{{#Wiki_filter:March 5, 2012
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION rch 5, 2012


==SUBJECT:==
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT UNITS 1 AND 2 (REPORT 05000445/2012001 AND 05000446/2012 001)
ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT UNITS 1 AND 2 (REPORT 05000445/2012001 AND 05000446/2012001)


==Dear Mr. Flores:==
==Dear Mr. Flores:==
On February 14, 2012, the NRC completed its end-of-cycle performance review of Comanche Peak Nuclear Power Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 , through December 31, 20 11. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRC's assessment of your performance in the Security  
On February 14, 2012, the NRC completed its end-of-cycle performance review of Comanche Peak Nuclear Power Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.


Cornerstone and its security-related inspection plan.
The NRC determined that overall, Comanche Peak Nuclear Power Plant Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Comanche Peak Nuclear Power Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green)
 
The NRC determined that overall, Comanche Peak Nuclear Power Plant Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Comanche Peak Nuclear Power Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC
=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green)
safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


The NRC identified a cross-cutting theme in the resources component of the human performance cross-cutting area. Specifically, the NRC identified four green findings in the resources component of the human performance cross-cutting area for failure to provide complete and accurate procedures
The NRC identified a cross-cutting theme in the resources component of the human performance cross-cutting area. Specifically, the NRC identified four green findings in the resources component of the human performance cross-cutting area for failure to provide complete and accurate procedures [H.2(c)]. The NRC determined that a substantive cross-cutting issue (SCCI) does not exist because your improvement initiatives and proposed corrective actions appear to provide sufficient scope to address the theme. The NRC will continue to monitor your staffs effort and progress in addressing the theme until the theme criteria are no longer met.
[H.2(c)]. The NRC determined that a substantive cross-cutting issue (SCCI) does not exist because your improvement initiatives and proposed corrective actions appear to provide sufficient scope to address the theme.
 
The NRC will continue to monitor your staff's effort and progress in addressing the theme until the theme criteria are no longer met.
 
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan.


The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD A R L I N G T O N , T E X A S 7 6 0 1 1-4511 the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


In accordance with 10 CFR 2.390 of the NRC
In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


Please contact me at 817-200-1148 with any questions you have regarding this letter.
Please contact me at 817-200-1148 with any questions you have regarding this letter.


Sincerely,
Sincerely,
/RA/ Wayne C. Walker Chief , Reactor Projects Branch A Division of Reactor Projects Docket Nos: 05000445, 05000446
/RA/
 
Wayne C. Walker Chief, Reactor Projects Branch A Division of Reactor Projects Docket Nos: 05000445, 05000446 License Nos: NPF-87, NPF-89 Enclosure: Comanche Peak Nuclear Power Plant Inspection/Activity Plan cc w/Enclosure: Distribution via ListServe cc w/Enclosure Electronic distribution by RIV:
License Nos:
NPF-87, NPF-89 Enclosure: Comanche Peak Nuclear Power Plant Inspection/Activity Plan
 
cc w/Enclosure: Distribution via ListServe cc w/Enclosure Electronic distribution by RIV:
Regional Administrator (Elmo.Collins@nrc.gov)
Regional Administrator (Elmo.Collins@nrc.gov)
Deputy Regional Administrator (Art
Deputy Regional Administrator (Art.Howell@nrc.gov)
.Howell@nrc.gov) DRP Director (Kriss.Kennedy@nrc.gov) DRP Deputy Director (Troy.Pruett@nrc.gov) DR S Director (Anton.Vegel@nrc.gov
DRP Director (Kriss.Kennedy@nrc.gov)
) DRS Deputy Director (Thomas.B lo un t@nrc.gov) Senior Resident Inspector (John.Kramer@nrc.gov)
DRP Deputy Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Thomas.Blount@nrc.gov)
Senior Resident Inspector (John.Kramer@nrc.gov)
Resident Inspector (Brian.Tindell@nrc.gov)
Resident Inspector (Brian.Tindell@nrc.gov)
Senior Project Engineer (David.Proulx@nrc.gov)  
Senior Project Engineer (David.Proulx@nrc.gov)
 
Project Engineer (Jason.Dykert@nrc.gov)
Project Engineer (Jason.Dykert@nrc.gov) Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
Branch Chief, DRP/A (Wayne.Walker@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov)
Regional State Liaison Officer (Bill.Maier@nrc.gov)
RA Secretary (Lisa.Quayle@nrc.gov) DRA Secretary (Anita.Tannenbaum@nrc.gov)
RA Secretary (Lisa.Quayle@nrc.gov)
DRA Secretary (Anita.Tannenbaum@nrc.gov)
Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)
Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)
Branch Chief, DRS/EB2 (Geoff
Branch Chief, DRS/EB2 (Geoff.Miller@nrc.gov)
.Miller@nrc.gov) Branch Chief, DRS/PSB1 (Michael.Hay@nrc.gov)
Branch Chief, DRS/PSB1 (Michael.Hay@nrc.gov)
Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)
Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)
Branch Chief, DRS/OB (Mark.Haire@nrc.gov)
Branch Chief, DRS/OB (Mark.Haire@nrc.gov)
Acting Branch Chief, DRS/TSB (Ryan.Alexan der@nrc.gov)
Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)
OEDO RIV Coordinator (Lydia.Chang@nrc.gov) Director, DIRS, NRR (Fred.Brown@nrc.gov) Deputy Director, DIRS, NRR (John.Lubinski@nrc.gov) Director, DORL, NRR (Joseph Giitter@nrc.gov)
OEDO RIV Coordinator (Lydia.Chang@nrc.gov)
Deputy Director, DORL, NRR (Robert.Nelson@nrc.gov) Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov) NRR Project Manager (Balwant.Singal@nrc.gov) RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov Congressional Affairs Officer (Jenny.Weil@nrc.gov
Director, DIRS, NRR (Fred.Brown@nrc.gov)
) File located:
Deputy Director, DIRS, NRR (John.Lubinski@nrc.gov)
R: _Reactors
Director, DORL, NRR (Joseph Giitter@nrc.gov)
\EOC 2011\CP EOC Letter 2011.docx SUNSI Review Yes No ADAMS Yes No Reviewer Initials WW Publicly Avail Yes No Sensitive Yes No Sens. Type Initials WW A:DRP/A signature D:DRS D:DRP WCWalker AVegel KKennedy /RA/ T.Blount for
Deputy Director, DORL, NRR (Robert.Nelson@nrc.gov)
/RA/ 2/28/12 2/28/12 2/29/12 Page 1 of 1 02/27/2012 14:28:50 Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Comanche Peak Inspection / Activity Plan 04/01/2012-06/30/2013 EXAM-INITIAL OPERATOR EXAM 5 1 INITIAL EXAM - UNIT 1 - CP (04/2012)
Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)
X02484 05/14/2012 05/18/2012 2 INITIAL EXAM - UNIT 2 - CP (04/2012)
NRR Project Manager (Balwant.Singal@nrc.gov)
X02485 05/14/2012 05/18/2012 1 INITIAL EXAM - UNIT 1 - CP (04/2012)
RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov Congressional Affairs Officer (Jenny.Weil@nrc.gov)
X02484 06/11/2012 06/23/2012 2 INITIAL EXAM - UNIT 2 - CP (04/2012)
File located: R: _Reactors\EOC 2011\CP EOC Letter 2011.docx SUNSI Review Yes No ADAMS Yes No Reviewer Initials WW Publicly Avail Yes No Sensitive Yes No Sens. Type Initials WW A:DRP/A signature D:DRS D:DRP WCWalker AVegel KKennedy
X02485 06/11/2012 06/23/2012 EB1-17T-50.59 & PERM PLANT MODS 3 1, 2 IP Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111117T 03/26/2012 04/06/2012 1, 2 IP change/test/evaluations 7111117T-chng/tst 03/26/2012 04/06/2012 1, 2 IP evaluations 7111117T-evals 03/26/2012 04/06/2012 1, 2 IP permanent mods 7111117T-permmod s 03/26/2012 04/06/2012 EP-1-BIENNIAL EP PROGRAM INSPECTION 1 1, 2 IP A lert and Notification System Testing 7111402 07/16/2012 07/20/2012 1, 2 IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 07/16/2012 07/20/2012 1, 2 IP Emergency Action Level and Emergency Plan Changes 7111404 07/16/2012 07/20/2012 1, 2 IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 07/16/2012 07/20/2012 1, 2 IP Drill/Exercise Performance 71151-EP01 07/16/2012 07/20/2012 1, 2 IP ERO Drill Participation 71151-EP02 07/16/2012 07/20/2012 1, 2 IP A lert & Notification System 71151-EP03 07/16/2012 07/20/2012 RS12-RADIATION SAFETY 2 1, 2 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/15/2012 10/19/2012 1, 2 IP Occupational ALARA Planning and Controls 71124.02 10/15/2012 10/19/2012 1 IP Occupational Exposure Control Effectiveness 71151-OR01 10/15/2012 10/19/2012 1 IP RETS/ODCM Radiological Effluent 71151-PR01 10/15/2012 10/19/2012 RS5678-RADIATION SAFETY TEAM INSPECTION 4 1, 2 IP Radiation Monitoring Instrumentation 71124.05 12/03/2012 12/07/2012 1, 2 IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 12/03/2012 12/07/2012 1, 2 IP Radiological Environmental Monitoring Program 71124.07 12/03/2012 12/07/2012 1, 2 IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 12/03/2012 12/07/2012 EB1-21-COMPONENT DESIGN BASIS INSPECTION 6 1, 2 IP Component Design Bases Inspection 7111121 05/20/2013 06/21/2013 This report does not include INPO and OUTAGE activities.
/RA/ T.Blount for /RA/
2/28/12 2/28/12 2/29/12
 
Page 1 of 1     Comanche Peak 02/27/2012 14:28:50   Inspection / Activity Plan Report 22 04/01/2012 - 06/30/2013 Unit Planned Dates        No. of Staff Number Start End Inspection Activity    Title  on Site EXAM - INITIAL OPERATOR EXAM       5 1 05/14/2012 05/18/2012 X02484 INITIAL EXAM - UNIT 1 - CP (04/2012)
2 05/14/2012 05/18/2012 X02485 INITIAL EXAM - UNIT 2 - CP (04/2012)
1 06/11/2012 06/23/2012 X02484 INITIAL EXAM - UNIT 1 - CP (04/2012)
2 06/11/2012 06/23/2012 X02485 INITIAL EXAM - UNIT 2 - CP (04/2012)
EB1-17T - 50.59 & PERM PLANT MODS       3 1, 2 03/26/2012 04/06/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 03/26/2012 04/06/2012 IP 7111117T-chng/tst change/test/evaluations 1, 2 03/26/2012 04/06/2012 IP 7111117T-evals evaluations 1, 2 03/26/2012 04/06/2012 IP 7111117T-permmodspermanent mods EP-1 - BIENNIAL EP PROGRAM INSPECTION     1 1, 2 07/16/2012 07/20/2012 IP 7111402 Alert and Notification System Testing 1, 2 07/16/2012 07/20/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 07/16/2012 07/20/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 07/16/2012 07/20/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 07/16/2012 07/20/2012 IP 71151-EP01 Drill/Exercise Performance 1, 2 07/16/2012 07/20/2012 IP 71151-EP02 ERO Drill Participation 1, 2 07/16/2012 07/20/2012 IP 71151-EP03 Alert & Notification System RS12 - RADIATION SAFETY       2 1, 2 10/15/2012 10/19/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/15/2012 10/19/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 10/15/2012 10/19/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 10/15/2012 10/19/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent RS5678 - RADIATION SAFETY TEAM INSPECTION     4 1, 2 12/03/2012 12/07/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 12/03/2012 12/07/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 12/03/2012 12/07/2012 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 12/03/2012 12/07/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB1-21 - COMPONENT DESIGN BASIS INSPECTION     6 1, 2 05/20/2013 06/21/2013 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 08:25, 12 November 2019

Annual Assessment Letter for Comanche Peak Nuclear Power Plant Units 1 and 2 (Report 05000445/2012001 and 05000446/2012001)
ML120610363
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/05/2012
From: Webb Patricia Walker
NRC/RGN-IV/DRP/RPB-A
To: Flores R
Luminant Generation Co
References
Download: ML120610363 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 5, 2012

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR COMANCHE PEAK NUCLEAR POWER PLANT UNITS 1 AND 2 (REPORT 05000445/2012001 AND 05000446/2012001)

Dear Mr. Flores:

On February 14, 2012, the NRC completed its end-of-cycle performance review of Comanche Peak Nuclear Power Plant Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011, through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.

The NRC determined that overall, Comanche Peak Nuclear Power Plant Units 1 and 2 operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Comanche Peak Nuclear Power Plant Units 1 and 2 during the most recent quarter was within the Licensee Response Column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green)

safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The NRC identified a cross-cutting theme in the resources component of the human performance cross-cutting area. Specifically, the NRC identified four green findings in the resources component of the human performance cross-cutting area for failure to provide complete and accurate procedures H.2(c). The NRC determined that a substantive cross-cutting issue (SCCI) does not exist because your improvement initiatives and proposed corrective actions appear to provide sufficient scope to address the theme. The NRC will continue to monitor your staffs effort and progress in addressing the theme until the theme criteria are no longer met.

The enclosed inspection plan lists the inspections scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1148 with any questions you have regarding this letter.

Sincerely,

/RA/

Wayne C. Walker Chief, Reactor Projects Branch A Division of Reactor Projects Docket Nos: 05000445, 05000446 License Nos: NPF-87, NPF-89 Enclosure: Comanche Peak Nuclear Power Plant Inspection/Activity Plan cc w/Enclosure: Distribution via ListServe cc w/Enclosure Electronic distribution by RIV:

Regional Administrator (Elmo.Collins@nrc.gov)

Deputy Regional Administrator (Art.Howell@nrc.gov)

DRP Director (Kriss.Kennedy@nrc.gov)

DRP Deputy Director (Troy.Pruett@nrc.gov)

DRS Director (Anton.Vegel@nrc.gov)

DRS Deputy Director (Thomas.Blount@nrc.gov)

Senior Resident Inspector (John.Kramer@nrc.gov)

Resident Inspector (Brian.Tindell@nrc.gov)

Senior Project Engineer (David.Proulx@nrc.gov)

Project Engineer (Jason.Dykert@nrc.gov)

Branch Chief, DRP/A (Wayne.Walker@nrc.gov)

RITS Coordinator (Marisa.Herrera@nrc.gov)

Public Affairs Officer (Victor.Dricks@nrc.gov)

Public Affairs Officer (Lara.Uselding@nrc.gov)

Regional State Liaison Officer (Bill.Maier@nrc.gov)

RA Secretary (Lisa.Quayle@nrc.gov)

DRA Secretary (Anita.Tannenbaum@nrc.gov)

Branch Chief, DRS/EB1 (Thomas.Farnholtz@nrc.gov)

Branch Chief, DRS/EB2 (Geoff.Miller@nrc.gov)

Branch Chief, DRS/PSB1 (Michael.Hay@nrc.gov)

Branch Chief, DRS/PSB2 (Greg.Werner@nrc.gov)

Branch Chief, DRS/OB (Mark.Haire@nrc.gov)

Acting Branch Chief, DRS/TSB (Ryan.Alexander@nrc.gov)

OEDO RIV Coordinator (Lydia.Chang@nrc.gov)

Director, DIRS, NRR (Fred.Brown@nrc.gov)

Deputy Director, DIRS, NRR (John.Lubinski@nrc.gov)

Director, DORL, NRR (Joseph Giitter@nrc.gov)

Deputy Director, DORL, NRR (Robert.Nelson@nrc.gov)

Chief, PLB IV, DORL, NRR (Michael.Markley@nrc.gov)

NRR Project Manager (Balwant.Singal@nrc.gov)

RidsNrrDirslpab Resource@nrc.gov ROPreports.Resource@nrc.gov Congressional Affairs Officer (Jenny.Weil@nrc.gov)

File located: R: _Reactors\EOC 2011\CP EOC Letter 2011.docx SUNSI Review Yes No ADAMS Yes No Reviewer Initials WW Publicly Avail Yes No Sensitive Yes No Sens. Type Initials WW A:DRP/A signature D:DRS D:DRP WCWalker AVegel KKennedy

/RA/ T.Blount for /RA/

2/28/12 2/28/12 2/29/12

Page 1 of 1 Comanche Peak 02/27/2012 14:28:50 Inspection / Activity Plan Report 22 04/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site EXAM - INITIAL OPERATOR EXAM 5 1 05/14/2012 05/18/2012 X02484 INITIAL EXAM - UNIT 1 - CP (04/2012)

2 05/14/2012 05/18/2012 X02485 INITIAL EXAM - UNIT 2 - CP (04/2012)

1 06/11/2012 06/23/2012 X02484 INITIAL EXAM - UNIT 1 - CP (04/2012)

2 06/11/2012 06/23/2012 X02485 INITIAL EXAM - UNIT 2 - CP (04/2012)

EB1-17T - 50.59 & PERM PLANT MODS 3 1, 2 03/26/2012 04/06/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1, 2 03/26/2012 04/06/2012 IP 7111117T-chng/tst change/test/evaluations 1, 2 03/26/2012 04/06/2012 IP 7111117T-evals evaluations 1, 2 03/26/2012 04/06/2012 IP 7111117T-permmodspermanent mods EP-1 - BIENNIAL EP PROGRAM INSPECTION 1 1, 2 07/16/2012 07/20/2012 IP 7111402 Alert and Notification System Testing 1, 2 07/16/2012 07/20/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 07/16/2012 07/20/2012 IP 7111404 Emergency Action Level and Emergency Plan Changes 1, 2 07/16/2012 07/20/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1, 2 07/16/2012 07/20/2012 IP 71151-EP01 Drill/Exercise Performance 1, 2 07/16/2012 07/20/2012 IP 71151-EP02 ERO Drill Participation 1, 2 07/16/2012 07/20/2012 IP 71151-EP03 Alert & Notification System RS12 - RADIATION SAFETY 2 1, 2 10/15/2012 10/19/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1, 2 10/15/2012 10/19/2012 IP 71124.02 Occupational ALARA Planning and Controls 1 10/15/2012 10/19/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 10/15/2012 10/19/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent RS5678 - RADIATION SAFETY TEAM INSPECTION 4 1, 2 12/03/2012 12/07/2012 IP 71124.05 Radiation Monitoring Instrumentation 1, 2 12/03/2012 12/07/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1, 2 12/03/2012 12/07/2012 IP 71124.07 Radiological Environmental Monitoring Program 1, 2 12/03/2012 12/07/2012 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EB1-21 - COMPONENT DESIGN BASIS INSPECTION 6 1, 2 05/20/2013 06/21/2013 IP 7111121 Component Design Bases Inspection This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.