IR 05000315/2021403

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000315/2021403 and 05000316/2021403
ML21320A362
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 11/17/2021
From: Steven Orth
Plant Support Branch II
To: Gebbie J
Indiana Michigan Power Co
Ziolkowski M
References
IR 2021403
Download: ML21320A362 (10)


Text

SUBJECT:

DONALD C. COOK NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000315/2021403 AND 05000316/2021403

Dear Mr. Gebbie:

On October 13, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000315 and 05000316

License Numbers:

DPR-58 and DPR-74

Report Numbers:

05000315/2021403 and 05000316/2021403

Enterprise Identifier:

I-2021-403-0031

Licensee:

Indiana Michigan Power Company

Facility:

Donald C. Cook Nuclear Plant

Location:

Bridgman, MI

Inspection Dates:

July 19, 2021 to October 13, 2021

Inspectors:

J. Mancuso, Resident Inspector

M. Ziolkowski, Senior Physical Security Inspector

Approved By:

Steven K. Orth, Chief

Plant Support Branch

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Donald C. Cook Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.

Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:

http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Starting on March 20, 2020, in response to the National Emergency declared by the President of the United States on the public health risks of the coronavirus (COVID-19), inspectors were directed to begin telework. In addition, regional baseline inspections were evaluated to determine if all or a portion of the objectives and requirements stated in the IP could be performed remotely. If the inspections could be performed remotely, they were conducted per the applicable IP. In some cases, portions of an IP were completed remotely and on site. The inspections documented below met the objectives and requirements for completion of the IP.

SAFEGUARDS

71130.01 - Access Authorization

The inspectors evaluated the access authorization program through completion of the following

procedure elements: Access Authorization

(1) Tier I: All Requirements

Tier II: 02.05a; 02.06 a-b

Tier III: 02.11a

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

procedure elements: Access Control

(1) Tier I: All Requirements

Tier II: 02.06 a, d

Tier III: 02.10 a

71130.05 - Protective Strategy Evaluation

On January 31, 2020, the Secretary of the United States Department of Health and Human Services declared a Public Health Emergency (PHE) on the public health risks of the COVID-19 coronavirus. In response to the PHE, Donald C. Cook Nuclear Plant pursued an exemption to security officer training and requalification requirements (ML20324A003 for specific exemptions approved). In addition to these exemptions, licensees implemented additional actions or alternatives in response to health concerns. As described in existing regulatory guidance (e.g., Regulatory Guide 5.75), licensees implemented measures to ensure annual Force-on-Force exercises were conducted as safely as possible while maintaining the requirements to simulate as closely as practicable site specific conditions and minimizing the number and effects of artificialities associated with these exercises (Part 73, Appendix B, VI.C.3).

The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements. The completion of these elements, combined with the completion of elements documented in report 05000315/2021402 and 05000316/2021402, dated June 9, 2021, constitute two complete samples including the observation of an annual FOF exercise on March 11, 2021.

Protective Strategy Evaluation (2 Samples)

(1) Protective Strategy Evaluation

Tier I: 02.01 a-c, e-j; 02.02 a-f; 02.03 a

Tier II: 02.06 d-e, h, k-m

Tier III: None

(2) Performance Evaluation Program

Tier I: 02.04 a, d-e

Tier II: 02.07 c

Tier III: None

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

procedure elements: Security Training

(1) Tier I: All Requirements

Tier II: 02.05 a - d

Tier III: 02.13 a - b

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Review Security Plan Changes (IP Section 02.01) (1 Sample)

(1) Since the last NRC inspection of this program area, Security Plan Revision 20 was implemented based on your determination, in accordance with 10 CFR 50.54(p)(2),that the changes resulted in no decrease in safeguards effectiveness of the security plan, and that the revised security plan changed continues to meet the requirements of 10 CFR 73.55(b). The inspectors conducted a review of the security plan changes to evaluate for potential decrease in safeguards effectiveness of the security plan. However, this review does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

71130.14 - Review of Power Reactor Target Sets

The inspectors evaluated the security target set program through completion of the following procedure elements:

Review of Power Reactor Target Sets (1 Sample)

(1) Requirements: 02.02 a-e; 02.03; 02.04 a-b

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17)

=

(1) Unit 1 (January 01, 2020 through June 30, 2021)

Unit 2 (January 01, 2020 through June 30, 2021)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On October 13, 2021, the inspectors presented the security baseline inspection results to Joel P. Gebbie and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

NANTeL

Generic Fitness-For-Duty and Behavioral Observation Content

Document

06/01/2021

Miscellaneous

NE-2020-29

Supplier Audit Report for Confidential Services INC.

06/23/2020

SPP-2060-SFI-

20

Access Authorization Program Elements

PMP-2060-ACS-

2

Access Authorization Program

PMP-2060-ACS-

003

In-Processing / Out-Processing

SPP-2060-SFI-

2

Unescorted Access Denial Appeal Process

SPP-2060-SFI-

23

Review Criteria for Unescorted Access Authorization

71130.01

Procedures

SPP-2060-SFI-

24

Employee Identification - Issuance and Control of Keycards

SPP_2060-SFI-

209

Protected Area Access/Exit Requirements

SPP_2060-SFI-

214

Security Core, Key and Lock Program

71130.02

Procedures

SPP_2060-SFI-

308

Tests of Security Related Equipment

Calculations

1601075

Minimum Safe Standoff Distance for the Large and Small NRC

Design Basis Explosive Threats

07/10/2021

Corrective Action

Documents

AR-2021-5001

SAC Self-Assessment Condition

06/01/2021

Calc 2998626-C-

005 RO

Engineering Evaluation of Delay Barrier Steel Post Overturning

08/15/2013

Engineering

Evaluations

SL-014566

Evaluation of Revised Vehicle Barrier System Layout

03/17/2021

SE-C-AR048

Controller Training

Miscellaneous

SE-O-RRTT01

Adversary Task Performance Evaluation Card

71130.05

Procedures

SPP-2060-SFI-

201

Armed Response Actions, Firearms, and Strategy

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

SPP-2060-SFI-

205

Central and Secondary Alarm Station (CAS/SAS)

SPP-2060-SFI-

205-1

Alarm Dispatch and Response

SPP-2060-SFI-

206

Security Patrols

SPP-2060-SFI-

2

Compensatory Measures

SPP_2060-1-SFI-

2

Compensatory Measures Risk Assessment

SPP_2060-SFI-

2

Security Safeguards Contingency Actions

SPP_2060-SFI-

213

Integrated Response Procedure

SPP_2060-SFI-

216

Plant Response to a Security Event

SPP_2060-SFI-

219

Responding to a UAV/UAS in the OCA and PA

Self-Assessments

20-0505-1

Protective Strategy Evaluation and Performance Evaluation

Program

Donald C. Cook Tactical Course

NRA Approval of Tactical Qualification Course

03/12/2020

NRA Duty Rifle/Thermal Site Qualification Course Approval

2/26/2020

SE-C-AR023

Patrol Responsibilities Lesson plan

Miscellaneous

SE-C-AR028

Deadly Force Lesson Plan

SE-Q-FOF01-1

Force-on-Force 40 hr. Qualification Card

SPP_2060-SFI-

505

Force-on-Force Training

SPP_2060-SFI-

511

Gas Masks

71130.07

Procedures

TPD-600-SEC

Security Training Program Description

Donald C. Cook Nuclear Plant Security Plan

71130.09

Miscellaneous

NEI 11-08 Security Plan Change Evaluation, Security Plan

Revision 20

01/04/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

PRA-STUDY-030

DC Cook Nuclear Plant PRA Study

2/01/2007

SD-061206-001

Flooding Evaluation Report for DC Cook Nuclear Plant

Calculations

WCAP-16141

RCP Seal Leakage PRA Model

08/01/2003

Procedures

SPP_2060-SFI-

507

Target Set Development

71130.14

Self-Assessments

GT 2021-0892-1

Self-Assessment Review of Reactor Target Sets

07/22/2021

71151

Procedures

PMP-7110-PIP-

001

Reactor Oversight Program Performance Indicator and

Monthly Operating Report Data

2