Category:REPORTABLE OCCURRENCE REPORT (SEE ALSO AO
MONTHYEARML20042E2261990-04-0909 April 1990 Special Rept:On 900227,fire Protection Alarm Reporting Sys Inoperable for More than 14 Days.Compensatory Fire Watches Instituted in Affected Areas & Failure & Malfunction Rept 90-44 Written to Document Problem ML19325E9021989-11-0606 November 1989 Special Rept:On 890929,fire Water Supply Sys Storage Tanks Declared Inoperable.Caused by Drained Storage Tank. Fwst (T-107A) Refilled & Declared Operable on 891007 ML20052E1801982-04-27027 April 1982 RO 82-011/01X-0:on 820427,review of Water Level Anomaly, Determined That Facility Entered Limiting Condition for Operation W/O Insertion of Control Rods.Special Order 82-04 Will Be Issued 820428 to Prevent Recurrence ML20050D5851982-04-0101 April 1982 Ro 82-008/01x-0:on 820331,HPCI Sys Declared Inoperable Due to Failure of HPCI Injection Valve Mo 2301-8 to Go Full Open During Performance of Surveillance Test 8.I.13. Cause Not Stated.Priority a Maint Request Issued ML20042A4581982-03-0909 March 1982 Telecopy RO 82-006/01X-0:on 820309,HPCI Stop Valve Main Disc Flange Which Should Be Attached to Main Disc by Four Cap Screws Found W/Three Cap Screws Broken.Cause Not Stated. Engineering Support Requested ML20039E0771981-12-15015 December 1981 RO 81-1:on 811208,util Received Analysis Rept from Yankee Atomic Environ Lab Indicating Potentially Reportable Concentration of Co-60 in Irish Moss Sample from Indicator Station.Calculated Doses Not Considered Significant ML20050C2121981-03-25025 March 1981 RO 82-07/01X-0:on 810325,HPCI,reactor Core Isolation Cooling & Reactor Water Cleanup Pipe Excess Flow Isolation Setpoints Set Unconservatively.Caused by Exclusion of plant-specific Parameters from Original Calculation ML20049A3361980-11-14014 November 1980 RO 80-084/01X-0:on 801113,during Repairs to D Msn Discovered Water Leaking from 2 Inch Vessel Drain Line Which Connects to Rwcv Sys.Caused by Defective 2 Inch Pipe Coupling Weld. Leak Isolated & Coupling Rewelded ML19340B1611980-10-15015 October 1980 RO 80-072/01X-0:on 801014,during Steady State Operation,Mgt Review Revealed That Reactor Protection Sys Trip Level Setting Was Miscalibrated to Nonconservative Level.Caused by Calculation Error.Monitors Were Immediately Recalibrated ML19340B1621980-10-14014 October 1980 RO 80-070/01X-0:on 801010,during Steady State operation,480 Volt Breaker B204 Tripped Twice within 10 Minutes, de-energizing 480 Volt Bus B14.Cause Unknown.Bus B14 Was Immediately Returned to Svc by Closing Breaker B204 ML19351D6751980-10-0303 October 1980 RO 80-067/01X-0:on 801002,NRC Was Notified That Analytical Reanalysis of RHR Sys B Indicated That as-built Configuration Would Not Remain Functional During Sse.Caused by Design Error.Seismic Anchor Is Being Modified ML19343A4191980-09-11011 September 1980 RO 80-050/01X-0:on 800907,during Surveillance Testing,Diesel Generator Removed from Svc When RBCCW Pump P202D Found Inoperable.Caused by Ambiguous Tech Specs.Tech Specs Will Be Revised to Clarify Limiting Condition of Operation ML19338C4281980-08-0707 August 1980 RO 80-036/01X-0:on 800807,found Hourly Fire Check of Auxiliary Offgas Bldg Was Not Performed on Continuous Basis After 800707.Hourly Fire Check Reinitiated,Surveillance Testing Completed & Sys Returned to Svc ML19330C5121980-07-17017 July 1980 RO 80-29/01X-0:on 800701,during Surveillance Testing to Verify Operability of Oxygen Analyzer Isolation Valves, SV-5065-23 Failed to Meet Acceptance Criteria for Closing Time,Impacting on Operability of Panel C-19 ML19309G6631980-03-0808 March 1980 RO 80-008/01X-0:on 800308,two Irradiated Fuel Assemblies Relocated in Spent Fuel Pool,W/Diesel Generators Inoperable & Secondary Containment Not Intact.Caused by Lack of Knowledge Re Core Drilling for Mods.Fuel Movements Stopped ML19260D4021980-02-0101 February 1980 LER 80-004/012-0:during Visual Examination of Core Spray Sparger,Seven Linear Indications Were Recorded.Cause Unstated.Analysis Initiated ML19257C6561980-01-24024 January 1980 RO 80-002/01X-0:during Investigation Following Review of IE Info Notice 79-32,several 125-volt Dc Automatic Depressurization Sys Supply Cables Found Routed in Cable Trays Containing HPCI Control Cables.Problem Being Resolved ML19257C6471980-01-23023 January 1980 RO 80-001/01X-0:fire Hazards Rept Indicated That Fire in Raceways of Facility Cannot Be Tolerated Because Safe Shutdown Would Be Jeopardized.Cause Unstated.Fire Protection Measures Proposed or Being Completed ML19262B5691979-12-24024 December 1979 RO-79-048 on 791224:backup Battery Charger,In Use Due to Main Battery Charger 791223 Failure,Tripped & Could Not Be Reset.Cause Under Investigation.Spare Battery Charger Will Be in Svc by 791224 ML19270H6271979-12-20020 December 1979 Ro:On 791211,while Transferring Fuel Assembly LTL-656,crane Lifted Assembly Out of Spent Fuel Pool.Caused by Failure to Monitor Hook While Withdrawing from Pool.Assembly Returned to Proper Position ML19322C0241979-12-17017 December 1979 RO 79-01/OR:on 791217,while Lowering New Fuel Assembly Into Fuel Pool,Rice Hook Holding Assembly Failed,Resulting in Assembly Falling Onto Spent Fuel.Cause Not Yet Determined. Investigation Underway Re Recovery of Assembly ML19254C7271979-10-10010 October 1979 Ro:On 791009,Bechtel Notified Util That Reanalysis of Reactor Bldg Component Cooling Water Sys as-built Configuration Indicated Sys Would Not Remain Functional During Sse.Caused by Design Error.Mods Underway ML19209B6971979-10-0202 October 1979 RO 79-036/01X-0:on 791001,util Was Informed That Portion of Loop Piping Does Not Meet SSE Criteria.Caused by Failure to Include Pipe Flange Weights in Design Calculations ML19249B5731979-08-28028 August 1979 RO 79-032/01X-0 on 790828:during Evaluation Performed Per IE Bulletin 79-01,dry Well Sump Containment Isolation Valves AO-7011A & B & AO-7017A & B Were Found Unqualified for Svc. Caused by High Radiation Exposure to Solenoid Valve ML19249B5781979-08-28028 August 1979 RO 79-033/01X-0:on 790828,lightning Struck Station Switchyard,Causing Loss of Offsite Power & Reactor Scram. Offsite Power Restored & Reactor Startup Initiated ML19242C7761979-07-27027 July 1979 RO 79-027/01X-0 on 790727:lightning Struck Station Switchyard,Causing Loss of Offsite Power & Reactor Scram. HPCI Was Started for Injecting Water Into Vessel.Relief Valve 203-3A Will Be Replaced & Tested Prior to Restart 1990-04-09
[Table view] Category:LER)
MONTHYEARML20042E2261990-04-0909 April 1990 Special Rept:On 900227,fire Protection Alarm Reporting Sys Inoperable for More than 14 Days.Compensatory Fire Watches Instituted in Affected Areas & Failure & Malfunction Rept 90-44 Written to Document Problem ML19325E9021989-11-0606 November 1989 Special Rept:On 890929,fire Water Supply Sys Storage Tanks Declared Inoperable.Caused by Drained Storage Tank. Fwst (T-107A) Refilled & Declared Operable on 891007 ML20052E1801982-04-27027 April 1982 RO 82-011/01X-0:on 820427,review of Water Level Anomaly, Determined That Facility Entered Limiting Condition for Operation W/O Insertion of Control Rods.Special Order 82-04 Will Be Issued 820428 to Prevent Recurrence ML20050D5851982-04-0101 April 1982 Ro 82-008/01x-0:on 820331,HPCI Sys Declared Inoperable Due to Failure of HPCI Injection Valve Mo 2301-8 to Go Full Open During Performance of Surveillance Test 8.I.13. Cause Not Stated.Priority a Maint Request Issued ML20042A4581982-03-0909 March 1982 Telecopy RO 82-006/01X-0:on 820309,HPCI Stop Valve Main Disc Flange Which Should Be Attached to Main Disc by Four Cap Screws Found W/Three Cap Screws Broken.Cause Not Stated. Engineering Support Requested ML20039E0771981-12-15015 December 1981 RO 81-1:on 811208,util Received Analysis Rept from Yankee Atomic Environ Lab Indicating Potentially Reportable Concentration of Co-60 in Irish Moss Sample from Indicator Station.Calculated Doses Not Considered Significant ML20050C2121981-03-25025 March 1981 RO 82-07/01X-0:on 810325,HPCI,reactor Core Isolation Cooling & Reactor Water Cleanup Pipe Excess Flow Isolation Setpoints Set Unconservatively.Caused by Exclusion of plant-specific Parameters from Original Calculation ML20049A3361980-11-14014 November 1980 RO 80-084/01X-0:on 801113,during Repairs to D Msn Discovered Water Leaking from 2 Inch Vessel Drain Line Which Connects to Rwcv Sys.Caused by Defective 2 Inch Pipe Coupling Weld. Leak Isolated & Coupling Rewelded ML19340B1611980-10-15015 October 1980 RO 80-072/01X-0:on 801014,during Steady State Operation,Mgt Review Revealed That Reactor Protection Sys Trip Level Setting Was Miscalibrated to Nonconservative Level.Caused by Calculation Error.Monitors Were Immediately Recalibrated ML19340B1621980-10-14014 October 1980 RO 80-070/01X-0:on 801010,during Steady State operation,480 Volt Breaker B204 Tripped Twice within 10 Minutes, de-energizing 480 Volt Bus B14.Cause Unknown.Bus B14 Was Immediately Returned to Svc by Closing Breaker B204 ML19351D6751980-10-0303 October 1980 RO 80-067/01X-0:on 801002,NRC Was Notified That Analytical Reanalysis of RHR Sys B Indicated That as-built Configuration Would Not Remain Functional During Sse.Caused by Design Error.Seismic Anchor Is Being Modified ML19343A4191980-09-11011 September 1980 RO 80-050/01X-0:on 800907,during Surveillance Testing,Diesel Generator Removed from Svc When RBCCW Pump P202D Found Inoperable.Caused by Ambiguous Tech Specs.Tech Specs Will Be Revised to Clarify Limiting Condition of Operation ML19338C4281980-08-0707 August 1980 RO 80-036/01X-0:on 800807,found Hourly Fire Check of Auxiliary Offgas Bldg Was Not Performed on Continuous Basis After 800707.Hourly Fire Check Reinitiated,Surveillance Testing Completed & Sys Returned to Svc ML19330C5121980-07-17017 July 1980 RO 80-29/01X-0:on 800701,during Surveillance Testing to Verify Operability of Oxygen Analyzer Isolation Valves, SV-5065-23 Failed to Meet Acceptance Criteria for Closing Time,Impacting on Operability of Panel C-19 ML19309G6631980-03-0808 March 1980 RO 80-008/01X-0:on 800308,two Irradiated Fuel Assemblies Relocated in Spent Fuel Pool,W/Diesel Generators Inoperable & Secondary Containment Not Intact.Caused by Lack of Knowledge Re Core Drilling for Mods.Fuel Movements Stopped ML19260D4021980-02-0101 February 1980 LER 80-004/012-0:during Visual Examination of Core Spray Sparger,Seven Linear Indications Were Recorded.Cause Unstated.Analysis Initiated ML19257C6561980-01-24024 January 1980 RO 80-002/01X-0:during Investigation Following Review of IE Info Notice 79-32,several 125-volt Dc Automatic Depressurization Sys Supply Cables Found Routed in Cable Trays Containing HPCI Control Cables.Problem Being Resolved ML19257C6471980-01-23023 January 1980 RO 80-001/01X-0:fire Hazards Rept Indicated That Fire in Raceways of Facility Cannot Be Tolerated Because Safe Shutdown Would Be Jeopardized.Cause Unstated.Fire Protection Measures Proposed or Being Completed ML19262B5691979-12-24024 December 1979 RO-79-048 on 791224:backup Battery Charger,In Use Due to Main Battery Charger 791223 Failure,Tripped & Could Not Be Reset.Cause Under Investigation.Spare Battery Charger Will Be in Svc by 791224 ML19270H6271979-12-20020 December 1979 Ro:On 791211,while Transferring Fuel Assembly LTL-656,crane Lifted Assembly Out of Spent Fuel Pool.Caused by Failure to Monitor Hook While Withdrawing from Pool.Assembly Returned to Proper Position ML19322C0241979-12-17017 December 1979 RO 79-01/OR:on 791217,while Lowering New Fuel Assembly Into Fuel Pool,Rice Hook Holding Assembly Failed,Resulting in Assembly Falling Onto Spent Fuel.Cause Not Yet Determined. Investigation Underway Re Recovery of Assembly ML19254C7271979-10-10010 October 1979 Ro:On 791009,Bechtel Notified Util That Reanalysis of Reactor Bldg Component Cooling Water Sys as-built Configuration Indicated Sys Would Not Remain Functional During Sse.Caused by Design Error.Mods Underway ML19209B6971979-10-0202 October 1979 RO 79-036/01X-0:on 791001,util Was Informed That Portion of Loop Piping Does Not Meet SSE Criteria.Caused by Failure to Include Pipe Flange Weights in Design Calculations ML19249B5731979-08-28028 August 1979 RO 79-032/01X-0 on 790828:during Evaluation Performed Per IE Bulletin 79-01,dry Well Sump Containment Isolation Valves AO-7011A & B & AO-7017A & B Were Found Unqualified for Svc. Caused by High Radiation Exposure to Solenoid Valve ML19249B5781979-08-28028 August 1979 RO 79-033/01X-0:on 790828,lightning Struck Station Switchyard,Causing Loss of Offsite Power & Reactor Scram. Offsite Power Restored & Reactor Startup Initiated ML19242C7761979-07-27027 July 1979 RO 79-027/01X-0 on 790727:lightning Struck Station Switchyard,Causing Loss of Offsite Power & Reactor Scram. HPCI Was Started for Injecting Water Into Vessel.Relief Valve 203-3A Will Be Replaced & Tested Prior to Restart 1990-04-09
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217E3021999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With ML20212C2921999-09-16016 September 1999 SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station ML20216F3511999-09-0808 September 1999 ISI Summary Rept for Refuel Outage 12 at Pnps ML20216E6881999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With ML20210R3401999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With ML20209C4731999-07-0707 July 1999 Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co ML20209H8251999-07-0101 July 1999 Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station ML20209E6191999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With ML20196H2451999-06-29029 June 1999 SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation ML20209A8901999-06-28028 June 1999 SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) ML20209B9861999-06-23023 June 1999 Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 ML20217N9061999-06-21021 June 1999 Rept of Changes,Tests & Experiments for Period of 970422-990621 ML20195K3431999-06-15015 June 1999 Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant ML20195G8231999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Pnps.With ML20207E7471999-05-27027 May 1999 Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 ML20206M1971999-05-11011 May 1999 SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant ML20206J6611999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With ML20205L0221999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With ML20207J5471999-03-0909 March 1999 Training Simulator,1999 4-Yr Certification Rept ML20207F9401999-03-0101 March 1999 Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station ML20207H5451999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With ML20196E2151998-12-31031 December 1998 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With ML20206Q2741998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With ML20197J3591998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With ML20195C9951998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With ML20154K0721998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With ML20153D3901998-09-22022 September 1998 Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station ML20197C5011998-09-0404 September 1998 Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr ML20197C5471998-08-31031 August 1998 Rev 12C to Pilgrim Nuclear Power Station Colr ML20151W8231998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With ML20237E2251998-08-26026 August 1998 Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station ML20237A9941998-07-31031 July 1998 Monthly Operating Rept for Pilgrim Nuclear Power Station ML20236U8201998-07-13013 July 1998 Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) ML20236P0151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station ML20249A3741998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr ML20247H2081998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station ML20207B7601998-03-31031 March 1998 Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA ML20216G3911998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station ML20216J3741998-03-19019 March 1998 Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B ML20248L2241998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station ML20202G5251998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station ML20236M8511997-12-31031 December 1997 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept ML20198L7701997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station ML20203D6101997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station ML20202D5761997-11-0808 November 1997 1997 Evaluated Exercise BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station1997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station ML20217D6431997-10-0101 October 1997 Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim ML20217H5621997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station ML20216J4131997-08-31031 August 1997 Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station ML20210J3321997-07-31031 July 1997 Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station 1999-09-08
[Table view] |
Text
.. . . . - - . ..
i o
.asw amuw !
, Pilgrim Nuclear Power Station l Rocky Hill Road l Plymouth. Massachusetts 02360 i
Ralph G. Sird 5enior Vice President - Nuclear l April 9, 1990 BECo Ltr. 90- 052 j U.S. Nuclear Regulatory Commission Attn:' Document Control Desk :
Hashington, D.C. 20555 '
Docket No. 50-293 License No. DPR-35
Subject:
Special Report - Fire Protection Alarm Reporting System
Dear Sir:
This special report is being submitted in accordance with Pilgrim Kuclear
- Power Station Technical Specification 3.12.A.b. The report is required because the Fire Protection Alarm Reporting System was declared inoperable February 27, 1990 at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> and could not be returned to operable status .
within fourteen days. The alarm reporting system was declared inoperable when a trouble condition in the central processing unit could not be cleared.
Refer to Attachment I for details. -
During the period that the alarm reporting system was inoperable, the area alarm panels in the process plant were functional and compensatory measures ,
fire watches were in place. ,
Please do not hesitate to contact me if you have any questions regarding this subject. .
R. G. Bird BM/bal a
cc: Mr. Thomas Martin ;
Regional Administrator, Region I ,
U.S. Nuclear Regulatory Commission O .
475 Allendale Rd.
King of Prussia, PA 19406 i( )
i Sr. NRC Resident Inspector - Pilgrim Station J i! U
'gI'O
[82**RB* gy j
ATTACHMENT I Boston Edigvi Company Docket No. 50-293 Pilgrine Nuclear Power Station License No. DPR-35 Alarms for the various Fire Protection systems report to the Main Control Room directly to alarm master panels, and through multiplex transponders to the central processing unit (CPU) where they alarm and are automatically logged on-a printer.
The CPU and its components were determined inoperable on February 27,1990 at 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> during a system engineer's walkdown. Compensatory fire watches were instituted in those areas where the systems were affected, and a failure and Malfunction Report 90-44 was written to document the problem.
The failure of the CPU resulted in the following losses:
- The automatic logging of alarms reporting to the main control room through the CPU.
- The alarm capability in the main control room for five (5) Tech.
Spec alarm systems.
Fire Doors #90 and #814 Fusible Link.
- Recirc. MG Set Het Pipe Water Flow.
- Reactor 23' and 51' Het Pipe Water Flow.
- - Access Control Het Pipe Water Flow.
Cable Spreading Room Halon System.
During the period that the CPU end the five (5) alarm systems are inoperable, redundant master panels for the remaining plant systems continue to provide i
alarm report capability in the Control Room.
Measures taken in response to the problem were consistent with the requirements of Procedure 8.B.14, " Compensatory Measures Fire Watch" and the i requirements of Technical Specification 3.12.A b. These measures will remain in place until the affected system components are upgraded under Long Term Plan item no. 524.
l
[