ML18016A767: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 11/30/1998 | | issue date = 11/30/1998 | ||
| title = Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr | | title = Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr | ||
| author name = | | author name = Eads J, Rogers S | ||
| author affiliation = CAROLINA POWER & LIGHT CO. | | author affiliation = CAROLINA POWER & LIGHT CO. | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:CATEGORY 1 REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS)'FACIL:50-400 Shearon Harris.Nuclear Power Plant, Unit 1, Carolina AUTH.NAME.Q.AUTHOR AFFILIATION ROGERS;S.u. | {{#Wiki_filter:CATEGORY 1 REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS) | ||
Carolina Power 6 Light Co.EADS,J.H;Carolina Power&, Light Co.RECIP.NAME RECIPIENT AFFILIATION | DOCKET | ||
'FACIL:50-400 Shearon Harris. Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME.Q . AUTHOR AFFILIATION ROGERS;S.u. Carolina Power 6 Light Co. | |||
EADS,J.H; Carolina Power &, Light Co. | |||
RECIP.NAME RECIPIENT AFFILIATION | |||
==SUBJECT:== | ==SUBJECT:== | ||
Monthly oper Nov 1998 for SH Nuclear Power Plant, Unit.With 981215 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR | Monthly oper Nov 1998 for SH Nuclear Power Plant, Unit .With 981215 ltr. | ||
Monthly Operating Repor t (per Tech Specs)NOTES:Application for permit renewal filed.0500040ÃRECIPIENT ID CODE/NAME PD2-1 PD | DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR Monthly Operating Repor t (per Tech Specs) 1 ENCL L SIZE'ITLE: | ||
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Carolina Power 8c Ught Company Harris Nuclear Plant P.O.8ox 165 New Hill NC 27562 OEC l 5 l998 United States Nuclear Regulatory Commission ATTENTION: | NOTES:Application for permit renewal filed. 0500040Ã RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 FLANDERS,S 1 1 INTERNAL AC 1 1 AEOD/SPD/RRAB 1 1. | ||
Document Control Desk Washington, DC 20555 | ILE CENTER 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H .1 1 NOAC 1 1 NRC PDR 1 1 D | ||
N NOTE TO ALL "RIDS" RECIPIENTS: | |||
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 | |||
Carolina Power 8c Ught Company Harris Nuclear Plant P.O. 8ox 165 New Hill NC 27562 OEC l 5 l998 United States Nuclear Regulatory Commission Serial: HNP-98-181 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT | |||
==Dear Sir or Madam:== | ==Dear Sir or Madam:== | ||
In accordance with Carolina Power&Light Company's Hams Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of November 1998 is provided, Sincerely, J.H.Eads Acting Manager, Regulatory Affairs Harris Plant SGR Enclosure c: Mr.J.B.Brady-NRC Senior Resident Inspector Mr.S.C.Flanders-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator 5413 Shearon Harris Road New Hill NC'it8i22iOi77 98ii30 I';PDR ADGCK 05000400~PDR~l 4 P~O 1 r~'j i | |||
FORECAST ACHZEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCZAL OPERATION 1.16-9 11 | In accordance with Carolina Power & Light Company's Hams Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of November 1998 is provided, Sincerely, J. H. Eads Acting Manager, Regulatory Affairs Harris Plant SGR Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road New Hill NC | ||
Enclosure to Serial: HNP-98-181 Sheet2of3 CPr L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 12/03/98 APPENDIX B | 'it8i22iOi77 98ii30 I'; | ||
(919)362-2573 REPORT MONTH: November 1998 | PDR ADGCK 05000400~ | ||
Plant was rctumed to service on 11/28/98 tm 23:36 and commenced ramp-up to 10(P/o popover.I F: Forced S: Scheduled | PDR~l | ||
4 P ~ | |||
O 1 | |||
r~ | |||
, a k | |||
L | |||
'j i $ lI | |||
'E C | |||
'I t | |||
Enclosure to Serial HNP-98-181 Sheet 1 of 3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 12/03/98 OPERATING DATA REPORT RPD36"000 RUN TIME 10:27:08 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573 | |||
: 1. UNIT NAME: HARRIS UNIT 1 | |||
: 2. REPORTING PERIOD: NOVEMBER 98 | |||
: 3. LICENSED THERMAL POWER (MWT): 2775 | |||
: 4. NAMEPLATE RATING (GROSS MWE): 950.9 | |||
: 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0 | |||
: 6. HAX DEPENDABLE CAPACXTY (GROSS MWE): 920.0 | |||
: 7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0 | |||
: 8. ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): | |||
: 10. REASONS FOR RESTRICTION IF ANY: | |||
THIS YR TO CUMUL MONTH DATE ATIVE | |||
: 11. HOURS XN REPORTING PERIOD 720.00 8016.00 101545.00 | |||
: 12. NUMBER OF HOURS REACTOR CRXTICAL 72.23 7171.90 85481.61 | |||
: 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00 | |||
: 14. HOURS GENERATOR ON LINE 48.40 7148.07 84641.61 | |||
: 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00 | |||
: 16. GROSS THERMAL ENERGY GEN. (MWH) 44835.12 19569051.36 227403828.54 | |||
: 17. GROSS ELEC. ENERGY GEN (MWH) 12417.00 6483471.00 75665275.00 | |||
: 18. NET ELEC. ENERGY GENERATED (MWH) 641.00 6074444.00 70599749.00 | |||
: 19. UNIT SERVICE FACTOR 6.72 89.17 83.35 | |||
: 20. UNIT AVAILABILXTYFACTOR 6.72 89.17 83.35 | |||
: 21. UNIT CAP. FACTOR (USING MDC NET) .10 88.12 80.84 | |||
: 22. UNIT CAP. FACTOR (USING DER NET) .10 84.20 77.25 | |||
: 23. UNIT FORCED OUTAGE RATE .00 .05 3.12 | |||
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE/ AND DURATION OF EACH): | |||
: 25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHZEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCZAL OPERATION 1.16 - 9 | |||
I 11 l | |||
t <' | |||
Enclosure to Serial: HNP-98-181 Sheet2of3 CPr L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 12/03/98 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 10:27:08 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 NOVEMBER 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 17 | |||
-10 18 -10 19 -10 20 | |||
-12 21 -10 | |||
-12 22 | |||
-12 23 -15 | |||
-12 -23 | |||
-10 25 -36 10 26 -35 27 12 -10 28 -37 13 -10 29 | |||
-10 30 282 as 16 1.16 8 | |||
k | |||
'4 It I | |||
Enclosure to Serial: HNP-t)8-181 Sheet 3of3 UNIT SHUTDOWNS AND POPOVER REDUCfION UNITNAME: Harris DATE: 11/30/98 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: November 1998 CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTfING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORTS CODE 4 CODE 5 Plant remained off-line for 98405 10/23/98 671.6 N/A Refueling Outage(RF08). | |||
Plant was rctumed to service on 11/28/98 tm 23:36 and commenced ramp-up to 10(P/o popover. | |||
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161) | |||
E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 G<perational Error (Explain) Exhibit I - Same Source Hither (Explain) | |||
p A | |||
4 r ~ | |||
' i~}} |
Latest revision as of 19:38, 3 February 2020
ML18016A767 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 11/30/1998 |
From: | Johnny Eads, Shannon Rogers CAROLINA POWER & LIGHT CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
HNP-98-181, NUDOCS 9812210177 | |
Download: ML18016A767 (9) | |
Text
CATEGORY 1 REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCKET
'FACIL:50-400 Shearon Harris. Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME.Q . AUTHOR AFFILIATION ROGERS;S.u. Carolina Power 6 Light Co.
EADS,J.H; Carolina Power &, Light Co.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Monthly oper Nov 1998 for SH Nuclear Power Plant, Unit .With 981215 ltr.
DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR Monthly Operating Repor t (per Tech Specs) 1 ENCL L SIZE'ITLE:
NOTES:Application for permit renewal filed. 0500040Ã RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 FLANDERS,S 1 1 INTERNAL AC 1 1 AEOD/SPD/RRAB 1 1.
ILE CENTER 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H .1 1 NOAC 1 1 NRC PDR 1 1 D
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10
Carolina Power 8c Ught Company Harris Nuclear Plant P.O. 8ox 165 New Hill NC 27562 OEC l 5 l998 United States Nuclear Regulatory Commission Serial: HNP-98-181 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT
Dear Sir or Madam:
In accordance with Carolina Power & Light Company's Hams Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of November 1998 is provided, Sincerely, J. H. Eads Acting Manager, Regulatory Affairs Harris Plant SGR Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road New Hill NC
'it8i22iOi77 98ii30 I';
PDR ADGCK 05000400~
PDR~l
4 P ~
O 1
r~
, a k
L
'j i $ lI
'E C
'I t
Enclosure to Serial HNP-98-181 Sheet 1 of 3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 12/03/98 OPERATING DATA REPORT RPD36"000 RUN TIME 10:27:08 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573
- 1. UNIT NAME: HARRIS UNIT 1
- 2. REPORTING PERIOD: NOVEMBER 98
- 3. LICENSED THERMAL POWER (MWT): 2775
- 4. NAMEPLATE RATING (GROSS MWE): 950.9
- 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
- 6. HAX DEPENDABLE CAPACXTY (GROSS MWE): 920.0
- 7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
- 8. ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
- 10. REASONS FOR RESTRICTION IF ANY:
THIS YR TO CUMUL MONTH DATE ATIVE
- 11. HOURS XN REPORTING PERIOD 720.00 8016.00 101545.00
- 12. NUMBER OF HOURS REACTOR CRXTICAL 72.23 7171.90 85481.61
- 13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
- 14. HOURS GENERATOR ON LINE 48.40 7148.07 84641.61
- 15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
- 16. GROSS THERMAL ENERGY GEN. (MWH) 44835.12 19569051.36 227403828.54
- 17. GROSS ELEC. ENERGY GEN (MWH) 12417.00 6483471.00 75665275.00
- 18. NET ELEC. ENERGY GENERATED (MWH) 641.00 6074444.00 70599749.00
- 19. UNIT SERVICE FACTOR 6.72 89.17 83.35
- 20. UNIT AVAILABILXTYFACTOR 6.72 89.17 83.35
- 22. UNIT CAP. FACTOR (USING DER NET) .10 84.20 77.25
- 23. UNIT FORCED OUTAGE RATE .00 .05 3.12
- 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE/ AND DURATION OF EACH):
- 25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHZEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCZAL OPERATION 1.16 - 9
I 11 l
t <'
Enclosure to Serial: HNP-98-181 Sheet2of3 CPr L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 12/03/98 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 10:27:08 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 NOVEMBER 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 17
-10 18 -10 19 -10 20
-12 21 -10
-12 22
-12 23 -15
-12 -23
-10 25 -36 10 26 -35 27 12 -10 28 -37 13 -10 29
-10 30 282 as 16 1.16 8
k
'4 It I
Enclosure to Serial: HNP-t)8-181 Sheet 3of3 UNIT SHUTDOWNS AND POPOVER REDUCfION UNITNAME: Harris DATE: 11/30/98 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: November 1998 CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTfING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORTS CODE 4 CODE 5 Plant remained off-line for 98405 10/23/98 671.6 N/A Refueling Outage(RF08).
Plant was rctumed to service on 11/28/98 tm 23:36 and commenced ramp-up to 10(P/o popover.
I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)
E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 G<perational Error (Explain) Exhibit I - Same Source Hither (Explain)
p A
4 r ~
' i~