ML100900466: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/30/2010 | | issue date = 03/30/2010 | ||
| title = Annual Report for ESADA-Vallecitos Experimental Superheat Reactor for the Year 2009 | | title = Annual Report for ESADA-Vallecitos Experimental Superheat Reactor for the Year 2009 | ||
| author name = Turner D | | author name = Turner D | ||
| author affiliation = GE-Hitachi Nuclear Energy Americas, LLC | | author affiliation = GE-Hitachi Nuclear Energy Americas, LLC | ||
| addressee name = | | addressee name = | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:GE Hitachi Nuclear Energy | ||
: 0. IHITACHI David W. Turner Manager, Vallecitos Nuclear.Center 6705 Vallecitos Rd Sunol, CA 94586 USA U.S. Nuclear Regulatory Commission T 925 862 4344 F 910 341 2577 Washington, D.C. 20555-0001 davidw.turner@ge.com Attn: Document Control Desk March 30th, 2010 | |||
==Subject:== | ==Subject:== | ||
Annual Report for EVESR, 2009 | |||
==Reference:== | ==Reference:== | ||
License DR-10, Docket 50-183 | |||
==Enclosure:== | ==Enclosure:== | ||
Annual Report No. 42 Enclosed is the Annual Report No. 42 for the deactivated ESADA-Vallecitos Experimental Superheat Reactor (EVESR) located at Vallecitos Nuclear Center near Sunol, California. | |||
Ifthere are any questions or additional information required, please contact me at the number above. | |||
Sincerely Yours, O~-David Digitally signed by WI Turne Date: 20'10.03132:5-70.a 13:21:15 -a7aa' - | |||
David W. Turner Manager, Vallecitos Nuclear Center cc: John Buckley, NRC (by e-mail) | |||
Robert Evans, Region IV(by e-mail) | |||
GE-Hitochi Nuclear Energy Americas, LLC | |||
GE Hitachi Nuclear Energy SHITACHI Vollecitos Nudeor Center Sunol&Celifornio ESADA-VALLECITOS EXPERIMENTAL SUPERHEAT REACTOR (DEACTIVATED) | |||
ANNUAL REPORT NO. 42 FOR THE YEAR 2009 LICENSE DR-10 DOCKET 50-183 MARCH 2010 | |||
ANNUAL REPORT NO. 42 FOR THE YEAR 2009 LICENSE DR-10 DOCKET 50-183 MARCH 2010 EVESR Annual Report No. 42 ESADA-Vallecitos Experimental Superheat Reactor (Deactivated) | |||
ANNUAL REPORT NO. 42 General Electric Company has maintained the ESADA Vallecitos Experimental Superheat Reactor (EVESR) in a deactivated status under the authority of Amendment No. 3 to License DR-IO, Docket 50-183, issued June 11, 1976. In this annual report, a summary of the status of the facility for the period of January 1, 2009 to December 31, 2009 is presented, as required by paragraph 3.E.2. of the license.1.0 | EVESR Annual Report No. 42 ESADA-Vallecitos Experimental Superheat Reactor (Deactivated) | ||
ANNUAL REPORT NO. 42 General Electric Company has maintained the ESADA Vallecitos Experimental Superheat Reactor (EVESR) in a deactivated status under the authority of Amendment No. 3 to License DR-IO, Docket 50-183, issued June 11, 1976. In this annual report, a summary of the status of the facility for the period of January 1, 2009 to December 31, 2009 is presented, as required by paragraph 3.E.2. of the license. | |||
1.0 | |||
==SUMMARY== | ==SUMMARY== | ||
Component removal activities began in 2008 above the 549 foot level. Tech Spec changes issues in Amendment 7 December 1, 2008 authorize the removal of systems beside the reactor vessel and bio-shield below the 549 level. Component removal continued in 2009 will continue in 2010. Entry into the containment building was made for routine radiation surveys and a general examination of conditions throughout the building. | |||
In accordance with written procedures, the Facility Manager controls access to the containment building.Radiation levels remain essentially unchanged. | Component removal activities began in 2008 above the 549 foot level. Tech Spec changes issues in Amendment 7 December 1, 2008 authorize the removal of systems beside the reactor vessel and bio-shield below the 549 level. Component removal continued in 2009 will continue in 2010. Entry into the containment building was made for routine radiation surveys and a general examination of conditions throughout the building. In accordance with written procedures, the Facility Manager controls access to the containment building. | ||
Contamination levels are up slightly, reflecting the ongoing equipment-removal activities. | Radiation levels remain essentially unchanged. Contamination levels are up slightly, reflecting the ongoing equipment-removal activities. | ||
2.0 STATUS OF FACILITY The facility continues to be in deactivated status. The plugs to the reactor vessel and head storage shield, the wooden cover over the fuel storage pool remain in place.3.0 RADIATION AND CONTAMINATION Complete radiation and contamination surveys of the facility indicate that levels remain low. Results of the surveys are presented in Table 1. The radiation/contamination levels listed are representative but not necessarily maximum values.4.0 ACTIVITIES Routine inspections were conducted during this report period. Component removal and downsizing was continued. | 2.0 STATUS OF FACILITY The facility continues to be in deactivated status. The plugs to the reactor vessel and head storage shield, the wooden cover over the fuel storage pool remain in place. | ||
4.234 mCi of material in 2354 ft 3 were removed and disposed in at the facility in Clive, Page 2 of 3 EVESR Annual Report No. 42 Table 1 Radiation and Contamination Level Data ESADA-Vallecitos Experimental Superheat Reactor (Deactivated) | 3.0 RADIATION AND CONTAMINATION Complete radiation and contamination surveys of the facility indicate that levels remain low. Results of the surveys are presented in Table 1. The radiation/contamination levels listed are representative but not necessarily maximum values. | ||
Contamination Levels Surface Smears Airborne Radiation Beta-Gamma Beta-Gamma' Levels (dpm/ | 4.0 ACTIVITIES Routine inspections were conducted during this report period. Component removal and downsizing was continued. | ||
12/08 12/09 12/08 12/09 12/08 12/09 Reactor Enclosure Top of spent fuel pool <1 <1 500 15,000 (main floor)549-ft level (main floor) <1 <1 500 10,000 0.03 23.9 534-ft level <1.5 <1 5,000 20,000 519-ft level <1 <1 20,000 10,000 0.03 11.9 503-ft level (maximum <1 <1 2,500 10,000 pipe reading)487-ft level (basement) | 4.234 mCi of material in 2354 ft 3 were removed and disposed in at the facility in Clive, Page 2 of 3 | ||
<1 <1 750 2,500 0.01 9.15 Note: Radiation levels, surface smears, and air samples may vary from survey to survey as they are taken in general areas rather than at specific locations. | |||
EVESR Annual Report No. 42 Table 1 Radiation and Contamination Level Data ESADA-Vallecitos Experimental Superheat Reactor (Deactivated) | |||
Contamination Levels Surface Smears Airborne Radiation Beta-Gamma Beta-Gamma' Levels (dpm/ft2 ) (PLCi/cc x 10-10) | |||
(mR/h Gamma) | |||
Date of Measurement: 12/08 12/09 12/08 12/09 12/08 12/09 Reactor Enclosure Top of spent fuel pool <1 <1 500 15,000 (main floor) 549-ft level (main floor) <1 <1 500 10,000 0.03 23.9 534-ft level <1.5 <1 5,000 20,000 519-ft level <1 <1 20,000 10,000 0.03 11.9 503-ft level (maximum <1 <1 2,500 10,000 pipe reading) 487-ft level (basement) <1 <1 750 2,500 0.01 9.15 Note: | |||
Radiation levels, surface smears, and air samples may vary from survey to survey as they are taken in general areas rather than at specific locations. | |||
24-hour decayed values Page 4 of 3}} | 24-hour decayed values Page 4 of 3}} |
Latest revision as of 20:15, 13 November 2019
ML100900466 | |
Person / Time | |
---|---|
Site: | Vallecitos File:GEH Hitachi icon.png |
Issue date: | 03/30/2010 |
From: | Doreen Turner GE-Hitachi Nuclear Energy Americas |
To: | Document Control Desk, NRC/FSME |
References | |
Download: ML100900466 (4) | |
Text
GE Hitachi Nuclear Energy
- 0. IHITACHI David W. Turner Manager, Vallecitos Nuclear.Center 6705 Vallecitos Rd Sunol, CA 94586 USA U.S. Nuclear Regulatory Commission T 925 862 4344 F 910 341 2577 Washington, D.C. 20555-0001 davidw.turner@ge.com Attn: Document Control Desk March 30th, 2010
Subject:
Annual Report for EVESR, 2009
Reference:
License DR-10, Docket 50-183
Enclosure:
Annual Report No. 42 Enclosed is the Annual Report No. 42 for the deactivated ESADA-Vallecitos Experimental Superheat Reactor (EVESR) located at Vallecitos Nuclear Center near Sunol, California.
Ifthere are any questions or additional information required, please contact me at the number above.
Sincerely Yours, O~-David Digitally signed by WI Turne Date: 20'10.03132:5-70.a 13:21:15 -a7aa' -
David W. Turner Manager, Vallecitos Nuclear Center cc: John Buckley, NRC (by e-mail)
Robert Evans, Region IV(by e-mail)
GE-Hitochi Nuclear Energy Americas, LLC
GE Hitachi Nuclear Energy SHITACHI Vollecitos Nudeor Center Sunol&Celifornio ESADA-VALLECITOS EXPERIMENTAL SUPERHEAT REACTOR (DEACTIVATED)
ANNUAL REPORT NO. 42 FOR THE YEAR 2009 LICENSE DR-10 DOCKET 50-183 MARCH 2010
EVESR Annual Report No. 42 ESADA-Vallecitos Experimental Superheat Reactor (Deactivated)
ANNUAL REPORT NO. 42 General Electric Company has maintained the ESADA Vallecitos Experimental Superheat Reactor (EVESR) in a deactivated status under the authority of Amendment No. 3 to License DR-IO, Docket 50-183, issued June 11, 1976. In this annual report, a summary of the status of the facility for the period of January 1, 2009 to December 31, 2009 is presented, as required by paragraph 3.E.2. of the license.
1.0
SUMMARY
Component removal activities began in 2008 above the 549 foot level. Tech Spec changes issues in Amendment 7 December 1, 2008 authorize the removal of systems beside the reactor vessel and bio-shield below the 549 level. Component removal continued in 2009 will continue in 2010. Entry into the containment building was made for routine radiation surveys and a general examination of conditions throughout the building. In accordance with written procedures, the Facility Manager controls access to the containment building.
Radiation levels remain essentially unchanged. Contamination levels are up slightly, reflecting the ongoing equipment-removal activities.
2.0 STATUS OF FACILITY The facility continues to be in deactivated status. The plugs to the reactor vessel and head storage shield, the wooden cover over the fuel storage pool remain in place.
3.0 RADIATION AND CONTAMINATION Complete radiation and contamination surveys of the facility indicate that levels remain low. Results of the surveys are presented in Table 1. The radiation/contamination levels listed are representative but not necessarily maximum values.
4.0 ACTIVITIES Routine inspections were conducted during this report period. Component removal and downsizing was continued.
4.234 mCi of material in 2354 ft 3 were removed and disposed in at the facility in Clive, Page 2 of 3
EVESR Annual Report No. 42 Table 1 Radiation and Contamination Level Data ESADA-Vallecitos Experimental Superheat Reactor (Deactivated)
Contamination Levels Surface Smears Airborne Radiation Beta-Gamma Beta-Gamma' Levels (dpm/ft2 ) (PLCi/cc x 10-10)
(mR/h Gamma)
Date of Measurement: 12/08 12/09 12/08 12/09 12/08 12/09 Reactor Enclosure Top of spent fuel pool <1 <1 500 15,000 (main floor) 549-ft level (main floor) <1 <1 500 10,000 0.03 23.9 534-ft level <1.5 <1 5,000 20,000 519-ft level <1 <1 20,000 10,000 0.03 11.9 503-ft level (maximum <1 <1 2,500 10,000 pipe reading) 487-ft level (basement) <1 <1 750 2,500 0.01 9.15 Note:
Radiation levels, surface smears, and air samples may vary from survey to survey as they are taken in general areas rather than at specific locations.
24-hour decayed values Page 4 of 3