ML20050D585
| ML20050D585 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 04/01/1982 |
| From: | Mcloughlin M BOSTON EDISON CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| RO-82-008-01X-0, RO-82-8-1X, NUDOCS 8204120341 | |
| Download: ML20050D585 (1) | |
Text
3CSTON EDISON CC19.C PROMPT REPORTAELE OCCUR?.ENCE EZCo?Y :"SSAGE To: (2 15) 337-5324 DA2/ TIME: April /1/82 /
1600 Telephene Number
'gri: Nuclear ?cuer Sta.
TO: - Director, Region I. g uCu -
D
- Office of Inspection and Enforcerent RE#1, Rocky Hill Road U.' S. Nuclear Regulatory CoH ssion Flyrouth, MA 02360 631 Park Avenue King of Prussia, PA 19406 Docket Nu=ber 50-293
~
Iicense DPR-35 Assigned LER Number 82-008/01X-0 Reported per T.S.Section 6.9.B.1.2 Event
Description:
On March 31, 1982 at acoroximately 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />, the
~
HPCI system was determined to be inoperable.
HPCI' Injection Valve, MD 2301 did not go full open during the performance of surveill'ance test number 8.I.13.
Cause and Corrective Action: An
'A' nrinritv maintenance reconst was immndiatelv issued.
The valve's Limitoroue switch was restored to intended design.
the system satisfactorily tested and returned to service at'a'oproximately 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> on April 1,1982.
20
- Ther al r4 Facility Status:
c)
Routine Startup yfMnda switch in RUN) g) Shutdown d)
Routine Shutdown h) Refueling e)
Steady State i) Other f)
Lead Changing j) Not Applicable j
A written followup report will be sent. within two weeks.
NRC Person Notified nm itye unTiricaTiny Prepared by
!L T. McLouchlin 4
O b
UUNgg 1
c@ 4pRi g;OO Mail (2) copies to:
- 823 2A
~
Director
\\
%i 6
Of fice of Managerent Infor.atien and Fregran Centrol U. S. Nuclear Re rulatory Co==ission
'D 4
~
Washington, D.C.' 20555 f ::
6 8204120341 820401 DR ADOCK 050002 pt cc:
S tandard 1.ER Dis tributic g
--