1 Draft 6/17/2008 2:32 pm SCHEDULING NOTE
Title:
BRIEFING ON FIRE PROTECTION ISSUES (Public Meeting)
Scheduled:
Thursday, July 17, 2008 1:00 pm Duration:
Approx. 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> Location:
Commissioners Conference Room, 1st fl OWFN
Participants:
Presentation Industry Stakeholders Richard A. Muench, President and CNO, Wolf Creek Nuclear Operating 10 mins.*
Company and Chairman of the NEI Fire Protection Working Group Topics:
- Implementation of 10CFR50.48c [NFPA-805]
- Industry method/actions to address fire-induced circuit failures (multiple spurious actuations)
- Ensuring appropriate use of manual actions Joseph H. Donahue, Vice President Nuclear Engineering & Services, 5 mins.*
Progress Energy Topic:
- Shearon Harris Transition to NFPA-805 - Lessons Learned David A. Baxter, Vice President, Oconee Site, Duke Energy 5 mins.*
(Alternate: Scott Batson, Oconee Site Engineering Manager)
Topic:
Topic:
- Fire PRA Modeling Commission Q & A 30 mins.
2 Public Stakeholder Jim Warren, Executive Director, NCWARN 10 mins.*
Topics:
- Public stakeholder perspectives on fire protection issues Commission Q & A 20 mins.
BREAK 5 mins.
NRC Staff 40 mins.*
R. W. Borchardt, EDO [or DEDO]
Eric Leeds, Director, NRR Mark Cunningham, Director, Division of Risk Assessment, NRR Christiana Lui, Director, Division of Risk Assessment, RES Others, tbd Topics:
- Implementation of 10CFR50.48c [NFPA-805]
- Ensuring protection from fire-induced multiple spurious equipment operations
- Ensuring adequate fire barrier performance, discussion of full range of fire protection materials, including Hemyc
- Ensuring appropriate use of manual actions
- Research on fire protection Commission Q & A 40 mins.
- For presentation only and does not include time for Commission Q & As Documents: