IR 05000266/2007005: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:February 21, 2008 Mr. James McCarthy Site Vice President FPL Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 SUBJECT: ERRATA TO POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, NRC INTEGRATED INSPECTION REPORT 05000266/2007005 AND 05000301/2007005
{{#Wiki_filter:ary 21, 2008
 
==SUBJECT:==
ERRATA TO POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, NRC INTEGRATED INSPECTION REPORT 05000266/2007005 AND 05000301/2007005


==Dear Mr. McCarthy:==
==Dear Mr. McCarthy:==
Line 24: Line 27:


Sincerely,
Sincerely,
/RA/ Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 Enclosure: Errata to Inspection Report No. 05000266/2007005 and 05000301/2007005. DISTRIBUTION:
/RA/
See next page Letter to
Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 Enclosure: Errata to Inspection Report No. 05000266/2007005 and 05000301/2007005.
 
DISTRIBUTION:
See next page
 
Letter to
}}
}}

Latest revision as of 20:16, 14 November 2019

IR 05000266-07-005, 05000301-07-005, on 10/01/2007-12/31/2007, Errata to Point Beach, Units 1 & 2; Adverse Weather Protection; Operability Evaluations; Followup of Events; Other Activities
ML080520331
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/21/2008
From: Michael Kunowski
NRC/RGN-III/DRP/B5
To: Mccarthy J
Florida Power & Light Energy Point Beach
References
IR-07-005
Download: ML080520331 (20)


Text

ary 21, 2008

SUBJECT:

ERRATA TO POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, NRC INTEGRATED INSPECTION REPORT 05000266/2007005 AND 05000301/2007005

Dear Mr. McCarthy:

On February 13, 2007, the U.S. Nuclear Regulatory Commission (NRC) issued Integrated Inspection Report 05000266/2007005 and 05000301/2007005 (ML080450234) for your Point Beach Nuclear Plant, Unit 1 and Unit 2. Inspection report sections documenting the completion of a periodic evaluation of maintenance effectiveness and the completion of the baseline Emergency Preparedness biennial program inspection were inadvertently omitted in the original report. The enclosed errata contain the omitted sections and should be inserted as Pages 15(a), 15(b), 25(a), 25(b), 32(a) and Attachment pages 17 through 20, where appropriate, into Integrated Inspection Report 05000266/2007005 and 05000301/2007005.

Sincerely,

/RA/

Michael A. Kunowski, Chief Branch 5 Division of Reactor Projects Docket Nos. 50-266; 50-301 License Nos. DPR-24; DPR-27 Enclosure: Errata to Inspection Report No. 05000266/2007005 and 05000301/2007005.

DISTRIBUTION:

See next page

Letter to