IR 05000315/2021402
| ML21160A056 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 06/09/2021 |
| From: | Steven Orth Division of Reactor Safety III |
| To: | Gebbie J Indiana Michigan Power Co |
| References | |
| IR 2021402 | |
| Download: ML21160A056 (6) | |
Text
June 9, 2021
SUBJECT:
DONALD C. COOK NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000315/2021402 AND 05000316/2021402
Dear Mr. Gebbie:
On May 11, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.
No findings or violations of more than minor significance were identified during this inspection.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety
Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74
Enclosure:
As stated
Inspection Report
Docket Numbers:
05000315 and 05000316
License Numbers:
Report Numbers:
05000315/2021402 and 05000316/2021402
Enterprise Identifier: I-2021-402-0063
Licensee:
Indiana Michigan Power Company Nuclear Generation Group
Facility:
Donald C. Cook Nuclear Plant
Location:
Bridgman, MI 49106
Inspection Dates:
March 08, 2021 to May 11, 2021
Inspectors:
J. Gilliam, Project Engineer
M. Ziolkowski, Senior Physical Security Inspector
Approved By:
Steven K. Orth, Chief
Plant Support Branch
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Donald C. Cook Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
List of Findings and Violations
No findings or violations of more than minor significance were identified.
Additional Tracking Items
None.
INSPECTION SCOPES
Unless otherwise noted, baseline security inspections were conducted in accordance with the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards. Publicly available IPs are located at:
http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
SAFEGUARDS
71130.05 - Protective Strategy Evaluation
The inspectors evaluated the licensee's protective strategy through completion of the following procedure elements:
Protective Strategy Evaluation (2 Partials)
(1)
(Partial)
Protective Strategy Evaluation
- Tier I: 02.01 d, k
- Tier II: 02.05 a; 02.06 a
- Tier III: 02.09 a
(2)
(Partial)
Performance Evaluation Program
- Tier I: 02.04 b, c
- Tier II: 02.07 a, b, d
- Tier III: 02.11 a
INSPECTION RESULTS
No findings were identified.
EXIT MEETINGS AND DEBRIEFS
The inspectors verified no proprietary information was retained or documented in this report.
- On May 11, 2021, the inspectors presented the security baseline inspection results to Joel Gebbie and other members of the licensee staff.
DOCUMENTS REVIEWED
Inspection
Procedure
Type
Designation
Description or Title
Revision or
Date
Miscellaneous
D.C. Cook Nuclear Power Plant Security Plan
19