ML092920187

From kanterella
Jump to navigation Jump to search
Enclosure 1 - Scheduling Note: Briefing on Fire Protection Lessons Learned from Shearon Harris (Public Meeting)
ML092920187
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/19/2009
From:
NRC/SECY
To:
Beyond Nuclear
References
Download: ML092920187 (2)


Text

Enclosure 1 Draft: 10/19/09 SCHEDULING NOTE

Title:

BRIEFING ON FIRE PROTECTION LESSONS LEARNED FROM SHEARON HARRIS (Public Meeting)

Scheduled: Tuesday, November 3, 2009 9:30 am Duration: Approx. 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 20 minutes Location: Commissioners Conference Room, 1st fl OWFN

Participants:

Presentation Stakeholder Panel 40 mins.*

Joseph W. Donahue, Vice President Nuclear Engineering & Services, 10 mins.*

Progress Energy Carolinas, Inc.

Topic:

  • Shearon Harris Transition to NFPA-805 - Lessons Learned Dan Pace, Sr. Vice President, Engineering, FENOC 10 mins.*

Topic:

  • Transition to NFPA-805 for Davis Besse, Beaver Valley, and Perry Ken Canavan, EPRI 10 mins.*

Topic:

  • Fire PRA Development Paul Gunter, Director of Reactor Oversight, Beyond Nuclear 10 mins.*

Topics:

  • Public Stakeholder Perspective on Transition to NFPA-805 Commission Q & A 40 mins.

NRC Staff Panel 30 mins.*

Bill Borchardt, Executive Director for Operations Jack Grobe, Associate Director for Engineering and Safety Systems, NRR Alex Klein, Chief, Fire Protection Branch, Division of Risk Assessment, NRR Donnie Harrison, Chief, PRA Licensing Branch, Division of Risk Assessment, NRR Mark Salley, Chief, Fire Research Branch, Division of Risk Analysis, RES Topics:

Enclosure 1

- Fire Protection Closure Plan Progress

- Fire Protection Regulatory Infrastructure and Pilot Plant Lessons Learned

- Fire Probabilistic Risk Assessment Regulatory Infrastructure

- Fire Research Activities Commission Q & A 30 mins.

  • For presentation only and does not include time for Commission Q & As Documents:

Staff Background material due to SECY: October 20, 2009.

Slides due to SECY: October 27, 2009.