March 8, 2017
SUBJECT:
DONALD C. COOK NUCLEAR POWER PLANT, UNIT 2 - INFORMATION REQUEST FOR AN NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL 05000316/2017009
Dear Mr. Gebbie:
On May 1, 2017, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval Site Inspection for License Renewal at Donald C. Cook Nuclear Power Plant, Unit 2. This inspection will be performed in accordance with NRC Inspection Procedure 71003. This inspection will focus on verifying that license conditions added as part of your renewed license and a sample of license renewal commitments have been implemented.
In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into two groups:
The first group lists information necessary for our initial inspection scoping and in office preparation activities. During the in-office preparation activities, the team will identify as much as possible the information and activities to be reviewed during the inspection. This information should be provided to the lead inspector by April 14, 2017.
The second group includes the additional information required for the team to review selected activities. This information should be available to the team onsite May 1, 2017. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the lead inspector as the documents are generated.
The lead inspector for this inspection is Mr. Benny Jose. We understand that our licensing contact for this inspection is Mr. Robert Kalinowski of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9756 or via e-mail at Benny.Jose@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.
This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Benny Jose, Team Lead Engineering Branch 2 Division of Reactor Safety Docket No. 50-316 License No. DPR-74 Enclosure:
Post-Approval Site Inspection License Renewal Document Request cc: Distribution via LISTSERV