ML18016A620: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/30/1998
| issue date = 09/30/1998
| title = Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr
| title = Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr
| author name = ROGERS S, VANDENBURGH C
| author name = Rogers S, Vandenburgh C
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                        05000400 AUTH.NAME,            AUTHOR AFFILIATION ROGERS,S.              Carolina Power    &  Light  Co.
VANDENBURGH,C.        Carolina Power    S  Light  Co.
RECIP.NAME      ,    RECIPIENT AFFILIATION
 
==SUBJECT:==
Monthly operating rept        for  Sept 1998    for Harris Nuclear Power Plan . 1t                  tr.
DISTRIBUTION CODE: IE24D          COPIES RECEIITED: LTR      I ENCL    i  SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application      for permit renewal filed.                                        05000408 RECIPIENT          COPIES              RECIPIENT            COPIES ID CODE/NAME          LTTR' ENCL        ID CODE/NAME          LTTR ENCL PD2-1      PD              1            FLANDERS,S                1    1 INTERNAL:      R                      1      1      AEOD/SPD/RRAB              1    1 IJE  C    ER          1      1      OC/DBA/PAD                1    1 RGN2                      1      1 EXTERNAL: LITCO BRYCE,J H            1      1      NOAC                      1    1 NRC PDR                    1      1 D
E N
NOTE TO  ALL ERIDSN RECIPIENTS PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR              10  ENCL    10
 
I' Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 OCT    12  1998 United States Nuclear Regulatory Commission                                  Serial: HNP-98-148 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICEt rSE NO. NPF-63 MONTHLYOPERATING REPORT,
 
==Dear Sir or Madam:==
 
In accordance        with Carolina Power  B'c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of September 1998 is provided.
Sincerely, C. A. VanDenburgh Manager Regulatory Affairs Harris Plant SGR Enclosure c:      Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator
  ~8<otaQaoS V809SQ PDR      ADOCK 05000400, R                      PDR
                                'tate  Road 1134    New Hill NC
 
Enclosure to Serial HNP-98-148 Sheet 1 of 3 CP&L CO.                      PLANT PERFORMANCE DATA SYSTEM                  PAGE      1 RUN DATE  10/05/98              OPERATING DATA REPORT                      RPD36-000 RUN TIME  12:44:00                  HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEXLA ROGERS OPERATING STATUS                                        TELEPHONE (919)362-2573
: 1. UNIT NAME:    HARRIS UNIT 1
: 2. REPORTING PERIOD: SEPTEMBER 98
: 3. LICENSED THERMAL POWER (MWT): 2775
: 4. NAMEPLATE RATING (GROSS MWE):      950.9
: 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
: 7. MAX DEPENDABLE CAPACITY (NET MWE):        860.0
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED    IF  ANY (NET MWE):
: 10. REASONS FOR RESTRICTION IF ANY:
THIS              YR TO                  CUMUL MONTH              DATE                  ATXVE
: 11. HOURS IN REPORTING PERIOD                      720.00            6551.00            100080.00
: 12. NUMBER OF HOURS REACTOR CRITICAL                720.00            6551.00              84860.71
: 13. REACTOR RESERVE SHUTDOWN HRS                        .00                .00                    .00
: 14. HOURS GENERATOR ON LINE                        720.00            6551.00              84044.54
: 15. UNIT RESERVE SHUTDOWN HOURS                        .00                .00                    .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)            1956101.94        18006821.82        225841599.00
: 17. GROSS ELEC. ENERGY GEN (MWH)                640567.00          5965847.00          75147651.00
: 18. NET ELEC. ENERGY GENERATED (MWH)            600833.00          5602536.00          70127841.00
: 19. UNIT  SERVICE FACTOR                            100.00            100.00                  83.98
: 20. UNIT  AVAILABILITYFACTOR                        100.00            100.00                  83.98
: 21. UNIT  CAP. FACTOR (USXNG MDC NET)                97.03              99.44                  81.48
: 22. UNIT  CAP. FACTOR (USING DER NET)                92.72              95.02                  77.86
: 23. UNIT  FORCED OUTAGE RATE                            .00                .00                  3.14
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Plant Refueling Outage number    8 is planned to begin October      24, 1998 and  is  scheduled for a  duration of  34  days.
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATXON 1.16  9
 
Enclosure to Serial: HNP-98-148 Sheet 2 of 3 CP&L CO.                    PLANT PERFORMANCE DATA SYSTEM                PAGE      1 RUN DATE  10/05/98      APPENDIX B  AVERAGE DAILY POWER LEVEL            RPD39-000 RUN TIME 12:43:59                  HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 SEPTEMBER        1998 DAY  AVG. DAILY POWER LEVEL              DAY    AVG. DAILY POWER LEVEL (MWE-NET)                                  (MWE-NET) 849                    17                  851 18                  850 852                    19                  852 851                    20                  853 851                    21                  851 850                    22                  847 847                    23                  861 869 833                    25                  862 10                  781                    26                  855 771                    27                  854 12                  762                    28                  845 13                  734                    29                  853 713                    30                  854 15                  831 16                  851
 
0 s C
e
 
Enclosure to HNP-98-14(m  'erial:
Sheet 3 of 3 UNITSHUTDOWNS AND POPOVER REDUCTION UNITNAME:      Harris DATE:        09/30/98 COMPLETED BY: S. G. Rogers TELEPHONE:    (919) 362-2573 REPORT MONTH: September 1998 CAUSE AND CORRECTIVE METHOD OF      LICENSEE                                      ACTION TO DURATION                      SHUTTING DOWN    EVENT        SYSTEM  COMPONENT      PREVENTRECURRENCE NUMBER      DATE        TYPE  I      (HOURS)          REASON 2      REACTOR 3      REPORT/I      CODE4      CODE 5 98403      09/10/98                        0.0                                            N/A          HH    PUMPXX      Power reduced to 90% on 9/10/98 Q 03:40 due to IA Heater Drain Pump trip.
IVork was performed on Feedtvater    )1eater  level control columns and plant was returned to 100% power on 9/15/98 tm 10:00.
I                            2                                                            3                              4 F: Forced                    Reason:                                                      Method:                        Exhibit G-Instructions S: Scheduled                  A-Equipment Failure (Explain)                                I-Manual                      for Preparation of Data 8-Maintenance or Test                                        2-Manual Scram                Entry Sheets for Licensee Event C-Rcfucling                                                  3-Automatic Scram              Report (LER) File D-Regulatory Restriction E-Operator Training tr: License Examination F-Administrative G43perational Error (Explain) 4.Continued 5-Reduced Load 6%ther (NUREG-0161) 5 Exhibit I - Same Source 0
H-Other (Explain)
 
( o ~
"4 'I k'A p~ ~ '\}}

Latest revision as of 20:40, 3 February 2020

Monthly Operating Rept for Sept 1998 for Harris Nuclear Power Plant.With 981012 Ltr
ML18016A620
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/30/1998
From: Shannon Rogers, Vandenburgh C
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-98-148, NUDOCS 9810160203
Download: ML18016A620 (9)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME, AUTHOR AFFILIATION ROGERS,S. Carolina Power & Light Co.

VANDENBURGH,C. Carolina Power S Light Co.

RECIP.NAME , RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for Sept 1998 for Harris Nuclear Power Plan . 1t tr.

DISTRIBUTION CODE: IE24D COPIES RECEIITED: LTR I ENCL i SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000408 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR' ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 FLANDERS,S 1 1 INTERNAL: R 1 1 AEOD/SPD/RRAB 1 1 IJE C ER 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

E N

NOTE TO ALL ERIDSN RECIPIENTS PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

I' Carolina Power & Light Company Harris Nuclear Plant PO Box 165 New Hill NC 27562 OCT 12 1998 United States Nuclear Regulatory Commission Serial: HNP-98-148 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICEt rSE NO. NPF-63 MONTHLYOPERATING REPORT,

Dear Sir or Madam:

In accordance with Carolina Power B'c Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of September 1998 is provided.

Sincerely, C. A. VanDenburgh Manager Regulatory Affairs Harris Plant SGR Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator

~8<otaQaoS V809SQ PDR ADOCK 05000400, R PDR

'tate Road 1134 New Hill NC

Enclosure to Serial HNP-98-148 Sheet 1 of 3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 10/05/98 OPERATING DATA REPORT RPD36-000 RUN TIME 12:44:00 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEXLA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: SEPTEMBER 98
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATXVE

11. HOURS IN REPORTING PERIOD 720.00 6551.00 100080.00
12. NUMBER OF HOURS REACTOR CRITICAL 720.00 6551.00 84860.71
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 720.00 6551.00 84044.54
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1956101.94 18006821.82 225841599.00
17. GROSS ELEC. ENERGY GEN (MWH) 640567.00 5965847.00 75147651.00
18. NET ELEC. ENERGY GENERATED (MWH) 600833.00 5602536.00 70127841.00
19. UNIT SERVICE FACTOR 100.00 100.00 83.98
20. UNIT AVAILABILITYFACTOR 100.00 100.00 83.98
21. UNIT CAP. FACTOR (USXNG MDC NET) 97.03 99.44 81.48
22. UNIT CAP. FACTOR (USING DER NET) 92.72 95.02 77.86
23. UNIT FORCED OUTAGE RATE .00 .00 3.14
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Plant Refueling Outage number 8 is planned to begin October 24, 1998 and is scheduled for a duration of 34 days.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATXON 1.16 9

Enclosure to Serial: HNP-98-148 Sheet 2 of 3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 10/05/98 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 12:43:59 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 SEPTEMBER 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 849 17 851 18 850 852 19 852 851 20 853 851 21 851 850 22 847 847 23 861 869 833 25 862 10 781 26 855 771 27 854 12 762 28 845 13 734 29 853 713 30 854 15 831 16 851

0 s C

e

Enclosure to HNP-98-14(m 'erial:

Sheet 3 of 3 UNITSHUTDOWNS AND POPOVER REDUCTION UNITNAME: Harris DATE: 09/30/98 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: September 1998 CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT PREVENTRECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT/I CODE4 CODE 5 98403 09/10/98 0.0 N/A HH PUMPXX Power reduced to 90% on 9/10/98 Q 03:40 due to IA Heater Drain Pump trip.

IVork was performed on Feedtvater )1eater level control columns and plant was returned to 100% power on 9/15/98 tm 10:00.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data 8-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Rcfucling 3-Automatic Scram Report (LER) File D-Regulatory Restriction E-Operator Training tr: License Examination F-Administrative G43perational Error (Explain) 4.Continued 5-Reduced Load 6%ther (NUREG-0161) 5 Exhibit I - Same Source 0

H-Other (Explain)

( o ~

"4 'I k'A p~ ~ '\