IR 05000316/2017009

From kanterella
Jump to navigation Jump to search
NRC Post-Approval Site Inspection for License Renewal 05000316/2017009 (Bxj)
ML17170A326
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 06/16/2017
From: Jeffers M
NRC/RGN-III/DRS/EB2
To: Gebbie J
Indiana Michigan Power Co
References
IR 2017009
Download: ML17170A326 (40)


Text

une 16, 2017

SUBJECT:

DONALD C. COOK NUCLEAR POWER PLANT, UNIT 2 - NRC POST-APPROVAL SITE INSPECTION FOR LICENSE RENEWAL 05000316/2017009

Dear Mr. Gebbie:

On May 19, 2017, the U.S. Nuclear Regulatory Commission completed a Post-Approval Site Inspection for License Renewal at your Donald C. Cook Nuclear Power Plant, Unit 2. The enclosed report documents the results of this inspection as discussed on May 19, 2017, with you, and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, performed walkdowns, and interviewed personnel.

Based on the sample selected for review, there were no findings of significance identified during this inspection.

We reviewed implementation of all 42 Commitment Items. The inspectors concluded that the actions associated with all 42 Commitment Items were properly identified, implemented, and completed.

The inspectors determined that you have adequately followed your commitment change process and have tracking mechanisms in place to ensure all actions are completed before the period of extended operation. On these bases and in consultation with the Division of License Renewal in the Office of Nuclear Reactor Regulation, operation into the period of extended operation is acceptable. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mark T. Jeffers, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-316 License No. DPR-74 Enclosure:

IR 05000316/2017009 cc: Distribution via LISTSERV

SUMMARY

................................................................................................................................ 2

REPORT DETAILS

OTHER ACTIVITIES

........................................................................................ 3

4OA5 Other Activities .......................................................................................... 3

4OA6 Management Meetings .............................................................................24

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

J. Gebbie, Chief Nuclear Officer
S. Lies, Site Vice President
M. Lloyd, Engineering Vice President
M. Scarpello, Manager, Regulatory Assurance
B. Kalinowski, Aging Management Coordinator
K. Anderson, ENU Acting Manager
R. Wynegar, Regulatory Affairs

U.S. Nuclear Regulatory Commission

J. Ellegood, Senior Resident Inspector
T. Taylor, Resident Inspector

LIST OF ITEMS

OPENED, CLOSED AND DISCUSSED

Opened, Closed, and Discussed

None

LIST OF DOCUMENTS REVIEWED