| number = ML093480492
| number = ML093480492
| issue date = 12/11/2009
| issue date = 12/11/2009
| title = Virgil C. Summer, Unit 1, Special Report (Spr) 2009-003 Re Electric Driven Fire Service Pump Being Out of Service for Greater than 7 Days Due to Loss of Power
| title = Special Report (Spr) 2009-003 Re Electric Driven Fire Service Pump Being Out of Service for Greater than 7 Days Due to Loss of Power
| author name = Archie J B
| author name = Archie J
| author affiliation = South Carolina Electric & Gas Co
| author affiliation = South Carolina Electric & Gas Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Jeffrey B. Archie Vice President, Nuclear Operations 803.345.4214 A-SCANL A COMPAN December 11, 2009 A SCANA COMPANY Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555  
{{#Wiki_filter:Jeffrey B. Archie Vice President,Nuclear Operations 803.345.4214 A-SCANLA COMPAN A SCANA COMPANY                                                                                            December 11, 2009 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555


==Dear Sir / Madam:==
==Dear Sir / Madam:==


==Subject:==
==Subject:==
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 SPECIAL REPORT (SPR) 2009-003 South Carolina Electric & Gas Company (SCE&G) is submitting this report pursuant to the requirements of Technical Specifications 6.9.2 and Fire Protection Procedure (FPP)-024, Enclosure 6.1.1. This report addresses the Electric Driven Fire Service Pump (XPP0134A) being out of service for greater than 7 days due to a loss of power.On November 22, 2009 while the plant was shut down for a refueling outage, a loss of Balance of Plant (BOP) power occurred.
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 SPECIAL REPORT (SPR) 2009-003 South Carolina Electric & Gas Company (SCE&G) is submitting this report pursuant to the requirements of Technical Specifications 6.9.2 and Fire Protection Procedure (FPP)-024, .1.1. This report addresses the Electric Driven Fire Service Pump (XPP0134A) being out of service for greater than 7 days due to a loss of power.
BOP power includes electrical bus XSW1C2 which supplies power to XPP0134A.
On November 22, 2009 while the plant was shut down for a refueling outage, a loss of Balance of Plant (BOP) power occurred. BOP power includes electrical bus XSW1C2 which supplies power to XPP0134A. After power was restored to the bus, XPP0134A was returned to service on November 30, 2009 at 2141 hours. The pump remained out of service for a total of 8 days and 6 hours, and therefore exceeded the 7 day administrative limit established within the VCSNS Fire Protection Program. During the loss of power to XPP01 34A, the Fire Service System was maintained operable by the Diesel Driven Fire Service Pump (XPP0134B).
After power was restored to the bus, XPP0134A was returned to service on November 30, 2009 at 2141 hours. The pump remained out of service for a total of 8 days and 6 hours, and therefore exceeded the 7 day administrative limit established within the VCSNS Fire Protection Program. During the loss of power to XPP01 34A, the Fire Service System was maintained operable by the Diesel Driven Fire Service Pump (XPP0134B).
The loss of BOP power and loss of power to XPP01 34A have been entered into the VCSNS corrective action program. Should you have any questions, please call Bruce Thompson at (803) 931-5042 at your convenience.
The loss of BOP power and loss of power to XPP01 34A have been entered into the VCSNS corrective action program. Should you have any questions, please call Bruce Thompson at (803) 931-5042 at your convenience.
Very truly yours, GAR/JBA/jg c: K. B. Marsh S. A. Byrne N. S. Carns J. H. Hamilton R. J. White W. M. Cherry L. A. Reyes R. E. Martin K. M. Sutton NRC Resident Inspector INPO Records Center NSRC RTS (CR-09-05193)
Very truly yours, GAR/JBA/jg c:   K. B. Marsh S. A. Byrne                                                                 K. M. Sutton N. S. Carns                                                                 NRC Resident Inspector J. H. Hamilton                                                               INPO Records Center R. J. White                                                                 NSRC W. M. Cherry                                                                 RTS (CR-09-05193)
File (818.08)PRSF (RC-09-0155)
L. A. Reyes                                                                File         (818.08)
SCE&G I Virgil C. Summer Nuclear Station
R. E. Martin                                                                PRSF (RC-09-0155)
* P. O. Box 88
SCE&G I Virgil C.Summer Nuclear Station
* P.O.Box 88
* Jenkinsville, South Carolina 29065 .T (803) 345.5209
* Jenkinsville, South Carolina 29065 .T (803) 345.5209
* www.sceg.com JJ7~KI~}}
* www.sceg.com JJ7~
KI~}}

Latest revision as of 00:31, 14 November 2019

Special Report (Spr) 2009-003 Re Electric Driven Fire Service Pump Being Out of Service for Greater than 7 Days Due to Loss of Power
ML093480492
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 12/11/2009
From: Archie J
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2009-003
Download: ML093480492 (1)


Text

Jeffrey B. Archie Vice President,Nuclear Operations 803.345.4214 A-SCANLA COMPAN A SCANA COMPANY December 11, 2009 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 SPECIAL REPORT (SPR) 2009-003 South Carolina Electric & Gas Company (SCE&G) is submitting this report pursuant to the requirements of Technical Specifications 6.9.2 and Fire Protection Procedure (FPP)-024, .1.1. This report addresses the Electric Driven Fire Service Pump (XPP0134A) being out of service for greater than 7 days due to a loss of power.

On November 22, 2009 while the plant was shut down for a refueling outage, a loss of Balance of Plant (BOP) power occurred. BOP power includes electrical bus XSW1C2 which supplies power to XPP0134A. After power was restored to the bus, XPP0134A was returned to service on November 30, 2009 at 2141 hours0.0248 days <br />0.595 hours <br />0.00354 weeks <br />8.146505e-4 months <br />. The pump remained out of service for a total of 8 days and 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and therefore exceeded the 7 day administrative limit established within the VCSNS Fire Protection Program. During the loss of power to XPP01 34A, the Fire Service System was maintained operable by the Diesel Driven Fire Service Pump (XPP0134B).

The loss of BOP power and loss of power to XPP01 34A have been entered into the VCSNS corrective action program. Should you have any questions, please call Bruce Thompson at (803) 931-5042 at your convenience.

Very truly yours, GAR/JBA/jg c: K. B. Marsh S. A. Byrne K. M. Sutton N. S. Carns NRC Resident Inspector J. H. Hamilton INPO Records Center R. J. White NSRC W. M. Cherry RTS (CR-09-05193)

L. A. Reyes File (818.08)

R. E. Martin PRSF (RC-09-0155)

SCE&G I Virgil C.Summer Nuclear Station

  • P.O.Box 88
  • www.sceg.com JJ7~

KI~