ML18016A720: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 10/31/1998 | | issue date = 10/31/1998 | ||
| title = Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr | | title = Monthly Operating Rept for Oct 1998 for Shearon Harris Nuclear Power Plant.With 981113 Ltr | ||
| author name = | | author name = Rogers S, Vandenburgh C | ||
| author affiliation = CAROLINA POWER & LIGHT CO. | | author affiliation = CAROLINA POWER & LIGHT CO. | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CATEGORY 1'4;l REGULA1 Y INFORMATION DISTRIBUTION~ | {{#Wiki_filter:CATEGORY 1 | ||
SYSTEM (RIDS)FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH'.NAME AUTHOR AFFILIATION ROGERS,S.Carolina Power&Light Co.VANDENBURGH,C. | '4 ;l REGULA1 Y INFORMATION DISTRIBUTION~ SYSTEM (RIDS) | ||
Carolina Power S Light Co.RECIP.NAME RECIPIENT AFFILIATION | DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH'.NAME AUTHOR AFFILIATION ROGERS,S. Carolina Power & Light Co. | ||
VANDENBURGH,C. Carolina Power S Light Co. | |||
RECIP.NAME RECIPIENT AFFILIATION | |||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly operating re | Monthly operating re Nuclear Power Pla .With 981113 ltr. for 8 Shearon Harris DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE: | ||
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Carolina Power 4 Light Conspa'ny, Harris Nuclear Plant P.O.Box 165 New Hill NC 27562 NOV18 1998 United States Nuclear Regulatory Commission ATTENTION: | TITLE: Monthly Operating Report (per Tech Specs) | ||
Document Control Desk Washington, DC 20555 | NOTES:Application for permit renewal filed. 05000400F' RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL IDCODE/NAME LTTR ENCL PD2-1 PD 1 1 FLANDERS,S 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTER 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D | ||
0 | |||
'N NOTE TO ALL "RIDS" RECIPIENTS: | |||
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 | |||
Carolina Power 4 Light Conspa'ny, Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 NOV18 1998 United States Nuclear Regulatory Commission Serial: HNP-98-164 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET iVO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
In accordance with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of October 1998 is provided.Sincerely, C.A.VanDen Manager Regulatory Affairs Harris Plant SGR Enclosure c: Mr.J.B.Brady-NRC Senior Resident Inspector Mr.S.C.Flanders-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator 5413 Shearon Harris Road New Hill NC'st8i i200093'st8i03i'.PDR ADQCK 05000400 R PDR V~l~~Enclosure to Serial 11N P-98-164 Sheet | |||
FORECAST ACHIEVED INITIAL CRITICALITY XNITIAL ELECTRICITY COMMERCIAL OPERATION 1.16-9 Enclosure to Serial: 1-1NP-98-164 Sheet 2 of4 CPs L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE ll/10/98 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 08:58:25 HARRIS UNIT 1 | In accordance with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of October 1998 is provided. | ||
Sheet 3 of 4 UNIT | Sincerely, C. A. VanDen Manager Regulatory Affairs Harris Plant SGR Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road New Hill NC | ||
(919)362-2573 REPORT MONTH: October 1998 | 'st8i i200093 'st8i03i '. | ||
Sheet 4 of 4 UNIT | PDR ADQCK 05000400 R PDR | ||
(919)362-2573 REPORT MONTH: October 1998 NUMBER DATE TYPE I | |||
V ~l | |||
~ | |||
~ | |||
Enclosure to Serial 11N P-98-164 Sheet of 4 1 | |||
CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 11/10/98 OPERATING DATA REPORT RPD36-000 RUN TIME 08:58:25 HARRXS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362"2573 | |||
: 1. UNIT NAME: HARRIS UNIT 1 | |||
: 2. REPORTING PERIOD: OCTOBER 98 | |||
: 3. LICENSED THERMAL POWER (MWT): 2775 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 950.9 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0 | |||
: 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0 | |||
: 7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0 | |||
: 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): | |||
: 10. REASONS FOR RESTRICTION IF ANY: | |||
THIS YR TO CUMUL MONTH DATE ATIVE | |||
: 11. HOURS XN REPORTING PERIOD 745.00 7296.00 100825.00 | |||
: 12. NUMBER OF HOURS REACTOR CRITICAL 548.67 7099.67 85409.38 | |||
: 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00 | |||
: 14. HOURS GENERATOR ON LINE 548.67 7099.67 84593.21 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 | |||
: 16. GROSS THERMAL ENERGY GEN. (MWH) 1517394.42 19524216.24 227358993.42 | |||
: 17. GROSS ELEC. ENERGY GEN (MWH) 505207.00 6471054.00 75652858.00 | |||
: 18. NET ELEC. ENERGY GENERATED (MWH) 471267.00 6073803.00 70599108.00 | |||
: 19. UNIT SERVICE FACTOR 73.65 97.31 83.90 | |||
: 20. UNIT AVAILABXLITYFACTOR 73.65 97.31 83.90 | |||
: 21. UNIT CAP. FACTOR (USING MDC NET) 73.56 96.80 81.42 | |||
: 22. UNIT CAP. FACTOR (USING DER NET) 70.29 92.50 77.80 | |||
: 23. UNIT FORCED OUTAGE RATE .60 .05 3.13 | |||
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH): | |||
Plant shutdown on 10/23/98 and entered RF08. Outage is scheduled for 32 days. | |||
: 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTXMATED DATE OF START UP: Noveraber 24, 1998 | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY XNITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9 | |||
Enclosure to Serial: 1-1NP-98-164 Sheet 2 of4 CPs L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE ll/10/98 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 08:58:25 HARRIS UNIT 1 DOCKET NO. 050"400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 OCTOBER 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 855 17 872 870 18 868 866 19 859 859 20 863 5 864 21 872 861 22 874 858 23 736 856 -36 868 25 -30 10 868 26 -20 868 27 "13 12 869 28 -12 13 867 29 867 30 -10 15 871 31 -10 16 871 | |||
Enclosure.to Serial: HNP-98-164. | |||
Sheet 3 of 4 UNIT SHUTDOWNS AND POPOVER REDUCTION UNITNAME: Harris DATE: 10/31/98 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: October 1998 CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT II CODE 4 CODE 5 Plant commenced shutdown 98-004 10/23/98 3.3 98407 HA INSTRU for RFO-8 10/23/98 Q 19:23. Turbine Generator valves failed open and Reactor was manually tripped 10/23/98 Q 20:40 due to increasing reactor power and outward rod motion. Plant entered RFO8 which was scheduled to begin 10/23/98 24:00. | |||
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG.0161) | |||
E-Operator Training tL License Examination 5-Reduced Load F-Administrative 6-Other 5 Gperationat Error (Explain) Exhibit I - Same Source Hither (Explain) | |||
a r Enclosure to Serial: HNP-98-164. | |||
Sheet 4 of 4 UNIT SHUTDOWNS AND POPOVER REDUCTION UNITNAME: Harris DATE: 10/31/98 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: October 1998 METHOD OF LICENSEE CAUSE AND DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT CORRECTI VE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT// CODE4 CODES ACTION TO PREVENT RECURRENCE 98405 10/23/98 193.0 N/A ZZZZZZ Entered scheduled Refueling outage (RFO-8) 10/23/98Q 24:00. Outage is scheduled for 32 days. | |||
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Liccnsce Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161) | |||
E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 operational Error (Explain) Exhibit I - Same Source Hither (Explain) | |||
0 i 'g 7. | |||
~ | |||
r | |||
~ ~ ~ ~ | |||
a ie}} |
Latest revision as of 19:38, 3 February 2020
ML18016A720 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 10/31/1998 |
From: | Shannon Rogers, Vandenburgh C CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
HNP-98-164, NUDOCS 9811200093 | |
Download: ML18016A720 (7) | |
Text
CATEGORY 1
'4 ;l REGULA1 Y INFORMATION DISTRIBUTION~ SYSTEM (RIDS)
DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH'.NAME AUTHOR AFFILIATION ROGERS,S. Carolina Power & Light Co.
VANDENBURGH,C. Carolina Power S Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly operating re Nuclear Power Pla .With 981113 ltr. for 8 Shearon Harris DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:Application for permit renewal filed. 05000400F' RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL IDCODE/NAME LTTR ENCL PD2-1 PD 1 1 FLANDERS,S 1 1 INTERNAL: ACRS 1 1 AEOD/SPD/RRAB 1 1 CENTER 1 1 OC/DBA/PAD 1 1 1 1 EXTERNAL: LITCO BRYCE,J H 1 1 NOAC 1 1 NRC PDR 1 1 D
0
'N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10
Carolina Power 4 Light Conspa'ny, Harris Nuclear Plant P.O. Box 165 New Hill NC 27562 NOV18 1998 United States Nuclear Regulatory Commission Serial: HNP-98-164 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET iVO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT
Dear Sir or Madam:
In accordance with Carolina Power Ec Light Company's Harris Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of October 1998 is provided.
Sincerely, C. A. VanDen Manager Regulatory Affairs Harris Plant SGR Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road New Hill NC
'st8i i200093 'st8i03i '.
V ~l
~
~
Enclosure to Serial 11N P-98-164 Sheet of 4 1
CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 11/10/98 OPERATING DATA REPORT RPD36-000 RUN TIME 08:58:25 HARRXS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362"2573
- 1. UNIT NAME: HARRIS UNIT 1
- 2. REPORTING PERIOD: OCTOBER 98
- 3. LICENSED THERMAL POWER (MWT): 2775
- 4. NAMEPLATE RATING (GROSS MWE): 950.9
- 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
- 6. MAX DEPENDABLE CAPACITY (GROSS MWE): 920.0
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS XN REPORTING PERIOD 745.00 7296.00 100825.00
- 12. NUMBER OF HOURS REACTOR CRITICAL 548.67 7099.67 85409.38
- 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
- 14. HOURS GENERATOR ON LINE 548.67 7099.67 84593.21
- 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 1517394.42 19524216.24 227358993.42
- 17. GROSS ELEC. ENERGY GEN (MWH) 505207.00 6471054.00 75652858.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 471267.00 6073803.00 70599108.00
- 19. UNIT SERVICE FACTOR 73.65 97.31 83.90
- 20. UNIT AVAILABXLITYFACTOR 73.65 97.31 83.90
- 22. UNIT CAP. FACTOR (USING DER NET) 70.29 92.50 77.80
- 23. UNIT FORCED OUTAGE RATE .60 .05 3.13
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Plant shutdown on 10/23/98 and entered RF08. Outage is scheduled for 32 days.
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTXMATED DATE OF START UP: Noveraber 24, 1998
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED INITIAL CRITICALITY XNITIAL ELECTRICITY COMMERCIAL OPERATION 1.16 - 9
Enclosure to Serial: 1-1NP-98-164 Sheet 2 of4 CPs L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE ll/10/98 APPENDIX B - AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 08:58:25 HARRIS UNIT 1 DOCKET NO. 050"400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 OCTOBER 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 855 17 872 870 18 868 866 19 859 859 20 863 5 864 21 872 861 22 874 858 23 736 856 -36 868 25 -30 10 868 26 -20 868 27 "13 12 869 28 -12 13 867 29 867 30 -10 15 871 31 -10 16 871
Enclosure.to Serial: HNP-98-164.
Sheet 3 of 4 UNIT SHUTDOWNS AND POPOVER REDUCTION UNITNAME: Harris DATE: 10/31/98 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: October 1998 CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT II CODE 4 CODE 5 Plant commenced shutdown 98-004 10/23/98 3.3 98407 HA INSTRU for RFO-8 10/23/98 Q 19:23. Turbine Generator valves failed open and Reactor was manually tripped 10/23/98 Q 20:40 due to increasing reactor power and outward rod motion. Plant entered RFO8 which was scheduled to begin 10/23/98 24:00.
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG.0161)
E-Operator Training tL License Examination 5-Reduced Load F-Administrative 6-Other 5 Gperationat Error (Explain) Exhibit I - Same Source Hither (Explain)
a r Enclosure to Serial: HNP-98-164.
Sheet 4 of 4 UNIT SHUTDOWNS AND POPOVER REDUCTION UNITNAME: Harris DATE: 10/31/98 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: October 1998 METHOD OF LICENSEE CAUSE AND DURATION SHUTTING DOWN EVENT SYSTEM COMPONENT CORRECTI VE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORT// CODE4 CODES ACTION TO PREVENT RECURRENCE 98405 10/23/98 193.0 N/A ZZZZZZ Entered scheduled Refueling outage (RFO-8) 10/23/98Q 24:00. Outage is scheduled for 32 days.
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Liccnsce Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)
E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 operational Error (Explain) Exhibit I - Same Source Hither (Explain)
0 i 'g 7.
~
r
~ ~ ~ ~
a ie