References:
Other Procedure(s) # _ _N/A._ _ _ Regulatory Document #_NIA_
Other: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
- 7. Reviewed training requirements with department training coordinator N/A date:
- 8. The following are complete, or are not applicable and are so marked.
Tech Review _X_ 50.54q _X_ ENN-Ll-100;1LPL-155 _N/A_ SMM-AD-102 _X_
Manager approval _X_ SRC _N/A_
- 9. Both table of contents and transmittals are complete _ _ _ _ _ date - - - - - - -
- 10. Approved doc/procedure delivered to Document Control for distribution ___ date_ __
- 11. Position Binders updated if applicable: _ _ _ _ _ _ _ _ _ _ _ _ __ date
- 12. Copy of EPDCC and document/procedure placed in EP file_ _ _ _ _ _ _date_ __
Sheet 1 of 1 Form EP-AD2-1 Rev. 0
CHANGE MANAGEMENT NOTICE IPEC EPLAN Rev. 17-01 (Merlin Rev. #20)
WHO is affected?
IPEC Emergency Planning Department Personnel WHAT is the change?
A total of 48 changes were made of which 52% were editorial along with minor program changes.
Please see the attached matrix for a summary of all the changes.
This revision is of "Low Risk/Complexity."
WHY is the change occurring?
This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review. Refer to the attached revision matrix for all changes made to 17-01 .
- WHEN is the change effective?
Nov. 15,2017 CONTACTS:
Tony lraola, Sr. Emergency Planner, x 7704 Frank Mitchell, EP Manager, x 8410
IPEC IMPLEMENTING PROCEDURE IP-SMM-AD-102 Rev: ,15 PREPARATION, REVIEW, AND APPROVAL Page 35 of 43 ATTACHMENT 10.2 IPEC PROCEDURE REVIEW AND APPROVAL Procedure
Title:
Emergency Plan Procedure No. IPEC-EP Existing Rev: 16-01 New Rev: 17-01 ORN/EC No: 17-01168 Procedure Activi~ D Converted To IPEC, Replaces: Temi;ioran( Procedure Change (MARK Applicable) (MARK Applicable)
D NEW PROCEDURE Unit 1 Procedure No. EDITORIAL Temporary Procedure Change D
D GENERAL REVISION D ADVANCE Temporary Procedure Change
[&I PARTIAL REVISION D EDITORIAL REVISION Unit 2 Procedure No: D CONDITIONAL Temporary Procedure Change D VOID PROCEDURE Terminating Condition:
D SUPERSEDED Unit 3 Procedure No:
Document in Microsoft Word:
D RAPID REVISION D VOID DRN/TPC No(s):
D Yes D No Revision Summan( D N/A - See Revision Summary page.
Refer to the attached summary of changes in the attached matrix.
lmi;ilementation Reguirements Implementation Plan? D Yes [&)No Formal Training? D Yes !BlNo Special Handling? D Ye .[&)No / i RPO Dept: Emergency Planning Writer: (Print Name/Ext/Sign):J.A~...!Jlr@ag_ol@af2/x[_j7[17'..()0~4:.........l_::J~~-:t:::_=:_.!.:_:':_J~,!...J_ _ __
Review and Ai;ii;iroval (Per Attachment 10.1, IPEC Revie
- ?~ts)
- 1. !Bl Technical Reviewer: F. Mitchell/
(Print Name/ Signature/ Date)
- 2. D Cross-Disciplinary Reviewers:
Dept: Reviewer:
Print Name/ Signature/ Date)
Dept: Reviewer:
- 3. [&I RPO- Responsibilities/Checklist:
(Print Name/ Signature/ Date)
[&)PAD required and is complete (PAD Approver and Reviewer qualifications have been verified)
D Previous exclusion from further Ll-100 Review is still valid D PAD not required due to type of change as defined in 4.6
- 4. D Non-Intent Determination Complete:
(Print Name/ Signature/ Date)
NO change of purpose or scope NO change to less restrictive acceptance criteria NO reduction in the level of nuclear safety NO change to steps previously identified as commitment steps NO voiding or canceling of a procedure, unless NO deviation from the Quality Assurance Program Manual requirements are incorporated into another procedure NO change that may result in deviations from Technical or the need for the procedure was eliminated Specifications, FSAR, plant design requirements,
- 5. D On-Shift Shift Manager/CRS:
(Print Name/ Signature/ Date)
- 6. D User Validation: User: Validator:
- 7. D Special Handling Requirements Understood:
(Print Name/ Signature/ Date)
- ~Entergy NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6 PROCEDURE MANAGEMENT MANUAL INFORMATIONAL USE PAGE 1 of4 Entergy Nuclear Change Management ATTACHMENT 7.1 CHANGE IMPACT CHECKLIST Sheet 1 of 3 This Checklist assists the change lead with identifying the specific impacts on people and processes. The checklist provides details of specific actions required to implement the change. The Change Owner /Lead completes the Change Impact Checklist to identify the needed forms identified in Section IV for the Impact Level of the change.
Additionally, the Change Owner/Lead uses additional forms and references identified in section II to analyze the change. This form is completed by following Section 3.3 in the procedure. See section 3.8 for documentation requirements.
If the change is a personnel change ONLY, use Attachment 7.4.
Section I - Define the Change: Reference 3.3[1]
Title of Change: Emergency Plan Revision 17-01 Change Owner: F. Mitchell Change Sponsor: F. Mitchell Change Lead: A. lrao!a Project Manager: N/A Whe1t is the Change? (Provide a brief description of what will be different and change scope.)
- Revised the Indian Point Emergency Plan of which 52% were editorial changes. Refer to the attached matrix for a summary of editorial. This new revision incorporates changes that were missed in 16-01 to due an incorrect revision (15-01 vs 15-
- 02) being used to update the annual 2016 revision. In addition several new changes were made as part of independent review.
Who and What groups/departments are impacted by the change? (Identify employees/groups, programs, processes, regulations, equipment, facilities, etc. affected by the change.)
Emergency Planning Why is the Change necessary? (Proyide a reason for the change, the benefit gained or consequence avoided.)
This change was required to correctly update the Emergency Plan having used the incorrect revision to update the 2016 revision When is the proposed or desired Date for Change? {Identify timeline or effective date for change.)
Nov. 15, 2017 Where is the Change being Implemented? (check as applicable; double click box to select)
D Fleet-Wide *D Echelon D White Plains 0 ANO D GGNS ~ IPEC D PAL 0 PIL D RBS D VY 0 WF3 D Other -
What SHOULD NOT be affected as a result of this change? (Identify any areas affected employees/groups might likely assume would be affected, but are not included.)
~ NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6
-===- Entergy MANAGEMENT PROCEDURE MANUAL INFORMATIONAL USE PAGE 2 of4 Entergy Nuclear Change Management ATTACHMENT 7.1 CHANGE IMPACT CHECKLIST Sheet 2 of 3 Yes No Unsure Section II - Impact Evaluation: Reference 3.3[2] Notes D [21 D Impact Nuclear, Radiological, Industrial Safety or Equipment Reliability?
Impact Licensing: FSAR/Technical Specifications/QA
[21 D D Program/Commitments? (i.e., ANSI, 50.59, 50.54, etc.) Perform evaluation in accordance with EN-L/-100 Impact E-Plan, Security Plan, QA Manual? Perform evaluation in
[21 D D accordance with EN-L/-100 Impact to Procedures/Policies?
D [21 D (e.g., non-editorial changes, change that affects multiple procedures, etc.)
D [21 D Impact scheduled Plant Work Activities or Operating Schedule?
Impact computer programs/applications software?
D [21 D If Yes, evaluate need for an SQA- Reference EN-IT-104.
Impact Accredited Training Job Task or Qualifications of Personnel?
D [21 D If Yes, an action !!1!1§! be initiated in accordance with EN-TQ-201. Contact Training management for additional information.
- D D
[21
[21 D
D Impact ANSI 3.1 Qualification Requirements (See EN-HR-137) Perform evaluation in accordance with EN-HR-137 Impact organizational responsibility, e.g., require transfer of responsibility from one organization to another?
If Yes, reference EN-HR-134 during change planning. Note: transferring responsibilities between organizations may impact the QAPM. Evaluate in accordance with aoolicable Licensing (EN-LI) procedures.
Impact resources or physical workload in other departments or D [21 D organizations?
(e.g., work activities, process time, employee schedules?)
Impact contractor resources which are working under Entergy procedures?
D [21 D (e.g., contractors working under Entergy procedures require additional notification beyond normal communication channels)
Impact of other Areas, Processes or Facilities to support the change?
D [21 D (Internal or External?)
Potential for new equipment or system not to function properly at D [21 D implementation? Consider use of Contingency/Prevention Worksheet, Attachment 7. 6 Change requires specific skills, experience and subject matter experts for D [21 D successful plan development and implementation? Use Team Skill Matrix, Attachment 7. 5 Change involves a temporary or permanent employee change due to":
Promotion, Transfer, New Hire, Resignation, Retirement, Staffing D [21 D Restructuring or Termination Leave of Absence, Medical Leave or Temporary Work Assignment. Use Personnel Change Checklist, Attachment 7.4
A NUCLEAR FLEET ADMINISTRATIVE EN-FAP-OM-023 REV.6
~Entergy MANAGEMENT PROCEDURE MANUAL INFORMATIONAL USE Page 3 of4 Entergy Nuclear Change Management ATTACHMENT7.1 CHANGE IMPACT CHECKLIST SHEET3 OF3 Section Ill - Identify the Change Impact Level: (Reference 3.3[3]) Medium High Refer to Section 3.3[3} for guidance.
Checked "Yes" to any of the above questions in Section II? Ensure all "Yes" responses were factored into the impact level evaluation.
Checked "Unsure" to any of the above questions in Section II? Review all notes and evaluate for followup actions.
SECTION IV - CHANGE MANAGEMENT PROCESS STEPS BY IMPACT TYPE (FOLLOW THE PROCEDURE GUIDANCE IDENTIFIED BELOW FOR THE IMPACT LEVEL OF THE CHANGE)
PROCESS ~lfflil~'5"11""~'--~aiM~E~D~IU~M~~~--,-~~~---,-;H~IG~H:---~~~-m,i:;:
ASSIGN CHANGE CHANGE OWNER, SPONSOR,CHANGE SPONSOR,CHANGE SPONSOR, CHANGE OWNER, ROLES {REF. 3.3[5]) CHANGE LEAD OWNER, CHANGE LEAD OWNER, CHANGE LEAD, CHANGELEAD,PROJECT PROJECT MANAGER OPT. MANAGER
- ANALYZE THE CHANGE DEVELOP ATT. 7.2 ATT. 7.2 (FLEET AND SITE LEVEL)
(REF. 3.4) COMMUNICATIONS ATT. 7.4 (OPT) ATT. 7.4 (OPT)
RESOURCE-TO-WORKLOAD RATIO ANALYSIS (3.4[1](G))
PLAN THE CHANGE ATT. 7.3 ATT. 7.3 (FLEET AND SITE LEVEL)
(REF. 3.5) ATT. 7.6 ATT. 7.7 PLAN ACTIONS FOR EFFECTIVENESS REVIEW IMPLEMENT THE IMPLEMENT& ATT. 7.3 COMPLETED ATT. 7.3 COMPLETED (FLEET AND SITE LEVEL)
CHANGE REF. 3.6 COMMUNICATE REVIEW THE CHANGE CHANGE ATT. 7.7 (OPT) ATT. 7.7
{REF. 3.7) ATT. 7.8 OPT ATT. 7.8 DOCUMENT THE DEPT STORED PCRS (OPT) PCRS (ATT. 7.1, ATT. 7.2, ATT. 7.3, ATT. 7.6, ATT. 7.7)
CHANGE REF. 3.8 Concurrence of Phase 1 Review Com letion for Ma'or and Hi ROLE NAME CHANGE OWNER/LEAD F.MITCHELLIA. IRAOL SPONSOR F. MITCHELL GOVERNANCE OWNER SITE PROCESS OWNER
A .
-=-Entergy NUCLEAR FLEET ADMINISTRATIVE EN-F AP-0 M-023 REV.6 PROCEDURE*
MANAGEMENT MANUAL INFORMATIONAL USE Page 4 of 4 Entergy Nuclear Change Management
a~Entergy NUCLEAR QUALITY RELATED EN-Ll-113 I REV.12 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 1 OF 3 Licensing Basis Document Change Process ATTACHMENT 9.1 LBDCR FORM
~=======~=====~~=======-=~~=====
Sheet 1 of 3 (TYPICAL)
I. LBDCR INITIATION Emergency Nov. 15, EPLAN Tony lraola 7704 1,2,3 Planning 2017 17-01 INITIATOR'S NAME DEPARTMENT PHONE UNIT DATE LBDCR#
(print or type)
DESCRIPTION OF THE CHANGE (Attach additional pages if necessary; may also refere~ce PAD Form)
This new revision incorporates changes that were missed In 16-01 to due an incorrect revision (15-01 vs 15-02) beinq used to update the annual 2016 revision. In addition, several new editorial chanqes were made.
AFFECTED SECTION/PAGE(S)
LICENSING DOCUMENT(S) AFFECTED (Attach marl<ed-up pages)
D Operating License (OL)
D Technical Specifications (TS)
D Environmental Protection Plan (EPP)
- D D
D D
D Anti-Trust Conditions (Appendix of OL)
NRC Orders Updated Final Safety Analysis Report (UFSAR)
TS Bases Technical Requirements Manual (TRM) (including TRM Bases)
D Quality Assurance Program Manual (QAPM)
D Security Plan/Cyber Security Plan (CSP) r8] Emergency Plan (EP) See attached matrix D Offsite Dose Calculation Manual (ODCM)
D Spent Fuel Storage Cask Final Safety Analysis Report (CFSAR)
D Spent Fuel Storage Cask Certificate of Compliance (CoC)
D Spent Fuel Storage Cask CoC Bases D 10 CFR 72.212 Evaluation Report (212 Report)
D Fire Protection Program (FPP)/Fire Hazards Analysis (FHA)
D Core Operating Limits Report (COLR)
D Other (Specify)
- NUCLEAR QUALITY RELATED EN-Ll-113 REV.12
~Entergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 20F3 Licensing Basis Document Change Process ATIACHMENT9.1 LBDCRFORM Sheet 2 of 3 METHOD(S) ALLOWING THE CHANGE D PAD Review (Attach a copy) D 10 CFR 50.48 / EN-DC-128 Review (Attach a copy)
D 10 CFR 50.59 Evaluation (Attach a copy) ~ 10 CFR 50.54 Review (Attach a copy)
D 10 CFR 72.48 Evaluation (Attach a copy) D Environmental Evaluation (Attach a copy)
D Approved NRC Change (Attach a copy of D Editorial Change (LBDs controlled under 50.59 or NRC Letter or reference NRC letter number) 72.48, only)
D NRC Approval is Required D Other Approval (Attach a copy of supporting documents)
D "UFSAR-only" Change (NEI 98-03)
Check the appropriate box below:
D Reformatting \
D Replacing Detailed Drawing
\D Referencing other Documents Check the appropriate box below and provide a basis for removing information, if applicable:
- D Removing Excessive Detail D Removing Obsolete Information D Removing Redundant Information D Removing Commitments Removal Basis:
1 II. LBDCR IMPLEMENTATION ACTIONS SUPPORTING IMPLEMENTATION REQUIRED ACTIONS ACTION TAKEN OR LSD SECTION TRACKING METHOD ACTION RESP. DEPT See attached Issuance of the EPLAN EP Entry into Merlin on Nov. 15, matrix scheduled for Nov.15, 2017 2017
~
~Entergy NUCLEAR QUALITY RELATED EN-Ll-113 I REV.12 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 3 OF 3 Licensing Basis Document Change Process ATTACHMENT9.1 LBDCRFORM Sheet 3 of 3 Ill. LBDCR REVIEW AND APPROVAL1 REVIEW AND APPROVAL of LBDCR (see Attachment 9.2) 2 Department Approved Date 3
UFSAR Section Owner N/A 4
Peer Review A lraola /
LBD Owner F. Mitchell/
1 Add additional table rows as needed.
2 The printed name should be included on the form when using electronic means for signature.
Signatures may be obtained via electronic processes (e.g., PCRS, ER processes, Asset Suite signature), manual methods (e.g., ink signature), e-mail, or telecommunication. If using an e-mail, attach it to this form.
3 UFSAR Section Owners should refer to EN-Ll-113-01, "Updated Final Safety Analysis Report Change Process," for review expectations. N/A if change does not update the UFSAR.
4 Administrative peer review intended to verify changes have been incorporated correctly into revised LBD prior to issuance. t *
- Change Page/Section Previous Version IPEC Emergency Plan Revision 17 -01 (Merlin Revision 20) REVISION MATRIX New Version Editorial* Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 1. COVER PAGE Rev 16-01 Rev 17-01 Yes No- This is an editorial change to the Revision number and effective Note: New Note: used 15-02 as the base date.
document and incorporated 16-01 This change does not change the revisions.
meaning or intent of a description, does not change facilities or List Of Effective Pages, 16-01 17-01 equipment, and does not change i
a process. No further evaluation is required for this change.
Part 1:
Part 1: Karsten 0
- 2. Section 0.2, 2° ... Emergency Director. .. ... Emergency Director (ED) ... Yes No- Added (ED) to define term sentence and re-use again in later portions Note: New of the Plan.
Page 5 This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is reauired for this chanae.
Part 2:
SECTION A: Karsten
- Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 3. . .. ED ... Yes No- Removed Emergency Director Section 1, a, 2°d bullet ... Emergency Director. ..
and replaced with ED as Note: New Page A-1 previously defined.
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- 4. The four (4) counties that are The four (4) counties located Yes No - added wording that the Section 1, County involved .... within the 10 mile Emergency counties are located in the 1O mile Offices of Disaster...
Note: New Planning Zone {EPZ) that are EPZ.
Page A-2 involved ....
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this chanae.
- 5. ... ERO ... Yes No- Removed Emergency Section 1.b 1*1 sentence ..... Emergency Response Response Organization and kept Organization .....
Note: New Page A-3 ERO as previously defined.
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- Change Page/Section Previous Version IPEC Emergenc i Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 6. .... ED .... Yes No- Removed Emergency Director Section 1.d .... Emergency Director....
and kept ED, Emergency Note: New ... Emergency Response .... ERO ... Response Organization and kept Organization ..... ERO as previously defined.
Page A-3 These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- 7. . .. ED ... Yes No- Removed Emergency Director Section 4 3rd sentence ... Emergency Director ...
and replaced with ED as Note: New Page A-4 previously defined.
This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this chanqe.
- 8. -
1 .... ERO ...... Yes No- Removed Emergency Section 41" and last ..... Emergency Response Response Organization and kept Note: New sentence Organization .....
ERO as previously defined.
Page A-4 This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- IPEC Emergenc V Pl an Rev1s1on 17 01 (M erm 1
- I" Rev1s1on 20) REVISION MATRIX
~
Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b) Planning Change Standards or NUREG-0654 program L elements? Justify if NO.
- 9. ... ERO ... Yes No- Removed Emergency Figure A-1 Note1& 2 . .... Emergency Response Response Organization and kept Organization .....
Note: New Page A-5 ERO as previously defined.
. . . Emergency Director.... ... ED ...
No - Removed Emergency Director and replaced with ED as previously defined.
These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
SECTION B: WATTS
- 10. This section describes the Indian This section describes the Indian Yes No- Removed Emergency SECTION B Point Emergency Response Point ERO, their key positions Response Organization and kept Note: 16-01, item 2 1st paragraph Organizations, their key positions and associated responsibilities. ERO as previously defined.
and associated responsibilities. This change does not change the Page B-1 meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- Change Page/Section Previous Version IPEC Emergency e1an Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 11. Yes No- Abbreviation for "ERO" as SECTION 8.1 Figures B-1.2a-d illustrates the full Figures B-1.2a-d illustrate the full previously defined.
Emergency Response ERO.
Note: 16-01, item 3 Section 1.0, 1st Also corrected the word. Also Organization (ERO).
paragraph corrected word "illustrate" to agree with plural "Figures- B-1.2a-d".
Page B-1 These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- 12. Yes No- Added semi-colon at end of SECTION 8.1.a One [1) Control Room Supervisor, One [1) Control Room Supervisor, sentence as a formatting change who holds a Senior Reactor who holds a Senior Reactor Note: 16-01, item 4 41h paragraph for consistency within the Operator's license and is Operator's license and is document.
Page B-1 responsible for safe operation of responsible for safe operation of the unit within the requirements of the unit within the requirements of This change does not change the the Technical Specifications. the Technical Specifications; meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- ,C~~ IPEC Erner Page/Section Previous Version Plan Revision 17 -01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning Change Standards or NUREG-0654 program L.~ elements? Justify if NO.
- 13. Yes No- Spelled out Fire Brigade Section 8.1.a One [1] Unit 3 SRO is assigned as One [1] Unit 3 SRO is assigned Leader to define term for "FBL".
FBL for both units as Fire Brigade Leader (FBL) for Note: 16-01, item 5 3rd paragraph Added semi-colon at end of both units; sentence as a formatting change Page 8-2
- for consistency within the document.
- These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- 14. Yes No- Spelled out Safe Shutdown to Section 8.1.a One [1] Unit 2 NPO is assigned to One [1] Unit 2 NPO is assigned to
/ define term for "SSD" and added Unit 1 and SSD and one Unit 3 Unit 1 and Safe Shutdown (SSD),
Note: 16-01, item 6 4th paragraph, 2"d comma in sentence. Added semi-NPO is the Communicator for and one Unit 3 NPO is the sentence colon at end of sentence as a notifications for both units. communicator for notifications for formatting change for consistency Page B-2 both units; within the document. Changed "C" to "c" for communicator.
These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 15. Section 8.1.b The Emergency Response The ERO is established to assure Yes No- Abbreviation for "ERO" as Organization (ERO) is established that a sufficient number of previously defined.
Note: 16-01, item 7 1st paragraph, 1st to assure that a sufficient number appropriately qualified personnel This change does not change the sentence of appropriately qualified are available each day, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> . meaning or intent of a description, personnel are available each day, a day to deal with any emergency does not change facilities or Page 8-2 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day to deal with any* situation. equipment, and does not change emergency situation. a process. No further evaluation is required for this change.
- 16. Section 8.1.b The Watch Force, depicted in The Watch Force, depicted in Yes No- Corrected word "accord" to Figure 8-1.1, satisfies the Figure B-1.1, satisfies the "accordance" to match the intent Note: 16-01, item 8 last paragraph, 2nd NUREG-0654 requirements for on- NUREG-0654 requirements for of sentence.
sentence shift personnel and on-shift staffing on-shift personnel and on-shift This change does not change the in accord with guidance of NRC's staffing in accordance with meaning or intent of a description, Page 8-2 NSIR/DPR-ISG-01 interim staff guidance of NRC's NSIR/DPR- does not change facilities or guidance and NEI 10-05 ISG-01 interim staff guidance and equipment, and does not change Assessment of On-Shift NEI 10-05 Assessment of On- a process. No further evaluation is Emergency Response Shift Emergency Response required for this change.
Organization Staffing and Organization Staffing and Caoabilities. Caoabilities.
- 17. Section 8.1.b The analysis resulted in a total of The analysis resulted in a total of Yes No- Corrected word "person's" to thirteen person's on-shift at each thirteen persons on-shift at each "persons" to indicate plural instead Note: 16-01, item 9 last paragraph, last unit. unit. of possessive.
sentence This change does not change the meaning or intent of a description, Page 8-2 does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- Change IPEC Emergenc*V Pl an Rev1s1on 17 -01 (M erm Page/Section Previous Version
- I" Rev1s1on 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 18. Section B.1.b These personnel are immediately These personnel are notified by No No- Change made to more clearly available during normal working an electronic notification system describe emergency notification Note: 16-01, item 2nd paragraph hours or are contacted by an and public address methods during working and non-10 *, electronic notification system announcements, and are working hours.
Page B-3 during non-working hours. The immediately available during This change does not change the electronic notification system is normal working hours. These meaning or intent of a description, backed up with an automated personnel are notified by an does not change facilities or telephone notification system. electronic notification system equipment, and does not change during non-working hours. An a process. No further evaluation is alternate notification system using required for this change.
an automated telephone notification process is used in the event that the normal electronic notification svstem is unavailable.
- 19. Section B.1.b The activation phase consists of The activation phase consists of Yes No- Abbreviation for "ERO" as Emergency Response ERO activation. previously defined.
Note: 16-01, item 3rd paragraph, first Organization (ERO) activation. This change does not change the 11 sentence meaning or intent of a description, does not change facilities or Page B-3 equipment, and does not change a process. No further evaluation is required for this change.
- 20. Yes No- Removed Emergency Director Section B.1.b Activation of the ERO gives the Activation of the ERO gives the and left ED as previously defined.
Emergency Director full access to Note: 16-01, item 5th paragraph, first ED full access to the resources of This change does not change the the resources of Entergy.
12 sentence Entergy. meaning or intent of a description, does not change facilities or Page B-3 equipment, and does not change a process. No further evaluation is reauired for this chanae.
- Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 21. Figures 8-1.2a-d illustrate the Yes No- Corrected word "illustrates" to 6th paragraph Figures B-1.2a-d illustrates the Indian Point ERO. "illustrate" because of multiple Indian Point ERO.
Note: 16-01, item Page 8-3 figures cited.
13 This change does not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- 22. The Shift Manager (or the Control Yes No- Abbreviations for "ED" and Section B.2 The Shift Manager (or the Control Room Supervisor in the event that "ERO" are sufficient because they Room Supervisor in the event that Note: 16-01, item Section 2, 1st the Shift Manager is unavailable), are previously defined in Section the Shift Manager is unavailable),
14 paragraph acting as the ED, has the B.
acting as the Emergency Director, authority to declare an These changes do not change the Page 8-3 has the authority to declare an emergency, immediately takes meaning or intent of a description, emergency, immediately takes charge of the emergency does not change facilities or charge of the emergency response response effort and is responsible equipment, and does not change effort and is responsible for offsite for offsite dose assessment until __ . a process. No further evaluation is dose assessment until relieved by relieved by another qualified ED. required for this change.
another qualified Emergency He/she activates the ERO as Director. He/she activates the necessary and continues to direct Emergency Response the emergency response until Organization (ERO) as necessary relieved by another qualified ED.
and continues to direct the emergency response until relieved by another qualified Emergency Director.
- Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 23. Yes No- Abbreviations for "ED", "POM" Section 8.2 The relieving Emergency The relieving ED/Plant Operations and "ERO" are sufficient because Director/Plant Operations Manager Manager (POM) takes charge of Note: 16-01, item 1st paragraph, 1*t, 2"d & they are previously defined in (POM) takes charge of the overall the overall emergency response, 15 3rd sentence and 2"d Section B. Added abbreviation emergency response, thus freeing thus freeing the Shift Manager to paragraph "EPM" for Emergency Plant the Shift Manager to direct his/her direct his/her attention towards Manager.
Page B-4 attention towards the mitigation of the mitigation of the accident the accident using the emergency using the emergency operating These changes do not change the operating procedures. The Plant procedures.
- The POM holds this meaning or intent of a description, Operations Manager holds this position until the on-call ED does not change facilities or position until the on-call arrives. Overall control of the equipment, and does not change Emergency Director arrives. Onsite ERO is maintained by the a process. No further evaluation is Overall control of the Onsite Emergency Plant Manager (EPM) required for this change.
Emergency Response in the TSC.
Organization is maintained by the Although the ERO described ..... ,
Emergency Plant Manager in the it may be altered by the ED.
TSC.
- 24. No YES- Refer to the "10 CFR 50.54 Section 8.2 After command and control is After command and control is (Q) (3) Evaluation" document.
transferred to the Emergency transferred to the ED in the Note: 16-01, item .1st paragraph, 4th & 5th Director in the EOF/AEOF, it EOF/AEOF, it remains there until 16 sentence remains there until the event is the event is terminated. In the Page 8-4 terminated. event that the ED becomes unavailable or personnel at the EOF are required to transfer to the AEOF, command and control may be transferred to the CCR until such time as a new ED assumes command and control or the ED assumes command and control upon arrival at the AEOF.
L
- Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 25. Yes No- Abbreviation for "ED" as Section B.3 The duties and responsibilities of The duties and responsibilities of previously defined.
51 the Emergency Director (ED) are the ED are initially assumed by Note: 16-01, item 1st paragraph, 1 This change does not change the initially assumed by the Shift the Shift Manager (CR Supervisor 17 sentence and 2"d meaning or intent of a description, Manager (CR Supervisor in his/her in his/her absence).
paragraph does not change facilities or absence).
The position of the on-call ED is equipment, and does not change Page B-4 normally staffed by high level a process. No further evaluation is station management personnel. required for this change.
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX
~
Change Page/Section Previous Version New Version Editorial Effect on 10 CFR 50.47(b) Plan No. Change Standards or NUREG-0654 pro elements? Justify if NO.
=-J
,. 26. Section B.4 The Emergency Director is The ED is responsible for Yes No- Abbreviations for "ED" and "EOF" as previously defined.
responsible for directing and directing and coordinating the Note: 16-01, item 1st & 2"d paragraph coordinating the integrated integrated emergency response 18 This change does not change the Page B-4 emergency response effort of all effort of all Company activities Company activities during the during the emergency including meaning or intent of a description, emergency including those which those which originate from does not change facilities or originate from Corporate Corporate Headquarters. equipment, and does not change Headquarters. Personnel trained Personnel trained in accordance a process. No further evaluation is in accordance with this plan and with this plan and qualified as required for this change.
qualified as Emergency Directors EDs are designated in an '
are designated in an Emergency Emergency Telephone Directory.
Telephone Directory. The The ED is stationed in the EOF Emergency Director is stationed in during an Alert, Site Area the Emergency Operations Facility Emergency or General during an Alert, Site Area Emergency and is the interface Emergency or General Emergency between the onsite and offsite and is the interface between the authorities. He/she has the onsite and offsite authorities. responsibility and authority to He/she has the responsibility and provide Protective Action authority to provide Protective Recommendations (PARs) to the Action Recommendations (PARs) authorities responsible for to the authorities responsible for implementing offsite emergency implementing offsite emergency measures.
measures.
Specific responsibilities of the ED '
Specific responsibilities of the include:
Emergency Director include:
- Change Page/Section Previous Version IPEC Emeraencv Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47{b) Planning No.* Change Standards or NUREG-0654 program elements? Justify if NO.
- 27. Yes No- Abbreviation for "JIC" is Section 8.4 Review all radiological, Review all radiological, meteorological and operational meteorological and operational sufficient because it is previously Note: 16-01, item 2nd bullet defined.
data and update the offsite data and update the offsite 19 Page 8-5 authorities and the Joint authorities and the JIC; This change does not change the Information Center (JIC); meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- 28. Yes No- Abbreviation for "ED" as Section 8.4 The Emergency Director is The ED is assisted in these previously defined.
assisted in these activities by the activities by the entire ERO.
Note: *1 s-01, item Last paragraph This change does not change the entire ERO. Although the Although the ED may delegate 20 meaning or intent of a description, Page 8-5 Emergency Director may delegate some of these responsibilities, some of these responsibilities, he/she may not delegate the does not change facilities or he/she may not delegate the responsibility to classify events or equipment, and does not change responsibility to classify events or for the decision to notify a process. No further evaluation is for the decision to notify authorities authorities and recommend offsite required for this change.
and recommend offsite protective protective actions.
actions.
- Change Page/Section Previous Version IPEC Emergency Plan Revision 17 -01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 29. Yes No-Abbreviations for "ED", "ERO" Section 8.5.a The EPM reports directly to the The EPM reports directly to the and "TSC" are sufficient because Emergency Director. He/she ED. He/she directs and Note: 16-01, item 1*1 paragraph they are previously defined.
directs and coordinates the coordinates the operational 21 These changes do not change the Page 8-5 operational aspects of the In-Plant aspects of the In-Plant ERO.
Emergency Organization. He/she He/she assures proper meaning or intent of a description, assures proper coordination and coordination and direction of the does not change facilities or direction of the efforts of each efforts of each element of the In- equipment, and does not change element of the In-Plant Emergency Plant ERO in returning the plant a process. No further evaluation is Organization in ret!,.lrning the plant to and maintaining it in a safe and required for this change.
to and maintaining it in a safe and stable condition. The EPM is stable condition. The EPM is located in the TSC. Specific located in the Technical Support responsibilities include:
Center. Specific responsibilities include:
- 30. Yes No- Abbreviation for "ED" as Section 8.5.b The EOF Manager reports directly The EOF Manager reports directly previously defined. Also added to the Emergency Director. to the ED. Specific Note: 16-01, item 1*1 paragraph & 1*1 semi-colon at end of sentence as Specific Responsibilities of the responsibilities of the EOF 22 bullet a formatting change for EOF Manager include: Manager include:
consistency within the document.
Page 8-5
- Coordination of Entergy's
- Coordination of Entergy's Changed "Responsibilities" to emergency response efforts emergency response efforts lower case to be grammatically outside the Protected Area outside the Protected Area correct.
Fence, Fence; These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is reauired for this chanae.
I
- I Change Page/Section Previous Version IPEC Emergenc ~ Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 31. Yes No- Abbreviation for "ED" as Section 8.5.b Assist the Emergency Director in Assist the ED in the interpretation previously defined.
the interpretation of offsite of offsite radiological Note: 16-01, item 1st bullet This change does not change the radiological assessments for assessments for emergency 23 meaning or intent of a description, Page 8-6 emergency classifications and classifications and Protective Protective Action Action Recommendations in does not change facilities or Recommendations in terms of both terms of both real-time equipment, and does not change real-time measurements and measurements and projected a process. No further evaluation is projected radiological exposures; radiological exposures; required for this change.
- 32. Yes No- Added semi-colon at end of Section 8.5.b Ensure proper communications Ensure proper communications sentence as a formatting change 2nd bullet between the Indian Point ERO and between the Indian Point ERO Note: 16-01, item for consistency within the offsite response organizations, and and offsite response 24 document.
Page 8-6 organizations; and These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required forthis change.
- 33. Yes No- Added semi-colon at end of Section 8.5.c With assistance from the JIC With assistance from the JIC sentences as a formatting change Manager, coordination of Entergy's Manager, coordination of Note: 16-01, item 2nd paragraph, 151 bullet for consistency within the public information response Entergy's public information 25 document.
Page 8-6 efforts, response efforts; This change does not change the Act as the official Entergy Act as the official Entergy meaning or intent of a description, representative to the media, and representative to the media; and does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
0
- Change Page/Section Previo~s Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 34. Yes No- Abbreviation for "TSC" as Section 8.5.d.1) Technical support is performed in Technical support is performed in previously defined .
1st & 2nd paragraph the Technical Support Center the TSC under the direction of the Note: 16-01, item This change does not change the under the direction of the TSC Manager. It is the central 26 meaning or intent of a description, Page 8-6 Technical Support Center facility for the accumulation and Manager. It is the central facility for re-transmittal of plant parameters; does not change facilities or the accumulation and re- equipment, and does not change Specific functions of the TSC a process. No further evaluation is transmittal of plant parameters; include; required for this change.
Specific functions of the Technical Support Center include;
- 35. Yes No- Abbreviations for "ED" and
'* Keeping the Emergency Director Keeping the ED apprised of plant Section 8.5.d.1) "TSC" as previously defined.
apprised of plant conditions; and conditions; and Note: 16-01, item 27 last 2 bullets Interfacing with NRC personnel in Interfacing with NRC personnel in These changes do not change the the Technical Support Center. the TSC. meaning or intent of a description, Page 8-6 does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change . Standards or NUREG-0654 program elements? Justify if NO.
~*- ------ ..__
I
- 36. Yes No- Abbreviations for "ERO", "ED" Section B.5.d.3) The Control Room communication The Control Room communication and "EOF" as previously defined.
links with offsite authorities are links with offsite authorities are Note: 16-01, item Page B-7 Also removed ""'s from available each day 24-hours a day. available each day 24-hours a 28 "Communicator" and made lower The initial notification of offsite day. The initial notification of case for consistency with other authorities and emergency offsite authorities and ERO wording.
response organization personnel is personnel is initiated by the Shift initiated by the Shift Manager Manager and/or Control Room These changes do not change the and/or Control Room communicator. Communications meaning or intent of a description, communicator. Communications with offsite authorities are does not change facilities or with offsite authorities are maintained from the Control equipment, and does not change maintained from the Control Room Room until the ED takes over the a process. No further evaluation is until the Emergency Director takes responsibility at the EOF. A required for this change.
over the responsibility at the communicator is designated at Emergency Operations Facility. A the EOF to establish/maintain "Communicator is designated at communication links.
the Emergency Operations Facility to establish/maintain communication links.
- 37. Yes No- Abbreviation for "OSC" is Section B.5.d.6) Maintenance mechanics, l&C Maintenance mechanics, l&C sufficient because it is previously Technicians and operations Technicians and operations Note: 16-01, item 2nd paragraph defined.
personnel (NPOs) who respond to personnel (NPOs) who respond to 29 This change does not change the Page B-7 the Operations Support Center the OSC perform repair and perform repair and corrective corrective actions directed by the meaning or intent of a description, actions directed by the Operations OSC Manager. does not change facilities or Support Cent~r Manager. equipment, and does not change a process. No further evaluation is required for this change.
- Change IPEC Erner Page/Section Previo us Version Pia n Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 38. Yes No- Abbreviation for "ED as Section B.5.d.9) Search and rescue jurisdiction Search and rescue jurisdiction previously defined.
1st paragraph, 1st during an emergency is divided during an emergency is divided Note: 16-01, item This change does not change the between the in-plant area (inside between the in-plant area (inside 30 sentence meaning or intent of a description, the protected area fence), which is the protected area fence), which Page 8-8 handled by the Shift is handled by the Shift does not change facilities or Manager/POM or EPM and the Manager/POM or EPM and the equipment, and does not change rest of the onsite area which is rest of the onsite area which is a process. No further evaluation is handled by the Emergency handled by the ED. required for this change.
Director.
- 39. Yes No- Abbreviation for "JIC" is Section 8.5.d.11) To assure that only factual and To assure that only factual and sufficient because it is previously consistent information is released; consistent information is released; Note: 16-01, item Page 8-8 defined in Section B.
statements concerning the statements concerning the 31 This change does not change the emergency are the responsibility of emergency are the responsibility Indian Point Energy Center of Indian Point Energy Center meaning or intent of a description, communications personnel and/or communications personnel and/or does not change facilities or individuals assigned to the Joint individuals assigned to the JIC. A equipment, and does not change Information Center. A Press Press Release Writer is available a process. No further evaluation is Release Writer is available on call on call 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day and is required for this change.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day and is responsible responsible for interfacing with the for interfacing with the news media news media for release of any for release of any public public statements prior to the JIC statements prior to the Joint being operational.
Information Center being operational.
- Change Page/Section Previous Version IPEC Emergenc*t Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 40. No No- Change made to clarify where Section B.5.d.11) The Joint Information Center, (JIC) The JIC Manager is responsible the Public Information Liaison 1 Manager is responsible for for providing accurate and timely Note: 16-01, item 1" paragraph reports.
providing accurate and timely information to the public through 32 Also used abbreviations for "JIC",
Page 8-9 information to the public through the news media and coordinating "ED", "ERO" and "EOF" because the news media and coordinating with Federal, State and local they are previously defined.
with Federal, State and local public public information officials to information officials to assure assure timely exchange and These changes do not change the timely exchange and release of release of information. Both the meaning or intent of a description, information. Both the Press Press Release Writer and the JIC does not change facilities or Release Writer and the Joint Manager have access to all equipment, and does not change Information Center Manager have necessary information, either a process. No further evaluation is access to all necessary directly available to them or required for this change.
information, either directly available through the onsite ERO.
available to them or available A Public Information Liaison through the onsite emergency reports to the EOF with the initial organization. A Public Information augmentation of the watch force Liaison at the Emergency to facilitate information flow Operation Facility reports to the regarding the emergency to the plant with the initial augmentation JIC Technical Advisor. The ED of the watch force to facilitate prior to the activation of the JIC information flow between the plant approves information that is used personnel and the JIC Technical to notify the public. Once the JIC Advisor. The Emergency Director is operational, the JIC Press prior to the activation of the Joint Release Writer prepares the Information Center approves press release, and once approved information that is used to notify by the ED, disseminates the the public. Once the Joint information to the public.
Information Center is operational, the JIC Press Release Writer prepares the press release, and once approved by the ED, disseminates the information to the public.
- Change Page/Section Previous Version IPEC Eme~r~-_Plan Revision 1?-01 (Merlin Revision 20LREVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 41. Yes No- Abbreviation for "ERO" as Section 8.6 Figures B-1.1, B-1.2a thru 8-1.2d Figures 8-1.1, 8-1.2a thru 8-1.2d previously defined.
illustrates the positions of the illustrate the positions of the Note: 16-01, item 1*1 sentence Section 8. Corrected word Indian Point Emergency Response Indian Point ERO and supporting 33 "illustrates" to "illustrate" because Page 8-9 Organization and supporting positions.
of multiple figures cited.
positions.
These changes do not change the meaning or intent of a description, does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- 42. Yes No- Abbreviations for "ERO" and Section 8.7 The Admin & Logistics Coordinator The Admin & Logistics "ED" as previously defined; also and/or the Corporate Duty Coordinator and/or the Corporate Note: 16-01, item Page 8-9 added missing "the" before ERO.
Manager coordinates corporate Duty Manager coordinates 34 These changes do not change the support into the Emergency corporate support into the ERO Response Organization once the once the on call ERO is activated. meaning or intent of a description, on call ERO is activated. With the With the full activation of the does not change facilities or full activation of Emergency ERO, Entergy is capable of equipment, and does not change Response Organization, Entergy is continuous (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) operations a process. No further evaluation is capable of continuous (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) for a protracted period. The ED required for this change.
operations for a protracted period. will ensure the continuity of The Emergency Director will resources (technical, ensure the continuity of resources administrative and logistics) to (technical, administrative and support the emergency response.
logistics) to support the emergency response.
- Change IPEC Erner Page/Section Previous Version Plan Revision 17-01 Merlin Revision 20 REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
- 43. If the need for additional technical If the need for additional technical No No- Change made to clarify that Section 8.8.b assistance is identified, this may assistance is identified, this may LOAs were previously removed Note: 16-01, item 1st paragraph be obtained by the Technical be obtained by the TSC Manager from Appendix 2. This was 35 Support Center Manager and the and the ED. Assistance of this evaluated for prior revision 15-02.
Page 8-10 Emergency Director. Assistance type could include that from the Also, abbreviations for "TSC" and of this type could include that from NSSS Supplier (Westinghouse), "ED" are sufficient because they the NSSS Supplier architect engineer and were previously defined in Section (Westinghouse), architect engineer consultants. A copy of the letter B.
and consultants. A copy of the of agreement with Westinghouse These changes do not change the letter of agreement with is referenced in Appendix 2. meaning or intent of a description, Westinghouse is contained in Other assistance is also available does not change facilities or Appendix 2. Other assistance is using existing contracts, i.e.: equipment, and does not change also available using existing Radiation Protection support. a process. No further evaluation is contracts, i.e.: Radiation Protection required for this change.
support.
- 44. One of the roles of the Institute of One of the roles of INPO is to Yes No- Abbreviation for "INPO" is Section 8.8.b Nuclear Power Operations (INPO) assist affected utilities by quickly sufficient because it previously Note: 16-01, item 2nd paragraph, 2nd is to assist affected utilities by applying the resources of the defined in the paragraph heading.
36 sentence quickly applying the resources of nuclear industry to meet the This change does not change the the nuclear industry to meet the needs of an emergency. meaning or intent of a description, Page 8-10 needs of an emergency. does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- Change Page/Section Previous Version IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION MATRIX New Version Editorial Effect on 10 CFR 50.47(b) Planning No. Change Standards or NUREG-0654 program elements? Justify if NO.
~----
- 45. American Nuclear Insurers (ANI): American Nuclear Insurers (ANI): Yes No- Corrected word "have"*to Section B.8.b In the event of an extraordinary In the event of an extraordinary "has" for word agreement.
Note: 16-01, item 3rd paragraph, 1st nuclear occurrence (as defined in nuclear occurrence (as defined in This change does not change the 37 sentence the Price- Anderson Law) ANI the Price-Anderson Law) ANI has meaning or intent of a description, have plans prepared to provide plans prepared to provide prompt does not change facilities or Page B-10 prompt emergency funding to emergency funding to affected equipment, and does not change affected members of the public. members of the public.
a process. No further evaluation is required for this change.
- 46. No No- Change made to clarify that Section B.9 The availability of local support The availability of local support 51 services to assist the emergency services to assist the emergency LOAs were previously removed Note: 16-01, item 1 paragraph from Appendix 2. This was forces has been ascertained and forces has been ascertained and 38 evaluated for prior revision 15-02.
Page B-10 agreement letters from each agreement letters from each organization in this section have organization in this section have This change does not change the been solicited. These letters are been solicited. These letters are meaning or intent of a description, contained in Appendix 2. referenced in Appendix 2. does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- 47. Yes No- added "EMS" abbreviation for Section B.9.a, 2nd Mutual aid backup from other Mutual aid backup from other sentence ambulance services provides for ambulance services provides for emergency medical services.
Note: 16-01, item additional emergency medical additional emergency medical This change does not change the 39 Page B-10 services, ambulances and EMS services.(EMS), ambulances and meaning or intent of a description, personnel. EMS personnel. does not change facilities or equipment, and does not change a process. No further evaluation is required for this change.
- Change No.
IPEC E mergency Pl an Rev1s1on 17 -01 (M erm Page/Section Previous Version r Revasion 20) REVISION M New Version Editorial Change EffE Stai ele;
- 48. Yes Section B.9.d, 1st When notified that assistance is When notified that assistance is sentence required, IPEC Security will notify required, IPEC Security will notify Note: 16-01, item the New York State Police which the New York State Police which 40 Page B-11 is the lead Local Law is the lead LLEA.
Enforcement Agency {LLEA).
- 49. Yes Figure B-1.2b Box containing Emergency Plant Box containing Emergency Plant Manager and Radiological Manager and Radiological Note: 16-01, item Page B-14 Coordinator Coordinator (corrected box 41 & new border)
Figure B-1.2b ... Onsite statement was in the header Moved the statement in the box of the diagram
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) _REVISION M Change Page/Section Previous Version New Version Editorial Effe No. Change Stai eler
- 50. No Table 8-5 (Deleted)
Note: Page 8-25 16-01, item 42 SAMG TSC Assist EPM in Evaluator MGR implementation of Severe Accident Management Guidelines
- 51. Yes Figures 8-1.2b-d Some of the figures had Figure or Moved Figure or Table# out of Table# in the Header the header Note: New Figure 8-1.3 Table 8-1 1.2.c - no Figure# or Title Added Figure # and Title
--~--------------------
- Change No.
IPEC Erner
.----~--------""'--_,.,_-
Page/Section Plan Revision 17-01 Merlin Revision 20 REVISION Previous Version New Version Editorial Change r~
Eff St~
ele
- 52. Yes Figure B-1.3
Title:
Normal Figure B-1.3
Title:
Figure B-1.3 Normal Station Organization Station Organization Note: 16-01, item Page B-17 43 SECTION C: lraola l
- 53. . ..... Emergency Telephone Yes Section 4 ...... Emergency Telephone Directory (ETD) .......
Directory ........
Note: 15-02, item Page C-2 21 - did not carry over ETD and 16-01 stated emergency phone list SECTION D: Karsten
- Change No'.
IPEC Emergency Plan Revisioi"! 17-01 (Merlin Revision 20) REVISION Page/Section Previous Version New Version Editorial Change E
St ele
- 54. 15 ' paragraph, 3ra . .... Emergency Response ... ERO .... Yes sentence Organization .....
Note: New Page D-1 1, NUE 2"d paragraph ... Emergency Director... . .. ED ...
Page D-2
- 55. 1. NUE 1st paragraph ... events that are in process ... ... events that are in progress... Yes Note: 15-02, item Page D-1 23
- No.
IPEC Erner Plan Revision 17-01 LM~rlin Revisio1;1 20 REVISION 1\#
r-=-C:-ha_n_g_e-.-=P-ag-e-:/=s-ec-:t-=--io-n-------,,~P,.....re-v....,i-ou_s_V~ers-io-n--------,- New Version Editorial Change Effi Sta ele1
- 56. Section 1, Alert .. . .Emergency Director ... ... ED .... Yes Note: New Page D-2 Added page brake Section 1, Alert, 1st .... Emergency Director ... ...ED ....
paragraph & a)
.... Emergency Response ... ERO ...
Page D-3 Organization ....
- 57. Section 1, Site Area A Site Emergency ..... A Site Area Emergency ... Yes Emergency, 1st Note: New paragraph ... the public or..... ... the public, or....
Page D-3 ... malicious acts: ... ... malicious acts; ...
- Change No.
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION Page/Section Previous Version New Version Editorial Change 1\1 Eff, Sta ele
- 58. Section 1, SAE, 1st WHICH which Yes paragraph Note: New Page D-4
Note: New .... Emergency Response Page D-4 Organization .... ... ERO ....
I
- Change No.
IPEC E mergency Pl an Rev1saon 17-01 (M erm Page/Section Previous Version r Revis1on 20) REVISION M New Version Editorial Change Effe Stai eler
Note: New .... Emergency Response Page D-5 Organization .... . .. ERO ....
SECTION E: Karsten '
,I
- 61. Section 1, a, 3 . ... Emergency Response ... ERO .... Yes Organization ....
Note: New Page E-1
- Change No.
iPEC Erne rgencv Plan Revision 17-01 (Merlin Revision 20) REVISION M Page/Section Previous Version New Version Editorial Change Effe Sta, eler
- 62. Section 1, b Alert 1), 2"" ... Emergency Director ... . .. ED ... Yes sentence Note: New Page E-2
- 63. Section 1.b.4 During normal working hours, the During normal working hours, the Yes necessary personnel are available necessary personnel are Note: 15-02, item Page E-2 in the plant and are contacted by available in the plant and are 35 - did not delete the Public Address System, or contacted by the Public Address a coma electronic notification system. System or electronic notification During off-hours, individuals can system. During off-hours, be contacted at their homes by individuals can be centacted at telephone or electronic notification their homes by telephone or system . electronic notification system.
___J
- Change No.
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS~ON fJ Page/Section Previous Version New Version Editorial Change Eff, Sta ele
- 64. Section 1,b.8 & 1,c.1, . .. Emergency Director... ... ED ... Yes 1.c.5 Note: New Section 1, c.1 ... condition listed in Section D .... ... condition listed in the Section D ....
Page E-3 Section 1c.8 ... Emergency Director... . .. ED ...
Page E-4
- 65. Section 1.c.2 Notification of site personnel is Notification of site personnel is No accomplished by the Control accomplished by the Control Note: 15-02 item Page E-3 Room Operator initiating the Site Room Operator initiating the site 41 & new Assembly Alarm or use of the assembly alarm or use of the public address system. Public Address System.
Accountability of personnel located Accountability of personnel within the Protected Area is located within the Protected Area performed. In addition the is performed. In addition, the unaffected Control Room affected unit's Control Room Personnel are contacted by the Operators also contact the affected Control Room Operators. unaffected unit's Control Room personnel.
- Change No.
~PEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION l\J Page/Section Previous Version New Version Editorial Change Eff, Sta ele
- 66. Section 1.d.1 & Yes Section 2 15 \ 2nd and 3rd ... Emergency Director ... . .. ED ....
Note: New paragraphs
.... Emergency Response Organization .... ... ERO ...
Section 1.d.1 ...listed in Section D... ... listed in the Section D....
Page E-4
- 67. Section 3, 1st .. Remaining ... ... remaining ... Yes paragraph, last Note: New sentence Emergency Alert System Emergency Alert System (EAS)
Page E-6
- Change No.
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS!ON N Page/Section Previous Version New Version Editorial Change Eff1 Sta ele
- 68. Section 4, 1** paragraph ... Emergency Director... ... ED ... Yes Note: New Page E-6 SECTION F: Martin
- 69. 1"' paragraph & 1"' . ... Emergency Response ... ERO .... Yes bullet Organization ....
Note: New Page F-1
- Change No.
iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION M Page/Section Previous Version
~---~---------~-------------~---------*---*----~---~-*
New Version Editorial Change Effe Star elen
- 70. Section 1, Direct Line ... respective responses ... respective organization Yes Phones, 2nd bullet organization .... responses ...
Note: New 3rd bullet Fixed font Page F-2 ... Emergency Director ... . .. ED ...
- 71. Section 1. Additional .... Emergency Response . .. ERO .... Yes Communications, 1*1 Organization ....
Note: New paragraph, a & c Page F-3
- 72.
Note: New Medical Communications Page F-4 Hudson Valley Hospital Phelps Memorial New York-Presbyterian/Hudson Valley Hospital Phelps Memorial Hospital Center Yes SECTION G: lraola No changes l
IPEC Emergency Plain Revision 17-01 (Merlin Revision 20) REVISION Nj Change Page/Section Previous Version New Version Editorial Eff1:
No. Change Sta elei SECTION H: Ambrose
- 73. Section H.1 Once the entire Emergency Once the entire ERO is No Second paragraph Response Organization is operational, if required, additional Note: 16-01, item operational additional positions are positions are assigned to the CR.
44 Page H-1 assigned to the CR.
- 74. Section 1, CR, 2"a & 3'a .... Emergency Response ... ERO ... Yes paragraph Organization ....
Note: New Page H-1 ... Emergency Director ... . .. ED ...
- iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION M Change Page/Section Previous Version New Version Editorial EffE No. I Change Sta ele1
- 77. Section 2, EOF, last ... Emergency Director... ... ED ... Yes paragraph Note: New ... Emergency Response . .. ERO ...
Page H-4 Organization ...
- Change No.
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION Page/Section Previous Version New Version Editorial Change n
Efl St, ele
- 78. Section 7.b, last .. .Emergency Response ... ERO ... Yes paragraph Organization ...
Note: New Page H-6
- 79. Section H.8.c Backup radiological monitoring Backup radiological monitoring No equipment and assistance can be equipment and assistance can be Note: 16-01, item Page H-8 obtained from other utilities obtained from other utilities 45 through INPO or the Department through INPO or the Department of Energy's Brookhaven Area of Energy's Brookhaven Area Office. Letters of agreement for Office. Letters of agreement for these services can be found in these services are referenced in Appendix 2 of this plan . Appendix 2 of this plan.
- SECTION I: Karsten
- Change No.
~PEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Page/Section Previous Version New Version Editorial Change EffG Sta ele1
- 80. Alert, 151 & 2°~ ... Emergency Director ... . .. ED ... Yes
,paragraph Note: New Page 1-2
- 81. SAE&GE, 1s, paragraph . . . Emergency Director... ... ED ... Yes Note: New 2°d paragraph .. .in accordance with a Plan ... in accordance with an Implementing Procedure ... Implementing Procedure ...
Page 1-2
- 82 .
Note: New SAE & GE, 1st & 3rd paragraph 5th paragraph Page 1-3
. . . Emergency Director...
.. .in accordance with a Plan Implementing Procedure ...
... ED ...
... in accordance with an Implementing Procedure ...
Yes
- IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change Page/Section Previous Version New Version . . Editorial Efft No. Change Sta ele1
- 83. Section 5 .. .locals, State, and ... . .. locals, State and ... Yes Note: New Page 1-5
- 84. Section 8, last ... Emergency Director... ... ED ... Yes paragraph Note: New Page 1-6 SECTION J: Robinson 5
- 85. Section 2, 1 ' paragraph Fixed spacing issues Yes Note: New . .. Emergency Director... . .. ED ...
Page J-1
- Change No..
!PEC EmergenC'i Plan Revasion 17-01 (Merlin Revision 20) REVISION I\
Page/Section Previous Version New Version Editorial Change Eft St, ele
- 86. Section 4, last . .. Emergency Director. .. ... ED ... Yes paragraph Note: New Section 5, 1*1 paragraph, last sentence Page J-2 87.
Not used
- 88. Section 6, c, last ... Emergency Director... ...ED ... Yes sentence Note: New Page J-3
- 89.
Note: New Section 7, 2nd paragraph, last sentence Page J-4
... Emergency Director .... ...ED ... Yes
- IPEC Emergency Plan Revision 17-01 (Merten Revision 20) REVISION l\l Change Page/Section Previous Version New Version Editorial Eff No. Change Sta ele
- 90. Section J.10.f, last ... Pre and Post... ... pre and post. .. Yes sentence Note: New Page J-5
\
- 91. Section .J.10.m The basis for dose driven The basis for dose driven No protective action recommendations protective action decisions by Note: 16-01, item Page J-5 are as follows: offsite authorities would include 47 several of the above factors as well as the following considerations:
SECTION K: Martin
- 92.
Note: New Section 4 Page K-3
... rests with the State & local. .. ... rests with the respective State &
local...
Yes
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION n Change Page/Section Previous Version New Version Editorial EH No. Change St, eh
- 93. Section 7, 4th sentence .... emergency worker monitoring ... emergency worker personnel Yes and decontamination center.... monitoring center...
Note: New Page K-4 SECTION L: lraola
- 94. 1. Hospital Services, A written agreement is contained A written agreement is referenced No 151 paragraph in Appendix 2. in Appendix 2.
Note: 16-01, item 48 Page L-1
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change Page/Section Previous Version New Version Editorial Effl No. Change Sta ele1
- 95. 1. Hospital Services, A written agreement is contained A written agreement is referenced No 2"d paragraph in Appendix 2. in Appendix 2.
Note: 16-01, item 49 Page L-1
,a
- 96. 1. Hospital Services, 3 In the event that a patient should In the event that a patient should No paragraph receive a massive radiation receive a massive radiation Note: 16-01, item exposure, an expert medical exposure, then Radiation 50 Page L-1 consultant specializing on the Emergency Assistance management of radiation injuries Center/Training Site (REAC/TS),
would be available. A written available 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s/day, would be agreement is contained in contacted for guidance. A written Appendix 2. agreement is referenced in Appendix 2 .
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION i'ti Change Page/Section Previous Version New Version Editorial Ef'if No. Change St:.
ele
- 97. Section 2, Onsite First These facilities consist of a These facilities consist of a Yes Aid Capability, 2"d stainless steel interior with stainless steel interior with Note: 16-01, item paragraph decontamination table, showers decontamination table, showers 51 and sinks draining into a holdup and sinks draining into holdup Page L-1 tanks. These facilities contain tanks. These facilities contain general first aid equipment and general first aid equipment and medical supplies for treatment of medical supplies for treatment of injuries. injuries.
- 98. Section 4, 2"" The Verplanck Fire Department The Verplanck Fire District Yes paragraph Ambulance, or other backup (Fire/Ambulance), or other backup Note: 15-02, item ambulance agency, participates in ambulance agency, participates in 110 Page L-2 annual medical emergency drills annual medical emergency drills as described in Section N. as described in Section N.
(work with items 166,167,and 205 for MOU)
- SECTION M: lraola
- Change No.
IPEC Erner Page/Section Plan Revision 17-01 Merlin Revision 20) REVISION Previous Version New Version Editorial Change Eff<<
Sta ele1
- 99. Section 1, Recovery, 2"u ... Emergency Director... ...ED ... Yes paragraph Note: New M-2 100. Section 1, Recovery . ... Emergency Response ... ERO .... Yes 151 bullet Organization ....
Note: New Page M-3 I 101. Section 2, Recovery . .. .Emergency Response ... ERO .... Yes Org Organization ....
Note: New 2nd bullet Page M-3
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION N Change Page/Section Previous Version New Version Editorial Eff1 No. Change Sta ele1 102. Section 2.b, 3'" bullet .... Emergency Response . .. ERO .... Yes Organization ....
Note: New Page M-4 103. Section 2.e, 4th bullet . ... Emergency Response ... ERO .... Yes Organization ....
Note: New Page M-5 104. Section 3, 1s, sentence . ... Emergency Response ... ERO .... Yes Organization ....
Note: New Page M-6
- Change No.
IPEC Emergencv Page/Section an Rev1s1on 17-01 (M erm Previous Version r Rev1s1on 20) REVISION New Version Editorial Change
~
Eft St; elE 105. Section 3, 2"a sentence All Indian Point Energy Center Additional Indian Point Energy No personnel are instructed of their Center personnel are instructed of Note: 16-01, item Page M-6 roles in relation to the Indian Point their roles in relation to the Indian 52 Recovery Organization and their Point Recovery Organization and responsibilities to the recovery their responsibilities to the effort. recovery effort.
106. Section 4, 3ra sentence . ... Emergency Response ... ERO .... Yes
( Organization ....
Note: New Page M-6
- SECTION N: Karsten ',
IPEC Emergency P!an Revision 17-01 (MerUn Revision 20) REVISION ru Change Page/Section Previous Version New Version Editorial Eff1 No. I Change Sta ele 107. 2nu bullet .... Emergency Response ...ERO .... Yes Organization ....
Note: New Page N-1 SECTION O: Ambrose I
I 108. 1, Assurance of - .... Emergency Response ... ERO .... Yes Training, 1*t paragraph Organization....
- Note: New Page 0-1
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVIS~ON ~
Change Page/Section Previous Version New Version Editorial Ef No. Change S!
0!1 109. Section 2 2. Methods of Training was on Moved to page 0-2 Yes page 0-1 Note: New Page 0-1 110. Section 4, a Personnel Responsible for Personnel responsible for Yes Management. ..... management. ...
Note: New Page 0-3
... Emergency Director ... . .. ED ...
111. 5.b, 2"" sentence .... Emergency Response ... ERO .... Yes Organization ....
Note: New 5.b, last paragraph ... ERO Roster... ... ERO roster ...
Page 0-6
IPEC Emergency Plan Revision 17-01 (Merlan Revision 20) REV!SION I\J Change Page/Section Previous Version New Version Editorial Eff No. Change Sta ele 112. 5.c, 2"" bullet .... Emergency Response ... ERO .... Yes Organization ....
Note: New Page 0-7 SECTION P: Martin 5
113. Section 2, 1 ' .... Emergency Response . .. ERO .... Yes paragraph, last Organization ....
Note: New sentence Page P-1
- 114. Section 3, 1st paragraph Page P-1
... Indian Point Preparedness ... . .. Indian Point Emergency Preparedness ...
Yes J
IPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION 1\1 Change Page/Section Previous Version New Version Editorial Eff No. Change St;i ele 115. Section 4, Technical reviews of the Plan and Technical reviews of the Plan and No 5th Paragraph procedures shall be conducted in procedures shall be conducted in Note: 16-01, item accordance with station accordance with station 53 Page P-3 procedures. Individuals that procedures. The reviewer shall conduct the technical review and determine the need for cross-safety review shall be qualified in disciplinary reviews.
accordance with station requirements. The reviewer shall Note: Removed the statement:
determine the need for cross-disciplinary review. "Individuals that conduct the technical review and safety review shall be qualified in accordance with station requirements."
IPEC E mergencv Pl an Rev1s1on 17 01 (M erm Rev1s1on 20l REVISIONr ru Eff, Change Page/Section Previous Version New Version Editorial No. Change Sta ele 116. Section 5, 3rd sentence . ... Emergency Response ... ERO .... Yes Organization ....
Note: New Page P-3 117. Section 10 .... Emergency Response ... ERO .... Yes Organization ....
Note: New Page P-5 APPENDIX 1:
No changes APPENDIX 2: lraola I
- Change No.
IPEC Emergency Plan Revision 17-01 (MerUn Revision 20) REVISION Page/Section Previous Version New Version
____________._______________,.....________________.._______~__,
Editorial Change
~
Efl St elE 118. Page: Appendix 2-1 NIA 10. Department of Energy- No Radiological Assistance Program Note: 16-01, item Region 1 ( Brookhaven) 54 119. Page: Appendix 2-1 As Letters of Agreements are As Letters of Agreements are No received they will be added to this received they will be listed in this Note: 16-01, item section. section. -
55
l iPEC Emergency Plan Revision 17-01 (Merlin Revision 20) REVISION ~
Change Page/Section Previous Version New Version Editorial Eft No. Change St, elE 120. APPENDIX 3: lraola IP-EP-115 IP-EP-115 No EN-EP-900 IP-EP-120 Note: 16-01, item IP-EP-120 56 IP-EP-210 IP-EP-220 IP-EP-210 IP-EP-221 IP-EP-220 IP-EP-230 IP-EP-221 IP-EP-231 IP-EP-230 IP-EP-250 IP-EP-231 IP-EP-251 IP-EP-250 IP-EP-260 IP-EP-251 IP-EP-260 IP-EP-210 EN-EP-609 EN-EP-610 IP-EP-220 EN-EP-611 IP-EP-221 EN-EP-900 IP-EP-230 IP-EP-210 IP-EP-231 IP-EP-220 IP-EP-250 IP-EP-221 IP-EP-251 EN-EP-610 (Twice)
IP-EP-230 IP-EP-231 IP-EP-230 EN-EP-611 IP-EP-250 IP-EP-350 IP-EP-250 IP-EP-251 IP-EP-250 EN-EP-609 IP-EP-320 IP-EP-230 IP-EP-250 IP-EP-350 EN-EP-611 IP-EP-250 IP-EP-320 EN-EP-609
IPEC Emergenc i Pian Revision 17-01 (Merlin Revision 20) REVISION ~
1Change Page/Section Previous Version New Version Editorial Ef No. Change St eh IP-EP-230 IP-EP-230 IP-EP-430 IP-EP-430 EN-EP-611 APPENDIX 4:
121. Appendix 4, No page 4-2 Note: new NSRAC - Nuclear Safety Review Deleted and Audit Committee 122. Appendix 4, page 4-8 Radiation Area - ... five millirem .... Radiation Area -... 5mRem .. Yes Note: 15-02, item 199 APPENDIX 5: No changes Not used
IPEC EMERGENCY PLAN DISTRIBUTION LIST Page 1 of 2 DELIVERED BY IP3 CONTROL ROOM IP3 53FT. CCR 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP3 SHIFT MANAGER IP3 53FT. ELEVATION 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 CONTROL ROOM IP2 53FT. CCR 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IPEC TSC IP2 53FT. ELEVATION 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 SIMULATOR IP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY IP2 SIMULATOR - CLASSROOM 4 IP2 SIMULATOR BLDG. 1 COPY OF ALL EP'S DOCUMENTS DELIVERED BY 3 COPIES OF ALL EP'S IP2 SIMULATOR - CLASSROOM 5 IP2 SIMULATOR BLDG.
DOCUMENTS EXCEPT E-PLAN NRC RESIDENT INSPECTOR NRC IP2 88FT. ELEVATION 1 COPY OF ALL EP'S 1 COPY OF ALL EP'S AND NRC - ROCKVILLE, MD DOC CONTROL DESK OFFSITE GENERAL RECORDS ADDRESS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND NRC JAMES DANNA OFFSITE GENERAL RECORDS EXCEPT IP-EP-115 1 COPY OF ALL EP'S AND NRC DEPUTY DIRECTOR OFFSITE GENERAL RECORDS EXCEPT IP-EP-115
. ; *.~'*
1 COPY OF THE FOLLOWING:
.LENORE TO ~PDATE '
E-PLAN, IP-EP-115, 120, NEW YORK STATE OEM TED FISCH ... 'WEBSITE .
210,220,230,250,310, N.O MAIL;COPIES 320,340,360,410,420, 430, 620 & IP-1055 1 COPY OF E-PLAN, WESTCHESTER COUNTY OEM DENNIS DELBORGO OFFSITE IP-EP-310 & 340 ROCKLAND COUNTY FIRE AND 1 COPY OF E-PLAN, NICHOLAS LONGO OFFSITE EMERGENCY SERVICES IP-EP-310, & 340 ORANGE COUNTY EMERGENCY 1 COPY OF E-PLAN, SHANNON FISHER OFFSITE SERVICES CENTER IP-EP-310 & 340 PUTNAM COUNTY BUREAU OF 1 COPY OF E-PLAN, ANTHONY SUTION OFFSITE EMERGENCY SERVICES " IP-EP-310 & 340 NOV 15 2017
_ ______.J