ML19257C656

From kanterella
Jump to navigation Jump to search
RO 80-002/01X-0:during Investigation Following Review of IE Info Notice 79-32,several 125-volt Dc Automatic Depressurization Sys Supply Cables Found Routed in Cable Trays Containing HPCI Control Cables.Problem Being Resolved
ML19257C656
Person / Time
Site: Pilgrim
Issue date: 01/24/1980
From: Mcloughlin M
BOSTON EDISON CO.
To:
References
NUDOCS 8001290555
Download: ML19257C656 (1)


Text

,

BOSTON EDISON COMPANY-TELECOPY MESSAGE '

To: l'3-337-5324 Telephone Number

  • Date/ Time: 1/24/ 0 / 1500 f

To: Director, Region I .

From: Pilgrim Nuclcar Power Station Office of Inspection and Enforcement RFD #1 Rocky 11111 Road U. S. Nuclear Regulatory Commission Plymouth, MA 02360 631 Park Avenue King of Prussia, PA 19406 Subj ect: PROMPT REPORTABLE OCCURRENCE Docket Number 50-293; License DPR-35

' Assigned LER Number 80-002/01X-0 Event

Description:

An investigati n .in-itiated following review of IE Information Notice No. 79-32 has revealed a cable separation inadequacy. Several 125V DC ADS supply cables are routed in cable trays that contain HPCI control cables. This item is reportable via PNPS T.S. Section 6.9.1.1.

Cause and Corrective Actioni I= mediate action is being taken to resolve this problem prior to s cartuo following our etfrrent Refuel 4 Outage.

Facility Status: 0 c) Routine Startup  % Thermal MW g) Shutdown d) Routine Shutdown h) Refueling X e) Steady State f) Load Changing 1) Other j) Not Applicaple t written follow-up report vill be sent within two weeks.

GC person notified Mr. David-Kehoe Prepared by Mr. M. Thomas McLoughlin

  1. n 182f 128 v... .

%0 tail (2) copies to:

  • Director #

Office of Management Information and Program Control 100i800' '

U. S. Nuclear Regulatory Commission ,

Washington, D.C. 20555 .