{{#Wiki_filter:1           1                   U.S. NUCLEAR REGULATORY COMMISSION                             FIRST ENERGY NUCLEAR OPERATING COMPANY 2                           PUBLIC MEETING           3           Meeting held on Tuesday, July 16, 2002, at                 2:00 p.m. at the Oak Harbor High School, Oak Harbor, Ohio, 4     taken by me Marie B. Fresch, Registered Merit Reporter, and Notary Public in and for the State of Ohio.
{{#Wiki_filter:1 1         U.S. NUCLEAR REGULATORY COMMISSION FIRST ENERGY NUCLEAR OPERATING COMPANY 2                 PUBLIC MEETING 3     Meeting held on Tuesday, July 16, 2002, at 2:00 p.m. at the Oak Harbor High School, Oak Harbor, Ohio, 4 taken by me Marie B. Fresch, Registered Merit Reporter, and Notary Public in and for the State of Ohio.
5                  ---
6 PANEL MEMBERS PRESENT:
7            U. S. NUCLEAR REGULATORY COMMISSION 8            Mr. John Grobe, Chairman, MC 0350 Panel William Dean, Vice Chairman, MC 0350 Panel 9            John Jacobson, Branch Chief, Mechanical Engineering Branch, DRS 10              Anthony Mendiola, Section Chief PDIII-2, NRR 11              Douglas Pickett, Project Manager, NRR Christopher (Scott) Thomas, 12                Senior Resident Inspector - Davis Besse Christine Lipa, Projects Branch Chief 13 FIRST ENERGY NUCLEAR OPERATING COMPANY 14 Lew Myers, FENOC Chief Operating Officer 15              Robert W. Schrauder, Director - Support Services 16              J. Randel Fast, Plant Manager James J. Powers, III 17                Director - Nuclear Engineering Howard Bergendahl, Vice President-Nuclear 18              Michael J. Ross, Manager - Operations Effectiveness 19              Michael J. Stevens, Director - Maintenance Steve Loehlein 20
                    ---
21 22 23 24 25 MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


5                               - - -          6     PANEL MEMBERS PRESENT:
2 1            MR. GROBE:              Good afternoon. I 2 was trying to set the tone by taking my coat off. Please 3 feel free to. Its a bit warm today.
7                     U. S. NUCLEAR REGULATORY COMMISSION 8                     Mr. John Grobe, Chairman, MC 0350 Panel                                  William Dean, Vice Chairman, MC 0350 Panel 9                      John Jacobson, Branch Chief, Mechanical Engineering Branch, DRS 10                      Anthony Mendiola, Section Chief PDIII-2, NRR 11                      Douglas Pickett, Project Manager, NRR Christopher (Scott) Thomas, 12                        Senior Resident Inspector - Davis Besse
4      My name is Jack Grobe. Im the Director of Reactor 5 Safety for the Nuclear Regulatory Commission Office for 6 Region 3 in Chicago. We have responsibility to the office 7 for the safety of the nuclear power plants in the midwest.
8       Were here today for our third meeting, public 9 meeting with the Licensee, First Energy, responsible for 10  operation of Davis-Besse Nuclear Power Station. The focus 11  of this meeting is what we refer to as the Manual Chapter 12  0350 Restart Oversight Panel. In a minute, Ill introduce 13  the panel members and other NRC staff that are here today.
14      Our meeting today is being transcribed by Marie 15  Fresch. And Marie was here last time and had some trouble 16  hearing. I think Mr. Stocker has the microphones turned 17  way up, so that should help, but please make sure when 18  youre making comments today, so the public can hear in the 19  audience, as well as Marie transcribing the meeting, that 20  you use the microphone.
21      Let me start by introducing the NRC staff here 22  today. On my far right, is John Jacobson. John is a 23  Senior Mechanical Engineer in Region 3 Office and a member 24  of the Restart Panel.
25      Right next to me on my immediate right is Christine MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


Christine Lipa, Projects Branch Chief
3 1 Lipa. Christine is a Projects Branch Chief. Shes the 2 Manager of Region 3 responsible for oversight at the 3 Davis-Besse Plant on a day-to-day basis.
4      On my immediate left is Bill Dean. Bill is the Vice 5 Chair of the Restart Panel and Senior Manager in our 6 office, Nuclear Reactor Regulation, our office 7  headquarters, and its in the Washington, D. C. area.
8      Two of the, two other additional staff from the 9 office of Nuclear Reactor Regulation. Tony Mendiola. Tony 10  is the manager responsible for overseeing the licensing 11  activities. And on his left is Doug Pickett. Doug is the 12  Licensing Project Manager specifically for Davis-Besse.
13      Then at the end of the table is a very important 14  person. Thats Scott Thomas, Senior Resident Inspector 15  that works at the Davis-Besse Plant every day. He works 16  for the Region 3 Office of the NRC.
17      We have a couple of additional NRC staff I want to 18  recognize. Helping out at Davis-Besse is the Resident 19  Inspector from the Perry Plant, east of Cleveland, its 20  John Elgood; and John is operating the slide machine right 21  now, but hes been inspecting the plant to help us out.
22      Nancy Keller was out front. Nancy is our 23  Administrative Assistant. Shes done an outstanding job.
24  I appreciate her support. Nancy had out front a stack of 25  handouts both from the NRC as well as the Licensee MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


13 FIRST ENERGY NUCLEAR OPERATING COMPANY
4 1 available for you. If you didnt receive one, please feel 2 free to obtain one of those handouts.
3      In addition out front, Nancy had what we refer to as 4 feedback forms. Theyre preaddressed, no postage necessary 5 forms that you can fill out and give us feedback on the 6 quality of our meeting, and other aspects of the conduct of 7 the meeting or content of the meeting; either one.
8        We would certainly appreciate and encourage you to 9 fill out one of those forms and give us feedback, so we can 10  continually improve the quality of our interface with the 11  public.
12        At this time, Lew, I would like you to introduce 13 your staff here today.
14              MR. MYERS:              Okay. Thank you 15  very much. We have some people out front of our audience 16  that are our technical, some of our technical experts. We 17  also have our Root Cause Team, that well introduce later 18  on.
19        First with our technical experts, I would like to 20  introduce Tim Chambers. Tim is in charge of the 21  Containment.
22        Mark McLaughlin, also the Containment.
23        Dave Baker, Head Resolution.
24        Dave Eshelman -- is Dave here? Dave is in charge 25  of helping us with Human Performance.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


14 Lew Myers, FENOC Chief Operating Officer 15                     Robert W. Schrauder, Director - Support Services 16                      J. Randel Fast, Plant Manager James J. Powers, III 17                        Director - Nuclear Engineering Howard Bergendahl, Vice President-Nuclear 18                      Michael J. Ross, Manager - Operations Effectiveness 19                      Michael J. Stevens, Director - Maintenance Steve Loehlein
5 1      Clark Price is our Restart Action Plan Lead.
2      Tony Staller, Restart and Post Restart.
3      Neil Morrison. Neil comes to us from our Beaver 4 Valley Plant, and hes helping us with program reviews.
5      Bill Rogers. Hes doing our System Health Reviews.
6      So, for each one of these, we have a man at the 7 table that has responsibility, and technical leads with us 8 today.
9      Would you want me to go on to our desired outcomes 10  now?
11              MR. GROBE:            If you dont mind, 12  introduce your staff at the table.
13              MR. MYERS:            Okay. To my right 14 is Howard Bergendahl.
15       Steve Loehlein is next. Steve is doing the 16  Management in Human Performance and Root Cause.
17      Jim Powers is next to him. Jim is the Director of 18  Engineering.
19      Bob Schrauder next to him. Bob is taking, a new 20  employee taking the job as Service Director, is new with 21  our company, new with that position.
22      Randy Fast is after him. Randy is our Plant 23  Manager.
24      And, Mike Stevens is Director of Maintenance.
25      And, at the very end I think is Mike Ross. I cant MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


20
6 1 see. So, Mike Ross comes to us from, hes a new addition, 2 comes to us from, from the Three Mile Island Plant. So, 3 the Plant Manager there is really experienced, and is part 4 of our discussions later on.
5            MR. GROBE:                Okay, thank you.
6      At this time, if there is public officials or 7 representatives of public officials here in the audience, I 8  would like to give you an opportunity to introduce 9 yourself. Please stand and up introduce yourself. Do we 10  have any public officials with us today?
11              MR. KOEBEL:              Carl Koebel, 12  Ottawa County Commissioner.
13              MR. WITT:              Jere Witt, Ottawa 14  County Administrator.
15              MR. GROBE:              Any others?
16  Okay, very good. Thanks, Carl and Jere.
17      John has a slide up on the overhead projector right 18  now that describes the agenda, and each of you should have 19  a copy of that.
20       In a moment, Im going to allow Lew to make opening 21  remarks, and then Im going to briefly summarize the last 22  meeting we had on June 12th. Well then turn the meeting 23  over to First Energy for presentation of the information 24  that they have prepared for today.
25      Then the NRC is going to discuss the framework that MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


                                          - - -
7 1 were using for, what we refer to as our research 2 checklist. Ill talk about that a little later, and a 3 number of the staff will help describe the framework for 4 our research; that is the NRC research. Well conclude the 5 business portion of the meeting at that time.
6      Following the business portion of the meeting 7 between the NRC and First Energy, well open the meeting up 8 for public questions and public feedback or inquires to the 9 NRC staff. I certainly hope that we have a good 10  participation by members of the public here today. At that 11  time, well adjourn the meeting.
12      In addition to this afternoon meeting, there is 13  going to be a meeting this evening at 7:00. Bill Dean will 14  chair that meeting. And that meeting is specifically 15  focused on receiving input from the public, as well as 16  answering any questions members of the public have.
17      So, if youre here this afternoon, and you think of 18  something, any additional questions or comments later this 19  evening, please come back at 7. Were also making it 20  available to other individuals who were unable to be here 21  this afternoon.
22      I think that concludes the logistics for the 23  meeting.
24      Oh, I do want to recognize Mr. Stucker. Hes been 25  here for each of our meetings. Oak Harbor High School MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


21 22
8 1 continues to make this fine facility available for our 2 meetings, and we certainly appreciate that. And, 3 Mr. Stucker works very hard to make sure that the sound 4 system and lighting and everything is just right. And, I 5 certainly appreciate his efforts and I want to thank Oak 6 Harbor High School and Mr. Stucker for that.
7      Did you have some comments before we begin, Lew?
8            MR. MYERS:            Were ready to get 9 started. Is that okay?
10            MR. GROBE:              Okay. Do you want 11  me to just summarize the June 12th meeting first?
12            MR. MYERS:              Yes.
13            MR. GROBE:              Okay, very good.
14      Next slide, John.
15      I wanted to make you aware, particularly members of 16  the public aware, of several documents First Energy has 17  submitted over the past several months, and make you aware 18  of our Web site where those can be obtained.
19      An Early Risk Assessment was provided by First 20  Energy. That was received by the NRC on April 8th, 2002.
21 We continue in our assessments of the risk plan and were 22 using the input that we receive from First Energy, 23  evaluating the input and continuing to ask questions and do 24  analyses to support the risk assessment that the NRC is 25  conducting.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


23
9 1      A Preliminary Root Cause Analysis Report was 2 submitted on April 18th. That addressed in preliminary 3 fashion both the technical side of root cause, what caused 4 the cracking of the head penetrations, as well as the 5  corrosion; and also to a certain extent addressed the 6 contributing factors to that situation.
7      The Return to Service Plan; the first revision of 8 that was submitted to us on May 21st, and it was recently 9 revised last week July -- Im sorry, yes, July 12, 2002.
10      All of these documents are available on the NRC Web 11  site at www.nrc.gov. And you can get to the Davis-Besse 12  link on that Web site, which contains just a tremendous 13  compendium of information; that would be head degradation 14  issue that occurred at Davis-Besse, NRC activities, 15  Licensee activities in response to that. So, please feel 16  free to gain access to that Web site to obtain that 17  information.
18      Our last meeting of the Restart Oversight Panel was 19  June 12th.
20      John, next slide.
21      The focus of that meeting was the Return to Service 22  Plan that First Energy submitted to the NRC. Return to 23 Service Plan had associated with it a number of what First 24  Energy called Building Blocks. Theyre listed there on the 25  slide.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


24
10 1      We discussed in some detail their plans at that 2 time, with the first five of the Building Blocks, and had a 3 number of questions regarding those various Building 4 Blocks.
5      First Energys evaluation of what they were trying 6 to accomplish as well as receiving input from the NRC 7 resulted in a revision to their Restart Plan and Building 8 Blocks, and I anticipate during todays meeting that were 9 going to get into several Building Blocks in more detail 10  than we talked about last June, as well as get into a 11  substantial amount of detail in the Management and Human 12  Performance area.
13      So, were going to continue with these meetings. At 14  this point, to a large extent, weve been addressing and 15  discussing the plans that First Energy is proceeding. And 16  well continue to discuss those plans.
17      During this meeting, get into, I think, more 18  progress that theyre making; and, as these meetings 19  continue over the summer months, we will be getting into 20  greater and greater detail in the implementation of those 21  plans, the results that the company is seeing, and 22  corrective actions that theyre taking.
23      We are transcribing this meeting this afternoon.
24 Well also be transcribing the meeting this evening. Those 25  transcripts will be available on the Web site when theyre MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


25                      MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 2          1                      MR. GROBE:              Good afternoon. I            2     was trying to set the tone by taking my coat off. Please 3    feel free to. It's a bit warm today.
11 1 completed. As Im sure you can appreciate, it takes a 2 couple weeks to get a transcript typed up, reviewed and 3 ready for posting on the Web site.
4           My name is Jack Grobe. I'm the Director of Reactor 5    Safety for the Nuclear Regulatory Commission Office for 6    Region 3 in Chicago. We have responsibility to the office 7    for the safety of the nuclear power plants in the midwest.
4     The transcript of the June 12th meeting is available 5 on the Web site. And as I said, these transcripts will 6 also be available within several weeks for those 7 individuals who are unable to attend the meeting.
8           We're here today for our third meeting, public 9     meeting with the Licensee, First Energy, responsible for 10    operation of Davis-Besse Nuclear Power Station. The focus 11     of this meeting is what we refer to as the Manual Chapter 12     0350 Restart Oversight Panel. In a minute, I'll introduce 13     the panel members and other NRC staff that are here today.
8     At this point, Lew, I would like to turn it over to 9 you and your staff for the presentation that you prepared 10  for us today.
14            Our meeting today is being transcribed by Marie 15    Fresch. And Marie was here last time and had some trouble 16     hearing. I think Mr. Stocker has the microphones turned 17     way up, so that should help, but please make sure when 18     you're making comments today, so the public can hear in the 19     audience, as well as Marie transcribing the meeting, that 20     you use the microphone.
11             MR. MYERS:              Okay. Thank you 12 very much.
21           Let me start by introducing the NRC staff here 22     today. On my far right, is John Jacobson. John is a 23     Senior Mechanical Engineer in Region 3 Office and a member 24    of the Restart Panel.
13       Its our pleasure to be here today to discuss Return 14  to Service Plan that we discussed last time. Our desired 15  outcome today is to show that were no longer in the 16 planning phase. Typically, you go through a planning 17 phase, a discovery phase, and implementation phase. Today 18 we want to demonstrate that were fully in the 19 implementation phase towards safe, reliable and sustained 20 operation for the Davis-Besse Plant.
25            Right next to me on my immediate right is Christine                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 3          1    Lipa. Christine is a Projects Branch Chief. She's the            2    Manager of Region 3 responsible for oversight at the 3    Davis-Besse Plant on a day-to-day basis.
21       We want to provide you with a status of several of 22 our Building Blocks. We want to demonstrate the closure of 23 several of the actions that were discussed at our last 24  meeting, and also in our Restart Oversight Plan Meeting the 25  day before.
4            On my immediate left is Bill Dean. Bill is the Vice 5    Chair of the Restart Panel and Senior Manager in our 6    office, Nuclear Reactor Regulation, our office 7    headquarters, and it's in the Washington, D. C. area.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
8            Two of the, two other additional staff from the 9    office of Nuclear Reactor Regulation. Tony Mendiola. Tony 10    is the manager responsible for overseeing the licensing 11    activities. And on his left is Doug Pickett. Doug is the 12    Licensing Project Manager specifically for Davis-Besse.
13            Then at the end of the table is a very important 14    person. That's Scott Thomas, Senior Resident Inspector 15    that works at the Davis-Besse Plant every day. He works 16    for the Region 3 Office of the NRC.
17            We have a couple of additional NRC staff I want to 18    recognize. Helping out at Davis-Besse is the Resident 19    Inspector from the Perry Plant, east of Cleveland, it's


20    John Elgood; and John is operating the slide machine right 21    now, but he's been inspecting the plant to help us out.
12 1      We also want to introduce you to some of the 2 Management and Human Performance elements in our Management 3 and Human Performance Excellence Plan that weve laid out; 4 some of the things that we know now, and well be prepared 5 to discuss that in detail today.
22            Nancy Keller was out front. Nancy is our 23     Administrative Assistant. She's done an outstanding job.
6      Starting out, you remember the last time, I thought 7 we had really seven Building Blocks, six of which are 8 Building Blocks that feed into the Restart Action Plan.
24     I appreciate her support. Nancy had out front a stack of 25     handouts both from the NRC as well as the Licensee                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 4          1    available for you. If you didn't receive one, please feel 2    free to obtain one of those handouts.
9      The Reactor Head Resolution Plan was sponsored by 10  Bob Schrauder, who is at the table. Our Program Compliance 11  Plan was by Jim Powers, the Director of Engineering. The 12  Containment Health Assurance Plan sponsored by Randy Fast, 13  the Maintenance Director. And the System Health Assurance 14  Plan is Jim Powers responsibility. Restart and Post 15  Restart Test Plan is Randy Fast. And finally, the 16  Management and Human Performance Excellence Plan, Im 17  responsible for that.
3            In addition out front, Nancy had what we refer to as 4    feedback forms. They're preaddressed, no postage necessary 5    forms that you can fill out and give us feedback on the 6    quality of our meeting, and other aspects of the conduct of
18      As you see, our plans all feed into the Restart 19  Action Plan, and that feed goes to what we call a Restart 20  Overview Panel. Thats a very important ingredient, and 21  people are talking about it independent of oversight.
22      Let me share with you the Restart Overview Panel, if 23 you will. This panel provides an independent oversight and 24 review of all of our plant activities. You can see this of 25 the FENOC Senior Executive Team.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


7     the meeting or content of the meeting; either one.
13 1      That team consists of Bob Saunders, President; 2 myself, Gary Leidich, and Bill Pearce. Gary is in charge 3 of the, Executive in charge of Engineering. Bill Pearce is 4 in charge of Oversight.
8            We would certainly appreciate and encourage you to 9    fill out one of those forms and give us feedback, so we can 10    continually improve the quality of our interface with the  
5      All of us may or may not be at any one meeting, 6 because of other obligations. The majority of us are at 7 each meeting. Lets talk about the panel members that we 8 asked to give us input.
9      First, we looked for someone who had extended outage 10  experience, and we picked Chris Bakken from the D.C. Cook 11  Plant. D.C. Cook went through some very tough times a few 12  years ago. And Chris Bakken was the Executive of the 13  Restart Plan, and has good experience.
14      We wanted somebody from the industry. Somebody that 15  communicates to us and to the industry. That person is 16  Buzz Galbraith. Buzz works the Nuclear Operations, which 17  is an industry oversight review group that has basic 18  building blocks, one of which is, one of the cornerstones 19  is operating experience. So, he shares that with us.
20      Finally, we wanted somebody on our Nuclear Review 21  Board. We normally have a Nuclear Oversight Review Board, 22  and we wanted somebody to feed into that Nuclear Review 23  Board. That person is Jack Martin. Jack Martin is on our 24  board and hes very involved with this panel and our routine 25  activities going on at the plant.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


11    public.
14 1      Finally, we wanted somebody that had real raw based 2 experience from a nuclear regulatory standpoint and a 3 troubled plant standpoint that could help us through this.
12            At this time, Lew, I would like you to introduce 13    your staff here today.
4 So, we went and got Joe Callan. Joe was the Executive 5 Officer of the NRC at one time, and hes retired now; 6 provides us raw base experience, many years of experience 7 with other plants, extended shutdowns like this.
14                      MR. MYERS:              Okay. Thank you 15    very much. We have some people out front of our audience 16    that are our technical, some of our technical experts. We 17     also have our Root Cause Team, that we'll introduce later
8      We wanted somebody from the community. Jere Witt 9 supplies that for us, a community leader here in Ottawa 10  County.
11      We wanted somebody that had a good history of the 12  plant, so we brought back one of the previous executives at 13  the Davis-Besse Plant that was here for the previous 14  problems through good performance. We brought in Lou Storz 15  to help us throughout whatever developments, whats changed 16  at the time of good performance.
17       So, we believe, we believe today that we have an 18  Oversight Review Panel. As that panel is made up today, it 19  provides very good independent input to First Energys 20  Senior Team to help us ensure that we can not only restart 21  Davis-Besse in a safe and reliable manner, but insure that 22  we have safe performance.
23      Weve also made several changes in our management 24  structure since our last meeting that well talk about.
25      Howard, do you want to continue?
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


18    on.
15 1            MR. GROBE:              Lew, before you go 2 on, who chairs the Restart Oversight Panel, or Restart 3 Overview Panel, who is the chairman of that?
19            First with our technical experts, I would like to 20    introduce Tim Chambers. Tim is in charge of the  
4            MR. MYERS:            Right now, Ive 5 been chairing the panel. Weve been talking to Joe Callan 6 about the possibility of chairing that panel; and the 7 reason for that is to give us a true balance, has more 8 independence.
9            MR. GROBE:              Okay. Thank you.
10              MR. MYERS:            Okay, Howard.
11              MR. BERGENDAHL:            Okay, I wanted 12  to -- can you hear me?
13        I wanted to introduce some of the new members of our 14  team. There is an organization chart there, which 15  highlights basically the yellow blocks, are individuals 16  that are new in positions since about the first of the 17  year. So, there has been a lot of change at the site, and 18  many of the oversight individuals, Lew has already 19  mentioned across the top of the organizational chart, but 20  we have some of the key senior managers from Davis-Besse 21  sitting here at the table and I wanted to take an 22  opportunity to introduce them.
23        Weve put together a team of very experienced and 24  qualified nuclear professionals that puts together the 25  senior management team that I know can do a good job at MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


21    Containment.
16 1 Davis-Besse.
22            Mark McLaughlin, also the Containment.
2      Im going to start with Jim Powers, two seats over 3 to my right. Jim is the Director of Engineering. I think 4 we introduced him last time. He joined us from the Perry 5 Plant. He has an excellent reputation and a major asset to 6 our organization.
23            Dave Baker, Head Resolution.
7      Next to Jim is a new addition to the Davis-Besse 8 organization. Hes been with First Energy, but hes now 9 joined Davis-Besse full time, Bob Schrauder will be our 10 Director of Support Services. Bob has had experience as 11 the Director of Engineering and also as a nuclear plant, 12  Plant Manager. And so, he brings a wealth of experience to 13  the team.
24            Dave Eshelman -- is Dave here?  Dave is in charge 25    of helping us with Human Performance.                         MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 5          1            Clark Price is our Restart Action Plan Lead.            2            Tony Staller, Restart and Post Restart.
14       Next to Bob is Randy Fast. Weve introduced Randy 15 in the past. Hes new to Davis-Besse in January. His 16 background includes Beaver Valley and a long stretch at the 17  South Texas Plant.
3            Neil Morrison. Neil comes to us from our Beaver 4    Valley Plant, and he's helping us with program reviews.
18        Next to Randy is Mike Stevens. Mike is brand new in 19  the position of Director of Maintenance. And Mike has been 20  with First Energy for about two years. He spent most of 21  his career with the Cinergy Plants down in Southeastern 22  United States and most recently he joined First Energy from 23  the Excelon Corporation.
5            Bill Rogers. He's doing our System Health Reviews.
24        Weve also hired in some experience from outside the 25  company, from other power plants in the industry. Mike MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
6            So, for each one of these, we have a man at the 7    table that has responsibility, and technical leads with us 8     today.
9           Would you want me to go on to our desired outcomes 10     now?
11                     MR. GROBE:              If you don't mind, 12    introduce your staff at the table.
13                      MR. MYERS:              Okay. To my right 14     is Howard Bergendahl.
15           Steve Loehlein is next. Steve is doing the 16     Management in Human Performance and Root Cause.
17            Jim Powers is next to him. Jim is the Director of  


18    Engineering.
17 1 Ross at the end of the table comes to us from another 2 Babcocks and Wilcox designed plant at Three Mile Island 3 Station. Mike led the Operations Department at Three Mile 4 Island through their brief start through many years as an 5 Operations Manager and Plant Manager. Mike has joined 6 Davis-Besse to provide oversight to our operations 7 activities to ensure we have high standards that we know 8 Mike accomplished through Three Mile Island.
19            Bob Schrauder next to him. Bob is taking, a new 20    employee taking the job as Service Director, is new with 21    our company, new with that position.
9      Also not at the table here today, joining our 10  company July 30th, is Pete Roberts. We hired Pete from the 11  sale of Oak Creek Station, New Jersey, to be our new 12  Manager of Maintenance.
22            Randy Fast is after him. Randy is our Plant 23    Manager.
13      So, we put together quite a team here and I know 14  weve got good things to come.
24            And, Mike Stevens is Director of Maintenance.
15              MR. MYERS:            Bob Schrauder 16  would like to take a few moments and discuss the Reactor 17  Head Resolution Oversight Plan, if you will. Were going 18  to the phase now where were going to present the status of 19  several of our plans.
25           And, at the very end I think is Mike Ross. I can't                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 6          1    see. So, Mike Ross comes to us from, he's a new addition,            2    comes to us from, from the Three Mile Island Plant. So, 3    the Plant Manager there is really experienced, and is part
20      Go ahead, Bob.
21              MR. SCHRAUDER:            Thank you, Lew.
22      Thanks, Howard.
23      First, let me start out by saying, Im very pleased 24  to join the Davis-Besse team, after what seems like a 25 short nine and a half year hiatus from the plant. I do MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


4     of our discussions later on.
18 1 believe, as Howard does, that we have a good solid team in 2 place, and that we will lead Davis-Besse back to a safe, 3 reliable plant that shows sustained performance.
5                      MR. GROBE:              Okay, thank you.   
4       Since our last meeting, I have been really pleased 5 on the progress that we have made on obtaining a new head 6 for Davis-Besse. We have accomplished a great deal in a 7 very short 30 days.
8      One of the things Im really happy to report is that 9 weve executed in excess of 30,000 person hours at the 10  Midland site retrieving that head, under some significant 11  challenging circumstances there.
12      As this slide indicates, we are on target with the 13  head replacement to support safe, reliable plant 14  return-to-service sometime during fourth quarter of this 15  year.
16      Ill talk a little bit about our activities at 17  Midland. We were able to successfully open the 18  containment. We had to chip away about three and a half 19  feet of concrete. We had to remove three layers of rebar, 20  and we had to detension the pre-cement tensioning elements 21  in this containment.
22      These two pictures up here show us the progress of 23 opening that containment and then in the lower right-hand 24  corner with the team that helped us open that containment.
25  Again, the team worked very safely and very effectively for MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


6            At this time, if there is public officials or 7    representatives of public officials here in the audience, I 8    would like to give you an opportunity to introduce 9    yourself. Please stand and up introduce yourself. Do we 10    have any public officials with us today?
19 1 us.
11                     MR. KOEBEL:            Carl Koebel, 12    Ottawa County Commissioner.
2      The service structure at Midland, service structure 3 on these reactor vessel heads is in three parts. The lower 4 two parts will remain on the Midland head and we will 5 transfer the upper portion from the Davis-Besse head onto 6  this service structure.
13                     MR. WITT:              Jere Witt, Ottawa 14     County Administrator.
7      We have implemented the modification on the service 8 structure, the lower portion of the service structure at 9 Midland with ten large diameter openings that will allow us 10  clear access to the bare head inspections that we will do 11 on this head going forward in the future. That 12  modification, as I said, is completed.
15                     MR. GROBE:              Any others?
13       The last time we got together, we had indicated our 14 inspection plan for this head. We had divided those 15 inspections, and identified they have three purposes. The 16  first was to supplement the original co-data package that 17 went with this head. The second was to baseline this head 18 for ongoing in-service inspection program. And the third 19 was to provide supplementary exams to assure ourselves that 20 no damage had occurred to the head during its storage 21 period at the Midland Plant.
16    Okay, very good. Thanks, Carl and Jere.
22       Im pleased to tell you that all of those 23  inspections have been completed satisfactorily on the 24 Midland, on the replacement head for Davis-Besse, and we 25  know now that we do have a very good compliment for use at MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
17           John has a slide up on the overhead projector right 18     now that describes the agenda, and each of you should have 19     a copy of that.
20           In a moment, I'm going to allow Lew to make opening 21     remarks, and then I'm going to briefly summarize the last 22     meeting we had on June 12th. We'll then turn the meeting 23    over to First Energy for presentation of the information 24     that they have prepared for today.
25            Then the NRC is going to discuss the framework that                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 7          1    we're using for, what we refer to as our research            2    checklist. I'll talk about that a little later, and a 3    number of the staff will help describe the framework for 4    our research; that is the NRC research. We'll conclude the


5    business portion of the meeting at that time.
20 1 Davis-Besse.
6           Following the business portion of the meeting 7    between the NRC and First Energy, we'll open the meeting up
2      One of the records that we also talked about last 3 time associated with the co-data package was the 4 radiographs; both for the dome, the flange weld on the 5 head, and the radiographs on the flange to nozzle. The 6 records that we were able to retrieve did not have either 7 of those films, nor did they have the records of the 8 inspections of those films, other than a signed-off log 9 entry that indicated that the exams had been completed 10  satisfactorily.
11      So, in order to resolve that, we reradiographed 12  those major welds on this head, and they did confirm that 13  we had good welds in all those locations. We were able to 14  achieve a hundred percent coverage of the flange-to-nozzle 15  weld and we achieved a 95 percent coverage of the 16  dome-to-flange weld. And, the remaining part of that weld 17  we were unable to get to, due to the lifting devices that 18  were put on the head after the original manufacturing.
19      Again, though, we confirmed with those that we did 20  have very good welds in all those locations. And that 21  information, coupled with the previous records that we had 22  that identified that the previous owner had accepted this 23  head and had identified that it had all the appropriate 24  records, and the signed off co-data form from the American 25  Nuclear Insurer, we assured ourselves that we did have a MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


8    for public questions and public feedback or inquires to the 9    NRC staff. I certainly hope that we have a good 10     participation by members of the public here today. At that 11    time, we'll adjourn the meeting.   
21 1 good head and good going forward records.
2      As a result of the 95 percent coverage, we will be 3 submitting our results to the NRC for their concurrence 4 approval that we do in fact have a high level of assurance 5 and certainty that this weld is good.
6            MR. JACOBSON:            Bob, let me just 7 mention briefly some of the inspection activities weve 8 done in this regard. Weve dispatched one of our 9 nondestructive examination experts out to the Midland site 10 and he spent a few days out there observing some of the 11  inspections that, that FENOC was doing on the head; also 12  reviewed all the radiographs that were done on the head.
13  And I did also, I reviewed a good portion of the 14  radiographs. So, thats some of the work that weve done 15  to date.
16      And the next phase is going to be to review all the 17  documentation of the head that supports the code, code and 18  stamp that needs to be on that head in order to use it.
19            MR. SCHRAUDER:              Thanks, John.
20      Thats a good point. I wanted to say our nuclear 21  inspector was present during all of these examinations 22  also, as well as our code experts and our departmental 23  experts.
24      The picture you see up there with the lifting glove.
25 Thats Lew inspecting that lifting glove and those are the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


12            In addition to this afternoon meeting, there is 13    going to be a meeting this evening at 7:00. Bill Dean will 14    chair that meeting. And that meeting is specifically 15     focused on receiving input from the public, as well as 16    answering any questions members of the public have.
22 1 attachments that are used to lift this head off and on the 2 reactor during service.
17            So, if you're here this afternoon, and you think of 18    something, any additional questions or comments later this 19    evening, please come back at 7. We're also making it 20    available to other individuals who were unable to be here
3              MR. GROBE:            John, before we go 4 on, could you characterize the results of your inspections 5 to-date?
6              MR. JACOBSON:            Pardon?
7             MR. GROBE:            Could you 8 characterize the results of your inspections to-date?
9              MR. JACOBSON:           The results of the 10  radiographs that weve looked at to-date were, met all code 11  requirements; and, in fact, the weld on the flange to the 12  dome was extremely clean, extremely good. Its one of the 13  best welds that Ive personally seen in a long time. And, 14  Ive looked at a lot of them. So, we did get that done.
15       Weve also looked at some of the welds up on the 16  control rod drive penetrations, and those also meet all 17  code requirements. So, to-date, all of the nondestructive 18  examination that weve reviewed is acceptable.
19              MR. SCHRAUDER:            Thank you. At 20  Midland right now our activities are centering around final 21  cleaning and preparation for shipment of the head. This 22  picture that you see here, is the, now there is a cover on 23  it. This is a cover on the reactor vessel head, but 24  this is actually the reactor vessel head being lifted off 25  the stand that it was sitting on at Midland.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


21     this afternoon.   
23 1      Next picture, please.
2      This is our opening, and that is the head stand that 3 we had to pull out in order to be able to retrieve the 4 head.
5      And in the next picture, again, the head being 6 readied to be lowered onto a temporary transportation 7 system to get it out to its main transport.
8      This is a picture of the type of transporter that 9 well be using to bring the head to Davis-Besse. That head 10  weighs about 80 tons. And this small truck that you see is 11  about 180 feet long. We will be transporting that head for 12  arrival at Davis-Besse prior to the date we set earlier, 13  which is August the 1st, which would be the latest date 14  that we would expect to have that on the site.
15      Now lets talk about some of the activities under 16  way at Davis-Besse. Our reactor pressure -- our head at 17  Davis-Besse is being repaired for removal from the 18  containment.
19      This is a picture of the service structure that I 20  spoke of earlier. The upper portion of the service 21 structure, which we will use on the new head when it 22  arrives. We will lift that off, thats a 40,000 pound 23  piece of equipment thats floating through the air to its 24  temporary resting place where it would be repaired for 25 installation on the Davis-Besse head. And, the head now at MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


22           I think that concludes the logistics for the  
24 1 Davis-Besse is being properly cleaned and prepared for 2 removal from the containment building.
3      We have gotten our construction packages from our 4 vendor and we are in the process of reviewing those now.
5 We have got the engineering packages available, and these 6 engineering packages are the packages that we put together 7 to open the containment and subsequently restore the 8 containment to its full design requirements.
9      We are making preparations for the containment 10  building opening itself. Again, this is a shot of the back 11  side of our containment where we will be making 12  approximately a 20 foot by 20 foot opening into that 13  containment, which happens to coincide with the original 14  construction opening in this building.
15      The process again for opening this containment will 16  not be the chipping or cutting techniques that we used at 17  Midland. This is a very high pressure water wash system, 18  which essentially separates the cement from the aggregate 19  in the concrete, washes it off the rebar. Then the rebar 20  is tagged, cut and removed and replaced in its original 21  condition when were ready to restore the container.
22       We did have to do some leveling of the ground in 23  this area in order to get our transport mechanism that will 24  go through the containment to move the old head out and new 25  head in. We did some ground leveling in there.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


23    meeting.
25 1      And we are in the process of right outside this, 2  just off to the righthand side out of your view on this 3 picture is our start-up transformer at the plant. We will 4 tag that transformer out, disconnect it, and put protection 5 around it so there is no way to injure that transformer 6 during the period of time that were under construction.
24            Oh, I do want to recognize Mr. Stucker. He's been 25    here for each of our meetings. Oak Harbor High School                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 8          1    continues to make this fine facility available for our            2    meetings, and we certainly appreciate that. And, 3    Mr. Stucker works very hard to make sure that the sound 4    system and lighting and everything is just right. And, I 5    certainly appreciate his efforts and I want to thank Oak 6     Harbor High School and Mr. Stucker for that.
7       Another item that came up in our last meeting is the 8 restoration of the pressure vessel. Again, the containment 9 at Davis-Besse is a shield building made out of about three 10 feet of concrete and a freestanding pressure vessel with 11  annular space between them. Both of those obviously have 12  to be cut to get access into the containment, moved ahead 13 in and out. Then we have to restore that pressure vessel 14 per code requirements.
7           Did you have some comments before we begin, Lew?
15       We had indicated the last time we were here that we 16 were contemplating doing a localized test around that 17 restoration process, in that we had just completed an 18 integrated test on this pressure vessel at previous 19  outings.
8                     MR. MYERS:              We're ready to get 9     started. Is that okay?
20       Since that time, we have identified several other 21 things that well be doing in containment, and we have 22 reached the conclusion that the best thing to do is to 23  perform an integrated leak grade test on this containment 24 vessel when it is restored.
10                     MR. GROBE:              Okay. Do you want 11    me to just summarize the June 12th meeting first?
25      Those are our current plans that are incorporated MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
12                      MR. MYERS:              Yes.
13                     MR. GROBE:              Okay, very good.
14           Next slide, John.
15           I wanted to make you aware, particularly members of 16     the public aware, of several documents First Energy has 17     submitted over the past several months, and make you aware 18     of our Web site where those can be obtained.
19            An Early Risk Assessment was provided by First 20     Energy. That was received by the NRC on April 8th, 2002.
21     We continue in our assessments of the risk plan and we're 22     using the input that we receive from First Energy, 23    evaluating the input and continuing to ask questions and do 24     analyses to support the risk assessment that the NRC is


25    conducting.                         MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 9          1            A Preliminary Root Cause Analysis Report was            2    submitted on April 18th. That addressed in preliminary 3    fashion both the technical side of root cause, what caused 4    the cracking of the head penetrations, as well as the 5    corrosion; and also to a certain extent addressed the  
26 1 into our plan and process. Unless there are questions, 2 thats all I have on the activities for replacing the 3 head.
4              MS. LIPA:            I do have one 5 question. I walked down the area where this transformer is 6 yesterday. What plans do you have for protection, what 7 kinds of barrier?
8              MR. SCHRAUDER:              The major plans 9 are to disconnect it, and then there are coverings that 10  will go over the bushings and the like on the transformer 11  itself, and I believe there is going to be a 12 scaffolding-type arrangement around it. Basically, were 13  protecting the major components on getting any kind of 14  water spray or dust or aggregate into it. Make sure that 15  -- we have to put up a large scaffolding and large platform 16  in order to get into that. That opening is about 20 feet 17  off the ground, 18 feet off the ground. We want to make 18  sure that scaffolding we have up there also doesnt have, 19  if it should happen to fall for any reason, it wont impact 20  or harm the transformer.
21              MS. LIPA:            Okay, thank you.
22              MR. GROBE:              Bob, you said that 23  you have construction procedures that have been submitted 24  and engineering packages that are nearing completion.
25  Could you describe in a little more detail the scope of MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


6     contributing factors to that situation.
27 1 those construction procedures and engineering packages and 2 what they address?
7           The Return to Service Plan; the first revision of 8    that was submitted to us on May 21st, and it was recently 9     revised last week July -- I'm sorry, yes, July 12, 2002.
3            MR. SCHRAUDER:                Well, the 4 construction procedures are the procedures for opening up 5 the containment, the detailed process on how do you go 6 about opening up the containment.
10            All of these documents are available on the NRC Web 11     site at www.nrc.gov. And you can get to the Davis-Besse 12     link on that Web site, which contains just a tremendous 13     compendium of information; that would be head degradation 14     issue that occurred at Davis-Besse, NRC activities, 15     Licensee activities in response to that. So, please feel 16    free to gain access to that Web site to obtain that
7       Were looking at things in those packages, and I 8 want to separate the construction package and the 9 engineering package; these are each, have some element of 10  the other.
11       We look at things, like the travel path for the 12 vehicle that would bring the head in on. As you know, at a 13 lot of nuclear plants or all the nuclear plants, there are 14 underground piping, underground utilities there. We have 15 to go through and assess all of those to make sure that 16  this vehicle wont impact those.
17      Engineering packages includes things like the 18  NCFR 5059 Evaluation to see if this could be done without 19  formal approval of the NRC or whether it fits within the 20  regulation, allows us basically to do those, if they dont 21  change our updated safety analysis report.
22      Those are included in those; and the detailed 23  engineering on, for instance, the pressure vessel itself, 24  has equipment hanging on it as part of its design. We have 25  to make sure that taking a 20 foot by 20 foot section out MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


17     information.
28 1 of that pressure vessel doesnt impact its structural 2 capabilities, and where we would need to put in reinforcing 3 supports or the like for that. Also we analyze things like 4 missle protection, while its open.
18           Our last meeting of the Restart Oversight Panel was  
5            MR. GROBE:            Any other 6 questions? Okay, very good. Thank you, Bob.
7            MR. MYERS:            Thank you.
8      As you can see, were making good progress on the 9 placement head project, and were well into the 10  implementation phase. New head is being prepared for 11  shipment. Weve opened up our containment and the whole 12  head has been dismounted, making good progress there.
13      The next area is Containment Health Plan. Jim 14  Powers and Randy Fast would discuss that.
15            MR. FAST:            Good afternoon. I 16  too am excited about our new team. Today I will discuss 17 the status of our Containment Health Plan Building Block.
18 As you can see, the last time we met, we called this 19  containment condition. It was focused principally on boric 20  acid corrosion on mechanisms which encountered with our 21  reactor vessel head; however, it became apparent that we 22  wanted to expand the scope for all of containment to really 23  talk about the health of everything thats within that 24  building.
25      Part of that plan scope was increased to include MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


19    June 12th.
29 1 containment vessel, the liner evaluation. And, we have had 2 ongoing work there. We have done an analysis. We have a 3 team undergoing a review, a comprehensive review of the 4 design requirements, but as well we did ultrasonic testing 5 to ensure metal thickness and we have an interim 6 disposition on that. However, we can do more exhaustive 7 testing to ensure with every confidence that it meets 8 design requirements.
20            John, next slide.
9      Weve also included environmental qualification of 10  our equipment.
21            The focus of that meeting was the Return to Service 22    Plan that First Energy submitted to the NRC. Return to 23    Service Plan had associated with it a number of what First 24     Energy called Building Blocks. They're listed there on the  
11              MR. GROBE:            Randy, before you 12  go on, I believe at our last meeting, one of our inspectors 13  Mel Holmberg identified a question regarding a potential 14  for corrosion below the concrete base mat on the inside of 15  the, of the pressure vessel and also around the outside of 16  the annular region. Have you done anything to evaluate 17  that issue?
18              MR. FAST:          That evaluation is 19  ongoing. A team is assembled and well be doing 20  comprehensive reviews, which will include all of the 21  containment liner areas.
22              MR. MYERS:            We have taken some 23  action to-date.
24             MR. FAST:          Yes. We did about 25  1700 ultrasonic examinations for metal thickness in the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


25    slide.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 10          1            We discussed in some detail their plans at that           2     time, with the first five of the Building Blocks, and had a 3    number of questions regarding those various Building 4     Blocks.
30 1 areas that were adjacent to those areas that Mel had 2 identified. That was our immediate corrective action; 3 however, were looking at all of the containment vessel for 4 integrity.
5           First Energy's evaluation of what they were trying 6    to accomplish as well as receiving input from the NRC 7    resulted in a revision to their Restart Plan and Building 8    Blocks, and I anticipate during today's meeting that we're 9    going to get into several Building Blocks in more detail 10    than we talked about last June, as well as get into a 11    substantial amount of detail in the Management and Human
5             MR. GROBE:              Okay. I read in 6 the paper this morning something that I think was already a 7 focus of both the NRC and First Energy, thats the issue of 8 whats referred to as MIC, or microbial induced corrosion.
9 Could you comment on that a little bit?
10              MR. FAST:            Well, thats 11  something that has to be evaluated. Micrologically induced 12  corrosion, MIC, as its called, is a naturally occurring; 13  and if weve had ground water in-seepage around the vessel 14  area, that would potentially be susceptible. So, well 15  have to do some evaluation and analysis to ensure that we 16  do not have any MIC present.
17              MR. BERGENDAHL:            We have, in fact 18  have an individual working on that right now.
19              MR. POWERS:              Im taking water 20  samples to physically look for that as well as corrosion 21  problems.
22              MR. GROBE:            Okay.
23              MR. FAST:            Were aware as 24  well it is an item that is under investigation and 25  evaluation.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


12     Performance area.
31 1            MR. GROBE:              I dont believe 2 that Mel has had a chance to come back and look at the 3 results of your ultrasonic tests. Could you briefly 4 summarize the results of what you found?
13           So, we're going to continue with these meetings. At 14    this point, to a large extent, we've been addressing and 15    discussing the plans that First Energy is proceeding. And 16    we'll continue to discuss those plans.
5            MR. FAST:              What we did was an 6 analysis that looked at minimum wall thickness. That 7 vessel liner is about an inch and a half thick. We didnt 8 see any significant degradation. There is some local 9 surface pitting, which is just expected of a carbon steel 10  component, but no deduction in the overall ability of the 11  areas that we did evaluate; nothing that would require any 12 additional remediation.
13             MR. GROBE:              You indicated, you 14  indicated that you were planning additional inspections.
15  Could you characterize those?
16              MR. FAST:            Well, I try to 17  describe what this vessel liner looks like for our folks 18  out in the public. If youve ever changed out a thermos 19  bottle, the glass liner inside that bottle is effectively 20  what our pressure vessel in the containment is like.
21      So, you see the concrete structure outside that 22  extends about 240 feet above the grade elevation; 2.4 23  million cubic feet of volume, but within that is a steel 24  structure much like this thermos bottle. And thats the 25  structural integrity that ensures that under a design basis MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


17            During this meeting, get into, I think, more 18    progress that they're making; and, as these meetings 19     continue over the summer months, we will be getting into
32 1 accident, that peak pressures that would be held during 2 that event are being contained within the containment; that 3  is the barrier that protects the environment from a design 4  basis accident.
5      So, that thermos bottle with its steel structure, 6 the integrity of that has to be evaluated to make sure it 7 meets design requirements.
8      So, part of those inspections is in the annular 9 space. Thats about a four foot wide space outside the 10  steel liner, but inside of the concrete, the external 11  concrete structure. Well be building scaffolding and 12  doing hand-over-hand reviews of the structural integrity, 13  as well as put together some additional ultrasonic tests to 14  make sure we meet the minimum wall requirements for 15  pressure retention. That will extend all the way to the 16  top of the vessel.
17              MR. GROBE:            Okay. And, are 18  you doing similar inspections on the inside of the 19 containment?
20              MR. FAST:            Yes, we are.
21              MR. GROBE:            What sort of 22  inspections are you planning, for lack of a better phrase, 23  for the subterranean section of the vessel?
24              MR. POWERS:            Ill handle that 25  one. We did inspections on the inside where there was a MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


20    greater and greater detail in the implementation of those 21    plans, the results that the company is seeing, and 22    corrective actions that they're taking.
33 1 gap identified between the concrete at the base of this 2 containment thermos bottle Randy described. Concrete was 3 originally poured at the base on the inside and interfaced 4 right up against the steel vessel structure.
23            We are transcribing this meeting this afternoon.
5      With time that concrete has shrunk a bit and there 6 is a narrow gap formed there, and there was concern about 7 whether water could have gotten down into that gap. So, we 8 went in and we did stick feeler gauges down to as much as 9 42 inches into that gap and found no moisture.
24    We'll also be transcribing the meeting this evening. Those 25    transcripts will be available on the Web site when they're                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 11          1    completed. As I'm sure you can appreciate, it takes a           2    couple weeks to get a transcript typed up, reviewed and 3    ready for posting on the Web site.
10        So, that was positive result from those initial 11  tests, and were going to continue further to characterize 12  all the way down to the bottom areas what the situation is, 13  whether there is any moisture down there, and characterize 14  what the wall thickness is and integrity at the lower 15  elevations.
4            The transcript of the June 12th meeting is available 5    on the Web site. And as I said, these transcripts will 6    also be available within several weeks for those 7    individuals who are unable to attend the meeting.
16              MR. GROBE:               Okay.
8            At this point, Lew, I would like to turn it over to 9    you and your staff for the presentation that you prepared 10    for us today.
17              MR. FAST:            Just to try to 18  clarify the ultrasonic tests that weve done so far. In 19  the area adjacent, in the lower elevation of containment 20 where Mel identified the small annular space where the 21 concrete had shrunk and there is some gap between the 22 concrete and steel liner, where Jim just identified we dip 23  sticked. On the exterior side, there is a section about a 24 couple, three feet on the outside where there is no 25  concrete; and we were able from the annular space to do MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
11                      MR. MYERS:             Okay. Thank you 12    very much.
13            It's our pleasure to be here today to discuss Return 14    to Service Plan that we discussed last time. Our desired 15    outcome today is to show that we're no longer in the 16    planning phase. Typically, you go through a planning 17    phase, a discovery phase, and implementation phase. Today 18    we want to demonstrate that we're fully in the 19    implementation phase towards safe, reliable and sustained 20     operation for the Davis-Besse Plant.
21           We want to provide you with a status of several of 22     our Building Blocks. We want to demonstrate the closure of 23    several of the actions that were discussed at our last 24     meeting, and also in our Restart Oversight Plan Meeting the 25    day before.                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 12          1            We also want to introduce you to some of the            2    Management and Human Performance elements in our Management 3    and Human Performance Excellence Plan that we've laid out; 4    some of the things that we know now, and we'll be prepared 5    to discuss that in detail today.
6            Starting out, you remember the last time, I thought 7    we had really seven Building Blocks, six of which are 8    Building Blocks that feed into the Restart Action Plan.
9            The Reactor Head Resolution Plan was sponsored by 10    Bob Schrauder, who is at the table. Our Program Compliance 11    Plan was by Jim Powers, the Director of Engineering. The 12    Containment Health Assurance Plan sponsored by Randy Fast, 13    the Maintenance Director. And the System Health Assurance 14    Plan is Jim Powers' responsibility. Restart and Post 15    Restart Test Plan is Randy Fast. And finally, the 16    Management and Human Performance Excellence Plan, I'm


17    responsible for that.
34 1 ultrasonic testing to be sure we had full integrity.
18            As you see, our plans all feed into the Restart 19    Action Plan, and that feed goes to what we call a Restart 20    Overview Panel. That's a very important ingredient, and 21    people are talking about it independent of oversight.
2      That would tell us if there were degradation in 3 areas that could not be seen by the naked eye, that you 4 would be able to tell we had full depth and integrity on 5 the steel liner.
22            Let me share with you the Restart Overview Panel, if 23    you will. This panel provides an independent oversight and 24    review of all of our plant activities. You can see this of 25    the FENOC Senior Executive Team.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 13          1            That team consists of Bob Saunders, President;            2    myself, Gary Leidich, and Bill Pearce. Gary is in charge 3     of the, Executive in charge of Engineering. Bill Pearce is 4     in charge of Oversight.
6             MR. GROBE:              Okay.
5            All of us may or may not be at any one meeting, 6     because of other obligations. The majority of us are at 7     each meeting. Let's talk about the panel members that we 8    asked to give us input.
7             MR. FAST:              The other areas 8 that weve incorporated as part of our Containment Health 9 Environmental Qualification is were concerned about such 10 things as electrical equipment, such as air operated or 11 motor operated valves. Well be going through a 12 comprehensive review of that equipment and other 13 environmental qualified, to ensure that the conditions in 14 containment, that all of that equipment is operated in or 15 as fine a condition within its design requirements.
9           First, we looked for someone who had extended outage 10     experience, and we picked Chris Bakken from the D.C. Cook 11     Plant. D.C. Cook went through some very tough times a few 12     years ago. And Chris Bakken was the Executive of the 13     Restart Plan, and has good experience.
16       One of the areas that were focusing on, this is 17 really an industry lesson learned is the containment sump; 18  and were looking from a design perspective at ensuring 19 that the emergency sump is intact and that it meets 20  requirements. As a matter of fact, our vision of success 21 is to improve margin.
14           We wanted somebody from the industry. Somebody that 15     communicates to us and to the industry. That person is 16     Buzz Galbraith. Buzz works the Nuclear Operations, which 17     is an industry oversight review group that has basic 18    building blocks, one of which is, one of the cornerstones 19     is operating experience. So, he shares that with us.
22      We think there is opportunities to actually extend 23  and improve the isolation from around the containment 24  emergency sump. So, we have a team in place that will be 25 looking at that as well. Looking at, where were moving MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
20            Finally, we wanted somebody on our Nuclear Review 21     Board. We normally have a Nuclear Oversight Review Board, 22    and we wanted somebody to feed into that Nuclear Review 23    Board. That person is Jack Martin. Jack Martin is on our 24    board and he's very involved with this panel and our routine 25     activities going on at the plant.                         MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 14          1            Finally, we wanted somebody that had real raw based            2    experience from a nuclear regulatory standpoint and a


3    troubled plant standpoint that could help us through this.
35 1 fibrous insulation, we could impact clogging that sump.
4    So, we went and got Joe Callan. Joe was the Executive 5     Officer of the NRC at one time, and he's retired now; 6     provides us raw base experience, many years of experience 7     with other plants, extended shutdowns like this.
2 So, that will be removed from containment. We will have 3 all metal insulation.
8           We wanted somebody from the community. Jere Witt 9     supplies that for us, a community leader here in Ottawa 10     County.
4      The other things that were looking at is, the Decay 5 Heat Valve Pit, which is, Im going to call it a legacy 6 issue. There are two motor operated valves, which are 7 located in a pit adjacent to the emergency sump. And we 8 have traditionally sealed those plates and done a pressure 9 test, what we call a drop test, to ensure in a design basis 10 condition those valves are not environmentally qualified, 11  so we have to keep them from the flooded conditions when it 12  exists. And weve traditionally gone in and sealed those 13  and verified their integrity from this drop test.
11            We wanted somebody that had a good history of the 12    plant, so we brought back one of the previous executives at 13    the Davis-Besse Plant that was here for the previous 14    problems through good performance. We brought in Lou Storz 15    to help us throughout whatever developments, what's changed
14      But thats not a standard that we continue to 15  operate to. So, we have a design team looking at that and 16  we have several options under evaluation, which would 17  include extending the operators outside of the flooded 18  region, putting valves outside of containment, or 19  qualifying operators that could operate under the harsh 20  environments that would exist on design basis access.
21      So, all of those are being evaluated and again, our 22  intent is to improve our margin of safety in this area.
23      Containment air coolers.
24              MR. GROBE:            Tony is clearing 25  his throat. I wanted to make sure.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


16    at the time of good performance.
36 1              MR. MENDIOLA:           I did have a 2 question.
17           So, we believe, we believe today that we have an 18    Oversight Review Panel. As that panel is made up today, it 19    provides very good independent input to First Energy's 20    Senior Team to help us ensure that we can not only restart 21    Davis-Besse in a safe and reliable manner, but insure that 22    we have safe performance.
3              MR. GROBE:            Okay. Go ahead.
23           We've also made several changes in our management 24    structure since our last meeting that we'll talk about.
4              MR. MENDIOLA:            I want to retreat 5 a second. Going back to the liner for a second. Two 6 questions I have.
25           Howard, do you want to continue?                         MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 15          1                      MR. GROBE:             Lew, before you go            2    on, who chairs the Restart Oversight Panel, or Restart 3    Overview Panel, who is the chairman of that?
7              MR. FAST:           Yes.
4                      MR. MYERS:             Right now, I've 5    been chairing the panel. We've been talking to Joe Callan 6    about the possibility of chairing that panel; and the 7    reason for that is to give us a true balance, has more
8              MR. MENDIOLA:           When you mentioned 9 that you evaluated the inside gap between, I guess, the 10  concrete and the inside of the liner, going down with a 11  feeler gauge and you found no moisture, but is there any 12  plans on sealing that gap or, or leaving the gap as found?
13              MR. POWERS:             Were still in 14  evaluation on that one, Tony. Were working on an overall 15  plan about surveiling the lower elevations even below that 16  gap area and restoring that as necessary. So, its a 17  detail we havent finalized yet, but its part of our 18  evaluation.
19              MR. MENDIOLA:           Okay. Then 20  similarly, is there a similar gap on the outside of the 21  liner, something like thats on the inside.
22              MR. POWERS:            On the outside, 23  there is ground water that has seeped through the 24  concrete. Its not unusual for this to happen with any 25  type of concrete, has small cracks in it. And what Randy MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


8     independence.
37 1 described earlier with surveiling the outside, yes, there 2 is, there is an area or space where water can migrate 3 alongside of the liner.
9                     MR. GROBE:              Okay. Thank you.
4        In fact, in the past, originally we did 5 modifications in that area injecting the ground to work on 6  sealing that, sealing that gap. And then were going to be 7 evaluating that as part of the overall integrity assessment 8 of the vessel; thats going to be included.
10                     MR. MYERS:             Okay, Howard.
9             MR. MENDIOLA:              Okay, thank you.
11                      MR. BERGENDAHL:        Okay, I wanted 12    to -- can you hear me?
10               MR. GROBE:               Just feel free to 11  clear your throat at any time.
13            I wanted to introduce some of the new members of our 14    team. There is an organization chart there, which 15     highlights basically the yellow blocks, are individuals 16     that are new in positions since about the first of the 17    year. So, there has been a lot of change at the site, and 18    many of the oversight individuals, Lew has already 19    mentioned across the top of the organizational chart, but 20    we have some of the key senior managers from Davis-Besse 21    sitting here at the table and I wanted to take an 22    opportunity to introduce them.
12        I had just a couple of questions. Some of these 13  activities appear to be directly related to the boric acid 14  issue. Some of these activities appear to be unrelated.
23            We've put together a team of very experienced and
15       You mentioned that the containment emergency sump, 16 there have been questions in operating experience from 17  other plants as well as you yourself have identified the 18  decay heat valve pit as something that you want to look 19  at.
20        Why werent these issues identified and corrected 21  earlier? Why are they being identified and corrected now?
22              MR. BERGENDAHL:                  Let me take a 23  shot at that. As were going to discuss later, the 24  management issues, according to one of the things were 25  looking at is the standards of the oversight and ownership MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


24    qualified nuclear professionals that puts together the 25    senior management team that I know can do a good job at                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 16          1    Davis-Besse.            2           I'm going to start with Jim Powers, two seats over 3     to my right. Jim is the Director of Engineering. I think 4    we introduced him last time. He joined us from the Perry 5    Plant. He has an excellent reputation and a major asset to 6    our organization.
38 1 of the power plant and programs. And as part of our new 2 initiatives to raise the standards and clarify that were 3 meeting requirements is not our standard. Our standard is 4  to exceed and do things the best.
7           Next to Jim is a new addition to the Davis-Besse 8    organization. He's been with First Energy, but he's now 9    joined Davis-Besse full time, Bob Schrauder will be our 10    Director of Support Services. Bob has had experience as 11    the Director of Engineering and also as a nuclear plant, 12    Plant Manager. And so, he brings a wealth of experience to
5        The fresh outlook has exposed some areas where we 6 have performed to meet requirements, and thats it. So, 7 although that pit may have met the requirements, it doesnt 8 meet our new standards of robust safety way.
9              MR. MYERS:           Ive been on the 10  Davis-Besse Oversight Review Board Meetings several times 11  over the years. Weve been looking at those two issues and 12  theyre not new issues to us. So, while were in this 13  extended outage, why not go and take them up. Perfect 14  opportunity to do that. Thats what were going to do.
15  And it will give us an opportunity to gain knowledge.
16              MR. GROBE:            Okay.
17              MR. FAST:          Next item, our 18  containment air coolers, and were going through complete 19  remediation. This is another example where our intention 20  is to improve margin.
21        Weve investigated the opportunity to get some 22  coolers of higher efficiency, better thermoconductivity and 23  well be doing a complete remediation of those containment 24  air coolers. So, they will be brought up to better than as 25  new condition; all three of those containment air coolers.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


13    the team.
39 1 Thats the comprehensive plan. Well actually start the 2 disassembling of those coolers next week.
14           Next to Bob is Randy Fast. We've introduced Randy 15    in the past. He's new to Davis-Besse in January. His 16    background includes Beaver Valley and a long stretch at the 17    South Texas Plant.
3              MR. MYERS:           Where are those?
18            Next to Randy is Mike Stevens. Mike is brand new in 19    the position of Director of Maintenance. And Mike has been 20    with First Energy for about two years. He spent most of 21    his career with the Cinergy Plants down in Southeastern 22    United States and most recently he joined First Energy from 23    the Excelon Corporation.
4              MR. FAST:            Those are the 5 original coolers that were installed at the plant. Its 6 like a radiator in your car, the way I would describe it 7 for the public, obviously. And it has deteriorated over 8 time.
24            We've also hired in some experience from outside the 25    company, from other power plants in the industry. Mike                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 17          1    Ross at the end of the table comes to us from another            2    Babcocks and Wilcox designed plant at Three Mile Island 3    Station. Mike led the Operations Department at Three Mile 4    Island through their brief start through many years as an 5    Operations Manager and Plant Manager. Mike has joined 6    Davis-Besse to provide oversight to our operations 7    activities to ensure we have high standards that we know 8    Mike accomplished through Three Mile Island.
9      Its a normal phenomenon for equipment and its time 10 now to go in and replace it and renew it and bring it up to 11  standards. And in this case, we can gain, because of 12  improvements in technology over the years, should have an 13  opportunity to actually improve their thermo performance.
9            Also not at the table here today, joining our 10    company July 30th, is Pete Roberts. We hired Pete from the 11    sale of Oak Creek Station, New Jersey, to be our new 12    Manager of Maintenance.
14             MR. DEAN:             Randy, are you 15  talking about replacing them or just refurbishing them by 16 replacing the tubes or innards?
13            So, we put together quite a team here and I know 14     we've got good things to come.
17             MR. FAST:            Primarily, the 18 design of the containment air cooler is a series of heat 19 exchangers. And those heat exchangers were replaceable 20 individually as a maintenance function. However, over the 21 years they degrade, so were going to be replacing probably 22 90 plus percent of those coolers. Im trying to think how 23 many coolers there actually are, but there are a few that 24 have been replaced recently as part of the normal 25  maintenance process, the old coolers were galvanized MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
15                      MR. MYERS:             Bob Schrauder 16     would like to take a few moments and discuss the Reactor 17     Head Resolution Oversight Plan, if you will. We're going 18     to the phase now where we're going to present the status of 19     several of our plans.
20           Go ahead, Bob.
21                     MR. SCHRAUDER:          Thank you, Lew.
22           Thanks, Howard.
23           First, let me start out by saying, I'm very pleased 24     to join the Davis-Besse team, after what seems like a 25    short nine and a half year hiatus from the plant. I do                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 18          1    believe, as Howard does, that we have a good solid team in            2    place, and that we will lead Davis-Besse back to a safe, 3    reliable plant that shows sustained performance.
4            Since our last meeting, I have been really pleased 5    on the progress that we have made on obtaining a new head 6    for Davis-Besse. We have accomplished a great deal in a 7    very short 30 days.
8            One of the things I'm really happy to report is that 9    we've executed in excess of 30,000 person hours at the 10    Midland site retrieving that head, under some significant


11    challenging circumstances there.
40 1 steel. The newer ones are stainless steel. They have 2 improved in design and improved thermoconductivity.
12           As this slide indicates, we are on target with the  
3      So, effectively when you look at it now, there are 4 other elements of the containment air coolers. We did 5 receive notification of motor problems and we have two 6  brand new motors, two of the three will receive brand new 7 motors and as well the register, the duct work have been 8 completely reworked and will be remediated to, to as-new 9 condition, so principally, that heat exchange will be 10  replaced.
11              MR. GROBE:              Okay. So, this 12 wasnt necessarily an artifact of the boric acid situation, 13  this was just an aging, normal aging, equipment aging?
14              MR. FAST:              Well, there are 15  really two factors, Jack. First is the aging, the normal 16  aging process of equipment, but the other is, that through 17  the trailing of boric acid, those would collect on the 18  fins and those have been cleaned numerous times by our 19  staff, that did take their toll, the boric acid that 20  collected on the, on those cooling fins could be cleaned.
21  But, that repetitive action did degrade the equipment.
22              MR. GROBE:              It sounds like 23  modification, not replacement for the component limit.
24  Will there be a substantive test program, heat transfer 25  testing program, following the replacement?
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


13    head replacement to support safe, reliable plant 14     return-to-service sometime during fourth quarter of this 15     year.
41 1            MR. FAST:            One of the things 2 were not going into a lot of detail today is restart, post 3 restart test plan, but all modifications for the plant will 4 undergo an extensive testing prior to restart of the plant.
16           I'll talk a little bit about our activities at 17     Midland. We were able to successfully open the 18    containment. We had to chip away about three and a half 19    feet of concrete. We had to remove three layers of rebar, 20    and we had to detension the pre-cement tensioning elements
5 So, that is, when you look at the chart or for the Restart 6 and Post-Restart Test Plan, that comprehensive test or plan 7 extends beyond the reactor coolant system and all the 8 support systems, and in this case that would be tested 9 extensively.
10              MR. MYERS:              Jack, you asked 11  the question, one of the things we can tell you, we could 12  probably go out and clean these coolers up, work on them 13  and meet the minimum requirements. We have, we have an 14 opportunity to replacement and gain on the margin, so 15 thats what were going to do.
16             MR. GROBE:              Okay.
17             MR. FAST:            Okay, there were 18  questions as we met last time about our inspections for 19  systems that contained borated water outside of the 20  containment. We talked about that, and said, where do we 21  want to do those reviews to ensure that we have a good 22  comprehensive review of systems outside of containment.
23      I mentioned here that we did roll that into our 24  System Health Assurance Plan to insure that any systems 25  that contain borated water are thoroughly evaluated for MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


21    in this containment.
42 1 their functional requirements and design capability. So, 2 its not part of the Containment Health Plan, however that 3 element has been rolled into the System Health Assurance 4 Plan.
22            These two pictures up here show us the progress of 23    opening that containment and then in the lower right-hand 24    corner with the team that helped us open that containment.
5      Since we met last, we have gone through a review of 6 our Inspector Training Program, and we actually saw 7 opportunities to improve. As we had talked previously 8 about inspection criteria, inspection requirements, we went 9 back and used our systematic approach to training to 10  review, to insure that our engineers were qualified to the 11  right standards for the inspections that had been done.
25    Again, the team worked very safely and very effectively for                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 19 1    us.            2            The service structure at Midland, service structure 3    on these reactor vessel heads is in three parts. The lower 4    two parts will remain on the Midland head and we will 5    transfer the upper portion from the Davis-Besse head onto 6    this service structure.
12        We saw opportunities to improve it by using the 13  systematic approach to training. Did incorporate it then, 14  lessons learned and being able to then apply inspection 15  techniques to civil, structural, electrical, mechanical and 16  our Alloy 600 reviews.
7            We have implemented the modification on the service 8    structure, the lower portion of the service structure at 9    Midland with ten large diameter openings that will allow us 10    clear access to the bare head inspections that we will do 11    on this head going forward in the future. That
17        So, subsequently, we revamped our training program 18 for our engineers, and we have trained them. We have job 19  familiarization guides that are implemented and we are in 20  the process of reestablishing our baseline inspections and 21  verifying inspections that were done previously were, would 22  meet our standards of excellence.
23        Well be detailing any differences between the 24  initial inspections and the subsequent inspections. And 25  using condition reports to identify those differences, and MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


12    modification, as I said, is completed.
43 1 theyll go into the engineering evaluation process.
13            The last time we got together, we had indicated our 14    inspection plan for this head. We had divided those 15    inspections, and identified they have three purposes. The 16    first was to supplement the original co-data package that 17    went with this head. The second was to baseline this head 18    for ongoing in-service inspection program. And the third 19    was to provide supplementary exams to assure ourselves that  
2              MR. GROBE:            I think I have two 3 things there I want to make sure I understand it. I think 4 I hear that youre going to reperform inspections and if 5 you identify any deficiencies, those deficiencies will go 6 into corrective action guidelines, condition reports, but 7 in addition, I think I heard you say that when you identify 8 deficiencies between your first inspection and the 9 reinspection for the improved training that youre going to 10  identify that difference as something to learn from, from 11  the standpoint of the systematic approach to training. Is 12  that, help me understand?
13             MR. FAST:           We want to make 14  sure that we understand that the inspections that were 15  done, we want to see what differences there are. We see 16  improvements in the training. In fact, the previous 17  training program, we brought some industry experts in and 18  tested them, and we identified shortfalls with even 19  industry experts in their understanding and knowledge of 20  inspection techniques. So, weve incorporated that.
21      We think we have an excellent training program. And 22  we expect to see that through this reinspection, there will 23  be some differences. And what we want to do is document 24  those differences. Now, if we saw something that were 25  generic in nature, we want to certainly apply that across MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


20    no damage had occurred to the head during its storage 21    period at the Midland Plant.
44 1 the board, but we will be documenting many of those 2 differences and doing evaluation and inspection.
22            I'm pleased to tell you that all of those 23    inspections have been completed satisfactorily on the 24    Midland, on the replacement head for Davis-Besse, and we 25    know now that we do have a very good compliment for use at                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 20          1    Davis-Besse.             2            One of the records that we also talked about last 3    time associated with the co-data package was the 4    radiographs; both for the dome, the flange weld on the 5    head, and the radiographs on the flange to nozzle. The 6    records that we were able to retrieve did not have either 7    of those films, nor did they have the records of the
3              MR. DEAN:            Randy, you 4 characterized what it was that drove you to revise the 5 field inspection training program?
6              MR. FAST:            Yeah, Ill try to 7 digress a little bit. As we originally identified our 8 extended condition, we were focused on extended condition 9 principally in the area of boric acid degradation through a 10  threat of Alloy 600 components.
11      We adopted a standard, which was set by the American 12  Society of Mechanical Engineers called a VT-2 Inspection.
13 We applied that VT-2 Inspection. We had some problems, 14  problematic problems in our inspection program. We went 15  back, rebaseline, redeveloped that program. And as we 16  raised standards, we self-identified that there were 17  shortfalls, that although this would be good for credible 18  Alloy 600 Inspections, it did not meet our inspection in 19  other areas, such as electrical components or other 20  structural components within the containment. So, we took 21  on a more, I would say, full body inspection program with 22  better criteria.
23      Okay, the other thing that we originally, in our 24  original plan had inspection plans that were developed by 25  engineering. We have subsequently rolled all of our MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


8    inspections of those films, other than a signed-off log 9     entry that indicated that the exams had been completed 10     satisfactorily.
45 1 inspection plans into plant procedures.
11           So, in order to resolve that, we reradiographed 12     those major welds on this head, and they did confirm that 13     we had good welds in all those locations. We were able to 14    achieve a hundred percent coverage of the flange-to-nozzle 15     weld and we achieved a 95 percent coverage of the 16     dome-to-flange weld. And, the remaining part of that weld 17    we were unable to get to, due to the lifting devices that 18    were put on the head after the original manufacturing.
2      Plant procedures are in hand. Have specific 3 criteria requirements for the entry and exit from those 4 procedures. And so part of our training program as well is 5 on these new procedures and the use of these procedures.
19            Again, though, we confirmed with those that we did 20    have very good welds in all those locations. And that 21    information, coupled with the previous records that we had 22    that identified that the previous owner had accepted this
6      As identified the validation of inspections is in 7 progress. As well, we have now a group of independent 8 inspectors that are as well going through, using the same 9 criteria inspection programs that well be doing validation 10 of our inspected areas.
11             MR. GROBE:              Help me understand 12 the word independent. Independent of what?
13             MR. FAST:            Its not the same 14  folks were using principally; our engineers from design 15 engineering and from our performance engineering, plant 16 engineering. These are individuals that we brought into 17  the organization with experience outside of Davis-Besse; 18  and they were trained to our same program and they will be 19  looking independently at the inspections and checking and 20  verifying and validating that weve done a good job on 21  those inspections.
22              MR. GROBE:              I just want to 23  make sure I understand this. When I think of the different 24  kinds of assessments of work thats done on nuclear plants, 25  which is what I refer to as line assessments; those were MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


23     head and had identified that it had all the appropriate
46 1 assessments by the organization responsible for conducting 2 the work. And then there is independent assessments that 3 weve recently established, Vice President of Oversight, 4 and thats a second level of independence. What kind of 5  independence are we talking about?
6              MR. FAST:            We actually have 7 two pieces of independence. One is our First Energys 8 quality assessment and that is ongoing. So, our quality 9 organization under Bill Pearce, the Vice President of 10  Quality, has also been training or doing assessments, but 11  we also brought in an external assessment organization.
12  So, we have both internal oversight and external 13  oversight.
14              MR. GROBE:            Okay. The 15  external oversight reports to the containment health team 16  as part of that teams activities?
17              MR. POWERS:            Thats correct, 18  yes.
19              MR. GROBE:            Yes.
20              MR. POWERS:            Containment health 21  organization has a new kind of review and oversight 22  organization, and thats part of our engineering assessment 23 board that weve assembled consisting of outside industry 24  experts, you know, providing oversight of all of our 25  activities.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


24    records, and the signed off co-data form from the American 25    Nuclear Insurer, we assured ourselves that we did have a                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 21          1    good head and good going forward records.             2           As a result of the 95 percent coverage, we will be 3    submitting our results to the NRC for their concurrence 4     approval that we do in fact have a high level of assurance 5     and certainty that this weld is good.
47 1              MR. GROBE:              Okay.
6                     MR. JACOBSON:          Bob, let me just 7    mention briefly some of the inspection activities we've 8     done in this regard. We've dispatched one of our 9    nondestructive examination experts out to the Midland site 10     and he spent a few days out there observing some of the 11     inspections that, that FENOC was doing on the head; also 12    reviewed all the radiographs that were done on the head.
2             MR. FAST:              Since we met 3 previously, we made significant progress in containment.
13    And I did also, I reviewed a good portion of the 14    radiographs. So, that's some of the work that we've done
4 As an example, we have off-loaded all of our nuclear fuels, 5 177 bundles have been transferred to spent fuel pool. This 6 has allowed us now to make the record cool system more 7 available for other inspections.
8       We have installed nozzle dams. We are in the 9 process this week. We will refill the cavity. We will 10 reinsert the import thimbles, then drain down, remove the 11 sealing plate, remove the insulation adjacent to the 12  reactor vessel flange, and well be doing thorough 13  inspections of the tops of the nozzles adjacent to the 14 reactor vessel itself.
15        After that is completed, we will also then be able 16  to do cleaning, and as well, we are going to be installing 17  a permanent cavity seal, which is something many plants 18  across the country have been able to install a permanent, 19  its a stainless steel plate that joins the liner from the 20  cavity to the vessel to insure that there is no leakage 21 path, which is one of the items.
22        If you have a temporary seal, then you have some 23  temporary, some minimal amount of leakage, leak path that 24  comes down the vessel. With the permanent cavity seal, 25 there is no leakage. Subsequently, we have no opportunity MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


15    to date.
48 1 then for any additional degradation under the vessel. So, 2 that is part of our going forward plans.
16            And the next phase is going to be to review all the  
3      The other things were doing is we have mobilized a 4 significant number of painters, went through a 5 qualification program. Weve got some pictures, some 6 slides here that show. We currently have 20 fully 7 qualified painters, effective in containment right now.
8      If you go in, youll see these four foot by four 9 foot squares where each painter actually went through a 10  qualification process. That was the in-field exercise to 11  insure that they met standards of excellence for coating.
12  And you can see their names and Social Security numbers on 13  the wall where we did this. And we go back subsequently 14  and test and verify the paint is applied properly.
15      We have an additional 20 painters that are in the 16  pipeline in training, and theyll be reporting to the 17  station to help as well, and with coatings in the 18  containment. And another 14 will come this week.
19      So, we have a significant number of painters, and 20  theyll be painting the entire containment dome, and as 21  well all of the surface areas from 603 elevation, thats 22  the operating deck, up to the polar crane.
23      So, its a nice bright white and we are in the 24  process of prepping it right now. As a matter of fact, I 25  was in yesterday and you can see where, you can see over MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


17    documentation of the head that supports the code, code and  
49 1 the years, many years of operation and training, just dirt 2 and normal dust, oils and thing that have collected on the 3 walls. Just like in your home, that can be cleaned and 4 those areas are brighter significantly.
5      Thats part of the preparation for the surface 6 prep. And thats going to brighten the containment 7 significantly, but that will demonstrate our standards and 8 our expectations for the quality of condition of the 9 containment. So, Im particularly excited about that.
10      Additionally, weve decontaminated a significant 11  amount of areas in containment. All of the containment air 12  cooler duct work, which weve had people inside doing that 13  work. We do have the containment air recirc fan running, 14  which is redistributing air throughout the containment.
15      We also have a temporary cooling package, which is 16  connected to our containment purge supply, and that is 17  providing cooler air, so that we get better environmental 18  conditions for the folks working inside containment.
19      Thats made environmental conditions more favorable 20  and really putting a lot better situation for the work that 21  were doing. So, we have a significant measurable progress 22  in cleaning and housekeeping remediation in our 23  containment.
24      That concludes my presentation. Any questions?
25              MR. THOMAS:              I have one, Randy.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


18    stamp that needs to be on that head in order to use it.
50 1 When they scope the evaluation for the containment air 2 coolers --
19                      MR. SCHRAUDER:         Thanks, John.
3 (Requested speaker to repeat.)
20            That's a good point. I wanted to say our nuclear 21    inspector was present during all of these examinations 22    also, as well as our code experts and our departmental 23     experts.
4            MR. THOMAS:              I asked if the 5 evaluation of the grade containment, potentially degraded 6 air coolers would include a past operability evaluation and 7 scope of their inspection?
24           The picture you see up there with the lifting glove.
8            MR. FAST:             The simple answer, 9 Scott, is we are doing a past operability determination.
25    That's Lew inspecting that lifting glove and those are the                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 22 1    attachments that are used to lift this head off and on the            2    reactor during service.
10              MR. THOMAS:              Thank you.
3                      MR. GROBE:              John, before we go 4    on, could you characterize the results of your inspections
11              MR. DEAN:              Randy, I have a 12  question about where, can you give us a sense of where you 13  gauge the percentage of which you have completed, at least, 14  the evaluation phase in terms of impact for the boric acid 15  disposition containment.
16              MR. FAST:            I try to use 17  numbers. I believe these are accurate. Mark, if Im 18  wrong, you can correct me. But we have about 280 condition 19  reports, which is actually about over 2000 individual line 20  items that have to be dispositioned. About 30 of those 21  have been dispositioned and turned into work orders for 22  work thats going to occur. The rest are in some phase of 23 evaluation and will be forthcoming.
24       I see a nod there, so it looks like I was pretty 25  close.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


5    to-date?
51 1            MR. GROBE:             Let me make sure I 2 understand what you said, Randy. When you said that a 3 certain number of your 2000 or so items of observations 4 have been dispositioned by creating work orders, I want to 5 make sure I understand that.
6                      MR. JACOBSON:           Pardon?
6            MR. FAST:           Okay. There is 7 280 condition reports. All of the inspections that were 8 done generated a condition report for any deviations, 9 didnt meet our standards. Each one of those condition 10  reports would have one or many individual items that 11  required disposition.
7                      MR. GROBE:              Could you 8    characterize the results of your inspections to-date?
12      Of the 280 condition reports that have been written, 13 about 30 of those condition reports, which would be 14  somewheres in the 15, 20 percent range, have been 15  dispositioned. The physical work that needs to be done 16  generates a work order. The work order is the actual 17 maintenance process to complete the work. And those 30 are 18 in progress.
9                      MR. JACOBSON:           The results of the 10    radiographs that we've looked at to-date were, met all code 11    requirements; and, in fact, the weld on the flange to the 12    dome was extremely clean, extremely good. It's one of the 13     best welds that I've personally seen in a long time. And, 14    I've looked at a lot of them. So, we did get that done.
19             MR. GROBE:             Okay. So, you 20 have condition records -- the focus of my question wasnt 21 clear. I apologize.
15            We've also looked at some of the welds up on the 16    control rod drive penetrations, and those also meet all 17     code requirements. So, to-date, all of the nondestructive 18     examination that we've reviewed is acceptable.
22       Have the condition reports been closed out to work 23  order, or condition reports wont be closed out until the 24 work thats specified in the work order is completed?
19                     MR. SCHRAUDER:         Thank you. At 20     Midland right now our activities are centering around final 21     cleaning and preparation for shipment of the head. This 22     picture that you see here, is the, now there is a cover on 23    it. This is a cover on the reactor vessel head, but 24     this is actually the reactor vessel head being lifted off 25     the stand that it was sitting on at Midland.                         MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 23          1            Next picture, please.            2            This is our opening, and that is the head stand that 3    we had to pull out in order to be able to retrieve the
25             MR. FAST:            The condition MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


4    head.
52 1 reports will not be closed until the work is completed and 2 verified.
5           And in the next picture, again, the head being 6     readied to be lowered onto a temporary transportation 7     system to get it out to its main transport.
3              MR. DEAN:            Then you would say 4 that those 280 condition reports essentially encompass the 5 results of the inspections. Although, the way I understand 6 it, you still have some validation effort ongoing, but 7 youve completed your initial inspection?
8           This is a picture of the type of transporter that 9     we'll be using to bring the head to Davis-Besse. That head 10     weighs about 80 tons. And this small truck that you see is 11    about 180 feet long. We will be transporting that head for 12    arrival at Davis-Besse prior to the date we set earlier, 13    which is August the 1st, which would be the latest date 14    that we would expect to have that on the site.
8               MR. FAST:          That is correct, 9 Bill. The 280 are the original inspections. I would 10 expect it will be generating some differences, based on 11  those reinspections.
15            Now let's talk about some of the activities under 16    way at Davis-Besse. Our reactor pressure -- our head at 17    Davis-Besse is being repaired for removal from the
12                MR. GROBE:          Any other 13  questions on Containment Health? I have a couple more.
14      I just want to make a couple comments. I think the 15  Containment Health Plan is a substantial improvement from 16  what you showed us last month. For one thing, you have 17  detailed procedures in place for the inspections. The 18  scope of the inspections is much more comprehensive with 19  respect to evaluating the condition of the equipment inside 20  containment.
21      Based on, again, this is just based on what youve 22  told us, you havent done extensive inspection in these 23  areas, but based on what you told us, it appears that 24  youre going beyond what, the event, the head corrosion 25  would have caused you to do. And I think thats helpful.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


18    containment.
53 1      Nuclear plant workers work to procedures. They 2 understand that. Quality assurance program assures that 3 procedures are adequate; theyre adequately implemented.
19            This is a picture of the service structure that I 20    spoke of earlier. The upper portion of the service 21    structure, which we will use on the new head when it 22    arrives. We will lift that off, that's a 40,000 pound 23    piece of equipment that's floating through the air to its 24    temporary resting place where it would be repaired for 25    installation on the Davis-Besse head. And, the head now at                       MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 24          1    Davis-Besse is being properly cleaned and prepared for            2    removal from the containment building.
4 So, this context of detail procedures and systematic 5 approach to training, thats a nuclear standard. Those are 6 very good attributes of the program and assure the results 7 of high quality activities.
3            We have gotten our construction packages from our 4    vendor and we are in the process of reviewing those now.
8      Im very encouraged to hear that youre having as 9 part of your inspection program a separate independent 10  look. And thats important from two standpoints. One is 11  its always better to have two sets of eyes than one, but 12  secondly, quite frankly, there was a question regarding 13  the, the standards of the workers that were making 14  decisions in the plant. And I dont want to infer by that 15  that all the workers at Davis-Besse dont have the right 16  standards. Thats not what Im trying to say. But there 17  was a question. And this will give you insight as to 18  whether or not that is a broad question, a narrow question 19  and what it means as far as the accuracy of your 20  inspections. So, thats good.
5    We have got the engineering packages available, and these 6    engineering packages are the packages that we put together 7    to open the containment and subsequently restore the
21        I also heard you say, as I was pursuing the question 22  of what independent inspections meant, that completely 23  independent at Davis-Besse organization, the folks in Bill 24  Pearces organization are going to be doing independent 25  assessments.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


8     containment to its full design requirements.
54 1      And Lew, I think it would be very healthy for us to 2 hear Bills staffs evaluation next time we meet on the 3 activities that youre presenting. And, I would fully 4 expect, let me say, I would be surprised if his evaluation 5 is completely rosy. Hopefully, hes finding some things 6 that continue to have done.
9            We are making preparations for the containment
7      So, I would hope that next time we meet, not only 8 can we hear from the staff thats doing the work, but I 9 would like to hear from Bills staff to get on the FENOC 10  corporate independent assessment, the quality of the work 11  thats going on in the field.
12              MR. MYERS:              That would be 13  good. We would do that.
14              MR. GROBE:              Anything else 15  before we move off of Containment Health?
16      Okay. Good. Thank you, Randy.
17      Marie, weve been at it for about an hour and 15 18  minutes; is it time for a five minute break?
19              MS. FRESCH:              Sure.
20              MR. GROBE:              Okay. Lets do 21  that. The last time, we wore out her fingers.
22              MR. MYERS:              Could I just 23  summarize on the Containment Health Plan?
24              MR. GROBE:              Sure.
25              MR. MYERS:              I think once again MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


10    building opening itself. Again, this is a shot of the back 11    side of our containment where we will be making 12    approximately a 20 foot by 20 foot opening into that 13     containment, which happens to coincide with the original
55 1 we demonstrated at the last meeting we were in the plan 2 phase, doing some discovery, doing implementation or 3 physically doing work. And, you know, weve taken on some 4 value and expanded the program.
5      Were upgrading our coolers. Were extremely 6 pleased with that. The thermo cavity seal is a major, 7 major effort that would add a lot of value and margin to 8  our plant; and it will produce, or does make our plant a 9  better plant. So, were moving to good implementation on 10  that.
11            MR. GROBE:              Okay. My watch 12  says 16 after. Lets be prompt at 21 after, five minutes, 13 and that way we can keep things moving.
14  (Off the record.)
15            MR. MYERS:              The next area we 16  would like to discuss is System Health Assurance Plan and 17  Howard Bergendahl will do that.
18            MR. BERGENDAHL:              Good afternoon.
19  As Lew indicated, we are committed to the safe operation of 20  Davis-Besse, more importantly, sustained safe operation.
21  So, were examining much more than the reactor vessel head 22  and containment building. Im going to briefly describe 23  where we are on System Health Issues.
24            MR. GROBE:              Just a minute.
25  Could you please close the doors back there?
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


14    construction opening in this building.
56 1      Thank you.
15           The process again for opening this containment will 16    not be the chipping or cutting techniques that we used at 17    Midland. This is a very high pressure water wash system, 18    which essentially separates the cement from the aggregate 19    in the concrete, washes it off the rebar. Then the rebar 20    is tagged, cut and removed and replaced in its original 21    condition when we're ready to restore the container.
2              MR. BERGENDAHL:           There is two 3 Building Blocks were trying to cover, The System Health 4 Assurance Program Compliance -- and these two Building 5 Blocks, as I indicated, are expansions over what we just 6 described.
22           We did have to do some leveling of the ground in 23     this area in order to get our transport mechanism that will 24     go through the containment to move the old head out and new 25    head in. We did some ground leveling in there.                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 25          1            And we are in the process of right outside this,            2    just off to the righthand side out of your view on this 3    picture is our start-up transformer at the plant. We will
7      The first one is System Health Assurance Plan.
8 Basically, a review of the key systems from three different 9 perspectives. Taking an operational look, basically 10  focusing on the needs of the operator. A second 11  perspective would be the system reliability, and thats the 12  system engineers view of the system as a whole. And third 13  is the design perspective of a system.
14      Now, the first one, called the Operational Readiness 15 Review; that was the operating perspective, as I 16  indicated. The plant manager led those reviews and they 17  are complete. That was a team review of some key systems 18  and review of the indicators on how that system is 19 performing and when its ready for safe operation.
20      That first cut review by Randy and some of his staff 21  identified some of those issues I mentioned earlier that 22 may have met compliance, but did not meet the standards for 23 future operations. So, that produced some work activities 24 that we had maybe identified for future implementation, 25  pull those up to current, to current outage.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


4     tag that transformer out, disconnect it, and put protection 5    around it so there is no way to injure that transformer 6    during the period of time that we're under construction.
57 1      That review is complete. And, then moved on to 2 System Readiness Review, which is a more structured review 3 of the risk significant maintenance rule systems, focusing 4 on material condition of the plant and including some 5 detailed system walkdowns. And walkdowns would be done of 6 course, with procedure.
7      And the results of these reviews would then be 8 presented to an independent board, which is our Program 9 Review Board, which is a subcommittee of the Engineering 10  Assurance Board, which we mentioned earlier.
11              MS. LIPA:          Howard, I have a 12  question for you.
13              MR. BERGENDAHL:            Yes.
14              MS. LIPA:          On the operational 15  readiness reviews that are complete, is that complete and 16  identifying what needs to be worked or is all the work 17  done?
18              MR. BERGENDAHL:            Its complete in 19  identifying the issues of what needs to be performed; that 20  work has been identified, and it is not all completed.
21              MS. LIPA:          And then are you 22  also looking at operating workarounds as part of that 23  review?
24              MR. BERGENDAHL:            Yes. That was 25  part of the perspective of what systems have operating MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


7           Another item that came up in our last meeting is the 8     restoration of the pressure vessel. Again, the containment 9    at Davis-Besse is a shield building made out of about three 10    feet of concrete and a freestanding pressure vessel with 11    annular space between them. Both of those obviously have 12     to be cut to get access into the containment, moved ahead 13    in and out. Then we have to restore that pressure vessel
58 1 workarounds, outstanding modifications, things of that 2 nature.
3            MS. LIPA:            Okay, thank you.
4            MR. GROBE:                Thats, thats a 5 new one for me. I wasnt aware that you were specifically 6 looking at operator workarounds. Let me make sure I 7 understand that.
8       When I think of an operator workaround, I think of 9 things that are embedded into procedures, things are 10  embedded into the culture of operating the system, 11  operational characteristics of a control room of a system, 12 as well as operational characteristics in the field; 13  things our operators are having to work around potentially 14  a design, not deficiency, but lack of optimal design.
15      Are you looking at those kinds of things, scouring 16  through procedures, the workarounds?
17              MR. BERGENDAHL:                Yeah. The first 18  Operational Readiness Review that Randy chaired, he can 19  describe it in a little more detail, but it was designed to 20  flush out issues like you describe.
21              MR. FAST:              Jack, what we put 22  together in this process, 36 systems, as I recall, and five 23  other systems, like gear operated valves, motor operated 24  valves, breakers, things of that nature. We established 25  criteria. Had the system engineer come to review panel, MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


14    per code requirements.
59 1 which consists of myself, operations and engineering and 2 maintenance folks. And we were focused on the system 3 health.
15            We had indicated the last time we were here that we 16     were contemplating doing a localized test around that 17     restoration process, in that we had just completed an 18    integrated test on this pressure vessel at previous
4        Brought into view then the performance of the system 5 in the past and its present health. We use criteria like 6 operator; we have a level one, level two, and level three 7 workaround, we track in our operations group. So, as an 8 individual would bring in a system, they would identify any 9 outstanding work orders on the system, modifications that 10  were pending for it, any operator workarounds that have 11  been established, procedures that needed to be revised or 12  written to support system health.
13        And that board was really, Im going to say, an 14  advocacy to the system engineer in creating a form where 15  they could bring the issues to the table and get the 16 appropriate level of support to ensure that those items 17 would be complete.
18        As we did those reviews, some of the legacy issues, 19  Ill call them legacy issues, system engineering; we said 20  if there were longstanding issues with problems of the 21  performance of the system, bring those forward with your 22  recommendations as well.
23        And, Ill give an example. Im trying to be 24  specific. Something like the high pressure injection 25  motors. Been there since the life of the plant. Never MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


19    outings.
60 1 been taken out, sent out for complete overhaul and health 2 check.
20            Since that time, we have identified several other 21    things that we'll be doing in containment, and we have
3        One of the engineers came forward and said, I would 4 like to talk about the health of the motors and where we 5 are and make proposals to send those out and have complete 6 inspections done. And, we subsequently agreed and are in 7 the process of taking those actions.
8        So, right now as we speak, their HPI motor is being 9 rigged out of the building to be sent out for complete 10  remediation.
11        There were other items, like items, diesel start 12  systems. System engineer said, heres one thats pending 13  modification. We need to put some emphasis on it. We 14  agreed. We applied the engineering resources, and that is 15  undergoing design, and that will be implemented as well.
16        Those are the kinds of things that the Operational 17  Readiness Review did.
18              MR. GROBE:              Let me just ask a 19  little bit more, get into little more depth here.
20        Something like a motor that hasnt had a 21  comprehensive amount of maintenance in 25 years, would that 22  be consistent with the vendor recommendations for that 23  motor?
24              MR. FAST:              The original 25  design of those motors for life of the plant was 40 years; MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


22    reached the conclusion that the best thing to do is to  
61 1 however, theyre not outside of their design basis, but 2 its just prudent maintenance activity to take those out 3 and do a health check on them.
4        So, we were doing the vendor recommended 5 preventative maintenance. Those items that are required; 6 bearings, lubrications and such, were within their period, 7 but its the unknown, its the unknowns about that which 8 really require a teardown and review.
9        So, they dont go through much of a duty cycle, but 10  it is just a prudent maintenance practice. This is above 11  and beyond what the vendor would recommend.
12              MR. GROBE:            Okay. Let me ask 13  a question, you just mentioned a couple specifics. This 14  diesel air start modification; was that something that was 15  a pending modification or was that something that had not 16  been requested?
17              MR. FAST:            That was a pending 18  modification, did not have implementation plan or target 19  date for at least in the near term. And that was an 20  example, we said were going to pull that forward and 21  complete that work.
22              MR. GROBE:            Okay. So, back to 23  the original question, which was operator workarounds. You 24  included in your Operational Readiness Reviews, operator 25  workarounds that had already been identified. Did you go MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


23    perform an integrated leak grade test on this containment 24    vessel when it is restored.
62 1 through a systematic review with, or was the intent of the 2  scope of this to find out review of the workarounds that 3 were latent?
25           Those are our current plans that are incorporated                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 26          1    into our plan and process. Unless there are questions,            2    that's all I have on the activities for replacing the
4              MR. FAST:              That was not 5 really, the focus was on system health. If there were any 6  outstanding operating workarounds, those are tracked by the 7 system engineer. He knows hes got a level one or level 8 two workaround.
9      Our Return to Service Plan included completion of 10  all the operator workaround activities. So, those came up 11  and when we said, so what are we doing about this level two 12  operator workaround, it might be that we needed to 13  implement a minor change to the design of the system. Then 14  we said, lets progress that, get the work order and get 15  that out.
16              MR. GROBE:              Okay, thank you.
17              MR. BERGENDAHL:            Now, the next 18  level reviewed is System Readiness Review, were more 19  structured comprehensive. That would flush out more of the 20  items, Jack, I think you refer to, which are not tracked as 21  an operator workaround, but procedure aspect.
22        In that review, we will review the close condition 23  reports for the last few years to see how we dealt with 24  problems. Closed maintenance work on a plant, on a system, 25 open and close modifications, operating experience. Its a MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


3    head.
63 1 more structured review and it goes through a panel to 2 independently assess the thoroughness of that review.
4                     MS. LIPA:              I do have one 5     question. I walked down the area where this transformer is 6    yesterday. What plans do you have for protection, what
3      In addition, on the next slide, weve added a new 4 program called the Latent Issues Review. This is a more 5 detailed look which gets beyond even the areas I just 6 discussed and goes into the System Health Plan design 7 perspective as well.
8      This program has been used at our Beaver Valley 9 Station. Weve adopted this program and identified some 10  systems to go after first. And ones that you see here are 11  systems that we selected to put this thorough team review.
12      Now, this type of review, very broad detailed 13  review, takes a team of people a couple weeks to perform.
14  This review goes back and looks at the original design 15  basis, the emergency procedures, all kinds of industry 16  operating experience, any operability reviews that were 17  performed, problematic risk assessment; and a very detailed 18  look.
19      We selected the Reactor Coolant System, Auxiliary 20  Feedwater System, Component Cooling Water System, Emergency 21  Diesel Generators and the Service Water Systems in these 22  reviews.
23      And we have currently assembled teams. Weve put 24  together the guidance and structure for doing these 25  reviews, and the teams are starting reviews now. I believe MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


7    kinds of barrier?
64 1 as of this week we have all the teams assembled.
8                      MR. SCHRAUDER:         The major plans 9    are to disconnect it, and then there are coverings that 10    will go over the bushings and the like on the transformer 11     itself, and I believe there is going to be a 12     scaffolding-type arrangement around it. Basically, we're 13     protecting the major components on getting any kind of 14     water spray or dust or aggregate into it. Make sure that 15     -- we have to put up a large scaffolding and large platform 16     in order to get into that. That opening is about 20 feet 17    off the ground, 18 feet off the ground. We want to make 18     sure that scaffolding we have up there also doesn't have, 19     if it should happen to fall for any reason, it won't impact
2            MR. GROBE:              Before you go on, 3 Howard -- Im sorry. Go ahead, Dean.
4            MR. DEAN:             I was going to ask 5 you, do you intend to do these design reviews or latent 6 issue reviews in parallel or do maybe one or two and gain 7 any lessons learned and apply that to the other ones?
8            MR. BERGENDAHL:            We started on the 9 Aux. Feedwater System as kind of a pilot to see if there 10  was any process improvements that could be gained. Make 11  sure we got the right scope and expertise.
12       So, we initiated that one. Did learn some things 13 from that, and modifying our process and using that. We 14 expected this new program would be continued to be used at 15 Davis-Besse. Its proven itself at Beaver Valley, and it 16 really does a good thorough job of examining the systems, 17  going back to the original design.
18       So, we plan to continue this program.
19             MR. MYERS:            Let me comment on 20  that too. Neil Morrison is with us today. Neil was the 21  person that spear-headed our reviews at our Beaver Valley 22  Station for the past two or three years. How many years 23  now?
24              MR. MORRISON:            Two and a half 25  years.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


20    or harm the transformer.
65 1              MR. MYERS:            Two and a half 2 years. And so there is, hes got a lot of lessons learned 3 there, so this is not a new program for us. Were just 4 moving it to this plant.
21                      MS. LIPA:              Okay, thank you.
5      But if you look at where weve been spending our 6 money at other plants, a lot of our money has been spent on 7 a lot of things, finding these latent issue reviews. We 8 found significant ways to improve the quality of our 9 systems at our other plants. So, were really excited 10  about bringing this program to our plant. We think its 11  the additional margin for the plant.
22                      MR. GROBE:             Bob, you said that 23     you have construction procedures that have been submitted
12              MR. GROBE:             Howard.
13               MR. BERGENDAHL:              The output of 14  these reviews again goes through the engineering assurance 15  board to get an independent check on thoroughness and rigor 16  on the reviews of the systems.
17              MR. GROBE:             Ive got a couple 18  questions. Its an interesting list of systems that youre 19  doing the Latent Issues Review on. Reactor Coolant System 20  is clearly a focus of the shutdown of the plant; 21  recognizing that the head is part of the Reactor Coolant 22  System.
23       Auxiliary Feedwater System, Component Cooling Water 24  Systems, Emergency Diesel Generators and Service Water 25  Systems are normally four of the five primary systems that MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


24    and engineering packages that are nearing completion.
66 1 Im familiar with that comprise almost the entire risk of 2 problems at the plant, but the fifth one is DC Power. Is 3 that a significant risk contributor at your plant? Im not 4 familiar with PRA.
25     Could you describe in a little more detail the scope of                       MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 27 1    those construction procedures and engineering packages and            2    what they address?
5            MR. POWERS:              Its a good one.
3                      MR. SCHRAUDER:              Well, the
6 The fifth one is, Jack, the Diesel Center --
7 (Requested speaker to repeat.)
8            MR. POWERS:              Im sorry. DC is 9 part of the Reactor Coolant System, for instance, diesel 10  generators. The Aux. Feedwater System, Service Water and 11  Component Cooling Water Systems.
12              MR. GROBE:              Jim, my question 13  was, normally when you look at say 95 percent of the risk 14  contribution, it would come from those four systems plus DC 15  Power. And Im not that familiar with your risk analysis 16  for Davis-Besse Plant. Does DC Power play a significant 17  role in the risk contributions at Davis-Besse?
18              MR. MYERS:              I dont know if we 19  know the answer to that.
20              MR. GROBE:              I dont expect you 21  to know every answer to every question.
22              MR. POWERS:              No, I have an 23  answer for you. What weve done, is on the preceding 24  level, what we have learned to do on our System Health 25 Reviews, weve included the 1.50 DC Systems as part of MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


4    construction procedures are the procedures for opening up 5     the containment, the detailed process on how do you go
67 1 that. Those are the main systems; there were 35 of them 2 that we are going to be going through, Jack. So, were 3 going to be looking at those in some level detail.
4      We didnt select those for the deep cut, but we 5 think the deep cut in the five systems that weve listed 6 here is going to tell us generally how, what the health of 7 our systems are.
8            MR. GROBE:            Okay.
9            MR. BERGENDAHL:            The System Health 10  Review will identify further evaluations that are 11  required. We need to do a more thorough evaluation.
12      These systems were selected, as you indicated, 13  important systems. A couple of them had system health 14  indicators, indicated that we had some issues with the 15  system in the past couple of years. And then we added a 16  couple that our indicators show very reliable performing as 17  well, but since they were high impact systems we added 18  those; and allows us to validate our monitoring programs.
19              MR. MYERS:            We still havent 20  answered that question; how does it affect PSA that you 21  want us to look at. Well give you an answer to that 22  shortly.
23              MR. GROBE:            Okay.
24              MR. BERGENDAHL:            Any other 25  questions on the system reviews?
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


6    about opening up the containment.
68 1            MR. GROBE:              Any other 2 questions?
7           We're looking at things in those packages, and I 8     want to separate the construction package and the 9     engineering package; these are each, have some element of  
3            MS. LIPA:           Yeah, I have one 4 question. On the, in your plan dated July 12th, you talk 5 about that, through these reviews youre going to identify 6 conditions that need further evaluation that could impact 7 the function of a system. And it sounds like a subset 8 would be restart items. What criteria are you using to 9 decide what items become restart items?
10              MR. BERGENDAHL:              In our Return to 11  Service Plan, we laid out a process. Every condition, any 12  appliance we have will be documented on condition reports.
13  These condition reports go through a station review board 14  that we would send to specifically evaluate all the 15  conditions against restart criteria. Technically, on the 16  restart action plans. Multi-field criteria. Safety.
17  Importance of safety -- I dont have the criteria 18  memorized. I could get that for you, Christine.
19              MS. LIPA:            Okay.
20              MR. BERGENDAHL:              Its, actually we 21  met today and we drafted a procedure for our Return to 22  Service Plan in process -- Let me correct. Our Restart 23  Action Plan process. And that criteria is in the procedure 24  which we reviewed today. It will be used in that.
25              MS. LIPA:            Okay.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


10    the other.
69 1              MR. BERGENDAHL:              Its also in the 2 chart for that station review board, clearly documented.
11            We look at things, like the travel path for the 12     vehicle that would bring the head in on. As you know, at a
3              MR. GROBE:            Howard, have you, 4 follow-up on Christines question; have you done the 5 screenings through your restart criteria and if so, how 6  many have you determined, whats the population restart 7 items to date?
8              MR. BERGENDAHL:              The answer is yes, 9 weve started. Every day, any reviews that are going on 10  generating condition reports immediately upon 11  identification. Im not sure of the exact number. There 12 is probably four hundred some odd actions that have been 13  identified that we will get resolved prior to restart.
14              MR. GROBE:              I think in the 15  future meetings, Lew, one of the things we would want to 16  do, I know that youre developing some performance 17  indicators, I havent peeked ahead, so I dont know if 18  youre going to talk about that, but one of the things we 19  want to understand in some detail is flow rates of work; 20  whats coming in and whats going on out, and whats in the 21  business to be worked as far as restart items, and other 22  issues that might go into performance indicators that you 23  developed as far as your approach toward restart.
24      And, I appreciate were still very early in this 25  process, but were going to need to start getting into MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


13     lot of nuclear plants or all the nuclear plants, there are 14    underground piping, underground utilities there. We have
70 1 somewhat detail in that regard. So, at future meetings, we 2 would possibly get that sort of data and start looking at 3 detailed future work, backlog work, accomplishment of work, 4 things of that nature.
5            MR. MYERS:              What we can do, is 6 Clark is in the audience, hes a building block on our 7 restart action list and we can start putting him up there 8 to tackle that.
9            MR. GROBE:              Whatever you think 10  is necessary.
11              MR. MYERS:              Lets do that next 12  time.
13             MR. GROBE:              Okay. Did you 14  have a question?
15              MR. MYERS:              Clark, get 16  ready.
17              MR. GROBE:              I had one other 18  question regarding the Latent Issue Reviews. I understand 19  you used these at one of your other sites in the FENOC 20  system; really two questions.
21      This type of activity has been done on a number of 22  plants, several on the east coast and midwest that Im 23  familiar with, but Im sure there is others also. Have you 24  tapped into the expertise of whats been occurring at other 25  plants to ensure the comprehensiveness of your Latent MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


15     to go through and assess all of those to make sure that 16    this vehicle won't impact those.   
71 1 Issues Review?
2            MR. BERGENDAHL:              Absolutely. The 3 D.C. Cook Plant, gone through some pretty good reviews and 4 weve visited that site, and we look for best practices 5 throughout the industry, and we have adopted lessons 6 learned from those.
7            MR. GROBE:              Okay. Can you 8 give me an idea of something that you might have learned 9 from your D.C. Cook evaluation that improved your Latent 10  Issues Review?
11              MR. POWERS:              As a matter of 12  fact, we are previewing not only the procedures D.C. Cook 13  used, also the people that have come over here and are 14  helping us now lay out the strategy. People experiencing 15 what was done at Cook, Millstone, Salem and are using the 16  composite of all that knowledge.
17      What we learned most specifically, Jack, is the 18  level of detail to go into, we believe, that drive the 19  FENOC Latent Issues Program another step, higher standards 20  as part of this. Its gone quite well for us. And we have 21  used others, past several years, but we think this process 22  is going to go to a higher level of detail. So, we think 23  were on the right line.
24              MR. GROBE:              I think Cook is a 25 good place to go. A number of the people came from Salem, MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


17            Engineering packages includes things like the 18    NCFR 5059 Evaluation to see if this could be done without 19    formal approval of the NRC or whether it fits within the 20    regulation, allows us basically to do those, if they don't 21    change our updated safety analysis report.
72 1 Christie River, Oak Creek; most of them that put that 2 program together. So, its kind of one-stop-shopping, so 3 to speak.
22            Those are included in those; and the detailed 23    engineering on, for instance, the pressure vessel itself, 24    has equipment hanging on it as part of its design. We have 25    to make sure that taking a 20 foot by 20 foot section out                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 28          1    of that pressure vessel doesn't impact its structural            2    capabilities, and where we would need to put in reinforcing 3    supports or the like for that. Also we analyze things like 4    missle protection, while it's open.
4              MR. MYERS:              It is dependent, 5 you know, on our steam generator -- on our head 6 replacement. We brought people in that just replaced steam 7 generators at the Cook Plant. We have some welders from 8 the, that were over in the --
5                      MR. GROBE:              Any other 6    questions?   Okay, very good. Thank you, Bob.
9 (Requested speaker repeat.)
7                      MR. MYERS:             Thank you.
10                MR. MYERS:              We brought some 11  craft members. We brought some experienced people, people 12  welding rebar back on containment. So, were looking for 13  that kind of experience.
8            As you can see, we're making good progress on the 9    placement head project, and we're well into the 10    implementation phase. New head is being prepared for 11    shipment. We've opened up our containment and the whole
14        Were using, its Cook is really good. There is 15  some other places you can gain valid experience too. Its 16  a little different for our case, like the steam generator 17  replacement. You have to cut a hole in the containment and 18 put that on, like were doing to install the reactor head.
19  Its not something that they did at Cook. See what Im 20  saying?
21        So, were trying to get the best everywhere, and are 22  applying some of that information thats necessary for our 23  operation.
24                MR. GROBE:               Okay. I had one 25  other question on Latent Issues Reviews. I think I know MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


12    head has been dismounted, making good progress there.
73 1 the answer to this question, but I want to make sure.
13            The next area is Containment Health Plan. Jim 14    Powers and Randy Fast would discuss that.
2      This is something that was used to some level of 3 success at Beaver Valley and its going to be used at 4  Davis-Besse. Is this something thats going to become part 5 of, say, the culture of First Energy System?
15                      MR. FAST:               Good afternoon. I 16     too am excited about our new team. Today I will discuss 17     the status of our Containment Health Plan Building Block.
6            MR. BERGENDAHL:              Absolutely.
18     As you can see, the last time we met, we called this 19    containment condition. It was focused principally on boric 20    acid corrosion on mechanisms which encountered with our 21    reactor vessel head; however, it became apparent that we 22     wanted to expand the scope for all of containment to really 23    talk about the health of everything that's within that
7            MR. GROBE:              That youre going 8 to do this type of review at all the plants?
9            MR. MYERS:             The Latent Issues 10  Reviews. One of the operational officers, one of the 11  things I was going to do even if I was running one of the 12  bigger plants in the country would be to take a couple 13  systems a year, and look at them from this latent issues 14  effect, because to make sure that youre maintaining your 15  design, your documentation. Its a good process, and I 16 would use it at all of our plants. So, the answer to that 17 is yes.
18             MR. GROBE:              Okay, thank you.
19              MR. BERGENDAHL:              Okay, the next two 20  slides are just some photographs of the work that Randy 21  indicated we initiated some work on the Decay Heat Pumps, 22 and the next slide is just some, bringing in many 23  additional resources, as Lew indicated, craftsmen from 24  around the midwest to help us with the work we have going 25  on at Davis-Besse; a lot of scaffolding to support the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


24    building.
74 1 inspection of containment and work activities.
25            Part of that plan scope was increased to include                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 29          1    containment vessel, the liner evaluation. And, we have had            2    ongoing work there. We have done an analysis. We have a 3    team undergoing a review, a comprehensive review of the 4    design requirements, but as well we did ultrasonic testing 5    to ensure metal thickness and we have an interim 6    disposition on that. However, we can do more exhaustive 7    testing to ensure with every confidence that it meets
2      So, we have a good work force out there and a lot of 3 good work. The items that we identify are being worked off 4 very well.
5      Next area is Program Compliance Plan. And, this 6 also has two different, we call them phases. They actually 7 parallel. Doing a program readiness review, which is a 8 baseline of our plant programs, we will assess, based on 9 the root cause of reactor head problems.
10      We identified some issues and standards and 11  ownership and oversight, and we set up some criteria to go 12  back and review our key programs on site, and assess them 13  against this criteria; present those results to our 14  independent review board; and really understand the overall 15  compliance and implementation of health of those programs; 16  to look at things like the qualifications of the 17  individuals involved, the interfaces, the individual 18  program owners have with the other groups. And again, then 19  present those to an outside independent oversight board.
20      In addition, much like the Latent Issues Review, we 21  developed a phase two or detailed program review, and Lew 22  mentioned Neil Morrison would be working on the System 23  Latent Issue review. We asked Neil to come over to 24  Davis-Besse and apply that same rigor to programs. We 25  designed a program and wrote a procedure and were using MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


8     design requirements.
75 1 that procedure to do these detailed program reviews.
9            We've also included environmental qualification of  
2 Theyre in-depth systematic review of key programs.
3      Now, the first programs were starting review on, 4 the next slide shows the implementation of this program.
5 Starts off with using it on the, the programs that were 6 identified in our root cause and we have some issues.
7      Each of the programs on this list when we did our 8 detailed root cause on the reactor head degradation, there 9 were some issues identified on each one of these systems.
10  So, we selected these systems to initiate our new detailed 11  program and review on.
12        Now, we started a pilot, we call Probabilistic 13  Safety Assessment Program. Since this had not been used at 14  any of our other facilities, it was new initiative. We 15  piloted it and thought Probabilistic Safety Assessment 16  Program to ensure the process was sound and our assumptions 17  and criteria were right.
18        We completed that pilot review, and weve moved on 19  to the Boric Acid Corrosion Control Program, and scheduled 20  the rest of these programs all to be put through this 21  thorough review process prior to restart at Davis-Besse, 22  and then well continue much like the Latent Issues Review 23  to apply this problematic review to additional areas of the 24  site.
25        Again, its a good thorough look at Davis-Besses MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


10    our equipment.
76 1 systems and programs. Its under way, its identifying 2 improvements, issues and were following off on these 3 issues as well.
11                      MR. GROBE:              Randy, before you 12    go on, I believe at our last meeting, one of our inspectors 13     Mel Holmberg identified a question regarding a potential 14    for corrosion below the concrete base mat on the inside of 15    the, of the pressure vessel and also around the outside of 16    the annular region. Have you done anything to evaluate
4      Any questions on our Program Compliance Plan?
5            MR. DEAN:            Howard, can you 6 share with us some of the insights you gained from the 7 pilot review that you referred to just a moment ago?
8            MR. BERGENDAHL:              Yes, the pilot on 9 the PSA, I dont have any specifics, but what we did there, 10  is we took a program. The reviews are done by an, 11  independent team members, we bring in from the outside of 12  Davis-Besse. So, what we did with that, is pilot putting 13 together a plan, bringing in the outside members, 14  developing a report and presenting that report to the 15  review board.
16      I dont know if you have any lessons learned, Jim?
17              MR. POWERS:              I think some of 18  the insights that we found, our pilot program, thats our 19  Probabilistic Safety Assessment, thats one of the 20  strengths that we have. I think at the Davis-Besse site 21  and I think youve seen that with interface with your PSA 22  Supervisor, Ken Berg. So, its an opportunity to look at 23  what is a fairly healthy program with good ownership.
24      Now, what weve also found is weve been moving 25  forward with the Boric Acid Control Program and Corrective MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


17     that issue?
77 1 Action Program; those are ongoing. Weve made substantial 2 progress in both of those.
18                     MR. FAST:               That evaluation is 19     ongoing. A team is assembled and we'll be doing 20    comprehensive reviews, which will include all of the
3      That Boric Acid Corrosion Control Program, weve got 4 a draft report, final review stages now. So, we can learn 5 from those areas more significant areas of improvement that 6 are required; ownership, corporate industry results; in the 7 case of Boric Acid Corrosion Control Program.
8      In the Corrective Action Program, were looking very 9 specifically at, you know, detail regulation and how the 10  program matches the regulation and going through lining 11  those up one by one and every process, and there are areas 12  of improvement there. Youll be seeing those results 13  coming out of those. So, were finding areas in issues 14  that need improved.
15              MR. DEAN:            Are you 16  incorporating a new benchmarking relative to, for example, 17 best industry practices, for using info to give you?
18             MR. POWERS:             Yes. As a matter 19 of fact, thats a good point. Kind of a key element of 20  this. These reports as we do them are being provided to 21  INPO, and in some cases on the detailed reserve, INPO is 22  participating on the team.
23      They are set up down in Atlanta to take our reports, 24  as we review all our programs and send them out to industry 25  experts at other sites that theyve identified where there MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


21    containment liner areas.
78 1 is good industry practices from benchmarking theyve 2 conducted, and well be getting feedback from those peer 3 sites to help us improve our standards.
22                      MR. MYERS:             We have taken some
4            MR. MENDIOLA:            Are these 5 benchmarking, these lessons learned, these program 6 improvements being reflected back to the other plants at 7 First Energy?
8            MR. MYERS:             Yes.
9            MR. GROBE:            I have a couple 10  thoughts, I guess, on System Health Assurance Plan. The 11  Operation Readiness Reviews, the scope of that activity 12  clearly was something that needed to be done following the 13  situation that occurred with the head.
14      The System Readiness Reviews, I think some aspects 15  of that also were direct outgrows of the lessons that you 16  learned from the head situation.
17      The Latent Issues Review clearly goes beyond the 18  depth of what would normally be expected, and Im glad to 19  see that youve taken these significant systems to do this 20  Latent Issues Review. I have confidence based on your 21  experience at Beaver Valley and the input that youre 22  getting from outside your organization that those reviews 23  should be of good scope.
24      The programs area, likewise, I think the level 25  review reflects not only what happened during the head MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


23    action to-date.
79 1 corrosion event, but also some things that youre going 2 beyond the scope of what may have been directly indicated 3 from the initial findings of the head corrosion event. So, 4 I think that likewise is good.
24                      MR. FAST:              Yes. We did about 25    1700 ultrasonic examinations for metal thickness in the                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 30          1    areas that were adjacent to those areas that Mel had            2     identified. That was our immediate corrective action; 3     however, we're looking at all of the containment vessel for 4     integrity.
5       Were still in the phase of, in many of these areas 6 of inspecting all good plants. In a couple of areas, John 7 talked earlier about some inspection work that weve done 8 already on a nondestructive examination weve had.
5                     MR. GROBE:              Okay. I read in 6     the paper this morning something that I think was already a 7    focus of both the NRC and First Energy, that's the issue of 8     what's referred to as MIC, or microbial induced corrosion.
9       And Mel has done some early inspection work and 10  provided substantive feedback to you on the containment, 11 early containment health work, or extended issue work, I 12  guess it was called at that time.
9     Could you comment on that a little bit?
13       There will be substantive inspections that will be 14  coming as you get into these in greater detail, and start 15 completing some of this work. Well be taking a good hard 16  look at that, and also giving you feedback.
10                      MR. FAST:              Well, that's 11     something that has to be evaluated. Micrologically induced 12    corrosion, MIC, as it's called, is a naturally occurring; 13     and if we've had ground water in-seepage around the vessel 14    area, that would potentially be susceptible. So, we'll 15     have to do some evaluation and analysis to ensure that we 16    do not have any MIC present.
17        Were going to be working closely with your staff 18  that are implementing these activities to make sure we 19  understand your schedule and what activities will be ready 20  for inspection.
17                      MR. BERGENDAHL:        We have, in fact 18    have an individual working on that right now.
21        We dont plan on inspecting things before theyre 22  done. Were not part of your team. Were not supporting 23  the success of your program. We want to look at what 24  youve accomplished, and well achieve our confidence based 25  on the quality of work you do.
19                      MR. POWERS:            I'm taking water 20    samples to physically look for that as well as corrosion
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


21    problems.
80 1      Youve mentioned a number of occasions assessment 2 boards and review boards. Ive watched over the last 3 several weeks as things evolved, and youve got quite a 4 different character of outside influence on these review 5 boards, created more review boards, structured them. In a 6 future meeting, I would like to get some feedback from the 7  value added, a little bit more detail on the structure of 8 those boards, what their function is, what theyre 9 accomplishing, and also some feedback value added from 10  those boards. What theyre seeing.
22                      MR. GROBE:              Okay.
11      Because those boards will give you a direct 12  reflection of the quality of the work, not only that the 13  people are doing in the field, but also the folks that 14  review and approve that work. Because the boards shouldnt 15  see that work until its been through your review process, 16  you know, in your line organization.
23                     MR. FAST:               We're aware as 24     well it is an item that is under investigation and 25    evaluation.                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 31          1                      MR. GROBE:              I don't believe            2    that Mel has had a chance to come back and look at the 3    results of your ultrasonic tests. Could you briefly 4    summarize the results of what you found?
17      So, Im hoping to get some insight from that.
5                      MR. FAST:              What we did was an 6    analysis that looked at minimum wall thickness. That 7    vessel liner is about an inch and a half thick. We didn't 8    see any significant degradation. There is some local 9    surface pitting, which is just expected of a carbon steel 10    component, but no deduction in the overall ability of the 11    areas that we did evaluate; nothing that would require any
18  Hopefully, that can be on the agenda for the next meeting.
19              MR. MYERS:            We can do that.
20              MR. GROBE:              Okay. Any other 21  comments on systems or programs?
22      Lets move on.
23             MR. MYERS:             Before what you 24 commented, I think the programs review is something that 25  helps us understand that each one of our programs is a MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


12    additional remediation.
81 1 pretty significant list of programs out there that we have 2 best industry implementation, doing the industry 3 implementation. Its not the minimum criteria, its where 4 we have the margin. And that we have good ownership, and 5 finally that were implementing that program properly in 6 the field.
13                      MR. GROBE:              You indicated, you 14    indicated that you were planning additional inspections.
7      So, thats really the structured process to go into 8 this whole latent issues process in and out. I note the 9 long term, I see that as an essential building block.
15    Could you characterize those?
10      The next area that we have to talk about is 11  Management and Human Performance Excellence Plan; and 12  particularly the Management Root Cause. I would like to 13  introduce that.
16                      MR. FAST:              Well, I try to 17    describe what this vessel liner looks like for our folks 18     out in the public. If you've ever changed out a thermos 19     bottle, the glass liner inside that bottle is effectively 20     what our pressure vessel in the containment is like.
14      Its hard, as folks say, to call your baby up. But, 15  in the last meeting, I indicated that management, 16  "Management ineffectively implemented processes, and thus 17  failed to detect and address plant problems as 18 opportunities arose"; especially in the forecast approach.
21           So, you see the concrete structure outside that 22    extends about 240 feet above the grade elevation; 2.4 23     million cubic feet of volume, but within that is a steel 24     structure much like this thermos bottle. And that's the 25     structural integrity that ensures that under a design basis                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 32          1    accident, that peak pressures that would be held during            2    that event are being contained within the containment; that 3    is the barrier that protects the environment from a design
19       There is four key areas of focus that were looking 20 at; Ownership, Oversight, Standards, and Decision-making.
21 And, our Boron Program does not have good ownership at the 22  engineering level to insure that we were meeting the 23 standards in industry, and that the requirements in our 24 program were proper.
25       The oversight groups in our management team were not MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


4    basis accident.
82 1 properly involved with that program to insure that we have 2 proper implementation. Were not out in the field looking 3 at what we were doing.
5           So, that thermos bottle with its steel structure, 6    the integrity of that has to be evaluated to make sure it
4      When problems were found, we did not have a good 5 questioning attitude in this boric acid issue that lead to 6 the easy conclusions. It was easy to justify that no leaks 7 in the past were the cause of this boron buildup. It was 8 an easy conclusion.
9      Our initial management reviews have come up with 10  some assessments that we can share, and thats that 11  standards have existed for many years at Black River in 12  problem solving. Our reviews are going back to the 1980s, 13  and have indicated this lack of problem solving at the 14  management level is something we have to work on.
15      Another thing we can say now is when there has been 16  times at Davis-Besse Plant that we had strong management 17  leadership. In the 1980s and 1990s, the trend was to 18  properly identify problems and resolve them. So, that lack 19  of rigor was not evident and you saw improvements in the 20  performance.
21      For example, I had a supervisor tell me today that 22  in the early 90s, Davis-Besse was setting the standards 23  that everybody else was coming to look at. Thats one of 24  those standards we need now.
25      As industry hired many of our leaders at the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


7     meets design requirements.   
83 1 Davis-Besse Plant, replacements reduced strong daily 2 involvement that resulted in a lax attitude of fixing the 3 problems. Lets just get the problem fixed. And since you 4 have that lack of rigor in decision-making down below, the 5 problem came evident.
6      Let me say this. The Davis-Besse Plant has operated 7 well for many years and its still in very, very good 8 material condition. As good as most plants in the 9 country. However, as new problems arose, without strong 10  upper level involvement, and the lax rigor, the 11  decision-making process appeared to be narrowly focused in 12  several cases that weve looked at.
13      Our approach has been simple. We initially assessed 14  the root cause of the head degradation. What would cause 15  this problem? As we did that, we also looked at some 16  management issues. We did that because we had noted that 17  there was a time performance at our Davis-Besse Plant. So, 18 by going to the technical root cause, we could first give 19  us some time to make some of the overall structure changes 20  that we wanted to make.
21      For example, we created the job Im in now, the 22  Chief Operating Officer, to provide additional plant 23  oversight of all three of our plants.
24      We created a new position, an elevated position of 25  oversight and promoted Bill Pearce. We brought in Harry MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


8            So, part of those inspections is in the annular 9    space. That's about a four foot wide space outside the 10    steel liner, but inside of the concrete, the external 11     concrete structure. We'll be building scaffolding and 12     doing hand-over-hand reviews of the structural integrity, 13     as well as put together some additional ultrasonic tests to 14     make sure we meet the minimum wall requirements for 15     pressure retention. That will extend all the way to the 16     top of the vessel.
84 1 Light, an executive from the Institute of Nuclear Power 2 Operations to be our Executive Officer of Engineering. We 3 need that time to make those strong implement changes.
17                      MR. GROBE:             Okay. And, are 18    you doing similar inspections on the inside of the
4      We brought in a new group of executives from the 5 industry to provide us as a management team with some 6 insight on the types of problems we might be encountering.
7 And they gave us a tremendous amount of insight. Several 8 VPs from several top notch utilities came in.
9      I was personally moved to the Davis-Besse Plant, so 10  we could ensure that we had plans and organization to 11 return Davis-Besse back to service in a safe and reliable 12 manner. And I plan to devote a significant amount of my 13 time until I feel confident that our performance would be 14 sustainable.
15       I chartered the Root Cause Team to look at the 16 management issues. Steve Loehlein will now discuss with 17  you the methodology weve gone through.
18              MR. LOEHLEIN:           Thank you, Lew.
19      Lew mentioned to you the AITs report and our own 20  technical cause report talked about degradation of the head 21  over the years. What were doing now, is caused now, is 22  looking at the why; why this happened over a period of 23  years, that this was not identified and dealt with.
24      I would like to say first to you, Jack, this team 25  that we have working on this particular issue really MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


19    containment?
85 1 understands how important the answer to this problem 2 statement is, because we know we can assure that the right 3 solutions are pursued so the plant will be able to sustain 4 safe performance.
20                      MR. FAST:              Yes, we are.
5      Now, Lew mentioned earlier some of the assessments 6 have already been done by various industry leaders. And 7 they do provide a lot of understanding to many of the 8 performance shortcomings. What were really doing in this 9 process is assuring that were digging down.
21                      MR. GROBE:              What sort of 22    inspections are you planning, for lack of a better phrase, 23    for the subterranean section of the vessel?
10      Our objective is to compliment the effort that has 11  been taken on so far by applying the rigorous root cause 12  analysis technique, and that will ensure that theyre more 13  subtle nonetheless very important causes for this upcoming 14  overall project.
24                      MR. POWERS:            I'll handle that 25    one. We did inspections on the inside where there was a                       MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 33          1    gap identified between the concrete at the base of this            2    containment thermos bottle Randy described. Concrete was 3    originally poured at the base on the inside and interfaced 4    right up against the steel vessel structure.
15      Next slide.
5            With time that concrete has shrunk a bit and there 6    is a narrow gap formed there, and there was concern about 7    whether water could have gotten down into that gap. So, we 8    went in and we did stick feeler gauges down to as much as
16      We have our Root Cause Team in the front row. I 17  would like to ask them to stand. Its a group, Ill tell 18  you who they are. We have from our Perry Plant, we have 19  Mario Destafano and Bill Babiak. In our Quality Assurance 20  Organization there, we have Bill Mugge, Bobby Vallines and 21  Joe Sturdavant, who are all Davis-Besse men.
22      We have a couple of experts from Conger and Elsea, 23  Lesley Wildfong and Dick Smith. Now Conger and Elsea is 24  the company that developed the Root Cause Analysis 25  Technique that were using to develop about 20 years ago.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


9    42 inches into that gap and found no moisture.
86 1 Its been used on a lot of very significant investigations, 2 including the challenge.
10            So, that was positive result from those initial 11    tests, and we're going to continue further to characterize 12    all the way down to the bottom areas what the situation is, 13    whether there is any moisture down there, and characterize 14    what the wall thickness is and integrity at the lower 15    elevations.
3      Final member we have here is Doctor Spyros 4 Traiforos, who was with us for many months also. We use 5 his analysis technique.
16                      MR. GROBE:             Okay.
6      Now, the team -- oh, Im sorry, I missed my own, my 7 comrade from Beaver Valley is Randy Rossomme. You forget 8 our own. Randy is from Beaver Valley in our Quality 9 Assurance.
17                      MR. FAST:               Just to try to 18     clarify the ultrasonic tests that we've done so far. In 19     the area adjacent, in the lower elevation of containment 20     where Mel identified the small annular space where the 21     concrete had shrunk and there is some gap between the 22     concrete and steel liner, where Jim just identified we dip 23    sticked. On the exterior side, there is a section about a 24     couple, three feet on the outside where there is no 25     concrete; and we were able from the annular space to do                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 34          1    ultrasonic testing to be sure we had full integrity.            2            That would tell us if there were degradation in 3    areas that could not be seen by the naked eye, that you 4    would be able to tell we had full depth and integrity on
10      And myself, Im also with Beaver Valley. I was 11  Technical Lead. My title at Beaver Valley is Principal 12  Nuclear Consultant.
13              MR. GROBE:           Steve, if you 14  could get those names to our stenographer, Im sure that 15  would help her.
16              MR. LOEHLEIN:         Im sure they can, 17  some of those arent easy to spell.
18       Its a balanced team. What were looking for, a 19 continuity for Technical Root Cause, which is one of the 20 main reasons Im on the team. We have process expertise 21 from outside consultants. We brought in the objectivity of 22 off-site personnel.
23      Then, we wanted to make sure we included the 24 ownership factor of on-site personnel. There are people 25 that need to be a part of this team, carry the message MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


5     the steel liner.
87 1 forward to the rest of the team, if you want quality by 2 example. People that really know firsthand, understand 3 what we found, what it means to the organization. More or 4 less be disciples to the rest of the organization.
6                      MR. GROBE:              Okay.
5     Now, not members of the team, but also helping us 6 are some oversight folks for us. We had Tony Maschari, who 7 has worked with nuclear power, excellent in human 8 performance. Hes not been down to the site. I believe he 9 plans to be down sometime in the future.
7                      MR. FAST:              The other areas 8    that we've incorporated as part of our Containment Health 9    Environmental Qualification is we're concerned about such
10      Leonard Rone, an organizational effectiveness expert 11  that met last week with us, and hes providing us with 12  insights as well.
13      Next slide.
14      We have a few photos here. We dont have all the 15  team members in the upper photo, what we have in the room 16  at this time. Here you see us working on a discussion 17  topic. Thats Lesley standing there, Im sure making a 18  point about the process.
19      This is approach. Again, Lew mentioned earlier the 20  Technical Root Cause results. The Technical Root Cause 21  pointed us in a couple of specific directions. One is the 22  errors in the decision-making occurred over a lengthy 23  period. We saw that there were opportunities to do various 24  things over about ten years that were missed. And that has 25  caused us to recognize that the timeline is also therefore MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


10     things as electrical equipment, such as air operated or 11     motor operated valves. We'll be going through a 12    comprehensive review of that equipment and other 13     environmental qualified, to ensure that the conditions in  
88 1 lengthening that we need to consider.
2      The other thing that was important on a Technical 3 Root Cause was we had other plant indications that have 4  allowed earlier detection on a problem. These were not 5 properly understood or acted upon.
6      So, from those key understandings were 7 investigating four major areas. One is the head itself.
8 Focus there to why wasnt the significance of the boric 9 acid buildup on the head recognized.
10       The next item there is pressurizer spray valve.
11 For any of you that read the Technical Root Cause 12  Investigation, there was an issue with boric acid pressure, 13 on the pressurizer spray valve in 1998 for which the plant 14  took a number of significant actions to try to gain 15  an understanding of the site focus, and guard for boric 16  acid. Yet somehow the effectiveness of the actions taken 17  there were not accurate to ensure that we identified the 18  problem on the head in the 2000 time frame.
19        We wish we had an opportunity at the time we were 20  reviewing that to regard that as significant issue to look 21  into.
22        The third one is the condition of the Containment 23  Air Coolers. The question asked was why wasnt the 24  significance of the increasing frequency and cleaning of 25  these coolers recognized.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


14    containment, that all of that equipment is operated in or 15    as fine a condition within its design requirements.
89 1        And the last major one listed there is similar.
16            One of the areas that we're focusing on, this is 17    really an industry lesson learned is the containment sump; 18    and we're looking from a design perspective at ensuring 19    that the emergency sump is intact and that it meets 20    requirements. As a matter of fact, our vision of success 21    is to improve margin.
2 Its the Radiation Monitor Filters, also the Technical Root 3 Cause of the monitors filters for them, were developing 4 clogging, boric acid, iron oxide; and why wasnt the 5 significance of that, that happening recognized.
22            We think there is opportunities to actually extend 23    and improve the isolation from around the containment 24     emergency sump. So, we have a team in place that will be 25     looking at that as well. Looking at, where we're moving                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 35          1    fibrous insulation, we could impact clogging that sump.            2    So, that will be removed from containment. We will have
6        Next slide, please.
7        Were using an in-depth approach on this, does take 8 some time, developing event and causal factors chart, and 9 well see a piece of that on the overhead here. Were also 10  using a hazard barrier target analysis technique in 11  conjunction with that.
12        The analysis process that were using is referred to 13  as MORT. It stands for Management Oversight and Risk Tree 14  Technique. That has a number of sections; one on the right 15  side of the tree analysis chart thats designated as 16  Management Time Issues.
17        Weve identified five key sections of that MORT 18  style analysis that we think are relevant here. One is 19  Technical Information Systems that are listed there. One, 20  Ill speak to for this.
21        I know the NRC, many of you are probably familiar at 22  NRC, used MORT yourself quite often over the years, many of 23  your trainings referring to it. But for those of you who 24 are unfamiliar with it, if I were to pick one of these out, 25 so management support oversight people understand why this MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


3    all metal insulation.
90 1 tree concept works.
4            The other things that we're looking at is, the Decay 5    Heat Valve Pit, which is, I'm going to call it a legacy 6     issue. There are two motor operated valves, which are 7     located in a pit adjacent to the emergency sump. And we 8     have traditionally sealed those plates and done a pressure 9     test, what we call a drop test, to ensure in a design basis 10     condition those valves are not environmentally qualified, 11     so we have to keep them from the flooded conditions when it 12    exists. And we've traditionally gone in and sealed those 13    and verified their integrity from this drop test.
2      If you look at managements role, this process 3 per se, management has three primary branches in our 4 obligations. One is to set policy or establish standards.
14            But that's not a standard that we continue to 15     operate to. So, we have a design team looking at that and 16    we have several options under evaluation, which would 17    include extending the operators outside of the flooded 18    region, putting valves outside of containment, or 19     qualifying operators that could operate under the harsh 20    environments that would exist on design basis access.
5 The next would be their responsibility to implement those 6 standards. And then the third major branch would be the 7 concept of managing risks.
21            So, all of those are being evaluated and again, our 22    intent is to improve our margin of safety in this area.   
8     Now, if you took that concept of managing risks and 9 looked at its branches, and set three branches to that, 10 would be information systems. How does management get 11 information it needs to understand what the risks are.
12      Then there is a process that evaluates called hazard 13  analysis. Now, thats the process you have in place to 14  make sure whatever happens out there youre evaluating 15 correctly, so it can be understood.
16      And the third branch to that particular process is 17  program monitoring, that the programs you have in place 18  inform you and analyze the risks are effective in doing 19 that for you.
20      So, its a very detailed analysis technique, which 21  is designed to see exactly where in these processes the 22  errors occur. As we get down through the conclusions of 23 them, well develop recommendations for consideration.
24      Next slide.
25      I cant see it very well, but from the copy I have MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


23            Containment air coolers.
91 1 here, that upper left-hand photo shows really the cause 2 factors chart going down the lefthand side. What it shows 3 there is the information we collected for 1997 up to the 4 present.
24                      MR. GROBE:              Tony is clearing 25    his throat. I wanted to make sure.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 36          1                      MR. MENDIOLA:          I did have a 2     question.
5       We do have data points that go all the way back to 6 the early 80s, but thats because thats when the first 7 industry information came out regarding boric acid and how 8 it may affect the fasteners. So, we dont have a lot of 9 data that far back, but were being thorough in going down 10  all the trails in relating to these issues and sections 11 that were investigating.
3                     MR. GROBE:              Okay. Go ahead.
12        So far, we have information from 69 interviews, and 13  well over 300 documents that are supplying the information 14  for this. The second photo shows, giving us a little tour 15 of the work chart.
4                      MR. MENDIOLA:          I want to retreat 5     a second. Going back to the liner for a second. Two 6     questions I have.
16       Next slide.
7                      MR. FAST:              Yes.
17        As Lew mentioned earlier, we have from the 18  information we have, the understanding we have been able to 19 work with, at least, weve talked to Lew about other 20 management team, these management attributes, management 21 oversight-type things, been at the site. I pointed out a 22 lot of things, but weve also seen management attribute 23 factors that represent things that the site can work on in 24 terms of prebaseline proper standards and staff. And these 25 are the insights we have clearly from our data.
8                      MR. MENDIOLA:          When you mentioned 9    that you evaluated the inside gap between, I guess, the 10    concrete and the inside of the liner, going down with a 11     feeler gauge and you found no moisture, but is there any 12    plans on sealing that gap or, or leaving the gap as found?
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
13                      MR. POWERS:            We're still in 14    evaluation on that one, Tony. We're working on an overall 15     plan about surveiling the lower elevations even below that 16     gap area and restoring that as necessary. So, it's a 17    detail we haven't finalized yet, but it's part of our 18    evaluation.
19                     MR. MENDIOLA:          Okay. Then 20     similarly, is there a similar gap on the outside of the 21     liner, something like that's on the inside.
22                     MR. POWERS:            On the outside, 23     there is ground water that has seeped through the 24     concrete. It's not unusual for this to happen with any 25     type of concrete, has small cracks in it. And what Randy                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 37          1    described earlier with surveiling the outside, yes, there            2    is, there is an area or space where water can migrate


3     alongside of the liner.
92 1      As we mentioned earlier, we have had standards and 2 for years have lacked rigor. That strong management and 3 leadership has been able to have the right things happen, 4 and performance of the plant has been good in those 5 periods. There has been lack of management oversight that 6 resulted in lax rigor in process implementation, and the 7 questioning attitude in some cases is not evident as well.
4            In fact, in the past, originally we did 5    modifications in that area injecting the ground to work on 6    sealing that, sealing that gap. And then we're going to be 7    evaluating that as part of the overall integrity assessment 8    of the vessel; that's going to be included.
8      So, the actual work analysis is continuing. Its 9 pretty short timeframe, but were working right along. I 10  cant take too long on getting certain things done. It 11  doesnt work that way, but for now these are our insights.
9                      MR. MENDIOLA:           Okay, thank you.
12      Lew, Ill go back to you.
10                      MR. GROBE:              Just feel free to 11    clear your throat at any time.   
13              MR. MYERS:           Thank you.
14              MR. GROBE:           Before we go on, 15  we have a few questions.
16      Christine.
17             MS. LIPA:          An obvious 18  question, and Im sure there is no answer yet, you know, 19  the timeline for when youre going to start putting some 20  actions into place, because that will be important that we 21  decide how to do our inspections on those various tasks.
22  Whats your estimate at this point?
23              MR. LOEHLEIN:          What were doing 24  right now, thats why were working so close with Lew. So 25 much what were doing now is, represents what we call MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


12            I had just a couple of questions. Some of these 13    activities appear to be directly related to the boric acid 14    issue. Some of these activities appear to be unrelated.
93 1 baseline proper standards, plus information out there on 2 the performance, can be measured as seen by, in forming 3 plans.
15           You mentioned that the containment emergency sump, 16     there have been questions in operating experience from 17     other plants as well as you yourself have identified the 18    decay heat valve pit as something that you want to look
4      We need to do these conclusions and see what sort of 5 adjustments we have to make to those plans for any other 6 results we may conclude.
7            MR. MYERS:            I think the report 8 will be this month.
9            MR. LOEHLEIN:            Were expecting 10  it. Again, root cause, iron clad prediction on when were 11  to be done, but were expecting to be done with our 12  analysis and conclusions at the end of the month, and 13  thats where we are.
14              MS. LIPA:          You plan to submit 15 that to us?
16             MR. MYERS:            Yes.
17             MR. DEAN:            Lew, this 18  question is not for you, but Steve. Clearly, you can take 19  some preliminary insights, and Im sure they jive pretty 20  well, you know, even with what we do; conclusions you come 21  to just by seeing what transpired and how you get where 22  youve got.
23      Are there actions being taken now in terms of 24  rebaseline proper standards, but the things that we talked 25  about earlier, your revamped management team in terms of MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


19    at.
94 1 driving those sort of standards and expectations down?
20            Why weren't these issues identified and corrected 21    earlier?  Why are they being identified and corrected now?
2              MR. MYERS:             Yes, they are.
22                      MR. BERGENDAHL:             Let me take a 23    shot at that. As we're going to discuss later, the 24    management issues, according to one of the things we're 25    looking at is the standards of the oversight and ownership                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 38          1    of the power plant and programs. And as part of our new            2    initiatives to raise the standards and clarify that we're 3    meeting requirements is not our standard. Our standard is 4    to exceed and do things the best.
3 Im going to talk about some of those in closing remarks.
5            The fresh outlook has exposed some areas where we 6    have performed to meet requirements, and that's it. So, 7    although that pit may have met the requirements, it doesn't 8    meet our new standards of robust safety way.
4 As you said, weve made management changes, restructured 5 some, brought in people already, created some additional 6 oversight and a few positions; myself and Gary, and Bill 7 Pearce. So, we are taking actions as we move forward.
9                      MR. MYERS:             I've been on the 10    Davis-Besse Oversight Review Board Meetings several times 11     over the years. We've been looking at those two issues and 12     they're not new issues to us. So, while we're in this 13     extended outage, why not go and take them up. Perfect 14     opportunity to do that. That's what we're going to do.
8 Were very conscious about the actions were taking not 9 being negative actions, you know. So, yes.
15    And it will give us an opportunity to gain knowledge.
10                MR. GROBE:             I have to say, Im 11 still frustrated in this area. I have a great deal of 12 confidence that once you apply yourselves, the technical 13 problems and the systems area and reactor head and 14 containment setup condition and all those things, that you 15  can do that work well, but safe restart, and more 16  importantly, safe operations after restart on a continuing 17  basis, is key in this area.
16                      MR. GROBE:              Okay.
18        And, these preliminary insights, while I know that 19  you have more data to support them, these insights today, 20  we could have probably sat down a week after the discovery 21  of the cavity and come up with these issues.
17                      MR. FAST:              Next item, our 18    containment air coolers, and we're going through complete 19    remediation. This is another example where our intention 20    is to improve margin.
22         And like I said, Steve, I know you have a lot more 23  data to support these issues and will be developing further 24 insights, but this is the key in my mind, to long term 25 improvement of the plant. And its also the key to MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
21            We've investigated the opportunity to get some 22     coolers of higher efficiency, better thermoconductivity and 23    we'll be doing a complete remediation of those containment 24     air coolers. So, they will be brought up to better than as 25     new condition; all three of those containment air coolers.                         MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 39          1    That's the comprehensive plan. We'll actually start the            2    disassembling of those coolers next week.
3                      MR. MYERS:              Where are those?
4                      MR. FAST:              Those are the 5    original coolers that were installed at the plant. It's 6    like a radiator in your car, the way I would describe it 7    for the public, obviously. And it has deteriorated over


8    time.
95 1 restart, along with all of the mechanical processes that 2 youre going through the systems.
9            It's a normal phenomenon for equipment and it's time 10    now to go in and replace it and renew it and bring it up to 11     standards. And in this case, we can gain, because of 12    improvements in technology over the years, should have an 13    opportunity to actually improve their thermo performance.
3      Christine asked a question, and maybe Im just 4 asking the same question again. When are we going to have 5 a clear understanding of specific actions; what your 6 expectations are as a result of those actions, what your, 7 how youre going to measure progress in those areas, what 8 performance indicators youre going to use on how 9 performance in these areas are changing?
14                      MR. DEAN:               Randy, are you 15    talking about replacing them or just refurbishing them by
10      Before you answer that, let me just add one more, 11 one more thought. Some of these issues deal with 12  management, some of them deal with staff. Clearly, youve 13  made a substantial change in your leadership team, your 14  senior leadership team, but day in and day out every 15  individual in the plant has to be a leader for excellence.
16      And, the first level of oversight doesnt come from 17  management. It comes from first line supervisor, 18  maintenance foreman, the field operator is overseeing 19  implementation work by other operators. I dont see 20  anything in here regarding that level. Could you speak to 21  those issues a little bit?
22              MR. MYERS:             Yes. Let me go 23  through my closing remarks a little bit. I think that will 24  answer these questions.
25      I think weve demonstrated today that our Building MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


16    replacing the tubes or innards?
96 1 Blocks have moved from the planning, discovery and into the 2 implementation phase in many areas. Okay.
17                     MR. FAST:              Primarily, the  
3      We have taken strong actions to incorporate the 4 comments from our Restart Overview Panel, the meetings we 5 have had with the NRC and the comments weve heard since 6 the last meeting.
7      We are taking management actions that are 8 substantial and demonstrative.
9      Let me explain that. As I said, we created a new 10  position of Chief Operating Officer, so that we would have 11  more day-in day-out involvement in making sure standards 12  between our staffs are fine.
13      Let me give you an example. At our other two 14  plants, were running the same process in corrective 15  action. And when we ask for operability determination, 16  inoperability determination; at Davis-Besse it was 17 inoperability justification.
18      That minor difference sent the wrong message. We 19  created the executive, the position of Executive Vice 20  President in Gary Leidich. And then we created VP of 21  Oversight. Those were all pretty substantial changes at 22  the senior level. New senior management team, and a strong 23  management team is now present with, every day at our 24  Davis-Besse Plant with proven leadership. And weve 25  clearly shown that, when we have the strong leadership at MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


18    design of the containment air cooler is a series of heat 19    exchangers. And those heat exchangers were replaceable 20    individually as a maintenance function. However, over the 21    years they degrade, so we're going to be replacing probably 22    90 plus percent of those coolers. I'm trying to think how 23    many coolers there actually are, but there are a few that 24    have been replaced recently as part of the normal 25    maintenance process, the old coolers were galvanized                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 40          1    steel. The newer ones are stainless steel. They have            2    improved in design and improved thermoconductivity.
97 1 the plant thats involved with everyday activities, that 2 the performance of the plant is efficient.
3            So, effectively when you look at it now, there are 4    other elements of the containment air coolers. We did 5    receive notification of motor problems and we have two 6    brand new motors, two of the three will receive brand new 7    motors and as well the register, the duct work have been 8    completely reworked and will be remediated to, to as-new 9    condition, so principally, that heat exchange will be  
3        Weve brought Mike Ross in, just at the end of the 4 table, to focus on the operations area. Weve already 5 chartered mine. We evaluate attributes of every operator 6 at our station, until we have the right attributes for each 7 position; from nonlicensed operator, to the licensed 8 operator, to the, to the control advisors, hes charting 9 that activity.
10        Were providing a case study with all of our 11  employees that sets expectation that change of ownership 12  and standards need to be made. Were sitting down with 13 your boards and spending a lot of time in that effort. We 14  will be going back and evaluating each of our employees to 15  our standards. Were rebaselining our standards; do we 16  have the right standards.
17        Ive seen some cases where I thought some of the 18  leadership action standards, if you will, that weve had in 19  place, have deteriorated. Were going to rebaseline those 20  standards. And they will clearly learn, monitor and 21  reinforce those standards at supervisor and manager 22  levels to make sure they understand and they can comply.
23  Its that simple.
24        Weve created a new engineering standards of 25  excellence already. That will be a model for each of our MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


10    replaced.
98 1 groups. We created a new Engineering Assessment Board. We 2 intend to use that board, its in their charter to provide 3 you the input you need to know about the quality of the 4 work. And, well continue to do that in other areas.
11                      MR. GROBE:              Okay. So, this 12     wasn't necessarily an artifact of the boric acid situation, 13    this was just an aging, normal aging, equipment aging?
5      The Plant Manager, Randy Fast, is now chairing our 6 Corrective Action Review Board. In my mind, this is the 7 most important program at our plant. And I intend to have 8 Randy provide me detailed performance indicators on the, on 9 the thoroughness of corrective action from that board.
14                      MR. FAST:              Well, there are 15    really two factors, Jack. First is the aging, the normal
10      How many comments do they have to make for our 11  standards and how many outages have they checked. But 12 Randy is going to charter that board. Thats not short 13  term. I consider that permanent.
14      The new operations of leadership to ensure the plant 15  operational focus is absolutely necessary. It was missing 16  in this, this whole issue over the years. It was ours.
17  And if you look, we brought in Mike Ross, and we chartered 18  him to provide us indications that we have the right 19  performance modeling tools in assessing the office of the 20  organization. Thats his charge.
21      We need, have to build teamwork between our 22  managers, supervisors, and line workers. If we cant get 23  that done, then we probably wont be ready to restart; not 24  ever for restart. So, we have to be all on the same page.
25      At our next meetings, we intend to provide you MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


16    aging process of equipment, but the other is, that through 17     the trailing of boric acid, those would collect on the 18    fins and those have been cleaned numerous times by our  
99 1 performance indicators on how each one of these actions are 2 taking place. Whats the effects. What are we seeing from 3 the Corrective Action Program, Engineering Assessment 4 Board, and what are we seeing out of the Oversight Review 5 Boards that we put in place, some on a temporary basis.
6      But we consider Engineering Overview Board a 7 permanent fixture. I dont see those ever going away. Who 8 continue to be committed to comprehensive approach to 9 ensure the Davis-Besse Plant is safe and reliable, and once 10  again, we will make sure that we will have sustainable 11  performance. We want to let you know that.
12      Thats what I have to say.
13              MR. GROBE:              Okay. Any 14  questions?
15      Okay. Before we go on to the next session of the 16  agenda, which is discussing the framework for restart 17 checklist, I think its appropriate for a couple comments 18  right now.
19      This has been a very comprehensive presentation on 20  the status of a variety of activities. I think over the 21  past month weve seen a substantive change in the focus and 22  scope on a number of the activities. And thats been the 23  result of your assessments of what youre doing and how 24  youre going to accomplish it. Its been the result of 25  some input from our staff, as well as some input from MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


19     staff, that did take their toll, the boric acid that
100 1 outside influences. And, I think thats very healthy.
2      The area as I mentioned a moment ago; many of these 3 activities in the management performance area were clearly 4 future tense activities. Im eager to get into some more 5 detail in this area, to understand specifics of what these 6 activities look like, how you measuring them, what your 7 expected outcomes are on specific activities, and what your 8 personal restart criteria are going to be in these areas.
9 And, I think this is very important.
10        At this time, John?
11        Hes good. Lets move on.
12        I wanted to provide framework, clearly comprehensive 13  framework for the NRC Restart Checklist. Obviously, youve 14  got your, one of your Building Blocks here at your restart 15  plan, specific criteria for whatever items that need to be 16  resolved from restart, whatever items that possibly can be 17  deferred until restart. I suspect before youre done, you 18  already have a, many hundreds of items identified that 19 youre going to screen, and probably several hundreds that 20  youve probably already identified that are a result of 21  restart.
22        Our research in this has to be much simpler. And 23  its going to have a framework that covers a number of 24  areas. Obviously, we have to see root cause, is very 25  important. The adequacy of structured systems and MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


20    collected on the, on those cooling fins could be cleaned.
101 1 components hardware in the plant. Weve added some 2 programs.
21     But, that repetitive action did degrade the equipment.
3      This is, our restart checklist is to a large extent 4 going to mirror your restart plan. Adequacy of 5 organizational effectiveness in performance.
22                      MR. GROBE:              It sounds like
6      As I mentioned a few moments ago. I personally 7  strongly believe that the first line supervisor is the key 8  to the long term exceptional performance. And this is 9 written a little bit different than what yours is, 10  management effective. Weve structured this more I think 11  broadly organizational factors. And, sub items were going 12  to get into in a little detail.
13      Readiness for restart, what were going to be 14  looking at in several areas, both the hardware as well as 15  the people, and licensing issues. And, as this restart 16  checklist involves, and Im going to talk about a couple of 17  these sections in more detail; Christine is going to talk 18  about one or two; Bill is going to be talking about one of 19  the sections.
20      But as the checklist gets formulated, and is issued 21 by the NRC, its important that we have a clear 22  understanding of the specific items. And I think as youve 23  gone through your structuring and restart plan, you can 24  find a very close alignment. We can provide you with a lot 25  of feedback. And I think its going to naturally meld MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


23    modification, not replacement for the component limit.
102 1 together, because the issues that are important to us, 2 weve been identifying the issues that youve identified or 3 reports have been good.
24    Will there be a substantive test program, heat transfer 25    testing program, following the replacement?                            MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 41          1                      MR. FAST:              One of the things            2    we're not going into a lot of detail today is restart, post 3    restart test plan, but all modifications for the plant will 4    undergo an extensive testing prior to restart of the plant.
4      So, I expect there will be a clear alignment. One 5 of the purposes of publishing the restart checklist. There 6 is actually two purposes. One is a very clear 7 communication between us of what the expectations are. I 8 would say minimum expectations on prior to restart. We 9 would like to go far beyond these specific activities in a 10 number of areas. And secondly, to clearly indicate to the 11  public what the NRC expectations are prior to restart.
5    So, that is, when you look at the chart or for the Restart 6    and Post-Restart Test Plan, that comprehensive test or plan 7    extends beyond the reactor coolant system and all the 8    support systems, and in this case that would be tested 9    extensively.
12        Let me talk a little about bit root cause. Weve 13  received documents from you regarding what Ill call 14  technical recalls. And Steve, you mentioned that earlier.
10                     MR. MYERS:              Jack, you asked 11    the question, one of the things we can tell you, we could 12    probably go out and clean these coolers up, work on them 13    and meet the minimum requirements. We have, we have an 14    opportunity to replacement and gain on the margin, so 15    that's what we're going to do.
15  It was called something different. I think it was actually 16  called root cause analysis, but didnt go into the level of 17  detail that Steves team is using today, more to his 18  industry recognized processes at this point, which many of 19  our staff do.
16                      MR. GROBE:              Okay.
20        Its very solid approach to identifying all the 21 organizational factors in the problem, so Im certainly 22  looking forward to that. The technical response is 23 specifically focused in two areas, thats cracking, 24 penetration, corrosion, what caused that, what contributed 25 to it. That was presented, I believe, on May 7th at MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
17                      MR. FAST:              Okay, there were 18    questions as we met last time about our inspections for 19    systems that contained borated water outside of the 20    containment. We talked about that, and said, where do we 21     want to do those reviews to ensure that we have a good 22    comprehensive review of systems outside of containment.
23           I mentioned here that we did roll that into our 24     System Health Assurance Plan to insure that any systems 25     that contain borated water are thoroughly evaluated for                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 42          1    their functional requirements and design capability. So,            2    it's not part of the Containment Health Plan, however that 3    element has been rolled into the System Health Assurance


4     Plan.
103 1 headquarters, public meeting to the NRC staff and other 2 folks. I think thats very well understood and we were 3 completing our evaluation of that part of the root cause 4 and that would be published and when we complete our 5 review, we will provide that to you.
5           Since we met last, we have gone through a review of 6    our Inspector Training Program, and we actually saw 7     opportunities to improve. As we had talked previously 8     about inspection criteria, inspection requirements, we went 9    back and used our systematic approach to training to 10     review, to insure that our engineers were qualified to the  
6      The second area of the reconnaissance, what I refer 7 to as the software side, thats the organizational 8 programmatic and people, and obviously, you havent had 9 your review yet, so we havent performed our formal review 10 of the facility; and well be doing that.
11      Christine, I think, has some scope of the advocates 12  of the systems out, to go over there.
13                MS. LIPA:          Sure, let me just 14  talk a little bit in general about the checklist we have.
15  I dont know if you guys got a copy of it. It was in our 16  handouts and we cant see the projector.
17      But this is, were calling this a framework for the 18  checklist. This is not the checklist. And the panel is 19  working to develop the checklist based on some of the 20  things Jack referred to in root cause, AIT Inspection 21  results and other items.
22      Then, once the checklist is developed and approved 23  by the panel, it would be reviewed and approved by agents 24  and management. So, this is the framework for today.
25  Well get you a handout.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


11    right standards for the inspections that had been done.
104 1      The first item that I have on here, 2 A, is the 2 Reactor Pressure Vessel Head Replacement. John gave you 3 some details earlier on some of the inspections that have 4 already been started. The inspections will continue.
12           We saw opportunities to improve it by using the 13     systematic approach to training. Did incorporate it then, 14    lessons learned and being able to then apply inspection 15     techniques to civil, structural, electrical, mechanical and 16    our Alloy 600 reviews.
5      The second item is Containment Vessel Restoration 6 Following The RPV Head Replacement and obviously opening 7 the containment and reclosing and testing as part of that 8 inspection that well be doing.
17            So, subsequently, we revamped our training program 18    for our engineers, and we have trained them. We have job 19    familiarization guides that are implemented and we are in
9      The third one are Structures, Systems and Components 10  Inside Containment; and its really similar to the 11  presentation you gave earlier. The things that were 12 interested in are some of the things youre interested in.
13 What damage might have been done to various components 14  within the containment head as a result of the boric acid.
15       That includes equipment, electrical equipment, 16  mechanical equipment, environmental qualification for some 17  of that equipment, the containment air coolers and the 18  radiation monitors. Well also be taking look at the 19  monitor plan on the sump and fibrous insulation issue.
20      And then the final supplement in this area, our 21  Systems Outside Containment. Specifically systems that 22  contain borated water and also some of your important 23  systems determined by your managerial criteria.
24      Thats how we intend to approach this area.
25      Jack?
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


20    the process of reestablishing our baseline inspections and 21     verifying inspections that were done previously were, would 22     meet our standards of excellence.
105 1              MR. GROBE:              I just wanted to 2 comment. These are broad categories. When we describe as 3 framework; specific inspection, the scope of inspection in 4 each of these areas will be different. They will be 5 dependent upon the root causes of what resulted in the head 6 degradation issue at Davis-Besse.
23            We'll be detailing any differences between the
7      The reason we havent presented this checklist 8 earlier is that I didnt want to be in a position to find 9 what was necessary. Youve been working through a number 10  of these areas. Youve evolved over the last month, month 11  and a half, and I want to be sure there was, you had a 12  clear vision of what you thought was important.
13      Weve provided feedback already in a number of these 14  areas. Also done a variety of inspection activities; Mel 15  Holmberg on the structure systems and components; John and, 16  Don Jones have done a number of inspections regarding 17  vessel head replacement in the area, nondestructive 18  examination; and weve already laid out the inspection plan 19  for the, what were planning on looking at with respect to 20  the, the code records for the necessary vessel head.
21       Shortly after we finalized this checklist, which I 22 expect in the next week or two, well be finalizing our 23  inspection plans, and get that schedule to you as well as 24  some detail on the scope of the inspection.
25      Schedule obviously is dictated by you. We cant MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


24    initial inspections and the subsequent inspections. And 25    using condition reports to identify those differences, and                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 43          1    they'll go into the engineering evaluation process.            2                      MR. GROBE:              I think I have two 3     things there I want to make sure I understand it. I think 4     I hear that you're going to reperform inspections and if 5     you identify any deficiencies, those deficiencies will go 6     into corrective action guidelines, condition reports, but 7     in addition, I think I heard you say that when you identify 8     deficiencies between your first inspection and the 9    reinspection for the improved training that you're going to 10    identify that difference as something to learn from, from 11    the standpoint of the systematic approach to training. Is
106 1 inspect anything until youve completed work. And, we may 2 be able to do some, or some inspections have to be done in 3 process. For example, nondestructive examination 4 inspection had to be done in process and thats already 5 been completed.
6     So, as we begin to develop the inspection scopes at 7 least, we will be clearly communicating that to you. The 8 leaders in each of these areas will be working closely with 9 your staff. I understand your schedule and my staffs, 10  watch the progress in those areas and be able to step in 11  and do our inspection at the appropriate times.
12      I think Bill was next going to talk about 13  problematic areas.
14              MR. DEAN:              Very briefly. I 15  think it would probably seem a pretty good matchup here in 16  terms of programs that were interested in looking at are 17  relative to the ones that you identified yourself here 18  today. Clearly, the basis of looking at these is that we 19  need to assure ourselves that the Licensee are assessing 20  your programs and they are in a self-critical manner; and 21  putting in place effective corrective actions which would 22  ensure those programs are effective in the future.
23      You will participate in assessment of the accuracy 24  of some of the programs. The one there that is a bit of a 25  delta is items received as audit and self-assessment MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


12    that, help me understand?
107 1 programs. And our intent there is that, we believe that we 2 can look at organizationally how do you put in place, say, 3 a process by which you have independent and organization 4 itself critical process, and that the results that emanated 5 from that process are treated appropriately.
13                      MR. FAST:              We want to make 14    sure that we understand that the inspections that were 15    done, we want to see what differences there are. We see 16    improvements in the training. In fact, the previous 17    training program, we brought some industry experts in and 18    tested them, and we identified shortfalls with even 19    industry experts in their understanding and knowledge of 20    inspection techniques. So, we've incorporated that.
6      So, thats one thats a bit of a delta that you have 7 to provide us here today.
21            We think we have an excellent training program. And 22    we expect to see that through this reinspection, there will 23     be some differences. And what we want to do is document 24    those differences. Now, if we saw something that were 25     generic in nature, we want to certainly apply that across                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 44          1    the board, but we will be documenting many of those            2    differences and doing evaluation and inspection.
8              MR. GROBE:              Thanks. I think 9 thats a real good point. We view corrective action 10  program, an operating experience program, a self-assessment 11  program as really part of the corrective action program; 12  and, to be completely effective, it requires a number of 13  components, and weve separated that out in our checklist.
3                      MR. DEAN:                Randy, you 4    characterized what it was that drove you to revise the
14        Youre taking actions in all of these areas. Its 15  just that you havent specifically defined in your 16  programmatic reviews things quite the same way as we have 17  here.
18        I was going to talk a little bit about 19  organizational effectiveness. This is the area you 20  probably wont get a lot of specificity from our checklist 21  at this point, but there are no NRC requirements in this 22  area. The organizational effectiveness and human 23 performance are actually critical safe operations. The 24  detailed look at this is going to be driven by, to a large 25 extent, by what you choose to do in this area.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


5     field inspection training program?
108 1      The results of this activity, of your effectiveness 2 in this area would be directly reflected in all of the 3 other inspections. And, organizational effectiveness, 4 human performance, will be measured by your performance in 5 all these other areas.
6                     MR. FAST:              Yeah, I'll try to 7     digress a little bit. As we originally identified our 8     extended condition, we were focused on extended condition 9    principally in the area of boric acid degradation through a 10    threat of Alloy 600 components.
6       So, I will be closely monitoring activities, as well 7 as the outcomes of those, as the organization performs 8 during its approach to the restart.
11            We adopted a standard, which was set by the American 12     Society of Mechanical Engineers called a VT-2 Inspection.
9      The next area is Readiness for Restart, and I would 10  expect that the Systems Readiness for Restart is different 11  than your System Reviews. Thats more akin to what you may 12 call a checklist. Its part of the systems in an 13 operational configuration for operations.
13     We applied that VT-2 Inspection. We had some problems, 14     problematic problems in our inspection program. We went 15    back, rebaseline, redeveloped that program. And as we 16    raised standards, we self-identified that there were 17    shortfalls, that although this would be good for credible 18    Alloy 600 Inspections, it did not meet our inspection in
14       Operations Readiness for Restart is an operational 15  organization of people. Operations, are they ready to make 16  the transition from shutdown plant to operating plant. And 17  obviously, test program, a number of activities that are 18  going to be accomplished both prior to restart as well as 19  during restart process, accomplish testing.
20      So, those are the three focus areas or the framework 21  for the restart.
22      Im going to ask Doug Pickett to talk a little about 23  the licensing issues, and Ill wrap it up.
24      Doug.
25              MR. PICKETT:          Okay, regarding the new MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


19    other areas, such as electrical components or other 20    structural components within the containment. So, we took 21     on a more, I would say, full body inspection program with
109 1 reactor vessel head, there is a number of licensing 2 issues. This is where we require approval prior to 3 restart. And all the issues under item 6 are basically 4 documentation issues of paperwork, if you will. They 5 shouldnt require any modifications or plant repairs.
6      The first four items are basically requests from the 7 NRC code. The next are the spec requirements, and they 8  allow us --
9 (Requested speaker to repeat) 10              MR. PICKETT:            The regulations 11  allow the staff to accept alternatives to the ASME Code, 12  providing the staff is convinced there is an equivalent 13  level of safety. Staff makes at times findings on all 14  plants.
15      The item 6e, is documentation of the reconciliation 16  between ASME Code, the new Midland Reactor Pressure Vessel 17  Head.
18      And the final item is additional documentation 19  provided on Verification of Technical Specification 20  Pressure/Temperature Curves for New Vesssel Head.
21       And, your staff is aware of these issues, and its 22  my understanding that youre preparing letters for the 23  staffs review, and we should see those shortly.
24              MR. SCHRAUDER:                Thats 25  correct.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


22    better criteria.
110 1              MR. GROBE:                  Okay.
23            Okay, the other thing that we originally, in our 24    original plan had inspection plans that were developed by 25    engineering. We have subsequently rolled all of our                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 45 1    inspection plans into plant procedures.             2            Plant procedures are in hand. Have specific 3     criteria requirements for the entry and exit from those 4    procedures. And so part of our training program as well is 5    on these new procedures and the use of these procedures.
2 Thanks, Doug.
6            As identified the validation of inspections is in 7    progress. As well, we have now a group of independent 8    inspectors that are as well going through, using the same 9    criteria inspection programs that we'll be doing validation
3      I believe that -- well, all of these areas are 4 fluid. Were going to shortly tie down what we believe to 5 be the restart checklist in the NRC perspective.
6      As Christine mentioned a few moments ago, once the 7 panel finalizes what it thinks should be on the restart 8 checklist, that will be by Jim Dyer, Regional Administrator 9 in Region 3 in Chicago, as well as Sam Collins, the 10  Director of the Office of Nuclear Reactor Regulations.
11  And, not until they approve it will we issue it to you and 12  to the public.
13        I wanted to go into some detail today just to give 14  you a scope and framework for what were looking at from 15  the restart checklist perspective.
16        One area that may have the most validity is the 17  Licensing Issues Resolution. There may be other activities 18  that come up that require either substantial safety 19  regulations, or licensing actions as you go through all 20  your system reviews. And certainly licensing actions are 21  something we would have to take a significant safety 22  evaluation, and complex safety evaluations, wed likely 23  take a look at also.
24        So, that area is going to be somewhat fluid as 25  things evolve over the last couple of months. The other MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


10     of our inspected areas.
111 1 areas likewise can also have issues added to them. It 2 depends on the significance of the issue. Were going to 3 be identifying a lot of things. I wouldnt expect many of 4 them to appear on this checklist, but if its something of 5 particularly significance, the checklist would be updated 6 and they would be added to the checklist.
11                     MR. GROBE:             Help me understand 12    the word independent. Independent of what?
7      This is the first time Ive shown this to you. I 8 wanted to get it out on the table and make sure you had a 9 clear understanding and respond to any questions you may 10 have regarding this framework.
13                      MR. FAST:               It's not the same 14    folks we're using principally; our engineers from design
11       Any questions from your side?
12                MR. BERGENDAHL:             Give an example, 13  like something that is systems outside containment.
14                MR. GROBE:             Sure. The one 15  specific issue, again restart checklist should be driven 16  from issues that result in the shutdown. So, clearly 17  systems containing boric acid. Water has boric acid in 18  it. I want you to focus for those constant factors.
19        But in addition, many of these areas; the 20  organizational effectiveness on human performance 21  characteristics that were, that resulted in head 22  degradation, may have resulted in other system 23  degradation. And so, were going to have to see in that 24  area also.
25        I cant give you scope of the inspection at this MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


15    engineering and from our performance engineering, plant 16    engineering. These are individuals that we brought into 17    the organization with experience outside of Davis-Besse; 18     and they were trained to our same program and they will be 19    looking independently at the inspections and checking and 20     verifying and validating that we've done a good job on
112 1 point, but I can tell you that we would be scanning a 2 variety of the work that youre doing in the area of your 3 system reviews, as well as some independent work. Areas 4 that you may not have done to benchmark the quality of work 5 that you have completed.
6      So, does that help out?
7            MR. BERGENDAHL:            Yeah, I understand 8 that.
9            MR. GROBE:            Other questions?
10      Okay. Very good.
11      Lew, do you have any concluding remarks before we 12  finish the business portion of the meeting?
13              MR. MYERS:            Well, I thought 14  this was a productive meeting. I think we accomplished our 15  desired items. What I heard was next time we will have 16  Bill Pearce here to talk about oversight; Clark Ross will 17  give us performance indicators and work off curves and what 18 were doing and what were identifying, have that at the 19  next meeting. And finally, on a management issue, focus on 20 the actions were going to take and how were going to, the 21  amount of the effectiveness of the actions. Okay?
22              MR. GROBE:            Sure.
23              MR. MYERS:            Okay.
24              MR. GROBE:            Let me add one or 25  two things to that, just to make sure you have a complete MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


21    those inspections.
113 1 list.
22                      MR. GROBE:              I just want to 23    make sure I understand this. When I think of the different 24    kinds of assessments of work that's done on nuclear plants, 25    which is what I refer to as line assessments; those were                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 46          1    assessments by the organization responsible for conducting            2    the work. And then there is independent assessments that 3    we've recently established, Vice President of Oversight, 4    and that's a second level of independence. What kind of 5    independence are we talking about?
2              MR. MYERS:              Okay.
6                     MR. FAST:               We actually have 7    two pieces of independence. One is our First Energy's 8    quality assessment and that is ongoing. So, our quality 9    organization under Bill Pearce, the Vice President of 10    Quality, has also been training or doing assessments, but 11    we also brought in an external assessment organization.
3              MR. GROBE:              I think we talked 4 about the oversight boards. And, did you mention that, 5 value, theyre adding what their function is?
12    So, we have both internal oversight and external 13    oversight.
6             MR. MYERS:             Right.
14                      MR. GROBE:              Okay. The 15    external oversight reports to the containment health team 16    as part of that team's activities?
7              MR. GROBE:              And also, I would 8 like to hear specifically about some of the more 9 substantive issues that your activities have identified.
17                      MR. POWERS:            That's correct, 18    yes.
10 So, thats more of a specific finding focus discussion.
19                      MR. GROBE:              Yes.
11  So, not only the performance indicators, or how many things 12 that youre finding and how many things youre working on, 13 that sort of thing, but also some specifics on more 14 specific issues.
20                      MR. POWERS:            Containment health 21    organization has a new kind of review and oversight 22    organization, and that's part of our engineering assessment 23    board that we've assembled consisting of outside industry 24    experts, you know, providing oversight of all of our 25    activities.                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 47          1                      MR. GROBE:              Okay.            2                      MR. FAST:              Since we met 3    previously, we made significant progress in containment.
15       And, as we go through and inspect those activities, 16  well also be presenting these meetings on special 17  findings. So, well be discussing results of our 18 inspections.
4    As an example, we have off-loaded all of our nuclear fuels, 5    177 bundles have been transferred to spent fuel pool. This 6    has allowed us now to make the record cool system more 7    available for other inspections.
19      So, I think thats kind of a healthy going-forward 20 spectrum for these meetings. Performance indicators, work 21 progress, specific findings that you have, value added 22  oversight boards, value added from Bill Pearces staff and 23  oversight, and then well give you our feedback as we have 24 from the results of our inspections.
8            We have installed nozzle dams. We are in the 9    process this week. We will refill the cavity. We will 10    reinsert the import thimbles, then drain down, remove the 11    sealing plate, remove the insulation adjacent to the 12     reactor vessel flange, and we'll be doing thorough 13     inspections of the tops of the nozzles adjacent to the 14     reactor vessel itself.
25             MR. MYERS:              You know, I think MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
15           After that is completed, we will also then be able 16    to do cleaning, and as well, we are going to be installing 17    a permanent cavity seal, which is something many plants 18     across the country have been able to install a permanent, 19    it's a stainless steel plate that joins the liner from the 20     cavity to the vessel to insure that there is no leakage 21     path, which is one of the items.
22            If you have a temporary seal, then you have some 23    temporary, some minimal amount of leakage, leak path that 24     comes down the vessel. With the permanent cavity seal, 25     there is no leakage. Subsequently, we have no opportunity                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 48          1    then for any additional degradation under the vessel. So,            2    that is part of our going forward plans.
3            The other things we're doing is we have mobilized a 4    significant number of painters, went through a 5    qualification program. We've got some pictures, some 6    slides here that show. We currently have 20 fully 7    qualified painters, effective in containment right now.
8            If you go in, you'll see these four foot by four 9    foot squares where each painter actually went through a 10    qualification process. That was the in-field exercise to 11    insure that they met standards of excellence for coating.
12    And you can see their names and Social Security numbers on 13    the wall where we did this. And we go back subsequently 14    and test and verify the paint is applied properly.
15            We have an additional 20 painters that are in the 16    pipeline in training, and they'll be reporting to the 17    station to help as well, and with coatings in the 18    containment. And another 14 will come this week.
19            So, we have a significant number of painters, and 20    they'll be painting the entire containment dome, and as 21    well all of the surface areas from 603 elevation, that's


22    the operating deck, up to the polar crane.
114 1 if you look at the event, and we had our first meeting, 2 this is our third; I think we made good progress for the 3 last meeting, and this meeting I think, I believe weve 4 moved into implementation, and now were going to go into 5 really good monitoring of some of these things were 6 talking about. Well be ready to do that the next time. I 7 dont see any problem.
23            So, it's a nice bright white and we are in the 24    process of prepping it right now. As a matter of fact, I 25    was in yesterday and you can see where, you can see over                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 49          1    the years, many years of operation and training, just dirt            2    and normal dust, oils and thing that have collected on the 3    walls. Just like in your home, that can be cleaned and 4    those areas are brighter significantly.
8              MR. GROBE:            Just a final 9 thought. Ive, over the last couple of months, Ive seen 10  an evolution in your approach towards this project.
5            That's part of the preparation for the surface 6    prep. And that's going to brighten the containment 7    significantly, but that will demonstrate our standards and 8    our expectations for the quality of condition of the 9    containment. So, I'm particularly excited about that.
11  Clearly, what youve articulated here today is a more 12  comprehensive and more thorough evaluation than what might 13  be the minimum mandated by the, the issues contributed to 14  the head degradation. And I think also clearly what youve 15  articulated today is commitment to go beyond those issues 16  as far as improving not only the reliability of the plant, 17  but safety of the plant and margins to safety.
10            Additionally, we've decontaminated a significant
18        So I think those are good, good indicators. And, 19  you also presented today some, in the area of the head, 20  specifically head replacement and substantive problems.
21  And weve been inspecting those activities and found good 22  results from your work, as far as the work that youve 23  done.
24        So, I think this meeting has been helpful to us.
25  Its been fairly comprehensive. Its been giving us a good MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


11    amount of areas in containment. All of the containment air 12    cooler duct work, which we've had people inside doing that 13    work. We do have the containment air recirc fan running, 14    which is redistributing air throughout the containment.
115 1 benchmark where youre at, and going. And we look forward 2 to our next meeting, which I expect would be around the 3 middle of the month, next month. And well work out that 4 schedule with your staff.
15           We also have a temporary cooling package, which is 16    connected to our containment purge supply, and that is 17    providing cooler air, so that we get better environmental 18    conditions for the folks working inside containment.
5              MR. MYERS:            Thank you.
19           That's made environmental conditions more favorable 20    and really putting a lot better situation for the work that 21    we're doing. So, we have a significant measurable progress
6              MR. GROBE:           At this point, why 7 dont we take a eight minute break, which I expect will be 8 ten by the time everybody gets back in their seats; give 9 Marie a break; and then well convene the public portion of 10  this meeting where we can receive questions from the 11  public; NRC staff can receive questions from the public, as 12  well as any feedback that you may have that you want to 13  share with us.
14      So, we will be convened. I have five minutes 15  until. Lets convene at three minutes after. Thank you.
16  (Off the record.)
17              MR. GROBE:          This portion of the 18  meeting is particularly focused on the NRC staff receiving 19 input and feedback from the public. And there is a pad of 20  paper on the podium up here, as well as the microphone.
21      And I would like to begin with any local members of 22  the community in the Oak Harbor area, in the areas 23  surrounding the Davis-Besse Plant as well as any local 24  officials that have thoughts or questions that they want to 25  ask, and then move into any other individuals that have MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


22     in cleaning and housekeeping remediation in our
116 1 thoughts or questions.
2      So, anybody thats interested in providing us some 3 thoughts or comments or has a question, please come up to 4 the podium, and were available to answer those.
5      I didnt think youd miss a chance at this.
6              HOWARD WHITCOMB:              I guess I have to 7 lead it off, Jack.
8      In follow-up to your comment that you made about 9 first-line supervision, I would offer the following 10  observation. This afternoon, Ive heard essentially two 11  prongs, if you will. One is a technical fix to the 12  corroded reactor vessel head and then the other is the 13  software fix or management fix involving the root cause 14  analysis determination, so forth.
15        Whats been provided by First Energy this afternoon 16  is a time frame for the technical fix. What has not been 17  provided is a time frame for the management fix. Clearly, 18  the technical issue is probably the least significant, but 19  I havent this afternoon, Mr. Grobe, heard First Energys 20  first prioritization of the management issues.
21        In other words, what are the root cause 22 determinations? Why did they occur? And how is First 23  Energy going to address them to prevent recurrence? And 24  this afternoon, we havent heard anything with respect to 25  what priority First Energy has attached to that aspect and MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


23    containment.
117 1 how thats going to essentially factor into restart of the 2 Davis-Besse Plant.
24            That concludes my presentation. Any questions?
3              MR. GROBE:            Okay. Excellent 4 question. I think I heard two parts. I think both 5 Christine and I had asked very similar questions today.
25                      MR. THOMAS:            I have one, Randy.                         MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 50          1    When they scope the evaluation for the containment air 2    coolers --
6      Youre correct that the root cause analysis is not 7 complete. The specific structure of what activities need 8 to be taken by the plant has not yet been decided by the 9 plant. And, were here to get those also and look forward 10  to those more detailed specifics at our next meeting next 11  month.
3    (Requested speaker to repeat.)
12      The other question I think is also a fair question, 13  and its not one for me to answer, but I would ask Lew or 14  Howard if they want to comment on what priority you place 15  on the, addressing the causal factors of more on the human 16  performance organization effectiveness as contrasted with 17  the priority placed on the hardware fixes?
4                      MR. THOMAS:            I asked if the 5    evaluation of the grade containment, potentially degraded 6    air coolers would include a past operability evaluation and
18              MR. MYERS:            Well, in my mind, 19  the management issues, Im sponsor to the management 20  issues, is pretty high priority. Thats the reason I am 21  the sponsor, because we realize weve had, weve made some 22  pretty significant organizational changes already at the 23  upper levels. Weve improved the senior team at the 24  station, has changed considerably.
25      As we go through finish up with the work processes, MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


7     scope of their inspection?
118 1 well probably find some additional insights of training 2 and standards that we need to take. And then finally the 3 programs reviews.
8                      MR. FAST:              The simple answer, 9    Scott, is we are doing a past operability determination.
4      As you go through these program reviews, weve got 5 to make sure weve got good industry standards on our 6 programs, that we have good ownership of our programs, and 7 we have to go on to monitor implementation of each and 8 every program. Were going to do that. I dont know that 9 every one of those is required before restart, but were 10  certainly going to look at our programs very hard for 11  restart.
10                      MR. THOMAS:             Thank you.
12        And the final thing is our independent review board 13  that I talked about. We wont restart the plant until that 14  board thinks were ready to go.
11                      MR. DEAN:              Randy, I have a 12    question about where, can you give us a sense of where you 13    gauge the percentage of which you have completed, at least, 14    the evaluation phase in terms of impact for the boric acid
15              MR. GROBE:              Okay. Anything 16  else, Howard?
17              HOWARD WHITCOMB:                No, that should do 18  it.
19              MR. GROBE:               Okay, thank you.
20        I did realize that I had forgotten to introduce one 21  NRC staff member that is here today. And, I thought he had 22  left. So, I was really feeling badly, but I just noticed 23  that he came back in the room. So, let me take this 24  opportunity to introduce Marty Farber.
25        Marty, where did you go? There he is over in the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


15    disposition containment.
119 1 back.
16                      MR. FAST:              I try to use 17    numbers. I believe these are accurate. Mark, if I'm 18    wrong, you can correct me. But we have about 280 condition 19     reports, which is actually about over 2000 individual line 20     items that have to be dispositioned. About 30 of those 21    have been dispositioned and turned into work orders for 22    work that's going to occur. The rest are in some phase of 23    evaluation and will be forthcoming.
2      Marty is a very experienced inspector in the Region 3 3 office. Outstanding performer for us. And he has taken 4 on the responsibility to be a leader on the, what we call, 5 the AIT follow-up inspection. Hes been working in 6 Regional office for several weeks and is on-site this week 7 bringing focus on the AIT findings, as far as the, whether 8 those findings or which of those findings represent 9 regulatory violations and what the significance of those 10  violations are.
24            I see a nod there, so it looks like I was pretty
11      So, over the next couple of weeks, I expect Marty 12  and possibly some other staff from Region 3 support will be 13  completing the AIT follow-up inspection.
14      I didnt want to miss the opportunities to introduce 15  Marty. So, I apologize Marty for not catching you earlier.
16  You were on my list and I missed you.
17      Are there other members of the Oak Harbor community 18  that have questions or comments?
19       Any elected officials that have questions or public 20 officials that have questions?
21      Okay. Very good.
22      Are there other members in the audience today that 23  have questions for us or comments that they want us to 24  consider?
25      Yes, sir?
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


25    close.                         MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 51          1                      MR. GROBE:              Let me make sure I           2    understand what you said, Randy. When you said that a 3    certain number of your 2000 or so items of observations 4    have been dispositioned by creating work orders, I want to
120 1            JOHN MILLER:            My name is John 2 Miller. Im a reporter.
3      Mr. Grobe, if you were king, what would you do about 4 the notion of the safety culture of the emphasis you put 5 today on first line supervisors having the kind of safety 6 attitude so that they catch problems as they arise rather 7 than pinning the safety of the plant only on the senior 8 management in some kind of bureaucratic process of CRs that 9 would, that would find problems?
10      In other words, what do you think ought to be 11  happening, not only at this plant, but around the industry 12 in this matter of training or evaluating safety culture?
13              MR. GROBE:              Thats a big 14  question. First off, let me take a step back. Our 15  inspection program is built upon a number of fundamentals.
16      And, Bill, maybe you can, as I go through a couple 17  things, maybe you can think through this and provide some 18  additional thoughts.
19      We have characteristics in our inspection program, 20  which we call cross-cutting issues. And what cross-cutting 21  issue means is, its something that affects safety 22  performance across the plant in any of the various safety 23  cornerstones, is what were calling them.
24      One of the cross-cutting issues is Human 25  Performance, and its the focus of our inspection program.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


5    make sure I understand that.
121 1 Second cross-cutting issue is the Corrective Action 2 Program, and safety culture of the plant. What we 3 sometimes refer to as the safety conscious work 4 environment.
6                     MR. FAST:              Okay. There is 7    280 condition reports. All of the inspections that were 8    done generated a condition report for any deviations, 9    didn't meet our standards. Each one of those condition 10    reports would have one or many individual items that
5      These issues are underpinning issues for our entire 6 inspection program, and we have a number of activities that 7 we conduct that focus on those. One of them has to do with 8 periodic, what we refer to as problem identification and 9 resolution inspection. And, that is specifically, focuses 10  on the activities it takes to evaluate problems, identify 11  problems, evaluate them, resolve them. Its a risk-focused 12  inspection, meaning take the highest risk significant 13  issues and ensure that those issues are being identified 14  and resolved.
15      We also have periodic activity where we go into 16  depth. Some people refer to it as drilling down into an 17  issue. Where an issue of particular, what appears on the 18  surface to be more significant than other issues that come 19  up on a day-by-day basis, we will drill down into the 20  issue; not at the same extent, but similar to what Steve 21  Loehlein has done with respect to this issue, and make sure 22  that the Licensee is going to do a good job identifying the 23  causal factors and correct it.
24      The last aspect of what we do currently focusing on 25  safety, but I think you used the word safety culture, is MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


11    required disposition.
122 1 each of our inspectors when they go out to a site, whether 2 theyre health physicists, security inspectors, engineering 3 inspectors, whatever different flavor of technical 4 expertise they have, spends a certain period of their 5 inspection time on site looking at the effectiveness of the 6 Licensees programs to identify problems and fix problems.
12            Of the 280 condition reports that have been written, 13     about 30 of those condition reports, which would be 14     somewheres in the 15, 20 percent range, have been 15    dispositioned. The physical work that needs to be done 16    generates a work order. The work order is the actual 17    maintenance process to complete the work. And those 30 are  
7      Bill, do you have, any thoughts that you have?
8              JOHN MILLER:          Maybe if I could 9 rephrase the question, because I think, I think I did 10  confuse you. You said to Mr. Myers; Mr. Myers, you know, 11  Im frustrated, I dont believe you have done enough in 12  telling me about how anybody at the plant below high level 13 management is going to be operating in a sufficiently 14 safety-minded mode; and you told him you want to see next 15 time what hes going to do about that.
16        So, Im asking you, what do you think he ought to 17  do?
18                MR. GROBE:            I appreciate, 19  maybe I misunderstood your question. I apologize.
20               JOHN MILLER:          It wasnt clear, 21  Im sorry.
22                MR. GROBE:            Its certainly not 23  my place to tell Mr. Myers how to fix his problems, its my 24  place to evaluate how effectively he does it. And there 25  are many ways to choose to address these kinds of issues.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


18    in progress.
123 1 And theyve been addressed at a number of plants around the 2 country. And, outside of nuclear power, there are 3 organizational effectiveness experts, and theyre applied 4 in big corporations, small companies across the country.
19                      MR. GROBE:              Okay. So, you 20    have condition records -- the focus of my question wasn't 21    clear. I apologize.
5        So, its, Mr. Myers and his teams responsibility to 6 bring to the table what they plan, and we make sure that to 7 our satisfaction that it is comprehensive, and then well 8 make sure from a planning prospective and make sure to our 9 satisfaction that, that its been effectively implemented.
22            Have the condition reports been closed out to work 23    order, or condition reports won't be closed out until the 24    work that's specified in the work order is completed?
10        And, well be presenting to you the results of our 11  inspections at these types of meetings in the future.
25                      MR. FAST:               The condition                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 52          1    reports will not be closed until the work is completed and            2    verified.
12                JOHN MILLER:           Okay. If you 13 would humor me just one more time.
3                      MR. DEAN:              Then you would say 4    that those 280 condition reports essentially encompass the 5    results of the inspections. Although, the way I understand 6    it, you still have some validation effort ongoing, but 7    you've completed your initial inspection?
14        Back to the first question. If you were king, if 15  you were the NRC Commission, you would be safe to saying 16  something more generic than I would just let all of the 17  utility managers around the country find their own way to a 18  program that ensures that first level supervisors are all 19  safety minded enough. What would those generic 20  requirements be?
8                      MR. FAST:               That is correct, 9    Bill. The 280 are the original inspections. I would 10    expect it will be generating some differences, based on
21                MR. GROBE:             Again, its, in 22  the organization, as well as any other organization, there 23  is all kinds of different ways. Each organization has, has 24  a character to it; and one solution in one organization 25  might not apply. Different parts of the country have MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


11    those reinspections.
124 1 different characteristics of people and how they, what 2 motivates them. What brings focus to their work. There is 3 no cookie cutter solution to this kind of a problem.
12                      MR. GROBE:              Any other 13    questions on Containment Health?  I have a couple more.
4      And, whats important is for Mr. Myers to define 5 what it is that he thinks is going to fix the issue here at 6 Davis-Besse, and then well evaluate his implementation.
14            I just want to make a couple comments. I think the 15    Containment Health Plan is a substantial improvement from 16    what you showed us last month. For one thing, you have 17    detailed procedures in place for the inspections. The 18     scope of the inspections is much more comprehensive with 19    respect to evaluating the condition of the equipment inside
7      And, as I mentioned earlier, the results are going 8 to be in the performance in the other areas of the restart 9 checklist. Whether his activities are successful or not 10  would be clearly evident, not only in the performance 11  indicators that he develops to evaluate human performance 12  and organizational effectiveness, but also the results of 13  the specific activities that are undertaken to improve the 14  plant, to accomplish the work.
15      Randy Fast talked about replacing the air coolers.
16  Thats a fairly large work activity that involves 17  engineering, involves maintenance workers, involves maybe 18 construction workers, depending on the scope of the work.
19  And, you know, well be inspecting those sorts of 20  activities in the plant.
21      And so, there is a number of ways that were going 22  to be evaluating the effectiveness, not only through the 23  specific limitation actions under that cornerstone -- Im 24  sorry, building block, but also in looking at the 25  performance of the staff and the organization.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


20    containment.
125 1            JOHN MILLER:           Could I ask one 2 more question on a different point?
21           Based on, again, this is just based on what you've 22    told us, you haven't done extensive inspection in these 23    areas, but based on what you told us, it appears that 24    you're going beyond what, the event, the head corrosion 25    would have caused you to do. And I think that's helpful.                         MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 53          1           Nuclear plant workers work to procedures. They            2    understand that. Quality assurance program assures that 3    procedures are adequate; they're adequately implemented.
3            MR. GROBE:            Certainly. Thats 4 what were here for.
4    So, this context of detail procedures and systematic 5    approach to training, that's a nuclear standard. Those are 6    very good attributes of the program and assure the results 7    of high quality activities.
5            JOHN MILLER:           One could make a 6 case that this is an example of something, that 7 Davis-Besses situation is an example of something that the 8 NRC hopes never to see.
8           I'm very encouraged to hear that you're having as 9    part of your inspection program a separate independent 10    look. And that's important from two standpoints. One is 11    it's always better to have two sets of eyes than one, but 12     secondly, quite frankly, there was a question regarding 13     the, the standards of the workers that were making 14     decisions in the plant. And I don't want to infer by that 15    that all the workers at Davis-Besse don't have the right 16    standards. That's not what I'm trying to say. But there 17     was a question. And this will give you insight as to 18    whether or not that is a broad question, a narrow question 19     and what it means as far as the accuracy of your 20    inspections. So, that's good.
9            MR. GROBE:            Im sorry, what?
21           I also heard you say, as I was pursuing the question 22    of what independent inspections meant, that completely 23    independent at Davis-Besse organization, the folks in Bill 24    Pearce's organization are going to be doing independent
10              JOHN MILLER:           NRC hopes never to 11  see. Whats that, given that you dont have enough 12 resources to inspect everything, you have a kind of 13 sampling inspection program; you inspect some things, not 14 others. You have a risk base analysis. Hopefully, its 15  what appears to be the most important things.
16      But we now have a plant that by your annual 17 inspection performed quite adequately, but under new 18  management you say, its clear over perhaps a decade or 19 more, numbers of individuals missed what in hindsight would 20  seem to be very simple indications of problems.
21       And the last time on June 12th at the public 22  meeting, at least, I think you and your assistant both 23  agreed that, that the local inspectors priorities on what 24  to inspect would not have this kind of a situation, boric 25  acid on the reactor head, anywhere near the top of the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


25    assessments.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 54          1            And Lew, I think it would be very healthy for us to            2    hear Bill's staff's evaluation next time we meet on the 3    activities that you're presenting. And, I would fully 4    expect, let me say, I would be surprised if his evaluation 5     is completely rosy. Hopefully, he's finding some things 6    that continue to have done.
126 1 list; it would be way down on that persons radar screen.
7           So, I would hope that next time we meet, not only 8     can we hear from the staff that's doing the work, but I 9     would like to hear from Bill's staff to get on the FENOC 10     corporate independent assessment, the quality of the work 11     that's going on in the field.
2        Given that, what would you say to the argument that 3 maybe this inspection team doesnt work; and, if NRC wants 4 to be able to prove to its own satisfaction and to the 5 satisfaction of the public that such a thing is never going 6 to happen again, given that it was such a near miss to a 7 LOCA, that the only solution would be a much larger 8 inspection program, inspecting many more things than are 9 required, many more financial on the human resources.
12                     MR. MYERS:             That would be 13    good. We would do that.
10               MR. GROBE:            I apologize, Ive 11 forgotten your name.
14                      MR. GROBE:             Anything else 15    before we move off of Containment Health?
12               JOHN MILLER:           John Miller.
16            Okay. Good. Thank you, Randy.
13              MR. GROBE:             John, there is a 14  number of things that are ongoing. You ask very good 15  questions, and Bill is itching to add to my response. Ill 16  pass the microphone to him in a moment.
17           Marie, we've been at it for about an hour and 15 18     minutes; is it time for a five minute break?
17         Im sure youve heard the old adage, dont throw the 18 baby out with the bath water. Im certainly not willing to 19 condemn the entire inspection approach or other, any of the 20 other broad statements that youve made, but what the NRC 21 has undertaken, is ongoing right now, here last month, if 22 you had an opportunity to hear Art Howell and Ed Hackett 23 present publicly what we refer to as a Lesson Learned Task 24 Force.
19                     MS. FRESCH:            Sure.
25         And the Executive Director, the head guy of the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
20                     MR. GROBE:              Okay. Let's do 21     that. The last time, we wore out her fingers.
22                     MR. MYERS:              Could I just 23     summarize on the Containment Health Plan?
24                     MR. GROBE:              Sure.
25                     MR. MYERS:              I think once again                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 55          1    we demonstrated at the last meeting we were in the plan            2    phase, doing some discovery, doing implementation or 3    physically doing work. And, you know, we've taken on some 4    value and expanded the program.
5            We're upgrading our coolers. We're extremely 6    pleased with that. The thermo cavity seal is a major, 7    major effort that would add a lot of value and margin to 8    our plant; and it will produce, or does make our plant a 9    better plant. So, we're moving to good implementation on


10    that.
127 1 Regulatory Commission has chartered a group of people 2 completely independent of anybody thats involved at 3 Davis-Besse to take a real hard look at inspection 4 programs; how we handled generic safety issues, our 5 interrelationship with the international community, and 6 lessons to learn. And I think there were a couple other 7 items on the charter for Lessons Learned Task Force.
11                      MR. GROBE:              Okay. My watch 12    says 16 after. Let's be prompt at 21 after, five minutes, 13    and that way we can keep things moving.
8      I cant remember all of them off the top of my head, 9 but that task force is working. They have spent a good 10  deal of time at the Davis-Besse site talking to Licensee.
14    (Off the record.)
11  Theyve talked to an incredible amount of NRC staff.
15                      MR. MYERS:              The next area we 16    would like to discuss is System Health Assurance Plan and 17    Howard Bergendahl will do that.
12  Theyve collected a wealth of documents.
18                      MR. BERGENDAHL:        Good afternoon.
13        The task force is fairly broad, and as far as 14  numbers and scope or perspective individuals that come from 15  a variety of parts of our organization, technically as well 16  as geographically. So, Im looking forward to the results 17  of their assessment, things that we can follow on a 18  inspection program.
19    As Lew indicated, we are committed to the safe operation of 20    Davis-Besse, more importantly, sustained safe operation.
19        Bill, did you have additional comments?
21    So, we're examining much more than the reactor vessel head 22    and containment building. I'm going to briefly describe 23    where we are on System Health Issues.
20                MR. DEAN:           John, I just want 21  to point out two things. One is, that if you looked at 22  nuclear industry as a whole, and where performance was ten, 23  fifteen years ago, and where performance is today as an 24  industry, there has been a lot of benefit gained from the 25  collective experience, and our inspection program has been MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO
24                      MR. GROBE:             Just a minute.
25    Could you please close the doors back there?                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 56          1            Thank you.            2                      MR. BERGENDAHL:        There is two 3    Building Blocks we're trying to cover, The System Health 4    Assurance Program Compliance -- and these two Building 5    Blocks, as I indicated, are expansions over what we just


6     described.
128 1 designed relative to that collective experience.
7           The first one is System Health Assurance Plan.
2      And, what we have here at Davis-Besse is a new 3 experience. And I would offer that our inspection program 4 has the flexibility to be able to be modified, if 5 appropriate, to address new phenomenon and new issues that 6 might emerge.
8    Basically, a review of the key systems from three different 9    perspectives. Taking an operational look, basically
7       And, relative to your comment about boric acid on 8 the vessel head not being important. I guess I would like 9 to point out that over the past couple of years, as we have 10  learned more as an agency and as an industry about issues 11  associated with CRDM nozzle cracking and learning about the 12  different types of phenomenon and so on and so forth, I 13  think there is a fairly significant track record over the 14  last couple of years that indicates the significance and 15  the seriousness with which the agency has considered and 16  asked and required Licensees to take specific action, 17  quote, for the vessel head degradation which occurred at 18  Davis-Besse as well as on the aftermath of that.
19      So, I think that, that provides an example of the 20  fact that any, any industry is not a static situation.
21  That things change. That we continue to learn. Thats one 22  of the important things that we have to have that comes out 23  of this, that we as an agency, Davis-Besse as the Licensee, 24  and the nuclear industry as a whole, learns from this, so 25  that the factors that led to this dont repeat themselves MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


10    focusing on the needs of the operator. A second 11    perspective would be the system reliability, and that's the 12    system engineer's view of the system as a whole. And third 13    is the design perspective of a system.
129 1 in the future.
14            Now, the first one, called the Operational Readiness 15     Review; that was the operating perspective, as I 16     indicated. The plant manager led those reviews and they 17    are complete. That was a team review of some key systems 18     and review of the indicators on how that system is 19    performing and when it's ready for safe operation.
2              JOHN MILLER:            One follow-up, if 3 I could. Accepting that your comment that performance is 4 better now we have experience; and accepting Mr. Grobes 5 comment that in general, throwing the baby out with the 6 bath water is not a good idea. But we have the convenience 7 of not having had the LOCA that we avoided only by what is 8 fair to say, dumb luck, because stainless steel is put in 9 there only for corrosion resistance, not for structure.
20            That first cut review by Randy and some of his staff
10      If we were now having this meeting in front of a 11  congressional committee examining why there was this LOCA; 12  do you really believe they would be convinced by the 13  argument dont throw the baby out with the bath water?
14              MR. GROBE:              I apologize.
15 There was so many premises to that question, Im not sure I 16 can answer it effectively.
17      What I would suggest is that you and I have a chance 18 to talk and go privately after this meeting, and we can get 19  into a bit more detail on this, because I think it is 20  important for you to understand in a little more detail the 21  scope of our programs, the activities that occurred prior 22  to Davis-Besse, the activities that have occurred after 23  Davis-Besse.
24      And, I think I dont want to give you the impression 25  that I feel any differently than this. I think a number of MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


21    identified some of those issues I mentioned earlier that 22    may have met compliance, but did not meet the standards for 23    future operations. So, that produced some work activities 24    that we had maybe identified for future implementation, 25     pull those up to current, to current outage.                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 57          1            That review is complete. And, then moved on to            2    System Readiness Review, which is a more structured review 3    of the risk significant maintenance rule systems, focusing
130 1 managers, the agency, including myself, has stated this 2 should never happen. And its the Licensees 3 responsibility to make sure these types of issues dont 4 happen.
5      Its our responsibility to have an inspection 6 program that provides a high level assurance that what 7 theyre doing is the right thing. And, our inspection 8 program did not disclose this as early as it should have, 9 and certainly the Licensee did not perform in a manner that 10  was appropriate, and it resulted in the head degradation.
11        So, with that said, lets get into this separately 12  after the meeting, because I dont want to tie everybody 13  else up with an extended discussion of this topic. Okay.
14              MR. MYERS:              Can I make a 15  comment?
16              MR. GROBE:              Sure, Lew.
17              MR. MYERS:              Let me make a 18  comment; a couple. Most likely, from an engineering 19  standpoint the situation we had would have caused leakage 20  that would have shut us down before it broke. One gallon 21  would shut it down. So, that was really first in there.
22  It shouldnt have happened. We should have found this.
23        But what I do think is healthy, I never thought I 24  would say this, but Ive been in this industry for over 30 25 years, and the performance improvements that we see are due MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


4    on material condition of the plant and including some 5     detailed system walkdowns. And walkdowns would be done of 6    course, with procedure.
131 1 to some of our oversight reviews and nuclear power 2 operations and processes that we go through like were 3 going through here when we find something new.
7            And the results of these reviews would then be 8     presented to an independent board, which is our Program 9    Review Board, which is a subcommittee of the Engineering 10     Assurance Board, which we mentioned earlier.
4      I think theyre right. Weve learned something new 5 that we need to share with the industry about this 6 particular program. And I think that this is not, this is 7 not a fun process, but its healthy. And these processes 8 that plants have gone through over the years to improve the 9 material condition of our plants, the air operated valve, 10 the leak rate programs; boric acid program, we should have 11 had in place better, have made this industry perform well 12 over the years.
11                     MS. LIPA:              Howard, I have a 12     question for you.
13       And thats the reason for these type of things that 14 we go through with the institute of nuclear power, because 15 assessments of those every 18 months. And youre own 16  internal self-assessments; if we do find a problem, there 17  is going to be problems with any industry, that it gets to 18  this level of detail, has really improved the performances 19  of our plants; not only from an operation standpoint, but 20  from a safety standpoint, that the NRC monitors.
13                     MR. BERGENDAHL:        Yes.
21      You know, I really do believe that. This is not a 22  fun process sitting up here on this stage, talking about 23  this issue, but its probably healthy.
14                     MS. LIPA:              On the operational 15     readiness reviews that are complete, is that complete and 16    identifying what needs to be worked or is all the work
24              MR. GROBE:              Are there any 25  other members of the public that have a question or MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


17    done?
132 1 comment?
18                      MR. BERGENDAHL:         It's complete in 19    identifying the issues of what needs to be performed; that 20    work has been identified, and it is not all completed.
2      Let me ask, before we get started, Mr. Stucker, can 3 you turn on the house lights?
21                      MS. LIPA:              And then are you 22    also looking at operating workarounds as part of that 23    review?
4              BEATRICE MIRINGU:           My name 5 is Beatrice, B E A T R I C E, and Miringu, M I R I N G U.
24                      MR. BERGENDAHL:         Yes. That was 25     part of the perspective of what systems have operating                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 58          1    workarounds, outstanding modifications, things of that 2    nature.
6      I just want to get an indication from First Energy.
3                      MS. LIPA:              Okay, thank you.
7 You said that you have an independent panel that select 8 people different experiences for different knowledge and 9 from different areas, but you also said that you have 10  brought in somebody who will help in facilitating 11  communication between you and First Energy.
4                      MR. GROBE:              That's, that's a 5    new one for me. I wasn't aware that you were specifically 6    looking at operator workarounds. Let me make sure I
12        Its my understanding that you have, NRC has two 13  staff members at every nuclear department. And indeed, the 14  problem that you would be having with Davis-Besse 15  especially with the boric acid problem has nothing do did 16  with communication between you and NRC.
17        So, if you could elaborate on what you mean by some 18  real facilitating or making it easier for you to 19  communicate to First Energy, to NRC, or NRC communicating 20  to you?
21              MR. GROBE:             Maam, the portion 22  of this meeting is to help the NRC with questions for us 23  and comments for us. I would suggest if you have a 24  specific question with First Energy, visit with those folks 25 after the meeting and you can get feedback from them MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


7    understand that.
133 1 directly, okay?
8            When I think of an operator workaround, I think of  
2            BEATRICE MIRINGU:          Well, I thought 3 since it was mentioned at this meeting that probably they 4 could bring it like that.
5            MR. GROBE:            I understand it.
6 Outside of the context of the specific portion of the 7 meeting, this section of the meeting is for us to hear from 8 the public, us meaning the NRC staff. So, please feel free 9 to direct your question to them after we complete this part 10  of the meeting.
11            MR. BERGENDAHL:              Well gladly be 12  available.
13            BEATRICE MIRINGU:           Okay.
14            MR. GROBE:              Thank you.
15            BEATRICE MIRINGU:            Then the question 16  I have also for, First Energy. You say at this meeting 17  that you have moved from the planning phase and going into 18  the implementation phase. And I understand that inspection 19  is an ongoing process, but from what you presented today, 20  there seems to be more inspections that need to be done; 21  and therefore, I think that you really are not in a 22  implementation state, and youre in the planning state.
23  Thank you.
24            MR. GROBE:              Okay, thank you.
25      Are there any other members of the public that have MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


9    things that are embedded into procedures, things are 10    embedded into the culture of operating the system, 11    operational characteristics of a control room of a system, 12    as well as operational characteristics in the field; 13    things our operators are having to work around potentially 14    a design, not deficiency, but lack of optimal design.
134 1 a question or comment for the NRC staff?
15            Are you looking at those kinds of things, scouring 16    through procedures, the workarounds?
2      By the way, if its reporters that have questions; 3 myself, the staff, and First Energy staff will be available 4 to discuss specific questions. So, we can do that in a 5 more informal way, after the meeting, if you prefer that.
17                      MR. BERGENDAHL:         Yeah. The first 18    Operational Readiness Review that Randy chaired, he can 19    describe it in a little more detail, but it was designed to 20    flush out issues like you describe.
6      Yes, sir?
21                      MR. FAST:              Jack, what we put 22    together in this process, 36 systems, as I recall, and five 23    other systems, like gear operated valves, motor operated 24    valves, breakers, things of that nature. We established 25     criteria. Had the system engineer come to review panel,                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 59          1    which consists of myself, operations and engineering and            2    maintenance folks. And we were focused on the system
7              WILLIAM BRUML:           Yeah. My name is 8 William Bruml, B R U M L.
9      First, I was going to comment that I am rather 10  relieved to see at this meeting that management is the 11  major cause issue here. Clearly, when you have a ten year 12  train wreck, the question isnt why didnt the brakes work; 13  its a question of why didnt someone set the brakes. Im 14  glad to see that, seeing you here, and I hope it continues 15  to, to be there.
16        Also in response to one remark Lew made about, that 17  he expected that if the situation had continued, they would 18  have had leakage rather than, rather than a LOCA.
19        Does the NRC have any intention to publish the 20  results of the inspections that its been doing on the 21  sections of the reactor head, so other members of the 22  general public might kind of have more of a sense of what 23  you guys are seeing?
24                MR. GROBE:            Thats an 25 interesting question. I think youre talking about the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


3     health.
135 1 detailed analysis of the materials head; is that correct?
4           Brought into view then the performance of the system 5    in the past and its present health. We use criteria like 6    operator; we have a level one, level two, and level three 7    workaround, we track in our operations group. So, as an 8     individual would bring in a system, they would identify any 9     outstanding work orders on the system, modifications that 10     were pending for it, any operator workarounds that have 11     been established, procedures that needed to be revised or 12     written to support system health.
2              WILLIAM BRUML:            Yes. Something as 3 simple as a cross section of what, you know, of how the 4 condition of the hole in the head; and, how the degradation 5 that was going on in the stainless steel. So, that the 6 rest of us can understand what people are talking about.
13            And that board was really, I'm going to say, an 14    advocacy to the system engineer in creating a form where 15    they could bring the issues to the table and get the 16    appropriate level of support to ensure that those items 17    would be complete.
7 Someone from either side here says, well, gee, this doesnt 8 look like its going to perform a full blown LOCA effect.
18           As we did those reviews, some of the legacy issues, 19     I'll call them legacy issues, system engineering; we said 20     if there were longstanding issues with problems of the 21    performance of the system, bring those forward with your 22    recommendations as well.
9 And I hear about all this steel thats corroded away. I 10 dont have a whole lot of confidence in that until at least 11 I see something that talks about it.
23            And, I'll give an example. I'm trying to be
12               MR. GROBE:            Sure. I just want 13  to make sure I understand the question before I answer it.
14  I think there is going to be two areas of documentation may 15  be of interest to you. The first is NRC is going to 16  complete a risk assessment which will get into some of 17  those issues, from a risk perspective. What was the risk, 18 loss of contacts, rupture of the liner that remained, 19 things of that nature. And that will be published as part 20 of our inspection activities.
21        The second area of documentation may be of interest 22  to you is the results of some detailed analysis that is 23  being done by our research organization, the Office of 24  Nuclear Reactor Research -- Regulatory Research, excuse 25  me. And, there is a number of what we refer to as user MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


24    specific. Something like the high pressure injection 25    motors. Been there since the life of the plant. Never                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 60          1    been taken out, sent out for complete overhaul and health 2    check.
136 1 needs. Im a user, so I sign a user need research and I 2  respond to that. And theyre in the process of responding 3 to that. And theyll be published from that.
3            One of the engineers came forward and said, I would 4    like to talk about the health of the motors and where we 5    are and make proposals to send those out and have complete 6    inspections done. And, we subsequently agreed and are in
4      I dont have the time frames on either of those, but 5 Im fairly confident that the inspection documentation 6 would precede formal publication report from research, and 7 that should be out in the next month or two. And 8 certainly, call at least with specific questions and we do 9 have a response team.
10              WILLIAM BRUML:            I have a second 11  question.
12              MR. GROBE:              Sure.
13              WILLIAM BRUML:            I heard Christine 14  mention in passing the issues of other in containment 15  equipment, electrical equipment, and I wonder if we could 16  hear a little more detail of what that means? One issue 17  that you folks are close to this more often, often think, 18  oh yeah, this is obvious, but to me it was a hole. Gee, 19  what do you do about this? Is the issue here you have a 20  building, you know, containment building that has a lot of 21  electrical equipment, much of which is safety related; 22  and, some of which has been opened up while inspection or 23  service for some reason, during the course of this long 24  period of boric acid on the containment vessel, containment 25  building.
MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


7     the process of taking those actions.
137 1      Which leads to the question of, gee, is this more 2 severe than what the equipment is qualified for, since most 3 of it is like, do you mean boric acid on the site? So, I 4 guess my question is, is there a process ongoing to 5 identify the equipment that might have that problem, how, 6 you know, what is the general tone of that issue?
8           So, right now as we speak, their HPI motor is being
7               MS. LIPA:          Let me tell you 8 what I know so far. That was the one of the items thats 9 on our foremat framework for the checklist. There is a 10  plan to have an inspector develop a detailed inspection 11  plan, and then go out and look at very specific things.
12  That inspection plan is likely to contain looking at a 13  number of things, such as cables, cable trays, junction 14  boxes, things, you know, all types of things within 15  containment pretty much top to bottom. What could have 16  been affected by the boric acid. Thats the scope of that 17  particular line item.
18                MR. GROBE:           I want to make 19  sure, you understand that our inspection will be the 20  sample. We wont be looking at everything. But the 21  Licensees activities, they have the components of their 22  containment health review, which includes environmental 23  health equipment and theyll be looking much more 24  comprehensively.
25        Well be sampling the activities they do as well as MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


9     rigged out of the building to be sent out for complete
138 1 some other activities or some other equipment that we may 2 want to look at in a different way to both evaluate what 3 theyre doing as well as independently assess the depth and 4 adequacy of what theyre doing. Okay? Thank you very 5 much.
6      Looking for other comments or questions.
7      I thought you were going to come forward. You stood 8 up, now youre required to come forward. Just kidding.
9     Other questions and comments? Yes, maam?
10              VICKY HEIDEL:          My name is Vicky 11  Heidel and I have a question. Understanding that youre 12  about ready to transport the Midland nuclear head, you said 13  prior to August 1st, does that mean the NRC has given its 14  stamp of approval that this is in excellent condition even 15  though its an old or new old nuclear head?
16              MR. GROBE:            John, you want to 17  briefly discuss our scope of the inspection activities for 18  the head, and explain what sort of certification goes along 19  with component base like this.
20              MR. JACOBSON:            Right, there is a 21  couple of components to the inspection that were going to 22  do regarding the head replacement, and one of them weve 23  already done; and that is look at some of the 24  nondestructive examination that was done, that the Licensee 25  did to supplement some of the documentation that they did MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


10    remediation.
139 1 have for the head. Some of it was missing. Its gone over 2 the years. And they did some supplemental inspections.
11            There were other items, like items, diesel start 12    systems. System engineer said, here's one that's pending 13    modification. We need to put some emphasis on it. We 14     agreed. We applied the engineering resources, and that is 15    undergoing design, and that will be implemented as well.
3      And weve looked at those inspections as to how good 4 inspections were done, as well as the results of those 5 inspections. And so far, that part of it, we have no 6 problem with. What we saw was done well, and the results 7 were acceptable.
16            Those are the kinds of things that the Operational 17    Readiness Review did.
8      The next part of the inspection thats going to be 9 done is looking at a sample, a good sample of the 10  documentation; both the new work that was done, as well as 11  documentation that exists from when the head was originally 12  manufactured. And we need to do that so that we can verify 13  for ourselves that this head in its condition today meets 14 all the requirements of the American Society of Mechanical 15  Engineers Boiler and Pressure Vessel Code.
18                      MR. GROBE:              Let me just ask a
16        And in that code, there is requirements, for 17  example, for the radiographs. There is requirements as to 18  how those radiographs will be taken and there is 19  requirements as to what the acceptance criteria is for any 20  flaws or discontinuities that are found during the 21  nondestructive examination.
22        And thats just an example of the kinds of things 23  that we will be looking at. And then the last part of the 24  head replacement that were going to be looking at is the 25  actual opening and then restoration of the containment to MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


19    little bit more, get into little more depth here.
140 1 place the head in the Davis-Besse containment.
20            Something like a motor that hasn't had a 21    comprehensive amount of maintenance in 25 years, would that 22    be consistent with the vendor recommendations for that  
2            VICKY HEIDEL:              So, this 3 inspection will be done prior to its being transported 4 here, the total inspection?
5            MR. JACOBSON:                Part of it has 6 been done already, part of it is about to start. Whether 7 the Licensee decides to transport this head now or they 8  decide to transport it six months from now, is really not 9 our concern.
10            VICKY HEIDEL:                Okay.
11            MR. JACOBSON:                And if they want 12  to move the head, its their head, and they can move it, 13  but ultimately, restart of the facility, that decision will 14  be made by the NRC.
15            VICKY HEIDEL:              Is there any 16  danger in transporting it that we should be concerned about 17  that?
18            MR. JACOBSON:                Any danger?
19            VICKY HEIDEL:              Any danger of 20  transporting the actual head.
21            MR. JACOBSON:                With respect to 22  what, radiation, radioactive?
23            VICKY HEIDEL:              Yes, exactly.
24            MR. JACOBSON:                No, the head has 25  never been used and theres no radioactivity associated MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


23    motor?
141 1 with it at this time.
24                      MR. FAST:              The original 25    design of those motors for life of the plant was 40 years;                        MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO 61          1    however, they're not outside of their design basis, but            2    it's just prudent maintenance activity to take those out
2              VICKY HEIDEL:            Lastly what do you 3 do with the old reactor head?
4              MR. JACOBSON:              Thats a question 5 that the Licensee would have to answer at this point.
6              MR. GROBE:              Let me respond to 7 that in a little bit of detail. And if you, if you want to 8 respond or ask your question to First Energy after the 9 meeting, thats fine.
10        The Licensee has performed an analysis of the 11  existing head to characterize what sort of waste it is.
12  There is different categories of waste within our 13  regulations and were expecting to perform an inspection of 14  that assessment that theyve done, how they made the 15  measurements and the validity of the assessment.
16        In addition to that, we have a routine aspect of our 17  inspection program that deals with package and 18  transportation of waste and well be performing those 19  routine inspections on this very nonroutine type activity.
20        So, we will have a thorough inspection of what 21  Licensee is planning. Its my understanding that they are 22  currently not planning on transporting the head to a waste 23  facility. Theyve currently characterized it, based on my 24  information, of whats referred to as class A waste, which 25  is low specitivity waste. And we will be performing MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


3    and do a health check on them.
142 1 inspections and reporting the results of those inspections 2 during future meetings like this one.
4           So, we were doing the vendor recommended 5     preventative maintenance. Those items that are required; 6     bearings, lubrications and such, were within their period, 7     but it's the unknown, it's the unknowns about that which 8    really require a teardown and review.
3            VICKY HEIDEL:            All right, last 4 but not least, I have understand that a brand new head has 5 been ordered, and will that ever be installed at 6 Davis-Besse?
9           So, they don't go through much of a duty cycle, but 10     it is just a prudent maintenance practice. This is above 11     and beyond what the vendor would recommend.
7             MR. GROBE:              Thats really not 8 the scope of our activities.
12                     MR. GROBE:              Okay. Let me ask 13    a question, you just mentioned a couple specifics. This 14    diesel air start modification; was that something that was 15    a pending modification or was that something that had not
9     Lew, do you want to respond to that?
10               MR. MYERS:            The answer is 11 yes.
12               MR. GROBE:              Okay, thank you 13  very much.
14      I didnt realize what time it had gotten to be. Why 15  dont I ask if there is any one additional question, and 16  then we need to move on since we have another meeting at 17  7:00. Any additional questions?
18      Okay. I thank you very much for attending. I 19  appreciate the questions we received. If per chance you 20  think of something or felt that you didnt get a chance to 21  ask a question, feel free to come back at 7:00.
22      Thank you very much.
23  (Off the record.)
24                    ---
25 MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO


16    been requested?
143 1              CERTIFICATE 2     I, Marie B. Fresch, Registered Merit Reporter and 3 Notary Public in and for the State of Ohio, duly 4 commissioned and qualified therein, do hereby certify that 5 the foregoing is a true and correct transcript of the 6 proceedings as taken by me and that I was present during 7 all of said proceedings.
17                      MR. FAST:              That was a pending 18    modification, did not have implementation plan or target 19    date for at least in the near term. And that was an 20    example, we said we're going to pull that forward and 21    complete that work.
8     IN WITNESS WHEREOF, I have hereunto set my hand and 9 affixed my seal of office at Norwalk, Ohio, on this 10 27th day of July, 2002.
22                      MR. GROBE:              Okay. So, back to 23    the original question, which was operator workarounds. You 24    included in your Operational Readiness Reviews, operator 25    workarounds that had already been identified. Did you go                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 62          1    through a systematic review with, or was the intent of the            2    scope of this to find out review of the workarounds that 3    were latent?
11 12 13 14 Marie B. Fresch, RMR 15 NOTARY PUBLIC, STATE OF OHIO 16                   My Commission Expires 10-9-03.
4                      MR. FAST:              That was not 5    really, the focus was on system health. If there were any 6    outstanding operating workarounds, those are tracked by the 7    system engineer. He knows he's got a level one or level 8    two workaround.
17 18 19 20 21 22 23 24 25 MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO}}
9            Our Return to Service Plan included completion of 10    all the operator workaround activities. So, those came up 11    and when we said, so what are we doing about this level two 12    operator workaround, it might be that we needed to 13    implement a minor change to the design of the system. Then 14    we said, let's progress that, get the work order and get
 
15    that out.
16                      MR. GROBE:              Okay, thank you.
17                      MR. BERGENDAHL:        Now, the next 18    level reviewed is System Readiness Review, were more 19    structured comprehensive. That would flush out more of the 20    items, Jack, I think you refer to, which are not tracked as 21    an operator workaround, but procedure aspect.
22            In that review, we will review the close condition 23    reports for the last few years to see how we dealt with 24    problems. Closed maintenance work on a plant, on a system, 25    open and close modifications, operating experience. It's a                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 63          1    more structured review and it goes through a panel to            2    independently assess the thoroughness of that review.
3            In addition, on the next slide, we've added a new 4    program called the Latent Issues Review. This is a more 5    detailed look which gets beyond even the areas I just 6    discussed and goes into the System Health Plan design 7    perspective as well.
8            This program has been used at our Beaver Valley 9    Station. We've adopted this program and identified some 10    systems to go after first. And ones that you see here are 11    systems that we selected to put this thorough team review.
12            Now, this type of review, very broad detailed 13    review, takes a team of people a couple weeks to perform.
14    This review goes back and looks at the original design 15    basis, the emergency procedures, all kinds of industry 16    operating experience, any operability reviews that were 17    performed, problematic risk assessment; and a very detailed
 
18    look.
19            We selected the Reactor Coolant System, Auxiliary 20    Feedwater System, Component Cooling Water System, Emergency 21    Diesel Generators and the Service Water Systems in these 22    reviews.
23            And we have currently assembled teams. We've put
 
24    together the guidance and structure for doing these 25    reviews, and the teams are starting reviews now. I believe                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 64          1    as of this week we have all the teams assembled.            2                      MR. GROBE:              Before you go on, 3    Howard -- I'm sorry. Go ahead, Dean.
4                      MR. DEAN:              I was going to ask 5    you, do you intend to do these design reviews or latent 6    issue reviews in parallel or do maybe one or two and gain 7    any lessons learned and apply that to the other ones?
8                      MR. BERGENDAHL:        We started on the 9    Aux. Feedwater System as kind of a pilot to see if there 10    was any process improvements that could be gained. Make 11    sure we got the right scope and expertise.
12            So, we initiated that one. Did learn some things 13    from that, and modifying our process and using that. We 14    expected this new program would be continued to be used at 15    Davis-Besse. It's proven itself at Beaver Valley, and it 16    really does a good thorough job of examining the systems, 17    going back to the original design.
18            So, we plan to continue this program.
19                      MR. MYERS:              Let me comment on 20    that too. Neil Morrison is with us today. Neil was the 21    person that spear-headed our reviews at our Beaver Valley 22    Station for the past two or three years. How many years 23    now?
24                      MR. MORRISON:          Two and a half 25    years.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 65          1                      MR. MYERS:              Two and a half            2    years. And so there is, he's got a lot of lessons learned 3    there, so this is not a new program for us. We're just 4    moving it to this plant.
5            But if you look at where we've been spending our 6    money at other plants, a lot of our money has been spent on 7    a lot of things, finding these latent issue reviews. We 8    found significant ways to improve the quality of our 9    systems at our other plants. So, we're really excited 10    about bringing this program to our plant. We think it's
 
11    the additional margin for the plant.
12                      MR. GROBE:              Howard.
13                      MR. BERGENDAHL:        The output of 14    these reviews again goes through the engineering assurance
 
15    board to get an independent check on thoroughness and rigor 16    on the reviews of the systems.
17                      MR. GROBE:              I've got a couple 18    questions. It's an interesting list of systems that you're 19    doing the Latent Issues Review on. Reactor Coolant System 20    is clearly a focus of the shutdown of the plant; 21    recognizing that the head is part of the Reactor Coolant 22    System.
23            Auxiliary Feedwater System, Component Cooling Water 24    Systems, Emergency Diesel Generators and Service Water 25    Systems are normally four of the five primary systems that                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 66          1    I'm familiar with that comprise almost the entire risk of            2    problems at the plant, but the fifth one is DC Power. Is 3    that a significant risk contributor at your plant?  I'm not 4    familiar with PRA.
5                      MR. POWERS:            It's a good one.
6    The fifth one is, Jack, the Diesel Center --
7    (Requested speaker to repeat.)
8                      MR. POWERS:            I'm sorry. DC is 9    part of the Reactor Coolant System, for instance, diesel 10    generators. The Aux. Feedwater System, Service Water and 11    Component Cooling Water Systems.
12                      MR. GROBE:              Jim, my question 13    was, normally when you look at say 95 percent of the risk 14    contribution, it would come from those four systems plus DC 15    Power. And I'm not that familiar with your risk analysis 16    for Davis-Besse Plant. Does DC Power play a significant 17    role in the risk contributions at Davis-Besse?
18                      MR. MYERS:              I don't know if we 19    know the answer to that.
20                      MR. GROBE:              I don't expect you 21    to know every answer to every question.
22                      MR. POWERS:            No, I have an 23    answer for you. What we've done, is on the preceding 24    level, what we have learned to do on our System Health 25    Reviews, we've included the 1.50 DC Systems as part of                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 67          1    that. Those are the main systems; there were 35 of them            2    that we are going to be going through, Jack. So, we're 3    going to be looking at those in some level detail.
4            We didn't select those for the deep cut, but we 5    think the deep cut in the five systems that we've listed 6    here is going to tell us generally how, what the health of 7    our systems are.
8                      MR. GROBE:              Okay.
9                      MR. BERGENDAHL:        The System Health 10    Review will identify further evaluations that are 11    required. We need to do a more thorough evaluation.
12            These systems were selected, as you indicated, 13    important systems. A couple of them had system health 14    indicators, indicated that we had some issues with the 15    system in the past couple of years. And then we added a 16    couple that our indicators show very reliable performing as 17    well, but since they were high impact systems we added 18    those; and allows us to validate our monitoring programs.
19                      MR. MYERS:              We still haven't 20    answered that question; how does it affect PSA that you 21    want us to look at. We'll give you an answer to that 22    shortly.
23                      MR. GROBE:              Okay.
24                      MR. BERGENDAHL:        Any other 25    questions on the system reviews?                          MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 68          1                      MR. GROBE:              Any other 2    questions?
3                      MS. LIPA:              Yeah, I have one 4    question. On the, in your plan dated July 12th, you talk 5    about that, through these reviews you're going to identify 6    conditions that need further evaluation that could impact 7    the function of a system. And it sounds like a subset 8    would be restart items. What criteria are you using to 9    decide what items become restart items?
10                      MR. BERGENDAHL:        In our Return to 11    Service Plan, we laid out a process. Every condition, any 12    appliance we have will be documented on condition reports.
13    These condition reports go through a station review board 14    that we would send to specifically evaluate all the 15    conditions against restart criteria. Technically, on the 16    restart action plans. Multi-field criteria. Safety.
17    Importance of safety -- I don't have the criteria 18    memorized. I could get that for you, Christine.
19                      MS. LIPA:              Okay.
20                      MR. BERGENDAHL:        It's, actually we 21    met today and we drafted a procedure for our Return to 22    Service Plan in process -- Let me correct. Our Restart
 
23    Action Plan process. And that criteria is in the procedure 24    which we reviewed today. It will be used in that.
25                      MS. LIPA:              Okay.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 69          1                      MR. BERGENDAHL:        It's also in the            2    chart for that station review board, clearly documented.
3                      MR. GROBE:              Howard, have you, 4    follow-up on Christine's question; have you done the 5    screenings through your restart criteria and if so, how 6    many have you determined, what's the population restart
 
7    items to date?
8                      MR. BERGENDAHL:        The answer is yes, 9    we've started. Every day, any reviews that are going on 10    generating condition reports immediately upon 11    identification. I'm not sure of the exact number. There 12    is probably four hundred some odd actions that have been 13    identified that we will get resolved prior to restart.
14                      MR. GROBE:              I think in the 15    future meetings, Lew, one of the things we would want to 16    do, I know that you're developing some performance 17    indicators, I haven't peeked ahead, so I don't know if 18    you're going to talk about that, but one of the things we 19    want to understand in some detail is flow rates of work; 20    what's coming in and what's going on out, and what's in the 21    business to be worked as far as restart items, and other 22    issues that might go into performance indicators that you 23    developed as far as your approach toward restart.
24            And, I appreciate we're still very early in this 25    process, but we're going to need to start getting into                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 70          1    somewhat detail in that regard. So, at future meetings, we            2    would possibly get that sort of data and start looking at 3    detailed future work, backlog work, accomplishment of work, 4    things of that nature.
5                      MR. MYERS:              What we can do, is 6    Clark is in the audience, he's a building block on our 7    restart action list and we can start putting him up there
 
8    to tackle that.
9                      MR. GROBE:              Whatever you think 10    is necessary.
11                      MR. MYERS:              Let's do that next
 
12    time.
13                      MR. GROBE:              Okay. Did you 14    have a question?
15                      MR. MYERS:              Clark, get 16    ready.
17                      MR. GROBE:              I had one other 18    question regarding the Latent Issue Reviews. I understand 19    you used these at one of your other sites in the FENOC 20    system; really two questions.
21            This type of activity has been done on a number of 22    plants, several on the east coast and midwest that I'm 23    familiar with, but I'm sure there is others also. Have you 24    tapped into the expertise of what's been occurring at other 25    plants to ensure the comprehensiveness of your Latent                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 71          1    Issues Review?            2                      MR. BERGENDAHL:        Absolutely. The 3    D.C. Cook Plant, gone through some pretty good reviews and 4    we've visited that site, and we look for best practices 5    throughout the industry, and we have adopted lessons
 
6    learned from those.
7                      MR. GROBE:              Okay. Can you 8    give me an idea of something that you might have learned 9    from your D.C. Cook evaluation that improved your Latent 10    Issues Review?
11                      MR. POWERS:            As a matter of 12    fact, we are previewing not only the procedures D.C. Cook 13    used, also the people that have come over here and are 14    helping us now lay out the strategy. People experiencing 15    what was done at Cook, Millstone, Salem and are using the 16    composite of all that knowledge.
17            What we learned most specifically, Jack, is the 18    level of detail to go into, we believe, that drive the 19    FENOC Latent Issues Program another step, higher standards 20    as part of this. It's gone quite well for us. And we have 21    used others, past several years, but we think this process 22    is going to go to a higher level of detail. So, we think 23    we're on the right line.
24                      MR. GROBE:              I think Cook is a
 
25    good place to go. A number of the people came from Salem,                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 72          1    Christie River, Oak Creek; most of them that put that            2    program together. So, it's kind of one-stop-shopping, so
 
3    to speak.
4                      MR. MYERS:              It is dependent, 5    you know, on our steam generator -- on our head 6    replacement. We brought people in that just replaced steam 7    generators at the Cook Plant. We have some welders from 8    the, that were over in the --
9    (Requested speaker repeat.)
10                      MR. MYERS:              We brought some 11    craft members. We brought some experienced people, people 12    welding rebar back on containment. So, we're looking for 13    that kind of experience.
14            We're using, it's Cook is really good. There is 15    some other places you can gain valid experience too. It's
 
16    a little different for our case, like the steam generator 17    replacement. You have to cut a hole in the containment and 18    put that on, like we're doing to install the reactor head.
19    It's not something that they did at Cook. See what I'm 20    saying?
21            So, we're trying to get the best everywhere, and are 22    applying some of that information that's necessary for our
 
23    operation.
24                      MR. GROBE:              Okay. I had one 25    other question on Latent Issues Reviews. I think I know                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 73          1    the answer to this question, but I want to make sure.            2            This is something that was used to some level of 3    success at Beaver Valley and it's going to be used at 4    Davis-Besse. Is this something that's going to become part 5    of, say, the culture of First Energy System?
6                      MR. BERGENDAHL:        Absolutely.
7                      MR. GROBE:              That you're going 8    to do this type of review at all the plants?
9                      MR. MYERS:              The Latent Issues 10    Reviews. One of the operational officers, one of the 11    things I was going to do even if I was running one of the 12    bigger plants in the country would be to take a couple 13    systems a year, and look at them from this latent issues 14    effect, because to make sure that you're maintaining your 15    design, your documentation. It's a good process, and I 16    would use it at all of our plants. So, the answer to that 17    is yes.
18                      MR. GROBE:              Okay, thank you.
19                      MR. BERGENDAHL:        Okay, the next two 20    slides are just some photographs of the work that Randy 21    indicated we initiated some work on the Decay Heat Pumps, 22    and the next slide is just some, bringing in many 23    additional resources, as Lew indicated, craftsmen from 24    around the midwest to help us with the work we have going 25    on at Davis-Besse; a lot of scaffolding to support the                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 74          1    inspection of containment and work activities.            2            So, we have a good work force out there and a lot of 3    good work. The items that we identify are being worked off 4    very well.
5            Next area is Program Compliance Plan. And, this 6    also has two different, we call them phases. They actually 7    parallel. Doing a program readiness review, which is a 8    baseline of our plant programs, we will assess, based on
 
9    the root cause of reactor head problems.
10            We identified some issues and standards and 11    ownership and oversight, and we set up some criteria to go 12    back and review our key programs on site, and assess them
 
13    against this criteria; present those results to our 14    independent review board; and really understand the overall
 
15    compliance and implementation of health of those programs;
 
16    to look at things like the qualifications of the 17    individuals involved, the interfaces, the individual 18    program owners have with the other groups. And again, then 19    present those to an outside independent oversight board.
20            In addition, much like the Latent Issues Review, we 21    developed a phase two or detailed program review, and Lew 22    mentioned Neil Morrison would be working on the System 23    Latent Issue review. We asked Neil to come over to 24    Davis-Besse and apply that same rigor to programs. We 25    designed a program and wrote a procedure and we're using                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 75          1    that procedure to do these detailed program reviews.            2    They're in-depth systematic review of key programs.
3            Now, the first programs we're starting review on, 4    the next slide shows the implementation of this program.
5    Starts off with using it on the, the programs that were 6    identified in our root cause and we have some issues.
7            Each of the programs on this list when we did our
 
8    detailed root cause on the reactor head degradation, there 9    were some issues identified on each one of these systems.
10    So, we selected these systems to initiate our new detailed 11    program and review on.
12            Now, we started a pilot, we call Probabilistic 13    Safety Assessment Program. Since this had not been used at 14    any of our other facilities, it was new initiative. We 15    piloted it and thought Probabilistic Safety Assessment 16    Program to ensure the process was sound and our assumptions 17    and criteria were right.
18            We completed that pilot review, and we've moved on 19    to the Boric Acid Corrosion Control Program, and scheduled
 
20    the rest of these programs all to be put through this 21    thorough review process prior to restart at Davis-Besse, 22    and then we'll continue much like the Latent Issues Review 23    to apply this problematic review to additional areas of the
 
24    site.
25            Again, it's a good thorough look at Davis-Besse's                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 76          1    systems and programs. It's under way, it's identifying            2    improvements, issues and we're following off on these 3    issues as well.
4            Any questions on our Program Compliance Plan?
5                      MR. DEAN:              Howard, can you 6    share with us some of the insights you gained from the 7    pilot review that you referred to just a moment ago?
8                      MR. BERGENDAHL:        Yes, the pilot on 9    the PSA, I don't have any specifics, but what we did there, 10    is we took a program. The reviews are done by an, 11    independent team members, we bring in from the outside of 12    Davis-Besse. So, what we did with that, is pilot putting
 
13    together a plan, bringing in the outside members, 14    developing a report and presenting that report to the 15    review board.
16            I don't know if you have any lessons learned, Jim?
17                      MR. POWERS:            I think some of 18    the insights that we found, our pilot program, that's our 19    Probabilistic Safety Assessment, that's one of the 20    strengths that we have. I think at the Davis-Besse site 21    and I think you've seen that with interface with your PSA 22    Supervisor, Ken Berg. So, it's an opportunity to look at 23    what is a fairly healthy program with good ownership.
24            Now, what we've also found is we've been moving 25    forward with the Boric Acid Control Program and Corrective                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 77          1    Action Program; those are ongoing. We've made substantial 2    progress in both of those.
3            That Boric Acid Corrosion Control Program, we've got 4    a draft report, final review stages now. So, we can learn 5    from those areas more significant areas of improvement that 6    are required; ownership, corporate industry results; in the
 
7    case of Boric Acid Corrosion Control Program.
8            In the Corrective Action Program, we're looking very 9    specifically at, you know, detail regulation and how the
 
10    program matches the regulation and going through lining 11    those up one by one and every process, and there are areas 12    of improvement there. You'll be seeing those results 13    coming out of those. So, we're finding areas in issues 14    that need improved.
15                      MR. DEAN:              Are you 16    incorporating a new benchmarking relative to, for example, 17    best industry practices, for using info to give you?
18                      MR. POWERS:            Yes. As a matter 19    of fact, that's a good point. Kind of a key element of 20    this. These reports as we do them are being provided to 21    INPO, and in some cases on the detailed reserve, INPO is
 
22    participating on the team.
23            They are set up down in Atlanta to take our reports, 24    as we review all our programs and send them out to industry 25    experts at other sites that they've identified where there                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 78          1    is good industry practices from benchmarking they've            2    conducted, and we'll be getting feedback from those peer 3    sites to help us improve our standards.
4                      MR. MENDIOLA:          Are these
 
5    benchmarking, these lessons learned, these program 6    improvements being reflected back to the other plants at 7    First Energy?
8                      MR. MYERS:              Yes.
9                      MR. GROBE:              I have a couple 10    thoughts, I guess, on System Health Assurance Plan. The 11    Operation Readiness Reviews, the scope of that activity 12    clearly was something that needed to be done following the 13    situation that occurred with the head.
14            The System Readiness Reviews, I think some aspects 15    of that also were direct outgrows of the lessons that you
 
16    learned from the head situation.
17            The Latent Issues Review clearly goes beyond the 18    depth of what would normally be expected, and I'm glad to 19    see that you've taken these significant systems to do this 20    Latent Issues Review. I have confidence based on your 21    experience at Beaver Valley and the input that you're 22    getting from outside your organization that those reviews
 
23    should be of good scope.
24            The programs area, likewise, I think the level 25    review reflects not only what happened during the head                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 79          1    corrosion event, but also some things that you're going            2    beyond the scope of what may have been directly indicated 3    from the initial findings of the head corrosion event. So, 4    I think that likewise is good.
5            We're still in the phase of, in many of these areas
 
6    of inspecting all good plants. In a couple of areas, John 7    talked earlier about some inspection work that we've done 8    already on a nondestructive examination we've had.
9            And Mel has done some early inspection work and 10    provided substantive feedback to you on the containment, 11    early containment health work, or extended issue work, I 12    guess it was called at that time.
13            There will be substantive inspections that will be 14    coming as you get into these in greater detail, and start 15    completing some of this work. We'll be taking a good hard 16    look at that, and also giving you feedback.
17            We're going to be working closely with your staff 18    that are implementing these activities to make sure we 19    understand your schedule and what activities will be ready
 
20    for inspection.
21            We don't plan on inspecting things before they're 22    done. We're not part of your team. We're not supporting 23    the success of your program. We want to look at what 24    you've accomplished, and we'll achieve our confidence based 25    on the quality of work you do.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 80          1            You've mentioned a number of occasions assessment            2    boards and review boards. I've watched over the last 3    several weeks as things evolved, and you've got quite a 4    different character of outside influence on these review 5    boards, created more review boards, structured them. In a 6    future meeting, I would like to get some feedback from the 7    value added, a little bit more detail on the structure of 8    those boards, what their function is, what they're 9    accomplishing, and also some feedback value added from 10    those boards. What they're seeing.
11            Because those boards will give you a direct 12    reflection of the quality of the work, not only that the
 
13    people are doing in the field, but also the folks that 14    review and approve that work. Because the boards shouldn't 15    see that work until it's been through your review process, 16    you know, in your line organization.
17            So, I'm hoping to get some insight from that.
18    Hopefully, that can be on the agenda for the next meeting.
19                      MR. MYERS:              We can do that.
20                      MR. GROBE:              Okay. Any other 21    comments on systems or programs?
22            Let's move on.
23                      MR. MYERS:              Before what you 24    commented, I think the programs review is something that
 
25    helps us understand that each one of our programs is a                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 81          1    pretty significant list of programs out there that we have            2    best industry implementation, doing the industry 3    implementation. It's not the minimum criteria, it's where 4    we have the margin. And that we have good ownership, and 5    finally that we're implementing that program properly in
 
6    the field.
7            So, that's really the structured process to go into 8    this whole latent issues process in and out. I note the
 
9    long term, I see that as an essential building block.
10            The next area that we have to talk about is 11    Management and Human Performance Excellence Plan; and 12    particularly the Management Root Cause. I would like to
 
13    introduce that.
14            It's hard, as folks say, to call your baby up. But, 15    in the last meeting, I indicated that management, 16    "Management ineffectively implemented processes, and thus
 
17    failed to detect and address plant problems as 18    opportunities arose"; especially in the forecast approach.
19            There is four key areas of focus that we're looking 20    at; Ownership, Oversight, Standards, and Decision-making.
21    And, our Boron Program does not have good ownership at the 22    engineering level to insure that we were meeting the 23    standards in industry, and that the requirements in our 24    program were proper.
25            The oversight groups in our management team were not                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 82          1    properly involved with that program to insure that we have            2    proper implementation. We're not out in the field looking 3    at what we were doing.
4            When problems were found, we did not have a good
 
5    questioning attitude in this boric acid issue that lead to 6    the easy conclusions. It was easy to justify that no leaks 7    in the past were the cause of this boron buildup. It was 8    an easy conclusion.
9            Our initial management reviews have come up with 10    some assessments that we can share, and that's that 11    standards have existed for many years at Black River in 12    problem solving. Our reviews are going back to the 1980's, 13    and have indicated this lack of problem solving at the 14    management level is something we have to work on.
15            Another thing we can say now is when there has been 16    times at Davis-Besse Plant that we had strong management 17    leadership. In the 1980's and 1990's, the trend was to 18    properly identify problems and resolve them. So, that lack 19    of rigor was not evident and you saw improvements in the
 
20    performance.
21            For example, I had a supervisor tell me today that 22    in the early 90's, Davis-Besse was setting the standards 23    that everybody else was coming to look at. That's one of 24    those standards we need now.
25            As industry hired many of our leaders at the                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 83          1    Davis-Besse Plant, replacements reduced strong daily            2    involvement that resulted in a lax attitude of fixing the 3    problems. Let's just get the problem fixed. And since you 4    have that lack of rigor in decision-making down below, the 5    problem came evident.
6            Let me say this. The Davis-Besse Plant has operated 7    well for many years and it's still in very, very good
 
8    material condition. As good as most plants in the 9    country. However, as new problems arose, without strong 10    upper level involvement, and the lax rigor, the 11    decision-making process appeared to be narrowly focused in 12    several cases that we've looked at.
13            Our approach has been simple. We initially assessed 14    the root cause of the head degradation. What would cause 15    this problem?  As we did that, we also looked at some 16    management issues. We did that because we had noted that 17    there was a time performance at our Davis-Besse Plant. So, 18    by going to the technical root cause, we could first give 19    us some time to make some of the overall structure changes 20    that we wanted to make.
21            For example, we created the job I'm in now, the 22    Chief Operating Officer, to provide additional plant 23    oversight of all three of our plants.
24            We created a new position, an elevated position of 25    oversight and promoted Bill Pearce. We brought in Harry                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 84          1    Light, an executive from the Institute of Nuclear Power            2    Operations to be our Executive Officer of Engineering. We
 
3    need that time to make those strong implement changes.
4            We brought in a new group of executives from the 5    industry to provide us as a management team with some 6    insight on the types of problems we might be encountering.
7    And they gave us a tremendous amount of insight. Several 8    VP's from several top notch utilities came in.
9            I was personally moved to the Davis-Besse Plant, so 10    we could ensure that we had plans and organization to 11    return Davis-Besse back to service in a safe and reliable 12    manner. And I plan to devote a significant amount of my 13    time until I feel confident that our performance would be
 
14    sustainable.
15            I chartered the Root Cause Team to look at the 16    management issues. Steve Loehlein will now discuss with 17    you the methodology we've gone through.
18                      MR. LOEHLEIN:          Thank you, Lew.
19            Lew mentioned to you the AIT's report and our own
 
20    technical cause report talked about degradation of the head 21    over the years. What we're doing now, is caused now, is 22    looking at the why; why this happened over a period of 23    years, that this was not identified and dealt with.
24            I would like to say first to you, Jack, this team 25    that we have working on this particular issue really                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 85          1    understands how important the answer to this problem            2    statement is, because we know we can assure that the right 3    solutions are pursued so the plant will be able to sustain
 
4    safe performance.
5            Now, Lew mentioned earlier some of the assessments 6    have already been done by various industry leaders. And 7    they do provide a lot of understanding to many of the 8    performance shortcomings. What we're really doing in this 9    process is assuring that we're digging down.
10            Our objective is to compliment the effort that has 11    been taken on so far by applying the rigorous root cause 12    analysis technique, and that will ensure that they're more 13    subtle nonetheless very important causes for this upcoming 14    overall project.
15            Next slide.
16            We have our Root Cause Team in the front row. I 17    would like to ask them to stand. It's a group, I'll tell 18    you who they are. We have from our Perry Plant, we have 19    Mario Destafano and Bill Babiak. In our Quality Assurance 20    Organization there, we have Bill Mugge, Bobby Vallines and 21    Joe Sturdavant, who are all Davis-Besse men.
22            We have a couple of experts from Conger and Elsea, 23    Lesley Wildfong and Dick Smith. Now Conger and Elsea is 24    the company that developed the Root Cause Analysis 25    Technique that we're using to develop about 20 years ago.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 86          1    It's been used on a lot of very significant investigations,            2    including the challenge.
3            Final member we have here is Doctor Spyros 4    Traiforos, who was with us for many months also. We use 5    his analysis technique.
6            Now, the team -- oh, I'm sorry, I missed my own, my 7    comrade from Beaver Valley is Randy Rossomme. You forget 8    our own. Randy is from Beaver Valley in our Quality
 
9    Assurance.
10            And myself, I'm also with Beaver Valley. I was 11    Technical Lead. My title at Beaver Valley is Principal
 
12    Nuclear Consultant.
13                      MR. GROBE:              Steve, if you 14    could get those names to our stenographer, I'm sure that 15    would help her.
16                      MR. LOEHLEIN:          I'm sure they can, 17    some of those aren't easy to spell.
18            It's a balanced team. What we're looking for, a 19    continuity for Technical Root Cause, which is one of the 20    main reasons I'm on the team. We have process expertise 21    from outside consultants. We brought in the objectivity of
 
22    off-site personnel.
23            Then, we wanted to make sure we included the 24    ownership factor of on-site personnel. There are people 25    that need to be a part of this team, carry the message                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 87          1    forward to the rest of the team, if you want quality by            2    example. People that really know firsthand, understand 3    what we found, what it means to the organization. More or 4    less be disciples to the rest of the organization.
5            Now, not members of the team, but also helping us 6    are some oversight folks for us. We had Tony Maschari, who 7    has worked with nuclear power, excellent in human 8    performance. He's not been down to the site. I believe he 9    plans to be down sometime in the future.
10            Leonard Rone, an organizational effectiveness expert 11    that met last week with us, and he's providing us with 12    insights as well.
13            Next slide.
14            We have a few photos here. We don't have all the 15    team members in the upper photo, what we have in the room 16    at this time. Here you see us working on a discussion 17    topic. That's Lesley standing there, I'm sure making a
 
18    point about the process.
19            This is approach. Again, Lew mentioned earlier the 20    Technical Root Cause results. The Technical Root Cause 21    pointed us in a couple of specific directions. One is the 22    errors in the decision-making occurred over a lengthy 23    period. We saw that there were opportunities to do various 24    things over about ten years that were missed. And that has 25    caused us to recognize that the timeline is also therefore                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 88          1    lengthening that we need to consider.            2            The other thing that was important on a Technical 3    Root Cause was we had other plant indications that have 4    allowed earlier detection on a problem. These were not 5    properly understood or acted upon.
6            So, from those key understandings we're 7    investigating four major areas. One is the head itself.
8    Focus there to why wasn't the significance of the boric 9    acid buildup on the head recognized.
10            The next item there is pressurizer spray valve.
11    For any of you that read the Technical Root Cause 12    Investigation, there was an issue with boric acid pressure, 13    on the pressurizer spray valve in 1998 for which the plant 14    took a number of significant actions to try to gain
 
15    an understanding of the site focus, and guard for boric 16    acid. Yet somehow the effectiveness of the actions taken 17    there were not accurate to ensure that we identified the
 
18    problem on the head in the 2000 time frame.
19            We wish we had an opportunity at the time we were 20    reviewing that to regard that as significant issue to look
 
21    into.
22            The third one is the condition of the Containment 23    Air Coolers. The question asked was why wasn't the 24    significance of the increasing frequency and cleaning of 25    these coolers recognized.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 89 1            And the last major one listed there is similar.            2    It's the Radiation Monitor Filters, also the Technical Root 3    Cause of the monitors filters for them, were developing 4    clogging, boric acid, iron oxide; and why wasn't the 5    significance of that, that happening recognized.
6            Next slide, please.
7            We're using an in-depth approach on this, does take 8    some time, developing event and causal factors chart, and 9    we'll see a piece of that on the overhead here. We're also 10    using a hazard barrier target analysis technique in 11    conjunction with that.
12            The analysis process that we're using is referred to 13    as MORT. It stands for Management Oversight and Risk Tree 14    Technique. That has a number of sections; one on the right 15    side of the tree analysis chart that's designated as 16    Management Time Issues.
17            We've identified five key sections of that MORT 18    style analysis that we think are relevant here. One is 19    Technical Information Systems that are listed there. One, 20    I'll speak to for this.
21            I know the NRC, many of you are probably familiar at 22    NRC, used MORT yourself quite often over the years, many of 23    your trainings referring to it. But for those of you who 24    are unfamiliar with it, if I were to pick one of these out, 25    so management support oversight people understand why this                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 90          1    tree concept works.            2            If you look at management's role, this process 3    per se, management has three primary branches in our 4    obligations. One is to set policy or establish standards.
5    The next would be their responsibility to implement those 6    standards. And then the third major branch would be the
 
7    concept of managing risks.
8            Now, if you took that concept of managing risks and
 
9    looked at its branches, and set three branches to that, 10    would be information systems. How does management get 11    information it needs to understand what the risks are.
12            Then there is a process that evaluates called hazard 13    analysis. Now, that's the process you have in place to 14    make sure whatever happens out there you're evaluating 15    correctly, so it can be understood. 
 
16            And the third branch to that particular process is 17    program monitoring, that the programs you have in place 18    inform you and analyze the risks are effective in doing 19    that for you.
20            So, it's a very detailed analysis technique, which 21    is designed to see exactly where in these processes the 22    errors occur. As we get down through the conclusions of 23    them, we'll develop recommendations for consideration.
24            Next slide.
25            I can't see it very well, but from the copy I have                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 91          1    here, that upper left-hand photo shows really the cause            2    factors chart going down the lefthand side. What it shows 3    there is the information we collected for 1997 up to the
 
4    present.
5            We do have data points that go all the way back to 6    the early 80's, but that's because that's when the first 7    industry information came out regarding boric acid and how 8    it may affect the fasteners. So, we don't have a lot of 9    data that far back, but we're being thorough in going down
 
10    all the trails in relating to these issues and sections 11    that we're investigating.
12            So far, we have information from 69 interviews, and 13    well over 300 documents that are supplying the information 14    for this. The second photo shows, giving us a little tour 15    of the work chart.
16            Next slide.
17            As Lew mentioned earlier, we have from the 18    information we have, the understanding we have been able to 19    work with, at least, we've talked to Lew about other
 
20    management team, these management attributes, management 21    oversight-type things, been at the site. I pointed out a 22    lot of things, but we've also seen management attribute 23    factors that represent things that the site can work on in
 
24    terms of prebaseline proper standards and staff. And these 25    are the insights we have clearly from our data.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 92          1            As we mentioned earlier, we have had standards and            2    for years have lacked rigor. That strong management and 3    leadership has been able to have the right things happen, 
 
4    and performance of the plant has been good in those 5    periods. There has been lack of management oversight that 6    resulted in lax rigor in process implementation, and the 7    questioning attitude in some cases is not evident as well.
8            So, the actual work analysis is continuing. It's 9    pretty short timeframe, but we're working right along. I 10    can't take too long on getting certain things done. It 11    doesn't work that way, but for now these are our insights.
12            Lew, I'll go back to you.
13                      MR. MYERS:              Thank you.
14                      MR. GROBE:              Before we go on, 15    we have a few questions. 
 
16            Christine.
17                      MS. LIPA:              An obvious 18    question, and I'm sure there is no answer yet, you know, 19    the timeline for when you're going to start putting some 20    actions into place, because that will be important that we 21    decide how to do our inspections on those various tasks.
22    What's your estimate at this point?
23                      MR. LOEHLEIN:          What we're doing 24    right now, that's why we're working so close with Lew. So 25    much what we're doing now is, represents what we call                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 93 1    baseline proper standards, plus information out there on            2    the performance, can be measured as seen by, in forming
 
3    plans.
4            We need to do these conclusions and see what sort of 5    adjustments we have to make to those plans for any other 6    results we may conclude.
7                      MR. MYERS:              I think the report 8    will be this month.
9                      MR. LOEHLEIN:          We're expecting 10    it. Again, root cause, iron clad prediction on when we're 11    to be done, but we're expecting to be done with our 12    analysis and conclusions at the end of the month, and 13    that's where we are.
14                      MS. LIPA:              You plan to submit
 
15    that to us?
16                      MR. MYERS:              Yes.
17                      MR. DEAN:              Lew, this 18    question is not for you, but Steve. Clearly, you can take 19    some preliminary insights, and I'm sure they jive pretty 20    well, you know, even with what we do; conclusions you come 21    to just by seeing what transpired and how you get where 22    you've got.
23            Are there actions being taken now in terms of 24    rebaseline proper standards, but the things that we talked 25    about earlier, your revamped management team in terms of                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 94          1    driving those sort of standards and expectations down?            2                      MR. MYERS:              Yes, they are.
3    I'm going to talk about some of those in closing remarks.
4    As you said, we've made management changes, restructured 5    some, brought in people already, created some additional 6    oversight and a few positions; myself and Gary, and Bill 7    Pearce. So, we are taking actions as we move forward.
8    We're very conscious about the actions we're taking not 9    being negative actions, you know. So, yes.
10                      MR. GROBE:              I have to say, I'm 11    still frustrated in this area. I have a great deal of 12    confidence that once you apply yourselves, the technical 13    problems and the systems area and reactor head and 14    containment setup condition and all those things, that you 15    can do that work well, but safe restart, and more 16    importantly, safe operations after restart on a continuing 17    basis, is key in this area.
18            And, these preliminary insights, while I know that 19    you have more data to support them, these insights today, 20    we could have probably sat down a week after the discovery 21    of the cavity and come up with these issues.
22            And like I said, Steve, I know you have a lot more 23    data to support these issues and will be developing further 24    insights, but this is the key in my mind, to long term 25    improvement of the plant. And it's also the key to                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 95          1    restart, along with all of the mechanical processes that            2    you're going through the systems.
3            Christine asked a question, and maybe I'm just 4    asking the same question again. When are we going to have 5    a clear understanding of specific actions; what your 6    expectations are as a result of those actions, what your, 7    how you're going to measure progress in those areas, what 8    performance indicators you're going to use on how
 
9    performance in these areas are changing?
10            Before you answer that, let me just add one more, 11    one more thought. Some of these issues deal with 12    management, some of them deal with staff. Clearly, you've 13    made a substantial change in your leadership team, your 14    senior leadership team, but day in and day out every 15    individual in the plant has to be a leader for excellence.
16            And, the first level of oversight doesn't come from 17    management. It comes from first line supervisor, 18    maintenance foreman, the field operator is overseeing 19    implementation work by other operators. I don't see 20    anything in here regarding that level. Could you speak to
 
21    those issues a little bit?
22                      MR. MYERS:              Yes. Let me go 23    through my closing remarks a little bit. I think that will 24    answer these questions.
25            I think we've demonstrated today that our Building                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 96          1    Blocks have moved from the planning, discovery and into the            2    implementation phase in many areas. Okay.
3            We have taken strong actions to incorporate the 4    comments from our Restart Overview Panel, the meetings we 5    have had with the NRC and the comments we've heard since
 
6    the last meeting.
7            We are taking management actions that are 8    substantial and demonstrative.
9            Let me explain that. As I said, we created a new 10    position of Chief Operating Officer, so that we would have 11    more day-in day-out involvement in making sure standards 12    between our staffs are fine.
13            Let me give you an example. At our other two 14    plants, we're running the same process in corrective 15    action. And when we ask for operability determination, 16    inoperability determination; at Davis-Besse it was 17    inoperability justification.
18            That minor difference sent the wrong message. We 19    created the executive, the position of Executive Vice 20    President in Gary Leidich. And then we created VP of 21    Oversight. Those were all pretty substantial changes at 22    the senior level. New senior management team, and a strong 23    management team is now present with, every day at our 24    Davis-Besse Plant with proven leadership. And we've 25    clearly shown that, when we have the strong leadership at                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 97          1    the plant that's involved with everyday activities, that 2    the performance of the plant is efficient.
3            We've brought Mike Ross in, just at the end of the 4    table, to focus on the operations area. We've already 5    chartered mine. We evaluate attributes of every operator 6    at our station, until we have the right attributes for each
 
7    position; from nonlicensed operator, to the licensed 8    operator, to the, to the control advisors, he's charting 9    that activity.
10            We're providing a case study with all of our 11    employees that sets expectation that change of ownership 12    and standards need to be made. We're sitting down with 13    your boards and spending a lot of time in that effort. We 14    will be going back and evaluating each of our employees to 15    our standards. We're rebaselining our standards; do we 16    have the right standards.
17            I've seen some cases where I thought some of the 18    leadership action standards, if you will, that we've had in 19    place, have deteriorated. We're going to rebaseline those 20    standards. And they will clearly learn, monitor and 21    reinforce those standards at supervisor and manager 22    levels to make sure they understand and they can comply.
23    It's that simple.
24            We've created a new engineering standards of 25    excellence already. That will be a model for each of our                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 98          1    groups. We created a new Engineering Assessment Board. We            2    intend to use that board, it's in their charter to provide 3    you the input you need to know about the quality of the 4    work. And, we'll continue to do that in other areas.
5            The Plant Manager, Randy Fast, is now chairing our 6    Corrective Action Review Board. In my mind, this is the 7    most important program at our plant. And I intend to have 8    Randy provide me detailed performance indicators on the, on 9    the thoroughness of corrective action from that board.
10            How many comments do they have to make for our 11    standards and how many outages have they checked. But 12    Randy is going to charter that board. That's not short
 
13    term. I consider that permanent.
14            The new operations of leadership to ensure the plant 15    operational focus is absolutely necessary. It was missing 16    in this, this whole issue over the years. It was ours.
17    And if you look, we brought in Mike Ross, and we chartered 18    him to provide us indications that we have the right
 
19    performance modeling tools in assessing the office of the 20    organization. That's his charge.
21            We need, have to build teamwork between our 22    managers, supervisors, and line workers. If we can't get 23    that done, then we probably won't be ready to restart; not 24    ever for restart. So, we have to be all on the same page.
25            At our next meetings, we intend to provide you                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 99          1    performance indicators on how each one of these actions are            2    taking place. What's the effects. What are we seeing from 3    the Corrective Action Program, Engineering Assessment 4    Board, and what are we seeing out of the Oversight Review 5    Boards that we put in place, some on a temporary basis.
6            But we consider Engineering Overview Board a 7    permanent fixture. I don't see those ever going away. Who 8    continue to be committed to comprehensive approach to 9    ensure the Davis-Besse Plant is safe and reliable, and once 10    again, we will make sure that we will have sustainable 11    performance. We want to let you know that.
12            That's what I have to say.
13                      MR. GROBE:              Okay. Any
 
14    questions?
15            Okay. Before we go on to the next session of the 16    agenda, which is discussing the framework for restart 17    checklist, I think it's appropriate for a couple comments 18    right now.
19            This has been a very comprehensive presentation on 20    the status of a variety of activities. I think over the 21    past month we've seen a substantive change in the focus and 22    scope on a number of the activities. And that's been the 23    result of your assessments of what you're doing and how 24    you're going to accomplish it. It's been the result of 25    some input from our staff, as well as some input from                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 100          1    outside influences. And, I think that's very healthy.            2            The area as I mentioned a moment ago; many of these 3    activities in the management performance area were clearly 4    future tense activities. I'm eager to get into some more 5    detail in this area, to understand specifics of what these 6    activities look like, how you measuring them, what your 7    expected outcomes are on specific activities, and what your
 
8    personal restart criteria are going to be in these areas.
9    And, I think this is very important. 
 
10            At this time, John?
11            He's good. Let's move on.
12            I wanted to provide framework, clearly comprehensive 13    framework for the NRC Restart Checklist. Obviously, you've 14    got your, one of your Building Blocks here at your restart 15    plan, specific criteria for whatever items that need to be 16    resolved from restart, whatever items that possibly can be 17    deferred until restart. I suspect before you're done, you 18    already have a, many hundreds of items identified that 19    you're going to screen, and probably several hundreds that 20    you've probably already identified that are a result of
 
21    restart.
22            Our research in this has to be much simpler. And 23    it's going to have a framework that covers a number of 24    areas. Obviously, we have to see root cause, is very 25    important. The adequacy of structured systems and                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 101          1    components hardware in the plant. We've added some 2    programs.
3            This is, our restart checklist is to a large extent 4    going to mirror your restart plan. Adequacy of 5    organizational effectiveness in performance.
6            As I mentioned a few moments ago. I personally 7    strongly believe that the first line supervisor is the key 8    to the long term exceptional performance. And this is 9    written a little bit different than what yours is, 10    management effective. We've structured this more I think 11    broadly organizational factors. And, sub items we're going
 
12    to get into in a little detail.
13            Readiness for restart, what we're going to be 14    looking at in several areas, both the hardware as well as
 
15    the people, and licensing issues. And, as this restart 16    checklist involves, and I'm going to talk about a couple of
 
17    these sections in more detail; Christine is going to talk 18    about one or two; Bill is going to be talking about one of
 
19    the sections. 
 
20            But as the checklist gets formulated, and is issued 21    by the NRC, it's important that we have a clear 22    understanding of the specific items. And I think as you've 23    gone through your structuring and restart plan, you can 24    find a very close alignment. We can provide you with a lot 25    of feedback. And I think it's going to naturally meld                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 102 1    together, because the issues that are important to us,            2    we've been identifying the issues that you've identified or 3    reports have been good.
4            So, I expect there will be a clear alignment. One 5    of the purposes of publishing the restart checklist. There 6    is actually two purposes. One is a very clear 7    communication between us of what the expectations are. I 8    would say minimum expectations on prior to restart. We 9    would like to go far beyond these specific activities in a 10    number of areas. And secondly, to clearly indicate to the 11    public what the NRC expectations are prior to restart.
12            Let me talk a little about bit root cause. We've 13    received documents from you regarding what I'll call 14    technical recalls. And Steve, you mentioned that earlier.
15    It was called something different. I think it was actually 16    called root cause analysis, but didn't go into the level of 17    detail that Steve's team is using today, more to his 18    industry recognized processes at this point, which many of
 
19    our staff do.
20            It's very solid approach to identifying all the 21    organizational factors in the problem, so I'm certainly 22    looking forward to that. The technical response is 23    specifically focused in two areas, that's cracking, 24    penetration, corrosion, what caused that, what contributed 25    to it. That was presented, I believe, on May 7th at                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 103          1    headquarters, public meeting to the NRC staff and other            2    folks. I think that's very well understood and we were 3    completing our evaluation of that part of the root cause 4    and that would be published and when we complete our 5    review, we will provide that to you.
6            The second area of the reconnaissance, what I refer 7    to as the software side, that's the organizational 8    programmatic and people, and obviously, you haven't had 9    your review yet, so we haven't performed our formal review 10    of the facility; and we'll be doing that.
11            Christine, I think, has some scope of the advocates 12    of the systems out, to go over there.
13                      MS. LIPA:              Sure, let me just 14    talk a little bit in general about the checklist we have.
15    I don't know if you guys got a copy of it. It was in our 16    handouts and we can't see the projector.
17            But this is, we're calling this a framework for the 18    checklist. This is not the checklist. And the panel is 19    working to develop the checklist based on some of the 20    things Jack referred to in root cause, AIT Inspection
 
21    results and other items.
22            Then, once the checklist is developed and approved 23    by the panel, it would be reviewed and approved by agents 24    and management. So, this is the framework for today.
25    We'll get you a handout.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 104          1            The first item that I have on here, 2 A, is the            2    Reactor Pressure Vessel Head Replacement. John gave you 3    some details earlier on some of the inspections that have 4    already been started. The inspections will continue.
5            The second item is Containment Vessel Restoration 6    Following The RPV Head Replacement and obviously opening
 
7    the containment and reclosing and testing as part of that 8    inspection that we'll be doing.
9            The third one are Structures, Systems and Components 10    Inside Containment; and it's really similar to the 11    presentation you gave earlier. The things that we're 12    interested in are some of the things you're interested in.
13    What damage might have been done to various components 14    within the containment head as a result of the boric acid.
15            That includes equipment, electrical equipment, 16    mechanical equipment, environmental qualification for some
 
17    of that equipment, the containment air coolers and the 18    radiation monitors. We'll also be taking look at the
 
19    monitor plan on the sump and fibrous insulation issue. 
 
20            And then the final supplement in this area, our 21    Systems Outside Containment. Specifically systems that 22    contain borated water and also some of your important 23    systems determined by your managerial criteria.
24            That's how we intend to approach this area. 
 
25            Jack?                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 105          1                      MR. GROBE:              I just wanted to            2    comment. These are broad categories. When we describe as 3    framework; specific inspection, the scope of inspection in 4    each of these areas will be different. They will be 5    dependent upon the root causes of what resulted in the head 6    degradation issue at Davis-Besse.
7            The reason we haven't presented this checklist 8    earlier is that I didn't want to be in a position to find 9    what was necessary. You've been working through a number 10    of these areas. You've evolved over the last month, month 11    and a half, and I want to be sure there was, you had a 12    clear vision of what you thought was important.
13            We've provided feedback already in a number of these 14    areas. Also done a variety of inspection activities; Mel 15    Holmberg on the structure systems and components; John and, 16    Don Jones have done a number of inspections regarding 17    vessel head replacement in the area, nondestructive 18    examination; and we've already laid out the inspection plan 19    for the, what we're planning on looking at with respect to 20    the, the code records for the necessary vessel head.
21            Shortly after we finalized this checklist, which I 22    expect in the next week or two, we'll be finalizing our 23    inspection plans, and get that schedule to you as well as
 
24    some detail on the scope of the inspection.
25            Schedule obviously is dictated by you. We can't                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 106          1    inspect anything until you've completed work. And, we may            2    be able to do some, or some inspections have to be done in 3    process. For example, nondestructive examination 4    inspection had to be done in process and that's already
 
5    been completed.
6            So, as we begin to develop the inspection scopes at 7    least, we will be clearly communicating that to you. The 8    leaders in each of these areas will be working closely with 9    your staff. I understand your schedule and my staff's, 10    watch the progress in those areas and be able to step in
 
11    and do our inspection at the appropriate times.
12            I think Bill was next going to talk about
 
13    problematic areas.
14                      MR. DEAN:              Very briefly. I 15    think it would probably seem a pretty good matchup here in 16    terms of programs that we're interested in looking at are 17    relative to the ones that you identified yourself here 18    today. Clearly, the basis of looking at these is that we 19    need to assure ourselves that the Licensee are assessing 20    your programs and they are in a self-critical manner; and 21    putting in place effective corrective actions which would 22    ensure those programs are effective in the future.
23            You will participate in assessment of the accuracy 24    of some of the programs. The one there that is a bit of a 25    delta is items received as audit and self-assessment                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 107          1    programs. And our intent there is that, we believe that we            2    can look at organizationally how do you put in place, say, 3    a process by which you have independent and organization
 
4    itself critical process, and that the results that emanated 5    from that process are treated appropriately.
6            So, that's one that's a bit of a delta that you have 7    to provide us here today.
8                      MR. GROBE:              Thanks. I think 9    that's a real good point. We view corrective action 10    program, an operating experience program, a self-assessment 11    program as really part of the corrective action program; 12    and, to be completely effective, it requires a number of 13    components, and we've separated that out in our checklist.
14            You're taking actions in all of these areas. It's 15    just that you haven't specifically defined in your 16    programmatic reviews things quite the same way as we have
 
17    here.
18            I was going to talk a little bit about 19    organizational effectiveness. This is the area you 20    probably won't get a lot of specificity from our checklist 21    at this point, but there are no NRC requirements in this 22    area. The organizational effectiveness and human 23    performance are actually critical safe operations. The 24    detailed look at this is going to be driven by, to a large 25    extent, by what you choose to do in this area.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 108          1            The results of this activity, of your effectiveness            2    in this area would be directly reflected in all of the 3    other inspections. And, organizational effectiveness, 4    human performance, will be measured by your performance in
 
5    all these other areas.
6            So, I will be closely monitoring activities, as well 7    as the outcomes of those, as the organization performs
 
8    during its approach to the restart.
9            The next area is Readiness for Restart, and I would 10    expect that the Systems Readiness for Restart is different 11    than your System Reviews. That's more akin to what you may 12    call a checklist. It's part of the systems in an
 
13    operational configuration for operations.
14            Operations Readiness for Restart is an operational 15    organization of people. Operations, are they ready to make 16    the transition from shutdown plant to operating plant. And 17    obviously, test program, a number of activities that are 18    going to be accomplished both prior to restart as well as
 
19    during restart process, accomplish testing.
20            So, those are the three focus areas or the framework
 
21    for the restart.
22            I'm going to ask Doug Pickett to talk a little about 23    the licensing issues, and I'll wrap it up.
24            Doug.
25                      MR. PICKETT:      Okay, regarding the new                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 109          1     reactor vessel head, there is a number of licensing            2    issues. This is where we require approval prior to 3    restart. And all the issues under item 6 are basically 4    documentation issues of paperwork, if you will. They 5    shouldn't require any modifications or plant repairs.
6            The first four items are basically requests from the 7    NRC code. The next are the spec requirements, and they 8    allow us --
9    (Requested speaker to repeat) 10                      MR. PICKETT:            The regulations 11    allow the staff to accept alternatives to the ASME Code, 12    providing the staff is convinced there is an equivalent 13    level of safety. Staff makes at times findings on all
 
14    plants.
15            The item 6e, is documentation of the reconciliation 16    between ASME Code, the new Midland Reactor Pressure Vessel 17    Head. 
 
18            And the final item is additional documentation 19    provided on Verification of Technical Specification 20    Pressure/Temperature Curves for New Vesssel Head.
21            And, your staff is aware of these issues, and it's 22    my understanding that you're preparing letters for the 23    staff's review, and we should see those shortly.
24                      MR. SCHRAUDER:               That's
 
25    correct.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 110          1                      MR. GROBE:                  Okay.            2    Thanks, Doug.
3            I believe that -- well, all of these areas are 4    fluid. We're going to shortly tie down what we believe to 5    be the restart checklist in the NRC perspective.
6            As Christine mentioned a few moments ago, once the 7    panel finalizes what it thinks should be on the restart 8    checklist, that will be by Jim Dyer, Regional Administrator 9    in Region 3 in Chicago, as well as Sam Collins, the 10    Director of the Office of Nuclear Reactor Regulations.
11    And, not until they approve it will we issue it to you and
 
12    to the public.
13            I wanted to go into some detail today just to give 14    you a scope and framework for what we're looking at from 15    the restart checklist perspective.
16            One area that may have the most validity is the 17    Licensing Issues Resolution. There may be other activities 18    that come up that require either substantial safety 19    regulations, or licensing actions as you go through all 20    your system reviews. And certainly licensing actions are 21    something we would have to take a significant safety 22    evaluation, and complex safety evaluations, we'd likely
 
23    take a look at also.
24            So, that area is going to be somewhat fluid as 25    things evolve over the last couple of months. The other                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 111          1    areas likewise can also have issues added to them. It            2    depends on the significance of the issue. We're going to 3    be identifying a lot of things. I wouldn't expect many of 4    them to appear on this checklist, but if it's something of 5    particularly significance, the checklist would be updated 6    and they would be added to the checklist.
7            This is the first time I've shown this to you. I 8    wanted to get it out on the table and make sure you had a 9    clear understanding and respond to any questions you may 10    have regarding this framework.
11            Any questions from your side?
12                      MR. BERGENDAHL:        Give an example, 13    like something that is systems outside containment.
14                      MR. GROBE:              Sure. The one 15    specific issue, again restart checklist should be driven 16    from issues that result in the shutdown. So, clearly 17    systems containing boric acid. Water has boric acid in 18    it. I want you to focus for those constant factors.
19            But in addition, many of these areas; the 20    organizational effectiveness on human performance 21    characteristics that were, that resulted in head 22    degradation, may have resulted in other system 23    degradation. And so, we're going to have to see in that
 
24    area also.
25            I can't give you scope of the inspection at this                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 112          1    point, but I can tell you that we would be scanning a            2    variety of the work that you're doing in the area of your 3    system reviews, as well as some independent work. Areas 4    that you may not have done to benchmark the quality of work 5    that you have completed. 
 
6            So, does that help out?
7                      MR. BERGENDAHL:        Yeah, I understand
 
8    that.
9                      MR. GROBE:              Other questions?
10            Okay. Very good.
11            Lew, do you have any concluding remarks before we
 
12    finish the business portion of the meeting?
13                      MR. MYERS:              Well, I thought 14    this was a productive meeting. I think we accomplished our 15    desired items. What I heard was next time we will have 16    Bill Pearce here to talk about oversight; Clark Ross will 17    give us performance indicators and work off curves and what 18    we're doing and what we're identifying, have that at the 19    next meeting. And finally, on a management issue, focus on 20    the actions we're going to take and how we're going to, the 21    amount of the effectiveness of the actions. Okay?
22                      MR. GROBE:              Sure.
23                      MR. MYERS:              Okay.
24                      MR. GROBE:              Let me add one or 25    two things to that, just to make sure you have a complete                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 113 1    list.            2                      MR. MYERS:              Okay.
3                      MR. GROBE:              I think we talked 4    about the oversight boards. And, did you mention that, 5    value, they're adding what their function is?
6                      MR. MYERS:              Right.
7                      MR. GROBE:              And also, I would 8    like to hear specifically about some of the more 9    substantive issues that your activities have identified.
10    So, that's more of a specific finding focus discussion.
11    So, not only the performance indicators, or how many things 12    that you're finding and how many things you're working on, 13    that sort of thing, but also some specifics on more
 
14    specific issues.
15            And, as we go through and inspect those activities, 16    we'll also be presenting these meetings on special 17    findings. So, we'll be discussing results of our
 
18    inspections.
19            So, I think that's kind of a healthy going-forward 20    spectrum for these meetings. Performance indicators, work 21    progress, specific findings that you have, value added 22    oversight boards, value added from Bill Pearce's staff and 23    oversight, and then we'll give you our feedback as we have
 
24    from the results of our inspections.
25                      MR. MYERS:              You know, I think                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 114          1    if you look at the event, and we had our first meeting,            2    this is our third; I think we made good progress for the 3    last meeting, and this meeting I think, I believe we've 4    moved into implementation, and now we're going to go into 5    really good monitoring of some of these things we're 6    talking about. We'll be ready to do that the next time. I 7    don't see any problem.
8                      MR. GROBE:              Just a final 9    thought. I've, over the last couple of months, I've seen 10    an evolution in your approach towards this project.
11    Clearly, what you've articulated here today is a more 12    comprehensive and more thorough evaluation than what might 13    be the minimum mandated by the, the issues contributed to 14    the head degradation. And I think also clearly what you've 15    articulated today is commitment to go beyond those issues 16    as far as improving not only the reliability of the plant, 17    but safety of the plant and margins to safety. 
 
18            So I think those are good, good indicators. And, 19    you also presented today some, in the area of the head, 20    specifically head replacement and substantive problems.
21    And we've been inspecting those activities and found good 22    results from your work, as far as the work that you've
 
23    done. 
 
24            So, I think this meeting has been helpful to us.
25    It's been fairly comprehensive. It's been giving us a good                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 115          1    benchmark where you're at, and going. And we look forward            2    to our next meeting, which I expect would be around the 3    middle of the month, next month. And we'll work out that 4    schedule with your staff.
5                      MR. MYERS:              Thank you.
6                      MR. GROBE:              At this point, why 7    don't we take a eight minute break, which I expect will be 8    ten by the time everybody gets back in their seats; give 9    Marie a break; and then we'll convene the public portion of 10    this meeting where we can receive questions from the 11    public; NRC staff can receive questions from the public, as 12    well as any feedback that you may have that you want to 13    share with us.
14            So, we will be convened. I have five minutes 15    until. Let's convene at three minutes after. Thank you.
16    (Off the record.)
17                      MR. GROBE:        This portion of the 18    meeting is particularly focused on the NRC staff receiving
 
19    input and feedback from the public. And there is a pad of 20    paper on the podium up here, as well as the microphone.
21            And I would like to begin with any local members of 22    the community in the Oak Harbor area, in the areas 23    surrounding the Davis-Besse Plant as well as any local 24    officials that have thoughts or questions that they want to 25    ask, and then move into any other individuals that have                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 116 1    thoughts or questions.            2            So, anybody that's interested in providing us some
 
3    thoughts or comments or has a question, please come up to 4    the podium, and we're available to answer those.
5            I didn't think you'd miss a chance at this.
6                      HOWARD WHITCOMB:        I guess I have to
 
7    lead it off, Jack.
8            In follow-up to your comment that you made about 9    first-line supervision, I would offer the following 10    observation. This afternoon, I've heard essentially two 11    prongs, if you will. One is a technical fix to the 12    corroded reactor vessel head and then the other is the 13    software fix or management fix involving the root cause 14    analysis determination, so forth.
15            What's been provided by First Energy this afternoon 16    is a time frame for the technical fix. What has not been 17    provided is a time frame for the management fix. Clearly, 18    the technical issue is probably the least significant, but 19    I haven't this afternoon, Mr. Grobe, heard First Energy's 20    first prioritization of the management issues.
21            In other words, what are the root cause 22    determinations?  Why did they occur?  And how is First 23    Energy going to address them to prevent recurrence?  And 24    this afternoon, we haven't heard anything with respect to 25    what priority First Energy has attached to that aspect and                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 117          1    how that's going to essentially factor into restart of the            2    Davis-Besse Plant.
3                      MR. GROBE:              Okay. Excellent 4    question. I think I heard two parts. I think both 5    Christine and I had asked very similar questions today.
6            You're correct that the root cause analysis is not 7    complete. The specific structure of what activities need 8    to be taken by the plant has not yet been decided by the 9    plant. And, we're here to get those also and look forward 10    to those more detailed specifics at our next meeting next
 
11    month.
12            The other question I think is also a fair question, 13    and it's not one for me to answer, but I would ask Lew or 14    Howard if they want to comment on what priority you place
 
15    on the, addressing the causal factors of more on the human 16    performance organization effectiveness as contrasted with 17    the priority placed on the hardware fixes?
18                      MR. MYERS:              Well, in my mind, 19    the management issues, I'm sponsor to the management 20    issues, is pretty high priority. That's the reason I am 21    the sponsor, because we realize we've had, we've made some 22    pretty significant organizational changes already at the 23    upper levels. We've improved the senior team at the 24    station, has changed considerably.
25            As we go through finish up with the work processes,                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 118          1    we'll probably find some additional insights of training            2    and standards that we need to take. And then finally the 3    programs reviews.
4            As you go through these program reviews, we've got 5    to make sure we've got good industry standards on our 6    programs, that we have good ownership of our programs, and 7    we have to go on to monitor implementation of each and 8    every program. We're going to do that. I don't know that 9    every one of those is required before restart, but we're 10    certainly going to look at our programs very hard for
 
11    restart.
12            And the final thing is our independent review board 13    that I talked about. We won't restart the plant until that 14    board thinks we're ready to go.
15                      MR. GROBE:              Okay. Anything 16    else, Howard?
17                      HOWARD WHITCOMB:        No, that should do
 
18    it.
19                      MR. GROBE:              Okay, thank you.
20            I did realize that I had forgotten to introduce one 21    NRC staff member that is here today. And, I thought he had 22    left. So, I was really feeling badly, but I just noticed
 
23    that he came back in the room. So, let me take this 24    opportunity to introduce Marty Farber.
25            Marty, where did you go?  There he is over in the                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 119 1    back.            2            Marty is a very experienced inspector in the Region 3    3 office. Outstanding performer for us. And he has taken 4    on the responsibility to be a leader on the, what we call, 5    the AIT follow-up inspection. He's been working in 6    Regional office for several weeks and is on-site this week 7    bringing focus on the AIT findings, as far as the, whether 8    those findings or which of those findings represent 9    regulatory violations and what the significance of those 10    violations are.
11            So, over the next couple of weeks, I expect Marty 12    and possibly some other staff from Region 3 support will be 13    completing the AIT follow-up inspection.
14            I didn't want to miss the opportunities to introduce 15    Marty. So, I apologize Marty for not catching you earlier.
16    You were on my list and I missed you.
17            Are there other members of the Oak Harbor community 18    that have questions or comments?
19            Any elected officials that have questions or public 20    officials that have questions?
21            Okay. Very good.
22            Are there other members in the audience today that 23    have questions for us or comments that they want us to
 
24    consider?
25            Yes, sir?                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 120          1                      JOHN MILLER:            My name is John            2    Miller. I'm a reporter.
3            Mr. Grobe, if you were king, what would you do about 4    the notion of the safety culture of the emphasis you put 5    today on first line supervisors having the kind of safety 6    attitude so that they catch problems as they arise rather 7    than pinning the safety of the plant only on the senior 8    management in some kind of bureaucratic process of CRs that 9    would, that would find problems?
10            In other words, what do you think ought to be 11    happening, not only at this plant, but around the industry 12    in this matter of training or evaluating safety culture?
13                      MR. GROBE:              That's a big 14    question. First off, let me take a step back. Our
 
15    inspection program is built upon a number of fundamentals.
16            And, Bill, maybe you can, as I go through a couple 17    things, maybe you can think through this and provide some
 
18    additional thoughts.
19            We have characteristics in our inspection program, 20    which we call cross-cutting issues. And what cross-cutting 21    issue means is, it's something that affects safety 22    performance across the plant in any of the various safety 23    cornerstones, is what we're calling them.
24            One of the cross-cutting issues is Human 25    Performance, and it's the focus of our inspection program.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 121          1    Second cross-cutting issue is the Corrective Action            2    Program, and safety culture of the plant. What we 3    sometimes refer to as the safety conscious work 4    environment.
5            These issues are underpinning issues for our entire 6    inspection program, and we have a number of activities that 7    we conduct that focus on those. One of them has to do with 8    periodic, what we refer to as problem identification and 9    resolution inspection. And, that is specifically, focuses 10    on the activities it takes to evaluate problems, identify 11    problems, evaluate them, resolve them. It's a risk-focused
 
12    inspection, meaning take the highest risk significant
 
13    issues and ensure that those issues are being identified 14    and resolved.
15            We also have periodic activity where we go into 16    depth. Some people refer to it as drilling down into an 17    issue. Where an issue of particular, what appears on the
 
18    surface to be more significant than other issues that come 19    up on a day-by-day basis, we will drill down into the 20    issue; not at the same extent, but similar to what Steve 21    Loehlein has done with respect to this issue, and make sure 22    that the Licensee is going to do a good job identifying the
 
23    causal factors and correct it.
24            The last aspect of what we do currently focusing on 25    safety, but I think you used the word safety culture, is                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 122          1    each of our inspectors when they go out to a site, whether            2    they're health physicists, security inspectors, engineering 3    inspectors, whatever different flavor of technical 4    expertise they have, spends a certain period of their 5    inspection time on site looking at the effectiveness of the 6    Licensee's programs to identify problems and fix problems.
7            Bill, do you have, any thoughts that you have?
8                      JOHN MILLER:            Maybe if I could
 
9    rephrase the question, because I think, I think I did 10    confuse you. You said to Mr. Myers; Mr. Myers, you know, 11    I'm frustrated, I don't believe you have done enough in 12    telling me about how anybody at the plant below high level 13    management is going to be operating in a sufficiently 14    safety-minded mode; and you told him you want to see next 15    time what he's going to do about that.
16            So, I'm asking you, what do you think he ought to
 
17    do?
18                      MR. GROBE:              I appreciate, 19    maybe I misunderstood your question. I apologize.
20                      JOHN MILLER:            It wasn't clear, 21    I'm sorry.
22                      MR. GROBE:              It's certainly not 23    my place to tell Mr. Myers how to fix his problems, it's my 24    place to evaluate how effectively he does it. And there 25    are many ways to choose to address these kinds of issues.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 123          1    And they've been addressed at a number of plants around the            2    country. And, outside of nuclear power, there are 3    organizational effectiveness experts, and they're applied 4    in big corporations, small companies across the country.
5            So, it's, Mr. Myers and his team's responsibility to 6    bring to the table what they plan, and we make sure that to 7    our satisfaction that it is comprehensive, and then we'll 8    make sure from a planning prospective and make sure to our 9    satisfaction that, that it's been effectively implemented.
10            And, we'll be presenting to you the results of our 11    inspections at these types of meetings in the future.
12                      JOHN MILLER:            Okay. If you 13    would humor me just one more time.
14            Back to the first question. If you were king, if 15    you were the NRC Commission, you would be safe to saying 16    something more generic than I would just let all of the 17    utility managers around the country find their own way to a 18    program that ensures that first level supervisors are all 19    safety minded enough. What would those generic
 
20    requirements be?
21                      MR. GROBE:              Again, it's, in 22    the organization, as well as any other organization, there 23    is all kinds of different ways. Each organization has, has 24    a character to it; and one solution in one organization 25    might not apply. Different parts of the country have                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 124          1    different characteristics of people and how they, what            2    motivates them. What brings focus to their work. There is
 
3    no cookie cutter solution to this kind of a problem.
4            And, what's important is for Mr. Myers to define 5    what it is that he thinks is going to fix the issue here at 6    Davis-Besse, and then we'll evaluate his implementation.
 
7            And, as I mentioned earlier, the results are going
 
8    to be in the performance in the other areas of the restart 9    checklist. Whether his activities are successful or not 10    would be clearly evident, not only in the performance 11    indicators that he develops to evaluate human performance 12    and organizational effectiveness, but also the results of 13    the specific activities that are undertaken to improve the 14    plant, to accomplish the work.
15            Randy Fast talked about replacing the air coolers.
16    That's a fairly large work activity that involves 17    engineering, involves maintenance workers, involves maybe 18    construction workers, depending on the scope of the work.
19    And, you know, we'll be inspecting those sorts of 20    activities in the plant.
21            And so, there is a number of ways that we're going 22    to be evaluating the effectiveness, not only through the 23    specific limitation actions under that cornerstone -- I'm 24    sorry, building block, but also in looking at the 25    performance of the staff and the organization.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 125          1                      JOHN MILLER:            Could I ask one 2    more question on a different point?
3                      MR. GROBE:              Certainly. That's 4    what we're here for.
5                      JOHN MILLER:            One could make a 6    case that this is an example of something, that 7    Davis-Besse's situation is an example of something that the 8    NRC hopes never to see.
9                      MR. GROBE:              I'm sorry, what?
10                      JOHN MILLER:            NRC hopes never to 11    see. What's that, given that you don't have enough 12    resources to inspect everything, you have a kind of 13    sampling inspection program; you inspect some things, not 14    others. You have a risk base analysis. Hopefully, it's 15    what appears to be the most important things.
16            But we now have a plant that by your annual 17    inspection performed quite adequately, but under new 18    management you say, it's clear over perhaps a decade or 19    more, numbers of individuals missed what in hindsight would 20    seem to be very simple indications of problems. 
 
21            And the last time on June 12th at the public 22    meeting, at least, I think you and your assistant both 23    agreed that, that the local inspectors priorities on what 24    to inspect would not have this kind of a situation, boric 25    acid on the reactor head, anywhere near the top of the                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 126          1    list; it would be way down on that person's radar screen.            2            Given that, what would you say to the argument that 3    maybe this inspection team doesn't work; and, if NRC wants 4    to be able to prove to its own satisfaction and to the 5    satisfaction of the public that such a thing is never going 6    to happen again, given that it was such a near miss to a 7    LOCA, that the only solution would be a much larger 8    inspection program, inspecting many more things than are 9    required, many more financial on the human resources.
10                      MR. GROBE:              I apologize, I've 11    forgotten your name.
12                      JOHN MILLER:            John Miller.
13                      MR. GROBE:              John, there is a 14    number of things that are ongoing. You ask very good 15    questions, and Bill is itching to add to my response. I'll
 
16    pass the microphone to him in a moment.
17            I'm sure you've heard the old adage, don't throw the 18    baby out with the bath water. I'm certainly not willing to 19    condemn the entire inspection approach or other, any of the 20    other broad statements that you've made, but what the NRC 21    has undertaken, is ongoing right now, here last month, if 22    you had an opportunity to hear Art Howell and Ed Hackett 23    present publicly what we refer to as a Lesson Learned Task
 
24    Force.
25            And the Executive Director, the head guy of the                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 127          1    Regulatory Commission has chartered a group of people            2    completely independent of anybody that's involved at 3    Davis-Besse to take a real hard look at inspection 4    programs; how we handled generic safety issues, our 5    interrelationship with the international community, and 6    lessons to learn. And I think there were a couple other 7    items on the charter for Lessons Learned Task Force.
8            I can't remember all of them off the top of my head, 9    but that task force is working. They have spent a good 10    deal of time at the Davis-Besse site talking to Licensee.
11    They've talked to an incredible amount of NRC staff.
12    They've collected a wealth of documents.
13            The task force is fairly broad, and as far as 14    numbers and scope or perspective individuals that come from 15    a variety of parts of our organization, technically as well 16    as geographically. So, I'm looking forward to the results 17    of their assessment, things that we can follow on a
 
18    inspection program.
19            Bill, did you have additional comments?
20                      MR. DEAN:              John, I just want 21    to point out two things. One is, that if you looked at 22    nuclear industry as a whole, and where performance was ten, 23    fifteen years ago, and where performance is today as an 24    industry, there has been a lot of benefit gained from the 25    collective experience, and our inspection program has been                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 128          1    designed relative to that collective experience.            2            And, what we have here at Davis-Besse is a new 3    experience. And I would offer that our inspection program 4    has the flexibility to be able to be modified, if 5    appropriate, to address new phenomenon and new issues that
 
6    might emerge.
7            And, relative to your comment about boric acid on 8    the vessel head not being important. I guess I would like 9    to point out that over the past couple of years, as we have 10    learned more as an agency and as an industry about issues 11    associated with CRDM nozzle cracking and learning about the 12    different types of phenomenon and so on and so forth, I 13    think there is a fairly significant track record over the 14    last couple of years that indicates the significance and 15    the seriousness with which the agency has considered and
 
16    asked and required Licensees to take specific action, 17    quote, for the vessel head degradation which occurred at 18    Davis-Besse as well as on the aftermath of that.
19            So, I think that, that provides an example of the 20    fact that any, any industry is not a static situation.
21    That things change. That we continue to learn. That's one 22    of the important things that we have to have that comes out 23    of this, that we as an agency, Davis-Besse as the Licensee, 24    and the nuclear industry as a whole, learns from this, so 25    that the factors that led to this don't repeat themselves                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 129 1    in the future.            2                      JOHN MILLER:            One follow-up, if 3    I could. Accepting that your comment that performance is 4    better now we have experience; and accepting Mr. Grobe's 5    comment that in general, throwing the baby out with the 6    bath water is not a good idea. But we have the convenience 7    of not having had the LOCA that we avoided only by what is 8    fair to say, dumb luck, because stainless steel is put in 9    there only for corrosion resistance, not for structure.
10            If we were now having this meeting in front of a 11    congressional committee examining why there was this LOCA; 12    do you really believe they would be convinced by the 13    argument don't throw the baby out with the bath water?
14                      MR. GROBE:              I apologize.
15    There was so many premises to that question, I'm not sure I 16    can answer it effectively.
17            What I would suggest is that you and I have a chance 18    to talk and go privately after this meeting, and we can get
 
19    into a bit more detail on this, because I think it is 20    important for you to understand in a little more detail the 21    scope of our programs, the activities that occurred prior 22    to Davis-Besse, the activities that have occurred after 23    Davis-Besse.
24            And, I think I don't want to give you the impression 25    that I feel any differently than this. I think a number of                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 130          1    managers, the agency, including myself, has stated this            2    should never happen. And it's the Licensee's 3    responsibility to make sure these types of issues don't
 
4    happen.
5            It's our responsibility to have an inspection 6    program that provides a high level assurance that what 7    they're doing is the right thing. And, our inspection 8    program did not disclose this as early as it should have, 9    and certainly the Licensee did not perform in a manner that 10    was appropriate, and it resulted in the head degradation.
11            So, with that said, let's get into this separately 12    after the meeting, because I don't want to tie everybody 13    else up with an extended discussion of this topic. Okay.
14                      MR. MYERS:              Can I make a
 
15    comment?
16                      MR. GROBE:              Sure, Lew.
17                      MR. MYERS:              Let me make a 18    comment; a couple. Most likely, from an engineering 19    standpoint the situation we had would have caused leakage 20    that would have shut us down before it broke. One gallon 21    would shut it down. So, that was really first in there.
22    It shouldn't have happened. We should have found this.
23            But what I do think is healthy, I never thought I 24    would say this, but I've been in this industry for over 30 25    years, and the performance improvements that we see are due                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 131          1    to some of our oversight reviews and nuclear power            2    operations and processes that we go through like we're 3    going through here when we find something new.
4            I think they're right. We've learned something new 5    that we need to share with the industry about this
 
6    particular program. And I think that this is not, this is 7    not a fun process, but it's healthy. And these processes 8    that plants have gone through over the years to improve the 9    material condition of our plants, the air operated valve, 10    the leak rate programs; boric acid program, we should have 11    had in place better, have made this industry perform well 12    over the years.
13            And that's the reason for these type of things that 14    we go through with the institute of nuclear power, because 15    assessments of those every 18 months. And you're own 16    internal self-assessments; if we do find a problem, there 17    is going to be problems with any industry, that it gets to 18    this level of detail, has really improved the performances 19    of our plants; not only from an operation standpoint, but 20    from a safety standpoint, that the NRC monitors.
21            You know, I really do believe that. This is not a
 
22    fun process sitting up here on this stage, talking about 23    this issue, but it's probably healthy.
24                      MR. GROBE:              Are there any 25    other members of the public that have a question or                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 132 1    comment?            2            Let me ask, before we get started, Mr. Stucker, can 3    you turn on the house lights?
4                      BEATRICE MIRINGU:      My name 5    is Beatrice, B E A T R I C E, and Miringu, M I R I N G U.
6            I just want to get an indication from First Energy.
7    You said that you have an independent panel that select 8    people different experiences for different knowledge and 9    from different areas, but you also said that you have 10    brought in somebody who will help in facilitating 11    communication between you and First Energy.
12            It's my understanding that you have, NRC has two 13    staff members at every nuclear department. And indeed, the 14    problem that you would be having with Davis-Besse 15    especially with the boric acid problem has nothing do did 16    with communication between you and NRC.
17            So, if you could elaborate on what you mean by some 18    real facilitating or making it easier for you to 19    communicate to First Energy, to NRC, or NRC communicating 20    to you?
21                      MR. GROBE:              Ma'am, the portion 22    of this meeting is to help the NRC with questions for us 23    and comments for us. I would suggest if you have a 24    specific question with First Energy, visit with those folks 25    after the meeting and you can get feedback from them                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 133          1    directly, okay?            2                      BEATRICE MIRINGU:      Well, I thought 3    since it was mentioned at this meeting that probably they
 
4    could bring it like that.
5                      MR. GROBE:              I understand it.
6    Outside of the context of the specific portion of the
 
7    meeting, this section of the meeting is for us to hear from 8    the public, us meaning the NRC staff. So, please feel free 9    to direct your question to them after we complete this part
 
10    of the meeting.
11                      MR. BERGENDAHL:        We'll gladly be 12    available.
13                      BEATRICE MIRINGU:      Okay.
14                      MR. GROBE:              Thank you.
15                      BEATRICE MIRINGU:      Then the question 16    I have also for, First Energy. You say at this meeting 17    that you have moved from the planning phase and going into
 
18    the implementation phase. And I understand that inspection 19    is an ongoing process, but from what you presented today, 20    there seems to be more inspections that need to be done; 21    and therefore, I think that you really are not in a 22    implementation state, and you're in the planning state.
23    Thank you.
24                      MR. GROBE:              Okay, thank you.
25            Are there any other members of the public that have                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 134          1    a question or comment for the NRC staff?              2            By the way, if it's reporters that have questions; 3    myself, the staff, and First Energy staff will be available 4    to discuss specific questions. So, we can do that in a 5    more informal way, after the meeting, if you prefer that.
6            Yes, sir?
7                      WILLIAM BRUML:          Yeah. My name is 8    William Bruml, B R U M L.
9            First, I was going to comment that I am rather 10    relieved to see at this meeting that management is the 11    major cause issue here. Clearly, when you have a ten year 12    train wreck, the question isn't why didn't the brakes work; 13    it's a question of why didn't someone set the brakes. I'm 14    glad to see that, seeing you here, and I hope it continues
 
15    to, to be there.
16            Also in response to one remark Lew made about, that 17    he expected that if the situation had continued, they would 18    have had leakage rather than, rather than a LOCA.
19            Does the NRC have any intention to publish the 20    results of the inspections that it's been doing on the
 
21    sections of the reactor head, so other members of the 22    general public might kind of have more of a sense of what 23    you guys are seeing?
24                      MR. GROBE:              That's an 25    interesting question. I think you're talking about the                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 135          1    detailed analysis of the materials head; is that correct?            2                      WILLIAM BRUML:          Yes. Something as 3    simple as a cross section of what, you know, of how the 4    condition of the hole in the head; and, how the degradation 5    that was going on in the stainless steel. So, that the 6    rest of us can understand what people are talking about.
7    Someone from either side here says, well, gee, this doesn't 8    look like it's going to perform a full blown LOCA effect.
9    And I hear about all this steel that's corroded away. I 10    don't have a whole lot of confidence in that until at least
 
11    I see something that talks about it.
12                      MR. GROBE:              Sure. I just want 13    to make sure I understand the question before I answer it.
14    I think there is going to be two areas of documentation may 15    be of interest to you. The first is NRC is going to 16    complete a risk assessment which will get into some of 17    those issues, from a risk perspective. What was the risk, 18    loss of contacts, rupture of the liner that remained, 19    things of that nature. And that will be published as part 20    of our inspection activities.
21            The second area of documentation may be of interest 22    to you is the results of some detailed analysis that is 23    being done by our research organization, the Office of 24    Nuclear Reactor Research -- Regulatory Research, excuse 25    me. And, there is a number of what we refer to as user                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 136          1    needs. I'm a user, so I sign a user need research and I            2    respond to that. And they're in the process of responding 3    to that. And they'll be published from that.
4            I don't have the time frames on either of those, but 5    I'm fairly confident that the inspection documentation 6    would precede formal publication report from research, and 7    that should be out in the next month or two. And 8    certainly, call at least with specific questions and we do 9    have a response team.
10                      WILLIAM BRUML:          I have a second
 
11    question.
12                      MR. GROBE:              Sure.
13                      WILLIAM BRUML:          I heard Christine
 
14    mention in passing the issues of other in containment 15    equipment, electrical equipment, and I wonder if we could 16    hear a little more detail of what that means?  One issue 17    that you folks are close to this more often, often think, 18    oh yeah, this is obvious, but to me it was a hole. Gee, 19    what do you do about this?  Is the issue here you have a 20    building, you know, containment building that has a lot of 21    electrical equipment, much of which is safety related; 22    and, some of which has been opened up while inspection or 23    service for some reason, during the course of this long 24    period of boric acid on the containment vessel, containment
 
25    building.                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 137          1            Which leads to the question of, gee, is this more            2    severe than what the equipment is qualified for, since most 3    of it is like, do you mean boric acid on the site?  So, I 4    guess my question is, is there a process ongoing to 5    identify the equipment that might have that problem, how, 6    you know, what is the general tone of that issue?
7                      MS. LIPA:              Let me tell you 8    what I know so far. That was the one of the items that's 9    on our foremat framework for the checklist. There is a 10    plan to have an inspector develop a detailed inspection 11    plan, and then go out and look at very specific things.
12    That inspection plan is likely to contain looking at a 13    number of things, such as cables, cable trays, junction 14    boxes, things, you know, all types of things within 15    containment pretty much top to bottom. What could have 16    been affected by the boric acid. That's the scope of that
 
17    particular line item.
18                      MR. GROBE:              I want to make 19    sure, you understand that our inspection will be the 20    sample. We won't be looking at everything. But the 21    Licensee's activities, they have the components of their 22    containment health review, which includes environmental 23    health equipment and they'll be looking much more 24    comprehensively.
25            We'll be sampling the activities they do as well as                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 138          1    some other activities or some other equipment that we may            2    want to look at in a different way to both evaluate what 3    they're doing as well as independently assess the depth and 4    adequacy of what they're doing. Okay?  Thank you very
 
5    much. 
 
6            Looking for other comments or questions.
7            I thought you were going to come forward. You stood 8    up, now you're required to come forward. Just kidding.
9            Other questions and comments?  Yes, ma'am?
10                      VICKY HEIDEL:          My name is Vicky 11    Heidel and I have a question. Understanding that you're 12    about ready to transport the Midland nuclear head, you said 13    prior to August 1st, does that mean the NRC has given its 14    stamp of approval that this is in excellent condition even 15    though it's an old or new old nuclear head?
16                      MR. GROBE:              John, you want to 17    briefly discuss our scope of the inspection activities for 18    the head, and explain what sort of certification goes along 19    with component base like this.
20                      MR. JACOBSON:          Right, there is a 21    couple of components to the inspection that we're going to 22    do regarding the head replacement, and one of them we've 23    already done; and that is look at some of the 24    nondestructive examination that was done, that the Licensee 25    did to supplement some of the documentation that they did                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 139          1    have for the head. Some of it was missing. It's gone over            2    the years. And they did some supplemental inspections.
3            And we've looked at those inspections as to how good 4    inspections were done, as well as the results of those 5    inspections. And so far, that part of it, we have no 6    problem with. What we saw was done well, and the results 7    were acceptable.
8            The next part of the inspection that's going to be
 
9    done is looking at a sample, a good sample of the 10    documentation; both the new work that was done, as well as 11    documentation that exists from when the head was originally 12    manufactured. And we need to do that so that we can verify 13    for ourselves that this head in its condition today meets 14    all the requirements of the American Society of Mechanical 15    Engineers Boiler and Pressure Vessel Code. 
 
16            And in that code, there is requirements, for 17    example, for the radiographs. There is requirements as to 18    how those radiographs will be taken and there is 19    requirements as to what the acceptance criteria is for any 20    flaws or discontinuities that are found during the 21    nondestructive examination.
22            And that's just an example of the kinds of things 23    that we will be looking at. And then the last part of the 24    head replacement that we're going to be looking at is the
 
25    actual opening and then restoration of the containment to                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 140          1    place the head in the Davis-Besse containment.            2                      VICKY HEIDEL:            So, this 3    inspection will be done prior to its being transported
 
4    here, the total inspection?
5                      MR. JACOBSON:          Part of it has 6    been done already, part of it is about to start. Whether 7    the Licensee decides to transport this head now or they 8    decide to transport it six months from now, is really not
 
9    our concern.
10                      VICKY HEIDEL:            Okay.
11                      MR. JACOBSON:          And if they want 12    to move the head, it's their head, and they can move it, 13    but ultimately, restart of the facility, that decision will 14    be made by the NRC.
15                      VICKY HEIDEL:          Is there any 16    danger in transporting it that we should be concerned about
 
17    that?
18                      MR. JACOBSON:          Any danger?
19                      VICKY HEIDEL:          Any danger of
 
20    transporting the actual head.
21                      MR. JACOBSON:          With respect to 22    what, radiation, radioactive?
23                      VICKY HEIDEL:          Yes, exactly.
24                      MR. JACOBSON:          No, the head has 25    never been used and there's no radioactivity associated                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 141          1    with it at this time.            2                      VICKY HEIDEL:          Lastly what do you 3    do with the old reactor head?
4                      MR. JACOBSON:          That's a question 5    that the Licensee would have to answer at this point.
6                      MR. GROBE:              Let me respond to 7    that in a little bit of detail. And if you, if you want to 8    respond or ask your question to First Energy after the 9    meeting, that's fine.
10            The Licensee has performed an analysis of the 11    existing head to characterize what sort of waste it is.
12    There is different categories of waste within our 13    regulations and we're expecting to perform an inspection of 14    that assessment that they've done, how they made the 15    measurements and the validity of the assessment.
16            In addition to that, we have a routine aspect of our 17    inspection program that deals with package and 18    transportation of waste and we'll be performing those 19    routine inspections on this very nonroutine type activity.
20            So, we will have a thorough inspection of what 21    Licensee is planning. It's my understanding that they are 22    currently not planning on transporting the head to a waste 23    facility. They've currently characterized it, based on my 24    information, of what's referred to as class A waste, which 25    is low specitivity waste. And we will be performing                        MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 142 1    inspections and reporting the results of those inspections 2    during future meetings like this one.
3                      VICKY HEIDEL:          All right, last 4    but not least, I have understand that a brand new head has 5    been ordered, and will that ever be installed at 6    Davis-Besse?
7                      MR. GROBE:              That's really not 8    the scope of our activities.
9            Lew, do you want to respond to that?
10                      MR. MYERS:              The answer is 11    yes.
12                      MR. GROBE:              Okay, thank you 13    very much.
14            I didn't realize what time it had gotten to be. Why 15    don't I ask if there is any one additional question, and 16    then we need to move on since we have another meeting at 17    7:00. Any additional questions?
18            Okay. I thank you very much for attending. I 19    appreciate the questions we received. If per chance you 20    think of something or felt that you didn't get a chance to
 
21    ask a question, feel free to come back at 7:00.
22            Thank you very much.
23    (Off the record.)
 
24                              - - -
 
25                      MARIE B. FRESCH & ASSOCIATES  1-800-669-DEPO 143          1                        CERTIFICATE           2           I, Marie B. Fresch, Registered Merit Reporter and 3     Notary Public in and for the State of Ohio, duly 4     commissioned and qualified therein, do hereby certify that  
 
5     the foregoing is a true and correct transcript of the 6     proceedings as taken by me and that I was present during  
 
7     all of said proceedings.
8           IN WITNESS WHEREOF, I have hereunto set my hand and 9     affixed my seal of office at Norwalk, Ohio, on this 10     27th day of July, 2002.
 
11
 
12
 
13
 
14                                           Marie B. Fresch, RMR
 
15 NOTARY PUBLIC, STATE OF OHIO 16                               My Commission Expires 10-9-03.
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25                       MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO}}

Revision as of 05:13, 24 November 2019

Transcript of Davis-Besse Public Meeting Held on 7/16/02 at 2:00 P.M. at Oak Harbor High School, Oak Harbor, Oh
ML022200663
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 07/16/2002
From:
NRC/RGN-III
To:
C. Lipa
References
-RFPFR
Download: ML022200663 (97)


Text

1 1 U.S. NUCLEAR REGULATORY COMMISSION FIRST ENERGY NUCLEAR OPERATING COMPANY 2 PUBLIC MEETING 3 Meeting held on Tuesday, July 16, 2002, at 2:00 p.m. at the Oak Harbor High School, Oak Harbor, Ohio, 4 taken by me Marie B. Fresch, Registered Merit Reporter, and Notary Public in and for the State of Ohio.

5 ---

6 PANEL MEMBERS PRESENT:

7 U. S. NUCLEAR REGULATORY COMMISSION 8 Mr. John Grobe, Chairman, MC 0350 Panel William Dean, Vice Chairman, MC 0350 Panel 9 John Jacobson, Branch Chief, Mechanical Engineering Branch, DRS 10 Anthony Mendiola, Section Chief PDIII-2, NRR 11 Douglas Pickett, Project Manager, NRR Christopher (Scott) Thomas, 12 Senior Resident Inspector - Davis Besse Christine Lipa, Projects Branch Chief 13 FIRST ENERGY NUCLEAR OPERATING COMPANY 14 Lew Myers, FENOC Chief Operating Officer 15 Robert W. Schrauder, Director - Support Services 16 J. Randel Fast, Plant Manager James J. Powers, III 17 Director - Nuclear Engineering Howard Bergendahl, Vice President-Nuclear 18 Michael J. Ross, Manager - Operations Effectiveness 19 Michael J. Stevens, Director - Maintenance Steve Loehlein 20

---

21 22 23 24 25 MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

2 1 MR. GROBE: Good afternoon. I 2 was trying to set the tone by taking my coat off. Please 3 feel free to. Its a bit warm today.

4 My name is Jack Grobe. Im the Director of Reactor 5 Safety for the Nuclear Regulatory Commission Office for 6 Region 3 in Chicago. We have responsibility to the office 7 for the safety of the nuclear power plants in the midwest.

8 Were here today for our third meeting, public 9 meeting with the Licensee, First Energy, responsible for 10 operation of Davis-Besse Nuclear Power Station. The focus 11 of this meeting is what we refer to as the Manual Chapter 12 0350 Restart Oversight Panel. In a minute, Ill introduce 13 the panel members and other NRC staff that are here today.

14 Our meeting today is being transcribed by Marie 15 Fresch. And Marie was here last time and had some trouble 16 hearing. I think Mr. Stocker has the microphones turned 17 way up, so that should help, but please make sure when 18 youre making comments today, so the public can hear in the 19 audience, as well as Marie transcribing the meeting, that 20 you use the microphone.

21 Let me start by introducing the NRC staff here 22 today. On my far right, is John Jacobson. John is a 23 Senior Mechanical Engineer in Region 3 Office and a member 24 of the Restart Panel.

25 Right next to me on my immediate right is Christine MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

3 1 Lipa. Christine is a Projects Branch Chief. Shes the 2 Manager of Region 3 responsible for oversight at the 3 Davis-Besse Plant on a day-to-day basis.

4 On my immediate left is Bill Dean. Bill is the Vice 5 Chair of the Restart Panel and Senior Manager in our 6 office, Nuclear Reactor Regulation, our office 7 headquarters, and its in the Washington, D. C. area.

8 Two of the, two other additional staff from the 9 office of Nuclear Reactor Regulation. Tony Mendiola. Tony 10 is the manager responsible for overseeing the licensing 11 activities. And on his left is Doug Pickett. Doug is the 12 Licensing Project Manager specifically for Davis-Besse.

13 Then at the end of the table is a very important 14 person. Thats Scott Thomas, Senior Resident Inspector 15 that works at the Davis-Besse Plant every day. He works 16 for the Region 3 Office of the NRC.

17 We have a couple of additional NRC staff I want to 18 recognize. Helping out at Davis-Besse is the Resident 19 Inspector from the Perry Plant, east of Cleveland, its 20 John Elgood; and John is operating the slide machine right 21 now, but hes been inspecting the plant to help us out.

22 Nancy Keller was out front. Nancy is our 23 Administrative Assistant. Shes done an outstanding job.

24 I appreciate her support. Nancy had out front a stack of 25 handouts both from the NRC as well as the Licensee MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

4 1 available for you. If you didnt receive one, please feel 2 free to obtain one of those handouts.

3 In addition out front, Nancy had what we refer to as 4 feedback forms. Theyre preaddressed, no postage necessary 5 forms that you can fill out and give us feedback on the 6 quality of our meeting, and other aspects of the conduct of 7 the meeting or content of the meeting; either one.

8 We would certainly appreciate and encourage you to 9 fill out one of those forms and give us feedback, so we can 10 continually improve the quality of our interface with the 11 public.

12 At this time, Lew, I would like you to introduce 13 your staff here today.

14 MR. MYERS: Okay. Thank you 15 very much. We have some people out front of our audience 16 that are our technical, some of our technical experts. We 17 also have our Root Cause Team, that well introduce later 18 on.

19 First with our technical experts, I would like to 20 introduce Tim Chambers. Tim is in charge of the 21 Containment.

22 Mark McLaughlin, also the Containment.

23 Dave Baker, Head Resolution.

24 Dave Eshelman -- is Dave here? Dave is in charge 25 of helping us with Human Performance.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

5 1 Clark Price is our Restart Action Plan Lead.

2 Tony Staller, Restart and Post Restart.

3 Neil Morrison. Neil comes to us from our Beaver 4 Valley Plant, and hes helping us with program reviews.

5 Bill Rogers. Hes doing our System Health Reviews.

6 So, for each one of these, we have a man at the 7 table that has responsibility, and technical leads with us 8 today.

9 Would you want me to go on to our desired outcomes 10 now?

11 MR. GROBE: If you dont mind, 12 introduce your staff at the table.

13 MR. MYERS: Okay. To my right 14 is Howard Bergendahl.

15 Steve Loehlein is next. Steve is doing the 16 Management in Human Performance and Root Cause.

17 Jim Powers is next to him. Jim is the Director of 18 Engineering.

19 Bob Schrauder next to him. Bob is taking, a new 20 employee taking the job as Service Director, is new with 21 our company, new with that position.

22 Randy Fast is after him. Randy is our Plant 23 Manager.

24 And, Mike Stevens is Director of Maintenance.

25 And, at the very end I think is Mike Ross. I cant MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

6 1 see. So, Mike Ross comes to us from, hes a new addition, 2 comes to us from, from the Three Mile Island Plant. So, 3 the Plant Manager there is really experienced, and is part 4 of our discussions later on.

5 MR. GROBE: Okay, thank you.

6 At this time, if there is public officials or 7 representatives of public officials here in the audience, I 8 would like to give you an opportunity to introduce 9 yourself. Please stand and up introduce yourself. Do we 10 have any public officials with us today?

11 MR. KOEBEL: Carl Koebel, 12 Ottawa County Commissioner.

13 MR. WITT: Jere Witt, Ottawa 14 County Administrator.

15 MR. GROBE: Any others?

16 Okay, very good. Thanks, Carl and Jere.

17 John has a slide up on the overhead projector right 18 now that describes the agenda, and each of you should have 19 a copy of that.

20 In a moment, Im going to allow Lew to make opening 21 remarks, and then Im going to briefly summarize the last 22 meeting we had on June 12th. Well then turn the meeting 23 over to First Energy for presentation of the information 24 that they have prepared for today.

25 Then the NRC is going to discuss the framework that MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

7 1 were using for, what we refer to as our research 2 checklist. Ill talk about that a little later, and a 3 number of the staff will help describe the framework for 4 our research; that is the NRC research. Well conclude the 5 business portion of the meeting at that time.

6 Following the business portion of the meeting 7 between the NRC and First Energy, well open the meeting up 8 for public questions and public feedback or inquires to the 9 NRC staff. I certainly hope that we have a good 10 participation by members of the public here today. At that 11 time, well adjourn the meeting.

12 In addition to this afternoon meeting, there is 13 going to be a meeting this evening at 7:00. Bill Dean will 14 chair that meeting. And that meeting is specifically 15 focused on receiving input from the public, as well as 16 answering any questions members of the public have.

17 So, if youre here this afternoon, and you think of 18 something, any additional questions or comments later this 19 evening, please come back at 7. Were also making it 20 available to other individuals who were unable to be here 21 this afternoon.

22 I think that concludes the logistics for the 23 meeting.

24 Oh, I do want to recognize Mr. Stucker. Hes been 25 here for each of our meetings. Oak Harbor High School MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

8 1 continues to make this fine facility available for our 2 meetings, and we certainly appreciate that. And, 3 Mr. Stucker works very hard to make sure that the sound 4 system and lighting and everything is just right. And, I 5 certainly appreciate his efforts and I want to thank Oak 6 Harbor High School and Mr. Stucker for that.

7 Did you have some comments before we begin, Lew?

8 MR. MYERS: Were ready to get 9 started. Is that okay?

10 MR. GROBE: Okay. Do you want 11 me to just summarize the June 12th meeting first?

12 MR. MYERS: Yes.

13 MR. GROBE: Okay, very good.

14 Next slide, John.

15 I wanted to make you aware, particularly members of 16 the public aware, of several documents First Energy has 17 submitted over the past several months, and make you aware 18 of our Web site where those can be obtained.

19 An Early Risk Assessment was provided by First 20 Energy. That was received by the NRC on April 8th, 2002.

21 We continue in our assessments of the risk plan and were 22 using the input that we receive from First Energy, 23 evaluating the input and continuing to ask questions and do 24 analyses to support the risk assessment that the NRC is 25 conducting.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

9 1 A Preliminary Root Cause Analysis Report was 2 submitted on April 18th. That addressed in preliminary 3 fashion both the technical side of root cause, what caused 4 the cracking of the head penetrations, as well as the 5 corrosion; and also to a certain extent addressed the 6 contributing factors to that situation.

7 The Return to Service Plan; the first revision of 8 that was submitted to us on May 21st, and it was recently 9 revised last week July -- Im sorry, yes, July 12, 2002.

10 All of these documents are available on the NRC Web 11 site at www.nrc.gov. And you can get to the Davis-Besse 12 link on that Web site, which contains just a tremendous 13 compendium of information; that would be head degradation 14 issue that occurred at Davis-Besse, NRC activities, 15 Licensee activities in response to that. So, please feel 16 free to gain access to that Web site to obtain that 17 information.

18 Our last meeting of the Restart Oversight Panel was 19 June 12th.

20 John, next slide.

21 The focus of that meeting was the Return to Service 22 Plan that First Energy submitted to the NRC. Return to 23 Service Plan had associated with it a number of what First 24 Energy called Building Blocks. Theyre listed there on the 25 slide.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

10 1 We discussed in some detail their plans at that 2 time, with the first five of the Building Blocks, and had a 3 number of questions regarding those various Building 4 Blocks.

5 First Energys evaluation of what they were trying 6 to accomplish as well as receiving input from the NRC 7 resulted in a revision to their Restart Plan and Building 8 Blocks, and I anticipate during todays meeting that were 9 going to get into several Building Blocks in more detail 10 than we talked about last June, as well as get into a 11 substantial amount of detail in the Management and Human 12 Performance area.

13 So, were going to continue with these meetings. At 14 this point, to a large extent, weve been addressing and 15 discussing the plans that First Energy is proceeding. And 16 well continue to discuss those plans.

17 During this meeting, get into, I think, more 18 progress that theyre making; and, as these meetings 19 continue over the summer months, we will be getting into 20 greater and greater detail in the implementation of those 21 plans, the results that the company is seeing, and 22 corrective actions that theyre taking.

23 We are transcribing this meeting this afternoon.

24 Well also be transcribing the meeting this evening. Those 25 transcripts will be available on the Web site when theyre MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

11 1 completed. As Im sure you can appreciate, it takes a 2 couple weeks to get a transcript typed up, reviewed and 3 ready for posting on the Web site.

4 The transcript of the June 12th meeting is available 5 on the Web site. And as I said, these transcripts will 6 also be available within several weeks for those 7 individuals who are unable to attend the meeting.

8 At this point, Lew, I would like to turn it over to 9 you and your staff for the presentation that you prepared 10 for us today.

11 MR. MYERS: Okay. Thank you 12 very much.

13 Its our pleasure to be here today to discuss Return 14 to Service Plan that we discussed last time. Our desired 15 outcome today is to show that were no longer in the 16 planning phase. Typically, you go through a planning 17 phase, a discovery phase, and implementation phase. Today 18 we want to demonstrate that were fully in the 19 implementation phase towards safe, reliable and sustained 20 operation for the Davis-Besse Plant.

21 We want to provide you with a status of several of 22 our Building Blocks. We want to demonstrate the closure of 23 several of the actions that were discussed at our last 24 meeting, and also in our Restart Oversight Plan Meeting the 25 day before.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

12 1 We also want to introduce you to some of the 2 Management and Human Performance elements in our Management 3 and Human Performance Excellence Plan that weve laid out; 4 some of the things that we know now, and well be prepared 5 to discuss that in detail today.

6 Starting out, you remember the last time, I thought 7 we had really seven Building Blocks, six of which are 8 Building Blocks that feed into the Restart Action Plan.

9 The Reactor Head Resolution Plan was sponsored by 10 Bob Schrauder, who is at the table. Our Program Compliance 11 Plan was by Jim Powers, the Director of Engineering. The 12 Containment Health Assurance Plan sponsored by Randy Fast, 13 the Maintenance Director. And the System Health Assurance 14 Plan is Jim Powers responsibility. Restart and Post 15 Restart Test Plan is Randy Fast. And finally, the 16 Management and Human Performance Excellence Plan, Im 17 responsible for that.

18 As you see, our plans all feed into the Restart 19 Action Plan, and that feed goes to what we call a Restart 20 Overview Panel. Thats a very important ingredient, and 21 people are talking about it independent of oversight.

22 Let me share with you the Restart Overview Panel, if 23 you will. This panel provides an independent oversight and 24 review of all of our plant activities. You can see this of 25 the FENOC Senior Executive Team.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

13 1 That team consists of Bob Saunders, President; 2 myself, Gary Leidich, and Bill Pearce. Gary is in charge 3 of the, Executive in charge of Engineering. Bill Pearce is 4 in charge of Oversight.

5 All of us may or may not be at any one meeting, 6 because of other obligations. The majority of us are at 7 each meeting. Lets talk about the panel members that we 8 asked to give us input.

9 First, we looked for someone who had extended outage 10 experience, and we picked Chris Bakken from the D.C. Cook 11 Plant. D.C. Cook went through some very tough times a few 12 years ago. And Chris Bakken was the Executive of the 13 Restart Plan, and has good experience.

14 We wanted somebody from the industry. Somebody that 15 communicates to us and to the industry. That person is 16 Buzz Galbraith. Buzz works the Nuclear Operations, which 17 is an industry oversight review group that has basic 18 building blocks, one of which is, one of the cornerstones 19 is operating experience. So, he shares that with us.

20 Finally, we wanted somebody on our Nuclear Review 21 Board. We normally have a Nuclear Oversight Review Board, 22 and we wanted somebody to feed into that Nuclear Review 23 Board. That person is Jack Martin. Jack Martin is on our 24 board and hes very involved with this panel and our routine 25 activities going on at the plant.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

14 1 Finally, we wanted somebody that had real raw based 2 experience from a nuclear regulatory standpoint and a 3 troubled plant standpoint that could help us through this.

4 So, we went and got Joe Callan. Joe was the Executive 5 Officer of the NRC at one time, and hes retired now; 6 provides us raw base experience, many years of experience 7 with other plants, extended shutdowns like this.

8 We wanted somebody from the community. Jere Witt 9 supplies that for us, a community leader here in Ottawa 10 County.

11 We wanted somebody that had a good history of the 12 plant, so we brought back one of the previous executives at 13 the Davis-Besse Plant that was here for the previous 14 problems through good performance. We brought in Lou Storz 15 to help us throughout whatever developments, whats changed 16 at the time of good performance.

17 So, we believe, we believe today that we have an 18 Oversight Review Panel. As that panel is made up today, it 19 provides very good independent input to First Energys 20 Senior Team to help us ensure that we can not only restart 21 Davis-Besse in a safe and reliable manner, but insure that 22 we have safe performance.

23 Weve also made several changes in our management 24 structure since our last meeting that well talk about.

25 Howard, do you want to continue?

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

15 1 MR. GROBE: Lew, before you go 2 on, who chairs the Restart Oversight Panel, or Restart 3 Overview Panel, who is the chairman of that?

4 MR. MYERS: Right now, Ive 5 been chairing the panel. Weve been talking to Joe Callan 6 about the possibility of chairing that panel; and the 7 reason for that is to give us a true balance, has more 8 independence.

9 MR. GROBE: Okay. Thank you.

10 MR. MYERS: Okay, Howard.

11 MR. BERGENDAHL: Okay, I wanted 12 to -- can you hear me?

13 I wanted to introduce some of the new members of our 14 team. There is an organization chart there, which 15 highlights basically the yellow blocks, are individuals 16 that are new in positions since about the first of the 17 year. So, there has been a lot of change at the site, and 18 many of the oversight individuals, Lew has already 19 mentioned across the top of the organizational chart, but 20 we have some of the key senior managers from Davis-Besse 21 sitting here at the table and I wanted to take an 22 opportunity to introduce them.

23 Weve put together a team of very experienced and 24 qualified nuclear professionals that puts together the 25 senior management team that I know can do a good job at MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

16 1 Davis-Besse.

2 Im going to start with Jim Powers, two seats over 3 to my right. Jim is the Director of Engineering. I think 4 we introduced him last time. He joined us from the Perry 5 Plant. He has an excellent reputation and a major asset to 6 our organization.

7 Next to Jim is a new addition to the Davis-Besse 8 organization. Hes been with First Energy, but hes now 9 joined Davis-Besse full time, Bob Schrauder will be our 10 Director of Support Services. Bob has had experience as 11 the Director of Engineering and also as a nuclear plant, 12 Plant Manager. And so, he brings a wealth of experience to 13 the team.

14 Next to Bob is Randy Fast. Weve introduced Randy 15 in the past. Hes new to Davis-Besse in January. His 16 background includes Beaver Valley and a long stretch at the 17 South Texas Plant.

18 Next to Randy is Mike Stevens. Mike is brand new in 19 the position of Director of Maintenance. And Mike has been 20 with First Energy for about two years. He spent most of 21 his career with the Cinergy Plants down in Southeastern 22 United States and most recently he joined First Energy from 23 the Excelon Corporation.

24 Weve also hired in some experience from outside the 25 company, from other power plants in the industry. Mike MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

17 1 Ross at the end of the table comes to us from another 2 Babcocks and Wilcox designed plant at Three Mile Island 3 Station. Mike led the Operations Department at Three Mile 4 Island through their brief start through many years as an 5 Operations Manager and Plant Manager. Mike has joined 6 Davis-Besse to provide oversight to our operations 7 activities to ensure we have high standards that we know 8 Mike accomplished through Three Mile Island.

9 Also not at the table here today, joining our 10 company July 30th, is Pete Roberts. We hired Pete from the 11 sale of Oak Creek Station, New Jersey, to be our new 12 Manager of Maintenance.

13 So, we put together quite a team here and I know 14 weve got good things to come.

15 MR. MYERS: Bob Schrauder 16 would like to take a few moments and discuss the Reactor 17 Head Resolution Oversight Plan, if you will. Were going 18 to the phase now where were going to present the status of 19 several of our plans.

20 Go ahead, Bob.

21 MR. SCHRAUDER: Thank you, Lew.

22 Thanks, Howard.

23 First, let me start out by saying, Im very pleased 24 to join the Davis-Besse team, after what seems like a 25 short nine and a half year hiatus from the plant. I do MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

18 1 believe, as Howard does, that we have a good solid team in 2 place, and that we will lead Davis-Besse back to a safe, 3 reliable plant that shows sustained performance.

4 Since our last meeting, I have been really pleased 5 on the progress that we have made on obtaining a new head 6 for Davis-Besse. We have accomplished a great deal in a 7 very short 30 days.

8 One of the things Im really happy to report is that 9 weve executed in excess of 30,000 person hours at the 10 Midland site retrieving that head, under some significant 11 challenging circumstances there.

12 As this slide indicates, we are on target with the 13 head replacement to support safe, reliable plant 14 return-to-service sometime during fourth quarter of this 15 year.

16 Ill talk a little bit about our activities at 17 Midland. We were able to successfully open the 18 containment. We had to chip away about three and a half 19 feet of concrete. We had to remove three layers of rebar, 20 and we had to detension the pre-cement tensioning elements 21 in this containment.

22 These two pictures up here show us the progress of 23 opening that containment and then in the lower right-hand 24 corner with the team that helped us open that containment.

25 Again, the team worked very safely and very effectively for MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

19 1 us.

2 The service structure at Midland, service structure 3 on these reactor vessel heads is in three parts. The lower 4 two parts will remain on the Midland head and we will 5 transfer the upper portion from the Davis-Besse head onto 6 this service structure.

7 We have implemented the modification on the service 8 structure, the lower portion of the service structure at 9 Midland with ten large diameter openings that will allow us 10 clear access to the bare head inspections that we will do 11 on this head going forward in the future. That 12 modification, as I said, is completed.

13 The last time we got together, we had indicated our 14 inspection plan for this head. We had divided those 15 inspections, and identified they have three purposes. The 16 first was to supplement the original co-data package that 17 went with this head. The second was to baseline this head 18 for ongoing in-service inspection program. And the third 19 was to provide supplementary exams to assure ourselves that 20 no damage had occurred to the head during its storage 21 period at the Midland Plant.

22 Im pleased to tell you that all of those 23 inspections have been completed satisfactorily on the 24 Midland, on the replacement head for Davis-Besse, and we 25 know now that we do have a very good compliment for use at MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

20 1 Davis-Besse.

2 One of the records that we also talked about last 3 time associated with the co-data package was the 4 radiographs; both for the dome, the flange weld on the 5 head, and the radiographs on the flange to nozzle. The 6 records that we were able to retrieve did not have either 7 of those films, nor did they have the records of the 8 inspections of those films, other than a signed-off log 9 entry that indicated that the exams had been completed 10 satisfactorily.

11 So, in order to resolve that, we reradiographed 12 those major welds on this head, and they did confirm that 13 we had good welds in all those locations. We were able to 14 achieve a hundred percent coverage of the flange-to-nozzle 15 weld and we achieved a 95 percent coverage of the 16 dome-to-flange weld. And, the remaining part of that weld 17 we were unable to get to, due to the lifting devices that 18 were put on the head after the original manufacturing.

19 Again, though, we confirmed with those that we did 20 have very good welds in all those locations. And that 21 information, coupled with the previous records that we had 22 that identified that the previous owner had accepted this 23 head and had identified that it had all the appropriate 24 records, and the signed off co-data form from the American 25 Nuclear Insurer, we assured ourselves that we did have a MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

21 1 good head and good going forward records.

2 As a result of the 95 percent coverage, we will be 3 submitting our results to the NRC for their concurrence 4 approval that we do in fact have a high level of assurance 5 and certainty that this weld is good.

6 MR. JACOBSON: Bob, let me just 7 mention briefly some of the inspection activities weve 8 done in this regard. Weve dispatched one of our 9 nondestructive examination experts out to the Midland site 10 and he spent a few days out there observing some of the 11 inspections that, that FENOC was doing on the head; also 12 reviewed all the radiographs that were done on the head.

13 And I did also, I reviewed a good portion of the 14 radiographs. So, thats some of the work that weve done 15 to date.

16 And the next phase is going to be to review all the 17 documentation of the head that supports the code, code and 18 stamp that needs to be on that head in order to use it.

19 MR. SCHRAUDER: Thanks, John.

20 Thats a good point. I wanted to say our nuclear 21 inspector was present during all of these examinations 22 also, as well as our code experts and our departmental 23 experts.

24 The picture you see up there with the lifting glove.

25 Thats Lew inspecting that lifting glove and those are the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

22 1 attachments that are used to lift this head off and on the 2 reactor during service.

3 MR. GROBE: John, before we go 4 on, could you characterize the results of your inspections 5 to-date?

6 MR. JACOBSON: Pardon?

7 MR. GROBE: Could you 8 characterize the results of your inspections to-date?

9 MR. JACOBSON: The results of the 10 radiographs that weve looked at to-date were, met all code 11 requirements; and, in fact, the weld on the flange to the 12 dome was extremely clean, extremely good. Its one of the 13 best welds that Ive personally seen in a long time. And, 14 Ive looked at a lot of them. So, we did get that done.

15 Weve also looked at some of the welds up on the 16 control rod drive penetrations, and those also meet all 17 code requirements. So, to-date, all of the nondestructive 18 examination that weve reviewed is acceptable.

19 MR. SCHRAUDER: Thank you. At 20 Midland right now our activities are centering around final 21 cleaning and preparation for shipment of the head. This 22 picture that you see here, is the, now there is a cover on 23 it. This is a cover on the reactor vessel head, but 24 this is actually the reactor vessel head being lifted off 25 the stand that it was sitting on at Midland.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

23 1 Next picture, please.

2 This is our opening, and that is the head stand that 3 we had to pull out in order to be able to retrieve the 4 head.

5 And in the next picture, again, the head being 6 readied to be lowered onto a temporary transportation 7 system to get it out to its main transport.

8 This is a picture of the type of transporter that 9 well be using to bring the head to Davis-Besse. That head 10 weighs about 80 tons. And this small truck that you see is 11 about 180 feet long. We will be transporting that head for 12 arrival at Davis-Besse prior to the date we set earlier, 13 which is August the 1st, which would be the latest date 14 that we would expect to have that on the site.

15 Now lets talk about some of the activities under 16 way at Davis-Besse. Our reactor pressure -- our head at 17 Davis-Besse is being repaired for removal from the 18 containment.

19 This is a picture of the service structure that I 20 spoke of earlier. The upper portion of the service 21 structure, which we will use on the new head when it 22 arrives. We will lift that off, thats a 40,000 pound 23 piece of equipment thats floating through the air to its 24 temporary resting place where it would be repaired for 25 installation on the Davis-Besse head. And, the head now at MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

24 1 Davis-Besse is being properly cleaned and prepared for 2 removal from the containment building.

3 We have gotten our construction packages from our 4 vendor and we are in the process of reviewing those now.

5 We have got the engineering packages available, and these 6 engineering packages are the packages that we put together 7 to open the containment and subsequently restore the 8 containment to its full design requirements.

9 We are making preparations for the containment 10 building opening itself. Again, this is a shot of the back 11 side of our containment where we will be making 12 approximately a 20 foot by 20 foot opening into that 13 containment, which happens to coincide with the original 14 construction opening in this building.

15 The process again for opening this containment will 16 not be the chipping or cutting techniques that we used at 17 Midland. This is a very high pressure water wash system, 18 which essentially separates the cement from the aggregate 19 in the concrete, washes it off the rebar. Then the rebar 20 is tagged, cut and removed and replaced in its original 21 condition when were ready to restore the container.

22 We did have to do some leveling of the ground in 23 this area in order to get our transport mechanism that will 24 go through the containment to move the old head out and new 25 head in. We did some ground leveling in there.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

25 1 And we are in the process of right outside this, 2 just off to the righthand side out of your view on this 3 picture is our start-up transformer at the plant. We will 4 tag that transformer out, disconnect it, and put protection 5 around it so there is no way to injure that transformer 6 during the period of time that were under construction.

7 Another item that came up in our last meeting is the 8 restoration of the pressure vessel. Again, the containment 9 at Davis-Besse is a shield building made out of about three 10 feet of concrete and a freestanding pressure vessel with 11 annular space between them. Both of those obviously have 12 to be cut to get access into the containment, moved ahead 13 in and out. Then we have to restore that pressure vessel 14 per code requirements.

15 We had indicated the last time we were here that we 16 were contemplating doing a localized test around that 17 restoration process, in that we had just completed an 18 integrated test on this pressure vessel at previous 19 outings.

20 Since that time, we have identified several other 21 things that well be doing in containment, and we have 22 reached the conclusion that the best thing to do is to 23 perform an integrated leak grade test on this containment 24 vessel when it is restored.

25 Those are our current plans that are incorporated MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

26 1 into our plan and process. Unless there are questions, 2 thats all I have on the activities for replacing the 3 head.

4 MS. LIPA: I do have one 5 question. I walked down the area where this transformer is 6 yesterday. What plans do you have for protection, what 7 kinds of barrier?

8 MR. SCHRAUDER: The major plans 9 are to disconnect it, and then there are coverings that 10 will go over the bushings and the like on the transformer 11 itself, and I believe there is going to be a 12 scaffolding-type arrangement around it. Basically, were 13 protecting the major components on getting any kind of 14 water spray or dust or aggregate into it. Make sure that 15 -- we have to put up a large scaffolding and large platform 16 in order to get into that. That opening is about 20 feet 17 off the ground, 18 feet off the ground. We want to make 18 sure that scaffolding we have up there also doesnt have, 19 if it should happen to fall for any reason, it wont impact 20 or harm the transformer.

21 MS. LIPA: Okay, thank you.

22 MR. GROBE: Bob, you said that 23 you have construction procedures that have been submitted 24 and engineering packages that are nearing completion.

25 Could you describe in a little more detail the scope of MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

27 1 those construction procedures and engineering packages and 2 what they address?

3 MR. SCHRAUDER: Well, the 4 construction procedures are the procedures for opening up 5 the containment, the detailed process on how do you go 6 about opening up the containment.

7 Were looking at things in those packages, and I 8 want to separate the construction package and the 9 engineering package; these are each, have some element of 10 the other.

11 We look at things, like the travel path for the 12 vehicle that would bring the head in on. As you know, at a 13 lot of nuclear plants or all the nuclear plants, there are 14 underground piping, underground utilities there. We have 15 to go through and assess all of those to make sure that 16 this vehicle wont impact those.

17 Engineering packages includes things like the 18 NCFR 5059 Evaluation to see if this could be done without 19 formal approval of the NRC or whether it fits within the 20 regulation, allows us basically to do those, if they dont 21 change our updated safety analysis report.

22 Those are included in those; and the detailed 23 engineering on, for instance, the pressure vessel itself, 24 has equipment hanging on it as part of its design. We have 25 to make sure that taking a 20 foot by 20 foot section out MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

28 1 of that pressure vessel doesnt impact its structural 2 capabilities, and where we would need to put in reinforcing 3 supports or the like for that. Also we analyze things like 4 missle protection, while its open.

5 MR. GROBE: Any other 6 questions? Okay, very good. Thank you, Bob.

7 MR. MYERS: Thank you.

8 As you can see, were making good progress on the 9 placement head project, and were well into the 10 implementation phase. New head is being prepared for 11 shipment. Weve opened up our containment and the whole 12 head has been dismounted, making good progress there.

13 The next area is Containment Health Plan. Jim 14 Powers and Randy Fast would discuss that.

15 MR. FAST: Good afternoon. I 16 too am excited about our new team. Today I will discuss 17 the status of our Containment Health Plan Building Block.

18 As you can see, the last time we met, we called this 19 containment condition. It was focused principally on boric 20 acid corrosion on mechanisms which encountered with our 21 reactor vessel head; however, it became apparent that we 22 wanted to expand the scope for all of containment to really 23 talk about the health of everything thats within that 24 building.

25 Part of that plan scope was increased to include MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

29 1 containment vessel, the liner evaluation. And, we have had 2 ongoing work there. We have done an analysis. We have a 3 team undergoing a review, a comprehensive review of the 4 design requirements, but as well we did ultrasonic testing 5 to ensure metal thickness and we have an interim 6 disposition on that. However, we can do more exhaustive 7 testing to ensure with every confidence that it meets 8 design requirements.

9 Weve also included environmental qualification of 10 our equipment.

11 MR. GROBE: Randy, before you 12 go on, I believe at our last meeting, one of our inspectors 13 Mel Holmberg identified a question regarding a potential 14 for corrosion below the concrete base mat on the inside of 15 the, of the pressure vessel and also around the outside of 16 the annular region. Have you done anything to evaluate 17 that issue?

18 MR. FAST: That evaluation is 19 ongoing. A team is assembled and well be doing 20 comprehensive reviews, which will include all of the 21 containment liner areas.

22 MR. MYERS: We have taken some 23 action to-date.

24 MR. FAST: Yes. We did about 25 1700 ultrasonic examinations for metal thickness in the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

30 1 areas that were adjacent to those areas that Mel had 2 identified. That was our immediate corrective action; 3 however, were looking at all of the containment vessel for 4 integrity.

5 MR. GROBE: Okay. I read in 6 the paper this morning something that I think was already a 7 focus of both the NRC and First Energy, thats the issue of 8 whats referred to as MIC, or microbial induced corrosion.

9 Could you comment on that a little bit?

10 MR. FAST: Well, thats 11 something that has to be evaluated. Micrologically induced 12 corrosion, MIC, as its called, is a naturally occurring; 13 and if weve had ground water in-seepage around the vessel 14 area, that would potentially be susceptible. So, well 15 have to do some evaluation and analysis to ensure that we 16 do not have any MIC present.

17 MR. BERGENDAHL: We have, in fact 18 have an individual working on that right now.

19 MR. POWERS: Im taking water 20 samples to physically look for that as well as corrosion 21 problems.

22 MR. GROBE: Okay.

23 MR. FAST: Were aware as 24 well it is an item that is under investigation and 25 evaluation.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

31 1 MR. GROBE: I dont believe 2 that Mel has had a chance to come back and look at the 3 results of your ultrasonic tests. Could you briefly 4 summarize the results of what you found?

5 MR. FAST: What we did was an 6 analysis that looked at minimum wall thickness. That 7 vessel liner is about an inch and a half thick. We didnt 8 see any significant degradation. There is some local 9 surface pitting, which is just expected of a carbon steel 10 component, but no deduction in the overall ability of the 11 areas that we did evaluate; nothing that would require any 12 additional remediation.

13 MR. GROBE: You indicated, you 14 indicated that you were planning additional inspections.

15 Could you characterize those?

16 MR. FAST: Well, I try to 17 describe what this vessel liner looks like for our folks 18 out in the public. If youve ever changed out a thermos 19 bottle, the glass liner inside that bottle is effectively 20 what our pressure vessel in the containment is like.

21 So, you see the concrete structure outside that 22 extends about 240 feet above the grade elevation; 2.4 23 million cubic feet of volume, but within that is a steel 24 structure much like this thermos bottle. And thats the 25 structural integrity that ensures that under a design basis MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

32 1 accident, that peak pressures that would be held during 2 that event are being contained within the containment; that 3 is the barrier that protects the environment from a design 4 basis accident.

5 So, that thermos bottle with its steel structure, 6 the integrity of that has to be evaluated to make sure it 7 meets design requirements.

8 So, part of those inspections is in the annular 9 space. Thats about a four foot wide space outside the 10 steel liner, but inside of the concrete, the external 11 concrete structure. Well be building scaffolding and 12 doing hand-over-hand reviews of the structural integrity, 13 as well as put together some additional ultrasonic tests to 14 make sure we meet the minimum wall requirements for 15 pressure retention. That will extend all the way to the 16 top of the vessel.

17 MR. GROBE: Okay. And, are 18 you doing similar inspections on the inside of the 19 containment?

20 MR. FAST: Yes, we are.

21 MR. GROBE: What sort of 22 inspections are you planning, for lack of a better phrase, 23 for the subterranean section of the vessel?

24 MR. POWERS: Ill handle that 25 one. We did inspections on the inside where there was a MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

33 1 gap identified between the concrete at the base of this 2 containment thermos bottle Randy described. Concrete was 3 originally poured at the base on the inside and interfaced 4 right up against the steel vessel structure.

5 With time that concrete has shrunk a bit and there 6 is a narrow gap formed there, and there was concern about 7 whether water could have gotten down into that gap. So, we 8 went in and we did stick feeler gauges down to as much as 9 42 inches into that gap and found no moisture.

10 So, that was positive result from those initial 11 tests, and were going to continue further to characterize 12 all the way down to the bottom areas what the situation is, 13 whether there is any moisture down there, and characterize 14 what the wall thickness is and integrity at the lower 15 elevations.

16 MR. GROBE: Okay.

17 MR. FAST: Just to try to 18 clarify the ultrasonic tests that weve done so far. In 19 the area adjacent, in the lower elevation of containment 20 where Mel identified the small annular space where the 21 concrete had shrunk and there is some gap between the 22 concrete and steel liner, where Jim just identified we dip 23 sticked. On the exterior side, there is a section about a 24 couple, three feet on the outside where there is no 25 concrete; and we were able from the annular space to do MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

34 1 ultrasonic testing to be sure we had full integrity.

2 That would tell us if there were degradation in 3 areas that could not be seen by the naked eye, that you 4 would be able to tell we had full depth and integrity on 5 the steel liner.

6 MR. GROBE: Okay.

7 MR. FAST: The other areas 8 that weve incorporated as part of our Containment Health 9 Environmental Qualification is were concerned about such 10 things as electrical equipment, such as air operated or 11 motor operated valves. Well be going through a 12 comprehensive review of that equipment and other 13 environmental qualified, to ensure that the conditions in 14 containment, that all of that equipment is operated in or 15 as fine a condition within its design requirements.

16 One of the areas that were focusing on, this is 17 really an industry lesson learned is the containment sump; 18 and were looking from a design perspective at ensuring 19 that the emergency sump is intact and that it meets 20 requirements. As a matter of fact, our vision of success 21 is to improve margin.

22 We think there is opportunities to actually extend 23 and improve the isolation from around the containment 24 emergency sump. So, we have a team in place that will be 25 looking at that as well. Looking at, where were moving MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

35 1 fibrous insulation, we could impact clogging that sump.

2 So, that will be removed from containment. We will have 3 all metal insulation.

4 The other things that were looking at is, the Decay 5 Heat Valve Pit, which is, Im going to call it a legacy 6 issue. There are two motor operated valves, which are 7 located in a pit adjacent to the emergency sump. And we 8 have traditionally sealed those plates and done a pressure 9 test, what we call a drop test, to ensure in a design basis 10 condition those valves are not environmentally qualified, 11 so we have to keep them from the flooded conditions when it 12 exists. And weve traditionally gone in and sealed those 13 and verified their integrity from this drop test.

14 But thats not a standard that we continue to 15 operate to. So, we have a design team looking at that and 16 we have several options under evaluation, which would 17 include extending the operators outside of the flooded 18 region, putting valves outside of containment, or 19 qualifying operators that could operate under the harsh 20 environments that would exist on design basis access.

21 So, all of those are being evaluated and again, our 22 intent is to improve our margin of safety in this area.

23 Containment air coolers.

24 MR. GROBE: Tony is clearing 25 his throat. I wanted to make sure.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

36 1 MR. MENDIOLA: I did have a 2 question.

3 MR. GROBE: Okay. Go ahead.

4 MR. MENDIOLA: I want to retreat 5 a second. Going back to the liner for a second. Two 6 questions I have.

7 MR. FAST: Yes.

8 MR. MENDIOLA: When you mentioned 9 that you evaluated the inside gap between, I guess, the 10 concrete and the inside of the liner, going down with a 11 feeler gauge and you found no moisture, but is there any 12 plans on sealing that gap or, or leaving the gap as found?

13 MR. POWERS: Were still in 14 evaluation on that one, Tony. Were working on an overall 15 plan about surveiling the lower elevations even below that 16 gap area and restoring that as necessary. So, its a 17 detail we havent finalized yet, but its part of our 18 evaluation.

19 MR. MENDIOLA: Okay. Then 20 similarly, is there a similar gap on the outside of the 21 liner, something like thats on the inside.

22 MR. POWERS: On the outside, 23 there is ground water that has seeped through the 24 concrete. Its not unusual for this to happen with any 25 type of concrete, has small cracks in it. And what Randy MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

37 1 described earlier with surveiling the outside, yes, there 2 is, there is an area or space where water can migrate 3 alongside of the liner.

4 In fact, in the past, originally we did 5 modifications in that area injecting the ground to work on 6 sealing that, sealing that gap. And then were going to be 7 evaluating that as part of the overall integrity assessment 8 of the vessel; thats going to be included.

9 MR. MENDIOLA: Okay, thank you.

10 MR. GROBE: Just feel free to 11 clear your throat at any time.

12 I had just a couple of questions. Some of these 13 activities appear to be directly related to the boric acid 14 issue. Some of these activities appear to be unrelated.

15 You mentioned that the containment emergency sump, 16 there have been questions in operating experience from 17 other plants as well as you yourself have identified the 18 decay heat valve pit as something that you want to look 19 at.

20 Why werent these issues identified and corrected 21 earlier? Why are they being identified and corrected now?

22 MR. BERGENDAHL: Let me take a 23 shot at that. As were going to discuss later, the 24 management issues, according to one of the things were 25 looking at is the standards of the oversight and ownership MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

38 1 of the power plant and programs. And as part of our new 2 initiatives to raise the standards and clarify that were 3 meeting requirements is not our standard. Our standard is 4 to exceed and do things the best.

5 The fresh outlook has exposed some areas where we 6 have performed to meet requirements, and thats it. So, 7 although that pit may have met the requirements, it doesnt 8 meet our new standards of robust safety way.

9 MR. MYERS: Ive been on the 10 Davis-Besse Oversight Review Board Meetings several times 11 over the years. Weve been looking at those two issues and 12 theyre not new issues to us. So, while were in this 13 extended outage, why not go and take them up. Perfect 14 opportunity to do that. Thats what were going to do.

15 And it will give us an opportunity to gain knowledge.

16 MR. GROBE: Okay.

17 MR. FAST: Next item, our 18 containment air coolers, and were going through complete 19 remediation. This is another example where our intention 20 is to improve margin.

21 Weve investigated the opportunity to get some 22 coolers of higher efficiency, better thermoconductivity and 23 well be doing a complete remediation of those containment 24 air coolers. So, they will be brought up to better than as 25 new condition; all three of those containment air coolers.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

39 1 Thats the comprehensive plan. Well actually start the 2 disassembling of those coolers next week.

3 MR. MYERS: Where are those?

4 MR. FAST: Those are the 5 original coolers that were installed at the plant. Its 6 like a radiator in your car, the way I would describe it 7 for the public, obviously. And it has deteriorated over 8 time.

9 Its a normal phenomenon for equipment and its time 10 now to go in and replace it and renew it and bring it up to 11 standards. And in this case, we can gain, because of 12 improvements in technology over the years, should have an 13 opportunity to actually improve their thermo performance.

14 MR. DEAN: Randy, are you 15 talking about replacing them or just refurbishing them by 16 replacing the tubes or innards?

17 MR. FAST: Primarily, the 18 design of the containment air cooler is a series of heat 19 exchangers. And those heat exchangers were replaceable 20 individually as a maintenance function. However, over the 21 years they degrade, so were going to be replacing probably 22 90 plus percent of those coolers. Im trying to think how 23 many coolers there actually are, but there are a few that 24 have been replaced recently as part of the normal 25 maintenance process, the old coolers were galvanized MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

40 1 steel. The newer ones are stainless steel. They have 2 improved in design and improved thermoconductivity.

3 So, effectively when you look at it now, there are 4 other elements of the containment air coolers. We did 5 receive notification of motor problems and we have two 6 brand new motors, two of the three will receive brand new 7 motors and as well the register, the duct work have been 8 completely reworked and will be remediated to, to as-new 9 condition, so principally, that heat exchange will be 10 replaced.

11 MR. GROBE: Okay. So, this 12 wasnt necessarily an artifact of the boric acid situation, 13 this was just an aging, normal aging, equipment aging?

14 MR. FAST: Well, there are 15 really two factors, Jack. First is the aging, the normal 16 aging process of equipment, but the other is, that through 17 the trailing of boric acid, those would collect on the 18 fins and those have been cleaned numerous times by our 19 staff, that did take their toll, the boric acid that 20 collected on the, on those cooling fins could be cleaned.

21 But, that repetitive action did degrade the equipment.

22 MR. GROBE: It sounds like 23 modification, not replacement for the component limit.

24 Will there be a substantive test program, heat transfer 25 testing program, following the replacement?

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

41 1 MR. FAST: One of the things 2 were not going into a lot of detail today is restart, post 3 restart test plan, but all modifications for the plant will 4 undergo an extensive testing prior to restart of the plant.

5 So, that is, when you look at the chart or for the Restart 6 and Post-Restart Test Plan, that comprehensive test or plan 7 extends beyond the reactor coolant system and all the 8 support systems, and in this case that would be tested 9 extensively.

10 MR. MYERS: Jack, you asked 11 the question, one of the things we can tell you, we could 12 probably go out and clean these coolers up, work on them 13 and meet the minimum requirements. We have, we have an 14 opportunity to replacement and gain on the margin, so 15 thats what were going to do.

16 MR. GROBE: Okay.

17 MR. FAST: Okay, there were 18 questions as we met last time about our inspections for 19 systems that contained borated water outside of the 20 containment. We talked about that, and said, where do we 21 want to do those reviews to ensure that we have a good 22 comprehensive review of systems outside of containment.

23 I mentioned here that we did roll that into our 24 System Health Assurance Plan to insure that any systems 25 that contain borated water are thoroughly evaluated for MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

42 1 their functional requirements and design capability. So, 2 its not part of the Containment Health Plan, however that 3 element has been rolled into the System Health Assurance 4 Plan.

5 Since we met last, we have gone through a review of 6 our Inspector Training Program, and we actually saw 7 opportunities to improve. As we had talked previously 8 about inspection criteria, inspection requirements, we went 9 back and used our systematic approach to training to 10 review, to insure that our engineers were qualified to the 11 right standards for the inspections that had been done.

12 We saw opportunities to improve it by using the 13 systematic approach to training. Did incorporate it then, 14 lessons learned and being able to then apply inspection 15 techniques to civil, structural, electrical, mechanical and 16 our Alloy 600 reviews.

17 So, subsequently, we revamped our training program 18 for our engineers, and we have trained them. We have job 19 familiarization guides that are implemented and we are in 20 the process of reestablishing our baseline inspections and 21 verifying inspections that were done previously were, would 22 meet our standards of excellence.

23 Well be detailing any differences between the 24 initial inspections and the subsequent inspections. And 25 using condition reports to identify those differences, and MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

43 1 theyll go into the engineering evaluation process.

2 MR. GROBE: I think I have two 3 things there I want to make sure I understand it. I think 4 I hear that youre going to reperform inspections and if 5 you identify any deficiencies, those deficiencies will go 6 into corrective action guidelines, condition reports, but 7 in addition, I think I heard you say that when you identify 8 deficiencies between your first inspection and the 9 reinspection for the improved training that youre going to 10 identify that difference as something to learn from, from 11 the standpoint of the systematic approach to training. Is 12 that, help me understand?

13 MR. FAST: We want to make 14 sure that we understand that the inspections that were 15 done, we want to see what differences there are. We see 16 improvements in the training. In fact, the previous 17 training program, we brought some industry experts in and 18 tested them, and we identified shortfalls with even 19 industry experts in their understanding and knowledge of 20 inspection techniques. So, weve incorporated that.

21 We think we have an excellent training program. And 22 we expect to see that through this reinspection, there will 23 be some differences. And what we want to do is document 24 those differences. Now, if we saw something that were 25 generic in nature, we want to certainly apply that across MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

44 1 the board, but we will be documenting many of those 2 differences and doing evaluation and inspection.

3 MR. DEAN: Randy, you 4 characterized what it was that drove you to revise the 5 field inspection training program?

6 MR. FAST: Yeah, Ill try to 7 digress a little bit. As we originally identified our 8 extended condition, we were focused on extended condition 9 principally in the area of boric acid degradation through a 10 threat of Alloy 600 components.

11 We adopted a standard, which was set by the American 12 Society of Mechanical Engineers called a VT-2 Inspection.

13 We applied that VT-2 Inspection. We had some problems, 14 problematic problems in our inspection program. We went 15 back, rebaseline, redeveloped that program. And as we 16 raised standards, we self-identified that there were 17 shortfalls, that although this would be good for credible 18 Alloy 600 Inspections, it did not meet our inspection in 19 other areas, such as electrical components or other 20 structural components within the containment. So, we took 21 on a more, I would say, full body inspection program with 22 better criteria.

23 Okay, the other thing that we originally, in our 24 original plan had inspection plans that were developed by 25 engineering. We have subsequently rolled all of our MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

45 1 inspection plans into plant procedures.

2 Plant procedures are in hand. Have specific 3 criteria requirements for the entry and exit from those 4 procedures. And so part of our training program as well is 5 on these new procedures and the use of these procedures.

6 As identified the validation of inspections is in 7 progress. As well, we have now a group of independent 8 inspectors that are as well going through, using the same 9 criteria inspection programs that well be doing validation 10 of our inspected areas.

11 MR. GROBE: Help me understand 12 the word independent. Independent of what?

13 MR. FAST: Its not the same 14 folks were using principally; our engineers from design 15 engineering and from our performance engineering, plant 16 engineering. These are individuals that we brought into 17 the organization with experience outside of Davis-Besse; 18 and they were trained to our same program and they will be 19 looking independently at the inspections and checking and 20 verifying and validating that weve done a good job on 21 those inspections.

22 MR. GROBE: I just want to 23 make sure I understand this. When I think of the different 24 kinds of assessments of work thats done on nuclear plants, 25 which is what I refer to as line assessments; those were MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

46 1 assessments by the organization responsible for conducting 2 the work. And then there is independent assessments that 3 weve recently established, Vice President of Oversight, 4 and thats a second level of independence. What kind of 5 independence are we talking about?

6 MR. FAST: We actually have 7 two pieces of independence. One is our First Energys 8 quality assessment and that is ongoing. So, our quality 9 organization under Bill Pearce, the Vice President of 10 Quality, has also been training or doing assessments, but 11 we also brought in an external assessment organization.

12 So, we have both internal oversight and external 13 oversight.

14 MR. GROBE: Okay. The 15 external oversight reports to the containment health team 16 as part of that teams activities?

17 MR. POWERS: Thats correct, 18 yes.

19 MR. GROBE: Yes.

20 MR. POWERS: Containment health 21 organization has a new kind of review and oversight 22 organization, and thats part of our engineering assessment 23 board that weve assembled consisting of outside industry 24 experts, you know, providing oversight of all of our 25 activities.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

47 1 MR. GROBE: Okay.

2 MR. FAST: Since we met 3 previously, we made significant progress in containment.

4 As an example, we have off-loaded all of our nuclear fuels, 5 177 bundles have been transferred to spent fuel pool. This 6 has allowed us now to make the record cool system more 7 available for other inspections.

8 We have installed nozzle dams. We are in the 9 process this week. We will refill the cavity. We will 10 reinsert the import thimbles, then drain down, remove the 11 sealing plate, remove the insulation adjacent to the 12 reactor vessel flange, and well be doing thorough 13 inspections of the tops of the nozzles adjacent to the 14 reactor vessel itself.

15 After that is completed, we will also then be able 16 to do cleaning, and as well, we are going to be installing 17 a permanent cavity seal, which is something many plants 18 across the country have been able to install a permanent, 19 its a stainless steel plate that joins the liner from the 20 cavity to the vessel to insure that there is no leakage 21 path, which is one of the items.

22 If you have a temporary seal, then you have some 23 temporary, some minimal amount of leakage, leak path that 24 comes down the vessel. With the permanent cavity seal, 25 there is no leakage. Subsequently, we have no opportunity MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

48 1 then for any additional degradation under the vessel. So, 2 that is part of our going forward plans.

3 The other things were doing is we have mobilized a 4 significant number of painters, went through a 5 qualification program. Weve got some pictures, some 6 slides here that show. We currently have 20 fully 7 qualified painters, effective in containment right now.

8 If you go in, youll see these four foot by four 9 foot squares where each painter actually went through a 10 qualification process. That was the in-field exercise to 11 insure that they met standards of excellence for coating.

12 And you can see their names and Social Security numbers on 13 the wall where we did this. And we go back subsequently 14 and test and verify the paint is applied properly.

15 We have an additional 20 painters that are in the 16 pipeline in training, and theyll be reporting to the 17 station to help as well, and with coatings in the 18 containment. And another 14 will come this week.

19 So, we have a significant number of painters, and 20 theyll be painting the entire containment dome, and as 21 well all of the surface areas from 603 elevation, thats 22 the operating deck, up to the polar crane.

23 So, its a nice bright white and we are in the 24 process of prepping it right now. As a matter of fact, I 25 was in yesterday and you can see where, you can see over MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

49 1 the years, many years of operation and training, just dirt 2 and normal dust, oils and thing that have collected on the 3 walls. Just like in your home, that can be cleaned and 4 those areas are brighter significantly.

5 Thats part of the preparation for the surface 6 prep. And thats going to brighten the containment 7 significantly, but that will demonstrate our standards and 8 our expectations for the quality of condition of the 9 containment. So, Im particularly excited about that.

10 Additionally, weve decontaminated a significant 11 amount of areas in containment. All of the containment air 12 cooler duct work, which weve had people inside doing that 13 work. We do have the containment air recirc fan running, 14 which is redistributing air throughout the containment.

15 We also have a temporary cooling package, which is 16 connected to our containment purge supply, and that is 17 providing cooler air, so that we get better environmental 18 conditions for the folks working inside containment.

19 Thats made environmental conditions more favorable 20 and really putting a lot better situation for the work that 21 were doing. So, we have a significant measurable progress 22 in cleaning and housekeeping remediation in our 23 containment.

24 That concludes my presentation. Any questions?

25 MR. THOMAS: I have one, Randy.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

50 1 When they scope the evaluation for the containment air 2 coolers --

3 (Requested speaker to repeat.)

4 MR. THOMAS: I asked if the 5 evaluation of the grade containment, potentially degraded 6 air coolers would include a past operability evaluation and 7 scope of their inspection?

8 MR. FAST: The simple answer, 9 Scott, is we are doing a past operability determination.

10 MR. THOMAS: Thank you.

11 MR. DEAN: Randy, I have a 12 question about where, can you give us a sense of where you 13 gauge the percentage of which you have completed, at least, 14 the evaluation phase in terms of impact for the boric acid 15 disposition containment.

16 MR. FAST: I try to use 17 numbers. I believe these are accurate. Mark, if Im 18 wrong, you can correct me. But we have about 280 condition 19 reports, which is actually about over 2000 individual line 20 items that have to be dispositioned. About 30 of those 21 have been dispositioned and turned into work orders for 22 work thats going to occur. The rest are in some phase of 23 evaluation and will be forthcoming.

24 I see a nod there, so it looks like I was pretty 25 close.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

51 1 MR. GROBE: Let me make sure I 2 understand what you said, Randy. When you said that a 3 certain number of your 2000 or so items of observations 4 have been dispositioned by creating work orders, I want to 5 make sure I understand that.

6 MR. FAST: Okay. There is 7 280 condition reports. All of the inspections that were 8 done generated a condition report for any deviations, 9 didnt meet our standards. Each one of those condition 10 reports would have one or many individual items that 11 required disposition.

12 Of the 280 condition reports that have been written, 13 about 30 of those condition reports, which would be 14 somewheres in the 15, 20 percent range, have been 15 dispositioned. The physical work that needs to be done 16 generates a work order. The work order is the actual 17 maintenance process to complete the work. And those 30 are 18 in progress.

19 MR. GROBE: Okay. So, you 20 have condition records -- the focus of my question wasnt 21 clear. I apologize.

22 Have the condition reports been closed out to work 23 order, or condition reports wont be closed out until the 24 work thats specified in the work order is completed?

25 MR. FAST: The condition MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

52 1 reports will not be closed until the work is completed and 2 verified.

3 MR. DEAN: Then you would say 4 that those 280 condition reports essentially encompass the 5 results of the inspections. Although, the way I understand 6 it, you still have some validation effort ongoing, but 7 youve completed your initial inspection?

8 MR. FAST: That is correct, 9 Bill. The 280 are the original inspections. I would 10 expect it will be generating some differences, based on 11 those reinspections.

12 MR. GROBE: Any other 13 questions on Containment Health? I have a couple more.

14 I just want to make a couple comments. I think the 15 Containment Health Plan is a substantial improvement from 16 what you showed us last month. For one thing, you have 17 detailed procedures in place for the inspections. The 18 scope of the inspections is much more comprehensive with 19 respect to evaluating the condition of the equipment inside 20 containment.

21 Based on, again, this is just based on what youve 22 told us, you havent done extensive inspection in these 23 areas, but based on what you told us, it appears that 24 youre going beyond what, the event, the head corrosion 25 would have caused you to do. And I think thats helpful.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

53 1 Nuclear plant workers work to procedures. They 2 understand that. Quality assurance program assures that 3 procedures are adequate; theyre adequately implemented.

4 So, this context of detail procedures and systematic 5 approach to training, thats a nuclear standard. Those are 6 very good attributes of the program and assure the results 7 of high quality activities.

8 Im very encouraged to hear that youre having as 9 part of your inspection program a separate independent 10 look. And thats important from two standpoints. One is 11 its always better to have two sets of eyes than one, but 12 secondly, quite frankly, there was a question regarding 13 the, the standards of the workers that were making 14 decisions in the plant. And I dont want to infer by that 15 that all the workers at Davis-Besse dont have the right 16 standards. Thats not what Im trying to say. But there 17 was a question. And this will give you insight as to 18 whether or not that is a broad question, a narrow question 19 and what it means as far as the accuracy of your 20 inspections. So, thats good.

21 I also heard you say, as I was pursuing the question 22 of what independent inspections meant, that completely 23 independent at Davis-Besse organization, the folks in Bill 24 Pearces organization are going to be doing independent 25 assessments.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

54 1 And Lew, I think it would be very healthy for us to 2 hear Bills staffs evaluation next time we meet on the 3 activities that youre presenting. And, I would fully 4 expect, let me say, I would be surprised if his evaluation 5 is completely rosy. Hopefully, hes finding some things 6 that continue to have done.

7 So, I would hope that next time we meet, not only 8 can we hear from the staff thats doing the work, but I 9 would like to hear from Bills staff to get on the FENOC 10 corporate independent assessment, the quality of the work 11 thats going on in the field.

12 MR. MYERS: That would be 13 good. We would do that.

14 MR. GROBE: Anything else 15 before we move off of Containment Health?

16 Okay. Good. Thank you, Randy.

17 Marie, weve been at it for about an hour and 15 18 minutes; is it time for a five minute break?

19 MS. FRESCH: Sure.

20 MR. GROBE: Okay. Lets do 21 that. The last time, we wore out her fingers.

22 MR. MYERS: Could I just 23 summarize on the Containment Health Plan?

24 MR. GROBE: Sure.

25 MR. MYERS: I think once again MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

55 1 we demonstrated at the last meeting we were in the plan 2 phase, doing some discovery, doing implementation or 3 physically doing work. And, you know, weve taken on some 4 value and expanded the program.

5 Were upgrading our coolers. Were extremely 6 pleased with that. The thermo cavity seal is a major, 7 major effort that would add a lot of value and margin to 8 our plant; and it will produce, or does make our plant a 9 better plant. So, were moving to good implementation on 10 that.

11 MR. GROBE: Okay. My watch 12 says 16 after. Lets be prompt at 21 after, five minutes, 13 and that way we can keep things moving.

14 (Off the record.)

15 MR. MYERS: The next area we 16 would like to discuss is System Health Assurance Plan and 17 Howard Bergendahl will do that.

18 MR. BERGENDAHL: Good afternoon.

19 As Lew indicated, we are committed to the safe operation of 20 Davis-Besse, more importantly, sustained safe operation.

21 So, were examining much more than the reactor vessel head 22 and containment building. Im going to briefly describe 23 where we are on System Health Issues.

24 MR. GROBE: Just a minute.

25 Could you please close the doors back there?

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

56 1 Thank you.

2 MR. BERGENDAHL: There is two 3 Building Blocks were trying to cover, The System Health 4 Assurance Program Compliance -- and these two Building 5 Blocks, as I indicated, are expansions over what we just 6 described.

7 The first one is System Health Assurance Plan.

8 Basically, a review of the key systems from three different 9 perspectives. Taking an operational look, basically 10 focusing on the needs of the operator. A second 11 perspective would be the system reliability, and thats the 12 system engineers view of the system as a whole. And third 13 is the design perspective of a system.

14 Now, the first one, called the Operational Readiness 15 Review; that was the operating perspective, as I 16 indicated. The plant manager led those reviews and they 17 are complete. That was a team review of some key systems 18 and review of the indicators on how that system is 19 performing and when its ready for safe operation.

20 That first cut review by Randy and some of his staff 21 identified some of those issues I mentioned earlier that 22 may have met compliance, but did not meet the standards for 23 future operations. So, that produced some work activities 24 that we had maybe identified for future implementation, 25 pull those up to current, to current outage.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

57 1 That review is complete. And, then moved on to 2 System Readiness Review, which is a more structured review 3 of the risk significant maintenance rule systems, focusing 4 on material condition of the plant and including some 5 detailed system walkdowns. And walkdowns would be done of 6 course, with procedure.

7 And the results of these reviews would then be 8 presented to an independent board, which is our Program 9 Review Board, which is a subcommittee of the Engineering 10 Assurance Board, which we mentioned earlier.

11 MS. LIPA: Howard, I have a 12 question for you.

13 MR. BERGENDAHL: Yes.

14 MS. LIPA: On the operational 15 readiness reviews that are complete, is that complete and 16 identifying what needs to be worked or is all the work 17 done?

18 MR. BERGENDAHL: Its complete in 19 identifying the issues of what needs to be performed; that 20 work has been identified, and it is not all completed.

21 MS. LIPA: And then are you 22 also looking at operating workarounds as part of that 23 review?

24 MR. BERGENDAHL: Yes. That was 25 part of the perspective of what systems have operating MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

58 1 workarounds, outstanding modifications, things of that 2 nature.

3 MS. LIPA: Okay, thank you.

4 MR. GROBE: Thats, thats a 5 new one for me. I wasnt aware that you were specifically 6 looking at operator workarounds. Let me make sure I 7 understand that.

8 When I think of an operator workaround, I think of 9 things that are embedded into procedures, things are 10 embedded into the culture of operating the system, 11 operational characteristics of a control room of a system, 12 as well as operational characteristics in the field; 13 things our operators are having to work around potentially 14 a design, not deficiency, but lack of optimal design.

15 Are you looking at those kinds of things, scouring 16 through procedures, the workarounds?

17 MR. BERGENDAHL: Yeah. The first 18 Operational Readiness Review that Randy chaired, he can 19 describe it in a little more detail, but it was designed to 20 flush out issues like you describe.

21 MR. FAST: Jack, what we put 22 together in this process, 36 systems, as I recall, and five 23 other systems, like gear operated valves, motor operated 24 valves, breakers, things of that nature. We established 25 criteria. Had the system engineer come to review panel, MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

59 1 which consists of myself, operations and engineering and 2 maintenance folks. And we were focused on the system 3 health.

4 Brought into view then the performance of the system 5 in the past and its present health. We use criteria like 6 operator; we have a level one, level two, and level three 7 workaround, we track in our operations group. So, as an 8 individual would bring in a system, they would identify any 9 outstanding work orders on the system, modifications that 10 were pending for it, any operator workarounds that have 11 been established, procedures that needed to be revised or 12 written to support system health.

13 And that board was really, Im going to say, an 14 advocacy to the system engineer in creating a form where 15 they could bring the issues to the table and get the 16 appropriate level of support to ensure that those items 17 would be complete.

18 As we did those reviews, some of the legacy issues, 19 Ill call them legacy issues, system engineering; we said 20 if there were longstanding issues with problems of the 21 performance of the system, bring those forward with your 22 recommendations as well.

23 And, Ill give an example. Im trying to be 24 specific. Something like the high pressure injection 25 motors. Been there since the life of the plant. Never MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

60 1 been taken out, sent out for complete overhaul and health 2 check.

3 One of the engineers came forward and said, I would 4 like to talk about the health of the motors and where we 5 are and make proposals to send those out and have complete 6 inspections done. And, we subsequently agreed and are in 7 the process of taking those actions.

8 So, right now as we speak, their HPI motor is being 9 rigged out of the building to be sent out for complete 10 remediation.

11 There were other items, like items, diesel start 12 systems. System engineer said, heres one thats pending 13 modification. We need to put some emphasis on it. We 14 agreed. We applied the engineering resources, and that is 15 undergoing design, and that will be implemented as well.

16 Those are the kinds of things that the Operational 17 Readiness Review did.

18 MR. GROBE: Let me just ask a 19 little bit more, get into little more depth here.

20 Something like a motor that hasnt had a 21 comprehensive amount of maintenance in 25 years, would that 22 be consistent with the vendor recommendations for that 23 motor?

24 MR. FAST: The original 25 design of those motors for life of the plant was 40 years; MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

61 1 however, theyre not outside of their design basis, but 2 its just prudent maintenance activity to take those out 3 and do a health check on them.

4 So, we were doing the vendor recommended 5 preventative maintenance. Those items that are required; 6 bearings, lubrications and such, were within their period, 7 but its the unknown, its the unknowns about that which 8 really require a teardown and review.

9 So, they dont go through much of a duty cycle, but 10 it is just a prudent maintenance practice. This is above 11 and beyond what the vendor would recommend.

12 MR. GROBE: Okay. Let me ask 13 a question, you just mentioned a couple specifics. This 14 diesel air start modification; was that something that was 15 a pending modification or was that something that had not 16 been requested?

17 MR. FAST: That was a pending 18 modification, did not have implementation plan or target 19 date for at least in the near term. And that was an 20 example, we said were going to pull that forward and 21 complete that work.

22 MR. GROBE: Okay. So, back to 23 the original question, which was operator workarounds. You 24 included in your Operational Readiness Reviews, operator 25 workarounds that had already been identified. Did you go MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

62 1 through a systematic review with, or was the intent of the 2 scope of this to find out review of the workarounds that 3 were latent?

4 MR. FAST: That was not 5 really, the focus was on system health. If there were any 6 outstanding operating workarounds, those are tracked by the 7 system engineer. He knows hes got a level one or level 8 two workaround.

9 Our Return to Service Plan included completion of 10 all the operator workaround activities. So, those came up 11 and when we said, so what are we doing about this level two 12 operator workaround, it might be that we needed to 13 implement a minor change to the design of the system. Then 14 we said, lets progress that, get the work order and get 15 that out.

16 MR. GROBE: Okay, thank you.

17 MR. BERGENDAHL: Now, the next 18 level reviewed is System Readiness Review, were more 19 structured comprehensive. That would flush out more of the 20 items, Jack, I think you refer to, which are not tracked as 21 an operator workaround, but procedure aspect.

22 In that review, we will review the close condition 23 reports for the last few years to see how we dealt with 24 problems. Closed maintenance work on a plant, on a system, 25 open and close modifications, operating experience. Its a MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

63 1 more structured review and it goes through a panel to 2 independently assess the thoroughness of that review.

3 In addition, on the next slide, weve added a new 4 program called the Latent Issues Review. This is a more 5 detailed look which gets beyond even the areas I just 6 discussed and goes into the System Health Plan design 7 perspective as well.

8 This program has been used at our Beaver Valley 9 Station. Weve adopted this program and identified some 10 systems to go after first. And ones that you see here are 11 systems that we selected to put this thorough team review.

12 Now, this type of review, very broad detailed 13 review, takes a team of people a couple weeks to perform.

14 This review goes back and looks at the original design 15 basis, the emergency procedures, all kinds of industry 16 operating experience, any operability reviews that were 17 performed, problematic risk assessment; and a very detailed 18 look.

19 We selected the Reactor Coolant System, Auxiliary 20 Feedwater System, Component Cooling Water System, Emergency 21 Diesel Generators and the Service Water Systems in these 22 reviews.

23 And we have currently assembled teams. Weve put 24 together the guidance and structure for doing these 25 reviews, and the teams are starting reviews now. I believe MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

64 1 as of this week we have all the teams assembled.

2 MR. GROBE: Before you go on, 3 Howard -- Im sorry. Go ahead, Dean.

4 MR. DEAN: I was going to ask 5 you, do you intend to do these design reviews or latent 6 issue reviews in parallel or do maybe one or two and gain 7 any lessons learned and apply that to the other ones?

8 MR. BERGENDAHL: We started on the 9 Aux. Feedwater System as kind of a pilot to see if there 10 was any process improvements that could be gained. Make 11 sure we got the right scope and expertise.

12 So, we initiated that one. Did learn some things 13 from that, and modifying our process and using that. We 14 expected this new program would be continued to be used at 15 Davis-Besse. Its proven itself at Beaver Valley, and it 16 really does a good thorough job of examining the systems, 17 going back to the original design.

18 So, we plan to continue this program.

19 MR. MYERS: Let me comment on 20 that too. Neil Morrison is with us today. Neil was the 21 person that spear-headed our reviews at our Beaver Valley 22 Station for the past two or three years. How many years 23 now?

24 MR. MORRISON: Two and a half 25 years.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

65 1 MR. MYERS: Two and a half 2 years. And so there is, hes got a lot of lessons learned 3 there, so this is not a new program for us. Were just 4 moving it to this plant.

5 But if you look at where weve been spending our 6 money at other plants, a lot of our money has been spent on 7 a lot of things, finding these latent issue reviews. We 8 found significant ways to improve the quality of our 9 systems at our other plants. So, were really excited 10 about bringing this program to our plant. We think its 11 the additional margin for the plant.

12 MR. GROBE: Howard.

13 MR. BERGENDAHL: The output of 14 these reviews again goes through the engineering assurance 15 board to get an independent check on thoroughness and rigor 16 on the reviews of the systems.

17 MR. GROBE: Ive got a couple 18 questions. Its an interesting list of systems that youre 19 doing the Latent Issues Review on. Reactor Coolant System 20 is clearly a focus of the shutdown of the plant; 21 recognizing that the head is part of the Reactor Coolant 22 System.

23 Auxiliary Feedwater System, Component Cooling Water 24 Systems, Emergency Diesel Generators and Service Water 25 Systems are normally four of the five primary systems that MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

66 1 Im familiar with that comprise almost the entire risk of 2 problems at the plant, but the fifth one is DC Power. Is 3 that a significant risk contributor at your plant? Im not 4 familiar with PRA.

5 MR. POWERS: Its a good one.

6 The fifth one is, Jack, the Diesel Center --

7 (Requested speaker to repeat.)

8 MR. POWERS: Im sorry. DC is 9 part of the Reactor Coolant System, for instance, diesel 10 generators. The Aux. Feedwater System, Service Water and 11 Component Cooling Water Systems.

12 MR. GROBE: Jim, my question 13 was, normally when you look at say 95 percent of the risk 14 contribution, it would come from those four systems plus DC 15 Power. And Im not that familiar with your risk analysis 16 for Davis-Besse Plant. Does DC Power play a significant 17 role in the risk contributions at Davis-Besse?

18 MR. MYERS: I dont know if we 19 know the answer to that.

20 MR. GROBE: I dont expect you 21 to know every answer to every question.

22 MR. POWERS: No, I have an 23 answer for you. What weve done, is on the preceding 24 level, what we have learned to do on our System Health 25 Reviews, weve included the 1.50 DC Systems as part of MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

67 1 that. Those are the main systems; there were 35 of them 2 that we are going to be going through, Jack. So, were 3 going to be looking at those in some level detail.

4 We didnt select those for the deep cut, but we 5 think the deep cut in the five systems that weve listed 6 here is going to tell us generally how, what the health of 7 our systems are.

8 MR. GROBE: Okay.

9 MR. BERGENDAHL: The System Health 10 Review will identify further evaluations that are 11 required. We need to do a more thorough evaluation.

12 These systems were selected, as you indicated, 13 important systems. A couple of them had system health 14 indicators, indicated that we had some issues with the 15 system in the past couple of years. And then we added a 16 couple that our indicators show very reliable performing as 17 well, but since they were high impact systems we added 18 those; and allows us to validate our monitoring programs.

19 MR. MYERS: We still havent 20 answered that question; how does it affect PSA that you 21 want us to look at. Well give you an answer to that 22 shortly.

23 MR. GROBE: Okay.

24 MR. BERGENDAHL: Any other 25 questions on the system reviews?

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

68 1 MR. GROBE: Any other 2 questions?

3 MS. LIPA: Yeah, I have one 4 question. On the, in your plan dated July 12th, you talk 5 about that, through these reviews youre going to identify 6 conditions that need further evaluation that could impact 7 the function of a system. And it sounds like a subset 8 would be restart items. What criteria are you using to 9 decide what items become restart items?

10 MR. BERGENDAHL: In our Return to 11 Service Plan, we laid out a process. Every condition, any 12 appliance we have will be documented on condition reports.

13 These condition reports go through a station review board 14 that we would send to specifically evaluate all the 15 conditions against restart criteria. Technically, on the 16 restart action plans. Multi-field criteria. Safety.

17 Importance of safety -- I dont have the criteria 18 memorized. I could get that for you, Christine.

19 MS. LIPA: Okay.

20 MR. BERGENDAHL: Its, actually we 21 met today and we drafted a procedure for our Return to 22 Service Plan in process -- Let me correct. Our Restart 23 Action Plan process. And that criteria is in the procedure 24 which we reviewed today. It will be used in that.

25 MS. LIPA: Okay.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

69 1 MR. BERGENDAHL: Its also in the 2 chart for that station review board, clearly documented.

3 MR. GROBE: Howard, have you, 4 follow-up on Christines question; have you done the 5 screenings through your restart criteria and if so, how 6 many have you determined, whats the population restart 7 items to date?

8 MR. BERGENDAHL: The answer is yes, 9 weve started. Every day, any reviews that are going on 10 generating condition reports immediately upon 11 identification. Im not sure of the exact number. There 12 is probably four hundred some odd actions that have been 13 identified that we will get resolved prior to restart.

14 MR. GROBE: I think in the 15 future meetings, Lew, one of the things we would want to 16 do, I know that youre developing some performance 17 indicators, I havent peeked ahead, so I dont know if 18 youre going to talk about that, but one of the things we 19 want to understand in some detail is flow rates of work; 20 whats coming in and whats going on out, and whats in the 21 business to be worked as far as restart items, and other 22 issues that might go into performance indicators that you 23 developed as far as your approach toward restart.

24 And, I appreciate were still very early in this 25 process, but were going to need to start getting into MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

70 1 somewhat detail in that regard. So, at future meetings, we 2 would possibly get that sort of data and start looking at 3 detailed future work, backlog work, accomplishment of work, 4 things of that nature.

5 MR. MYERS: What we can do, is 6 Clark is in the audience, hes a building block on our 7 restart action list and we can start putting him up there 8 to tackle that.

9 MR. GROBE: Whatever you think 10 is necessary.

11 MR. MYERS: Lets do that next 12 time.

13 MR. GROBE: Okay. Did you 14 have a question?

15 MR. MYERS: Clark, get 16 ready.

17 MR. GROBE: I had one other 18 question regarding the Latent Issue Reviews. I understand 19 you used these at one of your other sites in the FENOC 20 system; really two questions.

21 This type of activity has been done on a number of 22 plants, several on the east coast and midwest that Im 23 familiar with, but Im sure there is others also. Have you 24 tapped into the expertise of whats been occurring at other 25 plants to ensure the comprehensiveness of your Latent MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

71 1 Issues Review?

2 MR. BERGENDAHL: Absolutely. The 3 D.C. Cook Plant, gone through some pretty good reviews and 4 weve visited that site, and we look for best practices 5 throughout the industry, and we have adopted lessons 6 learned from those.

7 MR. GROBE: Okay. Can you 8 give me an idea of something that you might have learned 9 from your D.C. Cook evaluation that improved your Latent 10 Issues Review?

11 MR. POWERS: As a matter of 12 fact, we are previewing not only the procedures D.C. Cook 13 used, also the people that have come over here and are 14 helping us now lay out the strategy. People experiencing 15 what was done at Cook, Millstone, Salem and are using the 16 composite of all that knowledge.

17 What we learned most specifically, Jack, is the 18 level of detail to go into, we believe, that drive the 19 FENOC Latent Issues Program another step, higher standards 20 as part of this. Its gone quite well for us. And we have 21 used others, past several years, but we think this process 22 is going to go to a higher level of detail. So, we think 23 were on the right line.

24 MR. GROBE: I think Cook is a 25 good place to go. A number of the people came from Salem, MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

72 1 Christie River, Oak Creek; most of them that put that 2 program together. So, its kind of one-stop-shopping, so 3 to speak.

4 MR. MYERS: It is dependent, 5 you know, on our steam generator -- on our head 6 replacement. We brought people in that just replaced steam 7 generators at the Cook Plant. We have some welders from 8 the, that were over in the --

9 (Requested speaker repeat.)

10 MR. MYERS: We brought some 11 craft members. We brought some experienced people, people 12 welding rebar back on containment. So, were looking for 13 that kind of experience.

14 Were using, its Cook is really good. There is 15 some other places you can gain valid experience too. Its 16 a little different for our case, like the steam generator 17 replacement. You have to cut a hole in the containment and 18 put that on, like were doing to install the reactor head.

19 Its not something that they did at Cook. See what Im 20 saying?

21 So, were trying to get the best everywhere, and are 22 applying some of that information thats necessary for our 23 operation.

24 MR. GROBE: Okay. I had one 25 other question on Latent Issues Reviews. I think I know MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

73 1 the answer to this question, but I want to make sure.

2 This is something that was used to some level of 3 success at Beaver Valley and its going to be used at 4 Davis-Besse. Is this something thats going to become part 5 of, say, the culture of First Energy System?

6 MR. BERGENDAHL: Absolutely.

7 MR. GROBE: That youre going 8 to do this type of review at all the plants?

9 MR. MYERS: The Latent Issues 10 Reviews. One of the operational officers, one of the 11 things I was going to do even if I was running one of the 12 bigger plants in the country would be to take a couple 13 systems a year, and look at them from this latent issues 14 effect, because to make sure that youre maintaining your 15 design, your documentation. Its a good process, and I 16 would use it at all of our plants. So, the answer to that 17 is yes.

18 MR. GROBE: Okay, thank you.

19 MR. BERGENDAHL: Okay, the next two 20 slides are just some photographs of the work that Randy 21 indicated we initiated some work on the Decay Heat Pumps, 22 and the next slide is just some, bringing in many 23 additional resources, as Lew indicated, craftsmen from 24 around the midwest to help us with the work we have going 25 on at Davis-Besse; a lot of scaffolding to support the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

74 1 inspection of containment and work activities.

2 So, we have a good work force out there and a lot of 3 good work. The items that we identify are being worked off 4 very well.

5 Next area is Program Compliance Plan. And, this 6 also has two different, we call them phases. They actually 7 parallel. Doing a program readiness review, which is a 8 baseline of our plant programs, we will assess, based on 9 the root cause of reactor head problems.

10 We identified some issues and standards and 11 ownership and oversight, and we set up some criteria to go 12 back and review our key programs on site, and assess them 13 against this criteria; present those results to our 14 independent review board; and really understand the overall 15 compliance and implementation of health of those programs; 16 to look at things like the qualifications of the 17 individuals involved, the interfaces, the individual 18 program owners have with the other groups. And again, then 19 present those to an outside independent oversight board.

20 In addition, much like the Latent Issues Review, we 21 developed a phase two or detailed program review, and Lew 22 mentioned Neil Morrison would be working on the System 23 Latent Issue review. We asked Neil to come over to 24 Davis-Besse and apply that same rigor to programs. We 25 designed a program and wrote a procedure and were using MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

75 1 that procedure to do these detailed program reviews.

2 Theyre in-depth systematic review of key programs.

3 Now, the first programs were starting review on, 4 the next slide shows the implementation of this program.

5 Starts off with using it on the, the programs that were 6 identified in our root cause and we have some issues.

7 Each of the programs on this list when we did our 8 detailed root cause on the reactor head degradation, there 9 were some issues identified on each one of these systems.

10 So, we selected these systems to initiate our new detailed 11 program and review on.

12 Now, we started a pilot, we call Probabilistic 13 Safety Assessment Program. Since this had not been used at 14 any of our other facilities, it was new initiative. We 15 piloted it and thought Probabilistic Safety Assessment 16 Program to ensure the process was sound and our assumptions 17 and criteria were right.

18 We completed that pilot review, and weve moved on 19 to the Boric Acid Corrosion Control Program, and scheduled 20 the rest of these programs all to be put through this 21 thorough review process prior to restart at Davis-Besse, 22 and then well continue much like the Latent Issues Review 23 to apply this problematic review to additional areas of the 24 site.

25 Again, its a good thorough look at Davis-Besses MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

76 1 systems and programs. Its under way, its identifying 2 improvements, issues and were following off on these 3 issues as well.

4 Any questions on our Program Compliance Plan?

5 MR. DEAN: Howard, can you 6 share with us some of the insights you gained from the 7 pilot review that you referred to just a moment ago?

8 MR. BERGENDAHL: Yes, the pilot on 9 the PSA, I dont have any specifics, but what we did there, 10 is we took a program. The reviews are done by an, 11 independent team members, we bring in from the outside of 12 Davis-Besse. So, what we did with that, is pilot putting 13 together a plan, bringing in the outside members, 14 developing a report and presenting that report to the 15 review board.

16 I dont know if you have any lessons learned, Jim?

17 MR. POWERS: I think some of 18 the insights that we found, our pilot program, thats our 19 Probabilistic Safety Assessment, thats one of the 20 strengths that we have. I think at the Davis-Besse site 21 and I think youve seen that with interface with your PSA 22 Supervisor, Ken Berg. So, its an opportunity to look at 23 what is a fairly healthy program with good ownership.

24 Now, what weve also found is weve been moving 25 forward with the Boric Acid Control Program and Corrective MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

77 1 Action Program; those are ongoing. Weve made substantial 2 progress in both of those.

3 That Boric Acid Corrosion Control Program, weve got 4 a draft report, final review stages now. So, we can learn 5 from those areas more significant areas of improvement that 6 are required; ownership, corporate industry results; in the 7 case of Boric Acid Corrosion Control Program.

8 In the Corrective Action Program, were looking very 9 specifically at, you know, detail regulation and how the 10 program matches the regulation and going through lining 11 those up one by one and every process, and there are areas 12 of improvement there. Youll be seeing those results 13 coming out of those. So, were finding areas in issues 14 that need improved.

15 MR. DEAN: Are you 16 incorporating a new benchmarking relative to, for example, 17 best industry practices, for using info to give you?

18 MR. POWERS: Yes. As a matter 19 of fact, thats a good point. Kind of a key element of 20 this. These reports as we do them are being provided to 21 INPO, and in some cases on the detailed reserve, INPO is 22 participating on the team.

23 They are set up down in Atlanta to take our reports, 24 as we review all our programs and send them out to industry 25 experts at other sites that theyve identified where there MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

78 1 is good industry practices from benchmarking theyve 2 conducted, and well be getting feedback from those peer 3 sites to help us improve our standards.

4 MR. MENDIOLA: Are these 5 benchmarking, these lessons learned, these program 6 improvements being reflected back to the other plants at 7 First Energy?

8 MR. MYERS: Yes.

9 MR. GROBE: I have a couple 10 thoughts, I guess, on System Health Assurance Plan. The 11 Operation Readiness Reviews, the scope of that activity 12 clearly was something that needed to be done following the 13 situation that occurred with the head.

14 The System Readiness Reviews, I think some aspects 15 of that also were direct outgrows of the lessons that you 16 learned from the head situation.

17 The Latent Issues Review clearly goes beyond the 18 depth of what would normally be expected, and Im glad to 19 see that youve taken these significant systems to do this 20 Latent Issues Review. I have confidence based on your 21 experience at Beaver Valley and the input that youre 22 getting from outside your organization that those reviews 23 should be of good scope.

24 The programs area, likewise, I think the level 25 review reflects not only what happened during the head MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

79 1 corrosion event, but also some things that youre going 2 beyond the scope of what may have been directly indicated 3 from the initial findings of the head corrosion event. So, 4 I think that likewise is good.

5 Were still in the phase of, in many of these areas 6 of inspecting all good plants. In a couple of areas, John 7 talked earlier about some inspection work that weve done 8 already on a nondestructive examination weve had.

9 And Mel has done some early inspection work and 10 provided substantive feedback to you on the containment, 11 early containment health work, or extended issue work, I 12 guess it was called at that time.

13 There will be substantive inspections that will be 14 coming as you get into these in greater detail, and start 15 completing some of this work. Well be taking a good hard 16 look at that, and also giving you feedback.

17 Were going to be working closely with your staff 18 that are implementing these activities to make sure we 19 understand your schedule and what activities will be ready 20 for inspection.

21 We dont plan on inspecting things before theyre 22 done. Were not part of your team. Were not supporting 23 the success of your program. We want to look at what 24 youve accomplished, and well achieve our confidence based 25 on the quality of work you do.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

80 1 Youve mentioned a number of occasions assessment 2 boards and review boards. Ive watched over the last 3 several weeks as things evolved, and youve got quite a 4 different character of outside influence on these review 5 boards, created more review boards, structured them. In a 6 future meeting, I would like to get some feedback from the 7 value added, a little bit more detail on the structure of 8 those boards, what their function is, what theyre 9 accomplishing, and also some feedback value added from 10 those boards. What theyre seeing.

11 Because those boards will give you a direct 12 reflection of the quality of the work, not only that the 13 people are doing in the field, but also the folks that 14 review and approve that work. Because the boards shouldnt 15 see that work until its been through your review process, 16 you know, in your line organization.

17 So, Im hoping to get some insight from that.

18 Hopefully, that can be on the agenda for the next meeting.

19 MR. MYERS: We can do that.

20 MR. GROBE: Okay. Any other 21 comments on systems or programs?

22 Lets move on.

23 MR. MYERS: Before what you 24 commented, I think the programs review is something that 25 helps us understand that each one of our programs is a MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

81 1 pretty significant list of programs out there that we have 2 best industry implementation, doing the industry 3 implementation. Its not the minimum criteria, its where 4 we have the margin. And that we have good ownership, and 5 finally that were implementing that program properly in 6 the field.

7 So, thats really the structured process to go into 8 this whole latent issues process in and out. I note the 9 long term, I see that as an essential building block.

10 The next area that we have to talk about is 11 Management and Human Performance Excellence Plan; and 12 particularly the Management Root Cause. I would like to 13 introduce that.

14 Its hard, as folks say, to call your baby up. But, 15 in the last meeting, I indicated that management, 16 "Management ineffectively implemented processes, and thus 17 failed to detect and address plant problems as 18 opportunities arose"; especially in the forecast approach.

19 There is four key areas of focus that were looking 20 at; Ownership, Oversight, Standards, and Decision-making.

21 And, our Boron Program does not have good ownership at the 22 engineering level to insure that we were meeting the 23 standards in industry, and that the requirements in our 24 program were proper.

25 The oversight groups in our management team were not MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

82 1 properly involved with that program to insure that we have 2 proper implementation. Were not out in the field looking 3 at what we were doing.

4 When problems were found, we did not have a good 5 questioning attitude in this boric acid issue that lead to 6 the easy conclusions. It was easy to justify that no leaks 7 in the past were the cause of this boron buildup. It was 8 an easy conclusion.

9 Our initial management reviews have come up with 10 some assessments that we can share, and thats that 11 standards have existed for many years at Black River in 12 problem solving. Our reviews are going back to the 1980s, 13 and have indicated this lack of problem solving at the 14 management level is something we have to work on.

15 Another thing we can say now is when there has been 16 times at Davis-Besse Plant that we had strong management 17 leadership. In the 1980s and 1990s, the trend was to 18 properly identify problems and resolve them. So, that lack 19 of rigor was not evident and you saw improvements in the 20 performance.

21 For example, I had a supervisor tell me today that 22 in the early 90s, Davis-Besse was setting the standards 23 that everybody else was coming to look at. Thats one of 24 those standards we need now.

25 As industry hired many of our leaders at the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

83 1 Davis-Besse Plant, replacements reduced strong daily 2 involvement that resulted in a lax attitude of fixing the 3 problems. Lets just get the problem fixed. And since you 4 have that lack of rigor in decision-making down below, the 5 problem came evident.

6 Let me say this. The Davis-Besse Plant has operated 7 well for many years and its still in very, very good 8 material condition. As good as most plants in the 9 country. However, as new problems arose, without strong 10 upper level involvement, and the lax rigor, the 11 decision-making process appeared to be narrowly focused in 12 several cases that weve looked at.

13 Our approach has been simple. We initially assessed 14 the root cause of the head degradation. What would cause 15 this problem? As we did that, we also looked at some 16 management issues. We did that because we had noted that 17 there was a time performance at our Davis-Besse Plant. So, 18 by going to the technical root cause, we could first give 19 us some time to make some of the overall structure changes 20 that we wanted to make.

21 For example, we created the job Im in now, the 22 Chief Operating Officer, to provide additional plant 23 oversight of all three of our plants.

24 We created a new position, an elevated position of 25 oversight and promoted Bill Pearce. We brought in Harry MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

84 1 Light, an executive from the Institute of Nuclear Power 2 Operations to be our Executive Officer of Engineering. We 3 need that time to make those strong implement changes.

4 We brought in a new group of executives from the 5 industry to provide us as a management team with some 6 insight on the types of problems we might be encountering.

7 And they gave us a tremendous amount of insight. Several 8 VPs from several top notch utilities came in.

9 I was personally moved to the Davis-Besse Plant, so 10 we could ensure that we had plans and organization to 11 return Davis-Besse back to service in a safe and reliable 12 manner. And I plan to devote a significant amount of my 13 time until I feel confident that our performance would be 14 sustainable.

15 I chartered the Root Cause Team to look at the 16 management issues. Steve Loehlein will now discuss with 17 you the methodology weve gone through.

18 MR. LOEHLEIN: Thank you, Lew.

19 Lew mentioned to you the AITs report and our own 20 technical cause report talked about degradation of the head 21 over the years. What were doing now, is caused now, is 22 looking at the why; why this happened over a period of 23 years, that this was not identified and dealt with.

24 I would like to say first to you, Jack, this team 25 that we have working on this particular issue really MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

85 1 understands how important the answer to this problem 2 statement is, because we know we can assure that the right 3 solutions are pursued so the plant will be able to sustain 4 safe performance.

5 Now, Lew mentioned earlier some of the assessments 6 have already been done by various industry leaders. And 7 they do provide a lot of understanding to many of the 8 performance shortcomings. What were really doing in this 9 process is assuring that were digging down.

10 Our objective is to compliment the effort that has 11 been taken on so far by applying the rigorous root cause 12 analysis technique, and that will ensure that theyre more 13 subtle nonetheless very important causes for this upcoming 14 overall project.

15 Next slide.

16 We have our Root Cause Team in the front row. I 17 would like to ask them to stand. Its a group, Ill tell 18 you who they are. We have from our Perry Plant, we have 19 Mario Destafano and Bill Babiak. In our Quality Assurance 20 Organization there, we have Bill Mugge, Bobby Vallines and 21 Joe Sturdavant, who are all Davis-Besse men.

22 We have a couple of experts from Conger and Elsea, 23 Lesley Wildfong and Dick Smith. Now Conger and Elsea is 24 the company that developed the Root Cause Analysis 25 Technique that were using to develop about 20 years ago.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

86 1 Its been used on a lot of very significant investigations, 2 including the challenge.

3 Final member we have here is Doctor Spyros 4 Traiforos, who was with us for many months also. We use 5 his analysis technique.

6 Now, the team -- oh, Im sorry, I missed my own, my 7 comrade from Beaver Valley is Randy Rossomme. You forget 8 our own. Randy is from Beaver Valley in our Quality 9 Assurance.

10 And myself, Im also with Beaver Valley. I was 11 Technical Lead. My title at Beaver Valley is Principal 12 Nuclear Consultant.

13 MR. GROBE: Steve, if you 14 could get those names to our stenographer, Im sure that 15 would help her.

16 MR. LOEHLEIN: Im sure they can, 17 some of those arent easy to spell.

18 Its a balanced team. What were looking for, a 19 continuity for Technical Root Cause, which is one of the 20 main reasons Im on the team. We have process expertise 21 from outside consultants. We brought in the objectivity of 22 off-site personnel.

23 Then, we wanted to make sure we included the 24 ownership factor of on-site personnel. There are people 25 that need to be a part of this team, carry the message MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

87 1 forward to the rest of the team, if you want quality by 2 example. People that really know firsthand, understand 3 what we found, what it means to the organization. More or 4 less be disciples to the rest of the organization.

5 Now, not members of the team, but also helping us 6 are some oversight folks for us. We had Tony Maschari, who 7 has worked with nuclear power, excellent in human 8 performance. Hes not been down to the site. I believe he 9 plans to be down sometime in the future.

10 Leonard Rone, an organizational effectiveness expert 11 that met last week with us, and hes providing us with 12 insights as well.

13 Next slide.

14 We have a few photos here. We dont have all the 15 team members in the upper photo, what we have in the room 16 at this time. Here you see us working on a discussion 17 topic. Thats Lesley standing there, Im sure making a 18 point about the process.

19 This is approach. Again, Lew mentioned earlier the 20 Technical Root Cause results. The Technical Root Cause 21 pointed us in a couple of specific directions. One is the 22 errors in the decision-making occurred over a lengthy 23 period. We saw that there were opportunities to do various 24 things over about ten years that were missed. And that has 25 caused us to recognize that the timeline is also therefore MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

88 1 lengthening that we need to consider.

2 The other thing that was important on a Technical 3 Root Cause was we had other plant indications that have 4 allowed earlier detection on a problem. These were not 5 properly understood or acted upon.

6 So, from those key understandings were 7 investigating four major areas. One is the head itself.

8 Focus there to why wasnt the significance of the boric 9 acid buildup on the head recognized.

10 The next item there is pressurizer spray valve.

11 For any of you that read the Technical Root Cause 12 Investigation, there was an issue with boric acid pressure, 13 on the pressurizer spray valve in 1998 for which the plant 14 took a number of significant actions to try to gain 15 an understanding of the site focus, and guard for boric 16 acid. Yet somehow the effectiveness of the actions taken 17 there were not accurate to ensure that we identified the 18 problem on the head in the 2000 time frame.

19 We wish we had an opportunity at the time we were 20 reviewing that to regard that as significant issue to look 21 into.

22 The third one is the condition of the Containment 23 Air Coolers. The question asked was why wasnt the 24 significance of the increasing frequency and cleaning of 25 these coolers recognized.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

89 1 And the last major one listed there is similar.

2 Its the Radiation Monitor Filters, also the Technical Root 3 Cause of the monitors filters for them, were developing 4 clogging, boric acid, iron oxide; and why wasnt the 5 significance of that, that happening recognized.

6 Next slide, please.

7 Were using an in-depth approach on this, does take 8 some time, developing event and causal factors chart, and 9 well see a piece of that on the overhead here. Were also 10 using a hazard barrier target analysis technique in 11 conjunction with that.

12 The analysis process that were using is referred to 13 as MORT. It stands for Management Oversight and Risk Tree 14 Technique. That has a number of sections; one on the right 15 side of the tree analysis chart thats designated as 16 Management Time Issues.

17 Weve identified five key sections of that MORT 18 style analysis that we think are relevant here. One is 19 Technical Information Systems that are listed there. One, 20 Ill speak to for this.

21 I know the NRC, many of you are probably familiar at 22 NRC, used MORT yourself quite often over the years, many of 23 your trainings referring to it. But for those of you who 24 are unfamiliar with it, if I were to pick one of these out, 25 so management support oversight people understand why this MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

90 1 tree concept works.

2 If you look at managements role, this process 3 per se, management has three primary branches in our 4 obligations. One is to set policy or establish standards.

5 The next would be their responsibility to implement those 6 standards. And then the third major branch would be the 7 concept of managing risks.

8 Now, if you took that concept of managing risks and 9 looked at its branches, and set three branches to that, 10 would be information systems. How does management get 11 information it needs to understand what the risks are.

12 Then there is a process that evaluates called hazard 13 analysis. Now, thats the process you have in place to 14 make sure whatever happens out there youre evaluating 15 correctly, so it can be understood.

16 And the third branch to that particular process is 17 program monitoring, that the programs you have in place 18 inform you and analyze the risks are effective in doing 19 that for you.

20 So, its a very detailed analysis technique, which 21 is designed to see exactly where in these processes the 22 errors occur. As we get down through the conclusions of 23 them, well develop recommendations for consideration.

24 Next slide.

25 I cant see it very well, but from the copy I have MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

91 1 here, that upper left-hand photo shows really the cause 2 factors chart going down the lefthand side. What it shows 3 there is the information we collected for 1997 up to the 4 present.

5 We do have data points that go all the way back to 6 the early 80s, but thats because thats when the first 7 industry information came out regarding boric acid and how 8 it may affect the fasteners. So, we dont have a lot of 9 data that far back, but were being thorough in going down 10 all the trails in relating to these issues and sections 11 that were investigating.

12 So far, we have information from 69 interviews, and 13 well over 300 documents that are supplying the information 14 for this. The second photo shows, giving us a little tour 15 of the work chart.

16 Next slide.

17 As Lew mentioned earlier, we have from the 18 information we have, the understanding we have been able to 19 work with, at least, weve talked to Lew about other 20 management team, these management attributes, management 21 oversight-type things, been at the site. I pointed out a 22 lot of things, but weve also seen management attribute 23 factors that represent things that the site can work on in 24 terms of prebaseline proper standards and staff. And these 25 are the insights we have clearly from our data.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

92 1 As we mentioned earlier, we have had standards and 2 for years have lacked rigor. That strong management and 3 leadership has been able to have the right things happen, 4 and performance of the plant has been good in those 5 periods. There has been lack of management oversight that 6 resulted in lax rigor in process implementation, and the 7 questioning attitude in some cases is not evident as well.

8 So, the actual work analysis is continuing. Its 9 pretty short timeframe, but were working right along. I 10 cant take too long on getting certain things done. It 11 doesnt work that way, but for now these are our insights.

12 Lew, Ill go back to you.

13 MR. MYERS: Thank you.

14 MR. GROBE: Before we go on, 15 we have a few questions.

16 Christine.

17 MS. LIPA: An obvious 18 question, and Im sure there is no answer yet, you know, 19 the timeline for when youre going to start putting some 20 actions into place, because that will be important that we 21 decide how to do our inspections on those various tasks.

22 Whats your estimate at this point?

23 MR. LOEHLEIN: What were doing 24 right now, thats why were working so close with Lew. So 25 much what were doing now is, represents what we call MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

93 1 baseline proper standards, plus information out there on 2 the performance, can be measured as seen by, in forming 3 plans.

4 We need to do these conclusions and see what sort of 5 adjustments we have to make to those plans for any other 6 results we may conclude.

7 MR. MYERS: I think the report 8 will be this month.

9 MR. LOEHLEIN: Were expecting 10 it. Again, root cause, iron clad prediction on when were 11 to be done, but were expecting to be done with our 12 analysis and conclusions at the end of the month, and 13 thats where we are.

14 MS. LIPA: You plan to submit 15 that to us?

16 MR. MYERS: Yes.

17 MR. DEAN: Lew, this 18 question is not for you, but Steve. Clearly, you can take 19 some preliminary insights, and Im sure they jive pretty 20 well, you know, even with what we do; conclusions you come 21 to just by seeing what transpired and how you get where 22 youve got.

23 Are there actions being taken now in terms of 24 rebaseline proper standards, but the things that we talked 25 about earlier, your revamped management team in terms of MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

94 1 driving those sort of standards and expectations down?

2 MR. MYERS: Yes, they are.

3 Im going to talk about some of those in closing remarks.

4 As you said, weve made management changes, restructured 5 some, brought in people already, created some additional 6 oversight and a few positions; myself and Gary, and Bill 7 Pearce. So, we are taking actions as we move forward.

8 Were very conscious about the actions were taking not 9 being negative actions, you know. So, yes.

10 MR. GROBE: I have to say, Im 11 still frustrated in this area. I have a great deal of 12 confidence that once you apply yourselves, the technical 13 problems and the systems area and reactor head and 14 containment setup condition and all those things, that you 15 can do that work well, but safe restart, and more 16 importantly, safe operations after restart on a continuing 17 basis, is key in this area.

18 And, these preliminary insights, while I know that 19 you have more data to support them, these insights today, 20 we could have probably sat down a week after the discovery 21 of the cavity and come up with these issues.

22 And like I said, Steve, I know you have a lot more 23 data to support these issues and will be developing further 24 insights, but this is the key in my mind, to long term 25 improvement of the plant. And its also the key to MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

95 1 restart, along with all of the mechanical processes that 2 youre going through the systems.

3 Christine asked a question, and maybe Im just 4 asking the same question again. When are we going to have 5 a clear understanding of specific actions; what your 6 expectations are as a result of those actions, what your, 7 how youre going to measure progress in those areas, what 8 performance indicators youre going to use on how 9 performance in these areas are changing?

10 Before you answer that, let me just add one more, 11 one more thought. Some of these issues deal with 12 management, some of them deal with staff. Clearly, youve 13 made a substantial change in your leadership team, your 14 senior leadership team, but day in and day out every 15 individual in the plant has to be a leader for excellence.

16 And, the first level of oversight doesnt come from 17 management. It comes from first line supervisor, 18 maintenance foreman, the field operator is overseeing 19 implementation work by other operators. I dont see 20 anything in here regarding that level. Could you speak to 21 those issues a little bit?

22 MR. MYERS: Yes. Let me go 23 through my closing remarks a little bit. I think that will 24 answer these questions.

25 I think weve demonstrated today that our Building MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

96 1 Blocks have moved from the planning, discovery and into the 2 implementation phase in many areas. Okay.

3 We have taken strong actions to incorporate the 4 comments from our Restart Overview Panel, the meetings we 5 have had with the NRC and the comments weve heard since 6 the last meeting.

7 We are taking management actions that are 8 substantial and demonstrative.

9 Let me explain that. As I said, we created a new 10 position of Chief Operating Officer, so that we would have 11 more day-in day-out involvement in making sure standards 12 between our staffs are fine.

13 Let me give you an example. At our other two 14 plants, were running the same process in corrective 15 action. And when we ask for operability determination, 16 inoperability determination; at Davis-Besse it was 17 inoperability justification.

18 That minor difference sent the wrong message. We 19 created the executive, the position of Executive Vice 20 President in Gary Leidich. And then we created VP of 21 Oversight. Those were all pretty substantial changes at 22 the senior level. New senior management team, and a strong 23 management team is now present with, every day at our 24 Davis-Besse Plant with proven leadership. And weve 25 clearly shown that, when we have the strong leadership at MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

97 1 the plant thats involved with everyday activities, that 2 the performance of the plant is efficient.

3 Weve brought Mike Ross in, just at the end of the 4 table, to focus on the operations area. Weve already 5 chartered mine. We evaluate attributes of every operator 6 at our station, until we have the right attributes for each 7 position; from nonlicensed operator, to the licensed 8 operator, to the, to the control advisors, hes charting 9 that activity.

10 Were providing a case study with all of our 11 employees that sets expectation that change of ownership 12 and standards need to be made. Were sitting down with 13 your boards and spending a lot of time in that effort. We 14 will be going back and evaluating each of our employees to 15 our standards. Were rebaselining our standards; do we 16 have the right standards.

17 Ive seen some cases where I thought some of the 18 leadership action standards, if you will, that weve had in 19 place, have deteriorated. Were going to rebaseline those 20 standards. And they will clearly learn, monitor and 21 reinforce those standards at supervisor and manager 22 levels to make sure they understand and they can comply.

23 Its that simple.

24 Weve created a new engineering standards of 25 excellence already. That will be a model for each of our MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

98 1 groups. We created a new Engineering Assessment Board. We 2 intend to use that board, its in their charter to provide 3 you the input you need to know about the quality of the 4 work. And, well continue to do that in other areas.

5 The Plant Manager, Randy Fast, is now chairing our 6 Corrective Action Review Board. In my mind, this is the 7 most important program at our plant. And I intend to have 8 Randy provide me detailed performance indicators on the, on 9 the thoroughness of corrective action from that board.

10 How many comments do they have to make for our 11 standards and how many outages have they checked. But 12 Randy is going to charter that board. Thats not short 13 term. I consider that permanent.

14 The new operations of leadership to ensure the plant 15 operational focus is absolutely necessary. It was missing 16 in this, this whole issue over the years. It was ours.

17 And if you look, we brought in Mike Ross, and we chartered 18 him to provide us indications that we have the right 19 performance modeling tools in assessing the office of the 20 organization. Thats his charge.

21 We need, have to build teamwork between our 22 managers, supervisors, and line workers. If we cant get 23 that done, then we probably wont be ready to restart; not 24 ever for restart. So, we have to be all on the same page.

25 At our next meetings, we intend to provide you MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

99 1 performance indicators on how each one of these actions are 2 taking place. Whats the effects. What are we seeing from 3 the Corrective Action Program, Engineering Assessment 4 Board, and what are we seeing out of the Oversight Review 5 Boards that we put in place, some on a temporary basis.

6 But we consider Engineering Overview Board a 7 permanent fixture. I dont see those ever going away. Who 8 continue to be committed to comprehensive approach to 9 ensure the Davis-Besse Plant is safe and reliable, and once 10 again, we will make sure that we will have sustainable 11 performance. We want to let you know that.

12 Thats what I have to say.

13 MR. GROBE: Okay. Any 14 questions?

15 Okay. Before we go on to the next session of the 16 agenda, which is discussing the framework for restart 17 checklist, I think its appropriate for a couple comments 18 right now.

19 This has been a very comprehensive presentation on 20 the status of a variety of activities. I think over the 21 past month weve seen a substantive change in the focus and 22 scope on a number of the activities. And thats been the 23 result of your assessments of what youre doing and how 24 youre going to accomplish it. Its been the result of 25 some input from our staff, as well as some input from MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

100 1 outside influences. And, I think thats very healthy.

2 The area as I mentioned a moment ago; many of these 3 activities in the management performance area were clearly 4 future tense activities. Im eager to get into some more 5 detail in this area, to understand specifics of what these 6 activities look like, how you measuring them, what your 7 expected outcomes are on specific activities, and what your 8 personal restart criteria are going to be in these areas.

9 And, I think this is very important.

10 At this time, John?

11 Hes good. Lets move on.

12 I wanted to provide framework, clearly comprehensive 13 framework for the NRC Restart Checklist. Obviously, youve 14 got your, one of your Building Blocks here at your restart 15 plan, specific criteria for whatever items that need to be 16 resolved from restart, whatever items that possibly can be 17 deferred until restart. I suspect before youre done, you 18 already have a, many hundreds of items identified that 19 youre going to screen, and probably several hundreds that 20 youve probably already identified that are a result of 21 restart.

22 Our research in this has to be much simpler. And 23 its going to have a framework that covers a number of 24 areas. Obviously, we have to see root cause, is very 25 important. The adequacy of structured systems and MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

101 1 components hardware in the plant. Weve added some 2 programs.

3 This is, our restart checklist is to a large extent 4 going to mirror your restart plan. Adequacy of 5 organizational effectiveness in performance.

6 As I mentioned a few moments ago. I personally 7 strongly believe that the first line supervisor is the key 8 to the long term exceptional performance. And this is 9 written a little bit different than what yours is, 10 management effective. Weve structured this more I think 11 broadly organizational factors. And, sub items were going 12 to get into in a little detail.

13 Readiness for restart, what were going to be 14 looking at in several areas, both the hardware as well as 15 the people, and licensing issues. And, as this restart 16 checklist involves, and Im going to talk about a couple of 17 these sections in more detail; Christine is going to talk 18 about one or two; Bill is going to be talking about one of 19 the sections.

20 But as the checklist gets formulated, and is issued 21 by the NRC, its important that we have a clear 22 understanding of the specific items. And I think as youve 23 gone through your structuring and restart plan, you can 24 find a very close alignment. We can provide you with a lot 25 of feedback. And I think its going to naturally meld MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

102 1 together, because the issues that are important to us, 2 weve been identifying the issues that youve identified or 3 reports have been good.

4 So, I expect there will be a clear alignment. One 5 of the purposes of publishing the restart checklist. There 6 is actually two purposes. One is a very clear 7 communication between us of what the expectations are. I 8 would say minimum expectations on prior to restart. We 9 would like to go far beyond these specific activities in a 10 number of areas. And secondly, to clearly indicate to the 11 public what the NRC expectations are prior to restart.

12 Let me talk a little about bit root cause. Weve 13 received documents from you regarding what Ill call 14 technical recalls. And Steve, you mentioned that earlier.

15 It was called something different. I think it was actually 16 called root cause analysis, but didnt go into the level of 17 detail that Steves team is using today, more to his 18 industry recognized processes at this point, which many of 19 our staff do.

20 Its very solid approach to identifying all the 21 organizational factors in the problem, so Im certainly 22 looking forward to that. The technical response is 23 specifically focused in two areas, thats cracking, 24 penetration, corrosion, what caused that, what contributed 25 to it. That was presented, I believe, on May 7th at MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

103 1 headquarters, public meeting to the NRC staff and other 2 folks. I think thats very well understood and we were 3 completing our evaluation of that part of the root cause 4 and that would be published and when we complete our 5 review, we will provide that to you.

6 The second area of the reconnaissance, what I refer 7 to as the software side, thats the organizational 8 programmatic and people, and obviously, you havent had 9 your review yet, so we havent performed our formal review 10 of the facility; and well be doing that.

11 Christine, I think, has some scope of the advocates 12 of the systems out, to go over there.

13 MS. LIPA: Sure, let me just 14 talk a little bit in general about the checklist we have.

15 I dont know if you guys got a copy of it. It was in our 16 handouts and we cant see the projector.

17 But this is, were calling this a framework for the 18 checklist. This is not the checklist. And the panel is 19 working to develop the checklist based on some of the 20 things Jack referred to in root cause, AIT Inspection 21 results and other items.

22 Then, once the checklist is developed and approved 23 by the panel, it would be reviewed and approved by agents 24 and management. So, this is the framework for today.

25 Well get you a handout.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

104 1 The first item that I have on here, 2 A, is the 2 Reactor Pressure Vessel Head Replacement. John gave you 3 some details earlier on some of the inspections that have 4 already been started. The inspections will continue.

5 The second item is Containment Vessel Restoration 6 Following The RPV Head Replacement and obviously opening 7 the containment and reclosing and testing as part of that 8 inspection that well be doing.

9 The third one are Structures, Systems and Components 10 Inside Containment; and its really similar to the 11 presentation you gave earlier. The things that were 12 interested in are some of the things youre interested in.

13 What damage might have been done to various components 14 within the containment head as a result of the boric acid.

15 That includes equipment, electrical equipment, 16 mechanical equipment, environmental qualification for some 17 of that equipment, the containment air coolers and the 18 radiation monitors. Well also be taking look at the 19 monitor plan on the sump and fibrous insulation issue.

20 And then the final supplement in this area, our 21 Systems Outside Containment. Specifically systems that 22 contain borated water and also some of your important 23 systems determined by your managerial criteria.

24 Thats how we intend to approach this area.

25 Jack?

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

105 1 MR. GROBE: I just wanted to 2 comment. These are broad categories. When we describe as 3 framework; specific inspection, the scope of inspection in 4 each of these areas will be different. They will be 5 dependent upon the root causes of what resulted in the head 6 degradation issue at Davis-Besse.

7 The reason we havent presented this checklist 8 earlier is that I didnt want to be in a position to find 9 what was necessary. Youve been working through a number 10 of these areas. Youve evolved over the last month, month 11 and a half, and I want to be sure there was, you had a 12 clear vision of what you thought was important.

13 Weve provided feedback already in a number of these 14 areas. Also done a variety of inspection activities; Mel 15 Holmberg on the structure systems and components; John and, 16 Don Jones have done a number of inspections regarding 17 vessel head replacement in the area, nondestructive 18 examination; and weve already laid out the inspection plan 19 for the, what were planning on looking at with respect to 20 the, the code records for the necessary vessel head.

21 Shortly after we finalized this checklist, which I 22 expect in the next week or two, well be finalizing our 23 inspection plans, and get that schedule to you as well as 24 some detail on the scope of the inspection.

25 Schedule obviously is dictated by you. We cant MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

106 1 inspect anything until youve completed work. And, we may 2 be able to do some, or some inspections have to be done in 3 process. For example, nondestructive examination 4 inspection had to be done in process and thats already 5 been completed.

6 So, as we begin to develop the inspection scopes at 7 least, we will be clearly communicating that to you. The 8 leaders in each of these areas will be working closely with 9 your staff. I understand your schedule and my staffs, 10 watch the progress in those areas and be able to step in 11 and do our inspection at the appropriate times.

12 I think Bill was next going to talk about 13 problematic areas.

14 MR. DEAN: Very briefly. I 15 think it would probably seem a pretty good matchup here in 16 terms of programs that were interested in looking at are 17 relative to the ones that you identified yourself here 18 today. Clearly, the basis of looking at these is that we 19 need to assure ourselves that the Licensee are assessing 20 your programs and they are in a self-critical manner; and 21 putting in place effective corrective actions which would 22 ensure those programs are effective in the future.

23 You will participate in assessment of the accuracy 24 of some of the programs. The one there that is a bit of a 25 delta is items received as audit and self-assessment MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

107 1 programs. And our intent there is that, we believe that we 2 can look at organizationally how do you put in place, say, 3 a process by which you have independent and organization 4 itself critical process, and that the results that emanated 5 from that process are treated appropriately.

6 So, thats one thats a bit of a delta that you have 7 to provide us here today.

8 MR. GROBE: Thanks. I think 9 thats a real good point. We view corrective action 10 program, an operating experience program, a self-assessment 11 program as really part of the corrective action program; 12 and, to be completely effective, it requires a number of 13 components, and weve separated that out in our checklist.

14 Youre taking actions in all of these areas. Its 15 just that you havent specifically defined in your 16 programmatic reviews things quite the same way as we have 17 here.

18 I was going to talk a little bit about 19 organizational effectiveness. This is the area you 20 probably wont get a lot of specificity from our checklist 21 at this point, but there are no NRC requirements in this 22 area. The organizational effectiveness and human 23 performance are actually critical safe operations. The 24 detailed look at this is going to be driven by, to a large 25 extent, by what you choose to do in this area.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

108 1 The results of this activity, of your effectiveness 2 in this area would be directly reflected in all of the 3 other inspections. And, organizational effectiveness, 4 human performance, will be measured by your performance in 5 all these other areas.

6 So, I will be closely monitoring activities, as well 7 as the outcomes of those, as the organization performs 8 during its approach to the restart.

9 The next area is Readiness for Restart, and I would 10 expect that the Systems Readiness for Restart is different 11 than your System Reviews. Thats more akin to what you may 12 call a checklist. Its part of the systems in an 13 operational configuration for operations.

14 Operations Readiness for Restart is an operational 15 organization of people. Operations, are they ready to make 16 the transition from shutdown plant to operating plant. And 17 obviously, test program, a number of activities that are 18 going to be accomplished both prior to restart as well as 19 during restart process, accomplish testing.

20 So, those are the three focus areas or the framework 21 for the restart.

22 Im going to ask Doug Pickett to talk a little about 23 the licensing issues, and Ill wrap it up.

24 Doug.

25 MR. PICKETT: Okay, regarding the new MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

109 1 reactor vessel head, there is a number of licensing 2 issues. This is where we require approval prior to 3 restart. And all the issues under item 6 are basically 4 documentation issues of paperwork, if you will. They 5 shouldnt require any modifications or plant repairs.

6 The first four items are basically requests from the 7 NRC code. The next are the spec requirements, and they 8 allow us --

9 (Requested speaker to repeat) 10 MR. PICKETT: The regulations 11 allow the staff to accept alternatives to the ASME Code, 12 providing the staff is convinced there is an equivalent 13 level of safety. Staff makes at times findings on all 14 plants.

15 The item 6e, is documentation of the reconciliation 16 between ASME Code, the new Midland Reactor Pressure Vessel 17 Head.

18 And the final item is additional documentation 19 provided on Verification of Technical Specification 20 Pressure/Temperature Curves for New Vesssel Head.

21 And, your staff is aware of these issues, and its 22 my understanding that youre preparing letters for the 23 staffs review, and we should see those shortly.

24 MR. SCHRAUDER: Thats 25 correct.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

110 1 MR. GROBE: Okay.

2 Thanks, Doug.

3 I believe that -- well, all of these areas are 4 fluid. Were going to shortly tie down what we believe to 5 be the restart checklist in the NRC perspective.

6 As Christine mentioned a few moments ago, once the 7 panel finalizes what it thinks should be on the restart 8 checklist, that will be by Jim Dyer, Regional Administrator 9 in Region 3 in Chicago, as well as Sam Collins, the 10 Director of the Office of Nuclear Reactor Regulations.

11 And, not until they approve it will we issue it to you and 12 to the public.

13 I wanted to go into some detail today just to give 14 you a scope and framework for what were looking at from 15 the restart checklist perspective.

16 One area that may have the most validity is the 17 Licensing Issues Resolution. There may be other activities 18 that come up that require either substantial safety 19 regulations, or licensing actions as you go through all 20 your system reviews. And certainly licensing actions are 21 something we would have to take a significant safety 22 evaluation, and complex safety evaluations, wed likely 23 take a look at also.

24 So, that area is going to be somewhat fluid as 25 things evolve over the last couple of months. The other MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

111 1 areas likewise can also have issues added to them. It 2 depends on the significance of the issue. Were going to 3 be identifying a lot of things. I wouldnt expect many of 4 them to appear on this checklist, but if its something of 5 particularly significance, the checklist would be updated 6 and they would be added to the checklist.

7 This is the first time Ive shown this to you. I 8 wanted to get it out on the table and make sure you had a 9 clear understanding and respond to any questions you may 10 have regarding this framework.

11 Any questions from your side?

12 MR. BERGENDAHL: Give an example, 13 like something that is systems outside containment.

14 MR. GROBE: Sure. The one 15 specific issue, again restart checklist should be driven 16 from issues that result in the shutdown. So, clearly 17 systems containing boric acid. Water has boric acid in 18 it. I want you to focus for those constant factors.

19 But in addition, many of these areas; the 20 organizational effectiveness on human performance 21 characteristics that were, that resulted in head 22 degradation, may have resulted in other system 23 degradation. And so, were going to have to see in that 24 area also.

25 I cant give you scope of the inspection at this MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

112 1 point, but I can tell you that we would be scanning a 2 variety of the work that youre doing in the area of your 3 system reviews, as well as some independent work. Areas 4 that you may not have done to benchmark the quality of work 5 that you have completed.

6 So, does that help out?

7 MR. BERGENDAHL: Yeah, I understand 8 that.

9 MR. GROBE: Other questions?

10 Okay. Very good.

11 Lew, do you have any concluding remarks before we 12 finish the business portion of the meeting?

13 MR. MYERS: Well, I thought 14 this was a productive meeting. I think we accomplished our 15 desired items. What I heard was next time we will have 16 Bill Pearce here to talk about oversight; Clark Ross will 17 give us performance indicators and work off curves and what 18 were doing and what were identifying, have that at the 19 next meeting. And finally, on a management issue, focus on 20 the actions were going to take and how were going to, the 21 amount of the effectiveness of the actions. Okay?

22 MR. GROBE: Sure.

23 MR. MYERS: Okay.

24 MR. GROBE: Let me add one or 25 two things to that, just to make sure you have a complete MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

113 1 list.

2 MR. MYERS: Okay.

3 MR. GROBE: I think we talked 4 about the oversight boards. And, did you mention that, 5 value, theyre adding what their function is?

6 MR. MYERS: Right.

7 MR. GROBE: And also, I would 8 like to hear specifically about some of the more 9 substantive issues that your activities have identified.

10 So, thats more of a specific finding focus discussion.

11 So, not only the performance indicators, or how many things 12 that youre finding and how many things youre working on, 13 that sort of thing, but also some specifics on more 14 specific issues.

15 And, as we go through and inspect those activities, 16 well also be presenting these meetings on special 17 findings. So, well be discussing results of our 18 inspections.

19 So, I think thats kind of a healthy going-forward 20 spectrum for these meetings. Performance indicators, work 21 progress, specific findings that you have, value added 22 oversight boards, value added from Bill Pearces staff and 23 oversight, and then well give you our feedback as we have 24 from the results of our inspections.

25 MR. MYERS: You know, I think MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

114 1 if you look at the event, and we had our first meeting, 2 this is our third; I think we made good progress for the 3 last meeting, and this meeting I think, I believe weve 4 moved into implementation, and now were going to go into 5 really good monitoring of some of these things were 6 talking about. Well be ready to do that the next time. I 7 dont see any problem.

8 MR. GROBE: Just a final 9 thought. Ive, over the last couple of months, Ive seen 10 an evolution in your approach towards this project.

11 Clearly, what youve articulated here today is a more 12 comprehensive and more thorough evaluation than what might 13 be the minimum mandated by the, the issues contributed to 14 the head degradation. And I think also clearly what youve 15 articulated today is commitment to go beyond those issues 16 as far as improving not only the reliability of the plant, 17 but safety of the plant and margins to safety.

18 So I think those are good, good indicators. And, 19 you also presented today some, in the area of the head, 20 specifically head replacement and substantive problems.

21 And weve been inspecting those activities and found good 22 results from your work, as far as the work that youve 23 done.

24 So, I think this meeting has been helpful to us.

25 Its been fairly comprehensive. Its been giving us a good MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

115 1 benchmark where youre at, and going. And we look forward 2 to our next meeting, which I expect would be around the 3 middle of the month, next month. And well work out that 4 schedule with your staff.

5 MR. MYERS: Thank you.

6 MR. GROBE: At this point, why 7 dont we take a eight minute break, which I expect will be 8 ten by the time everybody gets back in their seats; give 9 Marie a break; and then well convene the public portion of 10 this meeting where we can receive questions from the 11 public; NRC staff can receive questions from the public, as 12 well as any feedback that you may have that you want to 13 share with us.

14 So, we will be convened. I have five minutes 15 until. Lets convene at three minutes after. Thank you.

16 (Off the record.)

17 MR. GROBE: This portion of the 18 meeting is particularly focused on the NRC staff receiving 19 input and feedback from the public. And there is a pad of 20 paper on the podium up here, as well as the microphone.

21 And I would like to begin with any local members of 22 the community in the Oak Harbor area, in the areas 23 surrounding the Davis-Besse Plant as well as any local 24 officials that have thoughts or questions that they want to 25 ask, and then move into any other individuals that have MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

116 1 thoughts or questions.

2 So, anybody thats interested in providing us some 3 thoughts or comments or has a question, please come up to 4 the podium, and were available to answer those.

5 I didnt think youd miss a chance at this.

6 HOWARD WHITCOMB: I guess I have to 7 lead it off, Jack.

8 In follow-up to your comment that you made about 9 first-line supervision, I would offer the following 10 observation. This afternoon, Ive heard essentially two 11 prongs, if you will. One is a technical fix to the 12 corroded reactor vessel head and then the other is the 13 software fix or management fix involving the root cause 14 analysis determination, so forth.

15 Whats been provided by First Energy this afternoon 16 is a time frame for the technical fix. What has not been 17 provided is a time frame for the management fix. Clearly, 18 the technical issue is probably the least significant, but 19 I havent this afternoon, Mr. Grobe, heard First Energys 20 first prioritization of the management issues.

21 In other words, what are the root cause 22 determinations? Why did they occur? And how is First 23 Energy going to address them to prevent recurrence? And 24 this afternoon, we havent heard anything with respect to 25 what priority First Energy has attached to that aspect and MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

117 1 how thats going to essentially factor into restart of the 2 Davis-Besse Plant.

3 MR. GROBE: Okay. Excellent 4 question. I think I heard two parts. I think both 5 Christine and I had asked very similar questions today.

6 Youre correct that the root cause analysis is not 7 complete. The specific structure of what activities need 8 to be taken by the plant has not yet been decided by the 9 plant. And, were here to get those also and look forward 10 to those more detailed specifics at our next meeting next 11 month.

12 The other question I think is also a fair question, 13 and its not one for me to answer, but I would ask Lew or 14 Howard if they want to comment on what priority you place 15 on the, addressing the causal factors of more on the human 16 performance organization effectiveness as contrasted with 17 the priority placed on the hardware fixes?

18 MR. MYERS: Well, in my mind, 19 the management issues, Im sponsor to the management 20 issues, is pretty high priority. Thats the reason I am 21 the sponsor, because we realize weve had, weve made some 22 pretty significant organizational changes already at the 23 upper levels. Weve improved the senior team at the 24 station, has changed considerably.

25 As we go through finish up with the work processes, MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

118 1 well probably find some additional insights of training 2 and standards that we need to take. And then finally the 3 programs reviews.

4 As you go through these program reviews, weve got 5 to make sure weve got good industry standards on our 6 programs, that we have good ownership of our programs, and 7 we have to go on to monitor implementation of each and 8 every program. Were going to do that. I dont know that 9 every one of those is required before restart, but were 10 certainly going to look at our programs very hard for 11 restart.

12 And the final thing is our independent review board 13 that I talked about. We wont restart the plant until that 14 board thinks were ready to go.

15 MR. GROBE: Okay. Anything 16 else, Howard?

17 HOWARD WHITCOMB: No, that should do 18 it.

19 MR. GROBE: Okay, thank you.

20 I did realize that I had forgotten to introduce one 21 NRC staff member that is here today. And, I thought he had 22 left. So, I was really feeling badly, but I just noticed 23 that he came back in the room. So, let me take this 24 opportunity to introduce Marty Farber.

25 Marty, where did you go? There he is over in the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

119 1 back.

2 Marty is a very experienced inspector in the Region 3 3 office. Outstanding performer for us. And he has taken 4 on the responsibility to be a leader on the, what we call, 5 the AIT follow-up inspection. Hes been working in 6 Regional office for several weeks and is on-site this week 7 bringing focus on the AIT findings, as far as the, whether 8 those findings or which of those findings represent 9 regulatory violations and what the significance of those 10 violations are.

11 So, over the next couple of weeks, I expect Marty 12 and possibly some other staff from Region 3 support will be 13 completing the AIT follow-up inspection.

14 I didnt want to miss the opportunities to introduce 15 Marty. So, I apologize Marty for not catching you earlier.

16 You were on my list and I missed you.

17 Are there other members of the Oak Harbor community 18 that have questions or comments?

19 Any elected officials that have questions or public 20 officials that have questions?

21 Okay. Very good.

22 Are there other members in the audience today that 23 have questions for us or comments that they want us to 24 consider?

25 Yes, sir?

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

120 1 JOHN MILLER: My name is John 2 Miller. Im a reporter.

3 Mr. Grobe, if you were king, what would you do about 4 the notion of the safety culture of the emphasis you put 5 today on first line supervisors having the kind of safety 6 attitude so that they catch problems as they arise rather 7 than pinning the safety of the plant only on the senior 8 management in some kind of bureaucratic process of CRs that 9 would, that would find problems?

10 In other words, what do you think ought to be 11 happening, not only at this plant, but around the industry 12 in this matter of training or evaluating safety culture?

13 MR. GROBE: Thats a big 14 question. First off, let me take a step back. Our 15 inspection program is built upon a number of fundamentals.

16 And, Bill, maybe you can, as I go through a couple 17 things, maybe you can think through this and provide some 18 additional thoughts.

19 We have characteristics in our inspection program, 20 which we call cross-cutting issues. And what cross-cutting 21 issue means is, its something that affects safety 22 performance across the plant in any of the various safety 23 cornerstones, is what were calling them.

24 One of the cross-cutting issues is Human 25 Performance, and its the focus of our inspection program.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

121 1 Second cross-cutting issue is the Corrective Action 2 Program, and safety culture of the plant. What we 3 sometimes refer to as the safety conscious work 4 environment.

5 These issues are underpinning issues for our entire 6 inspection program, and we have a number of activities that 7 we conduct that focus on those. One of them has to do with 8 periodic, what we refer to as problem identification and 9 resolution inspection. And, that is specifically, focuses 10 on the activities it takes to evaluate problems, identify 11 problems, evaluate them, resolve them. Its a risk-focused 12 inspection, meaning take the highest risk significant 13 issues and ensure that those issues are being identified 14 and resolved.

15 We also have periodic activity where we go into 16 depth. Some people refer to it as drilling down into an 17 issue. Where an issue of particular, what appears on the 18 surface to be more significant than other issues that come 19 up on a day-by-day basis, we will drill down into the 20 issue; not at the same extent, but similar to what Steve 21 Loehlein has done with respect to this issue, and make sure 22 that the Licensee is going to do a good job identifying the 23 causal factors and correct it.

24 The last aspect of what we do currently focusing on 25 safety, but I think you used the word safety culture, is MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

122 1 each of our inspectors when they go out to a site, whether 2 theyre health physicists, security inspectors, engineering 3 inspectors, whatever different flavor of technical 4 expertise they have, spends a certain period of their 5 inspection time on site looking at the effectiveness of the 6 Licensees programs to identify problems and fix problems.

7 Bill, do you have, any thoughts that you have?

8 JOHN MILLER: Maybe if I could 9 rephrase the question, because I think, I think I did 10 confuse you. You said to Mr. Myers; Mr. Myers, you know, 11 Im frustrated, I dont believe you have done enough in 12 telling me about how anybody at the plant below high level 13 management is going to be operating in a sufficiently 14 safety-minded mode; and you told him you want to see next 15 time what hes going to do about that.

16 So, Im asking you, what do you think he ought to 17 do?

18 MR. GROBE: I appreciate, 19 maybe I misunderstood your question. I apologize.

20 JOHN MILLER: It wasnt clear, 21 Im sorry.

22 MR. GROBE: Its certainly not 23 my place to tell Mr. Myers how to fix his problems, its my 24 place to evaluate how effectively he does it. And there 25 are many ways to choose to address these kinds of issues.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

123 1 And theyve been addressed at a number of plants around the 2 country. And, outside of nuclear power, there are 3 organizational effectiveness experts, and theyre applied 4 in big corporations, small companies across the country.

5 So, its, Mr. Myers and his teams responsibility to 6 bring to the table what they plan, and we make sure that to 7 our satisfaction that it is comprehensive, and then well 8 make sure from a planning prospective and make sure to our 9 satisfaction that, that its been effectively implemented.

10 And, well be presenting to you the results of our 11 inspections at these types of meetings in the future.

12 JOHN MILLER: Okay. If you 13 would humor me just one more time.

14 Back to the first question. If you were king, if 15 you were the NRC Commission, you would be safe to saying 16 something more generic than I would just let all of the 17 utility managers around the country find their own way to a 18 program that ensures that first level supervisors are all 19 safety minded enough. What would those generic 20 requirements be?

21 MR. GROBE: Again, its, in 22 the organization, as well as any other organization, there 23 is all kinds of different ways. Each organization has, has 24 a character to it; and one solution in one organization 25 might not apply. Different parts of the country have MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

124 1 different characteristics of people and how they, what 2 motivates them. What brings focus to their work. There is 3 no cookie cutter solution to this kind of a problem.

4 And, whats important is for Mr. Myers to define 5 what it is that he thinks is going to fix the issue here at 6 Davis-Besse, and then well evaluate his implementation.

7 And, as I mentioned earlier, the results are going 8 to be in the performance in the other areas of the restart 9 checklist. Whether his activities are successful or not 10 would be clearly evident, not only in the performance 11 indicators that he develops to evaluate human performance 12 and organizational effectiveness, but also the results of 13 the specific activities that are undertaken to improve the 14 plant, to accomplish the work.

15 Randy Fast talked about replacing the air coolers.

16 Thats a fairly large work activity that involves 17 engineering, involves maintenance workers, involves maybe 18 construction workers, depending on the scope of the work.

19 And, you know, well be inspecting those sorts of 20 activities in the plant.

21 And so, there is a number of ways that were going 22 to be evaluating the effectiveness, not only through the 23 specific limitation actions under that cornerstone -- Im 24 sorry, building block, but also in looking at the 25 performance of the staff and the organization.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

125 1 JOHN MILLER: Could I ask one 2 more question on a different point?

3 MR. GROBE: Certainly. Thats 4 what were here for.

5 JOHN MILLER: One could make a 6 case that this is an example of something, that 7 Davis-Besses situation is an example of something that the 8 NRC hopes never to see.

9 MR. GROBE: Im sorry, what?

10 JOHN MILLER: NRC hopes never to 11 see. Whats that, given that you dont have enough 12 resources to inspect everything, you have a kind of 13 sampling inspection program; you inspect some things, not 14 others. You have a risk base analysis. Hopefully, its 15 what appears to be the most important things.

16 But we now have a plant that by your annual 17 inspection performed quite adequately, but under new 18 management you say, its clear over perhaps a decade or 19 more, numbers of individuals missed what in hindsight would 20 seem to be very simple indications of problems.

21 And the last time on June 12th at the public 22 meeting, at least, I think you and your assistant both 23 agreed that, that the local inspectors priorities on what 24 to inspect would not have this kind of a situation, boric 25 acid on the reactor head, anywhere near the top of the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

126 1 list; it would be way down on that persons radar screen.

2 Given that, what would you say to the argument that 3 maybe this inspection team doesnt work; and, if NRC wants 4 to be able to prove to its own satisfaction and to the 5 satisfaction of the public that such a thing is never going 6 to happen again, given that it was such a near miss to a 7 LOCA, that the only solution would be a much larger 8 inspection program, inspecting many more things than are 9 required, many more financial on the human resources.

10 MR. GROBE: I apologize, Ive 11 forgotten your name.

12 JOHN MILLER: John Miller.

13 MR. GROBE: John, there is a 14 number of things that are ongoing. You ask very good 15 questions, and Bill is itching to add to my response. Ill 16 pass the microphone to him in a moment.

17 Im sure youve heard the old adage, dont throw the 18 baby out with the bath water. Im certainly not willing to 19 condemn the entire inspection approach or other, any of the 20 other broad statements that youve made, but what the NRC 21 has undertaken, is ongoing right now, here last month, if 22 you had an opportunity to hear Art Howell and Ed Hackett 23 present publicly what we refer to as a Lesson Learned Task 24 Force.

25 And the Executive Director, the head guy of the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

127 1 Regulatory Commission has chartered a group of people 2 completely independent of anybody thats involved at 3 Davis-Besse to take a real hard look at inspection 4 programs; how we handled generic safety issues, our 5 interrelationship with the international community, and 6 lessons to learn. And I think there were a couple other 7 items on the charter for Lessons Learned Task Force.

8 I cant remember all of them off the top of my head, 9 but that task force is working. They have spent a good 10 deal of time at the Davis-Besse site talking to Licensee.

11 Theyve talked to an incredible amount of NRC staff.

12 Theyve collected a wealth of documents.

13 The task force is fairly broad, and as far as 14 numbers and scope or perspective individuals that come from 15 a variety of parts of our organization, technically as well 16 as geographically. So, Im looking forward to the results 17 of their assessment, things that we can follow on a 18 inspection program.

19 Bill, did you have additional comments?

20 MR. DEAN: John, I just want 21 to point out two things. One is, that if you looked at 22 nuclear industry as a whole, and where performance was ten, 23 fifteen years ago, and where performance is today as an 24 industry, there has been a lot of benefit gained from the 25 collective experience, and our inspection program has been MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

128 1 designed relative to that collective experience.

2 And, what we have here at Davis-Besse is a new 3 experience. And I would offer that our inspection program 4 has the flexibility to be able to be modified, if 5 appropriate, to address new phenomenon and new issues that 6 might emerge.

7 And, relative to your comment about boric acid on 8 the vessel head not being important. I guess I would like 9 to point out that over the past couple of years, as we have 10 learned more as an agency and as an industry about issues 11 associated with CRDM nozzle cracking and learning about the 12 different types of phenomenon and so on and so forth, I 13 think there is a fairly significant track record over the 14 last couple of years that indicates the significance and 15 the seriousness with which the agency has considered and 16 asked and required Licensees to take specific action, 17 quote, for the vessel head degradation which occurred at 18 Davis-Besse as well as on the aftermath of that.

19 So, I think that, that provides an example of the 20 fact that any, any industry is not a static situation.

21 That things change. That we continue to learn. Thats one 22 of the important things that we have to have that comes out 23 of this, that we as an agency, Davis-Besse as the Licensee, 24 and the nuclear industry as a whole, learns from this, so 25 that the factors that led to this dont repeat themselves MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

129 1 in the future.

2 JOHN MILLER: One follow-up, if 3 I could. Accepting that your comment that performance is 4 better now we have experience; and accepting Mr. Grobes 5 comment that in general, throwing the baby out with the 6 bath water is not a good idea. But we have the convenience 7 of not having had the LOCA that we avoided only by what is 8 fair to say, dumb luck, because stainless steel is put in 9 there only for corrosion resistance, not for structure.

10 If we were now having this meeting in front of a 11 congressional committee examining why there was this LOCA; 12 do you really believe they would be convinced by the 13 argument dont throw the baby out with the bath water?

14 MR. GROBE: I apologize.

15 There was so many premises to that question, Im not sure I 16 can answer it effectively.

17 What I would suggest is that you and I have a chance 18 to talk and go privately after this meeting, and we can get 19 into a bit more detail on this, because I think it is 20 important for you to understand in a little more detail the 21 scope of our programs, the activities that occurred prior 22 to Davis-Besse, the activities that have occurred after 23 Davis-Besse.

24 And, I think I dont want to give you the impression 25 that I feel any differently than this. I think a number of MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

130 1 managers, the agency, including myself, has stated this 2 should never happen. And its the Licensees 3 responsibility to make sure these types of issues dont 4 happen.

5 Its our responsibility to have an inspection 6 program that provides a high level assurance that what 7 theyre doing is the right thing. And, our inspection 8 program did not disclose this as early as it should have, 9 and certainly the Licensee did not perform in a manner that 10 was appropriate, and it resulted in the head degradation.

11 So, with that said, lets get into this separately 12 after the meeting, because I dont want to tie everybody 13 else up with an extended discussion of this topic. Okay.

14 MR. MYERS: Can I make a 15 comment?

16 MR. GROBE: Sure, Lew.

17 MR. MYERS: Let me make a 18 comment; a couple. Most likely, from an engineering 19 standpoint the situation we had would have caused leakage 20 that would have shut us down before it broke. One gallon 21 would shut it down. So, that was really first in there.

22 It shouldnt have happened. We should have found this.

23 But what I do think is healthy, I never thought I 24 would say this, but Ive been in this industry for over 30 25 years, and the performance improvements that we see are due MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

131 1 to some of our oversight reviews and nuclear power 2 operations and processes that we go through like were 3 going through here when we find something new.

4 I think theyre right. Weve learned something new 5 that we need to share with the industry about this 6 particular program. And I think that this is not, this is 7 not a fun process, but its healthy. And these processes 8 that plants have gone through over the years to improve the 9 material condition of our plants, the air operated valve, 10 the leak rate programs; boric acid program, we should have 11 had in place better, have made this industry perform well 12 over the years.

13 And thats the reason for these type of things that 14 we go through with the institute of nuclear power, because 15 assessments of those every 18 months. And youre own 16 internal self-assessments; if we do find a problem, there 17 is going to be problems with any industry, that it gets to 18 this level of detail, has really improved the performances 19 of our plants; not only from an operation standpoint, but 20 from a safety standpoint, that the NRC monitors.

21 You know, I really do believe that. This is not a 22 fun process sitting up here on this stage, talking about 23 this issue, but its probably healthy.

24 MR. GROBE: Are there any 25 other members of the public that have a question or MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

132 1 comment?

2 Let me ask, before we get started, Mr. Stucker, can 3 you turn on the house lights?

4 BEATRICE MIRINGU: My name 5 is Beatrice, B E A T R I C E, and Miringu, M I R I N G U.

6 I just want to get an indication from First Energy.

7 You said that you have an independent panel that select 8 people different experiences for different knowledge and 9 from different areas, but you also said that you have 10 brought in somebody who will help in facilitating 11 communication between you and First Energy.

12 Its my understanding that you have, NRC has two 13 staff members at every nuclear department. And indeed, the 14 problem that you would be having with Davis-Besse 15 especially with the boric acid problem has nothing do did 16 with communication between you and NRC.

17 So, if you could elaborate on what you mean by some 18 real facilitating or making it easier for you to 19 communicate to First Energy, to NRC, or NRC communicating 20 to you?

21 MR. GROBE: Maam, the portion 22 of this meeting is to help the NRC with questions for us 23 and comments for us. I would suggest if you have a 24 specific question with First Energy, visit with those folks 25 after the meeting and you can get feedback from them MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

133 1 directly, okay?

2 BEATRICE MIRINGU: Well, I thought 3 since it was mentioned at this meeting that probably they 4 could bring it like that.

5 MR. GROBE: I understand it.

6 Outside of the context of the specific portion of the 7 meeting, this section of the meeting is for us to hear from 8 the public, us meaning the NRC staff. So, please feel free 9 to direct your question to them after we complete this part 10 of the meeting.

11 MR. BERGENDAHL: Well gladly be 12 available.

13 BEATRICE MIRINGU: Okay.

14 MR. GROBE: Thank you.

15 BEATRICE MIRINGU: Then the question 16 I have also for, First Energy. You say at this meeting 17 that you have moved from the planning phase and going into 18 the implementation phase. And I understand that inspection 19 is an ongoing process, but from what you presented today, 20 there seems to be more inspections that need to be done; 21 and therefore, I think that you really are not in a 22 implementation state, and youre in the planning state.

23 Thank you.

24 MR. GROBE: Okay, thank you.

25 Are there any other members of the public that have MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

134 1 a question or comment for the NRC staff?

2 By the way, if its reporters that have questions; 3 myself, the staff, and First Energy staff will be available 4 to discuss specific questions. So, we can do that in a 5 more informal way, after the meeting, if you prefer that.

6 Yes, sir?

7 WILLIAM BRUML: Yeah. My name is 8 William Bruml, B R U M L.

9 First, I was going to comment that I am rather 10 relieved to see at this meeting that management is the 11 major cause issue here. Clearly, when you have a ten year 12 train wreck, the question isnt why didnt the brakes work; 13 its a question of why didnt someone set the brakes. Im 14 glad to see that, seeing you here, and I hope it continues 15 to, to be there.

16 Also in response to one remark Lew made about, that 17 he expected that if the situation had continued, they would 18 have had leakage rather than, rather than a LOCA.

19 Does the NRC have any intention to publish the 20 results of the inspections that its been doing on the 21 sections of the reactor head, so other members of the 22 general public might kind of have more of a sense of what 23 you guys are seeing?

24 MR. GROBE: Thats an 25 interesting question. I think youre talking about the MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

135 1 detailed analysis of the materials head; is that correct?

2 WILLIAM BRUML: Yes. Something as 3 simple as a cross section of what, you know, of how the 4 condition of the hole in the head; and, how the degradation 5 that was going on in the stainless steel. So, that the 6 rest of us can understand what people are talking about.

7 Someone from either side here says, well, gee, this doesnt 8 look like its going to perform a full blown LOCA effect.

9 And I hear about all this steel thats corroded away. I 10 dont have a whole lot of confidence in that until at least 11 I see something that talks about it.

12 MR. GROBE: Sure. I just want 13 to make sure I understand the question before I answer it.

14 I think there is going to be two areas of documentation may 15 be of interest to you. The first is NRC is going to 16 complete a risk assessment which will get into some of 17 those issues, from a risk perspective. What was the risk, 18 loss of contacts, rupture of the liner that remained, 19 things of that nature. And that will be published as part 20 of our inspection activities.

21 The second area of documentation may be of interest 22 to you is the results of some detailed analysis that is 23 being done by our research organization, the Office of 24 Nuclear Reactor Research -- Regulatory Research, excuse 25 me. And, there is a number of what we refer to as user MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

136 1 needs. Im a user, so I sign a user need research and I 2 respond to that. And theyre in the process of responding 3 to that. And theyll be published from that.

4 I dont have the time frames on either of those, but 5 Im fairly confident that the inspection documentation 6 would precede formal publication report from research, and 7 that should be out in the next month or two. And 8 certainly, call at least with specific questions and we do 9 have a response team.

10 WILLIAM BRUML: I have a second 11 question.

12 MR. GROBE: Sure.

13 WILLIAM BRUML: I heard Christine 14 mention in passing the issues of other in containment 15 equipment, electrical equipment, and I wonder if we could 16 hear a little more detail of what that means? One issue 17 that you folks are close to this more often, often think, 18 oh yeah, this is obvious, but to me it was a hole. Gee, 19 what do you do about this? Is the issue here you have a 20 building, you know, containment building that has a lot of 21 electrical equipment, much of which is safety related; 22 and, some of which has been opened up while inspection or 23 service for some reason, during the course of this long 24 period of boric acid on the containment vessel, containment 25 building.

MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

137 1 Which leads to the question of, gee, is this more 2 severe than what the equipment is qualified for, since most 3 of it is like, do you mean boric acid on the site? So, I 4 guess my question is, is there a process ongoing to 5 identify the equipment that might have that problem, how, 6 you know, what is the general tone of that issue?

7 MS. LIPA: Let me tell you 8 what I know so far. That was the one of the items thats 9 on our foremat framework for the checklist. There is a 10 plan to have an inspector develop a detailed inspection 11 plan, and then go out and look at very specific things.

12 That inspection plan is likely to contain looking at a 13 number of things, such as cables, cable trays, junction 14 boxes, things, you know, all types of things within 15 containment pretty much top to bottom. What could have 16 been affected by the boric acid. Thats the scope of that 17 particular line item.

18 MR. GROBE: I want to make 19 sure, you understand that our inspection will be the 20 sample. We wont be looking at everything. But the 21 Licensees activities, they have the components of their 22 containment health review, which includes environmental 23 health equipment and theyll be looking much more 24 comprehensively.

25 Well be sampling the activities they do as well as MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

138 1 some other activities or some other equipment that we may 2 want to look at in a different way to both evaluate what 3 theyre doing as well as independently assess the depth and 4 adequacy of what theyre doing. Okay? Thank you very 5 much.

6 Looking for other comments or questions.

7 I thought you were going to come forward. You stood 8 up, now youre required to come forward. Just kidding.

9 Other questions and comments? Yes, maam?

10 VICKY HEIDEL: My name is Vicky 11 Heidel and I have a question. Understanding that youre 12 about ready to transport the Midland nuclear head, you said 13 prior to August 1st, does that mean the NRC has given its 14 stamp of approval that this is in excellent condition even 15 though its an old or new old nuclear head?

16 MR. GROBE: John, you want to 17 briefly discuss our scope of the inspection activities for 18 the head, and explain what sort of certification goes along 19 with component base like this.

20 MR. JACOBSON: Right, there is a 21 couple of components to the inspection that were going to 22 do regarding the head replacement, and one of them weve 23 already done; and that is look at some of the 24 nondestructive examination that was done, that the Licensee 25 did to supplement some of the documentation that they did MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

139 1 have for the head. Some of it was missing. Its gone over 2 the years. And they did some supplemental inspections.

3 And weve looked at those inspections as to how good 4 inspections were done, as well as the results of those 5 inspections. And so far, that part of it, we have no 6 problem with. What we saw was done well, and the results 7 were acceptable.

8 The next part of the inspection thats going to be 9 done is looking at a sample, a good sample of the 10 documentation; both the new work that was done, as well as 11 documentation that exists from when the head was originally 12 manufactured. And we need to do that so that we can verify 13 for ourselves that this head in its condition today meets 14 all the requirements of the American Society of Mechanical 15 Engineers Boiler and Pressure Vessel Code.

16 And in that code, there is requirements, for 17 example, for the radiographs. There is requirements as to 18 how those radiographs will be taken and there is 19 requirements as to what the acceptance criteria is for any 20 flaws or discontinuities that are found during the 21 nondestructive examination.

22 And thats just an example of the kinds of things 23 that we will be looking at. And then the last part of the 24 head replacement that were going to be looking at is the 25 actual opening and then restoration of the containment to MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

140 1 place the head in the Davis-Besse containment.

2 VICKY HEIDEL: So, this 3 inspection will be done prior to its being transported 4 here, the total inspection?

5 MR. JACOBSON: Part of it has 6 been done already, part of it is about to start. Whether 7 the Licensee decides to transport this head now or they 8 decide to transport it six months from now, is really not 9 our concern.

10 VICKY HEIDEL: Okay.

11 MR. JACOBSON: And if they want 12 to move the head, its their head, and they can move it, 13 but ultimately, restart of the facility, that decision will 14 be made by the NRC.

15 VICKY HEIDEL: Is there any 16 danger in transporting it that we should be concerned about 17 that?

18 MR. JACOBSON: Any danger?

19 VICKY HEIDEL: Any danger of 20 transporting the actual head.

21 MR. JACOBSON: With respect to 22 what, radiation, radioactive?

23 VICKY HEIDEL: Yes, exactly.

24 MR. JACOBSON: No, the head has 25 never been used and theres no radioactivity associated MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

141 1 with it at this time.

2 VICKY HEIDEL: Lastly what do you 3 do with the old reactor head?

4 MR. JACOBSON: Thats a question 5 that the Licensee would have to answer at this point.

6 MR. GROBE: Let me respond to 7 that in a little bit of detail. And if you, if you want to 8 respond or ask your question to First Energy after the 9 meeting, thats fine.

10 The Licensee has performed an analysis of the 11 existing head to characterize what sort of waste it is.

12 There is different categories of waste within our 13 regulations and were expecting to perform an inspection of 14 that assessment that theyve done, how they made the 15 measurements and the validity of the assessment.

16 In addition to that, we have a routine aspect of our 17 inspection program that deals with package and 18 transportation of waste and well be performing those 19 routine inspections on this very nonroutine type activity.

20 So, we will have a thorough inspection of what 21 Licensee is planning. Its my understanding that they are 22 currently not planning on transporting the head to a waste 23 facility. Theyve currently characterized it, based on my 24 information, of whats referred to as class A waste, which 25 is low specitivity waste. And we will be performing MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

142 1 inspections and reporting the results of those inspections 2 during future meetings like this one.

3 VICKY HEIDEL: All right, last 4 but not least, I have understand that a brand new head has 5 been ordered, and will that ever be installed at 6 Davis-Besse?

7 MR. GROBE: Thats really not 8 the scope of our activities.

9 Lew, do you want to respond to that?

10 MR. MYERS: The answer is 11 yes.

12 MR. GROBE: Okay, thank you 13 very much.

14 I didnt realize what time it had gotten to be. Why 15 dont I ask if there is any one additional question, and 16 then we need to move on since we have another meeting at 17 7:00. Any additional questions?

18 Okay. I thank you very much for attending. I 19 appreciate the questions we received. If per chance you 20 think of something or felt that you didnt get a chance to 21 ask a question, feel free to come back at 7:00.

22 Thank you very much.

23 (Off the record.)

24 ---

25 MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO

143 1 CERTIFICATE 2 I, Marie B. Fresch, Registered Merit Reporter and 3 Notary Public in and for the State of Ohio, duly 4 commissioned and qualified therein, do hereby certify that 5 the foregoing is a true and correct transcript of the 6 proceedings as taken by me and that I was present during 7 all of said proceedings.

8 IN WITNESS WHEREOF, I have hereunto set my hand and 9 affixed my seal of office at Norwalk, Ohio, on this 10 27th day of July, 2002.

11 12 13 14 Marie B. Fresch, RMR 15 NOTARY PUBLIC, STATE OF OHIO 16 My Commission Expires 10-9-03.

17 18 19 20 21 22 23 24 25 MARIE B. FRESCH & ASSOCIATES 1-800-669-DEPO