RO 80-067/01X-0:on 801002,NRC Was Notified That Analytical Reanalysis of RHR Sys B Indicated That as-built Configuration Would Not Remain Functional During Sse.Caused by Design Error.Seismic Anchor Is Being Modified
ML19351D675
Person / Time
Site: Pilgrim
Issue date: 10/03/1980
From: Graham E
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
80-067-01X-0, 80-67-1X, NUDOCS 8010140456
Download: ML19351D675 (1)


Text

_ _ .

, 391 TON EDISON COMPANY TELECOPY MESSAGE Telephone Number l To: Director, Region I From: Pilgrim Nuclear Power Station Office of Inspection and Enforcement RFD #1 Rocky Hill Road U. S. Nuclear Regulatory Commission Plytneuth, MA 02360 631 Park Avenue

, King of Prussia, PA 19406 l

Subject:

PROMPT REPORTABLE OCCURRENCE Docke Number 50-293; License DPR-35 Assigned LER Number 80-067-01X-0 i

l Event Descripcion: On October 2,1980 Boston Edison Company ' Engineering Department notified Pilgrim Station that an analytical re-analysis of "B" RHR System indicated ,

that the as-built configuration would not remain functional during a Safe Shutdown Earthquake. ,

cause and Corrective Action: This event resulted from a design error. A seismic anchor is I

being modified to make the anchor operable.

Facility Status: 0 :: Thermal MW c) Routine Startup g) Shutdown X d) Routine Shutdown h) Refueling e) Steady State 'i) Other f) Load Changing j) Not Applicaple A written follow-up report will be sent within two weeks. .

NRC person notified T. Martin Prepared by E. T. Graham N

00 ~