ML18306A488: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML18306A488 | | number = ML18306A488 | ||
| issue date = 10/25/2018 | | issue date = 10/25/2018 | ||
| title = | | title = Revised Technical Specifications Manual | ||
| author name = | | author name = | ||
| author affiliation = PPL Susquehanna, LLC | | author affiliation = PPL Susquehanna, LLC | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter:* MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2018-18612 USER INFORMATION: | {{#Wiki_filter:Page 1 of 2 | ||
GERLACH*ROSEY M Address: NUCSA2 Phone#: 542-3194 | * MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2018-18612 USER INFORMATION: | ||
TO: GERLACH*ROSEY M 10/25/2018 LOCATION: | GERLACH*ROSEY M EMPL#: 028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194 TRANSMITTAL INFORMATION: | ||
NRC REGION 1 TECH SPECS FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2) | TO: GERLACH*ROSEY M 10/25/2018 LOCATION: NRC REGION 1 TECH SPECS FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2) | ||
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF RRORS. | |||
WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF RRORS. TENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no C will be issued with the updated material. | TENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no C will be issued with the updated material. | ||
TSl -PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 10/15/2018 ADD MANUAL TABLE OF CONTENTS DATE: 10/24/2018 CATEGORY: | TSl - PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 10/15/2018 ADD MANUAL TABLE OF CONTENTS DATE: 10/24/2018 CATEGORY: DOCUMENTS TYPE: TSl ID: TEXT 3.6.4.1 REMOVE: .REV:6 ADD: REV: 7 | ||
DOCUMENTS TYPE: TSl ID: TEXT 3.6.4.1 REMOVE: | |||
* ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3107 OR X3171 FOR ASSISTANCE. | Page 2 of 2 | ||
UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. | *ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3107 OR X3171 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX . | ||
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX . | |||
,:...* SSES MANUAL Manual Name: TSl | |||
* Manual | |||
* SSES MANUAL | |||
==Title:== | |||
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL Table Of Contents Issue Date: 10/24/2018 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 46 07/05/2018 | |||
==Title:== | |||
LIST OF EFFECTIVE SECTIONS TEXT TOC 9 07/05/2018 | |||
* Manual Title: PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL | |||
==Title:== | |||
INSTRUMENTATION TEXT 3.3.4.2 1 11/16/2016 Title: INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT. SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) | TABLE OF CONTENTS TEXT 1.1 2 05/02/2008 | ||
INSTRUMENTATION TEXT 3.3.5.1 4 11/16/2016 Title: INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION TEXT 3.3.5.2 1 11/16/2016 Title: INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.l 6 11/16/2016 Title: INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 1 11/16/2016 Title: INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 1 11/16/2016 Title: INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM. INSTRUMENTATION TEXT 3.3.8.1 1 11/16/2016 Title: IN~TRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION* | |||
TEXT 3.3.8.2 1 11/16/2016 Title: INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 4 11/16/2016 Title: REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING Pagel of 9 Report Date: 10/25/18 SSES MANUAL Manual Name: TSl \--Manual Title: PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANU~ | ==Title:== | ||
USE AND APPLICATION DEFINITIONS TEXT 1.2 0 TEXT 1.3 TEXT 1.4 TEXT 2.0 TEXT 3.0 REQUIREMENT 0 11/06/2002 | |||
==Title:== | |||
REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM) | |||
TEXT 3 .1.2 0 11/06/2002 | |||
==Title:== | |||
REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 2 11/16/2016 | |||
==Title:== | |||
REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY | |||
* Page 1. of 9 Report Date: 10/25/18 | |||
SSES MANUAL Manual Name: TSl Manual | |||
APPLICABILITY: | |||
MODES 1, 2, and 3, | ==Title:== | ||
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANDA. | |||
ACTIONS CONDITION A. Secondary containment inoperable in MODE 1, 2, or 3. | TEXT 3 .1.4 3 11/16/2016 | ||
SUSQUEHANNA | |||
-UNIT 1 TS/ 3.6-35 Amendment~. | ==Title:== | ||
226 | REACTIVITY CONTROL SYSTEMS TEXT 3.1.5 1 11/16/2016 | ||
==Title:== | |||
Rev. 7 Secondary Containment 3.6.4.1 CONDITION REQUIRED ACTION COMPLETION TIME C. Secondary containment | REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3 .1. 6 1 11/16/2016 | ||
Suspend movement of Immediately irradiated fuel assemblies in the secondary containment. | |||
C.2 Suspend CORE ALTERATIONS. | ==Title:== | ||
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL TEXT 3.1.7 4 11/16/2016 | |||
SUSQUEHANNA | ==Title:== | ||
-UNIT 1 TS I 3.6-36 Amendment | REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 2 11/16/2016 | ||
..:J.+g, 2-24,-2-2@, 2W, 270 | |||
==Title:== | |||
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 2 11/16/2016 | |||
---------------------------NOTE------------------------- | ==Title:== | ||
POWER DISTRIBUTION LIMITS AVERAGE PLANAR *LINEAR HEAT GENERATION RATE (APLHGR) | |||
TEXT 3.2.2 2 11/16/2016 | |||
==Title:== | |||
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR) | |||
TEXT 3.2.3 2 11/16/2016 | |||
==Title:== | |||
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR) | |||
TEXT 3.3:1.1 4 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 1 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION SOURCE RANGE MONITOR (BRM) INSTRUMENTATION TEXT 3.3.2.1 3 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 2 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION Page J of 9 Report Date: 10/25/18 | |||
. "' .SSES MANUAL Manual Name: TSl | |||
* Manual | |||
==Title:== | |||
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.3.3.1 3 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 2 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 2 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION.END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION TEXT 3.3.4.2 1 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT. SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 4 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION | |||
* TEXT 3.3.5.2 1 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.l 6 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 1 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 1 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM. | |||
INSTRUMENTATION TEXT 3.3.8.1 1 11/16/2016 | |||
==Title:== | |||
IN~TRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION* | |||
TEXT 3.3.8.2 1 11/16/2016 | |||
==Title:== | |||
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 4 11/16/2016 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING Pagel of 9 Report Date: 10/25/18 | |||
SSES MANUAL Manual Name: TSl | |||
\-- Manual | |||
==Title:== | |||
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANU~ | |||
TEXT 3.4.2 2 11/16/2016 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 2 01/13/~012 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS) | |||
TEXT 3.4.4 1 11/16/2016 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 0 11/14/2002 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 3 11/16/2016 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 2 11/16/20i6 | |||
==Title:== | |||
R~ACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 2 11/16/2016 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM HOT SHUTDOWN TEXT 3.4.9 1 11/16/2016 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM I | |||
COLD SHUTDOWN TEXT 3.4.10 4 11/16/2016 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 1 11/16/2016 | |||
==Title:== | |||
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 3 11/16/2016 | |||
==Title:== | |||
EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) | |||
SYSTEM ECCS OPERATING TEXT 3.5.2 1 11/16/2016 | |||
==Title:== | |||
EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) | |||
SYSTEM ECCS SHUTDOWN Page! of ~ Report Date: 10/25/18 | |||
SSES MANUAL Manual Name: TSl Manual | |||
==Title:== | |||
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.5.3 2 11/16/2016 | |||
==Title:== | |||
EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC) | |||
SYSTEM RCIC SYSTEM TEXT 3.6.1.1 1 11/16/2016 | |||
==Title:== | |||
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT TEXT 3 . 6 . 1. 2 1 11/16/2016 | |||
==Title:== | |||
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3 . 6 . 1. 3 4 11/16/2016 Titl~: CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS) | |||
TEXT 3 . 6 . 1. 4 1 11/16/2016 | |||
==Title:== | |||
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE | |||
* TEXT 3 . 6 . 1. 5 1 11/16/2016 | |||
==Title:== | |||
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3 . 6 . 1. 6 1 11/16/2016 | |||
==Title:== | |||
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 1 11/16/2016 | |||
==Title:== | |||
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 1 11/16/2016 | |||
==Title:== | |||
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 1 11/16/2016 Titl~: CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 1 11/16/2016 | |||
==Title:== | |||
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2 06/13/2006 | |||
==Title:== | |||
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINE~S Page~ of 9 Report Date: 10/25/18 | |||
SSES MANUAL Manual Name: TSl Manual | |||
==Title:== | |||
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANDA~ | |||
TEXT 3.6.3.2 2 11/16/2016 | |||
==Title:== | |||
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 1 11/16/2016 | |||
==Title:== | |||
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 7 10/24/2018 | |||
==Title:== | |||
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 1 11/16/2016 | |||
==Title:== | |||
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS) | |||
TEXT 3.6.4.3 3 09/15/2017 | |||
==Title:== | |||
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 TEXT 3.7.2 2 | |||
ULTIMATE HEAT SINK (UHS) 1 11/16/2016 | |||
==Title:== | |||
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE 11/16/2016 | |||
==Title:== | |||
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 3 09/15/2017 | |||
==Title:== | |||
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 1 11/16/2016 | |||
==Title:== | |||
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 1 11/16/2016 | |||
==Title:== | |||
PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 3 11/16/2016 | |||
==Title:== | |||
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 1 11/16/2016 | |||
==Title:== | |||
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL Page .§. of i Report Date: 10/25/18 | |||
SSES MANUAL Manual Name: TSl Manual | |||
==Title:== | |||
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.7.8 1 11/16/2016 | |||
==Title:== | |||
MAIN TURBINE PRESSURE REGULATION SYSTEM PLANT SYSTEMS TEXT 3.8.1 6 02/27/2018 | |||
==Title:== | |||
ELECTRICAL POWER SYSTEMS AC SOURCES OPERATING TEXT 3.8.2 1 10/05/2005 | |||
==Title:== | |||
ELECTRICAL POWER SYSTEMS AC SOURCES SHUTDOWN TEXT 3.8.3 1 11/16/2016 | |||
==Title:== | |||
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3.8.4 4 11/16/2016 | |||
==Title:== | |||
ELECTRICAL POWER SYSTEMS DC SOURCES OPERATING | |||
* TEXT 3.8.5 1 12/14/2006 | |||
==Title:== | |||
ELECTRICAL POWER SYSTEMS DC SOURCES SHUTDOWN TEXT 3.8.6 2 11/16/2016 | |||
==Title:== | |||
ELECTRICAL POWER SYSTEMS BATTERY CELL. PARAMETERS TEXT 3.8.7 2 11/16/2016 | |||
==Title:== | |||
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS OPERATING TEXT 3.8.8 2 11/16/2016 | |||
==Title:== | |||
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS SHUTDOWN TEXT 3.9.1 1 11/16/2016 | |||
==Title:== | |||
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 1 11/16/2016 | |||
==Title:== | |||
REFUELING OPERATIONS REFUEL POSITION ONE ROD OUT INTERLOCK TEXT 3.9.3 1 11/16/2016 | |||
==Title:== | |||
REFUELING OPERATIONS CONTROL ROD POSITION Page 1 of 9 Report Date: 10/25/18 | |||
SSES MANUAL Manual Name: TSl | |||
,~ Manual | |||
==Title:== | |||
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUA~ | |||
TEXT 3.9.4 0 11/14/2002 | |||
==Title:== | |||
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 1 , 11/16/2016 | |||
==Title:== | |||
REFUELING OPERATIONS CONTROL ROD OPERABILITY REFUELING TEXT 3.9.6 1 11/16/2016 | |||
==Title:== | |||
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 1 11/16/2016 | |||
==Title:== | |||
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) HIGH WATER LEVEL TEXT 3.9.8 1 11/16/2016 | |||
==Title:== | |||
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) LOW WATER LEVEL TEXT 3.10.1 1 01/23/2008 | |||
==Title:== | |||
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 1 11/16/2016 | |||
==Title:== | |||
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 1 11/16/2016 | |||
==Title:== | |||
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL HOT SHUTDOWN TEXT 3.10.4 1 11/16/2016 | |||
==Title:== | |||
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL COLD SHUTDOWN TEXT 3.10.5 1 11/16/2016 | |||
==Title:== | |||
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL REFUELING TEXT 3.10.6 1 11/16/2016 | |||
==Title:== | |||
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING TEXT 3.10.7 0 11/14/2002 | |||
==Title:== | |||
SPECIAL OPERATIONS CONTROL ROD TESTING OPERATING Page~ of 9 Report Date: 10/25/18 | |||
SSES MANUAL Manual Name: TSl | |||
* Manual | |||
==Title:== | |||
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.10.8 3 11/16/2016 | |||
==Title:== | |||
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST REFUELING TEXT 4.0 2 05/24/2007 | |||
==Title:== | |||
DESIGN FEATURES TEXT 5.1 0 11/14/2002 | |||
==Title:== | |||
ADMINISTRATIVE CONTROLS RESPONSIBILITY TEXT 5.2 1 10/09/2009 | |||
==Title:== | |||
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 5.3 0 11/14/2002 | |||
==Title:== | |||
ADMINISTRATIVE CONTROLS UNIT STAFF QUALIFICATIONS | |||
* TEXT 5.4 0 11/14/2002 | |||
==Title:== | |||
ADMINISTRATIVE CONTROLS PROCEDURES TEXT 5.5 6 11/16/2016 | |||
==Title:== | |||
ADMINISTRATIVE CONTROLS PROGRAMS AND MANUALS TEXT 5.6 7 05/02/2008 | |||
==Title:== | |||
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 5.7 0 11/14/2002 | |||
==Title:== | |||
ADMINISTRATIVE CONTROLS HIGH RADIATION AREA | |||
* Page~ of 9 Report Date: 10/25/18 | |||
Rev. 7 Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE. | |||
APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary _ | |||
containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs). | |||
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment A.1 Restore secondary containment 4 hours | |||
* inoperable in MODE 1, 2, or 3. | |||
to OPERABLE status. | |||
48 hours for a one-time outage for replacement of the Reactor Building Recirculating Fan Damper Motors, to be completed by December 31, 2005. | |||
B. Required Action and B.1 Be in MODE 3. 12 hours associated Completion Time of Condition A not met. | |||
B.2 Be in MODE 4. 36 hours (continued) | |||
* SUSQUEHANNA - UNIT 1 TS/ 3.6-35 Amendment~. 226 | |||
Rev. 7 Secondary Containment 3.6.4.1 ACTIONS (continued) | |||
CONDITION REQUIRED ACTION COMPLETION TIME C. Secondary containment C.1 --------------NOTE---------------- | |||
inoperable during movement LCO 3.0.3 is not applicable. | |||
of irradiated fuel assemblies in the secondary containment, during CORE Suspend movement of Immediately ALTERATIONS, or during irradiated fuel assemblies in the OPDRVs. secondary containment. | |||
C.2 Suspend CORE Immediately ALTERATIONS. | |||
C.3 Initiate action to suspend Immediately OPDRVs . | |||
* SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3. 6 .4. 1.1 ----------------------------NOTE---------------------------- In accordance with the Not required to be met for 4 hours if analysis Surveillance Frequency demonstrates one standby gas treatment (SGT) Control Program subsystem is capable of establishing the required secondary containment vacuum. | |||
Verify secondary containment vacuum is | |||
~ 0.25 inch of vacuum water gauge. | |||
SR 3.6.4.1.2 Verify all required secondary containment In accordance with the removable walls and equipment hatches required Surveillance Frequency to be closed are closed and sealed. Control Program (continued) | |||
* SUSQUEHANNA - UNIT 1 TS I 3.6-36 Amendment ..:J.+g, 2-24,-2-2@, 2W, 270 | |||
Rev. 7 Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS (continued) | |||
SURVEILLANCE FREQUENCY SR 3.6.4.1.3 Verify one secondary containment access door in In accordance with the each access opening is closed, except when the Surveillance Frequency access opening is being used for entry and exit. Control Program SR 3.6.4.1.4 ---------------------------NOTE------------------------- | |||
The maximum time allowed for secondary containment draw down is dependent on the secondary containment configuration. | The maximum time allowed for secondary containment draw down is dependent on the secondary containment configuration. | ||
Verify each SGT subsystem will draw down the secondary containment to 0.25 inch of vacuum water gauge in less than or equal to the maximum time allowed for the secondary containment configuration that is OPERABLE. | Verify each SGT subsystem will draw down the In accordance with the secondary containment to ~ 0.25 inch of vacuum Surveillance Frequency water gauge in less than or equal to the maximum Control Program time allowed for the secondary containment configuration that is OPERABLE. | ||
SR 3.6.4.1.5 The maximum flow allowed for maintaining secondary containment vacuum is dependent on the secondary containment configuration. | * SR 3.6.4.1.5 -------------------NOTE--------------------- | ||
Verify each SGT subsystem can maintain 0.25 inch of vacuum water gauge in the secondary containment for at least 1 hour at a flow rate less than or equal to the maximum flow rate permitted for the secondary containment configuration that is OPERABLE. | The maximum flow allowed for maintaining secondary containment vacuum is dependent on the secondary containment configuration. | ||
Verify each SGT subsystem can maintain In accordance with the | |||
-UNIT 1 TS/ 3.6-37 Amendment 4--78, ~. 2-29, 2W, 2-6-7, 270}} | ~ 0.25 inch of vacuum water gauge in the Surveillance Frequency secondary containment for at least 1 hour at a flow Control Program rate less than or equal to the maximum flow rate permitted for the secondary containment configuration that is OPERABLE. | ||
* SUSQUEHANNA - UNIT 1 TS/ 3.6-37 Amendment 4--78, ~ . 2-29, 2W, 2-6-7, 270}} |
Latest revision as of 15:51, 2 February 2020
ML18306A488 | |
Person / Time | |
---|---|
Site: | Susquehanna |
Issue date: | 10/25/2018 |
From: | Susquehanna |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML18306A488 (14) | |
Text
Page 1 of 2
- MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2018-18612 USER INFORMATION:
GERLACH*ROSEY M EMPL#: 028401 CA#: 0363 Address: NUCSA2 Phone#: 542-3194 TRANSMITTAL INFORMATION:
TO: GERLACH*ROSEY M 10/25/2018 LOCATION: NRC REGION 1 TECH SPECS FROM: NUCLEAR RECORDS DOCUMENT CONTROL CENTER (NUCSA-2)
THE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU. HARDCOPY USERS MUST ENSURE THE DOCUMENTS PROVIDED MATCH THE INFORMATION ON THIS TRANSMITTAL. WHEN REPLACING THIS MATERIAL IN YOUR HARDCOPY MANUAL, ENSURE THE UPDATE DOCUMENT ID IS THE SAME DOCUMENT ID YOU'RE REMOVING FROM YOUR MANUAL. TOOLS FROM THE HUMAN PERFORMANCE TOOL BAG SHOULD BE UTILIZED TO ELIMINATE THE CHANCE OF RRORS.
TENTION: "REPLACE" directions do not affect the Table of Contents, Therefore no C will be issued with the updated material.
TSl - PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL REMOVE MANUAL TABLE OF CONTENTS DATE: 10/15/2018 ADD MANUAL TABLE OF CONTENTS DATE: 10/24/2018 CATEGORY: DOCUMENTS TYPE: TSl ID: TEXT 3.6.4.1 REMOVE: .REV:6 ADD: REV: 7
Page 2 of 2
- ANY DISCREPANCIES WITH THE MATERIAL PROVIDED, CONTACT DCS@ X3107 OR X3171 FOR ASSISTANCE. UPDATES FOR HARDCOPY MANUALS WILL BE DISTRIBUTED WITHIN 3 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES. PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON COMPLETION OF UPDATES. FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX .
,:...* SSES MANUAL Manual Name: TSl
- Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL Table Of Contents Issue Date: 10/24/2018 Procedure Name Rev Issue Date Change ID Change Number TEXT LOES 46 07/05/2018
Title:
LIST OF EFFECTIVE SECTIONS TEXT TOC 9 07/05/2018
Title:
TABLE OF CONTENTS TEXT 1.1 2 05/02/2008
Title:
USE AND APPLICATION DEFINITIONS TEXT 1.2 0 TEXT 1.3 TEXT 1.4 TEXT 2.0 TEXT 3.0 REQUIREMENT 0 11/06/2002
Title:
REACTIVITY CONTROL SYSTEMS SHUTDOWN MARGIN (SDM)
TEXT 3 .1.2 0 11/06/2002
Title:
REACTIVITY CONTROL SYSTEMS REACTIVITY ANOMALIES TEXT 3.1.3 2 11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD OPERABILITY
- Page 1. of 9 Report Date: 10/25/18
SSES MANUAL Manual Name: TSl Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANDA.
TEXT 3 .1.4 3 11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS TEXT 3.1.5 1 11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS CONTROL ROD SCRAM ACCUMULATORS TEXT 3 .1. 6 1 11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS ROD PATTERN CONTROL TEXT 3.1.7 4 11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS STANDBY LIQUID CONTROL (SLC) SYSTEM TEXT 3.1.8 2 11/16/2016
Title:
REACTIVITY CONTROL SYSTEMS SCRAM DISCHARGE VOLUME (SDV) VENT AND DRAIN VALVES TEXT 3.2.1 2 11/16/2016
Title:
POWER DISTRIBUTION LIMITS AVERAGE PLANAR *LINEAR HEAT GENERATION RATE (APLHGR)
TEXT 3.2.2 2 11/16/2016
Title:
POWER DISTRIBUTION LIMITS MINIMUM CRITICAL POWER RATIO (MCPR)
TEXT 3.2.3 2 11/16/2016
Title:
POWER DISTRIBUTION LIMITS LINEAR HEAT GENERATION RATE (LHGR)
TEXT 3.3:1.1 4 11/16/2016
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) INSTRUMENTATION TEXT 3.3.1.2 1 11/16/2016
Title:
INSTRUMENTATION SOURCE RANGE MONITOR (BRM) INSTRUMENTATION TEXT 3.3.2.1 3 11/16/2016
Title:
INSTRUMENTATION CONTROL ROD BLOCK INSTRUMENTATION TEXT 3.3.2.2 2 11/16/2016
Title:
INSTRUMENTATION FEEDWATER MAIN TURBINE HIGH WATER LEVEL TRIP INSTRUMENTATION Page J of 9 Report Date: 10/25/18
. "' .SSES MANUAL Manual Name: TSl
- Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.3.3.1 3 11/16/2016
Title:
INSTRUMENTATION POST ACCIDENT MONITORING (PAM) INSTRUMENTATION TEXT 3.3.3.2 2 11/16/2016
Title:
INSTRUMENTATION REMOTE SHUTDOWN SYSTEM TEXT 3.3.4.1 2 11/16/2016
Title:
INSTRUMENTATION.END OF CYCLE RECIRCULATION PUMP TRIP (EOC-RPT) INSTRUMENTATION TEXT 3.3.4.2 1 11/16/2016
Title:
INSTRUMENTATION ANTICIPATED TRANSIENT WITHOUT. SCRAM RECIRCULATION PUMP TRIP (ATWS-RPT) INSTRUMENTATION TEXT 3.3.5.1 4 11/16/2016
Title:
INSTRUMENTATION EMERGENCY CORE COOLING SYSTEM (ECCS) INSTRUMENTATION
- TEXT 3.3.5.2 1 11/16/2016
Title:
INSTRUMENTATION REACTOR CORE ISOLATION COOLING (RCIC) SYSTEM INSTRUMENTATION TEXT 3.3.6.l 6 11/16/2016
Title:
INSTRUMENTATION PRIMARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.6.2 1 11/16/2016
Title:
INSTRUMENTATION SECONDARY CONTAINMENT ISOLATION INSTRUMENTATION TEXT 3.3.7.1 1 11/16/2016
Title:
INSTRUMENTATION CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM.
INSTRUMENTATION TEXT 3.3.8.1 1 11/16/2016
Title:
IN~TRUMENTATION LOSS OF POWER (LOP) INSTRUMENTATION*
TEXT 3.3.8.2 1 11/16/2016
Title:
INSTRUMENTATION REACTOR PROTECTION SYSTEM (RPS) ELECTRIC POWER MONITORING TEXT 3.4.1 4 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RECIRCULATION LOOPS OPERATING Pagel of 9 Report Date: 10/25/18
SSES MANUAL Manual Name: TSl
\-- Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANU~
TEXT 3.4.2 2 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) JET PUMPS TEXT 3.4.3 2 01/13/~012
Title:
REACTOR COOLANT SYSTEM (RCS) SAFETY/RELIEF VALVES (S/RVS)
TEXT 3.4.4 1 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS OPERATIONAL LEAKAGE TEXT 3.4.5 0 11/14/2002
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE ISOLATION VALVE (PIV) LEAKAGE TEXT 3.4.6 3 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS LEAKAGE DETECTION INSTRUMENTATION TEXT 3.4.7 2 11/16/20i6
Title:
R~ACTOR COOLANT SYSTEM (RCS) RCS SPECIFIC ACTIVITY TEXT 3.4.8 2 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM HOT SHUTDOWN TEXT 3.4.9 1 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RESIDUAL HEAT REMOVAL (RHR) SHUTDOWN COOLING SYSTEM I
COLD SHUTDOWN TEXT 3.4.10 4 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) RCS PRESSURE AND TEMPERATURE (P/T) LIMITS TEXT 3.4.11 1 11/16/2016
Title:
REACTOR COOLANT SYSTEM (RCS) REACTOR STEAM DOME PRESSURE TEXT 3.5.1 3 11/16/2016
Title:
EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS OPERATING TEXT 3.5.2 1 11/16/2016
Title:
EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM ECCS SHUTDOWN Page! of ~ Report Date: 10/25/18
SSES MANUAL Manual Name: TSl Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.5.3 2 11/16/2016
Title:
EMERGENCY CORE COOLING SYSTEM (ECCS) AND REACTOR CORE ISOLATION COOLING (RCIC)
SYSTEM RCIC SYSTEM TEXT 3.6.1.1 1 11/16/2016
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT TEXT 3 . 6 . 1. 2 1 11/16/2016
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT AIR LOCK TEXT 3 . 6 . 1. 3 4 11/16/2016 Titl~: CONTAINMENT SYSTEMS PRIMARY CONTAINMENT ISOLATION VALVES (PCIVS)
TEXT 3 . 6 . 1. 4 1 11/16/2016
Title:
CONTAINMENT SYSTEMS CONTAINMENT PRESSURE
- TEXT 3 . 6 . 1. 5 1 11/16/2016
Title:
CONTAINMENT SYSTEMS DRYWELL AIR TEMPERATURE TEXT 3 . 6 . 1. 6 1 11/16/2016
Title:
CONTAINMENT SYSTEMS SUPPRESSION CHAMBER TO DRYWELL VACUUM BREAKERS TEXT 3.6.2.1 1 11/16/2016
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL AVERAGE TEMPERATURE TEXT 3.6.2.2 1 11/16/2016
Title:
CONTAINMENT SYSTEMS SUPPRESSION POOL WATER LEVEL TEXT 3.6.2.3 1 11/16/2016 Titl~: CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL COOLING TEXT 3.6.2.4 1 11/16/2016
Title:
CONTAINMENT SYSTEMS RESIDUAL HEAT REMOVAL (RHR) SUPPRESSION POOL SPRAY TEXT 3.6.3.1 2 06/13/2006
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT HYDROGEN RECOMBINE~S Page~ of 9 Report Date: 10/25/18
SSES MANUAL Manual Name: TSl Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANDA~
TEXT 3.6.3.2 2 11/16/2016
Title:
CONTAINMENT SYSTEMS DRYWELL AIR FLOW SYSTEM TEXT 3.6.3.3 1 11/16/2016
Title:
CONTAINMENT SYSTEMS PRIMARY CONTAINMENT OXYGEN CONCENTRATION TEXT 3.6.4.1 7 10/24/2018
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT TEXT 3.6.4.2 1 11/16/2016
Title:
CONTAINMENT SYSTEMS SECONDARY CONTAINMENT ISOLATION VALVES (SCIVS)
TEXT 3.6.4.3 3 09/15/2017
Title:
CONTAINMENT SYSTEMS STANDBY GAS TREATMENT (SGT) SYSTEM TEXT 3.7.1 TEXT 3.7.2 2
ULTIMATE HEAT SINK (UHS) 1 11/16/2016
Title:
PLANT SYSTEMS RESIDUAL HEAT REMOVAL SERVICE WATER (RHRSW) SYSTEM AND THE 11/16/2016
Title:
PLANT SYSTEMS EMERGENCY SERVICE WATER (ESW) SYSTEM TEXT 3.7.3 3 09/15/2017
Title:
PLANT SYSTEMS CONTROL ROOM EMERGENCY OUTSIDE AIR SUPPLY (CREOAS) SYSTEM TEXT 3.7.4 1 11/16/2016
Title:
PLANT SYSTEMS CONTROL ROOM FLOOR COOLING SYSTEM TEXT 3.7.5 1 11/16/2016
Title:
PLANT SYSTEMS MAIN CONDENSER OFFGAS TEXT 3.7.6 3 11/16/2016
Title:
PLANT SYSTEMS MAIN TURBINE BYPASS SYSTEM TEXT 3.7.7 1 11/16/2016
Title:
PLANT SYSTEMS SPENT FUEL STORAGE POOL WATER LEVEL Page .§. of i Report Date: 10/25/18
SSES MANUAL Manual Name: TSl Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.7.8 1 11/16/2016
Title:
MAIN TURBINE PRESSURE REGULATION SYSTEM PLANT SYSTEMS TEXT 3.8.1 6 02/27/2018
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES OPERATING TEXT 3.8.2 1 10/05/2005
Title:
ELECTRICAL POWER SYSTEMS AC SOURCES SHUTDOWN TEXT 3.8.3 1 11/16/2016
Title:
ELECTRICAL POWER SYSTEMS DIESEL FUEL OIL LUBE OIL AND STARTING AIR TEXT 3.8.4 4 11/16/2016
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES OPERATING
- TEXT 3.8.5 1 12/14/2006
Title:
ELECTRICAL POWER SYSTEMS DC SOURCES SHUTDOWN TEXT 3.8.6 2 11/16/2016
Title:
ELECTRICAL POWER SYSTEMS BATTERY CELL. PARAMETERS TEXT 3.8.7 2 11/16/2016
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS OPERATING TEXT 3.8.8 2 11/16/2016
Title:
ELECTRICAL POWER SYSTEMS DISTRIBUTION SYSTEMS SHUTDOWN TEXT 3.9.1 1 11/16/2016
Title:
REFUELING OPERATIONS REFUELING EQUIPMENT INTERLOCKS TEXT 3.9.2 1 11/16/2016
Title:
REFUELING OPERATIONS REFUEL POSITION ONE ROD OUT INTERLOCK TEXT 3.9.3 1 11/16/2016
Title:
REFUELING OPERATIONS CONTROL ROD POSITION Page 1 of 9 Report Date: 10/25/18
SSES MANUAL Manual Name: TSl
,~ Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUA~
TEXT 3.9.4 0 11/14/2002
Title:
REFUELING OPERATIONS CONTROL ROD POSITION INDICATION TEXT 3.9.5 1 , 11/16/2016
Title:
REFUELING OPERATIONS CONTROL ROD OPERABILITY REFUELING TEXT 3.9.6 1 11/16/2016
Title:
REFUELING OPERATIONS REACTOR PRESSURE VESSEL (RPV) WATER LEVEL TEXT 3.9.7 1 11/16/2016
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) HIGH WATER LEVEL TEXT 3.9.8 1 11/16/2016
Title:
REFUELING OPERATIONS RESIDUAL HEAT REMOVAL (RHR) LOW WATER LEVEL TEXT 3.10.1 1 01/23/2008
Title:
SPECIAL OPERATIONS INSERVICE LEAK AND HYDROSTATIC TESTING OPERATION TEXT 3.10.2 1 11/16/2016
Title:
SPECIAL OPERATIONS REACTOR MODE SWITCH INTERLOCK TESTING TEXT 3.10.3 1 11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL HOT SHUTDOWN TEXT 3.10.4 1 11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD WITHDRAWAL COLD SHUTDOWN TEXT 3.10.5 1 11/16/2016
Title:
SPECIAL OPERATIONS SINGLE CONTROL ROD DRIVE (CRD) REMOVAL REFUELING TEXT 3.10.6 1 11/16/2016
Title:
SPECIAL OPERATIONS MULTIPLE CONTROL ROD WITHDRAWAL REFUELING TEXT 3.10.7 0 11/14/2002
Title:
SPECIAL OPERATIONS CONTROL ROD TESTING OPERATING Page~ of 9 Report Date: 10/25/18
SSES MANUAL Manual Name: TSl
- Manual
Title:
PP&L SUSQUEHANNA STEAM ELECTRIC STATION TECHNICAL SPECIFICATIONS UNIT 1 MANUAL TEXT 3.10.8 3 11/16/2016
Title:
SPECIAL OPERATIONS SHUTDOWN MARGIN (SDM) TEST REFUELING TEXT 4.0 2 05/24/2007
Title:
DESIGN FEATURES TEXT 5.1 0 11/14/2002
Title:
ADMINISTRATIVE CONTROLS RESPONSIBILITY TEXT 5.2 1 10/09/2009
Title:
ADMINISTRATIVE CONTROLS ORGANIZATION TEXT 5.3 0 11/14/2002
Title:
ADMINISTRATIVE CONTROLS UNIT STAFF QUALIFICATIONS
- TEXT 5.4 0 11/14/2002
Title:
ADMINISTRATIVE CONTROLS PROCEDURES TEXT 5.5 6 11/16/2016
Title:
ADMINISTRATIVE CONTROLS PROGRAMS AND MANUALS TEXT 5.6 7 05/02/2008
Title:
ADMINISTRATIVE CONTROLS REPORTING REQUIREMENTS TEXT 5.7 0 11/14/2002
Title:
ADMINISTRATIVE CONTROLS HIGH RADIATION AREA
- Page~ of 9 Report Date: 10/25/18
Rev. 7 Secondary Containment 3.6.4.1 3.6 CONTAINMENT SYSTEMS 3.6.4.1 Secondary Containment LCO 3.6.4.1 The secondary containment shall be OPERABLE.
APPLICABILITY: MODES 1, 2, and 3, During movement of irradiated fuel assemblies in the secondary _
containment, During CORE ALTERATIONS, During operations with a potential for draining the reactor vessel (OPDRVs).
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. Secondary containment A.1 Restore secondary containment 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />
- inoperable in MODE 1, 2, or 3.
to OPERABLE status.
48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> for a one-time outage for replacement of the Reactor Building Recirculating Fan Damper Motors, to be completed by December 31, 2005.
B. Required Action and B.1 Be in MODE 3. 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time of Condition A not met.
B.2 Be in MODE 4. 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> (continued)
- SUSQUEHANNA - UNIT 1 TS/ 3.6-35 Amendment~. 226
Rev. 7 Secondary Containment 3.6.4.1 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. Secondary containment C.1 --------------NOTE----------------
inoperable during movement LCO 3.0.3 is not applicable.
of irradiated fuel assemblies in the secondary containment, during CORE Suspend movement of Immediately ALTERATIONS, or during irradiated fuel assemblies in the OPDRVs. secondary containment.
C.2 Suspend CORE Immediately ALTERATIONS.
C.3 Initiate action to suspend Immediately OPDRVs .
- SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3. 6 .4. 1.1 ----------------------------NOTE---------------------------- In accordance with the Not required to be met for 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> if analysis Surveillance Frequency demonstrates one standby gas treatment (SGT) Control Program subsystem is capable of establishing the required secondary containment vacuum.
Verify secondary containment vacuum is
~ 0.25 inch of vacuum water gauge.
SR 3.6.4.1.2 Verify all required secondary containment In accordance with the removable walls and equipment hatches required Surveillance Frequency to be closed are closed and sealed. Control Program (continued)
- SUSQUEHANNA - UNIT 1 TS I 3.6-36 Amendment ..:J.+g, 2-24,-2-2@, 2W, 270
Rev. 7 Secondary Containment 3.6.4.1 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE FREQUENCY SR 3.6.4.1.3 Verify one secondary containment access door in In accordance with the each access opening is closed, except when the Surveillance Frequency access opening is being used for entry and exit. Control Program SR 3.6.4.1.4 ---------------------------NOTE-------------------------
The maximum time allowed for secondary containment draw down is dependent on the secondary containment configuration.
Verify each SGT subsystem will draw down the In accordance with the secondary containment to ~ 0.25 inch of vacuum Surveillance Frequency water gauge in less than or equal to the maximum Control Program time allowed for the secondary containment configuration that is OPERABLE.
- SR 3.6.4.1.5 -------------------NOTE---------------------
The maximum flow allowed for maintaining secondary containment vacuum is dependent on the secondary containment configuration.
Verify each SGT subsystem can maintain In accordance with the
~ 0.25 inch of vacuum water gauge in the Surveillance Frequency secondary containment for at least 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> at a flow Control Program rate less than or equal to the maximum flow rate permitted for the secondary containment configuration that is OPERABLE.
- SUSQUEHANNA - UNIT 1 TS/ 3.6-37 Amendment 4--78, ~ . 2-29, 2W, 2-6-7, 270