| issue date = 03/31/1997
| issue date = 03/31/1997
| title = Monthly Operating Rept for Mar 1997 for Harris Nuclear Plant,Unit 1.W/970415 Ltr
| title = Monthly Operating Rept for Mar 1997 for Harris Nuclear Plant,Unit 1.W/970415 Ltr
| author name = DONAHUE J W, ROGERS S
| author name = Donahue J, Rogers S
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULAT ZNFORMATZON DZSTRZBUTZONISTEM (RZDS)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.Nh."4E a.AUTHOR AFFILIATION ROGERS,S.'arolina Power&Light Co.DONAHUE,J.W.
{{#Wiki_filter:CATEGORY 1 REGULAT       ZNFORMATZON DZSTRZBUTZONISTEM (RZDS)
Carolina Power 6 Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                     05000400 AUTH.Nh."4E a ROGERS,S.
DONAHUE,J.W.
                'arolina AUTHOR AFFILIATION Carolina Power & Light Co.
Power 6 Light Co.
RECIP.NAME           RECIPIENT AFFILIATION Monthly operati                                for Harris Nuclear


==SUBJECT:==
==SUBJECT:==
Monthly operati or Mar 1997 for Harris Nuclear Plant, Unit 1./970415 lt DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed..T 05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS (FTGE CERN EXTERNAL: LITCO BRYCEFJ H NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/SPD/RRAB NRR/DRPM/PECB RGN2 NOAC COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 D E N NOTE TO ALL"RIDS" RECIPIENTS:
 
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11 0 g I I Carolina Power R Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 APR)5 f997 United States Nuclear Regulatory Commission ATTENTION:
Plant, Unit 1. /970415     ltor  Mar 1997 DISTRIBUTION CODE: IE24D         COPIES RECEIVED:LTR         ENCL       SIZE:
Document Control Desk Washington, DC 20555 Serial: HNP-97-081 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT  
TITLE: Monthly Operating Report (per Tech Specs)
                                                                                                    .T NOTES:Application for permit renewal           filed.                                 05000400 RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL          ID CODE/NAME        LTTR ENCL PD2-1 PD               1     1       LE,N                      1     1 INTERNAL: ACRS                      1     1       AEOD/SPD/RRAB             1    1 (FTGE CERN                1      1      NRR/DRPM/PECB             1     1 1     1       RGN2                      1     1 EXTERNAL: LITCO BRYCEFJ H            1     1       NOAC                      1    1 NRC PDR                  1      1 D
E N
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR             11   ENCL   11
 
0 g I I
 
Carolina Power R Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 APR ) 5 f997 United States Nuclear Regulatory Commission                                               Serial: HNP-97-081 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of March 1997 is provided.Sincerely, J.W.Donahue Director of Site Operations Harris Plant MV Enclosure Mr.J.B.Brady-NRC Senior Resident Inspector Mr.S.D.Ebneter-NRC Regional Administrator Mr.N.B.Le-NRC Project Manager'st7042i0 i 42 9'7033i.PDR ADQCK 05000400 R'" PDR IIIIjII:1II]II,'1II.tIIIIIIIIIIII State Road 1134 New Hill NC J
 
Enclosure to Serial HNP-97-081 Sheet l of 2 CP&L CO.RUN DATE 04/04/97 RUN TIME 15:05:32 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1)NOTES 2.REPORTING PERIOD: MARCH 97 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9)5.DESIGN ELECTRICAL RATING (NET MWE): 900.0)6.MAX DEPENDABLB CAPACITY (GROSS MWE): 920.0)7.MAX DEPENDABLE CAPACITY (NET MWB): 860.0 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION ZF ANY: THIS MONTH YR TO, DATE CUMUL ATIVE 11.HOURS IN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GBN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 744.00 744.00.00 744.00.00 2059505.10 691869.00 651701.00 100.00 100.00 101.85 97.33.00 (TYPE, DATE, 86929.00 73391.45.00 72669.42.00 194718053.
In accordance with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of March   1997 is provided.
70 64828560.00 60468579.00 83.60 83.60 80.88 77.29 3.30 2160.00 2125.34.00 2111.76.00'" 5833720.44 1961308.00 1843840.00 97.77 97.77 99.26 94.85 2.23 AND DURATION OF EACH): Refueling outage is scheduled to begin April 5, 1997 for a duration of 40 days.25.ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Sincerely, J. W. Donahue Director of Site Operations Harris Plant MV Enclosure Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. D. Ebneter - NRC Regional Administrator Mr. N. B. Le       - NRC Project Manager
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 t rl'1~a II l z~il Enclosure to Serial HNP-97-081 Sheet 2 of 2 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 04/04/97 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 15:05:32 HARRIS UNIT 1 PAGE 1 RPD39-000 DOCKET NO.050-400 COMPIETED BY SHEILA ROGERS TELEPHONE (919)362-2573 MARCH 1997 DAY AVG.DAILY POWER LEVEL DAY AVG.DAILY POWER LEVEL tMWE-NET)(MWE-NET)868 17 880 866 18 875 874 19 881 883 20 880 874 21 875 878 22 870 884 23 880 879 881 879 25 875 10 873 26 869 876 27 878 12 881 28 875 13 878 29 861 14 870 30 869 15 881 31 875 16 884}}
  'st7042i0 i 42 9'7033i .
PDR     ADQCK 05000400
                      '" PDR                                     IIIIjII:1II]II,'1II.tIIIIIIIIIIII R
State Road 1134 New Hill NC
 
J Enclosure to Serial HNP-97-081 Sheet l of 2 CP&L CO.                     PLANT PERFORMANCE DATA SYSTEM                PAGE    1 RUN DATE 04/04/97               OPERATING DATA REPORT                    RPD36-000 RUN TIME 15:05:32                   HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS                                      TELEPHONE (919) 362-2573
: 1. UNIT NAME: HARRIS UNIT 1                       ) NOTES
: 2. REPORTING PERIOD: MARCH       97
: 3. LICENSED THERMAL POWER (MWT): 2775
: 4. NAMEPLATE RATING (GROSS MWE): 950.9           )
: 5. DESIGN ELECTRICAL RATING (NET MWE):     900.0 )
: 6. MAX DEPENDABLB CAPACITY (GROSS MWE):   920.0 )
: 7. MAX DEPENDABLE CAPACITY (NET MWB):     860.0
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS   (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED   IF ANY (NET MWE):
: 10. REASONS FOR RESTRICTION ZF ANY:
THIS           YR TO,             CUMUL MONTH              DATE             ATIVE
: 11. HOURS IN REPORTING PERIOD                     744.00          2160.00            86929.00
: 12. NUMBER OF HOURS REACTOR CRITICAL             744.00          2125.34            73391.45
: 13. REACTOR RESERVE SHUTDOWN HRS                     .00                .00                .00
: 14. HOURS GENERATOR ON LINE                       744.00          2111.76            72669.42
: 15. UNIT RESERVE SHUTDOWN HOURS                       .00                .00'"              .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)         2059505.10        5833720.44      194718053. 70
: 17. GROSS ELEC. ENERGY GBN (MWH)             691869. 00        1961308. 00      64828560.00
: 18. NET ELEC. ENERGY GENERATED (MWH)         651701. 00        1843840.00        60468579.00
: 19. UNIT SERVICE FACTOR                         100. 00            97.77              83.60
: 20. UNIT AVAILABILITYFACTOR                      100. 00            97.77              83.60
: 21. UNIT CAP. FACTOR (USING MDC NET)             101.85            99.26              80.88
: 22. UNIT CAP. FACTOR (USING DER NET)             97.33            94.85              77.29
: 23. UNIT FORCED OUTAGE RATE                         .00              2.23              3.30
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling outage is scheduled to begin   April 5,   1997 for a duration of   40 days.
: 25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
 
t rl 1~
a II
  ~ill z
 
Enclosure to Serial HNP-97-081 Sheet 2 of 2 CP&L CO.                   PLANT PERFORMANCE DATA SYSTEM                 PAGE    1 RUN DATE 04/04/97     APPENDIX B - AVERAGE DAILY POWER LEVEL             RPD39-000 RUN TIME 15:05:32                 HARRIS UNIT 1 DOCKET NO. 050-400 COMPIETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 MARCH           1997 DAY   AVG. DAILY POWER LEVEL             DAY   AVG. DAILY POWER LEVEL tMWE-NET)                                 (MWE-NET) 868                   17                 880 866                   18                 875 874                   19                 881 883                   20                 880 874                   21                 875 878                   22                 870 884                   23                 880 879                                       881 879                   25                 875 10                 873                   26                 869 876                   27                 878 12                 881                   28                 875 13                 878                   29                 861 14                 870                   30                 869 15                 881                   31                 875 16                 884}}

Latest revision as of 20:47, 3 February 2020

Monthly Operating Rept for Mar 1997 for Harris Nuclear Plant,Unit 1.W/970415 Ltr
ML18012A618
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/31/1997
From: Donahue J, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-97-081, HNP-97-81, NUDOCS 9704210142
Download: ML18012A618 (7)


Text

CATEGORY 1 REGULAT ZNFORMATZON DZSTRZBUTZONISTEM (RZDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.Nh."4E a ROGERS,S.

DONAHUE,J.W.

'arolina AUTHOR AFFILIATION Carolina Power & Light Co.

Power 6 Light Co.

RECIP.NAME RECIPIENT AFFILIATION Monthly operati for Harris Nuclear

SUBJECT:

Plant, Unit 1. /970415 ltor Mar 1997 DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

.T NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 LE,N 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 (FTGE CERN 1 1 NRR/DRPM/PECB 1 1 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCEFJ H 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

0 g I I

Carolina Power R Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 APR ) 5 f997 United States Nuclear Regulatory Commission Serial: HNP-97-081 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of March 1997 is provided.

Sincerely, J. W. Donahue Director of Site Operations Harris Plant MV Enclosure Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. D. Ebneter - NRC Regional Administrator Mr. N. B. Le - NRC Project Manager

'st7042i0 i 42 9'7033i .

PDR ADQCK 05000400

'" PDR IIIIjII:1II]II,'1II.tIIIIIIIIIIII R

State Road 1134 New Hill NC

J Enclosure to Serial HNP-97-081 Sheet l of 2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 04/04/97 OPERATING DATA REPORT RPD36-000 RUN TIME 15:05:32 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919) 362-2573

1. UNIT NAME: HARRIS UNIT 1 ) NOTES
2. REPORTING PERIOD: MARCH 97
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9 )
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0 )
6. MAX DEPENDABLB CAPACITY (GROSS MWE): 920.0 )
7. MAX DEPENDABLE CAPACITY (NET MWB): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION ZF ANY:

THIS YR TO, CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 2160.00 86929.00
12. NUMBER OF HOURS REACTOR CRITICAL 744.00 2125.34 73391.45
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 744.00 2111.76 72669.42
15. UNIT RESERVE SHUTDOWN HOURS .00 .00'" .00
16. GROSS THERMAL ENERGY GEN. (MWH) 2059505.10 5833720.44 194718053. 70
17. GROSS ELEC. ENERGY GBN (MWH) 691869. 00 1961308. 00 64828560.00
18. NET ELEC. ENERGY GENERATED (MWH) 651701. 00 1843840.00 60468579.00
19. UNIT SERVICE FACTOR 100. 00 97.77 83.60
20. UNIT AVAILABILITYFACTOR 100. 00 97.77 83.60
21. UNIT CAP. FACTOR (USING MDC NET) 101.85 99.26 80.88
22. UNIT CAP. FACTOR (USING DER NET) 97.33 94.85 77.29
23. UNIT FORCED OUTAGE RATE .00 2.23 3.30
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Refueling outage is scheduled to begin April 5, 1997 for a duration of 40 days.

25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

t rl 1~

a II

~ill z

Enclosure to Serial HNP-97-081 Sheet 2 of 2 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 04/04/97 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 15:05:32 HARRIS UNIT 1 DOCKET NO. 050-400 COMPIETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 MARCH 1997 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL tMWE-NET) (MWE-NET) 868 17 880 866 18 875 874 19 881 883 20 880 874 21 875 878 22 870 884 23 880 879 881 879 25 875 10 873 26 869 876 27 878 12 881 28 875 13 878 29 861 14 870 30 869 15 881 31 875 16 884