| title = Perry Nuclear Power Plant, Unit 1 - Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000440/2016502
| title = Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000440/2016502
| author name = Orth S K
| author name = Orth S
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Hamilton D
| addressee name = Hamilton D
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:UNITED STATES ber 20, 2016
[[Issue date::September 20, 2016]]


Mr. David Hamilton Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant P. O. Box 97, 10 Center Road, A-PY-A290 Perry, OH 44081-0097
==SUBJECT:==
PERRY NUCLEAR POWER PLANT, UNIT 1 - BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000440/2016502


SUBJECT: PERRY NUCLEAR POWER PLANT, UNIT 1 - BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000440/2016502
==Dear Mr. Hamilton:==
On September 15, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Perry Nuclear Power Plant, Unit 1. The enclosed report documents the results of this inspection, which were discussed on September 15, 2016, with you and other members of your staff.
 
No findings were identified during this inspection.


==Dear Mr. Hamilton:==
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
On September 15, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Perry Nuclear Power Plant, Unit 1. The enclosed report documents the results of this inspection, which were discussed on September 15, 2016, with you and other members of your staff. No findings were identified during this inspection. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Sincerely,/RA/ Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58  
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58


===Enclosure:===
===Enclosure:===
IR 05000440/2016502 cc: Distribution via LISTSERV Enclosure U.S. NUCLEAR REGULATORY COMMISSION REGION III Docket No: 50-440 License No: NPF-58 Report No: 05000440/2016502 Licensee: FirstEnergy Nuclear Operating Company (FENOC) Facility: Perry Nuclear Power Plant, Unit 1 Location: North Perry, Ohio Dates: September 12 through 15, 2016 Inspectors: G. Hansen, Senior Emergency Preparedness Inspector M. Garza, Emergency Preparedness Inspector B. Kemker, Senior Resident Inspector J. Rutkowski, Project Engineer Approved by: S. Orth, Chief Plant Support Branch Division of Reactor Safety 2
IR 05000440/2016502
 
REGION III==
Docket No: 50-440 License No: NPF-58 Report No: 05000440/2016502 Licensee: FirstEnergy Nuclear Operating Company (FENOC)
Facility: Perry Nuclear Power Plant, Unit 1 Location: North Perry, Ohio Dates: September 12 through 15, 2016 Inspectors: G. Hansen, Senior Emergency Preparedness Inspector M. Garza, Emergency Preparedness Inspector B. Kemker, Senior Resident Inspector J. Rutkowski, Project Engineer Approved by: S. Orth, Chief Plant Support Branch Division of Reactor Safety Enclosure


=SUMMARY=
=SUMMARY=
IR 05000440/2016502; 09/12/2016 - 09/15/2016; Perry Nuclear Power Plant, Unit 1; Baseline Emergency Preparedness Exercise Evaluation; Exercise Evaluation Scenario Review; and Performance Indicator Verification. This report covers a 1-week period of announced baseline inspection by four Region III inspectors. The U.S. Nuclear Regulatory Commission's program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, "Reactor Oversight Process," dated July 2016.
IR 05000440/2016502; 09/12/2016 - 09/15/2016; Perry Nuclear Power Plant, Unit 1;
 
Baseline Emergency Preparedness Exercise Evaluation; Exercise Evaluation Scenario Review; and Performance Indicator Verification.
 
This report covers a 1-week period of announced baseline inspection by four Region III inspectors. The U.S. Nuclear Regulatory Commissions program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649,
Reactor Oversight Process, dated July 201


===NRC-Identified===
===NRC-Identified===
and Self-Revealed Findings  
and Self-Revealed Findings
 
===Cornerstone: Emergency Preparedness===


===Cornerstone: Emergency Preparedness No findings were identified.===
No findings were identified.


===
===Licensee-Identified Violations===
Licensee-Identified Violations===
None   


3
None


=REPORT DETAILS=
=REPORT DETAILS=
Line 51: Line 64:
==REACTOR SAFETY==
==REACTOR SAFETY==


===Cornerstone:===
===Cornerstone: Emergency Preparedness===
Emergency Preparedness
{{a|1EP1}}
{{a|1EP1}}
==1EP1 Exercise Evaluation==
==1EP1 Exercise Evaluation==
Line 59: Line 71:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors reviewed the September 13, 2016, biennial emergency preparedness exercise objectives and scenario to ensure that the exercise would acceptably test major elements of the licensee's emergency plan and to verify that the exercise's simulated problems provided an acceptable framework to support demonstration of the licensee's capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2014, 2015, and 2016, to verify that those drills' scenarios were sufficiently different from the scenario used in the September 13, 2016, exercise. The inspectors observed and evaluated the licensee's exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision-making, implementation of accident mitigation strategies, and correction of past exercise weaknesses, in the following emergency response facilities:   Control Room Simulator (CRS); Technical Support Center (TSC); Operational Support Center (OSC); and Emergency Operations Facility (EOF). The inspectors also assessed the licensee's recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensee's emergency plan. The inspectors attended post-exercise critiques in the CRS, TSC, OSC, and EOF to evaluate the licensee's initial self-assessment of its exercise performance. The inspectors later met with the licensee's lead exercise evaluators and managers to obtain the licensee's findings and assessments of its exercise participants' performances. These self-assessments were then compared with the inspectors' independent observations and assessments to assess the licensee's ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report. This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01.
The inspectors reviewed the September 13, 2016, biennial emergency preparedness exercise objectives and scenario to ensure that the exercise would acceptably test major elements of the licensees emergency plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2014, 2015, and 2016, to verify that those drills scenarios were sufficiently different from the scenario used in the September 13, 2016, exercise.
 
The inspectors observed and evaluated the licensees exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision-making, implementation of accident mitigation strategies, and correction of past exercise weaknesses, in the following emergency response facilities:
* Control Room Simulator (CRS);
* Technical Support Center (TSC);
* Operational Support Center (OSC); and
* Emergency Operations Facility (EOF).
 
The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees emergency plan.
 
The inspectors attended post-exercise critiques in the CRS, TSC, OSC, and EOF to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances. These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance.
 
Documents reviewed are listed in the Attachment to this report.
 
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified. {{a|1EP8}}
 
4
{{a|1EP8}}
==1EP8 Exercise Evaluation - Scenario Review==
==1EP8 Exercise Evaluation - Scenario Review==
{{IP sample|IP=IP 71114.08}}
{{IP sample|IP=IP 71114.08}}


====a. Inspection Scope====
====a. Inspection Scope====
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenarios submitted to the NRC using IP 71114.08, "Exercise Evaluation - Scenario Review," to determine if the exercise would test major elements of the Emergency Plan as required by 10 CFR 50.47(b)(14). Documents reviewed are listed in the Attachment to this report. This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08.
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenarios submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the Emergency Plan as required by 10 CFR 50.47(b)(14).
 
Documents reviewed are listed in the Attachment to this report.
 
This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08.


====b. Findings====
====b. Findings====
Line 77: Line 104:
==OTHER ACTIVITIES==
==OTHER ACTIVITIES==


===Cornerstone:===
===Cornerstone: Emergency Preparedness===
Emergency Preparedness
{{a|4OA1}}
{{a|4OA1}}
==4OA1 Performance Indicator Verification==
==4OA1 Performance Indicator Verification==
Line 85: Line 111:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors sampled licensee submittals for the Drill/Exercise Performance (DEP) Performance Indicator (PI) for the period from the second quarter of 2015 through the second quarter of 2016. To determine the accuracy of the PI data reported during this period, PI definitions and guidance contained in Nuclear Energy Institute (NEI) 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, were used. The inspectors reviewed the licensee's records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report. This inspection constituted one DEP sample as defined in IP 71151.
The inspectors sampled licensee submittals for the Drill/Exercise Performance (DEP)
Performance Indicator (PI) for the period from the second quarter of 2015 through the second quarter of 2016. To determine the accuracy of the PI data reported during this period, PI definitions and guidance contained in Nuclear Energy Institute (NEI) 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, were used. The inspectors reviewed the licensees records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills.
 
Documents reviewed are listed in the Attachment to this report.
 
This inspection constituted one DEP sample as defined in IP 71151.


====b. Findings====
====b. Findings====
Line 93: Line 124:


====a. Inspection Scope====
====a. Inspection Scope====
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter of 2015 through the 5 second quarter of 2016. To determine the accuracy of the PI data reported during this period, PI definitions and guidance contained in NEI 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, were used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, performance during the 2015 and 2016 drill, and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the Attachment to this report. This inspection constituted one ERO Drill Participation sample as defined in IP 71151.
The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter of 2015 through the second quarter of 2016. To determine the accuracy of the PI data reported during this period, PI definitions and guidance contained in NEI 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, performance during the 2015 and 2016 drill, and revisions of the roster of personnel assigned to key emergency response organization positions.
 
Documents reviewed are listed in the Attachment to this report.
 
This inspection constituted one ERO Drill Participation sample as defined in IP 71151.


====b. Findings====
====b. Findings====
Line 102: Line 137:
====a. Inspection Scope====
====a. Inspection Scope====
The inspectors sampled licensee submittals for the Alert and Notification System (ANS)
The inspectors sampled licensee submittals for the Alert and Notification System (ANS)
PI for the period from the second quarter of 2015 through the second quarter of 2016. To determine the accuracy of the PI data reported during this period, PI definitions and guidance contained in NEI 99-02, "Regulatory Assessment Performance Indicator Guideline," Revision 7, were used. The inspectors reviewed the licensee's records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. Documents reviewed are listed in the Attachment to this report. This inspection constituted one ANS sample as defined in IP 71151.
PI for the period from the second quarter of 2015 through the second quarter of 2016.
 
To determine the accuracy of the PI data reported during this period, PI definitions and guidance contained in NEI 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests.
 
Documents reviewed are listed in the Attachment to this report.
 
This inspection constituted one ANS sample as defined in IP 71151.


====b. Findings====
====b. Findings====
No findings were identified.
No findings were identified.
{{a|4OA6}}
{{a|4OA6}}
==4OA6 Management Meetings==
==4OA6 Management Meetings==


===.1 Exit Meeting Summary On September 15, 2016, the inspectors presented the biennial exercise inspection results to Mr. D. Hamilton, and other members of the licensee staff.===
===.1 Exit Meeting Summary===
The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary. ATTACHMENT:
 
On September 15, 2016, the inspectors presented the biennial exercise inspection results to Mr. D. Hamilton, and other members of the licensee staff. The licensee acknowledged the issues presented.
 
The inspectors confirmed that none of the potential report input discussed was considered proprietary.
 
ATTACHMENT:  


=SUPPLEMENTAL INFORMATION=
=SUPPLEMENTAL INFORMATION=


==KEY POINTS OF CONTACT==
==KEY POINTS OF CONTACT==
Licensee  
 
: [[contact::D. Hamilton]], Site Vice President  
Licensee
: [[contact::F. Payne]], Plant General Manager  
: [[contact::D. Hamilton]], Site Vice President
: [[contact::T. Brown]], Performance Improvement Director
: [[contact::F. Payne]], Plant General Manager
: [[contact::D. Reeves]], Site Engineering Director  
: [[contact::T. Brown]], Performance Improvement Director
: [[contact::B. Blair]], Operations Manager  
: [[contact::D. Reeves]], Site Engineering Director
: [[contact::R. O'Connor]], Emergency Preparedness Manager  
: [[contact::B. Blair]], Operations Manager
: [[contact::C. Elliot]], Radiation Protection Manager  
: [[contact::R. OConnor]], Emergency Preparedness Manager
: [[contact::J. Pry]], Work Management Manager  
: [[contact::C. Elliot]], Radiation Protection Manager
: [[contact::J. Tufts]], Outage Management Manager  
: [[contact::J. Pry]], Work Management Manager
: [[contact::P. Boissoneault]], Training Manager  
: [[contact::J. Tufts]], Outage Management Manager
: [[contact::S. Gorski]], Programs & Technical Services Manager  
: [[contact::P. Boissoneault]], Training Manager
: [[contact::M. Fox]], Security Manager  
: [[contact::S. Gorski]], Programs & Technical Services Manager
: [[contact::S. Zalesny]], Fleet Emergency Preparedness  
: [[contact::M. Fox]], Security Manager
: [[contact::L. Zerr]], Regulatory Compliance Supervisor  
: [[contact::S. Zalesny]], Fleet Emergency Preparedness
: [[contact::T. Kledzik]], Regulatory Compliance  
: [[contact::L. Zerr]], Regulatory Compliance Supervisor
: [[contact::L. Vanderhourst]], Emergency Preparedness  
: [[contact::T. Kledzik]], Regulatory Compliance
: [[contact::B. Luthanen]], Emergency Preparedness  
: [[contact::L. Vanderhourst]], Emergency Preparedness
: [[contact::P. Harkins]], Emergency Preparedness
: [[contact::B. Luthanen]], Emergency Preparedness
: [[contact::U.S. Nuclear Regulatory Commission J. Nance]], Resident Inspector  
: [[contact::P. Harkins]], Emergency Preparedness
U.S. Nuclear Regulatory Commission
: [[contact::J. Nance]], Resident Inspector
 
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED==


===Opened, Closed, and Discussed===
===Opened, Closed, and Discussed===
None  
 
None


==LIST OF DOCUMENTS REVIEWED==
==LIST OF DOCUMENTS REVIEWED==
The following is a partial list of documents reviewed during the inspection.
 
: Inclusion on this list does not imply that the NRC inspectors reviewed the documents in their entirety, but rather that selected sections or portions of the documents were evaluated as part of the overall inspection effort.
: Inclusion of a document on this list does not imply NRC acceptance of the document or any part of it, unless this is stated in the body of the inspection report. 1EP1 Exercise Evaluation (71114.01) Perry Nuclear Power Plant Emergency Plan; Revision 48
: EPI-A1; Emergency Action Levels; Revision 26
: EPI-A2; Emergency Actions Based on Event Classification; Revision 19
: EPI-A6; Technical Support Center Activation; Revision 26
: EPI-A7; Operations Support Center Activation; Revision 22
: EPI-A8; Emergency Operations Facility Activation; Revision 21 Two Years of Drill and Exercise Corrective Action Program Items; September 2014 -September 2016 Two Years of Scenario Timelines; September 2014 -September 2016
: EPI-B1; Emergency Notification System; Revision 25
: EPI-B4; First Aid and Medical Care; Revision 16
: EPI-B5; Personnel Accountability/Site Evacuation; Revision 16
: EPI-B8; Protective Actions and Guides; Revision 18
: EPI-B10; Emergency Radiological Environmental Monitoring Program; Revision 7
: EPI-B11; Emergency Dosimetry Issue; Revision 10
: EP-B13; Determination of Core Damage Under Accident Conditions; Revision 10
: NOP-LP-2001; Corrective Action Program; Revision 38
: NOP-LP-5007; Perry MIDAS Dose Assessment; Revision 2
: CR 2014-13881; 8/27/14 ERO Drill Controller Performance Issues;
: Dated September 3, 2014
: CR 2014-14364;
: PA-PY-14-02, Repeat procedure use and adherence issues with ERO dose assessment; Dated September 15, 2014
: CR 2015-04097; Perry ANS Siren Performance Trend Identified; Dated March 26, 2015
: CR 2016-04271; Declining trend in pager test responses; Dated March 31, 2016
: CR 2016-11070; Evaluated Exercise - Transfer of Emergency Coordinator Duties; Dated September 19, 2016
: CR 2016-10863; ERO Drill critique, monitoring of subcriticality during an ATWS,
: EOP-1A; Dated September 13, 2016
: CR 2016-10923; 2016 Evaluated Exercise- Release source term not communicated; Dated September 15, 2016
: CR 2016-10925; 2016 Evaluated Exercise -
: NOP-LP-5007 MIDAS Logic Flowchart Deficiencies; Dated September 15, 2016
: CR 2016-10932; 2016 Evaluated Exercise - Perry and State Protective Action Recommendations to the Counties were not in Agreement; Dated September 15, 2016
: CR 2016-10938; 2016 Evaluated Exercise - Objective K.7 Not Met - Site Area Emergency News Statement Timeliness; Dated September 15, 2016
: CR 2016-10941; 2016 Evaluated Exercise - Objective F.6 Not Met - Source of Release; Dated September 15, 2016 1EP8 Exercise Evaluation - Scenario Review (71114.08) Perry Nuclear Plant Emergency Preparedness Exercise 60-Day Scenario Submittal; Dated July 11, 2016 4OA1 Performance Indicator Verification (71151)
: NOBP-LP-4012-11; Emergency Preparedness Drill/Exercise Performance Records; April 2015 - June 2016
: NOBP-LP-4012-12; Emergency Response Organization Drill Participation Records; April 2015 - June 2016
: NOBP-LP-4012-13; Alert and Notification System Reliability Records; April 2015 - June 2016
==LIST OF ACRONYMS==
: [[USED]] [[]]
: [[ADAMS]] [[Agencywide Documents Access and Management System]]
: [[ANS]] [[Alert and Notification System]]
: [[CFR]] [[Code of Federal Regulations]]
: [[CRS]] [[Control Room Simulator]]
: [[DEP]] [[Drill and Exercise Performance]]
: [[EOF]] [[Emergency Operations Facility]]
: [[ERO]] [[Emergency Response Organization]]
: [[IP]] [[Inspection Procedure]]
: [[NEI]] [[Nuclear Energy Institute]]
: [[NRC]] [[U.S. Nuclear Regulatory Commission]]
: [[OSC]] [[Operational Support Center]]
: [[PARS]] [[Publicly Available Records System]]
PI Performance Indicator TSC Technical Support Center
Mr. David Hamilton Site Vice President  FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant
: [[P.]] [[O. Box 97, 10 Center Road, A-]]
: [[PY]] [[-A290 Perry,]]
: [[OH]] [[44081-0097]]
: [[SUBJEC]] [[T:]]
: [[PERRY]] [[]]
: [[NUCLEA]] [[R]]
: [[POWER]] [[]]
: [[PLANT]] [[,]]
: [[UNIT]] [[1 -]]
: [[BASELI]] [[NE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION]]
: [[REPORT]] [[05000440/2016502 Dear Mr. Hamilton: On September 15, 2016, the U.S. Nuclear Regulatory Commission (]]
: [[NRC]] [[) completed an inspection at your Perry Nuclear Power Plant, Unit 1. The enclosed report documents the results of this inspection, which were discussed on September 15, 2016, with you and other members of your staff. No findings were identified during this inspection. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS, accessible from the]]
: [[NRC]] [[Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /]]
: [[RA]] [[/ Steven]]
: [[K.]] [[Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No.]]
: [[NPF]] [[-58 Enclosure:]]
: [[IR]] [[05000440/2016502 cc:  Distribution via]]
: [[LISTSE]] [[RV]]
}}
}}

Latest revision as of 20:05, 19 December 2019

Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000440/2016502
ML16265A048
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 09/20/2016
From: Steven Orth
Plant Support Branch II
To: Hamilton D
FirstEnergy Nuclear Operating Co
References
IR 2016502
Download: ML16265A048 (11)


Text

UNITED STATES ber 20, 2016

SUBJECT:

PERRY NUCLEAR POWER PLANT, UNIT 1 - BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000440/2016502

Dear Mr. Hamilton:

On September 15, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Perry Nuclear Power Plant, Unit 1. The enclosed report documents the results of this inspection, which were discussed on September 15, 2016, with you and other members of your staff.

No findings were identified during this inspection.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS, accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-440 License No. NPF-58

Enclosure:

IR 05000440/2016502

REGION III==

Docket No: 50-440 License No: NPF-58 Report No: 05000440/2016502 Licensee: FirstEnergy Nuclear Operating Company (FENOC)

Facility: Perry Nuclear Power Plant, Unit 1 Location: North Perry, Ohio Dates: September 12 through 15, 2016 Inspectors: G. Hansen, Senior Emergency Preparedness Inspector M. Garza, Emergency Preparedness Inspector B. Kemker, Senior Resident Inspector J. Rutkowski, Project Engineer Approved by: S. Orth, Chief Plant Support Branch Division of Reactor Safety Enclosure

SUMMARY

IR 05000440/2016502; 09/12/2016 - 09/15/2016; Perry Nuclear Power Plant, Unit 1;

Baseline Emergency Preparedness Exercise Evaluation; Exercise Evaluation Scenario Review; and Performance Indicator Verification.

This report covers a 1-week period of announced baseline inspection by four Region III inspectors. The U.S. Nuclear Regulatory Commissions program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649,

Reactor Oversight Process, dated July 201

NRC-Identified

and Self-Revealed Findings

Cornerstone: Emergency Preparedness

No findings were identified.

Licensee-Identified Violations

None

REPORT DETAILS

REACTOR SAFETY

Cornerstone: Emergency Preparedness

1EP1 Exercise Evaluation

.1 Exercise Evaluation

a. Inspection Scope

The inspectors reviewed the September 13, 2016, biennial emergency preparedness exercise objectives and scenario to ensure that the exercise would acceptably test major elements of the licensees emergency plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted in 2014, 2015, and 2016, to verify that those drills scenarios were sufficiently different from the scenario used in the September 13, 2016, exercise.

The inspectors observed and evaluated the licensees exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision-making, implementation of accident mitigation strategies, and correction of past exercise weaknesses, in the following emergency response facilities:

  • Control Room Simulator (CRS);
  • Operational Support Center (OSC); and
  • Emergency Operations Facility (EOF).

The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees emergency plan.

The inspectors attended post-exercise critiques in the CRS, TSC, OSC, and EOF to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances. These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance.

Documents reviewed are listed in the Attachment to this report.

This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01.

b. Findings

No findings were identified.

1EP8 Exercise Evaluation - Scenario Review

a. Inspection Scope

Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenarios submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the Emergency Plan as required by 10 CFR 50.47(b)(14).

Documents reviewed are listed in the Attachment to this report.

This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08.

b. Findings

No findings were identified.

OTHER ACTIVITIES

Cornerstone: Emergency Preparedness

4OA1 Performance Indicator Verification

.1 Drill/Exercise Performance

a. Inspection Scope

The inspectors sampled licensee submittals for the Drill/Exercise Performance (DEP)

Performance Indicator (PI) for the period from the second quarter of 2015 through the second quarter of 2016. To determine the accuracy of the PI data reported during this period, PI definitions and guidance contained in Nuclear Energy Institute (NEI) 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, were used. The inspectors reviewed the licensees records associated with the performance indicator to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills.

Documents reviewed are listed in the Attachment to this report.

This inspection constituted one DEP sample as defined in IP 71151.

b. Findings

No findings were identified.

.2 Emergency Response Organization Drill Participation

a. Inspection Scope

The inspectors sampled licensee submittals for the Emergency Response Organization (ERO) Drill Participation PI for the period from the second quarter of 2015 through the second quarter of 2016. To determine the accuracy of the PI data reported during this period, PI definitions and guidance contained in NEI 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, performance during the 2015 and 2016 drill, and revisions of the roster of personnel assigned to key emergency response organization positions.

Documents reviewed are listed in the Attachment to this report.

This inspection constituted one ERO Drill Participation sample as defined in IP 71151.

b. Findings

No findings were identified.

.3 Alert and Notification System

a. Inspection Scope

The inspectors sampled licensee submittals for the Alert and Notification System (ANS)

PI for the period from the second quarter of 2015 through the second quarter of 2016.

To determine the accuracy of the PI data reported during this period, PI definitions and guidance contained in NEI 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests.

Documents reviewed are listed in the Attachment to this report.

This inspection constituted one ANS sample as defined in IP 71151.

b. Findings

No findings were identified.

4OA6 Management Meetings

.1 Exit Meeting Summary

On September 15, 2016, the inspectors presented the biennial exercise inspection results to Mr. D. Hamilton, and other members of the licensee staff. The licensee acknowledged the issues presented.

The inspectors confirmed that none of the potential report input discussed was considered proprietary.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

D. Hamilton, Site Vice President
F. Payne, Plant General Manager
T. Brown, Performance Improvement Director
D. Reeves, Site Engineering Director
B. Blair, Operations Manager
R. OConnor, Emergency Preparedness Manager
C. Elliot, Radiation Protection Manager
J. Pry, Work Management Manager
J. Tufts, Outage Management Manager
P. Boissoneault, Training Manager
S. Gorski, Programs & Technical Services Manager
M. Fox, Security Manager
S. Zalesny, Fleet Emergency Preparedness
L. Zerr, Regulatory Compliance Supervisor
T. Kledzik, Regulatory Compliance
L. Vanderhourst, Emergency Preparedness
B. Luthanen, Emergency Preparedness
P. Harkins, Emergency Preparedness

U.S. Nuclear Regulatory Commission

J. Nance, Resident Inspector

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened, Closed, and Discussed

None

LIST OF DOCUMENTS REVIEWED