| issue date = 06/12/2017 | | issue date = 06/12/2017 | ||
| title = Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000315/2017502; 05000316/2017502 | | title = Baseline Emergency Preparedness Biennial Exercise Inspection Report 05000315/2017502; 05000316/2017502 | ||
| author name = Riemer K | | author name = Riemer K | ||
| author affiliation = NRC/RGN-III/DRS/PSB | | author affiliation = NRC/RGN-III/DRS/PSB | ||
| addressee name = Gebbie J | | addressee name = Gebbie J | ||
| addressee affiliation = Indiana Michigan Power Co | | addressee affiliation = Indiana Michigan Power Co | ||
| docket = 05000315, 05000316 | | docket = 05000315, 05000316 | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES | {{#Wiki_filter:UNITED STATES une 12, 2017 | ||
==SUBJECT:== | |||
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 - | |||
BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000315/2017502; 05000316/2017502 | |||
==Dear Mr. Gebbie:== | ==Dear Mr. Gebbie:== | ||
On May 25, | On May 25, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Donald C. Cook Nuclear Power Plant, Units 1 and 2, and the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of the inspection are documented in the enclosed report. | ||
The results of the inspection are documented in the enclosed report. | |||
The NRC inspectors did not identify any finding or violation of more than minor significance. | The NRC inspectors did not identify any finding or violation of more than minor significance. | ||
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading | This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, | |||
Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | ||
Sincerely, | Sincerely, | ||
/RA/ Kenneth Riemer, Chief Plant Support Branch Division of Reactor Safety | /RA/ | ||
Kenneth Riemer, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 Enclosure: | |||
Inspection Report 05000315/2017502; 05000316/2017502 cc w/encl: Distribution via LISTSERV | |||
=SUMMARY= | |||
IR 05000315/2017502; 05000316/2017502; 05/22/2017 - 05/25/2017; Donald C. Cook Nuclear | |||
Power Plant, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise Inspection; | |||
Exercise Evaluation Scenario Review; Performance Indicator Verification. | |||
This report covers a 1-week period of announced baseline inspection by five regional inspectors. The U.S. Nuclear Regulatory Commissions program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 6, dated July 201 | |||
===NRC-Identified=== | ===NRC-Identified=== | ||
Line 56: | Line 53: | ||
No findings were identified. | No findings were identified. | ||
=== | ===Licensee-Identified Violations=== | ||
Licensee-Identified Violations=== | |||
None | None | ||
=REPORT DETAILS= | =REPORT DETAILS= | ||
Line 65: | Line 61: | ||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
===Cornerstone: | ===Cornerstone: Emergency Preparedness=== | ||
{{a|1EP1}} | |||
{{a| | ==1EP1 Exercise Evaluation== | ||
== | {{IP sample|IP=IP 71114.01}} | ||
===.1 Exercise Evaluation=== | ===.1 Exercise Evaluation=== | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors reviewed the May 23, 2017, Biennial Emergency Preparedness | The inspectors reviewed the May 23, 2017, Biennial Emergency Preparedness Exercises objectives and scenario to ensure that the exercise would acceptably test major elements of the licensees Emergency Plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted from 2015 through 2017, to verify that those drills scenarios were sufficiently different from the scenario used in the May 23, 2017 exercise. | ||
The inspectors | The inspectors evaluated the licensees exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities: | ||
* Control Room Simulator; | |||
* Technical Support Center; | |||
* Operations Support Center; and | |||
* Emergency Operations Facility. | |||
The inspectors attended post | The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees Emergency Plan. | ||
-exercise critiques in the control room simulator , technical support center , operations support center, and emergency operations facility to evaluate the | |||
-assessment of its exercise performance. The inspectors later met with the | The inspectors attended post-exercise critiques in the control room simulator, technical support center, operations support center, and emergency operations facility to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances. These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report. | ||
-assessments were then compared with the inspectors | |||
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01. | This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01. | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified | No findings were identified. {{a|1EP8}} | ||
. | ==1EP8 Exercise Evaluation - Scenario Review== | ||
{{IP sample|IP=IP 71114.08}} | |||
{{a| | |||
== | |||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Prior to the inspection activity on-site, the inspectors conducted an in | Prior to the inspection activity on-site, the inspectors conducted an in-office review of the exercise objectives and scenarios submitted to the U.S. Nuclear Regulatory Commission using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the Emergency Plan as required by Title 10 of the Code of Federal Regulations, Part 50.47(b)(14). Documents reviewed are listed in the Attachment to this report. | ||
-office review of the exercise objectives and scenarios submitted to the U.S. Nuclear Regulatory Commission using IP 71114.08, | |||
- Scenario Review, | |||
This review of the exercise objectives and scenario constituted one inspection | This review of the exercise objectives and scenario constituted one inspection sample as defined in IP 71114.08. | ||
====b. Findings==== | ====b. Findings==== | ||
Line 108: | Line 97: | ||
==OTHER ACTIVITIES== | ==OTHER ACTIVITIES== | ||
===Cornerstone: | ===Cornerstone: Emergency Preparedness=== | ||
{{a|4OA1}} | {{a|4OA1}} | ||
==4OA1 Performance Indicator Verification== | ==4OA1 Performance Indicator Verification== | ||
{{IP sample|IP=IP 71151}} | |||
===.1 Drill/Exercise Performance=== | ===.1 Drill/Exercise Performance=== | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors sampled licensee submittals for the Drill/Exercise Performance Indicator (PI) for the period from the first quarter 2016 through first quarter | The inspectors sampled licensee submittals for the Drill/Exercise Performance Indicator (PI) for the period from the first quarter 2016 through first quarter 2017. | ||
To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, were used. | |||
The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report. | |||
-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report. This inspection constituted one Drill/Exercise Performance sample as defined in IP 71151. | This inspection constituted one Drill/Exercise Performance sample as defined in IP 71151. | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
===.2 Emergency Response Organization (ERO)=== | ===.2 Emergency Response Organization (ERO) Drill Participation=== | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors sampled licensee submittals for the ERO Drill Participation PI for the period from the first quarter of 2016 through first quarter of 2017. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99 | The inspectors sampled licensee submittals for the ERO Drill Participation PI for the period from the first quarter of 2016 through first quarter of 2017. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2016 and 2017 exercises and drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the Attachment to this report. | ||
-02, | |||
This inspection constituted one ERO Drill Participation sample as defined in IP 71151. | This inspection constituted one ERO Drill Participation sample as defined in IP 71151. | ||
Line 145: | Line 128: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors sampled licensee submittals for the Alert and Notification System (ANS) PI for the period from the first quarter 2016 through first quarter 2017. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99 | The inspectors sampled licensee submittals for the Alert and Notification System (ANS) | ||
-02, | PI for the period from the first quarter 2016 through first quarter 2017. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. | ||
Documents reviewed are listed in the Attachment to this report. | Documents reviewed are listed in the Attachment to this report. | ||
Line 154: | Line 137: | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA6}} | |||
{{a|4OA6}} | |||
==4OA6 Management Meetings== | ==4OA6 Management Meetings== | ||
===.1 Exit Meeting Summary=== | ===.1 Exit Meeting Summary=== | ||
On May 25 , 2017, the inspectors presented the biennial exercise inspection results to Mr. J. Gebbie , and other members of the licensee staff. The licensee acknowledged the issues presented. | On May 25, 2017, the inspectors presented the biennial exercise inspection results to Mr. J. Gebbie, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary. | ||
ATTACHMENT: | |||
=SUPPLEMENTAL INFORMATION= | |||
= | ==KEY POINTS OF CONTACT== | ||
Licensee | |||
: [[contact::J. Gebbie]], Senior Vice President and Chief Nuclear Officer | : [[contact::J. Gebbie]], Senior Vice President and Chief Nuclear Officer | ||
: [[contact::S. Lies]], Site Vice President | : [[contact::S. Lies]], Site Vice President | ||
Line 179: | Line 160: | ||
: [[contact::K. Fernau]], Operations Director | : [[contact::K. Fernau]], Operations Director | ||
: [[contact::J. Petro]], Design Engineering DIrector | : [[contact::J. Petro]], Design Engineering DIrector | ||
: [[contact::M. Scarpello ]], Nuclear Regulatory Affairs Manager | : [[contact::M. Scarpello]], Nuclear Regulatory Affairs Manager | ||
: [[contact::G. Weber]], Cyber Security / Engineering Manager | : [[contact::G. Weber]], Cyber Security / Engineering Manager | ||
: [[contact::K. Harper]], Regulatory Affairs | : [[contact::K. Harper]], Regulatory Affairs | ||
Line 189: | Line 170: | ||
: [[contact::J. Tipton-Stone]], EP Coordinator | : [[contact::J. Tipton-Stone]], EP Coordinator | ||
: [[contact::S. Wiederwax]], EP Coordinator | : [[contact::S. Wiederwax]], EP Coordinator | ||
: [[contact::K. | : [[contact::K. Appel]], EP Coordinator | ||
U.S. Nuclear Regulatory Commission | U.S. Nuclear Regulatory Commission | ||
: [[contact::T. Taylor]], Resident Inspector | : [[contact::T. Taylor]], Resident Inspector | ||
LIST OF ITEMS OPENED, CLOSED, AND | |||
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | |||
===Opened, Closed, and Discussed=== | |||
None | None | ||
LIST OF DOCUMENTS REVIEWED | |||
==LIST OF DOCUMENTS REVIEWED== | |||
}} | }} |
Latest revision as of 14:24, 19 December 2019
ML17163A434 | |
Person / Time | |
---|---|
Site: | Cook |
Issue date: | 06/12/2017 |
From: | Kenneth Riemer Plant Support Branch II |
To: | Gebbie J Indiana Michigan Power Co |
References | |
IR 2017502 | |
Download: ML17163A434 (12) | |
Text
UNITED STATES une 12, 2017
SUBJECT:
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 -
BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000315/2017502; 05000316/2017502
Dear Mr. Gebbie:
On May 25, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at the Donald C. Cook Nuclear Power Plant, Units 1 and 2, and the NRC inspectors discussed the results of this inspection with you and other members of your staff. The results of the inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Kenneth Riemer, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 Enclosure:
Inspection Report 05000315/2017502; 05000316/2017502 cc w/encl: Distribution via LISTSERV
SUMMARY
IR 05000315/2017502; 05000316/2017502; 05/22/2017 - 05/25/2017; Donald C. Cook Nuclear
Power Plant, Units 1 and 2; Baseline Emergency Preparedness Biennial Exercise Inspection;
Exercise Evaluation Scenario Review; Performance Indicator Verification.
This report covers a 1-week period of announced baseline inspection by five regional inspectors. The U.S. Nuclear Regulatory Commissions program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 6, dated July 201
NRC-Identified
and Self-Revealed Findings
Cornerstone: Emergency Preparedness
No findings were identified.
Licensee-Identified Violations
None
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness
1EP1 Exercise Evaluation
.1 Exercise Evaluation
a. Inspection Scope
The inspectors reviewed the May 23, 2017, Biennial Emergency Preparedness Exercises objectives and scenario to ensure that the exercise would acceptably test major elements of the licensees Emergency Plan and to verify that the exercises simulated problems provided an acceptable framework to support demonstration of the licensees capability to implement its plan. The inspectors also reviewed records of other drills and exercises conducted from 2015 through 2017, to verify that those drills scenarios were sufficiently different from the scenario used in the May 23, 2017 exercise.
The inspectors evaluated the licensees exercise performance, focusing on the risk-significant activities of emergency classification, notification, and protective action decision making, implementation of accident mitigation strategies, and correction of past exercise weaknesses in the following emergency response facilities:
- Control Room Simulator;
- Operations Support Center; and
The inspectors also assessed the licensees recognition of abnormal plant conditions, transfer of responsibilities between facilities, internal communications, interfaces with offsite officials, readiness of emergency facilities and related equipment, and overall implementation of the licensees Emergency Plan.
The inspectors attended post-exercise critiques in the control room simulator, technical support center, operations support center, and emergency operations facility to evaluate the licensees initial self-assessment of its exercise performance. The inspectors later met with the licensees lead exercise evaluators and managers to obtain the licensees findings and assessments of its exercise participants performances. These self-assessments were then compared with the inspectors independent observations and assessments to assess the licensees ability to adequately critique its exercise performance. Documents reviewed are listed in the Attachment to this report.
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.01.
b. Findings
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review
a. Inspection Scope
Prior to the inspection activity on-site, the inspectors conducted an in-office review of the exercise objectives and scenarios submitted to the U.S. Nuclear Regulatory Commission using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the Emergency Plan as required by Title 10 of the Code of Federal Regulations, Part 50.47(b)(14). Documents reviewed are listed in the Attachment to this report.
This review of the exercise objectives and scenario constituted one inspection sample as defined in IP 71114.08.
b. Findings
No findings were identified.
OTHER ACTIVITIES
Cornerstone: Emergency Preparedness
4OA1 Performance Indicator Verification
.1 Drill/Exercise Performance
a. Inspection Scope
The inspectors sampled licensee submittals for the Drill/Exercise Performance Indicator (PI) for the period from the first quarter 2016 through first quarter 2017.
To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, were used.
The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; assessments of PI opportunities during pre-designated control room simulator training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one Drill/Exercise Performance sample as defined in IP 71151.
b. Findings
No findings were identified.
.2 Emergency Response Organization (ERO) Drill Participation
a. Inspection Scope
The inspectors sampled licensee submittals for the ERO Drill Participation PI for the period from the first quarter of 2016 through first quarter of 2017. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI; performance during the 2016 and 2017 exercises and drills; and revisions of the roster of personnel assigned to key emergency response organization positions. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ERO Drill Participation sample as defined in IP 71151.
b. Findings
No findings were identified.
.3 Alert and Notification System
a. Inspection Scope
The inspectors sampled licensee submittals for the Alert and Notification System (ANS)
PI for the period from the first quarter 2016 through first quarter 2017. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 7, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests.
Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ANS sample as defined in IP 71151.
b. Findings
No findings were identified.
4OA6 Management Meetings
.1 Exit Meeting Summary
On May 25, 2017, the inspectors presented the biennial exercise inspection results to Mr. J. Gebbie, and other members of the licensee staff. The licensee acknowledged the issues presented. The inspectors confirmed that none of the potential report input discussed was considered proprietary.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- J. Gebbie, Senior Vice President and Chief Nuclear Officer
- S. Lies, Site Vice President
- S. Partin, Site Director
- J. Ross, Plant Manager
- L. Baun, Nuclear Oversight Director
- M. Lloyd, Vice President Engineering
- S. Dailey, Maintenance Director
- K. Fernau, Operations Director
- J. Petro, Design Engineering DIrector
- M. Scarpello, Nuclear Regulatory Affairs Manager
- G. Weber, Cyber Security / Engineering Manager
- K. Harper, Regulatory Affairs
- A. Thompson, EP Supervisor
- K. Simpson, EP Supervisor
- J. Crisenbery, EP Coordinator
- J. Tipton-Stone, EP Coordinator
- S. Wiederwax, EP Coordinator
U.S. Nuclear Regulatory Commission
- T. Taylor, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None