SUBJECT:

DONALD C. COOK NUCLEAR PLANT - INTEGRATED INSPECTION REPORT 05000315/2022002 AND 05000316/2022002

Dear Mr. Lies:

On June 30, 2022, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Donald C. Cook Nuclear Plant and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low safety significance (Green) is documented in this report. This finding did not involve a violation of NRC requirements.

Licensee-identified violations which were determined to be of very low safety significance are documented in this report. We are treating these violations as non-cited violations (NCVs)

consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violations or the significance or severity of the violations documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN:

Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; and the NRC Resident Inspector at Donald C. Cook Nuclear Plant.

If you disagree with a finding not associated with a regulatory requirement in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; and the NRC Resident Inspector at Donald C. Cook Nuclear Plant.

August 8, 2022

Q. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Laura L. Kozak, Acting Chief Branch 4 Division of Reactor Projects Docket Nos. 05000315 and 05000316 License Nos. DPR-58 and DPR-74

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000315 and 05000316

License Numbers:

DPR-58 and DPR-74

Report Numbers:

05000315/2022002 and 05000316/2022002

Enterprise Identifier:

I-2022-002-0047

Licensee:

Indiana Michigan Power Company

Facility:

Donald C. Cook Nuclear Plant

Location:

Bridgman, MI

Inspection Dates:

April 1, 2022 to June 30, 2022

Inspectors:

S. Bell, Health Physicist

M. Domke, Reactor Inspector

M. Garza, Emergency Preparedness Inspector

J. Gewargis, Reactor Engineer

I. Hafeez, Senior Reactor Inspector

J. Mancuso, Resident Inspector

R. Ng, Project Engineer

J. Reed, Health Physicist

R. Wehrmann, Reactor Engineer

P. Zurawski, Senior Resident Inspector

Approved By:

Laura L. Kozak, Chief

Branch 4

Division of Reactor Projects

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting an integrated inspection at Donald C. Cook Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. Licensee-identified non-cited violations are documented in report sections: 71111.20 and 71124.0

List of Findings and Violations

Spent Fuel Crane Bridge Modification Not Processed Correctly Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green FIN 05000315,05000316/2022002-01 Open Unable to Identify 71111.18 A Green finding was NRC-identified and associated with the licensees failure to process a permanent spent fuel handling crane bridge modification in accordance with licensee procedure IP ENG-001, Standard Design Process, Revision 0. Specifically, a permanent modification to a seismic category I structure, system, or component (SSC) was processed as a commercial change on May 26, 2020, which was prohibited by IP ENG-001.

Additional Tracking Items

None.

PLANT STATUS

Unit 1 began the inspection period at 100 percent power and shut down for a refueling outage on April 3, 2022. The unit was returned to rated thermal power on June 2, 2022. Unit 2 began the inspection period at rated thermal power and power was reduced to approximately 92 percent on June 10, 2022, for main feedwater pump and turbine valve functional checks. The unit was returned to full rated power on June 11,

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2515, Light-Water Reactor Inspection Program - Operations Phase. The inspectors performed activities described in IMC 2515, Appendix D, Plant Status, observed risk significant activities, and completed on-site portions of IPs. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

71111.01 - Adverse Weather Protection

Seasonal Extreme Weather Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated summer readiness of offsite and alternate alternating current (AC) power systems prior to the onset of excessive heat and hot weather conditions on June 13, 2022.

71111.04 - Equipment Alignment

Partial Walkdown Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated system configurations during partial walkdowns of the following systems/trains:

(1) Unit 1 turbine driven auxiliary feedwater (AFW) Pump on May 21, 2022
(2) Unit 1 north and south safety injection (SI) pumps on May 24, 2022
(3) Unit 1 east and west residual heat removal (RHR) pumps on May 24, 2022

71111.05 - Fire Protection

Fire Area Walkdown and Inspection Sample (IP Section 03.01) (4 Samples)

The inspectors evaluated the implementation of the fire protection program by conducting a walkdown and performing a review to verify program compliance, equipment functionality, material condition, and operational readiness of the following fire areas:

(1) Fire Zone 53; Unit 1 Control Room, elevation 633' -0" on April 15, 2022
(2) Fire Zone 56; Unit 1 Auxiliary Cable Vault, elevation 620'-6" on April 29, 2022
(3) Fire Zone 52; Unit 1 and Unit 2 Auxiliary Building, elevation 633' on May 10, 2022
(4) Fire Zone 69; Unit 1 and Unit 2 Auxiliary Building, elevation 650' on May 17, 2022

71111.08P - Inservice Inspection Activities (PWR) PWR Inservice Inspection Activities Sample (IP Section 03.01)

(1) The inspectors verified that the reactor coolant system boundary, steam generator tubes, reactor vessel internals, risk-significant piping system boundaries, and containment boundary are appropriately monitored for degradation and that repairs and replacements were appropriately fabricated, examined and accepted by reviewing the following activities from April 4, 2022 to April 25, 2022:

03.01.a - Nondestructive Examination and Welding Activities.

Volumetric Examination of Component 1-SI-31-26F, ASME Section XI Category R-A/R1.20

Volumetric Examination of Bolts 1-24 in accordance with ASME Section XI Category B-G/B6.180

Volumetric Examination of Component 1-WD-644-03S, ASME Section XI Category R-A/R11.S

Surface Examination of ASME Class II Reactor Coolant Pump Seal Injection Lines 1, 2, 3, 4

Pressure Boundary Taper Fillet Welds 1, 4, 5, 8 on Charging Pump Bypass Line per Work Order 5550042-01 03.01.b - Pressurized-Water Reactor Vessel Upper Head Penetration Examination Activities.

Visual Examination of Reactor Closure Head and All 58 and 2 Vent Penetrations in accordance with ASME Section XI Category N-729/B4.30 03.01.c - Pressurized-Water Reactor Boric Acid Corrosion Control Activities.

Boric Acid Evaluation AR 2020-7358-1, 9/19/2020, 1-SI-153E has a Boric Acid Leak

Boric Acid Evaluation AR 2020-7371, 9/19/2020, BA Leak at 1-CS-440-4

Boric Acid Evaluation AR 2020-7379, 9/19/2020, BA Leak at 1-CS-441-4

Boric Acid Correction Action AR 2022-2559, 1-CS-451-3 Flange Leak

Boric Acid Correction Action AR 2022-2651, 1-RH-143 Boric Acid Leak

Boric Acid Correction Action AR 2022-2587, 1-SI-153W Pipe Cap Leak 03.01.d - Pressurized-Water Reactor Steam Generator Tube Examination Activities.

Steam Generators 11, 12, 13, 14 examined 100 percent tubes by eddy current.

71111.11Q - Licensed Operator Requalification Program and Licensed Operator Performance

Licensed Operator Performance in the Actual Plant/Main Control Room (IP Section 03.01) (1 Sample)

(1) The inspectors observed and evaluated licensed operator performance in the Control Room during Unit 1 startup following refueling outage U1C31 on May 23, 2022.

Licensed Operator Requalification Training/Examinations (IP Section 03.02) (1 Sample)

(1) The inspectors observed and evaluated Licensed Operator Requalification RQ-S-4704-U2 on June 8, 2022.

71111.12 - Maintenance Effectiveness

Maintenance Effectiveness (IP Section 03.01) (2 Samples 1 Partial)

The inspectors evaluated the effectiveness of maintenance to ensure the following structures, systems, and components (SSCs) remain capable of performing their intended function:

(1) Evaluation of 1-HE-15W west component cooling water (CCW) heat exchanger (HX)partial re-tubing on April 25, 2022
(2) Evaluation of 1-HE-15E east CCW HX partial re-tubing on April 15, 2022 (3)

(Partial)

Loss of Auxiliary Building integrity on May 4, 2022

71111.13 - Maintenance Risk Assessments and Emergent Work Control

Risk Assessment and Management Sample (IP Section 03.01) (3 Samples)

The inspectors evaluated the accuracy and completeness of risk assessments for the following planned and emergent work activities to ensure configuration changes and appropriate work controls were addressed:

(1) Unit 1 outage risk due to dual loop essential service water (ESW) outage on April 13, 2022
(2) Hot connection on 2-TR21B transformer on May 2, 2022
(3) Maintenance risk during east CCW/RHR work windows on June 7, 2022

71111.15 - Operability Determinations and Functionality Assessments

Operability Determination or Functionality Assessment (IP Section 03.01) (6 Samples)

The inspectors evaluated the licensee's justifications and actions associated with the following operability determinations and functionality assessments:

(1) AR 2022-2874; Stem Nut Replacement Reduces Anchor-Darling ECCS Valve Stroke Length, on April 8, 2022
(2) AR 2022-2319; Unit 2 Train B CEQ [Containment Equalization] Fan Failed Surveillance Acceptance Criteria, on April 11, 2022
(3) AR 2022-2701; Boric Acid Deposit on U1 Seal Water Injection Piping Suspect Through Wall, on April 11, 2022
(4) AR 2022-3865; Hot Connection on 2-TR21B Transformer, on May 2, 2022
(5) AR 2022-4450; Gas Void at 2-RH-125W, on May 18, 2022
(6) AR 2022-4891; 2-HV-AFP-T2AC Room Cooler Suspected Compressor Issues, on June 7, 2022

71111.18 - Plant Modifications

Temporary Modifications and/or Permanent Modifications (IP Section 03.01 and/or 03.02) (2 Samples)

The inspectors evaluated the following temporary or permanent modifications:

(1) Engineering Change (EC): 57459; Permanent storage of camera boxes on the Spent Fuel Handling Machine Bridge, on May 17, 2022
(2) EC 54743; Unit 1 Moisture Separator Reheater (MSR) system controls upgrade, on Jun 30, 2022

71111.19 - Post-Maintenance Testing

Post-Maintenance Test Sample (IP Section 03.01) (5 Samples)

The inspectors evaluated the following post-maintenance testing activities to verify system operability and/or functionality:

(1) U1C31 Containment Penetration 1-CPN-26 VT after Integrated Leak Rate Test (ILRT)on May 13, 2022
(2) Upper Containment Airlock Local Leak Rate Test, 1-AIRLOCK-C650, after ILRT on May 16, 2022 (3)1-IMO-325 Leak Inspection after stem nut replacement on May 15, 2022
(4) West RHR Pump Leak Test after seal cooler cleaning on May 16, 2022
(5) Main turbine startup after high pressure turbine thrust bearing repairs on May 30, 2022

71111.20 - Refueling and Other Outage Activities

Refueling/Other Outage Sample (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated refueling outage U1C31 activities from April 2 to May 31, 2022.

71111.22 - Surveillance Testing

The inspectors evaluated the following surveillance testing activities to verify system operability and/or functionality:

Surveillance Tests (other) (IP Section 03.01) (6 Samples)

(1)12-MHP-4030-010-001; Ice Basket Weighing, on April 4, 2022

(2) Unit 2 CD Diesel Generator Slow Start Monthly Surveillance, on April 11, 2022 (3)12-EHP-4030-051-256; Main Steam Safety Valve Setpoint Verification with Lift Assist Device, on April 11, 2022 (4)12-MHP-4050-FHP-005; Unit 1 Core Unload/Reload, on April 11, 2022 (5)12-MHP-4030-031-01; Inspection of the Recirculation Sump, on May 5, 2022 (6)2-IHP-4030-211-001A; Train A Solid-State Protection System Logic/Reactor Trip Breakers Surveillance, on May12, 2022

Inservice Testing (IP Section 03.01) (1 Sample)

(1)1-EHP-4030-134-202; Unit 1 Containment Integrated Leak Rate Test, as documented in Work Order (WO) 5544779 on May 12, 2022

Ice Condenser Testing (IP Section 03.01) (1 Sample)

(1)12-MHP-4030-010-001; U1C131 Ice Condenser Basket Weighing Surveillance, on April 4, 2022

71114.02 - Alert and Notification System Testing

Inspection Review (IP Section 02.01-02.04) (1 Sample)

(1) The inspectors evaluated the licensees compliance with the requirements specified in the Federal Emergency Management Agency-approved Alert and Notification System Design Report.

71114.03 - Emergency Response Organization Staffing and Augmentation System

Inspection Review (IP Section 02.01-02.02) (1 Sample)

(1) The inspectors evaluated the readiness of the Emergency Preparedness Organization.

71114.05 - Maintenance of Emergency Preparedness

Inspection Review (IP Section 02.01 - 02.11) (1 Sample)

(1) The inspectors evaluated the maintenance of the emergency preparedness program.

71114.06 - Drill Evaluation

Select Emergency Preparedness Drills and/or Training for Observation (IP Section 03.01) (1 Sample)

(1) Emergency response facility drill, on June 28,

RADIATION SAFETY

71124.01 - Radiological Hazard Assessment and Exposure Controls

Radiological Hazard Assessment (IP Section 03.01) (1 Sample)

(1) The inspectors evaluated how the licensee identifies the magnitude and extent of radiation levels and the concentrations and quantities of radioactive materials and how the licensee assesses radiological hazards.

Instructions to Workers (IP Section 03.02) (1 Sample)

(1) The inspectors evaluated how the licensee instructs workers on plant-related radiological hazards and the radiation protection requirements intended to protect workers from those hazards.

Contamination and Radioactive Material Control (IP Section 03.03) (3 Samples)

The inspectors observed/evaluated the following licensee processes for monitoring and controlling contamination and radioactive material:

(1) Workers exiting the radiologically controlled area (RCA) at the Radiation Protection Access Facility during the Unit 1 refueling outage
(2) Workers and equipment exiting the Unit 1 Containment Lower Access Facility during the Unit 1 refueling outage
(3) Workers exiting the RCA at the Turbine Building Access Facility during the Unit 1 refueling outage

Radiological Hazards Control and Work Coverage (IP Section 03.04) (4 Samples)

The inspectors evaluated the licensee's control of radiological hazards for the following radiological work:

(1) RWP 221186 U1C31; Radiological Diving to Repair the Upender
(2) RWP 221130 U1C31; Perform Radiography in Auxiliary, Containment & Turbine Buildings & Plant RCA
(3) RWP 221148 U1C31; Steam Generator Primary Activities
(4) RWP 221128 U1C31; Valve Activities in the Auxiliary Building, Containment, and Plant RCA High Radiation Area and Very High Radiation Area Controls (IP Section 03.05) (5 Samples)

The inspectors evaluated licensee controls of the following High Radiation Areas and Very High Radiation Areas:

(1) Unit 1 587' Auxiliary Building Reactor Coolant Filter Room
(2) Unit 1 Containment Reactor Pit
(3) Unit 1 Containment Steam Generator 1-3 Secondary Side
(4) Unit 1 Accumulator 1-1 Annulus Ladder Entrance
(5) Unit 1 Fuel Transfer Tube Room Radiation Worker Performance and Radiation Protection Technician Proficiency (IP Section 03.06) (1 Sample)
(1) The inspectors evaluated radiation worker and radiation protection technician performance as it pertains to radiation protection requirements.

71124.03 - In-Plant Airborne Radioactivity Control and Mitigation

Temporary Ventilation Systems (IP Section 03.02) (1 Sample)

The inspectors evaluated the configuration of the following temporary ventilation systems:

(1) Steam Generator high efficiency particulate air (HEPA) unit #1607, (1600 cubic feet per minute unit)

71124.08 - Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, &

Transportation Radioactive Material Storage (IP Section 03.01) (1 Partial)

The inspectors evaluated the licensees performance in controlling, labeling, and securing the following radioactive materials:

(1)

(Partial)

Material Containers in the Radioactive Materials Building (RMB)

OTHER ACTIVITIES - BASELINE

===71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

MS07: High Pressure Injection Systems (IP Section 02.06)===

(1) Unit 1 (April 1, 2021 - March 31, 2022)
(2) Unit 2 (April 1, 2021 - March 31, 2022)

MS10: Cooling Water Support Systems (IP Section 02.09) (2 Samples)

(1) Unit 1 (April 1, 2021 - March 31, 2022)
(2) Unit 2 (April 1, 2021 - March 31, 2022)

EP01: Drill/Exercise Performance (DEP) Sample (IP Section 02.12) (1 Sample)

(1) July 1, 2021 through December 31, 2021 EP02: Emergency Response Organization (ERO) Drill Participation (IP Section 02.13) (1 Sample)
(1) July 1, 2021 through December 31, 2021 EP03: Alert and Notification System (ANS) Reliability Sample (IP Section 02.14) (1 Sample)
(1) July 1, 2021 through December 31, 2021

71152S - Semiannual Trend Problem Identification and Resolution Semiannual Trend Review (Section 03.02)

(1) The inspectors reviewed the licensees corrective action program for potential adverse trends that might be indicative of a more significant safety issue associated with U1C31 refueling outage main turbine vibrations during the weeks ending June 24 and June 30,

INSPECTION RESULTS

Spent Fuel Crane Bridge Modification Not Processed Correctly Cornerstone Significance Cross-Cutting Aspect Report Section Barrier Integrity Green FIN 05000315,05000316/2022002-01 Open/Closed Unable to Identify 71111.18 A Green finding was NRC-identified and associated with the licensees failure to process a permanent spent fuel handling crane bridge modification in accordance with licensee procedure IP ENG-001, Standard Design Process, Revision 0. Specifically, a permanent modification to a seismic category I structure, system, or component (SSC) was processed as a commercial change on May 26, 2020, which was prohibited by IP ENG-001.

Description:

On May 17, 2022, during tour of the 650-0 elevation of the Auxiliary Building, the inspectors observed items stored on the spent fuel handling crane bridge. The licensee implemented Permanent Engineering Change, (EC)-0000057459 that authorized storage of up to 8 boxes of camera equipment on the bridge. In addition, storage permit 30105224 was implemented for temporary storage of boxes beyond the EC requirements. Moreover, the inspector observed loose items that did not comply with either the storage permit or the EC.

The inspectors reviewed IP ENG-001, Standard Design Process, Revision 0. Section 1.2.6 states in part, any Yes answer to the following questions prohibits the use of Commercial Change for the proposed activity. Question 7 states in part, Are any affected Structure, System, or Component (SSC) seismic category I or required to be seismically mounted. The spent fuel handling crane bridge is a seismic category I SSC and required a yes answer to Question 7, which precluded the use of a Commercial Change for EC-0000057549.

However, the EC was processed as a commercial change on May 26, 2020 and none of the boxes on the crane bridge were seismically mounted.

Corrective Actions: Immediate corrective actions included removal of the loose items as well as reconfiguration of the boxes stored on the bridge.

Corrective Action References: AR 2022-4404

Performance Assessment:

Performance Deficiency: The licensees failure to adequately process EC-0000057549 was contrary to Section 1.2.6 of licensee procedure IP ENG-001, Standard Design Process, Revision 0, and was a performance deficiency. Specifically, the licensee processed the EC as a commercial change, which was prohibited by the IP ENG-001 procedure.

Screening: The inspectors determined the performance deficiency was more than minor because if left uncorrected, it would have the potential to lead to a more significant safety concern. Specifically, the failure to properly implement the engineering change process resulted in lack of updates to design bases documents associated with the spent fuel handling crane bridge and could result in modifications not adequately incorporating prior changes resulting in unanalyzed conditions, or exceeding design limits.

Significance: The inspectors assessed the significance of the finding using IMC 0609 Appendix A, The Significance Determination Process (SDP) for Findings At-Power. The inspectors determined that the finding had very low safety significance (Green) because each of the questions in Section E of Exhibit 3 was answered NO.

Cross-Cutting Aspect: Unable to Identify. No cross-cutting aspect was assigned to this finding because the inspectors were unable to identify a cross-cutting aspect that represents the cause or most-significant contributor as to why the performance deficiency exists using Inspection Manual Chapter 0310.

Enforcement:

Inspectors did not identify a violation of regulatory requirements associated with this finding.

Licensee-Identified Non-Cited Violation 71111.20 This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: Technical Specification (TS) 5.4.1.a, Procedures requires, in part, that written procedures shall be established, implemented, and maintained covering the applicable procedures recommended in Regulatory Guide 1.33, Appendix A, February 1978. Regulatory Guide 1.33, Appendix A, Section 3.f.(1) recommended Maintaining Containment Integrity as a general plant operating procedure.

Contrary to the above, on May 14, 2022, the licensee failed to implement a written procedure covering a procedure recommended in Regulatory Guide 1.33, Appendix A, February 1978. Specifically, the licensee established procedure 12-MHP-5021-001-189 CPN-71 Service Penetration, Revision 015, to cover the procedure recommended by Section 3.f.(1) of Regulatory Guide 1.33, Appendix A. In part, Steps 3.2 and 3.6 of this procedure required service penetration CPN-71 to be placed in service to provide containment integrity and containment closure capability during Mode 5 and when containment closure was required during service penetration removal, then at least one cover be installed. However, during Mode 5 with containment integrity required, the licensee removed an integrated leak rate test device from the outboard CPN-71 service penetration flange prior to closure of its inboard cover.

Significance/Severity: Green. The inspectors evaluated the significance of this issue using Inspection Manual Chapter 0609, Appendix H, "Containment Integrity Significance Determination Process and screened the issue Green in Step 2.1.

Corrective Action References: AR 2022-4243 Licensee-Identified Non-Cited Violation 71124.08 This violation of very low safety significance was identified by the licensee and has been entered into the licensee corrective action program and is being treated as a non-cited violation, consistent with Section 2.3.2 of the Enforcement Policy.

Violation: Title 10 CFR 37.45

(d) states, the licensee shall coordinate with the local law enforcement agency (LLEA) at least every 12 months, or when changes to the facility design or operation adversely affect the potential vulnerability of the licensee's material to theft, sabotage, or diversion.

Title 10 CFR 37.55

(a) states, each licensee shall be responsible for the continuing effectiveness of the security program. Each licensee shall ensure that the security program is reviewed to confirm compliance with the requirements of this subpart and that comprehensive actions are taken to correct any noncompliance that is identified. The review must include the radioactive material security program content and implementation. Each licensee shall periodically (at least annually) review the security program content and implementation.

Contrary to the above, from July 30, 2015 to December 22, 2021, the licensee failed to (1)coordinate with the local law enforcement agency (LLEA) at least every 12 months, or when changes to the facility design or operation adversely affect the potential vulnerability of the licensee's material to theft, sabotage, or diversion, and

(2) periodically (at least annually)review the security program content and implementation.

Significance/Severity: Green. The inspectors assessed the significance of the finding using IMC 609 Appendix D, Public Radiation Safety SDP. The inspectors evaluated the finding by applying the Part 37 Subpart A, B or C finding branch of the SDP. The finding was determined to be of very low safety significance (i.e., Green) because:

(1) there was no actual loss of material,
(2) access was not granted to an individual who is not trustworthy and reliable,
(3) there was not an ineffective security zone, and
(4) there was not a deficient security zone.

Corrective Action References: AR 2021-9421 and AR 2021-9047

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

On June 30, 2022, the inspectors presented the integrated inspection results to Mr. Q. S. Lies, Senior VP and Chief Nuclear Officer, and other members of the licensee staff.

On April 25, 2022, the inspectors presented the inservice inspection results to Mr. J. Gebbie, Senior VP and Chief Nuclear Officer, and other members of the licensee staff.

On April 28, 2022, the inspectors presented the radiation protection baseline inspection results to Mr. S. Lies, Site Vice President, and other members of the licensee staff.

On May 6, 2022, the inspectors presented the emergency planning program inspection results to Mr. J. Gebbie, Senior VP and Chief Nuclear Officer, and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.01

Procedures

PMI-5055

Winterization/Summerization

008

71111.01

Procedures

PMP-5055-001-

001

Winterization/Summerization

039

71111.04

Corrective Action

Documents

AR 2022-3787

Repeat Maintenance Preventable Functional Failure

04/29/2022

71111.04

Corrective Action

Documents

AR 2022-4269

1-QT-506 not Stroking Properly.

05/16/2022

71111.04

Drawings

OP-1-5106A

Flow Diagram Aux-Feedwater Unit 1

068

71111.04

Drawings

OP-1-5142

Flow Diagram Emergency Core Cooling (SIS)

71111.04

Drawings

OP-1-5143

Flow Diagram Emer. Core Cooling (RHR) Unit No. 1

71111.04

Miscellaneous

GT 2022-3778

Track completion of 156-107T, LU1 TDAFP

05/02/2022

71111.04

Procedures

1-OHP-4021-017-

2

Placing In Service the Residual Heat Removal System

71111.04

Procedures

1-OHP-4030-108-

051N

North Safety Injection Pump System Test

71111.04

Procedures

1-OHP-4030-108-

051S

South Safety Injection Pump System Test

23

71111.04

Procedures

1-OHP-4030-156-

017T

Turbine Driven Auxiliary Feedwater System Test

031

71111.05

Corrective Action

Documents

AR 2022-3408

Unpermitted combustibles Found in Level B Area

04/20/2022

71111.05

Corrective Action

Documents

AR 2022-4139

Unattended Combustibles

05/10/2022

71111.05

Corrective Action

Documents

AR 2022-4386

NRC Identified Degraded Fire Hose at FHC 84

05/17/2022

71111.05

Fire Plans

2-5975

Fire Hazard Analysis Plan EL 601' 609 & 620' 6" to 625' 10"

004

71111.05

Fire Plans

2-5976

Fire Hazard Analysis Turbine Building Main Floor Elevation

633'-0" Units 1 & 2

014

71111.05

Procedures

2-FPP-2270-

066-055

Fire Detection Instrument Channel Functional Test

(U-1 Zones 7, 16, 22, 24, and Unit 2 Zones 2, 15, 16, 20)

71111.05

Procedures

2-FPP-2270-

066-057

Fire Detection Instrumentation Channel Functional Test

(U-2 Zones 6, 9, 22, 24, 26, and Shared Zone 4)

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.05

Procedures

2-FPP-2270-

066-058

Fire Detector Instrumentation Channel Functional Test

(U-1 Zones 10, 11, 13[RCT], 14[4kV], 18, 20, 22 and Shared

Zone 5)

71111.05

Procedures

2-FPP-4030-

066-201

Fire Detection Instrumentation Operational Test (U-1 Zone

16, U-2 Zone 11 and Shared Zone 2)

71111.05

Procedures

2-FPP-4030-

066-205

Fire Detection Instrumentation Channel Operational Test

(U-1 Zones 6, 8, 9, 12, 13[4kV], 14[RCT], 15[4kV], 17, 19,

21, 23, 24.

71111.05

Procedures

PMP-2270-CCM-

001

Control of Combustible Materials

050

71111.05

Work Orders

55537568-01

OPFP, 1-EFR-FIREZONE 22, Channel Functional Test

07/08/2020

71111.05

Work Orders

WO-55549765-01

1-EFR-FIRE-ZONE-4 OPFP, 1-EFR-FIREZONE-4, Channel

Functional Test

07/29/2021

71111.08P

Corrective Action

Documents

2011-11547

Step Change in Steam Generator Eddy Current Indication

Count

10/05/2011

71111.08P

Corrective Action

Documents

20-7358-1

1-SI-153E has a Boric Acid Leak

09/19/2020

71111.08P

Corrective Action

Documents

20-7371

BA Leak at 1-CS-440-4

09/19/2020

71111.08P

Corrective Action

Documents

20-7379

BA Leak at 1-CS-441-4

09/19/2020

71111.08P

Corrective Action

Documents

20-7699

Improper Evaluation of BMI Inspection Relevant Conditions

09/25/2020

71111.08P

Corrective Action

Documents

20-8218-12

Revise EHI-5054-RHI Revision 2, Reactor Head Inspection

Program

01/28/2021

71111.08P

Corrective Action

Documents

22-2559

1-CS-451-3 Flange Leak

04/02/2022

71111.08P

Corrective Action

Documents

22-2587

1-SI-153W Pipe Cap Leak

04/03/2022

71111.08P

Corrective Action

Documents

22-2651

1-RH-143 Boric Acid Leak

04/04/2022

71111.08P

Corrective Action

Documents

Resulting from

22-2744

Limited Coverage Obtained During ISI Examination

04/06/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Inspection

71111.08P

Engineering

Changes

57714

Use 2 to 1 Taper Fillet Welds on Charging Pump Bypass

Lines

71111.08P

NDE Reports

51-9280743-000

DC Cook Unit 1 Steam Generator Condition Monitoring for

Cycles 26 and 27 and Final Operational Assessment for

Cycles 28, 29, and 30.

71111.08P

NDE Reports

C10013391002

Liquid Penetrant Examination Report

04/08/2022

71111.08P

NDE Reports

U1-UT-22-005

UT Calibration/Examination

04/05/2022

71111.08P

NDE Reports

U1-UT-22-008

UT Calibration/Examination

04/06/2022

71111.08P

NDE Reports

U1-UT-22-035

UT Calibration/Examination

04/20/2022

71111.08P

NDE Reports

U1-VT-22-016

Visual Examination of Boric Acid (VT-BM)

04/05/2022

71111.08P

NDE Reports

U1-VT-22-023

Visual Examination of Boric Acid (VT-BM)

04/10/2022

71111.08P

Procedures

2-QHP-5050-

NDE-001

Liquid Penetrant Examination

71111.08P

Procedures

EHI-5054-RHI

Reactor Head Inspection Program

71111.08P

Procedures

MRS-GEN-1240

Positive Verification Procedure

71111.08P

Procedures

SGP-PLG-RIB-

FP-GEN

Mechanical Ribbed Plugging of Steam Generator Tubes

5.0

71111.08P

Procedures

WDI-STD-1186

Generic Ultrasonic Examination Procedure for Austenitic

Welds in accordance with PDI-UT-2

71111.08P

Work Orders

55550042-01

to 1 Fillets

09/30/2020

71111.11Q

Miscellaneous

DIT-10000-00

Unit 1 Cycle 30 End-of-Cycle (EOC) Time-to-Boil Information

03/02/2022

71111.11Q

Miscellaneous

DIT-10001-00

Unit 1 Cycle 31 Beginning-of-Cycle (BOC) Time-to-Boil

Information

03/07/2022

71111.11Q

Miscellaneous

PMP-4015-RMP-

001

Reactivity Management Program, Data Sheet 1; Unit 1 Cycle

TREVI Testing Downpower and Shutdown

03/15/2022

71111.11Q

Miscellaneous

RQ-S-4702-U2-

T1

Period 4702 U2 Training Scenario T1

71111.11Q

Procedures

1-OHP-4021-001-

2

Reactor Startup

069

71111.11Q

Procedures

1-OHP-4021-001-

003

Power Reduction

71111.11Q

Procedures

1-OHP-4021-001-

006

Power Escalation

086

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.11Q

Radiation

Surveys

1-OHP-4023 E-0

Reactor Trip or Safety Injection

71111.12

Corrective Action

Documents

AR 2022-3902

Aux Building Bent on 650' Elevation Opened During

Refueling

05/03/2022

71111.12

Work Orders

C10007737002

1-HE-15W, Perform Tube Plug, Without Tube

05/15/2022

71111.12

Work Orders

WO 55531595-09

MTM, 1-HE-15E, Perform Inprocess Test/Check For Tube

Leaks

04/15/2022

71111.12

Work Orders

WO 5553159501

1-HE-15E, Perform Partial Retube of CCE Heat Exchanger

05/18/2022

71111.12

Work Orders

WO 5553159516

MTM, 1-HE-15E, Disassemble/Reassemble ESW Side of

E CCW HX

05/15/2022

71111.12

Work Orders

WO 55532623-24

MTM, 1-HE-15W, Inspect for Tube Leaks (As-Left Test)

05/15/2022

71111.12

Work Orders

WO 5553262301

Vendor, 1-HE-15W, Perform Partial Tube Replacement

05/15/2022

71111.12

Work Orders

WO 5553262306

Vendor 1-HE-15W, Re-install Channel Head

05/15/2022

71111.12

Work Orders

WO-55557144-01

West ESW Train Flow Verification

05/06/2022

71111.12

Work Orders

WO-55557248-01

East ESW Train Flow Verification

04/20/2022

71111.13

Corrective Action

Documents

AR 2022-3865

Hot Connection on 2-TR21B Transformer

05/02/2022

71111.13

Miscellaneous

Unit 1 and 2 Cycle 122, Work Week 10 Risk

71111.13

Procedures

2-OHP-4021-082-

21

Removal and Restoration of Power to 600V Bus 21B and

Associated Motor Control Center

71111.13

Procedures

2-OHP-4022-082-

005

Loss of Power to a 600V Emergency Bus

001

71111.13

Work Orders

C10023002

2-TTR21B Hot Connection

05/02/2022

71111.15

Calculations

NEID-2DCP650-

2

2-DCP-650, CEQ Fan Timing Relay Setpoint Calculation

71111.15

Corrective Action

Documents

AR 2022-2319

Unit 2 CEQ Fan Quarterly Surveillance Failed

03/24/2022

71111.15

Corrective Action

Documents

AR 2022-2701

Boric Acid Deposit on U1 SWI Piping Suspect Through Wall

04/05/2022

71111.15

Corrective Action

Documents

AR 2022-2874

Anchor-Darling Valve Stem Nuts Replacement

04/08/2022

71111.15

Corrective Action

Documents

AR 2022-3865

Hot Connection on 2-TR21B Transformer

05/02/2022

71111.15

Corrective Action

AR 2022-4450

Gas Void at 2-RH-125W

05/12/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Documents

71111.15

Corrective Action

Documents

AR 2022-4891

2-HV-AFP-T2AC Room Cooler Suspected Compressor

Issues

06/03/2022

71111.15

NDE Reports

2-QHP-5050-

NDE-001

Liquid Penetrant Examination

71111.15

Operability

Evaluations

AR 2022-2874

Stem Nut Replacement Reduces Anchor-Darling ECCS

Valve Stroke Length

71111.15

Procedures

2-IHP-4030-228-

005B

Train B CEQ Fan Surveillance and ESF Response Time

Test

71111.15

Work Orders

55448317

2-IMO-350-ACT, Perform As-Found/As-Left Diagnostic Test

04/26/2021

71111.15

Work Orders

55448318

2-IMO-340-ACT, Perform As-Found/As-Left Diagnostic Test

04/26/2021

71111.15

Work Orders

55527055

2-ICM-306-ACT, Perform As-Found/As-Left Diagnostic

04/09/2021

71111.15

Work Orders

55530574

As-Left Diagnostic Test

09/26/2020

71111.15

Work Orders

WO 55527054-14

2-ICM-305-ACT, Perform As-found/As-Left Diagnostic

04/19/2021

71111.18

Corrective Action

Documents

AR 2022-4044

EC-0000057459 Not Properly Implemented

05/17/2022

71111.18

Engineering

Changes

EC-0000054743

Unit 1 Moisture Separator Reheater (MSR) System Controls

Upgrade

71111.18

Engineering

Changes

EC-0000057459

Storage of Camera Boxes on Spent Fuel Handling Machine

Bridge

001

71111.18

Procedures

IP ENG-001

Standard Design Process

001

71111.18

Work Orders

WO-5554330834

TPG, R01, PMT of Components Relocated in Panel 1-C

05/17/2022

71111.18

Work Orders

WO-5554330864

TPG, R01, Control Room, Demo Panel 1-C and Rack 1-CR

04/10/2022

71111.18

Work Orders

WO-

C10001471063

TPG, MSR, Repair Fire Seal F6163

04/01/2022

71111.18

Work Orders

WO-

C10001471065

TPG, MSR, Repair Fire Seal F6123

04/01/2022

71111.18

Work Orders

WO-

C10001471066

TPG, R1P, MSR, EC-54743, Install Cables, Control Room

03/21/2022

71111.18

Work Orders

WO-

C10001471078

TPO, U1, MSR, EC-54743, Install & Terminate Panel T

1-SG-21

04/27/2022

71111.18

Work Orders

WO-

C10001471080

TPG, MSR, Repair Fire Seal F6163 (FCR-54743-010)

04/12/2022

71111.18

Work Orders

WO-

TPG, MSR, Repair Fire Seal F6167 (FCR-54743-010)

04/23/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

C10001471082

71111.18

Work Orders

WO-

C10001471084

TPG, P1P, MSR, EC-54743, Install Cables, Control Room

04/13/2022

71111.18

Work Orders

WO-

C10001471096

TPG, U1, MSR, Incorporation of RFI-54743-054

05/09/2022

71111.18

Work Orders

WO-

C10001858020

U1, MSR Re-Install Temp Removed Components Panel 1-C

04/19/2022

71111.18

Work Orders

WO-

C1000858019

U1, MSR, Temp Remove Components 1-C

04/14/2022

71111.19

Drawings

DC-03871

Personnel Airlock (Upper) General Arrangement and

Drawing Index

71111.19

Drawings

OP-1-5143

Flow Diagram Emergency Core Cooling (RHR)

71111.19

Engineering

Changes

EC-0000057371

Removal of Bellows, Protective Cover, and Weld Build Up

for Containment Penetration 1-CPN-26

71111.19

Procedures

1-OHP-4021-050-

001

Turbine Generator Normal Startup and Operation

05/30/2022

71111.19

Procedures

2-QHP-5070-

NDE-005

Visual Examinations: Metallic Containment Pressure

Retaining Components and Their Integral Attachments.

007

71111.19

Work Orders

WO 5545322311

OPS: 1-IMO-325; Perform PMT Leak Inspection

06/02/2022

71111.19

Work Orders

WO C10007271-

013

U1C31 Containment Penetration CPN-26 VT after ILRT

05/13/2022

71111.19

Work Orders

WO-55557265-01

West RHR Leak Rate Test

05/16/2022

71111.19

Work Orders

WO-

C10012372001

MTI, 1-AIRLOCK-C650, Perform 12-IHP-4030-046-002 Seal

LRT

05/17/2022

71111.20

Calibration

Records

AR 2022-2559

1-CS-451-3 Flange Leak

04/02/2022

71111.20

Calibration

Records

AR 2022-2574

Evidence of Prior Leak on Reactor Pit Wall

04/02/2022

71111.20

Corrective Action

Documents

AR 2022-2501

1-SI-167-2 Downstream Cap Is Leaking onto Carbon Steel

03/31/2022

71111.20

Corrective Action

Documents

AR 2022-2503

Boric Acid Leaking from Pipe Cap 1-SI-159E

03/31/2022

71111.20

Corrective Action

Documents

AR 2022-2504

1-NS-622 Boric Acid Leak

03/31/2022

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.20

Corrective Action

Documents

AR 2022-2506

1-NLP-151-1E Boric Acid Leak

03/31/2022

71111.20

Corrective Action

Documents

AR 2022-2551

Boric Acid Leaking from Packing on 1-IRV-147

04/02/2022

71111.20

Corrective Action

Documents

AR 2022-2560

1-SI-169-L1 Boric Acid Leak

04/02/2022

71111.20

Corrective Action

Documents

AR 2022-2561

1-QRV-114 Boric Acid Leak

04/02/2022

71111.20

Corrective Action

Documents

AR 2022-2571

  1. 14 RCP Excessive Leakage

04/02/2022

71111.20

Corrective Action

Documents

AR 2022-2587

1-SI-153W Pipe Cap Leak

04/03/2022

71111.20

Corrective Action

Documents

AR 2022-2604

1-CS-119N 80 DPM Leak

04/03/2022

71111.20

Corrective Action

Documents

AR 2022-2646

RCP Shaft Seal is Overflowing Down the Side of the

Pump

04/04/2022

71111.20

Corrective Action

Documents

AR 2022-3333

Two Positive WBCs from Changing Steam Generator HEPA

Filters

04/18/2022

71111.20

Corrective Action

Documents

AR 2022-3363

Two Divers with Positive Whole-Body Counts

04/19/2022

71111.20

Corrective Action

Documents

AR 2022-4240

Potential Uptakes during Vertical Missile Block Installation

05/13/2022

71111.20

Miscellaneous

Operational Narrative Logs (April 01-04, 2022)

71111.20

Miscellaneous

GT 2020-7120-50

SU1C31 Refueling Outage Shutdown Safety Plan Report

(Outage Milestone 21B, GT 2020-7120-50)

71111.20

Miscellaneous

U1C31 Refueling

Outage Shutdown

Safety Plan

The Shutdown Safety Plan Report

2/25/2022

71111.20

Procedures

1-OHP-4030-001-

2

Containment Inspection Tours

71111.20

Procedures

2-MHP-4050-

FHP-023

Reactor Vessel Head Removal with Fuel in The Vessel

71111.20

Procedures

PMP-2060-WHL-

001

Work Hour Limitation and Fatigue Management

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71111.22

Corrective Action

Documents

AR 2021-9935

One Cup of Oil Discharged from DG2CD 2R Bank during

Blowdown.

2/08/2021

71111.22

Miscellaneous

2CD EDG

DG2CD System Engineer's Leak Tracking Log.

04/11/2022

71111.22

Procedures

1-EHP-4030-134-

2

Integrated Leak Rate Test

014

71111.22

Procedures

2-EHP-4030-

051-256

Main Steam Safety Valve Setpoint Verification with Lift

Assist Device

03/31/2022

71111.22

Procedures

2-MHP-4030-

010-001

Ice Condenser Basket Weighing Surveillance

71111.22

Procedures

2-MHP-4030-

031-001

Inspection of the Recirculation Sump

71111.22

Procedures

2-MHP-4050-

FHP-005

Core Unload/Reload and Incore Shuffle

71111.22

Procedures

2-OHP-4030-232-

27CD

CD Diesel Generator Operability Test (Train A) Attachment 1

DG2CD Slow Speed Start

068

71111.22

Procedures

260934-01

Perform Recirculation Sump Inspection

71111.22

Work Orders

55557124-02

MTM, 1-STN-320 Recirculation Sump Inspection

05/18/2021

71111.22

Work Orders

C10004756001

MTI, 2-IHP-4030-211-001A, TR A SSPS LOGIC/RX TRIP

BKRS SURV

05/12/2022

71111.22

Work Orders

WO 555547801

1-OME-ICE-COND Ice Basket Weighing Surveillance

04/21/2022

71114.02

Corrective Action

Documents

AR 2020-4409

Prompt NRC Notification 4-hour Report for EP Sirens

05/27/2020

71114.02

Miscellaneous

Alert and Notification System Evaluation Report

71114.03

Corrective Action

Documents

AR 2020-4343

ERO Shift Staffing Requirements Were Not Met

05/23/2020

71114.03

Corrective Action

Documents

AR 2020-9382

Revise EPP-100 with New ERONS Instruction

2/03/2021

71114.03

Corrective Action

Documents

AR 20202-5493

First Half 2020 Unannounced Drill Was 8 Days Late

07/09/2020

71114.03

Corrective Action

Documents

AR 2021-10362

Everbridge System Down

2/22/2021

71114.03

Corrective Action

Documents

AR 2021-1871

ERO Use of Procedure Was Not Up to Standards

2/23/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.03

Corrective Action

Documents

AR 2021-7359

EOF Activation Time During Drill Exceeded CEP

Requirements

08/26/2021

71114.03

Corrective Action

Documents

AR 2021-7950

ERO Notification System ERONS/Everbridge

09/22/2021

71114.03

Corrective Action

Documents

AR 2021-7980

ERO Exercise Result

09/21/2021

71114.03

Corrective Action

Documents

AR 2022-0327

EOF Full Staffing Level Not Met Within 1 Hour Expectation

01/12/2022

71114.05

Corrective Action

Documents

AR 2020-3833

U1 Red NRC Phone Did Not Ring When NRC Called

05/06/2020

71114.05

Corrective Action

Documents

AR 2020-5910

NRC Red Phone Not Functioning

07/24/2020

71114.05

Corrective Action

Documents

AR 2020-6553

Emergency Plan SCBA's in the Control Room

08/20/2020

71114.05

Corrective Action

Documents

AR 2020-7626

NRC Red Phone Not Functioning

09/24/2020

71114.05

Corrective Action

Documents

AR 2020-9382

Converting 2020 Unannounced Drive-In Drill to Call-Only

11/10/2020

71114.05

Corrective Action

Documents

AR 2021-10289

Berrien County EOC Ringdown Phone Inoperable

2/18/2021

71114.05

Corrective Action

Documents

AR 2021-1870

Review/Correct MIDAS Issues During ERO Drill

2/25/2021

71114.05

Corrective Action

Documents

AR 2021-2965

Poor Procedure Change Review and 50.54q Screening by

EP

04/12/2021

71114.05

Corrective Action

Documents

AR 2021-4717

NRC Red Phone Issues

05/21/2021

71114.05

Corrective Action

Documents

AR 2021-4818

NRC HPN Phone Issues

05/25/2021

71114.05

Corrective Action

Documents

AR 2021-4910

10CFR50.54q Screenings

05/27/2021

71114.05

Corrective Action

Documents

AR 2021-5056

NRC Phone System Wide Failure

06/02/2021

71114.05

Corrective Action

Documents

AR 2021-5149

TSC NRC RSCL Inoperable

06/07/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.05

Corrective Action

Documents

AR 2021-5654

Control Room NRC Red Phones Not Working

06/24/2021

71114.05

Corrective Action

Documents

AR 2021-6449

EOC Phones Failed Daily Testing in SAS and CAS

07/26/2021

71114.05

Corrective Action

Documents

AR 2021-7980

ERO Exercise Result

09/21/2021

71114.05

Corrective Action

Documents

AR 2021-7982

ERO Exercise Result

09/23/2021

71114.05

Corrective Action

Documents

AR 2021-8901

BCSD Ringdown Phone Not Working as Designed

10/29/2021

71114.05

Corrective Action

Documents

AR 2021-9059

ERO Drill PAR Result

09/21/2021

71114.05

Corrective Action

Documents

AR 2021-9069

OSC Facility was Declared to be Minimum Staff

11/04/2021

71114.05

Corrective Action

Documents

AR 2022-0343

Backup Method Required to Notify MSP During ERO Drill

01/12/2022

71114.05

Corrective Action

Documents

AR 2022-1277

RMT-2080-PPA-001 Data Sheet Document Incorrect

2/15/2022

71114.05

Corrective Action

Documents

AR 2022-1317

TPD-600-EPT Silent on Implementation of Planning

Standard

2/16/2022

71114.05

Corrective Action

Documents

AR 2022-1455

Conduct of HP Drills

2/22/2022

71114.05

Corrective Action

Documents

GT 2021-1685

Document Items from the ERO Drill

2/22/2021

71114.05

Miscellaneous

D.C. Cook Nuclear Plant Emergency Plan

71114.05

Miscellaneous

D.C. Cook Nuclear Power Plant Unusual Event (HU4.1)

Declaration Evaluation Report

2/15/2022

71114.05

Miscellaneous

Emergency Response Resource Readiness

Sample

From 2020-

21

71114.05

Miscellaneous

DC Cook Nuclear Power Plant August 25, 2020, Training

Drill

09/24/2020

71114.05

Miscellaneous

DC Cook Nuclear Power Plant Health Physics Drill

01/26/2021

71114.05

Miscellaneous

DC Cook Nuclear Power Plant June 2, 2021, Training Drill

09/02/2021

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71114.05

Miscellaneous

DC Cook Nuclear Power Plant NRC Evaluated Exercise

10/25/2021

71114.05

Miscellaneous

AR 2021-1936

2/23 Training Drill EAL Classification Different than Manual

2/23/2021

71114.05

Miscellaneous

PMP-2080-EPP-

101

Emergency Classification

71114.06

Miscellaneous

Emergency Response Facility Drill Scenario (June 28, 2022)

71124.01

Corrective Action

Documents

AR 2022-2860

Posting of 609' Demin During Resin Sluice

04/07/2022

71124.01

Corrective Action

Documents

Resulting from

Inspection

AR 2022-3456

Alpha Surveys and Smears not Consistent

04/21/2022

71124.01

Engineering

Evaluations

RP-07-02

Technical Basis for D. C. Cook's Alpha Program

71124.01

Miscellaneous

Reactor Cavity Upender Dive Repair Sentinel Dosimetry

Records

04/09/2022

71124.01

Miscellaneous

LHRA and VHRA Door Verification

03/23/2022

71124.01

Miscellaneous

Radiography Shot Plan - Unit 1 RHR

04/20/2022

71124.01

Miscellaneous

Historical Alpha

Data

Characterization

Data

Historical Alpha Data Characterization Data

Various

71124.01

Procedures

2-THP-6010-

RPP-019

Locked High Radiation Area and Very High Radiation Area

Verification

71124.01

Procedures

2-THP-6010-

RPP-301

Radiation Protection Actions for Radiological Controlled

Area Material Control

71124.01

Procedures

2-THP-6010-

RPP-401

Performance of Radiation and Contamination Surveys

71124.01

Procedures

2-THP-6010-

RPP-407

Special Radiological Evolutions

71124.01

Procedures

2-THP-6010-

RPP-413

Radiological Controls for Nuclear Diving Operations

71124.01

Procedures

2-THP-6010-

RPP-418

Radiological Postings

71124.01

Procedures

PMP-6010-RPP-

Radiation Work Permit Program

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

006

71124.01

Radiation

Surveys

U1C31 Refueling Outage Air Sample Data

Various

71124.01

Radiation

Surveys

CNP 2204-00323

U1 U/C Lower Cavity Upender Repair Dive

04/09/2022

71124.01

Radiation

Surveys

CNP-2204-00508

Unit 1 591' RHR Vestibule Internals of ICM Valves

04/15/2022

71124.01

Radiation

Surveys

CNP-2204-00535

Unit 1 Lower Containment Steam Generator Platforms 1 and

04/18/2022

71124.01

Radiation

Surveys

CNP-2204-00562

U1 C31 591' RHR Vestibule Reassembly of 1-ICM-305

04/17/2022

71124.01

Radiation

Surveys

CNP-2204-00587

Unit 1 Lower Containment 615' Initial Breach of SI-158-L2

04/18/2022

71124.01

Radiation

Surveys

CNP-2204-00592

Unit 1 Lower Containment Steam Generator Platforms 2 and

04/18/2022

71124.01

Radiation

Surveys

CNP-2204-00598

Unit 1 591' RHR Vestibule Breach of 1 DCR-205

04/18/2022

71124.01

Radiation

Surveys

CNP-2204-00660

Unit 1 Lower Containment 598' Initial Breach of 1-SI-170-L3

04/21/2022

71124.01

Radiation Work

Permits (RWPs)

21128

U1C31 - Valve Activities in the Auxiliary, Containment, &

Turbine Buildings & Plant Radiologically Controlled Areas

(RCAs)

71124.01

Radiation Work

Permits (RWPs)

21130

U1C31-Perform Radiography in Auxiliary, Containment, &

Turbine Buildings & Plant Radiologically Controlled Areas

(RCAs)

71124.01

Radiation Work

Permits (RWPs)

21148

U1C31 - Steam Generator Primary Activities

71124.01

Radiation Work

Permits (RWPs)

21186

U1C31 - Support Work for Diving Activities

71124.03

Miscellaneous

Total Effective Dose Evaluation (TEDE) for SI-170-L3

04/20/2022

71124.03

Procedures

2-THP-6010-

RPP-315

HEPA Equipment Issue, Control, and Maintenance

71124.03

Procedures

2-THP-6010-

RPP-403

Portable Air Sampling

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

71124.03

Procedures

2-THP-6010-

RPP-405

Analysis of Airborne Radioactivity

71124.08

Corrective Action

Documents

AR 2021-7962

RMB Roll Up Door Left Open

09/22/2021

71124.08

Corrective Action

Documents

AR 2021-9047

No Objective Evidence Identified for 10 CFR 37.55

11/04/2021

71124.08

Corrective Action

Documents

AR 2021-9421

Reporting Category 1 and Category 2 Quantities to LLEA

11/17/2021

71151

Miscellaneous

NRC Performance Indicator Data; Emergency

Preparedness - ERO Participation Drill

3rd Quarter

21

through 4th

Quarter

21

71151

Miscellaneous

NRC Performance Indicator Data; Emergency

Preparedness - Drill/Exercise Performance

3rd Quarter

21

through 4th

Quarter

21

71151

Miscellaneous

MSPI Deviation Report MSPI High Pressure Systems

(10/01/2021 - 03/31/2022) Unit 1

71151

Miscellaneous

MSPI Deviation Report MSPI High Pressure Systems

(10/01/2021 - 03/31/2022) Unit 2

71151

Miscellaneous

MSPI Deviation Report MSPI Cooling Water Systems

(10/01/2021 - 03/31/2022) Unit 1

71151

Miscellaneous

Operational Narrative Logs (October 2021 - March 2022)

71151

Miscellaneous

MSPI Deviation Report MSPI Cooling Water Systems

(10/01/2021 - 03/31/2022) Unit 2