MONTHYEARIR 05000445/20230052023-08-23023 August 2023 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2023005 and 05000446/2023005)- Mid Cycle Letter 2023 ML23068A3782023-03-0909 March 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000445/2023011 and 05000446/2023011) and Request for Information IR 05000445/20220062023-03-0101 March 2023 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022006 and 05000446/2022006) IR 05000445/20220052022-08-22022 August 2022 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2022005 and 05000446/2022005) ML22179A3032022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000445/2022401; 05000446/2022401 ML22124A3042022-05-0505 May 2022 Notification of NRC Triennial Heat Exchanger/Sink Performance Inspection (05000445/2022003 and 05000446/2022003) and Request for Information IR 05000445/20210062022-03-0202 March 2022 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021006 and 05000446/2021006) ML21253A2332021-09-0909 September 2021 Request for Information: Comanche Peak Nuclear Power Plant, Units 1 and 2 (05000445 and 05000446); Occupation Radiation Safety (71124.01, 71124.02, 7511) ML21245A3072021-09-0202 September 2021 Request for Information ML21245A307 IR 05000445/20210052021-09-0101 September 2021 Mid-Cycle Inspection Plan Transmittal Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2021005 and 05000446/2021005) ML21176A1292021-06-25025 June 2021 CPNPP FFD Inspection Doc Request 2021 ML21103A3982021-04-13013 April 2021 CP Security Inspection Information Request 2021403 ML21027A4322021-01-27027 January 2021 Information Request, Security IR 2021401 ML20309A3602020-11-0404 November 2020 Notification of NRC Design Bases Assurance Inspection (Teams) (Inspection Report 05000445/2021011 and 05000446/2021011) and Initial Request for Information IR 05000445/20200052020-09-0101 September 2020 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2020005 and 05000446/2020005) ML20139A1452020-05-18018 May 2020 Notification of NRC Design Bases Assurance Inspection (Programs) (05000445/2020010 and 05000446/2020010) and Initial Request for Information ML20055E1052020-03-0303 March 2020 CP2019006 Annual Assessment Letter ML20045E3512020-02-13013 February 2020 Information Request February 13, 2020 Notification of Inspection and Request for Information Comanche Peak Unit 2 NRC Inspection Report 05000446/2020002 IR 05000445/20190052019-08-30030 August 2019 Updated Inspection Plan for Comanche Peak, Units 1 and 2, Reports 05000445/2019005 and 05000446/2019005 IR 05000445/20180062019-03-0404 March 2019 Annual Assessment Letter for Comanche Peak, Units 1 and 2 (Report 05000445/2018006 and 05000446/2018006) ML19043A9442019-02-20020 February 2019 2019 CP Brq RFI Letter IR 05000445/20180052018-08-31031 August 2018 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2018005 and 05000446/2018005) IR 05000445/20170062018-03-0101 March 2018 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2017006 and 05000446/2017006) IR 05000445/20170052017-08-28028 August 2017 Updated Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2017005 and 05000446/2017005) IR 05000445/20160062017-03-0101 March 2017 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2016006 and 05000446/2016006) ML16302A1002016-10-27027 October 2016 Notification of Inspection (NRC Inspection Report 05000445/2017002 and 05000446/2017002) and Request for Information IR 05000445/20160052016-09-12012 September 2016 Errata for Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2016005 and 05000446/2016005) ML16239A2522016-08-31031 August 2016 Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2016005 and 05000446/2016005) IR 05000445/20164012016-08-31031 August 2016 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant (NRC Physical Security Inspection Report Numbers 05000445/2016401 and 05000446/2016401) IR 05000445/20150062016-03-0202 March 2016 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2015006 and 05000446/2015006) IR 05000445/20154012015-09-0101 September 2015 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant (NRC Physical Security Inspection Report Numbers 05000445/2015401 and 05000446/2015401) IR 05000445/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2015005 and 05000446/2015005) IR 05000445/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2014006 and 05000446/2014006) IR 05000445/20144022014-09-0202 September 2014 Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant (NRC Physical Security Inspection Report Numbers 05000445/2014402 and 05000446/2014402) IR 05000445/20130012014-03-0404 March 2014 IR 05000445-13-001 & 05000446-13-001, 02/12/2014, Comanche Peak, Units 1 & 2, Annual Assessment Inspection Plan ML13282A5002013-10-0909 October 2013 Notification of NRC Triennial Fire Protection Baseline Inspection (NRC Inspection Report 05000445-14-008 and 05000446-14-008) and Request for Information IR 05000445/20130062013-09-0303 September 2013 (Report 05000445/2013006 and 05000446/2013006) IR 05000445/20128012013-03-0404 March 2013 Annual Assessment Letter for Comanche Peak Nuclear Power Plant, Units 1 and 2 (Report 05000445/2012801 and 05000446/2012801) ML13060A4352013-03-0101 March 2013 Notification of NRC Component Design Bases Inspection IR 05000445-13-007 and 05000446-13-007, and Initial Request for Information IR 05000445/20120062012-09-0404 September 2012 Mid-Cycle Letter for Comanche Peak Nuclear Power Plant Units 1 and 2 (Reports 05000445/2012006 and 05000446/2012006) IR 05000445/20120012012-03-0505 March 2012 Annual Assessment Letter for Comanche Peak Nuclear Power Plant Units 1 and 2 (Report 05000445/2012001 and 05000446/2012001) ML1124306442011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan - Comanche Peak Nuclear Power Plant - Units 1 and 2 CP-201101030, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 6, (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2000, Second Interval)2011-08-0202 August 2011 Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 6, (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2000, Second Interval) CP-201101031, Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval)2011-08-0202 August 2011 Transmittal of Unit 1 Inservice Inspection Program Plan, Revision 0 (Unit 1: ASME Code XI 1998 Edition, 1999 and 2000 Addenda, Interval Start - August 13, 2010, Third Interval) IR 05000445/20110012011-03-0404 March 2011 IR 05000445-11-001, 05000446-11-001, 03/01/2011 - 02/29/2012, Comanche Peak Nuclear Power Plant, Units 1 and 2, Annual Assessment Letter ML1024403972010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plant - Comanche Peak Nuclear Power Plant IR 05000445/20100012010-03-0303 March 2010 Annual Assessment Letter - Comanche Peak Nuclear Power Plant (Reports 05000445-10-001 and 05000446-10-001) CP-200900848, Submittal of Unit 2 Inservice Inspection Plan for Refueling Outage No .112009-07-30030 July 2009 Submittal of Unit 2 Inservice Inspection Plan for Refueling Outage No .11 IR 05000445/20090012009-03-0404 March 2009 Annual Assessment Letter - Comanche Peak Steam Electric Station (Reports 05000445/2009001 and 05000446/2009001) ML0824606392008-09-0202 September 2008 2008 Midcycle Assessment Letter Comanche Peak and Inspection Plan 2023-08-23
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24019A0742024-01-19019 January 2024 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - License Amendment Request to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator ML24018A1072024-01-18018 January 2024 Notification of Commercial Grade Dedication Inspection (05000445/2024012 and 05000446/2024012) and Request for Information ML23256A1502023-09-11011 September 2023 Request for Additional Information Requests - Comanche Peak - Set 4 ML23256A1492023-09-11011 September 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 4 ML23213A2162023-08-0202 August 2023 Vistra Operations Company, LLC Notification of License Renewal Inspection and Request for Information ML23188A0452023-07-0707 July 2023 Request for Additional Information Requests - Comanche Peak - Set 3 ML23188A0442023-07-0707 July 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 3 ML23181A0212023-06-29029 June 2023 Request for Additional Information Requests - Comanche Peak - Set 2 ML23181A0202023-06-29029 June 2023 Email from Mark Yoo (NRC) to Ken Peters (Vistra) - Comanche Peak LRA - Request for Additional Information - Set 2 ML23167A0222023-06-14014 June 2023 Email: Request for Additional Information (RAI) Letter for the Review of the Comanche Peak Initial License Renewal Application, Set 1 ML23167A0232023-06-14014 June 2023 Request for Additional Information (RAI) for the Review of the Comanche Peak Initial License Renewal Application (Lra), Set 1 ML23145A2322023-05-25025 May 2023 LRA - Request for Confirmation of Information - Set 2 ML23143A1372023-05-23023 May 2023 LRA - Request for Confirmation of Information - Set 1 ML23132A2542023-05-23023 May 2023 Supplemental Information Needed for Acceptance of Requested Licensing Action LAR to Adopt 10 CFR 50.69,Risk-Informed Categorization & Treatment of Structures,Systems & Components for Nuclear Power Reactors EPID L-2023-LLA-0057 ML23068A0562023-05-0909 May 2023 Request for Additional Information - Comanche Peak License Renewal Application Environmental Review ML23068A0732023-04-13013 April 2023 Requests for Confirmation of Information for the Environmental Review of the Comanche Peak Nuclear Power Plant, Units 1 and 2, Licensed Renewal Application (EPID Number: L-2022-LNE-0004) (Docket Numbers 50-445 and 50-446) ML23103A4682023-04-11011 April 2023 NRR E-mail Capture - Comanche Peak Request for Additional Information - License Amendment Request to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model ML23086B9852023-03-27027 March 2023 NRR E-mail Capture - Comanche Peak Draft Request for Additional Information - Request to Apply the Westinghouse Full Spectrum Loss of Coolant Accident Evaluation Model ML23010A1442023-01-0909 January 2023 Inservice Inspection Request for Information ML22325A2742022-11-21021 November 2022 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22318A3102022-11-10010 November 2022 NRR E-mail Capture - Comanche Peak - Draft Request for Additional Information - Proposed Alternative P-1 Regarding IST of Safeguards Building Sump Pumps ML22230B1092022-08-17017 August 2022 NRR E-mail Capture - Comanche Peak Unit 2 - Request for Additional Information - 2RE19 Inspection Summary Report for Steam Generator Tubing ML22220A1942022-08-0808 August 2022 NRR E-mail Capture - Comanche Peak Unit 2 - Draft Request for Additional Information - 2RE19 Inspection Summary Report for Steam Generator Tubing ML22179A3032022-06-28028 June 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000445/2022401; 05000446/2022401 ML22083A0262022-03-23023 March 2022 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Request to Adopt TSTF 505 Revision 2 ML21286A7912021-10-13013 October 2021 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Request to Adopt TSTF-577 Revision 1 ML21253A2242021-09-0909 September 2021 Request for Information Occupational Radiation Safety Inspection (71124.01, 71124.02, and 71151) from 10/18-22/2021 ML21253A2332021-09-0909 September 2021 Request for Information: Comanche Peak Nuclear Power Plant, Units 1 and 2 (05000445 and 05000446); Occupation Radiation Safety (71124.01, 71124.02, 7511) ML21245A3072021-09-0202 September 2021 Request for Information ML21245A307 ML21166A3382021-06-22022 June 2021 Supplemental Information Needed for Acceptance of Requested Licensing Action LAR to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML21165A1022021-06-13013 June 2021 Pi&R; Request for Information ML21103A3982021-04-13013 April 2021 CP Security Inspection Information Request 2021403 ML20225A0932020-08-12012 August 2020 Notification of Inspection 05000445/2020004 and 05000446/2020004 and Request for Information ML20105A1072020-04-13013 April 2020 NRR E-mail Capture - Comanche Peak - Request for Additional Information - Exigent Amendment Request for One Time Change to Unit 2 Steam Generator Inspection Frequency ML20104A0022020-04-11011 April 2020 NRR E-mail Capture - Comanche Peak Unit 2 - Request for Additional Information - Proposed Alternative to ASME OM Code for Deferral of Snubber Testing (SNB-1) and Visual Examinations (SNB-2) ML20045E3512020-02-13013 February 2020 Information Request February 13, 2020 Notification of Inspection and Request for Information Comanche Peak Unit 2 NRC Inspection Report 05000446/2020002 ML19346B3812019-12-11011 December 2019 NRR E-mail Capture - Comanche Peak RAIs - Quality Assurance Program Reduction in Commitment ML19319A5432019-11-14014 November 2019 NRR E-mail Capture - Draft Comanche Peak RAIs - Quality Assurance Program Reduction in Commitment ML19058A3592019-02-27027 February 2019 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2 - Final Request for Additional Information Concerning License Amendment Request to Revise the Emergency Plan IR 05000445/20170072018-02-0808 February 2018 Notification of Nrc Design Bases Assurance Inspection (Programs) (05000445/2017007 and 05000446/2017007) ML17276B8622017-10-0303 October 2017 Notification of NRC Design Bases Assurance Inspection (Programs)(05000445/2017007 and 05000446/2017007) and Initial Request for Information ML17087A2032017-03-28028 March 2017 NRR E-mail Capture - Comanche Peak, Unit 2 - Final Request for Additional Information Regarding Request No. 2B3-1 ML17066A2372017-03-0707 March 2017 Notification of NRC Triennial Fire Protection Baseline Inspection (05000445/2017008 and 05000446/2017008) and Request for Information ML17048A4172017-02-17017 February 2017 Notification of NRC Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication/ Staffing/Multi-Unit Dose Assessment... ML16034A1962016-02-0808 February 2016 Independent Spent Fuel Storage Installation - Request for Additional Information, Application for Order Approving Transfer of Facility Operating Licenses and Conforming Amendment ML16015A0032016-01-14014 January 2016 NRR E-mail Capture - Request for Additional Information - Relief Request 1B3-3 for Comanche Peak Nuclear Power Plant, Unit 1 ML15345A0112015-12-16016 December 2015 Request for Additional Information, License Amendment Request, Revise Emergency Action Levels Based on Nuclear Energy Institute (NEI) 99-01, Revision 6 ML15317A1582015-11-13013 November 2015 Request for Additional Information Email, Relief Request B-15, C-2, and C-4 for Welds in the RPV and Containment Spray and Residual Heat Removal Heat Exchanger Shells, Second 10-year Inservice Inspection Interval ML15317A1482015-11-13013 November 2015 Request for Additional Information Email, Relief Request No. B-9 for Reactor Pressure Vessel Outlet Nozzle Safe End to Piping Welds, Second 10-year Inservice Inspection Interval ML15317A1502015-11-13013 November 2015 Request for Additional Information Email, Relief Request No. B-3 for Reactor Coolant System Pipe to Pipe Flange Weld, Second 10-year Inservice Inspection Interval 2024-01-19
[Table view] |
Text
The following items are requested for the Occupational Radiation Safety Inspection at Comanche Peak Dates of Inspection: 10/18/2021 to 10/22/2021 Integrated Report 2021004 Inspection areas are listed in the attachments below.
Please provide the requested information on or before Tuesday, October 05, 2021.
Please submit this information using the same lettering system as below. For example, all contacts and phone numbers for Inspection Procedure 71124.01 should be in a file/folder titled 1-A, applicable organization charts in file/folder 1-B, etc.
The information should be provided in electronic format or a secure document management service. If information is placed on a secured document management system, please ensure the inspection exit date entered is at least 30 days later than the onsite inspection dates, so the inspectors will have access to the information while writing the report.
In addition to the corrective action document lists provided for each inspection procedure listed below, please provide updated lists of corrective action documents at the entrance meeting.
The dates for these lists should range from the end dates of the original lists to the day of the entrance meeting.
If more than one inspection procedure is to be conducted and the information requests appear to be redundant, there is no need to provide duplicate copies. Enter a note explaining in which file the information can be found.
If you have any questions or comments, please contact Bernadette Baca at 817-200-1235 or via e-mail at Bernadette.Baca@nrc.gov.
PAPERWORK REDUCTION ACT STATEMENT This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, control number 3150-0011.
- 1. Radiological Hazard Assessment and Exposure Controls (71124.01) and Performance Indicator Verification (71151)
Date of Last Inspection, to include 71151 data: November 1, 2020 A. List of contacts and telephone numbers for the Radiation Protection Organization Staff and Technicians, as well as the Licensing/Regulatory Affairs staff. Please include area code and prefix. If work cell numbers are appropriate, then please include them as well.
B. Applicable organization charts including position or job titles. Please include as appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
C. Copies of audits, self-assessments, LARs, and LERs written since the last inspection date, related to this inspection area D. Procedure indexes for the radiation protection procedures and other related disciplines.
E. Please provide procedures related to the following areas noted below. Additional procedures may be requested by number after the inspector reviews the procedure indexes.
- 1. Radiation Protection Program
- 2. Radiation Protection Conduct of Operations, if not included in #1.
- 3. Personnel Dosimetry
- 4. Posting of Radiological Areas
- 5. High Radiation Area Controls
- 6. RCA Access Controls and Radiation Worker Instructions
- 7. Conduct of Radiological Surveys
- 8. Radioactive Source Inventory and Control
- 9. Fuel Pool Inventory Access and Control F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently committed to relative to this program. Please include the revision and/or date for the commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and sub-tiered systems) since the last inspection date.
- 1. Initiated by the radiation protection organization
- 2. Assigned to the radiation protection organization NOTE: These lists should include a description of the condition that provides sufficient detail that the inspectors can ascertain the regulatory impact, the significance level assigned to the condition, the status of the action (e.g., open, working, closed, etc.) and the search criteria used. Please provide in document formats which are sortable and searchable so that inspectors can quickly and efficiently determine appropriate sampling and perform word searches, as needed. (Excel spreadsheets are the preferred format.) If codes are used, please provide a legend for each column where a code is used.
H. List of radiologically significant work activities scheduled to be conducted during the inspection period. (If the inspection is scheduled during an outage, please also include a list of work activities greater than 1 rem, scheduled during the outage with the dose
estimate for the work activity.) Please include the radiological risk assigned to each activity.
I. Provide a summary of any changes to plant operation that have resulted or could result in a significant new radiological hazard. For each change, please provide the assessment conducted on the potential impact and any monitoring done to evaluate it.
J. List of active radiation work permits and those specifically planned for the on-site inspection week.
K. Please provide a list of air samples taken to verify engineering controls and a separate list for breathing air samples in airborne radiation areas or high contamination work areas. Please include the RWP the breathing air sampling supports.
L. Please provide the current radioactive source inventory, listing all radioactive sources that are required to be leak tested. Indicate which sources are deemed 10 CFR Part 20, Appendix E, Category 1 or Category 2. Please indicate the radioisotope, initial and current activity (w/assay date), and storage location for each applicable source.
M. Please provide the last two leak test results for all required/applicable radioactive sources. Please specifically indicate the sources that have failed its leak test within the last two years. Provide any applicable condition reports.
N. A list of all non-fuel items stored in the spent fuel pools, and if available, their appropriate dose rates (Contact / @ 30cm)
O. A list of radiological controlled area entries greater than 100 millirem, since the last inspection date. The list should include the date of entry, some form of worker identification, the radiation work permit used by the worker, dose accrued by the worker, and the electronic dosimeter dose alarm set-point used during the entry (for Occupational Radiation Safety Performance Indicator verification in accordance with IP 71151).
P. A list describing VHRAs and TS HRAs (> 1 rem/hour) that are current and historical.
Include their current status, locations, and control measures.
Q. Temporary effluent monitor locations and calibrations (AMS-4) used to monitor normally closed doors or off-normal release points (e.g., equipment hatch or turbine heater bay doors). Include any CRs associated with this monitoring or instrumentation.
- 2. Occupational ALARA Planning and Controls (71124.02)
Date of Last Inspection: May 17, 2021 A. List of contacts and telephone numbers for ALARA program personnel, as well as the Licensing/Regulatory Affairs staff. Please include area code and prefix. If work cell numbers are appropriate, then please include them as well.
B. Applicable organization charts including position or job titles. Please include as appropriate for your site, Site Management, RP, Chemistry, Maintenance (I&C),
Engineering, and Emergency Protection. (Recent pictures are appreciated.)
C. Copies of audits, self-assessments, LARs, and LERs, written since the date of last inspection, focusing on ALARA D. Procedure index for ALARA Program procedures and other related disciplines.
E. Please provide specific procedures related to the following areas noted below.
Additional Specific Procedures may be requested by number after the inspector reviews the procedure indexes.
- 1. ALARA Program
- 2. ALARA Planning
- 3. ALARA Reviews
- 4. ALARA Committee
- 5. Radiation Work Permit Preparation F. Please provide a list of NRC Regulatory Guides and NUREGs that you are currently committed to relative to this program. Please include the revision and/or date for the commitment and where this may be located in your current licensing basis documents.
G. Please provide a summary list of corrective action documents (including corporate and sub-tiered systems) written since the date of last inspection, related to the ALARA program, including exceeding RWP Dose Estimates.
NOTE: These lists should include a description of the condition that provides sufficient detail that the inspectors can ascertain the regulatory impact, the significance level assigned to the condition, the status of the action (e.g., open, working, closed, etc.) and the search criteria used. Please provide in document formats which are sortable and searchable so that inspectors can quickly and efficiently determine appropriate sampling and perform word searches, as needed. (Excel spreadsheets are the preferred format.) If codes are used, please provide a legend for each column where a code is used.
H. List of work activities (RWPs) greater than 1 rem, since date of last inspection, including the original dose estimates and actual doses accrued. (Excel format preferred). Please provide all revisions/changes, as well as any related RWPs that support the work activity.
I. List of active work activities (RWPs) that will be in use while we are onsite, including the dose and dose rate settings, and if available, the planned dose. Include planning documents and surveys. Include radiological risk assessments and proposed control measures.
J. Site dose totals for the past 3 years (based on dose of record). Also provide the current year-to-date (YTD) collective radiation exposure (CRE). In addition, please provide another document that separates the online and outage doses for the past 3 years.
K. Most recent assessment of your isotopic mix, including the hard-to-detect radionuclides and alpha hazards. Include a list of new and historical exposure issues (radiological source term or high exposure areas/activities).
L. If available, provide a copy of the lessons learned from the most recently completed outage for each unit. Include a summary list of any associated corrective action documents and the current status of any corrective actions assigned.
M. Please provide the methods/reports that are in your process to meet the requirements of 10 CFR 20.1101(c) for periodic review of your RP program.
N. Current exposure trends (BRAC dose rates and/or source term information).
- 3. 71151 Performance Indicators: Occupational and Public Radiation Safety Cornerstone A. For the Occupational Radiation Safety Cornerstone, items have been requested under the 7221.01 request.
B. For the Public Radiation Safety Cornerstone, please provide the following data since November 1, 2020:
- 1. Chemistry or other department quarterly effluent release comparison to ODCM and regulatory limits review; i.e. data as included in your Annual Effluent Report Table 9.1, Liquid and Gaseous Batch Release Summary; Tables 9.3, Gaseous Effluents - Summation of All Releases; Table 9.4, Gaseous Effluents - Ground Level Releases; Table 9.5, Liquid Effluents - Summation of All Releases; Table 9.6, Liquid Effluents; Table 9.7, Dose Due to Liquid Releases; and Table 9.8, Air Dose Due To Gaseous Releases.
- 2. A summary list of corrective action documents related to (a) potentially unmonitored release pathways, as well as plant incidents involving leaking radioactive liquids or gases that are not bounded by plant collection systems and could be potential unmonitored release paths and (b) Radiological effluent release occurrences per reactor unit that exceed the ODCM and Part 50 Appendix I values.