     ,                                      391 TON EDISON COMPANY TELECOPY MESSAGE Telephone Number l    To: Director, Region I                                From: Pilgrim Nuclear Power Station Office of Inspection and Enforcement                    RFD #1 Rocky Hill Road U. S. Nuclear Regulatory Commission                    Plytneuth, MA      02360 631 Park Avenue
                                            ,
     ,                                      391 TON EDISON COMPANY
  ,
TELECOPY MESSAGE
                                          .
,
Telephone Number
                                                          .
l    To: Director, Region I                                From: Pilgrim Nuclear Power Station Office of Inspection and Enforcement                    RFD #1 Rocky Hill Road U. S. Nuclear Regulatory Commission                    Plytneuth, MA      02360 631 Park Avenue
,          King of Prussia, PA 19406 l
,          King of Prussia, PA 19406 l
                                                                                              .


==Subject:==
==Subject:==
Line 36: Line 26:
cause and Corrective Action: This event resulted from a design error. A seismic anchor is I
cause and Corrective Action: This event resulted from a design error. A seismic anchor is I
being modified to make the anchor operable.
being modified to make the anchor operable.
                                  .
Facility Status:                                                      0 :: Thermal MW c) Routine Startup                                            g) Shutdown          X d) Routine Shutdown                                          h) Refueling e) Steady State                                              'i) Other f) Load Changing                                              j) Not Applicaple A written follow-up report will be sent within two weeks.                                            .
Facility Status:                                                      0 :: Thermal MW
NRC person notified        T. Martin                    Prepared by    E. T. Graham N
                                                          '
00      ~
c) Routine Startup                                            g) Shutdown          X d) Routine Shutdown                                          h) Refueling e) Steady State                                              'i) Other f) Load Changing                                              j) Not Applicaple A written follow-up report will be sent within two weeks.                                            .
NRC person notified        T. Martin                    Prepared by    E. T. Graham
                                                                                                    '
:        -                        .                  .
        '
:
!
N 00      ~
   - _ Mail (2) copies to:
   - _ Mail (2) copies to:
9
9 Director                                                                                          Qk Office of Management Information and Program Control
                                                          .
Director                                                                                          Qk Office of Management Information and Program Control
* U. S. Nuclear Regulatory' Commission
* U. S. Nuclear Regulatory' Commission
!p        washington, D.C. 20555                                                    -
!p        washington, D.C. 20555                                                    -
!G                      .8 010140 %}}
!G                      .8 010140 %}}

Latest revision as of 23:55, 30 January 2020

RO 80-067/01X-0:on 801002,NRC Was Notified That Analytical Reanalysis of RHR Sys B Indicated That as-built Configuration Would Not Remain Functional During Sse.Caused by Design Error.Seismic Anchor Is Being Modified
ML19351D675
Person / Time
Site: Pilgrim
Issue date: 10/03/1980
From: Graham E
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
80-067-01X-0, 80-67-1X, NUDOCS 8010140456
Download: ML19351D675 (1)


Text

_ _ .

, 391 TON EDISON COMPANY TELECOPY MESSAGE Telephone Number l To: Director, Region I From: Pilgrim Nuclear Power Station Office of Inspection and Enforcement RFD #1 Rocky Hill Road U. S. Nuclear Regulatory Commission Plytneuth, MA 02360 631 Park Avenue

, King of Prussia, PA 19406 l

Subject:

PROMPT REPORTABLE OCCURRENCE Docke Number 50-293; License DPR-35 Assigned LER Number 80-067-01X-0 i

l Event Descripcion: On October 2,1980 Boston Edison Company ' Engineering Department notified Pilgrim Station that an analytical re-analysis of "B" RHR System indicated ,

that the as-built configuration would not remain functional during a Safe Shutdown Earthquake. ,

cause and Corrective Action: This event resulted from a design error. A seismic anchor is I

being modified to make the anchor operable.

Facility Status: 0 :: Thermal MW c) Routine Startup g) Shutdown X d) Routine Shutdown h) Refueling e) Steady State 'i) Other f) Load Changing j) Not Applicaple A written follow-up report will be sent within two weeks. .

NRC person notified T. Martin Prepared by E. T. Graham N