ML082550034

From kanterella
Jump to navigation Jump to search
Agenda - 556th ACRS Meeting, October 2-4, 2008
ML082550034
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/11/2008
From:
Advisory Committee on Reactor Safeguards
To:
References
GSI-191
Download: ML082550034 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEE ON REACTOR SAFEGUARDS WASHINGTON, D.C. 20555-0001 September 11, 2008 AGENDA th 556 ACRS MEETING OCTOBER 2-4, 2008 THURSDAY, OCTOBER 2, 2008, CONFERENCE ROOM T-2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND

1) 8:30 - 8:35 A.M. Opening Remarks by the ACRS Chairman (Open) (WJS/CS/SD) 1.1) Opening statement 1.2) Items of current interest
2) 8:35 - 10:00 A.M. License Renewal Application and Final Safety Evaluation Report (SER) for the Shearon Harris Nuclear Power Plant, Unit 1 (Open)

(JS/PW) 2.1) Remarks by the Subcommittee Chairman 2.2) Briefing by and discussions with representatives of the NRC staff and Carolina Power & Light Company regarding the license renewal application for the Shearon Harris Nuclear Power Plant, Unit 1, and the associated NRC staffs final Safety Evaluation Report (SER).

Members of the public may provide their views, as appropriate.

10:00 - 10:15 A.M. *** BREAK ***

3) 10:15 -12:15 P.M. Status of Resolution of Generic Safety Issue (GSI)-191, Assessment of Debris Accumulation on Pressurized-Water Reactor (PWR) Sump Performance (Open) (SB/DAW/DB) 3.1) Remarks by the Subcommittee Chairman 3.2) Briefing by and discussions with representatives of the NRC staff and PWR Owners Group regarding the staff and industry activities associated with the resolution of GSI-191.

Representatives of the nuclear industry and members of the public may provide their views, as appropriate.

12:15 - 1:15 P.M. *** LUNCH ***

4) 1:15 - 3:15 P.M. Selected Chapters of the SER Associated with the Economic Simplified Boiling Water Reactor (ESBWR) Design Certification Application (Open/Closed) (MLC/HJV) 4.1) Remarks by the Subcommittee Chairman 4.2) Briefing by and discussions with representatives of the

NRC staff and General Electric - Hitachi Nuclear Energy (GEH) regarding selected Chapters of the NRC staffs SER With Open Items associated with the ESBWR design certification application.

Members of the public may provide their views, as appropriate.

[NOTE: A portion of this session may be closed to protect information that is proprietary to GEH and its contractors pursuant to 5 U.S.C. 552b (c) (4).]

3:15 - 3:30 P.M. *** BREAK ***

5) 3:30 - 4:00 P.M. Quality Assessment of Selected Research Projects (Open)

(DAP/HPN) 5.1) Remarks by the Subcommittee Chairman 5.2) Discussion of the draft final report on the quality assessment of the NRC research projects on: FRAPCON /

FRAPTRAN Code work at the Pacific Northwest National Laboratory (PNNL), and NUREG/CR - 6943, A Study of Remote Visual Methods to Detect Cracking in Reactor Components.

6) 4:00 - 5:15 P.M. Historical Perspectives and Insights on Reactor Consequence Analyses (Open) (WJS/HPN)

Discussion of the draft White Paper prepared by Dr. Nourbakhsh, ACRS Senior Technical Advisor, regarding historical perspectives and insights on reactor consequence analyses.

5:15 - 5:30 P.M. *** BREAK ***

7) 5:30 - 7:00 P.M. Preparation of ACRS Reports (Open)

Discussion of proposed ACRS reports on:

7.1) License Renewal Application for the Shearon Harris Nuclear Power Plant, Unit 1 (JS/PW) 7.2) Status of Resolution of Generic Safety Issue - 191 (SB/DAW/DB) 7.3) Selected Chapters of the SER Associated with the ESBWR Design Certification Application (MLC/HJV)

FRIDAY, OCTOBER 3, 2008, CONFERENCE ROOM T-2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND

8) 8:30 - 8:35 A.M. Opening Remarks by the ACRS Chairman (Open) (WJS/CS/SD)
9) 8:35 - 9:30 A.M. Future ACRS Activities/Report of the Planning and Procedures Subcommittee (Open/Closed) (WJS/EMH/SD) 9.1) Discussion of the recommendations of the Planning and Procedures Subcommittee regarding items proposed for consideration by the Full Committee during future ACRS meetings.

9.2) Report of the Planning and Procedures Subcommittee on matters related to the conduct of ACRS business, including anticipated workload and member assignments.

[NOTE: A portion of this meeting may be closed pursuant to 5 U.S.C. 552b (c) (2) and (6) to discuss organizational and personnel matters that relate solely to internal personnel rules and practices of ACRS, and information the release of which would constitute a clearly unwarranted invasion of personal privacy.]

10) 9:30 - 9:45 A.M. Reconciliation of ACRS Comments and Recommendations (Open)

(WJS/CS/AFD)

Discussion of the responses from the NRC Executive Director for Operations to comments and recommendations included in recent ACRS reports and letters.

11) 9:45 - 10:00 A.M. Subcommittee Reports (Open) 11.1) Report by and discussions with the Chairman of the ACRS Subcommittee on Materials, Metallurgy, and Reactor Fuels regarding Proposed Supplemental Pressurized Thermal Shock Rule (10 CFR 50.61) that was discussed during the Subcommittee meeting on October 1, 2008. (WJS/CLB) 11.2) Report by and discussions with the Chairman of the ACRS Subcommittee on Reliability and PRA regarding the draft final NUREG-1855, Guidance on the Treatment of Uncertainties in Risk-Informed Decisionmaking, that was discussed during the Subcommittee meeting on September 30, 2008. (GEA/HJV) 10:00 - 10:15 A.M. *** BREAK ***
12) 10:15 - 11:30 A.M. Preparation for Meeting with the Commission on November 7, 2008 (Open) (WJS, et al. /EMH, et al.)

Discussion of proposed topics for meeting with the Commission on November 7, 2008.

11:30 - 12:30 P.M. *** LUNCH ***

13) 12:30 - 7:00 P.M. Preparation of ACRS Reports (Open)

Continued discussion of proposed ACRS reports on:

13.1) License Renewal Application for the Shearon Harris Nuclear Power Plant, Unit 1 (JS/PW) 13.2) Status of Resolution of Generic Safety Issue - 191 (SB/DAW/DB) 13.3) Selected Chapters of the SER Associated with the ESBWR Design Certification Application (MLC/HJV)

SATURDAY, OCTOBER 4, 2008, CONFERENCE ROOM T-2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND

14) 8:30 - 1:00 P.M. Preparation of ACRS Reports (Open)

(10:30-10:45 A.M. BREAK) Continue discussion of the proposed ACRS reports listed under Item 13.

15) 1:00 - 1:30 P.M. Miscellaneous (Open) (WJS/EMH)

Discussion of matters related to the conduct of Committee activities and specific issues that were not completed during previous meetings, as time and availability of information permit.

NOTES:

  • During the days of the meeting, phone number 301-415-7360 should be used in order to access anyone in the ACRS Office.
  • Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.
  • Thirty five (35) hard copies and one (1) electronic copy of the presentation materials should be provided to the ACRS in advance of the briefing.

SATURDAY, OCTOBER 4, 2008, CONFERENCE ROOM T-2B3, TWO WHITE FLINT NORTH, ROCKVILLE, MARYLAND

14) 8:30 - 1:00 P.M. Preparation of ACRS Reports (Open)

(10:30-10:45 A.M. BREAK) Continue discussion of the proposed ACRS reports listed under Item 13.

15) 1:00 - 1:30 P.M. Miscellaneous (Open) (WJS/EMH)

Discussion of matters related to the conduct of Committee activities and specific issues that were not completed during previous meetings, as time and availability of information permit.

NOTES:

  • During the days of the meeting, phone number 301-415-7360 should be used in order to access anyone in the ACRS Office.
  • Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.
  • Thirty five (35) hard copies and one (1) electronic copy of the presentation materials should be provided to the ACRS in advance of the briefing.

Accession No: ML082550034 Publicly Available (Y/N): Y Sensitive (Y/N): N Viewing Rights: NRC Users or ACRS Only or See Restricted distribution OFFICE ACRS SUNSI Review PMDA ACRS NAME GShukla GShukla JPerry CSantos/ADias DATE 09/11/08 09/11/08 09/11/08 09/11/08 OFFICIAL RECORD COPY