ML18016A767: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/30/1998
| issue date = 11/30/1998
| title = Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr
| title = Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr
| author name = EADS J H, ROGERS S G
| author name = Eads J, Rogers S
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CATEGORY 1 REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS)'FACIL:50-400 Shearon Harris.Nuclear Power Plant, Unit 1, Carolina AUTH.NAME.Q.AUTHOR AFFILIATION ROGERS;S.u.
{{#Wiki_filter:CATEGORY 1 REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS)
Carolina Power 6 Light Co.EADS,J.H;Carolina Power&, Light Co.RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000400
DOCKET
  'FACIL:50-400 Shearon Harris. Nuclear Power Plant, Unit 1, Carolina                             05000400 AUTH.NAME.Q .         AUTHOR AFFILIATION ROGERS;S.u.           Carolina Power       6   Light Co.
EADS,J.H;             Carolina Power       &, Light Co.
RECIP.NAME           RECIPIENT AFFILIATION


==SUBJECT:==
==SUBJECT:==
Monthly oper Nov 1998 for SH Nuclear Power Plant, Unit.With 981215 ltr.DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR 1 ENCL L SIZE'ITLE:
Monthly oper                         Nov 1998 for SH Nuclear Power Plant, Unit .With 981215           ltr.
Monthly Operating Repor t (per Tech Specs)NOTES:Application for permit renewal filed.0500040ÃRECIPIENT ID CODE/NAME PD2-1 PD INTERNAL AC ILE CENTER RGN2 COPIES LTTR ENCL 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME FLANDERS,S AEOD/SPD/RRAB OC/DBA/PAD COPIES LTTR ENCL 1 1 1 1.1 1 EXTERNAL: LITCO BRYCE,J H NRC PDR.1 1 1 1 NOAC 1 1 D N NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: IE24D           COPIES RECEIVED:LTR Monthly Operating Repor t (per Tech Specs) 1  ENCL  L    SIZE'ITLE:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10 Carolina Power 8c Ught Company Harris Nuclear Plant P.O.8ox 165 New Hill NC 27562 OEC l 5 l998 United States Nuclear Regulatory Commission ATTENTION:
NOTES:Application       for permit     renewal   filed.                                       0500040Ã RECIPIENT             COPIES              RECIPIENT                      COPIES ID CODE/NAME           LTTR ENCL        ID  CODE/NAME        LTTR ENCL PD2-1   PD                 1     1     FLANDERS,S                        1   1 INTERNAL AC                              1     1     AEOD/SPD/RRAB                     1    1.
Document Control Desk Washington, DC 20555 Serial: HNP-98-181 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400/LICENSE NO.NPF-63 MONTHLY OPERATING REPORT  
ILE  CENTER              1      1      OC/DBA/PAD                         1   1 RGN2                        1     1 EXTERNAL: LITCO BRYCE,J H               .1     1     NOAC                              1   1 NRC PDR                    1     1 D
N NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR                 10   ENCL     10
 
Carolina Power   8c Ught Company Harris Nuclear Plant P.O. 8ox 165 New Hill NC 27562 OEC   l 5 l998 United States Nuclear Regulatory Commission                                     Serial: HNP-98-181 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT


==Dear Sir or Madam:==
==Dear Sir or Madam:==
In accordance with Carolina Power&Light Company's Hams Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of November 1998 is provided, Sincerely, J.H.Eads Acting Manager, Regulatory Affairs Harris Plant SGR Enclosure c: Mr.J.B.Brady-NRC Senior Resident Inspector Mr.S.C.Flanders-NRC Project Manager Mr.L.A.Reyes-NRC Regional Administrator 5413 Shearon Harris Road New Hill NC'it8i22iOi77 98ii30 I';PDR ADGCK 05000400~PDR~l 4 P~O 1 r~'j i k ,-a$lI L'E C'I t Enclosure to Serial HNP-98-181 Sheet 1 of 3 CP&L CO.RUN DATE 12/03/98 RUN TIME 10:27:08 PLANT PERFORMANCE DATA SYSTEM OPERATING DATA REPORT HARRIS UNIT 1 PAGE 1 RPD36"000 OPERATING STATUS DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 1.UNIT NAME: HARRIS UNIT 1 2.REPORTING PERIOD: NOVEMBER 98 3.LICENSED THERMAL POWER (MWT): 2775 4.NAMEPLATE RATING (GROSS MWE): 950.9 5.DESIGN ELECTRICAL RATING (NET MWE): 900.0 6.HAX DEPENDABLE CAPACXTY (GROSS MWE): 920.0 7.MAX DEPENDABLE CAPACITY (NET MWE): 860.0 8.ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7)SINCE LAST REPORT, GIVE REASONS: 9.POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE): 10.REASONS FOR RESTRICTION IF ANY: THIS MONTH YR TO DATE CUMUL ATIVE 11.HOURS XN REPORTING PERIOD 12.NUMBER OF HOURS REACTOR CRXTICAL 13.REACTOR RESERVE SHUTDOWN HRS 14.HOURS GENERATOR ON LINE 15.UNIT RESERVE SHUTDOWN HOURS 16.GROSS THERMAL ENERGY GEN.(MWH)17.GROSS ELEC.ENERGY GEN (MWH)18.NET ELEC.ENERGY GENERATED (MWH)19.UNIT SERVICE FACTOR 20.UNIT AVAILABILXTY FACTOR 21.UNIT CAP.FACTOR (USING MDC NET)22.UNIT CAP.FACTOR (USING DER NET)23.UNIT FORCED OUTAGE RATE 24.SHUTDOWNS SCHED.OVER NEXT 6 MONTHS 720.00 72.23.00 48.40.00 44835.12 12417.00 641.00 6.72 6.72.10.10.00 (TYPE, DATE/101545.00 85481.61.00 84641.61.00 227403828.54 75665275.00 70599749.00 83.35 83.35 80.84 77.25 3.12 8016.00 7171.90.00 7148.07.00 19569051.36 6483471.00 6074444.00 89.17 89.17 88.12 84.20.05 AND DURATION OF EACH): 25.ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP: 26.UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
 
FORECAST ACHZEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCZAL OPERATION 1.16-9 11 I l t<''
In accordance with Carolina Power & Light Company's Hams Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of November 1998 is provided, Sincerely, J. H. Eads Acting Manager, Regulatory Affairs Harris Plant SGR Enclosure c:       Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road   New Hill NC
Enclosure to Serial: HNP-98-181 Sheet2of3 CPr L CO.PLANT PERFORMANCE DATA SYSTEM RUN DATE 12/03/98 APPENDIX B-AVERAGE DAILY POWER LEVEL RUN TIME 10:27:08 HARRIS UNIT 1 PAGE 1 RPD39-000 NOVEMBER 1998 DAY AVG.DAILY POWER LEVEL (MWE-NET)DOCKET NO.050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919)362-2573 DAY AVG.DAILY POWER LEVEL (MWE-NET)17 10 12 13 as 16-10-12-12-12-12-10-10-10-10 18 19 20 21 22 23 25 26 27 28 29 30-10-10-10-15-23-36-35-37 282 1.16-8 k'4 It I UNIT NAME: Harris DATE: 11/30/98 COMPLETED BY: S.G.Rogers TELEPHONE:
'it8i22iOi77 98ii30 I';
(919)362-2573 REPORT MONTH: November 1998 UNIT SHUTDOWNS AND POPOVER REDUCfION Enclosure to Serial: HNP-t)8-181 Sheet 3of3 NUMBER 98405 DATE TYPE I 10/23/98 DURATION (HOURS)671.6 REASON 2 METHOD OF SHUTfING DOWN REACTOR 3 LICENSEE EVENT REPORTS N/A SYSTEM CODE 4 COMPONENT CODE 5 CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE Plant remained off-line for Refueling Outage(RF08).
PDR       ADGCK       05000400~
Plant was rctumed to service on 11/28/98 tm 23:36 and commenced ramp-up to 10(P/o popover.I F: Forced S: Scheduled 2 Reason: A-Equipment Failure (Explain)B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administrative G<perational Error (Explain)Hither (Explain)3 Method: I-Manual 2-Manual Scram 3-Automatic Scram 4-Continued 5-Reduced Load 6-Other 4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161) 5 Exhibit I-Same Source p A 4 r~'i~}}
PDR~l
 
4       P ~
O 1
r~
              , a k
L
  'j i     $ lI
                          'E C
              'I t
 
Enclosure to Serial HNP-98-181 Sheet 1 of 3 CP&L CO.                   PLANT PERFORMANCE DATA SYSTEM                  PAGE      1 RUN DATE 12/03/98               OPERATING DATA REPORT                    RPD36"000 RUN TIME 10:27:08                 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS                                      TELEPHONE (919)362-2573
: 1. UNIT NAME: HARRIS UNIT 1
: 2. REPORTING PERIOD: NOVEMBER 98
: 3. LICENSED THERMAL POWER (MWT): 2775
: 4. NAMEPLATE RATING (GROSS MWE): 950.9
: 5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
: 6. HAX DEPENDABLE CAPACXTY (GROSS MWE): 920.0
: 7. MAX DEPENDABLE CAPACITY (NET MWE):     860.0
: 8. ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS     3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POWER LEVEL TO WHICH RESTRICTED   IF ANY (NET MWE):
: 10. REASONS FOR RESTRICTION IF ANY:
THIS             YR TO                 CUMUL MONTH              DATE                 ATIVE
: 11. HOURS XN REPORTING PERIOD                     720.00          8016.00            101545.00
: 12. NUMBER OF HOURS REACTOR CRXTICAL               72.23          7171.90              85481.61
: 13. REACTOR RESERVE SHUTDOWN HRS                     .00                .00                    .00
: 14. HOURS GENERATOR ON LINE                       48.40          7148.07              84641.61
: 15. UNIT RESERVE SHUTDOWN HOURS                     .00                .00                    .00
: 16. GROSS THERMAL ENERGY GEN. (MWH)           44835.12        19569051.36        227403828.54
: 17. GROSS ELEC. ENERGY GEN (MWH)               12417.00        6483471.00          75665275.00
: 18. NET ELEC. ENERGY GENERATED (MWH)             641.00        6074444.00          70599749.00
: 19. UNIT SERVICE FACTOR                             6.72            89.17                  83.35
: 20. UNIT AVAILABILXTYFACTOR                        6.72            89.17                  83.35
: 21. UNIT CAP. FACTOR (USING MDC NET)                 .10            88.12                  80.84
: 22. UNIT CAP. FACTOR (USING DER NET)                 .10            84.20                  77.25
: 23. UNIT FORCED OUTAGE RATE                         .00                .05                  3.12
: 24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE/ AND DURATION OF EACH):
: 25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHZEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCZAL OPERATION 1.16 - 9
 
I 11 l
t <'
 
Enclosure to Serial: HNP-98-181 Sheet2of3 CPr L CO.                   PLANT PERFORMANCE DATA SYSTEM                   PAGE      1 RUN DATE 12/03/98     APPENDIX B AVERAGE DAILY POWER LEVEL             RPD39-000 RUN TIME 10:27:08                 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 NOVEMBER        1998 DAY    AVG. DAILY POWER LEVEL              DAY   AVG. DAILY POWER LEVEL (MWE-NET)                                  (MWE-NET) 17
                    -10                    18                -10 19                -10 20
                    -12                     21                -10
                    -12                     22
                    -12                     23                -15
                    -12                                       -23
                    -10                     25                -36 10                                         26                -35 27 12                  -10                     28                 -37 13                  -10                     29
                    -10                     30                282 as 16 1.16 8
 
k
      '4 It I
 
Enclosure to Serial: HNP-t)8-181 Sheet 3of3 UNIT SHUTDOWNS AND POPOVER REDUCfION UNITNAME:     Harris DATE:         11/30/98 COMPLETED BY: S. G. Rogers TELEPHONE:   (919) 362-2573 REPORT MONTH: November 1998 CAUSE AND CORRECTIVE METHOD OF      LICENSEE                                    ACTION TO DURATION                      SHUTfING DOWN      EVENT        SYSTEM COMPONENT      PREVENT RECURRENCE NUMBER       DATE       TYPE   I       (HOURS)       REASON 2       REACTOR 3       REPORTS       CODE 4   CODE 5 Plant remained off-line for 98405      10/23/98                      671.6                                      N/A                              Refueling Outage(RF08).
Plant was rctumed to service on 11/28/98 tm 23:36 and commenced ramp-up to 10(P/o popover.
I                           2                                                            3                            4 F: Forced                   Reason:                                                      Method:                      Exhibit G-Instructions S: Scheduled                 A-Equipment Failure (Explain)                               I-Manual                    for Preparation of Data B-Maintenance or Test                                       2-Manual Scram              Entry Sheets for Licensee Event C-Refueling                                                 3-Automatic Scram            Report (LER) File D-Regulatory Restriction                                     4-Continued                  (NUREG-0161)
E-Operator Training & License Examination                   5-Reduced Load F-Administrative                                             6-Other                      5 G<perational Error (Explain)                                                             Exhibit I - Same Source Hither (Explain)
 
p A
4 r ~
' i~}}

Latest revision as of 19:38, 3 February 2020

Monthly Operating Rept for Nov 1998 for Shnpp,Unit 1.With 981215 Ltr
ML18016A767
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 11/30/1998
From: Johnny Eads, Shannon Rogers
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-98-181, NUDOCS 9812210177
Download: ML18016A767 (9)


Text

CATEGORY 1 REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

DOCKET

'FACIL:50-400 Shearon Harris. Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.NAME.Q . AUTHOR AFFILIATION ROGERS;S.u. Carolina Power 6 Light Co.

EADS,J.H; Carolina Power &, Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly oper Nov 1998 for SH Nuclear Power Plant, Unit .With 981215 ltr.

DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR Monthly Operating Repor t (per Tech Specs) 1 ENCL L SIZE'ITLE:

NOTES:Application for permit renewal filed. 0500040Ã RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 PD 1 1 FLANDERS,S 1 1 INTERNAL AC 1 1 AEOD/SPD/RRAB 1 1.

ILE CENTER 1 1 OC/DBA/PAD 1 1 RGN2 1 1 EXTERNAL: LITCO BRYCE,J H .1 1 NOAC 1 1 NRC PDR 1 1 D

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPZES RECEIVED BY YOU OR YOUR ORGANIZATIONS CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 10 ENCL 10

Carolina Power 8c Ught Company Harris Nuclear Plant P.O. 8ox 165 New Hill NC 27562 OEC l 5 l998 United States Nuclear Regulatory Commission Serial: HNP-98-181 ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 MONTHLYOPERATING REPORT

Dear Sir or Madam:

In accordance with Carolina Power & Light Company's Hams Nuclear Plant Technical Specification 6.9.1.5, the report of operating statistics and shutdown experience for the month of November 1998 is provided, Sincerely, J. H. Eads Acting Manager, Regulatory Affairs Harris Plant SGR Enclosure c: Mr. J. B. Brady - NRC Senior Resident Inspector Mr. S. C. Flanders - NRC Project Manager Mr. L. A. Reyes - NRC Regional Administrator 5413 Shearon Harris Road New Hill NC

'it8i22iOi77 98ii30 I';

PDR ADGCK 05000400~

PDR~l

4 P ~

O 1

r~

, a k

L

'j i $ lI

'E C

'I t

Enclosure to Serial HNP-98-181 Sheet 1 of 3 CP&L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 12/03/98 OPERATING DATA REPORT RPD36"000 RUN TIME 10:27:08 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS OPERATING STATUS TELEPHONE (919)362-2573

1. UNIT NAME: HARRIS UNIT 1
2. REPORTING PERIOD: NOVEMBER 98
3. LICENSED THERMAL POWER (MWT): 2775
4. NAMEPLATE RATING (GROSS MWE): 950.9
5. DESIGN ELECTRICAL RATING (NET MWE): 900.0
6. HAX DEPENDABLE CAPACXTY (GROSS MWE): 920.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 860.0
8. ZF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS XN REPORTING PERIOD 720.00 8016.00 101545.00
12. NUMBER OF HOURS REACTOR CRXTICAL 72.23 7171.90 85481.61
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 .00
14. HOURS GENERATOR ON LINE 48.40 7148.07 84641.61
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 44835.12 19569051.36 227403828.54
17. GROSS ELEC. ENERGY GEN (MWH) 12417.00 6483471.00 75665275.00
18. NET ELEC. ENERGY GENERATED (MWH) 641.00 6074444.00 70599749.00
19. UNIT SERVICE FACTOR 6.72 89.17 83.35
20. UNIT AVAILABILXTYFACTOR 6.72 89.17 83.35
21. UNIT CAP. FACTOR (USING MDC NET) .10 88.12 80.84
22. UNIT CAP. FACTOR (USING DER NET) .10 84.20 77.25
23. UNIT FORCED OUTAGE RATE .00 .05 3.12
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE/ AND DURATION OF EACH):
25. ZF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHZEVED INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCZAL OPERATION 1.16 - 9

I 11 l

t <'

Enclosure to Serial: HNP-98-181 Sheet2of3 CPr L CO. PLANT PERFORMANCE DATA SYSTEM PAGE 1 RUN DATE 12/03/98 APPENDIX B AVERAGE DAILY POWER LEVEL RPD39-000 RUN TIME 10:27:08 HARRIS UNIT 1 DOCKET NO. 050-400 COMPLETED BY SHEILA ROGERS TELEPHONE (919) 362-2573 NOVEMBER 1998 DAY AVG. DAILY POWER LEVEL DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 17

-10 18 -10 19 -10 20

-12 21 -10

-12 22

-12 23 -15

-12 -23

-10 25 -36 10 26 -35 27 12 -10 28 -37 13 -10 29

-10 30 282 as 16 1.16 8

k

'4 It I

Enclosure to Serial: HNP-t)8-181 Sheet 3of3 UNIT SHUTDOWNS AND POPOVER REDUCfION UNITNAME: Harris DATE: 11/30/98 COMPLETED BY: S. G. Rogers TELEPHONE: (919) 362-2573 REPORT MONTH: November 1998 CAUSE AND CORRECTIVE METHOD OF LICENSEE ACTION TO DURATION SHUTfING DOWN EVENT SYSTEM COMPONENT PREVENT RECURRENCE NUMBER DATE TYPE I (HOURS) REASON 2 REACTOR 3 REPORTS CODE 4 CODE 5 Plant remained off-line for 98405 10/23/98 671.6 N/A Refueling Outage(RF08).

Plant was rctumed to service on 11/28/98 tm 23:36 and commenced ramp-up to 10(P/o popover.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee Event C-Refueling 3-Automatic Scram Report (LER) File D-Regulatory Restriction 4-Continued (NUREG-0161)

E-Operator Training & License Examination 5-Reduced Load F-Administrative 6-Other 5 G<perational Error (Explain) Exhibit I - Same Source Hither (Explain)

p A

4 r ~

' i~