|
|
(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML092740234 | | | number = ML092740234 |
| | issue date = 09/30/2009 | | | issue date = 09/30/2009 |
| | title = 09/30/2009 - Draft Agenda for Briefing on Fire Protection Lessons Learned from Shearon Harris (Public Meeting) | | | title = Draft Agenda for Briefing on Fire Protection Lessons Learned from Shearon Harris (Public Meeting) |
| | author name = | | | author name = |
| | author affiliation = NRC/SECY | | | author affiliation = NRC/SECY |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Enclosure 1 Draft: 9/30/09 SCHEDULING NOTE | | {{#Wiki_filter:Enclosure 1 Draft: 9/30/09 SCHEDULING NOTE |
|
| |
|
| Title: BRIEFING ON FIRE PROTECTION LESSONS LEARNED FROM SHEARON HARRIS (Public Meeting) | | ==Title:== |
| | BRIEFING ON FIRE PROTECTION LESSONS LEARNED FROM SHEARON HARRIS (Public Meeting) |
| | Scheduled: Tuesday, November 3, 2009 9:30 am Duration: Approx. 2 hours and 20 minutes Location: Commissioners Conference Room, 1st fl OWFN |
|
| |
|
| Scheduled: Tuesday, November 3, 2009 9:30 am
| | ==Participants:== |
| | | Presentation Stakeholder Panel 40 mins.* |
| Duration: Approx. 2 hours and 20 minutes
| | Joseph W. Donahue, Vice President Nuclear Engineering & Services, 10 mins.* |
| | | Progress Energy Carolinas, Inc. |
| Location: Commissioners' Conference Room, 1 st fl OWFN
| | Topic: |
| | | * Shearon Harris Transition to NFPA-805 - Lessons Learned Dan Pace, Sr. Vice President, Engineering, FENOC 10 mins.* |
| Participants: Presentation
| | Topic: |
| | | * Transition to NFPA-805 for Davis Besse, Beaver Valley, and Perry Ken Canavan, EPRI 10 mins.* |
| Stakeholder Panel 40 mins.* | | Topic: |
| | | * Fire PRA Development Jim Warren, Executive Director, NCWARN 10 mins.* |
| Joseph W. Donahue, Vice President Nuclear Engineering & Services, 10 mins.* Progress Energy Carolinas, Inc. Topic: | |
| * Shearon Harris Transition to NFPA-805 - Lessons Learned | |
| | |
| Dan Pace, Sr. Vice President, Engineering, FENOC 10 mins.* Topic: | |
| * Transition to NFPA-805 for Davis Besse, Beaver Valley, and Perry | |
| | |
| Ken Canavan, EPRI 10 mins.* Topic: | |
| * Fire PRA Development Jim Warren, Executive Director, NCWARN 10 mins.* | |
| Topics: | | Topics: |
| * Public Stakeholder Perspective on Transition to NFPA-805 Commission Q & A 40 mins. | | * Public Stakeholder Perspective on Transition to NFPA-805 Commission Q & A 40 mins. |
| NRC Staff Panel 30 mins.* | | NRC Staff Panel 30 mins.* |
| | | Commission Q & A 30 mins. |
| Commission Q & A 30 mins. | | *For presentation only and does not include time for Commission Q & As Documents: |
| *For presentation only and does not include time for Commission Q & A's | | Staff Background material due to SECY: October 20, 2009. |
| | | Slides due to SECY: October 27, 2009.}} |
| Documents: Staff Background material due to SECY: October 20, 2009. | |
| Slides due to SECY: October 27, 2009.}} | |
Draft Agenda for Briefing on Fire Protection Lessons Learned from Shearon Harris (Public Meeting)ML092740234 |
Person / Time |
---|
Site: |
Harris |
---|
Issue date: |
09/30/2009 |
---|
From: |
NRC/SECY |
---|
To: |
|
---|
References |
---|
Download: ML092740234 (1) |
|
|
---|
Category:Meeting Agenda
MONTHYEARPMNS20240492, Duke Sites Annual Assessment Meeting2024-04-10010 April 2024 Duke Sites Annual Assessment Meeting ML24100A8062024-04-0909 April 2024 Duke Energy Sites Annual Assessment Meeting Presentation Slides April 23, 2024 PMNS20231317, Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant Planned Exemption Request to Be Submitted the Under Risk-Informed Process for Evaluations (RIPE)2023-11-21021 November 2023 Meeting with Duke Energy to Discuss a Shearon Harris Nuclear Power Plant Planned Exemption Request to Be Submitted the Under Risk-Informed Process for Evaluations (RIPE) PMNS20230561, Annual Assessment Meeting2023-04-26026 April 2023 Annual Assessment Meeting PMNS20230395, Meeting with Duke Energy to Discuss a Planned License Amendment Request (LAR) to Be Submitted Under Risk-Informed Process for Evaluations (RIPE)2023-04-13013 April 2023 Meeting with Duke Energy to Discuss a Planned License Amendment Request (LAR) to Be Submitted Under Risk-Informed Process for Evaluations (RIPE) PMNS20220537, Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-1912022-06-0202 June 2022 Meeting with Duke Energy to Discuss the Shearon Harris Nuclear Power Plant, Unit 1 Closeout of Generic Safety Issue (GSI)-191 PMNS20220375, Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve2022-04-19019 April 2022 Pre-submittal Public Meeting with Duke Energy to Discuss the Proposed License Amendment Request to Revise Surveillance Frequency for Reactor Cooling System Pressurized Isolation Valve PMNS20220350, Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting2022-04-0404 April 2022 Annual Assessment Meetingshearon Harris Nuclear Power Plant Annual Assessment Meeting PMNS20210385, and Shearon Harris Nuclear Plant 2020 Annual Assessment Meeting2021-04-12012 April 2021 and Shearon Harris Nuclear Plant 2020 Annual Assessment Meeting ML20329A3812020-12-0707 December 2020 Regulatory Audit Summary Regarding License Amendment Request to Adopt Risk Informed Completion Times Technical Specification Task Force-505, Rev. 2, Provide Risk-Informed Completion Times (EPID L-2019-LLA-0218 ML20100G6342020-04-0909 April 2020 Revised- Bru 2019 Annual Assessment Meeting Slides ML16103A2552016-04-14014 April 2016 05/02/2016 Notice of Forthcoming Closed Pre-Submittal Meeting with Duke Energy Progress, Inc., to Discuss Fuel Reload Design Methodology Reports and Proposed LAR Re. H. B. Robinson and Shearon Harris Plants (CAC Nos. MF7443 and MF7444) ML15107A4252015-04-17017 April 2015 4/20/2015, Forthcoming Closed Meeting with Duke Energy Progress, Inc. to Discuss Shearon Harris Nuclear Power Plant, Unit 1, Relief Request I3R-15 Revision and Supplement, Reactor Vessel Closure Head Nozzle Repair Technique, Inservice Inspe ML14106A2902014-04-16016 April 2014 Notice of Category 1 Public Meeting Regarding Shearon Harris Nuclear Plant to Discuss NRC Reactor Oversight Process Annual Assessment of 2013 Performance ML14087A0802014-03-28028 March 2014 Notice of Forthcoming Meeting with Duke Energy ML13295A3062013-10-22022 October 2013 Meeting Notice with Duke Energy Carolinas, LLC Discuss the Planned Modifications Related to the Fukushima Flood Hazard Reevaluations for the Sites Operated by Duke Energy Carolinas, LLC ML13162A2962013-06-11011 June 2013 7/9/2013 - Notice of Forthcoming Meeting with Duke Energy, Inc. Re. a Nonconservative Technical Specification Loss of Offsite Power Voltage Setpoint License Amendment Request ML13120A1372013-05-0202 May 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Regarding a Non-Conservative Technical Specification Loss-of-Offsite Power Voltage Setpoint License Amendment Request for Shearon Harris, Unit 1 ML13106A3372013-04-17017 April 2013 Notice of Forthcoming Meeting with Duke Energy, Inc. Concerning the Relocation of the Emergency Operating Facilities ML12300A4032012-10-26026 October 2012 11/8/2012 Meeting Notice with Duke Energy to Discuss NRC Order on Mitigation Strategies for Beyond-design-Basis External Events ML12261A0992012-09-17017 September 2012 10/2/12 - Notice of Forthcoming Public Conference Call with Duke Energy Carolinas Regarding Shearon Harris Nuclear Plant, Unit 1 ML12249A1702012-09-0606 September 2012 Notice of Forthcoming Conference Call Public Meeting with Duke Energy Regarding the Non Conservative Technical Specifications License Amendment Requests for Shearon Harris Nuclear Plant Unit 1 ML12076A1422012-01-11011 January 2012 Meeting Topics - Suggested Discussion Items Regarding Large Break Loss-of-Coolant Accident Submittal - Shearon Harris Nuclear Power Plant, Unit 1 ML11336A1592011-12-0202 December 2011 Notice of Closed Meeting with Carolina Power & Light Company Regarding Shearon Harris Nuclear Plant, Unit 1 (TAC ME6999), the Purpose of the Meeting Is to Discuss the August 22, 2011, Large Break Loss of Coolant Accident Submittal ML1108004872011-03-21021 March 2011 Notice of Meeting with Carolina Power & Light Co. to Discuss NRC Reactor Oversight Process Annual Assessment of the Shearon Harris Nuclear Plant ML1103804972011-02-0808 February 2011 Notice of Forthcoming Preapplication Meeting with Carolina Power & Light Company and Representatives Regarding Shearon Harris Nuclear Plant, Unit 1 ML1005702002010-02-26026 February 2010 Notice of Closed Meeting with Progress Energy to Observe a Live Test Fire of Mackenzie River Partner'S Remotely Operated Weapon System at the Shearon Harris Nuclear Plant ML0936406952010-01-0707 January 2010 Notice of Meeting with Carolina Power & Light Company to Discuss Requests for Additional Information Associated with Generic Letter 2004-02 ML0929201872009-10-19019 October 2009 Enclosure 1 - Scheduling Note: Briefing on Fire Protection Lessons Learned from Shearon Harris (Public Meeting) ML0927402342009-09-30030 September 2009 Draft Agenda for Briefing on Fire Protection Lessons Learned from Shearon Harris (Public Meeting) ML0916605042009-06-24024 June 2009 04/21-22/2009 Summary of Category 2 Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition Shearon, Unit 1 and Oconee to NFPA 805 ML0909900182009-04-10010 April 2009 04/21-22/2009, Notice of Meeting with Progress Energy Carolinas, Inc., and Duke Energy Carolinas, LLC, to Discuss Topics Involving the License Amendment Requests to Transition the Shearon, Unit 1 and the Oconee, Units 1, 2 and 3 ML0830800052008-10-31031 October 2008 Meeting Slides, Progress Energy Public Meeting, NRC Region II Visit ML0825500342008-09-11011 September 2008 Agenda - 556th ACRS Meeting, October 2-4, 2008 ML0820605362008-08-0707 August 2008 Summary of Mtg. with Progress Energy Carolinas, and Duke Energy Carolinas to Discuss the LARs to Transition the Shearon Harris and Oconee Nuclear Plants to National Fire Protection Association Standard NFPA-805 M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection2008-07-17017 July 2008 M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection ML0819605262008-07-14014 July 2008 Notice of Public Meeting for Shearon Harris on Openness and Transparency of NRC Security Inspection Findings and NRC Assessment of Licensee Security Performance ML0818406962008-07-0707 July 2008 Meeting with Progress Energy Carolinas, Inc. and Duke Energy Carolinas, LLC, to Discuss the 05/29&30/2008, License Amendment Requests to Transition Shearon Harris, Unit 1, and Oconee, Units 1, 2, & 3 to NFPA Standard 805 ML0816901212008-06-17017 June 2008 Forthcoming Closed Meeting with Progress Energy Carolinas, Inc., to Discuss the May 29, 2008, License Amendment Request (LAR) to Transition the Shearon Harris Nuclear Plant, Unit 1 (Harris) to National Fire Protection Association (Nfpa).. ML0816908822008-06-17017 June 2008 Meeting Notice, Briefing on Fire Protection Issues ML0809303182008-04-0202 April 2008 04/14-16/2007 - Notice of Meeting with Duke Energy and Progress Energy to Discuss Pilot Plant Implementation of National Fire Protection Association Standard 805 ML0736010052008-01-14014 January 2008 01/30/2008-Notice of Meeting to Discuss the Draft Supplemental Environmental Impact Statement for the License Renewal of Shearon Harris Nuclear Power Plant Unit 1 ML0735205132007-12-19019 December 2007 01/07-08/2008 Pilot Observation Visit with Duke Energy and Progress Energy Regarding Oconee and Harris Transition to National Fire Protection Association Standard 805 ML0733711662007-12-0303 December 2007 Notice of Meeting with Progress Energy & Duke Energy Regarding Fire Probabilistic Risk Assessment for the Pilot Plants Transitioning to the National Fire Protection Association Standard NFPA 805 ML0723900092007-08-27027 August 2007 Notice of Public Outreach Meeting on Shearon Harris Nuclear Plant Units 2 and 3, Combined License Application (Cola) ML0720104302007-07-24024 July 2007 Notice of Public Meeting with Duke Energy and Progress Energy Pilot Observation Visit Regarding Oconee and Harris Transition to the National Fire Protection Association Standard NFPA 805 ML0707901492007-03-27027 March 2007 04/18/2007 Notice of Meeting to Discuss the License Renewal Process and Environmental Scoping for Shearon Harris Nuclear Power Plant, Unit 1, License Renewal Application Review ML0630505652006-11-0202 November 2006 Forthcoming Meeting with Petitioners Requesting Action Under 10 CFR 2.206 Regarding Recurring Fire Protection Issues at Shearon Harris Nuclear Plant ML0627103722006-09-28028 September 2006 Notice of Meeting Between NRC and Carolina Power and Light Company - Regulatory Conference Shearon Harris Nuclear Power Plant ML0432703752004-11-22022 November 2004 Progress Energy, Meeting Notice to Communicate the Current Status and Results to Date of Progress Energy'S Initiatives in the Area of Fire Protection 2024-04-09
[Table view] |
Text
Enclosure 1 Draft: 9/30/09 SCHEDULING NOTE
Title:
BRIEFING ON FIRE PROTECTION LESSONS LEARNED FROM SHEARON HARRIS (Public Meeting)
Scheduled: Tuesday, November 3, 2009 9:30 am Duration: Approx. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 20 minutes Location: Commissioners Conference Room, 1st fl OWFN
Participants:
Presentation Stakeholder Panel 40 mins.*
Joseph W. Donahue, Vice President Nuclear Engineering & Services, 10 mins.*
Progress Energy Carolinas, Inc.
Topic:
- Shearon Harris Transition to NFPA-805 - Lessons Learned Dan Pace, Sr. Vice President, Engineering, FENOC 10 mins.*
Topic:
- Transition to NFPA-805 for Davis Besse, Beaver Valley, and Perry Ken Canavan, EPRI 10 mins.*
Topic:
- Fire PRA Development Jim Warren, Executive Director, NCWARN 10 mins.*
Topics:
- Public Stakeholder Perspective on Transition to NFPA-805 Commission Q & A 40 mins.
NRC Staff Panel 30 mins.*
Commission Q & A 30 mins.
- For presentation only and does not include time for Commission Q & As Documents:
Staff Background material due to SECY: October 20, 2009.
Slides due to SECY: October 27, 2009.