ML092740234: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML092740234
| number = ML092740234
| issue date = 09/30/2009
| issue date = 09/30/2009
| title = 09/30/2009 - Draft Agenda for Briefing on Fire Protection Lessons Learned from Shearon Harris (Public Meeting)
| title = Draft Agenda for Briefing on Fire Protection Lessons Learned from Shearon Harris (Public Meeting)
| author name =  
| author name =  
| author affiliation = NRC/SECY
| author affiliation = NRC/SECY
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Enclosure 1 Draft: 9/30/09 SCHEDULING NOTE  
{{#Wiki_filter:Enclosure 1 Draft: 9/30/09 SCHEDULING NOTE


Title: BRIEFING ON FIRE PROTECTION LESSONS LEARNED FROM SHEARON HARRIS (Public Meeting)
==Title:==
BRIEFING ON FIRE PROTECTION LESSONS LEARNED FROM SHEARON HARRIS (Public Meeting)
Scheduled:          Tuesday, November 3, 2009 9:30 am Duration:          Approx. 2 hours and 20 minutes Location:          Commissioners Conference Room, 1st fl OWFN


Scheduled: Tuesday, November 3, 2009 9:30 am
==Participants:==
 
Presentation Stakeholder Panel                                                         40 mins.*
Duration: Approx. 2 hours and 20 minutes
Joseph W. Donahue, Vice President Nuclear Engineering & Services,           10 mins.*
 
Progress Energy Carolinas, Inc.
Location: Commissioners' Conference Room, 1 st fl OWFN 
Topic:
 
* Shearon Harris Transition to NFPA-805 - Lessons Learned Dan Pace, Sr. Vice President, Engineering, FENOC                           10 mins.*
Participants:                                                                                                Presentation  
Topic:
 
* Transition to NFPA-805 for Davis Besse, Beaver Valley, and Perry Ken Canavan, EPRI                                                         10 mins.*
Stakeholder Panel                       40 mins.*                
Topic:
 
* Fire PRA Development Jim Warren, Executive Director, NCWARN                                     10 mins.*
Joseph W. Donahue, Vice President Nuclear Engineering & Services,       10 mins.* Progress Energy Carolinas, Inc. Topic:
* Shearon Harris Transition to NFPA-805 - Lessons Learned  
 
Dan Pace, Sr. Vice President, Engineering, FENOC         10 mins.* Topic:
* Transition to NFPA-805 for Davis Besse, Beaver Valley, and Perry  
 
Ken Canavan, EPRI             10 mins.* Topic:
* Fire PRA Development Jim Warren, Executive Director, NCWARN         10 mins.*
Topics:
Topics:
* Public Stakeholder Perspective on Transition to NFPA-805 Commission Q & A                                                                                             40 mins.
* Public Stakeholder Perspective on Transition to NFPA-805 Commission Q & A                                                             40 mins.
NRC Staff Panel             30 mins.*  
NRC Staff Panel                                                           30 mins.*
 
Commission Q & A                                                           30 mins.
Commission Q & A                                                                                           30 mins.
*For presentation only and does not include time for Commission Q & As Documents:
*For presentation only and does not include time for Commission Q & A's
Staff Background material due to SECY: October 20, 2009.
 
Slides due to SECY: October 27, 2009.}}
Documents: Staff Background material due to SECY: October 20, 2009.
Slides due to SECY: October 27, 2009.}}

Latest revision as of 23:06, 6 December 2019

Draft Agenda for Briefing on Fire Protection Lessons Learned from Shearon Harris (Public Meeting)
ML092740234
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/30/2009
From:
NRC/SECY
To:
References
Download: ML092740234 (1)


Text

Enclosure 1 Draft: 9/30/09 SCHEDULING NOTE

Title:

BRIEFING ON FIRE PROTECTION LESSONS LEARNED FROM SHEARON HARRIS (Public Meeting)

Scheduled: Tuesday, November 3, 2009 9:30 am Duration: Approx. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 20 minutes Location: Commissioners Conference Room, 1st fl OWFN

Participants:

Presentation Stakeholder Panel 40 mins.*

Joseph W. Donahue, Vice President Nuclear Engineering & Services, 10 mins.*

Progress Energy Carolinas, Inc.

Topic:

  • Shearon Harris Transition to NFPA-805 - Lessons Learned Dan Pace, Sr. Vice President, Engineering, FENOC 10 mins.*

Topic:

  • Transition to NFPA-805 for Davis Besse, Beaver Valley, and Perry Ken Canavan, EPRI 10 mins.*

Topic:

  • Fire PRA Development Jim Warren, Executive Director, NCWARN 10 mins.*

Topics:

  • Public Stakeholder Perspective on Transition to NFPA-805 Commission Q & A 40 mins.

NRC Staff Panel 30 mins.*

Commission Q & A 30 mins.

  • For presentation only and does not include time for Commission Q & As Documents:

Staff Background material due to SECY: October 20, 2009.

Slides due to SECY: October 27, 2009.