SUBJECT:

COMANCHE PEAK NUCLEAR POWER PLANT, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000445/2012201, 0500446/2012201

Dear Mr. Flores:

On March 15, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at the Comanche Peak Nuclear Power Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on March 15, 2012, with Ken Peters, Site Vice President and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

The report documents one licensee identified finding of very low safety significance (i.e., Green as determined by the Physical Protection Significance Determination Process). This finding was determined to involve a violation of NRC requirements. The deficiency was promptly corrected or compensated for and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspectors left the site.

If you contest any non-cited violation, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U. S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Director, Office of Nuclear Security and Incident Response (NSIR); the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; the Branch Chief, Security Training and Support Branch, NSIR; and the NRC Resident Inspectors at Comanche Peak Nuclear Power Plant, Units 1 and 2. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Garmon West, Chief Security Training and Support Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos. 50-445; 50-446 License Nos. NPF-87; NPF-89 Enclosure: Inspection Report 05000445/2012201, 05000446/2012201 w/Attachments: