| issue date = 10/31/1998
| issue date = 10/31/1998
| title = Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr
| title = Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr
| author name = ROGERS S, VANDENBURGH C
| author name = Rogers S, Vandenburgh C
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1'4;l REGULA1 Y INFORMATION DISTRIBUTION~
{{#Wiki_filter:CATEGORY 1
SYSTEM (RIDS)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH'.NAME AUTHOR AFFILIATION ROGERS,S.Carolina Power&Light Co.VANDENBURGH,C.
'4   ;l REGULA1     Y INFORMATION DISTRIBUTION~ SYSTEM (RIDS)
Carolina Power S Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                         05000400 AUTH'.NAME             AUTHOR AFFILIATION ROGERS,S.               Carolina Power     &   Light Co.
VANDENBURGH,C.         Carolina Power     S   Light Co.
RECIP.NAME             RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly operating re 8 for Shearon Harris Nuclear Power Pla.With 981113 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Monthly Operating Report (per Tech Specs)NOTES:Application for permit renewal filed.05000400F' RECIPIENT ID CODE/NAME PD2-1 PD COPIES LTTR ENCL 1" 1 RECIPIENT IDCODE/NAME FLANDERS,S COPIES LTTR ENCL 1 1 INTERNAL: ACRS CENTER 1 1 1 1 1 1 AEOD/SPD/RRAB OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR 1 1 1 1 NOAC 1 1 D 0'N NOTE TO ALL"RIDS" RECIPIENTS:
Monthly operating re Nuclear Power Pla .With 981113             ltr. for 8      Shearon Harris DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR         ENCL       SIZE:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Carolina Power 4 Light Conspa'ny, Harris Nuclear Plant P.O.Box 165 New Hill NC 27562 NOV18 1998 United States Nuclear Regulatory Commission ATTENTION:
TITLE: Monthly Operating Report (per Tech Specs)
Document Control Desk Washington, DC 20555 Serial: HNP-98-164 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET iVO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT  
NOTES:Application       for permit renewal filed.                                         05000400F' RECIPIENT           COPIES              RECIPIENT            COPIES ID CODE/NAME         LTTR ENCL IDCODE/NAME        LTTR ENCL PD2-1 PD                   1     1       FLANDERS,S               1     1 INTERNAL: ACRS                         1     1       AEOD/SPD/RRAB             1    1 CENTER              1      1      OC/DBA/PAD               1     1 1     1 EXTERNAL: LITCO BRYCE,J H               1     1       NOAC                      1     1 NRC PDR                    1     1 D
0
                                                                                                      'N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                 10   ENCL   10
 
Carolina Power   4   Light Conspa'ny, Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 NOV18       1998 United States Nuclear Regulatory Commission                                         Serial: HNP-98-164 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET iVO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of October 1998 is provided.Sincerely, C.A.VanDen Manager Regulatory Affairs Harris Plant SGR Enclosure c: Mr.J.B.Brady-NRC Senior Resident Inspector Mr.S.C.Flanders-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator 5413 Shearon Harris Road New Hill NC'st8i i200093'st8i03i'.PDR ADQCK 05000400 R PDR V~l~~Enclosure to Serial 11N P-98-164 Sheet 1 of 4 CP&L CO.RUN DATE 11/10/98 RUN TIME 08:58:25 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRXS UNIT 1 PAGE 1 RPD36-000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362"2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: OCTOBER 98 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS XN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRITICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABXLITY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 745.00 548.67.00 548.67.00 1517394.42 505207.00 471267.00 73.65 73.65 73.56 70.29.60 (TYPE, DATE, 100825.00 85409.38.00 84593.21.00 227358993.42 75652858.00 70599108.00 83.90 83.90 81.42 77.80 3.13 7296.00 7099.67.00 7099.67.00 19524216.24 6471054.00 6073803.00 97.31 97.31 96.80 92.50.05 AND DURATION OF EACH): Plant shutdown on 10/23/98 and entered RF08.Outage is scheduled for 32 days.25.IF SHUTDOWN AT END OF REPORT PERIOD, ESTXMATED DATE OF START UP: Noveraber 24, 1998 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
 
FORECAST ACHIEVED INITIAL CRITICALITY XNITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 Enclosure to Serial: 1-1NP-98-164 Sheet 2 of4 CPs L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE ll/10/98 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 08:58:25 HARRIS UNIT 1 PAGE 1 RPD39-000 OCTOBER 1998 DAY AVG.DAILY POWER LEVEL (MWE-NET)DOCKET NO.050"400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)5 10 12 13 15 16 855 870 866 859 864 861 858 856 868 868 868 869 867 867 871 871 17 18 19 20 21 22 23 25 26 27 28 29 30 31 872 868 859 863 872 874 736-36-30-20"13-12-10-10 Enclosure.to Serial: HNP-98-164.
In accordance         with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of October 1998 is provided.
Sheet 3 of 4 UNIT NAME: Harris DATE: 10/31/98 COMPLETED BY: S.G.Rogers TELEPHONE:
Sincerely, C. A. VanDen Manager Regulatory Affairs Harris Plant SGR Enclosure c:       Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road New Hill NC
(919)362-2573 REPORT MONTH: October 1998 UNIT SHUTDOWNS AND POPOVER REDUCTION NUMBER 98-004 DATE TYPE I 10/23/98 DURATION (HOURS)3.3 REASON 2 METHOD OF SHUTTING DOWN REACTOR 3 LICENSEE EVENT REPORT II 98407 SYSTEM CODE 4 HA COMPONENT CODE 5 INSTRU CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE Plant commenced shutdown for RFO-8 10/23/98 Q 19:23.Turbine Generator valves failed open and Reactor was manually tripped 10/23/98 Q 20:40 due to increasing reactor power and outward rod motion.Plant entered RFO8 which was scheduled to begin 10/23/9824:00.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training tL License Examination F-Administrative Gperationat Error (Explain)Hither (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG.0161) 5 Exhibit I-Same Source UNIT SHUTDOWNS AND POPOVER REDUCTION a r Enclosure to Serial: HNP-98-164.
    'st8i i200093 'st8i03i '.
Sheet 4 of 4 UNIT NAME: Harris DATE: 10/31/98 COMPLETED BY: S.G.Rogers TELEPHONE:
PDR     ADQCK       05000400 R                             PDR
(919)362-2573 REPORT MONTH: October 1998 NUMBER DATE TYPE I DURATION (HOURS)REASON 2 METHOD OF SHUTTING DOWN REACTOR 3 LICENSEE EVENT REPORT//SYSTEM CODE4 COMPONENT CODES CAUSE AND CORRECTI VE ACTION TO PREVENT RECURRENCE 98405 10/23/98 193.0 N/A ZZZZZZ Entered scheduled Refueling outage (RFO-8)10/23/98Q 24:00.Outage is scheduled for 32 days.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative operational Error (Explain)Hither (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Liccnsce Event Report (LER)File (NUREG-0161) 5 Exhibit I-Same Source 0 i'g~~~~~7.r a ie}}
 
V ~l
    ~
      ~
Enclosure to Serial 11N P-98-164 Sheet of 4 1
CP&L CO.                     PLANT PERFORMANCE DATA SYSTEM                    PAGE        1 RUN DATE 11/10/98               OPERATING DATA REPORT                      RPD36-000 RUN TIME 08:58:25                 HARRXS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS                                        TELEPHONE (919)362"2573
: 1. UNIT NAME:   HARRIS UNIT 1
: 2. REPORTING PERIOD: OCTOBER     98
: 3. LICENSED THERMAL POWER (MWT): 2775
: 4. NAMEPLATE RATING (GROSS MWE): 950.9
: 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
: 7. MAX DEPENDABLE CAPACITY (NET MWE):       860.0
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED     IF ANY (NET MWE):
: 10. REASONS FOR RESTRICTION IF ANY:
THIS               YR TO                   CUMUL MONTH                DATE                   ATIVE
: 11. HOURS XN REPORTING PERIOD                     745.00            7296.00              100825.00
: 12. NUMBER OF HOURS REACTOR CRITICAL               548.67            7099.67                85409.38
: 13. REACTOR RESERVE SHUTDOWN HRS                       .00                .00                      .00
: 14. HOURS GENERATOR ON LINE                       548.67            7099.67                84593.21
: 15. UNIT RESERVE SHUTDOWN HOURS                       .00                .00                      .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)           1517394.42        19524216.24          227358993.42
: 17. GROSS ELEC. ENERGY GEN (MWH)               505207.00          6471054.00            75652858.00
: 18. NET ELEC. ENERGY GENERATED (MWH)           471267.00          6073803.00            70599108.00
: 19. UNIT SERVICE FACTOR                             73.65              97.31                    83.90
: 20. UNIT AVAILABXLITYFACTOR                        73.65              97.31                    83.90
: 21. UNIT CAP. FACTOR (USING MDC NET)               73.56              96.80                    81.42
: 22. UNIT CAP. FACTOR (USING DER NET)               70.29              92.50                  77.80
: 23. UNIT FORCED OUTAGE RATE                           .60                  .05                    3.13
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Plant shutdown on 10/23/98 and entered RF08. Outage       is scheduled   for   32   days.
: 25. IF SHUTDOWN AT END OF REPORT   PERIOD, ESTXMATED DATE OF START UP: Noveraber 24,             1998
: 26. UNITS IN TEST STATUS (PRIOR   TO COMMERCIAL OPERATION): FORECAST       ACHIEVED INITIAL CRITICALITY XNITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
 
Enclosure to Serial: 1-1NP-98-164 Sheet 2 of4 CPs L CO.                   PLANT PERFORMANCE DATA SYSTEM                 PAGE      1 RUN DATE ll/10/98     APPENDIX B - AVERAGE DAILY POWER LEVEL           RPD39-000 RUN TIME 08:58:25                 HARRIS UNIT 1 DOCKET NO. 050"400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 OCTOBER          1998 DAY    AVG. DAILY POWER LEVEL            DAY   AVG. DAILY POWER LEVEL (MWE-NET)                               (MWE-NET) 855                   17                872 870                   18                868 866                   19                859 859                   20                863 5                  864                   21                872 861                   22                874 858                   23                 736 856                                      -36 868                    25                -30 10                  868                    26                -20 868                    27                "13 12                  869                    28                -12 13                  867                    29 867                    30                -10 15                  871                    31                -10 16                  871
 
Enclosure.to Serial: HNP-98-164.
Sheet 3 of 4 UNIT SHUTDOWNS AND POPOVER REDUCTION UNITNAME:     Harris DATE:         10/31/98 COMPLETED BY: S. G. Rogers TELEPHONE:   (919) 362-2573 REPORT MONTH: October 1998 CAUSE AND CORRECTIVE METHOD OF      LICENSEE                                    ACTION TO DURATION                      SHUTTING DOWN      EVENT        SYSTEM  COMPONENT      PREVENT RECURRENCE NUMBER       DATE       TYPE   I       (HOURS)         REASON 2       REACTOR 3       REPORT II     CODE 4   CODE 5 Plant commenced shutdown 98-004    10/23/98                      3.3                                          98407          HA    INSTRU      for RFO-8 10/23/98 Q 19:23. Turbine Generator valves failed open and Reactor was manually tripped 10/23/98 Q 20:40 due to increasing reactor power and outward rod motion. Plant entered RFO8 which was scheduled to begin 10/23/98    24:00.
I                           2                                                            3                            4 F: Forced                   Reason:                                                      Method:                      Exhibit G-Instructions S: Scheduled                 A-Equipment Failure (Explain)                                 I-Manual                      for Preparation of Data B-Maintenance or Test                                         2-Manual Scram                Entry Sheets for Licensee Event C-Refueling                                                   3-Automatic Scram            Report (LER) File D-Regulatory Restriction                                     4-Continued                  (NUREG.0161)
E-Operator Training tL License Examination                   5-Reduced Load F-Administrative                                              6-Other                       5 Gperationat Error (Explain)                                                                 Exhibit I - Same Source Hither (Explain)
 
a   r Enclosure to Serial: HNP-98-164.
Sheet 4 of 4 UNIT SHUTDOWNS AND POPOVER REDUCTION UNITNAME:       Harris DATE:         10/31/98 COMPLETED BY: S. G. Rogers TELEPHONE:   (919) 362-2573 REPORT MONTH: October 1998 METHOD OF      LICENSEE                                    CAUSE AND DURATION                      SHUTTING DOWN      EVENT        SYSTEM  COMPONENT            CORRECTI VE NUMBER       DATE       TYPE   I       (HOURS)       REASON 2       REACTOR 3       REPORT//     CODE4     CODES               ACTION TO PREVENT RECURRENCE 98405       10/23/98                       193.0                                         N/A                 ZZZZZZ     Entered scheduled Refueling outage (RFO-8) 10/23/98Q 24:00. Outage is scheduled for 32 days.
I                           2                                                            3                            4 F: Forced                   Reason:                                                      Method:                      Exhibit G-Instructions S: Scheduled                 A-Equipment Failure (Explain)                               I-Manual                      for Preparation of Data B-Maintenance or Test                                       2-Manual Scram                Entry Sheets for Liccnsce Event C-Refueling                                                 3-Automatic Scram            Report (LER) File D-Regulatory Restriction                                     4-Continued                  (NUREG-0161)
E-Operator Training & License Examination                   5-Reduced Load F-Administrative                                            6-Other                       5 operational Error (Explain)                                                               Exhibit I - Same Source Hither (Explain)
 
0   i 'g 7.
          ~
r
              ~ ~ ~ ~
a ie}}

Latest revision as of 19:38, 3 February 2020

Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr
ML18016A720
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/31/1998
From: Shannon Rogers, Vandenburgh C
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-98-164, NUDOCS 9811200093
Download: ML18016A720 (7)


Text

CATEGORY 1

'4 ;l REGULA1 Y INFORMATION DISTRIBUTION~ SYSTEM (RIDS)

DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH'.NAME AUTHOR AFFILIATION ROGERS,S. Carolina Power & Light Co.

VANDENBURGH,C. Carolina Power S Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating re Nuclear Power Pla .With 981113 ltr. for 8 Shearon Harris DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:Application for permit renewal filed. 05000400F' RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL IDCODE/NAME LTTR ENCL PD2-1 PD 1 1 FLANDERS,S 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTER 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D

0

'N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Carolina Power 4 Light Conspa'ny, Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 NOV18 1998 United States Nuclear Regulatory Commission Serial: HNP-98-164 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET iVO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of October 1998 is provided.

Sincerely, C. A. VanDen Manager Regulatory Affairs Harris Plant SGR Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road New Hill NC

'st8i i200093 'st8i03i '.

PDR ADQCK 05000400 R PDR

V ~l

~

~

Enclosure to Serial 11N P-98-164 Sheet of 4 1

CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 11/10/98 OPERATING DATA REPORT RPD36-000 RUN TIME 08:58:25 HARRXS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362"2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: OCTOBER 98
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS XN REPORTING PERIOD 745.00 7296.00 100825.00
12. NUMBER OF HOURS REACTOR CRITICAL 548.67 7099.67 85409.38
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 548.67 7099.67 84593.21
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1517394.42 19524216.24 227358993.42
17. GROSS ELEC. ENERGY GEN (MWH) 505207.00 6471054.00 75652858.00
18. NET ELEC. ENERGY GENERATED (MWH) 471267.00 6073803.00 70599108.00
19. UNIT SERVICE FACTOR 73.65 97.31 83.90
20. UNIT AVAILABXLITYFACTOR 73.65 97.31 83.90
21. UNIT CAP. FACTOR (USING MDC NET) 73.56 96.80 81.42
22. UNIT CAP. FACTOR (USING DER NET) 70.29 92.50 77.80
23. UNIT FORCED OUTAGE RATE .60 .05 3.13
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

Plant shutdown on 10/23/98 and entered RF08. Outage is scheduled for 32 days.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTXMATED DATE OF START UP: Noveraber 24, 1998
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY XNITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9

Enclosure to Serial: 1-1NP-98-164 Sheet 2 of4 CPs L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE ll/10/98 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 08:58:25 HARRIS UNIT 1 DOCKET NO. 050"400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 OCTOBER 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 855 17 872 870 18 868 866 19 859 859 20 863 5 864 21 872 861 22 874 858 23 736 856 -36 868 25 -30 10 868 26 -20 868 27 "13 12 869 28 -12 13 867 29 867 30 -10 15 871 31 -10 16 871

Enclosure.to Serial: HNP-98-164.

Sheet 3 of 4 UNIT SHUTDOWNS AND POPOVER REDUCTION UNITNAME: Harris DATE: 10/31/98 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: October 1998 CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT II CODE 4 CODE 5 Plant commenced shutdown 98-004 10/23/98 3.3 98407 HA INSTRU for RFO-8 10/23/98 Q 19:23. Turbine Generator valves failed open and Reactor was manually tripped 10/23/98 Q 20:40 due to increasing reactor power and outward rod motion. Plant entered RFO8 which was scheduled to begin 10/23/98 24:00.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG.0161)

E-Operator Training tL License Examination 5-Reduced Load F-Administrative 6-Other 5 Gperationat Error (Explain) Exhibit I - Same Source Hither (Explain)

a r Enclosure to Serial: HNP-98-164.

Sheet 4 of 4 UNIT SHUTDOWNS AND POPOVER REDUCTION UNITNAME: Harris DATE: 10/31/98 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: October 1998 METHOD OF LICENSEE CAUSE AND DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT CORRECTI VE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT// CODE4 CODES ACTION TO PREVENT RECURRENCE 98405 10/23/98 193.0 N/A ZZZZZZ Entered scheduled Refueling outage (RFO-8) 10/23/98Q 24:00. Outage is scheduled for 32 days.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Liccnsce Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 operational Error (Explain) Exhibit I - Same Source Hither (Explain)