                             *VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 15, 1991 United States Nuclear Regulatory Commission                      Serial No. 91-054 Attention: Document Control Desk                                  NO/ETS      R6 Washington, D. C. 20555                                          Docket No. 50-280 License No. DPR-32 Gentlemen:
                             *VIRGINIA ELECTRIC AND POWER COMPANY
* RICHMOND, VIRGINIA 23261 February 15, 1991 United States Nuclear Regulatory Commission                      Serial No. 91-054 Attention: Document Control Desk                                  NO/ETS      R6 Washington, D. C. 20555                                          Docket No. 50-280 License No. DPR-32 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY
VIRGINIA ELECTRIC AND POWER COMPANY
     . SURRY POWER STATION UNIT 1 SPECIAL REPORT ATWS MITIGATION SYSTEM ACTUATION CIRCUITRY Surry Unit 1 installed ATWS Mitigation System Actuation Circuitry (AMSAC) in accordance. with the requirements of 10 CFR 50.62 during the Fall 1990 refueling outage. After installation but prior to startup, the AMSAC was thoroughly tested. This testing included post-modification testing as well as functional testing. Based on these test results and the subsequent Technical Review required by our Design Change Program, the system was declared operable by the Station Nuclear Safety and Operating Committee and placed in service. However, shortly after unit startup on December 20, 1990, we began to receive spurious alarms and the system was placed in "Bypass."
     . SURRY POWER STATION UNIT 1 SPECIAL REPORT ATWS MITIGATION SYSTEM ACTUATION CIRCUITRY Surry Unit 1 installed ATWS Mitigation System Actuation Circuitry (AMSAC) in accordance. with the requirements of 10 CFR 50.62 during the Fall 1990 refueling outage. After installation but prior to startup, the AMSAC was thoroughly tested. This testing included post-modification testing as well as functional testing. Based on these test results and the subsequent Technical Review required by our Design Change Program, the system was declared operable by the Station Nuclear Safety and Operating Committee and placed in service. However, shortly after unit startup on December 20, 1990, we began to receive spurious alarms and the system was placed in "Bypass."
Line 30: Line 28:
Senior Vice President - Nuclear Attachment 910220()242 910215 PDR ADOCI< 05000280 S                  PDR
Senior Vice President - Nuclear Attachment 910220()242 910215 PDR ADOCI< 05000280 S                  PDR


' .
cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
                      *
* cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station
Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station
* ATTACHMENT
* ATTACHMENT SPECIAL REPORT ATWS MITIGATION SYSTEM ACTUATION CIRCUITRY (AMSAC)
* SPECIAL REPORT ATWS MITIGATION SYSTEM ACTUATION CIRCUITRY (AMSAC)
The Anticipated Transient Without Scram (ATWS) Mitigation System Actuation Circuitry was installed in Surry Unit 1 during the recently completed refueling outage. In early December of 1990, engineering and testing personnel performed field verification testing as specified by the design document and also satisfactorily performed calibration and functional testing. Based on the results of this testing, the system was determined to be fully operable. On December 20, 1990, shortly after placing the system in service, we began to receive spurious alarms, and the system was placed in "Bypass" for troubleshooting.
The Anticipated Transient Without Scram (ATWS) Mitigation System Actuation Circuitry was installed in Surry Unit 1 during the recently completed refueling outage. In early December of 1990, engineering and testing personnel performed field verification testing as specified by the design document and also satisfactorily performed calibration and functional testing. Based on the results of this testing, the system was determined to be fully operable. On December 20, 1990, shortly after placing the system in service, we began to receive spurious alarms, and the system was placed in "Bypass" for troubleshooting.
On December 21, 1990, a problem was found and corrected in one of the
On December 21, 1990, a problem was found and corrected in one of the
Line 47: Line 42:
No further problems were encountered and the system was returned to service on February 4, 1991, after recalibration and field verification.
No further problems were encountered and the system was returned to service on February 4, 1991, after recalibration and field verification.


                  *
Later that day, spurious alarms began to recur, including problems originating with the** door switch, and the system was placed in "Bypass" for further troubleshooting.      On February 6, 1991, troubleshooting located a short between two field wiring contacts on one of the system power supply status relays. Correction of this situation eliminated the abnormal symptoms observed that day from actuation of the panel door switch.
* Later that day, spurious alarms began to recur, including problems originating with the** door switch, and the system was placed in "Bypass" for further troubleshooting.      On February 6, 1991, troubleshooting located a short between two field wiring contacts on one of the system power supply status relays. Correction of this situation eliminated the abnormal symptoms observed that day from actuation of the panel door switch.
The AMSAC is redundant to the Reactor Protection System and is designed to trip the main turbine, initiate auxiliary feedwater flow, and trip the output breakers of the Rod Drive Motor Generator sets in the event the Reactor Protection System (RPS) fails to function. The RPS has been fully operable since the unit was returned to- service.
The AMSAC is redundant to the Reactor Protection System and is designed to trip the main turbine, initiate auxiliary feedwater flow, and trip the output breakers of the Rod Drive Motor Generator sets in the event the Reactor Protection System (RPS) fails to function. The RPS has been fully operable since the unit was returned to- service.
Therefore, the health and safety of the public were unaffected. Also, the Emergency Operating Procedures provide detailed manual actions to be taken by operations personnel in the event the RPS does not function when required.        These manual actions include those performed automatically by AMSAC.
Therefore, the health and safety of the public were unaffected. Also, the Emergency Operating Procedures provide detailed manual actions to be taken by operations personnel in the event the RPS does not function when required.        These manual actions include those performed automatically by AMSAC.
At* the date of this letter, extensive troubleshooting, component replacement, and system grooming are still in progress. A final report will be submitted when the problems have been corrected and the system -*
At* the date of this letter, extensive troubleshooting, component replacement, and system grooming are still in progress. A final report will be submitted when the problems have been corrected and the system -*
has been returned to service.}}
has been returned to service.}}

Latest revision as of 22:43, 2 February 2020

Special Rept:On 901220,spurious Alarms Received Shortly After Placing ATWS Mitigation Sys Actuation Circuitry in Svc.From 901222-28,spurious Trouble Alarms Received.On 901231,improper Voltage Ratings Found on Relay Modules
ML18153C544
Person / Time
Site: Surry Dominion icon.png
Issue date: 02/15/1991
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-91-054, L-91-54, NUDOCS 9102200242
Download: ML18153C544 (4)


Text

I' i

  • VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 February 15, 1991 United States Nuclear Regulatory Commission Serial No.91-054 Attention: Document Control Desk NO/ETS R6 Washington, D. C. 20555 Docket No. 50-280 License No. DPR-32 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY

. SURRY POWER STATION UNIT 1 SPECIAL REPORT ATWS MITIGATION SYSTEM ACTUATION CIRCUITRY Surry Unit 1 installed ATWS Mitigation System Actuation Circuitry (AMSAC) in accordance. with the requirements of 10 CFR 50.62 during the Fall 1990 refueling outage. After installation but prior to startup, the AMSAC was thoroughly tested. This testing included post-modification testing as well as functional testing. Based on these test results and the subsequent Technical Review required by our Design Change Program, the system was declared operable by the Station Nuclear Safety and Operating Committee and placed in service. However, shortly after unit startup on December 20, 1990, we began to receive spurious alarms and the system was placed in "Bypass."

Since the inoperability of AMSAC is not covered under existing Technical Specifications or applicable under 10 CFR 50.72, we are providing formal notification by this Special Report. The attached Special Report provides a description of the circumstances surrounding this event. A final report will be submitted when corrective .

actions are complete and the system is returned to service.

This Special Report has been reviewed and approved by the Station Nuclear Safety and Operating Committee. It has been determined that operation with AMSAC out of service does not present any undue risk to the health and safety of the public.

We will continue to aggressively pursue resolution of the AMSAC technical issues as well as keep you advised of our progress. Should you have any further questions, please contact us.

I W. L. St wart

~

Senior Vice President - Nuclear Attachment 910220()242 910215 PDR ADOCI< 05000280 S PDR

cc: U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station

  • ATTACHMENT SPECIAL REPORT ATWS MITIGATION SYSTEM ACTUATION CIRCUITRY (AMSAC)

The Anticipated Transient Without Scram (ATWS) Mitigation System Actuation Circuitry was installed in Surry Unit 1 during the recently completed refueling outage. In early December of 1990, engineering and testing personnel performed field verification testing as specified by the design document and also satisfactorily performed calibration and functional testing. Based on the results of this testing, the system was determined to be fully operable. On December 20, 1990, shortly after placing the system in service, we began to receive spurious alarms, and the system was placed in "Bypass" for troubleshooting.

On December 21, 1990, a problem was found and corrected in one of the

  • analog input modules. The system was tested using the monthly performance test, and on December 22, 1990, it was placed. back in "Normal". From December 22 through 28, a number of spurious "Trouble"

~ilarms were received, and on December 28, 1990, the system was returned to "Bypass" for* further troubleshooting.

On December 31, 1990, a problem was found with improper voltage ratings of the output relay modules interfacing with the Main Control Room annunciator circuits. Specifically, 125 volts DC was being applied to relay output module boards which were rated for only 30 volts DC. , A

  • Field Change to the original .design was installed to correct this condition.

When the* system was tested. on January 12, 1991,

  • following the Field Change, another problem was discovered.. When the panel door was being closed, the door switch was initiating an unexpected "Armed" alarm, and troubleshooting was resumed using diagnostic software. Some components were found suspect and replaced, and the system was recalibrated and field verified: After a satisfactory technical review* by engineering and the Station Nuclear Safety and Operating Committee on January 23, 1991, the system was returned to "Normal." Eighteen hours later, on January 24, 1991, spurious alarms were received again and the system was returned to "Bypass." The diagnostic software was reinstalled, and a defective input module was found in one of the programmable logic controllers. This module was replaced and the system was monitored using the diagnostic
  • software for. several days.

No further problems were encountered and the system was returned to service on February 4, 1991, after recalibration and field verification.

Later that day, spurious alarms began to recur, including problems originating with the** door switch, and the system was placed in "Bypass" for further troubleshooting. On February 6, 1991, troubleshooting located a short between two field wiring contacts on one of the system power supply status relays. Correction of this situation eliminated the abnormal symptoms observed that day from actuation of the panel door switch.

The AMSAC is redundant to the Reactor Protection System and is designed to trip the main turbine, initiate auxiliary feedwater flow, and trip the output breakers of the Rod Drive Motor Generator sets in the event the Reactor Protection System (RPS) fails to function. The RPS has been fully operable since the unit was returned to- service.

Therefore, the health and safety of the public were unaffected. Also, the Emergency Operating Procedures provide detailed manual actions to be taken by operations personnel in the event the RPS does not function when required. These manual actions include those performed automatically by AMSAC.

At* the date of this letter, extensive troubleshooting, component replacement, and system grooming are still in progress. A final report will be submitted when the problems have been corrected and the system -*

has been returned to service.