September 23, 2020

SUBJECT:

PERRY NUCLEAR POWER PLANT - SECURITY BASELINE INSPECTION REPORT 05000440/2020402

Dear Mr. Payne:

On August 19, 2020, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Perry Nuclear Power Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety

Docket No. 05000440 License No. NPF-58

Enclosure:

As stated

Inspection Report

Docket Number:

05000440

License Number:

NPF-58

Report Number:

05000440/2020402

Enterprise Identifier: I-2020-402-0030

Licensee:

Energy Harbor Nuclear Corp.

Facility:

Perry Nuclear Power Plant

Location:

Perry, OH

Inspection Dates:

August 03, 2020 to August 19, 2020

Inspector:

N. Egan, Senior Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Perry Nuclear Power Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), regional inspectors were directed to begin telework. The inspection documented below was determined that the objectives and requirements stated in the IP could, in part, be performed remotely.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspector evaluated the security equipment testing and maintenance program.

The following elements were evaluated from this IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1)

  • Tier I: All requirements
  • Tier II: 02.09 (a), 02.10 (a), 02.11 a-b
  • Tier III: 02.11 a-b

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspector verified no proprietary information was retained or documented in this report.

  • On August 19, 2020, the inspector presented the security baseline inspection results to Frank Payne and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71130.04

Procedures

NOP-LP-1107

Safety and Security Interface

NOP-LP-1301

Security Testing, Maintenance, and Inspection

NOP-LP-1701

Protected Area Lighting Inspections

PYBP-SPS-0005

Site Protection Early Warning System Testing

PYBP-SPS-0009

Arms Room Practices and Weapons Maintenance Program

SSI-0001

PAF Search Equipment Testing

SSI-0003

Security System Equipment Operability Testing

SSI-0005

Security Tamper Switch Yearly Testing

SSI-0008

Perimeter Equipment - Annual and Acceptance Testing

SSI-0009

Security System Equipment Testing Following

Repairs/Calibration

SSI-0011

Hand Geometry System - Annual Operability Test Instruction 12

Self-Assessments MS-C-18-10-19

Fleet Oversight Audit Report

2/14/2018

Sa-BN-2020-

1893

Analysis of Equipment Performance, Testing, and

Maintenance in Relation to 71130.04 Perry Nuclear Power

Plant

0