| | issue date = 11/18/2009 | | | issue date = 11/18/2009 |
| | title = IR 05000341-09-403, (Drs), on 10/19/2009 - 10/23/2009, for Fermi Power Plant, Unit 2 | | | title = IR 05000341-09-403, (Drs), on 10/19/2009 - 10/23/2009, for Fermi Power Plant, Unit 2 |
| | author name = Duncan E R | | | author name = Duncan E |
| | author affiliation = NRC/RGN-III/DRS/PSB | | | author affiliation = NRC/RGN-III/DRS/PSB |
| | addressee name = Davis J M | | | addressee name = Davis J |
| | addressee affiliation = Detroit Edison | | | addressee affiliation = Detroit Edison |
| | docket = 05000341 | | | docket = 05000341 |
Line 19: |
Line 19: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 18, 2009 EA-09-136 | | {{#Wiki_filter:ber 18, 2009 |
|
| |
|
| Mr. Jack Senior Vice President and Chief Nuclear Officer Detroit Edison Company
| | ==SUBJECT:== |
| | | FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2009403(DRS) |
| Fermi 2 - 210 NOC
| |
| | |
| 6400 North Dixie Highway Newport, MI 48166
| |
| | |
| SUBJECT: FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2009403(DRS) | |
|
| |
|
| ==Dear Mr. Davis:== | | ==Dear Mr. Davis:== |
| On October 23, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 23, 2009, with Mr. Plona and other members of your staff. | | On October 23, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 23, 2009, with Mr. Plona and other members of your staff. |
|
| |
|
| The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations and the conditions of your license. | | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and the conditions of your license. |
|
| |
|
| The inspectors reviewed selected procedures and records, observed activities, and interviewed | | The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. |
|
| |
|
| personnel.
| | Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1. of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. |
|
| |
|
| Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this viol ation as a non-cited violation (NCV) consistent with Section VI.A.1. of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program. If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:
| | If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: |
| Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Fermi Power Plant, Unit 2. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be | | Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Fermi Power Plant, Unit 2. |
|
| |
|
| available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection. | | Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection. |
|
| |
|
| In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC's document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response "Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1). | | In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1). |
|
| |
|
| Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | | Should you have any questions concerning this inspection, we will be pleased to discuss them with you. |
|
| |
|
| Sincerely,/RA/ Eric Duncan, Chief | | Sincerely, |
| | | /RA/ |
| Plant Support Branch | | Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure: Inspection Report 05000341/2009403(DRS) |
| | | w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/STSB T. Strong, Chief, State Liaison Officer, State of Michigan cc w/o encl: Distribution via ListServ |
| Division of Reactor Safety | |
| | |
| Docket No. 50-341 License No. NPF-43 Nonpublic | |
| | |
| ===Enclosure:===
| |
| Inspection Report 05000341/2009403(DRS) | |
| | |
| ===w/Attachment:===
| |
| Supplemental Information | |
| | |
| cc w/encl: S. Coker, NSIR/DSO/DDSO/STSB T. Strong, Chief, State Liaison Officer, State of Michigan | |
| | |
| cc w/o encl: Distribution via ListServ | |
| }} | | }} |
Similar Documents at Fermi |
---|
Category:Letter
MONTHYEARIR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 ML23341A1852023-12-0808 December 2023 Acknowledgement of Response to NRC Inspection Report 05000341/2023402 and Disputed Non-Cited Violation ML23310A1492023-12-0808 December 2023 Issuance of Amendment No. 227 Regarding Revision of Technical Specification 3.8.1, AC Sources - Operating, Emergency Diesel Generator Voltage and Frequency Surveillance Requirements IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 ML23334A1902023-12-0101 December 2023 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000341/2024010 ML23335A0062023-12-0101 December 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000341/2024002 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 ML23297A0512023-10-30030 October 2023 Issuance of Amendment No. 226 Regarding Revision of Technical Specifications 3.8.1, AC Sources - Operating (Exigent Circumstances) ML23311A3482023-10-20020 October 2023 DTE Electric Company (DTE) - Submittal of the Renewed Fermi 3 Michigan Department of Environmental, Great Lakes, and Energy (EGLE) National Pollutant Discharge Elimination System (NPDES) Permit No. MI0058892 ML23272A1552023-10-10010 October 2023 Letter to Licensee and Federal Register Notification of Amendment to Renewed Facility Operating License and Proposed No Significant Hazards Consideration Determination (Exigent Circumstances) (EPID L-2023-LLA-0134) (Letter) ML23283A0222023-10-0909 October 2023 Follow Up to Fermi Unit 2 Inservice Testing (IST) Program for the Fourth 10-Year Inspection Interval ML23276B4542023-10-0505 October 2023 Cyber Security Inspection Report 05000341/2023402 ML23243A8852023-09-18018 September 2023 Issuance of Amendment No. 225 Regarding Revision of Technical Specifications 3.7.2, Emergency Equipment Cooling Water, Emergency Equipment Service Water and System and Ultimate Heat Sink (Exigent Circumstances) ML23248A2242023-09-0707 September 2023 Regulatory Audit in Support of Review of License Amendment Request for a Risk-Informed Approach for Addressing the Effects of Debris on ECCS Strainer Performance ML23223A2242023-08-29029 August 2023 Individual Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for Hearing (Exigent Circumstances) ML23237B4332023-08-25025 August 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and RFI IR 05000341/20230052023-08-24024 August 2023 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) ML23229A0122023-08-17017 August 2023 Issuance of Amendment No. 224 to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (Emergency Circumstances) IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 ML23227A2212023-08-15015 August 2023 Emergency Application to Revise Technical Specifications to Adopt TSTF 568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 ML23219A1792023-08-0707 August 2023 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Fermi Power Plant, Unit 2 IR 05000341/20230022023-08-0404 August 2023 Integrated Inspection Report 05000341/2023002 ML23216A1872023-08-0404 August 2023 Submittal of Relief Request RR-A25 for Extended License Period ML23206A1272023-07-26026 July 2023 NOED for Fermi Power Plant, Unit Two Technical Specification 3.7.2, Emergency Equipment Cooling Water Emergency Equipment Service Water System and Ultimate Heat Sink ML23200A2552023-06-28028 June 2023 Post-Exam Letter with Comments and Exam Analysis IR 05000341/20230012023-06-28028 June 2023 Integrated Inspection Report 05000341/2023001 ML23178A2422023-06-28028 June 2023 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch III ML23122A2332023-06-26026 June 2023 Issuance of Amendment No. 223 Regarding Revision of Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements IR 05000341/20220102023-06-21021 June 2023 Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 ML23166A0892023-06-15015 June 2023 Operator Licensing Examination Approval Fermi Power Plant, June 2023 ML23158A1332023-06-0808 June 2023 Notice of Enforcement Discretion (NOED) for Fermi Power Plant, Unit Two (EPID L-2023-LLD-0000) Technical Specification 3.7.2, Emergency Equipment Cooling Water (Eecw)/ Emergency Equipment Service Water (Eesw) System and Ultimate Heat Sink ML23130A1032023-05-17017 May 2023 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency IR 05000341/20234022023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23118A3612023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 ML23114A1172023-05-0101 May 2023 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML23115A4152023-04-25025 April 2023 Information Meeting with a Question and Answer Session to Discuss NRC 2022 End-of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML23124A2032023-04-10010 April 2023 DTE Electric Company Submittal of Fermi 3 Periodic Reports ML23200A1842023-04-0606 April 2023 Proposed Exam Submittal Letter IR 05000341/20230112023-04-0606 April 2023 Triennial Fire Protection Inspection Report 05000341/2023011 IR 05000341/20234012023-03-17017 March 2023 Security Baseline Inspection Report 05000341/2023401 ML23074A1972023-03-16016 March 2023 Confirmation of Initial License Examination February 2024 IR 05000341/20220062023-03-0101 March 2023 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22325A2992023-02-24024 February 2023 Audit Plan in Support of Review of License Amendment Request to Revise Technical Specification Surveillance Requirements Relating to Emergency Diesel Generator Voltage and Frequency ML23039A1552023-02-14014 February 2023 Integrated Inspection Report 05000341/2022004 IR 05000341/20224032023-02-13013 February 2023 Security Baseline Inspection Report 05000341/2022403 ML23200A2162023-01-20020 January 2023 Outline Submittal Letter 2024-02-05
[Table view] Category:Inspection Report
MONTHYEARIR 05000341/20230042024-02-0505 February 2024 Integrated Inspection Report 05000341/2023004 IR 05000341/20230102023-12-0808 December 2023 Nbsp;Biennial Problem Identification and Resolution Inspection Report 05000341/2023010 IR 05000016/20230012023-12-0101 December 2023 NRC Inspection Report No. 050-00016/2023-001 (Drss) - Enrico Fermi Atomic Power Plant, Unit 1 IR 05000341/20230032023-11-0707 November 2023 Integrated Inspection Report 05000341/2023003 and 07200071/2023001 IR 05000341/20230052023-08-24024 August 2023 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2023005) IR 05000341/20233012023-08-16016 August 2023 NRC Initial License Examination Report 05000341/2023301 IR 05000341/20230022023-08-0404 August 2023 Integrated Inspection Report 05000341/2023002 IR 05000341/20230012023-06-28028 June 2023 Integrated Inspection Report 05000341/2023001 IR 05000341/20220042023-06-22022 June 2023 Non-Concurrence on Fermi Power Plant, Unit 2 - Integrated Inspection Report 05000341/2022004 IR 05000341/20220102023-06-21021 June 2023 Reissue Fermi Power Plant, Unit 2, Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 IR 05000341/20234022023-05-0101 May 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000341/2023402 IR 05000341/20230112023-04-0606 April 2023 Triennial Fire Protection Inspection Report 05000341/2023011 IR 05000341/20234012023-03-17017 March 2023 Security Baseline Inspection Report 05000341/2023401 IR 05000341/20220062023-03-0101 March 2023 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2022006) ML23039A1552023-02-14014 February 2023 Integrated Inspection Report 05000341/2022004 IR 05000341/20224032023-02-13013 February 2023 Security Baseline Inspection Report 05000341/2022403 ML22313A1032022-11-0909 November 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000341/2022010 IR 05000341/20220032022-11-0808 November 2022 Integrated Inspection Report 05000341/2022003 IR 05000016/20220012022-11-0808 November 2022 NRC Inspection Report No. 05000016/2022001(DRSS) - Enrico Fermi Atomic Power Plant, Unit 1 IR 05000341/20224202022-11-0101 November 2022 Security Baseline Inspection Report 05000341/2022420 IR 05000341/20225012022-10-17017 October 2022 Emergency Preparedness Biennial Exercise Inspection Report 05000341/2022501 IR 05000341/20220052022-08-25025 August 2022 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2022005) IR 05000341/20220022022-08-0404 August 2022 Integrated Inspection Report 05000341/2022002 IR 05000341/20220012022-05-0909 May 2022 Integrated Inspection Report 05000341/2022001 IR 05000341/20224012022-03-21021 March 2022 Security Baseline Inspection Report 05000341/2022401 IR 05000341/20210062022-03-0202 March 2022 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2021006) IR 05000341/20210042022-02-0707 February 2022 Integrated Inspection Report 05000341/2021004 IR 05000341/20210132021-12-17017 December 2021 Temporary Instruction 2515/194 Inspection Report 05000341/2021013 IR 05000016/20210012021-12-13013 December 2021 Subject: NRC Inspection Report No. 050-00016/2021-001 (DNMS) - Enrico Fermi Atomic Power Plant, Unit 1 IR 05000341/20214022021-12-0909 December 2021 Security Baseline Inspection Report 05000341/2021402 IR 05000341/20210122021-12-0707 December 2021 Biennial Problem Identification and Resolution Inspection Report 05000341/2021012 IR 05000341/20210032021-10-28028 October 2021 Integrated Inspection Report 05000341/2021003 IR 05000341/20215012021-10-21021 October 2021 Emergency Preparedness Biennial Exercise Inspection Report 05000341/2021501 IR 05000341/20214032021-09-0808 September 2021 Material Control and Accounting Program Inspection Report 05000341/2021403 IR 05000341/20210052021-09-0101 September 2021 Updated Inspection Plan for Fermi Power Plant, Unit 2 (Report 05000341/2021005) IR 05000341/20210112021-08-25025 August 2021 Triennial Inspection of Evaluation of Changes, Tests and Experiments Baseline Inspection Report 05000341/2021011 IR 05000341/20210022021-08-0606 August 2021 Integrated Inspection Report 05000341/2021002 IR 05000341/20213012021-07-13013 July 2021 NRC Initial License Examination Report 05000341/2021301 IR 05000341/20214012021-06-0707 June 2021 Security Baseline Inspection Report 05000341/2021401 IR 05000341/20210012021-05-0404 May 2021 Integrated Inspection Report 05000341/2021001 IR 05000341/20210102021-05-0303 May 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000341/2021010 IR 05000341/20203022021-03-18018 March 2021 NRC Initial License Examination Report 05000341/2020302 IR 05000341/20200062021-03-0404 March 2021 Annual Assessment Letter for Fermi Power Plant, Unit 2 (Report 05000341/2020006) IR 05000341/20200042021-02-10010 February 2021 Integrated Inspection Report 05000341/2020004 IR 05000016/20200012021-01-12012 January 2021 Enrico Fermi Atomic Power Plant, Unit 1, NRC Inspection Report 05000016/2020001 (DNMS) IR 05000341/20204022020-11-12012 November 2020 Security Baseline Inspection Report 05000341/2020402 IR 05000341/20200102020-11-0505 November 2020 Confirmatory Action Letter Followup Inspection Report 05000341/2020010 and Closure IR 05000341/20200032020-11-0303 November 2020 Integrated Inspection Report 05000341/2020003 IR 05000341/20200122020-10-19019 October 2020 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000341/2020012 IR 05000341/20204012020-10-13013 October 2020 Security Baseline Inspection Report 05000341/2020401 2024-02-05
[Table view] |
Text
ber 18, 2009
SUBJECT:
FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2009403(DRS)
Dear Mr. Davis:
On October 23, 2009, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on October 23, 2009, with Mr. Plona and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified. However, one licensee-identified violation, which was determined to be of very low security significance, is listed in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section VI.A.1. of the NRC Enforcement Policy because of the very low security significance of the violation and because it was entered into your corrective action program.
If you contest this NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN:
Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Fermi Power Plant, Unit 2.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agency wide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure: Inspection Report 05000341/2009403(DRS)
w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/STSB T. Strong, Chief, State Liaison Officer, State of Michigan cc w/o encl: Distribution via ListServ