ML18306A488: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 22: Line 22:
TENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no C will be issued with the updated material.
TENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no C will be issued with the updated material.
TSl - PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS    DATE: 10/15/2018 ADD    MANUAL TABLE OF CONTENTS  DATE: 10/24/2018 CATEGORY: DOCUMENTS  TYPE: TSl ID: TEXT 3.6.4.1 REMOVE:  .REV:6 ADD:    REV: 7
TSl - PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS    DATE: 10/15/2018 ADD    MANUAL TABLE OF CONTENTS  DATE: 10/24/2018 CATEGORY: DOCUMENTS  TYPE: TSl ID: TEXT 3.6.4.1 REMOVE:  .REV:6 ADD:    REV: 7
* Page      2 of 2
 
Page      2 of 2
*ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3107 OR X3171 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX .
*ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3107 OR X3171 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX .
*
*


        .,,
,:...*                                              SSES MANUAL Manual Name:  TSl
,:...*                                              SSES MANUAL Manual Name:  TSl
* Manual
* Manual
Line 41: Line 39:


==Title:==
==Title:==
USE AND APPLICATION DEFINITIONS TEXT 1.2                          0
USE AND APPLICATION DEFINITIONS TEXT 1.2                          0 TEXT 1.3 TEXT 1.4 TEXT 2.0 TEXT 3.0 REQUIREMENT 0    11/06/2002
* TEXT 1.3 TEXT 1.4 TEXT 2.0 TEXT 3.0 REQUIREMENT 0    11/06/2002


==Title:==
==Title:==
Line 82: Line 79:
==Title:==
==Title:==
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
* TEXT 3.2.3                        2    11/16/2016
TEXT 3.2.3                        2    11/16/2016


==Title:==
==Title:==
Line 96: Line 93:
==Title:==
==Title:==
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2                      2    11/16/2016
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2                      2    11/16/2016
                                                                                                *


==Title:==
==Title:==
INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION Page J      of  9                                                        Report Date: 10/25/18
INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION Page J      of  9                                                        Report Date: 10/25/18


      *'
. "'                                            .SSES MANUAL Manual Name:    TSl
. "'                                            .SSES MANUAL Manual Name:    TSl
* Manual
* Manual
Line 143: Line 138:
==Title:==
==Title:==
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1                        4    11/16/2016
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1                        4    11/16/2016
  *


==Title:==
==Title:==
Line 156: Line 150:


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) JET PUMPS
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3                      2    01/13/~012
  -,
TEXT 3.4.3                      2    01/13/~012


==Title:==
==Title:==
Line 177: Line 169:


==Title:==
==Title:==
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM HOT SHUTDOWN TEXT 3.4.9                      1    11/16/2016
* HOT SHUTDOWN TEXT 3.4.9                      1    11/16/2016


==Title:==
==Title:==
Line 193: Line 184:
EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS OPERATING TEXT 3.5.2                      1    11/16/2016
SYSTEM ECCS OPERATING TEXT 3.5.2                      1    11/16/2016
                                                                                                  *


==Title:==
==Title:==
Line 199: Line 189:
SYSTEM ECCS SHUTDOWN Page!      of  ~                                                        Report Date: 10/25/18
SYSTEM ECCS SHUTDOWN Page!      of  ~                                                        Report Date: 10/25/18


SSES MANUAL
SSES MANUAL Manual Name:      TSl Manual
* Manual Name:      TSl Manual


==Title:==
==Title:==
Line 234: Line 223:
==Title:==
==Title:==
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1                    2    06/13/2006
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1                    2    06/13/2006
*


==Title:==
==Title:==
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINE~S Page~      of    9                                                    Report Date: 10/25/18
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINE~S Page~      of    9                                                    Report Date: 10/25/18


                                                                                                *.
SSES MANUAL Manual Name:      TSl Manual
SSES MANUAL Manual Name:      TSl Manual


Line 267: Line 254:


==Title:==
==Title:==
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3                          3    09/15/2017
* TEXT 3.7.3                          3    09/15/2017


==Title:==
==Title:==
Line 281: Line 267:
==Title:==
==Title:==
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7                          1    11/16/2016
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7                          1    11/16/2016
                                                                                                  *


==Title:==
==Title:==
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL Page .§.      of  i                                                        Report Date: 10/25/18
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL Page .§.      of  i                                                        Report Date: 10/25/18


SSES MANUAL
SSES MANUAL Manual Name:  TSl Manual
* Manual Name:  TSl Manual


==Title:==
==Title:==
Line 325: Line 309:
==Title:==
==Title:==
REFUELING OPERATIONS REFUEL POSITION ONE ROD OUT INTERLOCK TEXT 3.9.3                        1    11/16/2016
REFUELING OPERATIONS REFUEL POSITION ONE ROD OUT INTERLOCK TEXT 3.9.3                        1    11/16/2016
*


==Title:==
==Title:==
Line 356: Line 339:


==Title:==
==Title:==
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3                      1    11/16/2016
* TEXT 3.10.3                      1    11/16/2016


==Title:==
==Title:==
Line 370: Line 352:
==Title:==
==Title:==
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING TEXT 3.10.7                      0    11/14/2002
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING TEXT 3.10.7                      0    11/14/2002
                                                                                              *


==Title:==
==Title:==
Line 410: Line 391:
* Page~    of  9                                                        Report Date: 10/25/18
* Page~    of  9                                                        Report Date: 10/25/18


Rev. 7
Rev. 7 Secondary Containment 3.6.4.1 3.6            CONTAINMENT SYSTEMS 3.6.4.1        Secondary Containment LCO 3.6.4.1        The secondary containment shall be OPERABLE.
* Secondary Containment 3.6.4.1 3.6            CONTAINMENT SYSTEMS 3.6.4.1        Secondary Containment LCO 3.6.4.1        The secondary containment shall be OPERABLE.
APPLICABILITY:      MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary _
APPLICABILITY:      MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary _
containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).
containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).
Line 422: Line 402:
* SUSQUEHANNA - UNIT 1                    TS/ 3.6-35                            Amendment~. 226
* SUSQUEHANNA - UNIT 1                    TS/ 3.6-35                            Amendment~. 226


Rev. 7
Rev. 7 Secondary Containment 3.6.4.1 ACTIONS (continued)
* Secondary Containment 3.6.4.1 ACTIONS (continued)
CONDITION                              REQUIRED ACTION                      COMPLETION TIME C. Secondary containment                  C.1 --------------NOTE----------------
CONDITION                              REQUIRED ACTION                      COMPLETION TIME C. Secondary containment                  C.1 --------------NOTE----------------
inoperable during movement                    LCO 3.0.3 is not applicable.
inoperable during movement                    LCO 3.0.3 is not applicable.
Line 435: Line 414:
* SUSQUEHANNA - UNIT 1                          TS I 3.6-36              Amendment ..:J.+g, 2-24,-2-2@, 2W, 270
* SUSQUEHANNA - UNIT 1                          TS I 3.6-36              Amendment ..:J.+g, 2-24,-2-2@, 2W, 270


Rev. 7
Rev. 7 Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS (continued)
* Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE                                          FREQUENCY SR 3.6.4.1.3 Verify one secondary containment access door in          In accordance with the each access opening is closed, except when the          Surveillance Frequency access opening is being used for entry and exit.        Control Program SR 3.6.4.1.4 ---------------------------NOTE-------------------------
SURVEILLANCE                                          FREQUENCY SR 3.6.4.1.3 Verify one secondary containment access door in          In accordance with the each access opening is closed, except when the          Surveillance Frequency access opening is being used for entry and exit.        Control Program SR 3.6.4.1.4 ---------------------------NOTE-------------------------
The maximum time allowed for secondary containment draw down is dependent on the secondary containment configuration.
The maximum time allowed for secondary containment draw down is dependent on the secondary containment configuration.

Latest revision as of 15:51, 2 February 2020

Revised Technical Specifications Manual
ML18306A488
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 10/25/2018
From:
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML18306A488 (14)


Text

Page 1 of 2

  • MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2018-18612 USER INFORMATION:

GERLACH*ROSEY M EMPL#: 028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194 TRANSMITTAL INFORMATION:

TO: GERLACH*ROSEY M 10/25/2018 LOCATION: NRC REGION 1 TECH SPECS FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)

THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF RRORS.

TENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no C will be issued with the updated material.

TSl - PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 10/15/2018 ADD MANUAL TABLE OF CONTENTS DATE: 10/24/2018 CATEGORY: DOCUMENTS TYPE: TSl ID: TEXT 3.6.4.1 REMOVE: .REV:6 ADD: REV: 7

Page 2 of 2

  • ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3107 OR X3171 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX .

,:...* SSES MANUAL Manual Name: TSl

  • Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL Table Of Contents Issue Date: 10/24/2018 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 46 07/05/2018

Title:

LIST OF EFFECTIVE SECTIONS TEXT TOC 9 07/05/2018

Title:

TABLE OF CONTENTS TEXT 1.1 2 05/02/2008

Title:

USE AND APPLICATION DEFINITIONS TEXT 1.2 0 TEXT 1.3 TEXT 1.4 TEXT 2.0 TEXT 3.0 REQUIREMENT 0 11/06/2002

Title:

REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM)

TEXT 3 .1.2 0 11/06/2002

Title:

REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 2 11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY

  • Page 1. of 9 Report Date: 10/25/18

SSES MANUAL Manual Name: TSl Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANDA.

TEXT 3 .1.4 3 11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS TEXT 3.1.5 1 11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3 .1. 6 1 11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL TEXT 3.1.7 4 11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 2 11/16/2016

Title:

REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 2 11/16/2016

Title:

POWER DISTRIBUTION LIMITS AVERAGE PLANAR *LINEAR HEAT GENERATION RATE (APLHGR)

TEXT 3.2.2 2 11/16/2016

Title:

POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)

TEXT 3.2.3 2 11/16/2016

Title:

POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR)

TEXT 3.3:1.1 4 11/16/2016

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 1 11/16/2016

Title:

INSTRUMENTATION SOURCE RANGE MONITOR (BRM) INSTRUMENTATION TEXT 3.3.2.1 3 11/16/2016

Title:

INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 2 11/16/2016

Title:

INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION Page J of 9 Report Date: 10/25/18

. "' .SSES MANUAL Manual Name: TSl

  • Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.3.3.1 3 11/16/2016

Title:

INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 2 11/16/2016

Title:

INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 2 11/16/2016

Title:

INSTRUMENTATION.END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION TEXT 3.3.4.2 1 11/16/2016

Title:

INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT. SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 4 11/16/2016

Title:

INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION

  • TEXT 3.3.5.2 1 11/16/2016

Title:

INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.l 6 11/16/2016

Title:

INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 1 11/16/2016

Title:

INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 1 11/16/2016

Title:

INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM.

INSTRUMENTATION TEXT 3.3.8.1 1 11/16/2016

Title:

IN~TRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION*

TEXT 3.3.8.2 1 11/16/2016

Title:

INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 4 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING Pagel of 9 Report Date: 10/25/18

SSES MANUAL Manual Name: TSl

\-- Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANU~

TEXT 3.4.2 2 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 2 01/13/~012

Title:

REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)

TEXT 3.4.4 1 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 0 11/14/2002

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 3 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 2 11/16/20i6

Title:

R~ACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 2 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM HOT SHUTDOWN TEXT 3.4.9 1 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM I

COLD SHUTDOWN TEXT 3.4.10 4 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 1 11/16/2016

Title:

REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 3 11/16/2016

Title:

EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS OPERATING TEXT 3.5.2 1 11/16/2016

Title:

EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM ECCS SHUTDOWN Page! of ~ Report Date: 10/25/18

SSES MANUAL Manual Name: TSl Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.5.3 2 11/16/2016

Title:

EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)

SYSTEM RCIC SYSTEM TEXT 3.6.1.1 1 11/16/2016

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT TEXT 3 . 6 . 1. 2 1 11/16/2016

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3 . 6 . 1. 3 4 11/16/2016 Titl~: CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)

TEXT 3 . 6 . 1. 4 1 11/16/2016

Title:

CONTAINMENT SYSTEMS CONTAINMENT PRESSURE

  • TEXT 3 . 6 . 1. 5 1 11/16/2016

Title:

CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3 . 6 . 1. 6 1 11/16/2016

Title:

CONTAINMENT SYSTEMS SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 1 11/16/2016

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 1 11/16/2016

Title:

CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 1 11/16/2016 Titl~: CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 1 11/16/2016

Title:

CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2 06/13/2006

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINE~S Page~ of 9 Report Date: 10/25/18

SSES MANUAL Manual Name: TSl Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANDA~

TEXT 3.6.3.2 2 11/16/2016

Title:

CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 1 11/16/2016

Title:

CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 7 10/24/2018

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 1 11/16/2016

Title:

CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)

TEXT 3.6.4.3 3 09/15/2017

Title:

CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 TEXT 3.7.2 2

ULTIMATE HEAT SINK (UHS) 1 11/16/2016

Title:

PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE 11/16/2016

Title:

PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 3 09/15/2017

Title:

PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 1 11/16/2016

Title:

PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 1 11/16/2016

Title:

PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 3 11/16/2016

Title:

PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 1 11/16/2016

Title:

PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL Page .§. of i Report Date: 10/25/18

SSES MANUAL Manual Name: TSl Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.7.8 1 11/16/2016

Title:

MAIN TURBINE PRESSURE REGULATION SYSTEM PLANT SYSTEMS TEXT 3.8.1 6 02/27/2018

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES OPERATING TEXT 3.8.2 1 10/05/2005

Title:

ELECTRICAL POWER SYSTEMS AC SOURCES SHUTDOWN TEXT 3.8.3 1 11/16/2016

Title:

ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3.8.4 4 11/16/2016

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES OPERATING

  • TEXT 3.8.5 1 12/14/2006

Title:

ELECTRICAL POWER SYSTEMS DC SOURCES SHUTDOWN TEXT 3.8.6 2 11/16/2016

Title:

ELECTRICAL POWER SYSTEMS BATTERY CELL. PARAMETERS TEXT 3.8.7 2 11/16/2016

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS OPERATING TEXT 3.8.8 2 11/16/2016

Title:

ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS SHUTDOWN TEXT 3.9.1 1 11/16/2016

Title:

REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 1 11/16/2016

Title:

REFUELING OPERATIONS REFUEL POSITION ONE ROD OUT INTERLOCK TEXT 3.9.3 1 11/16/2016

Title:

REFUELING OPERATIONS CONTROL ROD POSITION Page 1 of 9 Report Date: 10/25/18

SSES MANUAL Manual Name: TSl

,~ Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUA~

TEXT 3.9.4 0 11/14/2002

Title:

REFUELING OPERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 1 , 11/16/2016

Title:

REFUELING OPERATIONS CONTROL ROD OPERABILITY REFUELING TEXT 3.9.6 1 11/16/2016

Title:

REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 1 11/16/2016

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) HIGH WATER LEVEL TEXT 3.9.8 1 11/16/2016

Title:

REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) LOW WATER LEVEL TEXT 3.10.1 1 01/23/2008

Title:

SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 1 11/16/2016

Title:

SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 1 11/16/2016

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL HOT SHUTDOWN TEXT 3.10.4 1 11/16/2016

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL COLD SHUTDOWN TEXT 3.10.5 1 11/16/2016

Title:

SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL REFUELING TEXT 3.10.6 1 11/16/2016

Title:

SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING TEXT 3.10.7 0 11/14/2002

Title:

SPECIAL OPERATIONS CONTROL ROD TESTING OPERATING Page~ of 9 Report Date: 10/25/18

SSES MANUAL Manual Name: TSl

  • Manual

Title:

PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.10.8 3 11/16/2016

Title:

SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST REFUELING TEXT 4.0 2 05/24/2007

Title:

DESIGN FEATURES TEXT 5.1 0 11/14/2002

Title:

ADMINISTRATIVE CONTROLS RESPONSIBILITY TEXT 5.2 1 10/09/2009

Title:

ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 5.3 0 11/14/2002

Title:

ADMINISTRATIVE CONTROLS UNIT STAFF QUALIFICATIONS

  • TEXT 5.4 0 11/14/2002

Title:

ADMINISTRATIVE CONTROLS PROCEDURES TEXT 5.5 6 11/16/2016

Title:

ADMINISTRATIVE CONTROLS PROGRAMS AND MANUALS TEXT 5.6 7 05/02/2008

Title:

ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 5.7 0 11/14/2002

Title:

ADMINISTRATIVE CONTROLS HIGH RADIATION AREA

  • Page~ of 9 Report Date: 10/25/18

Rev. 7 Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary _

containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment A.1 Restore secondary containment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />

to OPERABLE status.

48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> for a one-time outage for replacement of the Reactor Building Recirculating Fan Damper Motors, to be completed by December 31, 2005.

B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.

B.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)

  • SUSQUEHANNA - UNIT 1 TS/ 3.6-35 Amendment~. 226

Rev. 7 Secondary Containment 3.6.4.1 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C. Secondary containment C.1 --------------NOTE----------------

inoperable during movement LCO 3.0.3 is not applicable.

of irradiated fuel assemblies in the secondary containment, during CORE Suspend movement of Immediately ALTERATIONS, or during irradiated fuel assemblies in the OPDRVs. secondary containment.

C.2 Suspend CORE Immediately ALTERATIONS.

C.3 Initiate action to suspend Immediately OPDRVs .

  • SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3. 6 .4. 1.1 ----------------------------NOTE---------------------------- In accordance with the Not required to be met for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> if analysis Surveillance Frequency demonstrates one standby gas treatment (SGT) Control Program subsystem is capable of establishing the required secondary containment vacuum.

Verify secondary containment vacuum is

~ 0.25 inch of vacuum water gauge.

SR 3.6.4.1.2 Verify all required secondary containment In accordance with the removable walls and equipment hatches required Surveillance Frequency to be closed are closed and sealed. Control Program (continued)

  • SUSQUEHANNA - UNIT 1 TS I 3.6-36 Amendment ..:J.+g, 2-24,-2-2@, 2W, 270

Rev. 7 Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.4.1.3 Verify one secondary containment access door in In accordance with the each access opening is closed, except when the Surveillance Frequency access opening is being used for entry and exit. Control Program SR 3.6.4.1.4 ---------------------------NOTE-------------------------

The maximum time allowed for secondary containment draw down is dependent on the secondary containment configuration.

Verify each SGT subsystem will draw down the In accordance with the secondary containment to ~ 0.25 inch of vacuum Surveillance Frequency water gauge in less than or equal to the maximum Control Program time allowed for the secondary containment configuration that is OPERABLE.

The maximum flow allowed for maintaining secondary containment vacuum is dependent on the secondary containment configuration.

Verify each SGT subsystem can maintain In accordance with the

~ 0.25 inch of vacuum water gauge in the Surveillance Frequency secondary containment for at least 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at a flow Control Program rate less than or equal to the maximum flow rate permitted for the secondary containment configuration that is OPERABLE.

  • SUSQUEHANNA - UNIT 1 TS/ 3.6-37 Amendment 4--78, ~ . 2-29, 2W, 2-6-7, 270