BOSTON EDISON COMPANY TELECOPY MESSACE
. ~~~
215-337-5324 Oct. 14, 198p
.;.3 Date/ Time:
Telephone Number Ta: Director, Region I From: Pilgrim Nuclear Power Station Office of Inspection and Enforcement RFD #1 Rocky Hill Road
. U. S. Nuclear Regulatory Commission Plymouth, MA 02360 631 Park Avenue King of Prussia, PA 19406 Subj ect:
PROMPT REPORT.dLE OCCURRENCE
~
Docket Number 50-293; License DPR-35
., e
' Assigned LER Number 80-070/01X-0 (Reported per Tech. Spec. 6.9.B.1.b)
Event
Description:
On October 10, 1980 at approximately 1600 ' hours 480 Volt Breaker B204 tripped twice within 10 minutes, de-energiring 480 volt Bus B14. Loss of B14 disabled the ' A' loop of ~ the RBCCW. ' At the time the :'B' loop of the RBCCW was out of service fo r' maintenance. Recovery was i= mediate obviating a reactor shutdown.
1 l
Cause and Corrective Action:
B14 bus was immediatelv returned to service by closing breaker B204 and the ' A' loop of the RBCCW returned to normal. At the time of the trip no unusual loading of the bus was detected. Maintenance performed on breaker B204 on October 11, 1980 revealed no anomalies.
Facility Status:
100 : Ther=al MW c) Routine Startup g) Shutdown d) Routine Shutdown h) Refueling
' c) Steady' Stat._
X
~1) Other f) Load'Chagging j) Not Applicaple A written follow-up report will be sent within two weeks.
NRC person, notified Mr. Jon Johnson p;ep'ared by Mr. Thomas McLoughlin