Ro:On 791009,Bechtel Notified Util That Reanalysis of Reactor Bldg Component Cooling Water Sys as-built Configuration Indicated Sys Would Not Remain Functional During Sse.Caused by Design Error.Mods Underway
ML19254C727
Person / Time
Site: Pilgrim
Issue date: 10/10/1979
From: Mathis C
BOSTON EDISON CO.
To:
References
NUDOCS 7910170268
Download: ML19254C727 (1)


Text

'

BOSTON EDISON COMPANY TELECOPY MESSACE y,. 1-215-337 1000 Da e/ Time ~10/10/79 /

Telephone Number To: Director, region I From: Pilgrim Nuclear Power Station

. Of fice of Ir.spection and Enforcement RFD #1 Rocky Hill Road U. S. Nuclear Regulatory Commission Plymouth, MA 02360 631 Park Avenue '

King of Prussia, PA 19406 Subj ect: PROMPT REPORTAb)E OCCURRENCr.

Docket Number 50-293; License DPR-35 s

'Ar. signed LER Number

,o 79-039/'/r:QL .

Esent

Description:

At 1215 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.623075e-4 months <br /> on 10/9/79, Bechtel Corporation notified BECo that reanalysis of as built configuration of "B" RBCCW indicated that, analytically, thesystemwouldnotremainfunctionalduringSS$.

Cause and Corrective Action: This event resulted from a design error. Three supports are presently being modified to return the system to its original design criteria.

Facility Status: 80  % Thermal MW c) Routine Startup_, ,__ g) Shutdown d) Routine Shutdown h) Refueling e) Steady State x i) Other f) Load Changing j) St Applicaple

& written follow-up report will be sent within two weeks.

ERC person notified 'fr. Ralph Architzel Prepared by Mr. C. J. Mathis I157 J41 Nail (2) copies to: ,.

9s Director '

Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D.C. 20555 7 910170 y}_ f, J -