{{#Wiki_filter:CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME, AUTHOR AFFILIATION ROGERS,S.Carolina Power&Light Co.VANDENBURGH,C.
{{#Wiki_filter:CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
Carolina Power S Light Co.RECIP.NAME
DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                       05000400 AUTH.NAME,             AUTHOR AFFILIATION ROGERS,S.             Carolina Power   &   Light Co.
, RECIPIENT AFFILIATION DOCKET 05000400
VANDENBURGH,C.         Carolina Power   S   Light Co.
RECIP.NAME       ,     RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating rept for Sept 1998 for Harris Nuclear Power Plan.1t tr.DISTRIBUTION CODE: IE24D COPIES RECEIITED:
Monthly operating rept       for   Sept 1998   for Harris Nuclear Power Plan . 1t                   tr.
LTR I ENCL i SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.05000408 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: R IJE C ER RGN2 COPIES LTTR ENCL 1'1 1 1 1 1 1 RECIPIENT ID CODE/NAME FLANDERS,S AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D E N NOTE TO ALL ERIDSN RECIPIENTS PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 I'
DISTRIBUTION CODE: IE24D         COPIES RECEIITED: LTR     I ENCL     i SIZE:
Carolina Power&Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 OCT 12 1998 United States Nuclear Regulatory Commission ATTENTION:
TITLE: Monthly Operating Report (per Tech Specs)
Document Control Desk Washington, DC 20555 Serial: HNP-98-148 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICEt rSE NO.NPF-63 MONTHLY OPERATING REPORT,  
NOTES:Application       for permit renewal filed.                                       05000408 RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR' ENCL        ID CODE/NAME          LTTR ENCL PD2-1     PD             1            FLANDERS,S                1    1 INTERNAL:     R                     1     1     AEOD/SPD/RRAB             1    1 IJE  C    ER          1      1      OC/DBA/PAD                 1     1 RGN2                      1     1 EXTERNAL: LITCO BRYCE,J H             1     1     NOAC                      1     1 NRC PDR                    1     1 D
E N
NOTE TO ALL ERIDSN RECIPIENTS PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL     10
 
I' Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 OCT   12   1998 United States Nuclear Regulatory Commission                                   Serial: HNP-98-148 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICEt rSE NO. NPF-63 MONTHLYOPERATING REPORT,


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with Carolina Power B'c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of September 1998 is provided.Sincerely, C.A.VanDenburgh Manager Regulatory Affairs Harris Plant SGR Enclosure c: Mr.J.B.Brady-NRC Senior Resident Inspector Mr.S.C.Flanders-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator
~8<otaQaoS V809SQ PDR ADOCK 05000400, R PDR'tate Road 1134 New Hill NC Enclosure to Serial HNP-98-148 Sheet 1 of 3 CP&L CO.RUN DATE 10/05/98 RUN TIME 12:44:00 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEXLA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: SEPTEMBER 98 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL ATXVE 11.HOURS IN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILITY FACTOR 21.UNIT CAP.FACTOR (USXNG MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 720.00 720.00.00 720.00.00 1956101.94 640567.00 600833.00 100.00 100.00 97.03 92.72.00 (TYPE, DATE, AND 100080.00 84860.71.00 84044.54.00 225841599.00 75147651.00 70127841.00 83.98 83.98 81.48 77.86 3.14 6551.00 6551.00.00 6551.00.00 18006821.82 5965847.00 5602536.00 100.00 100.00 99.44 95.02.00 DURATION OF EACH): Plant Refueling Outage number 8 is planned to begin October 24, 1998 and is scheduled for a duration of 34 days.25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATXON 1.16-9


Enclosure to Serial: HNP-98-148 Sheet 2 of 3 CP&L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 10/05/98 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 12:43:59 HARRIS UNIT 1 PAGE 1 RPD39-000 SEPTEMBER 1998 DAY AVG.DAILY POWER LEVEL (MWE-NET)DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)10 12 13 15 16 849 852 851 851 850 847 833 781 771 762 734 713 831 851 17 18 19 20 21 22 23 25 26 27 28 29 30 851 850 852 853 851 847 861 869 862 855 854 845 853 854 0 s C e UNIT NAME: Harris DATE: 09/30/98 COMPLETED BY: S.G.Rogers TELEPHONE:
In accordance        with Carolina Power  B'c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of September 1998 is provided.
(919)362-2573 REPORT MONTH: September 1998 UNIT SHUTDOWNS AND POPOVER REDUCTION Enclosure to'erial: HNP-98-14(m Sheet 3 of 3 NUMBER DATE TYPE I DURATION (HOURS)REASON 2 METHOD OF SHUTTING DOWN REACTOR 3 LICENSEE EVENT REPORT/I SYSTEM CODE4 COMPONENT CODE 5 CAUSE AND CORRECTIVE ACTION TO PREVENTRECURRENCE 98403 09/10/98 0.0 N/A HH PUMPXX Power reduced to 90%on 9/10/98 Q 03:40 due to IA Heater Drain Pump trip.IVork was performed on Feedtvater
Sincerely, C. A. VanDenburgh Manager Regulatory Affairs Harris Plant SGR Enclosure c:      Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator
)1eater level control columns and plant was returned to 100%power on 9/15/98 tm 10:00.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)8-Maintenance or Test C-Rcfucling D-Regulatory Restriction E-Operator Training tr: License Examination F-Administrative G43perational Error (Explain)H-Other (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4.Continued 5-Reduced Load 6%ther 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit I-Same Source 0 (o~'"4'I k'A p~~'\}}
  ~8<otaQaoS V809SQ PDR      ADOCK 05000400, R                      PDR
                                'tate  Road 1134    New Hill NC
 
Enclosure to Serial HNP-98-148 Sheet 1 of 3 CP&L CO.                      PLANT PERFORMANCE DATA SYSTEM                  PAGE      1 RUN DATE  10/05/98              OPERATING DATA REPORT                      RPD36-000 RUN TIME  12:44:00                  HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEXLA ROGERS OPERATING STATUS                                        TELEPHONE (919)362-2573
: 1. UNIT NAME:    HARRIS UNIT 1
: 2. REPORTING PERIOD: SEPTEMBER 98
: 3. LICENSED THERMAL POWER (MWT): 2775
: 4. NAMEPLATE RATING (GROSS MWE):      950.9
: 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
: 7. MAX DEPENDABLE CAPACITY (NET MWE):        860.0
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED    IF  ANY (NET MWE):
: 10. REASONS FOR RESTRICTION IF ANY:
THIS              YR TO                  CUMUL MONTH              DATE                  ATXVE
: 11. HOURS IN REPORTING PERIOD                      720.00            6551.00            100080.00
: 12. NUMBER OF HOURS REACTOR CRITICAL                720.00            6551.00              84860.71
: 13. REACTOR RESERVE SHUTDOWN HRS                        .00                .00                    .00
: 14. HOURS GENERATOR ON LINE                        720.00            6551.00              84044.54
: 15. UNIT RESERVE SHUTDOWN HOURS                        .00                .00                    .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)            1956101.94        18006821.82        225841599.00
: 17. GROSS ELEC. ENERGY GEN (MWH)                640567.00          5965847.00          75147651.00
: 18. NET ELEC. ENERGY GENERATED (MWH)            600833.00          5602536.00          70127841.00
: 19. UNIT  SERVICE FACTOR                            100.00            100.00                  83.98
: 20. UNIT  AVAILABILITYFACTOR                        100.00            100.00                  83.98
: 21. UNIT  CAP. FACTOR (USXNG MDC NET)                97.03              99.44                  81.48
: 22. UNIT  CAP. FACTOR (USING DER NET)                92.72              95.02                  77.86
: 23. UNIT  FORCED OUTAGE RATE                            .00                .00                  3.14
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Plant Refueling Outage number    8 is planned to begin October      24, 1998 and  is  scheduled for a  duration of  34  days.
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATXON 1.16  9
 
Enclosure to Serial: HNP-98-148 Sheet 2 of 3 CP&L CO.                   PLANT PERFORMANCE DATA SYSTEM                 PAGE      1 RUN DATE 10/05/98     APPENDIX B AVERAGE DAILY POWER LEVEL           RPD39-000 RUN TIME 12:43:59                 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 SEPTEMBER        1998 DAY  AVG. DAILY POWER LEVEL              DAY   AVG. DAILY POWER LEVEL (MWE-NET)                                 (MWE-NET) 849                   17                  851 18                  850 852                    19                  852 851                   20                 853 851                    21                 851 850                   22                  847 847                   23                  861 869 833                    25                  862 10                  781                    26                  855 771                    27                  854 12                  762                    28                  845 13                  734                    29                  853 713                    30                  854 15                  831 16                  851
 
0 s C
e
 
Enclosure to HNP-98-14(m  'erial:
Sheet 3 of 3 UNITSHUTDOWNS AND POPOVER REDUCTION UNITNAME:       Harris DATE:         09/30/98 COMPLETED BY: S. G. Rogers TELEPHONE:     (919) 362-2573 REPORT MONTH: September 1998 CAUSE AND CORRECTIVE METHOD OF      LICENSEE                                      ACTION TO DURATION                      SHUTTING DOWN    EVENT        SYSTEM  COMPONENT      PREVENTRECURRENCE NUMBER       DATE         TYPE   I       (HOURS)         REASON 2       REACTOR 3     REPORT/I     CODE4     CODE 5 98403     09/10/98                       0.0                                           N/A           HH     PUMPXX       Power reduced to 90% on 9/10/98 Q 03:40 due to IA Heater Drain Pump trip.
IVork was performed on Feedtvater   )1eater level control columns and plant was returned to 100% power on 9/15/98 tm 10:00.
I                           2                                                            3                              4 F: Forced                     Reason:                                                      Method:                        Exhibit G-Instructions S: Scheduled                 A-Equipment Failure (Explain)                                 I-Manual                      for Preparation of Data 8-Maintenance or Test                                         2-Manual Scram                Entry Sheets for Licensee Event C-Rcfucling                                                   3-Automatic Scram              Report (LER) File D-Regulatory Restriction E-Operator Training tr: License Examination F-Administrative G43perational Error (Explain) 4.Continued 5-Reduced Load 6%ther (NUREG-0161) 5 Exhibit I - Same Source 0
H-Other (Explain)
 
( o ~
"4 'I k'A p~ ~ '\}}

Latest revision as of 20:40, 3 February 2020

Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr
ML18016A620
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/30/1998
From: Shannon Rogers, Vandenburgh C
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-98-148, NUDOCS 9810160203
Download: ML18016A620 (9)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME, AUTHOR AFFILIATION ROGERS,S. Carolina Power & Light Co.

VANDENBURGH,C. Carolina Power S Light Co.

RECIP.NAME , RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Sept 1998 for Harris Nuclear Power Plan . 1t tr.

DISTRIBUTION CODE: IE24D COPIES RECEIITED: LTR I ENCL i SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000408 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR' ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 FLANDERS,S 1 1 INTERNAL: R 1 1 AEOD/SPD/RRAB 1 1 IJE C ER 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL ERIDSN RECIPIENTS PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

I' Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 OCT 12 1998 United States Nuclear Regulatory Commission Serial: HNP-98-148 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICEt rSE NO. NPF-63 MONTHLYOPERATING REPORT,

Dear Sir or Madam:

In accordance with Carolina Power B'c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of September 1998 is provided.

Sincerely, C. A. VanDenburgh Manager Regulatory Affairs Harris Plant SGR Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator

~8<otaQaoS V809SQ PDR ADOCK 05000400, R PDR

'tate Road 1134 New Hill NC

Enclosure to Serial HNP-98-148 Sheet 1 of 3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 10/05/98 OPERATING DATA REPORT RPD36-000 RUN TIME 12:44:00 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEXLA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: SEPTEMBER 98
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATXVE

11. HOURS IN REPORTING PERIOD 720.00 6551.00 100080.00
12. NUMBER OF HOURS REACTOR CRITICAL 720.00 6551.00 84860.71
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 720.00 6551.00 84044.54
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1956101.94 18006821.82 225841599.00
17. GROSS ELEC. ENERGY GEN (MWH) 640567.00 5965847.00 75147651.00
18. NET ELEC. ENERGY GENERATED (MWH) 600833.00 5602536.00 70127841.00
19. UNIT SERVICE FACTOR 100.00 100.00 83.98
20. UNIT AVAILABILITYFACTOR 100.00 100.00 83.98
21. UNIT CAP. FACTOR (USXNG MDC NET) 97.03 99.44 81.48
22. UNIT CAP. FACTOR (USING DER NET) 92.72 95.02 77.86
23. UNIT FORCED OUTAGE RATE .00 .00 3.14
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Plant Refueling Outage number 8 is planned to begin October 24, 1998 and is scheduled for a duration of 34 days.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATXON 1.16 9

Enclosure to Serial: HNP-98-148 Sheet 2 of 3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 10/05/98 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 12:43:59 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 SEPTEMBER 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 849 17 851 18 850 852 19 852 851 20 853 851 21 851 850 22 847 847 23 861 869 833 25 862 10 781 26 855 771 27 854 12 762 28 845 13 734 29 853 713 30 854 15 831 16 851

0 s C

e

Enclosure to HNP-98-14(m 'erial:

Sheet 3 of 3 UNITSHUTDOWNS AND POPOVER REDUCTION UNITNAME: Harris DATE: 09/30/98 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: September 1998 CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT PREVENTRECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT/I CODE4 CODE 5 98403 09/10/98 0.0 N/A HH PUMPXX Power reduced to 90% on 9/10/98 Q 03:40 due to IA Heater Drain Pump trip.

IVork was performed on Feedtvater )1eater level control columns and plant was returned to 100% power on 9/15/98 tm 10:00.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Rcfucling 3-Automatic Scram Report (LER) File D-Regulatory Restriction E-Operator Training tr: License Examination F-Administrative G43perational Error (Explain) 4.Continued 5-Reduced Load 6%ther (NUREG-0161) 5 Exhibit I - Same Source 0