RO 80-072/01X-0:on 801014,during Steady State Operation,Mgt Review Revealed That Reactor Protection Sys Trip Level Setting Was Miscalibrated to Nonconservative Level.Caused by Calculation Error.Monitors Were Immediately Recalibrated
ML19340B161
Person / Time
Site: Pilgrim
Issue date: 10/15/1980
From: Mcloughlin M
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
RO-80-072-01X-0, RO-80-72-1X, NUDOCS 8010210554
Download: ML19340B161 (1)


Text

. _ _

  • ,
  • a ,

s

. ~ BOSTON EDISON COMPANT ,

~

~

TELECOPY MESSAGE

~

~-

215-337-5324 oct. 15,1980 .1500 hours0.0174 days <br />0.417 hours <br />0.00248 weeks <br />5.7075e-4 months <br />.

Datd h 7 Telephone Number .

~

,+ ., f - -

.- __s ,

_y. -

1From: Pilgrim Nuclear Power Station TJ: Director, Region I .

Office of Inspection and Enforcemenc 'RFD #1 Rocky Hill Road-U. S. Nuclear Regulatory Commission- Plymouth, MA ~02360 631~ Park Avenue King cf Prussia, PA 19406 '.,_

g .

Subject:

PROMPT REPORTABLE OCCURRENCE-

. Docke licher 50;-293; License DPR-35

' Assigned LEE Number 80-072/01X-0-(Reported per Technical Specification 6.9.B.1.b)

. , # 6.9.B.I.b) .

Event'

Description:

October M,1980 a. management review revealed that a RPS trip <

level serting was m'iscalibrated 'to a non-conservative level. - The review indi-

~

cated that on October 2', '1980 as a result of a calculation error the Main -

. , . Steam Line.High Radiation Monitors were set to 7.7 times normal full power -.

background. . .

Causa and Corrective Action:- The ' monitors were immediately recalibrated to d,"

.seven t'imes normal full power background as 'specified' in Technical

, Specification Table 3.1.L.

+. .

, - s-

' I7 e iPccility Status: 100 % Thermal MW c) Routine Scarcup ,

g) Shutdown j

~ '

d) Routine Shutdown __

h) Refueling o). Steady' State *

'1) Other f) Load' Changing ..

j) Not Applicaple A. written follow-up report will be sent' within two weeks. .

MRC person notified & Jon Johnson ,

y;, pared by Mr. M. Thomas McLoughlin

~

. ,s .

-> , ~. . . .

,:. ,.-u

, _. y ,

3. &3r. :.( ..,

_, y - -,

. . . p ..

-Nail'(2)~ copies to: '

h Director .

)

~

. Office' of Management ,Information and Progrant Control

  • l U. S. Nuclear Regulatory Constission. .

l c

in ton, D.C. 20555 -

8 1$

m - -

_ _ -