|
|
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:May 1, 2013 Matthew W. Sunseri, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 May 1, 2013 Matthew W. Sunseri, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 23: |
Line 23: |
|
| |
|
| ==Dear Mr. Sunseri:== | | ==Dear Mr. Sunseri:== |
| On April 18, 201 3 , members of the NRC staff met with representatives of Wolf Creek Nuclear Operating Corporation in New Strawn, KS to discuss the results of the yearly performance assessment of Wolf Creek Generating Station. A copy of the NRC's presentation is included as Enclosure 1. | | |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading | | On April 18, 2013, members of the NRC staff met with representatives of Wolf Creek Nuclear Operating Corporation in New Strawn, KS to discuss the results of the yearly performance assessment of Wolf Creek Generating Station. A copy of the NRCs presentation is included as . |
| -rm/adams.html (The Public Electronic Reading Room). | | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). |
| Sincerely, /RA/ Neil O'Keefe , Chief Project Branch B Division of Reactor Projects Docket No.: 50-482 License No.: NPF-42 | | Sincerely, |
| | /RA/ |
| | Neil OKeefe, Chief Project Branch B Division of Reactor Projects Docket No.: 50-482 License No.: NPF-42 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1. Presentation Slides U N I T E D S T A T E S N U C L E A R R E G U L A T O R Y C O M M I S S I O N R E G I O N I V1600 EAST LAMAR BLVD A R L I N G T O N , T E X A S 7 6 0 1 1-4511 M Sunseri Electronic distribution by RIV | | : 1. Presentation Slides |
| : Regional Administrator (Art.Howell@nrc.gov)
| | |
| | M Sunseri Electronic distribution by RIV: |
| | Regional Administrator (Art.Howell@nrc.gov) |
| Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov) | | Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov) |
| DRP Director (Kriss.Kennedy@nrc.gov | | DRP Director (Kriss.Kennedy@nrc.gov) |
| ) Acting DRP Deputy Director (Michael.Scott@nrc.gov)
| | Acting DRP Deputy Director (Michael.Scott@nrc.gov) |
| DRS Director (Tom.Blount@nrc.gov) | | DRS Director (Tom.Blount@nrc.gov) |
| Acting DRS Deputy Director (Jeff.Clark@nrc.gov) | | Acting DRS Deputy Director (Jeff.Clark@nrc.gov) |
| Senior Resident Inspector (Charles.Peabody@nrc.gov) | | Senior Resident Inspector (Charles.Peabody@nrc.gov) |
| Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) Senior Project Engineer, DRP/B (Mike.Bloodgood@nrc.gov) Project Engineer, DRP/B (David | | Branch Chief, DRP/B (Neil.OKeefe@nrc.gov) |
| .You@nrc.gov) Public Affairs Officer (Victor.Dricks@nrc.gov | | Senior Project Engineer, DRP/B (Mike.Bloodgood@nrc.gov) |
| ) Public Affairs Officer (Lara.Uselding@nrc.gov
| | Project Engineer, DRP/B (David.You@nrc.gov) |
| ) Project Manager (Fred.Lyon@nrc.gov) Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
| | Public Affairs Officer (Victor.Dricks@nrc.gov) |
| RITS Coordinator (Marisa.Herrera@nrc.gov | | Public Affairs Officer (Lara.Uselding@nrc.gov) |
| ) ACES (R4Enforcement.Resource@nrc.gov)
| | Project Manager (Fred.Lyon@nrc.gov) |
| Regional Counsel (Karla.Fuller@nrc.gov | | Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov) |
| ) Technical Support Assistant (Loretta.Williams@nrc.gov)
| | RITS Coordinator (Marisa.Herrera@nrc.gov) |
| | ACES (R4Enforcement.Resource@nrc.gov) |
| | Regional Counsel (Karla.Fuller@nrc.gov) |
| | Technical Support Assistant (Loretta.Williams@nrc.gov) |
| Congressional Affairs Officer (Jenny.Weil@nrc.gov) | | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| RIV/ETA: OEDO (Doug.Huyck@nrc.gov) | | RIV/ETA: OEDO (Doug.Huyck@nrc.gov) |
| File Located: | | File Located: R:\_REACTORS\_WC\2013 ADAMS: |
| R:\_REACTORS\_WC\2013 ADAMS: SUNSI Rev Compl. | | SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials MRB Publicly Avail Yes No Sensitive Yes No Sens. Type Initials MRB RIV/SPE:DRP/B C:DRP/B MRBloodgood CFOKeefe |
| Yes No ADAMS Yes No Reviewer Initials MRB Publicly Avail Yes No Sensitive Yes No Sens. Type Initials MRB RIV/SPE:DRP/B C:DRP/B MRBloodgood C FO'Keefe /RA/ /RA/ 5/1/13 5/1/13 OFFICIAL RECORD COPY T=Telephone E=E | | /RA/ /RA/ |
| -mail F=Fax | | 5/1/13 5/1/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax |
| | |
| | Wo lf Cre e k Ge n e ra tin g S ta tio n 2012 An n u a l As s e s s m e n t Me e tin g Nu c le a r Re g u la to ry Co m m is s io n - Re g io n IV Bu rlin g to n , KS Ap ril 18, 2013 1 |
| | Ag e n d a |
| | * In tro d u c tio n s |
| | * Ove rvie w o f In s p e c tio n P ro c e s s |
| | * Dis c u s s io n o f P la n t P e rfo rm a n c e Re s u lts |
| | * WCNOC Co m m e n ts |
| | * Clo s in g Re m a rks |
| | * P u b lic Co m m e n ts a n d Qu e s tio n s 2 |
| | NRC S ta ff |
| | * Kris s Ke n n e d y, Dire c to r, Divis io n o f Re a c to r P ro je c ts , NRC Re g io n IV |
| | * Ch a rle s P e a b o d y, S e n io r Re s id e n t In s p e c to r a t Wo lf Cre e k 3 |
| | Enclosure |
|
| |
|
| Enclosure 1Wolf Creek Generating Station2012 Annual Assessment MeetingNuclear Regulatory Commission
| | NRC P e rfo rm a n c e Go a ls |
| -Region IVBurlington, KSApril 18, 2013 2AgendaIntroductionsOverview of Inspection ProcessDiscussion of Plant Performance ResultsWCNOC CommentsClosing RemarksPublic Comments and Questions NRC StaffKriss Kennedy, Director, Division of Reactor Projects, NRC Region IVCharles Peabody, Senior Resident Inspector at Wolf Creek 3
| | * S a fe ty: En s u re a d e q u a te p ro te c tio n o f p u b lic h e a lth a n d s a fe ty a n d th e e n viro n m e n t. |
| Enclosure 4NRC Performance GoalsSafety: Ensure adequate protection of public health and safety and the environment.Security: Ensure adequate protection in the secure use and management of radioactive materials.
| | * S e c u rity: En s u re a d e q u a te p ro te c tio n in th e s e c u re u s e a n d m a n a g e m e n t o f ra d io a c tive m a te ria ls . |
| 5Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas 6Significance ThresholdPerformance IndicatorsGreen:Only Baseline InspectionWhite:Increases NRC oversightYellow:Increases NRC oversightRed:Increases NRC oversightInspection FindingsGreen:Very low safety issueWhite:Low to moderate safety issueYellow:Substantial safety issueRed:High safety issue
| | 4 Re a c to r Ove rs ig h t P ro c e s s Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 5 |
| | S ig n ific a n c e Th re s h o ld P e rfo rm a n c e In d ic a to rs Gre e n : On ly Ba s e lin e In s p e c tio n Wh ite : In c re a s e s NRC o ve rs ig h t Ye llo w: In c re a s e s NRC o ve rs ig h t Re d : In c re a s e s NRC o ve rs ig h t In s p e c tio n Fin d in g s Gre e n : Ve ry lo w s a fe ty is s u e Wh ite : Lo w to m o d e ra te s a fe ty is s u e Ye llo w: S u b s ta n tia l s a fe ty is s u e Re d : Hig h s a fe ty is s u e 6 |
| | Enclosure |
|
| |
|
| Enclosure 7Action Matrix ConceptIncreasing Safety SignificanceIncreasing NRC Inspection EffortsIncreasing NRC/Licensee Management InvolvementIncreasing Regulatory ActionsLicenseeResponseRegulatoryResponseDegradedCornerstoneMultiple/Rep.DegradedCornerstoneUnacceptablePerformance 8Wolf Creek Generating Station Inspection ActivitiesJanuary 1 -December 31, 2012Baseline Inspection
| | Ac tio n Ma trix Co n c e p t Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone In c re a s in g S a fe ty S ig n ific a n c e In c re a s in g NRC In s p e c tio n Effo rts In c re a s in g NRC/Lic e n s e e Ma n a g e m e n t In vo lve m e n t In c re a s in g Re g u la to ry Ac tio n s 7 |
| -~ 7500 hours | | Wo lf Cre e k Ge n e ra tin g S ta tio n In s p e c tio n Ac tivitie s J a n u a ry 1 - De c e m b e r 31, 2012 |
| -Resident inspectors on site daily | | * Ba s e lin e In s p e c tio n - ~ 7500 h o u rs |
| -Regional inspectors from Arlington, TX | | - Re s id e n t in s p e c to rs o n s ite d a ily |
| -Maintenance | | - Re g io n a l in s p e c to rs fro m Arlin g to n , TX |
| -Operations | | - Ma in te n a n c e |
| -Engineering | | - Op e ra tio n s |
| -Radiation Protection | | - En g in e e rin g |
| -Security-Emergency Preparedness 9Wolf Creek Generating Station Inspection ActivitiesJanuary 1 | | - Ra d ia tio n P ro te c tio n |
| -December 31, 2012Baseline InspectionsAugmented InspectionFollow-up Augmented InspectionProblem Identification and Resolution Team Inspection | | - S e c u rity |
| | - Em e rg e n c y P re p a re d n e s s 8 |
| | Wo lf Cre e k Ge n e ra tin g S ta tio n In s p e c tio n Ac tivitie s J a n u a ry 1 - De c e m b e r 31, 2012 |
| | * Ba s e lin e In s p e c tio n s |
| | * Au g m e n te d In s p e c tio n |
| | * Fo llo w-u p Au g m e n te d In s p e c tio n |
| | * P ro b le m Id e n tific a tio n a n d Re s o lu tio n Te a m In s p e c tio n 9 |
| | Enclosure |
|
| |
|
| Enclosure 10Wolf Creek Generating StationAnnual Assessment SummaryJanuary 1
| | Wo lf Cre e k Ge n e ra tin g S ta tio n An n u a l As s e s s m e n t S u m m a ry J a n u a ry 1 - De c e m b e r 31, 2012 |
| -December 31, 2012Overall conclusion: Wolf Creek Nuclear Operating Corporation operated Wolf Creek Generating Station in a manner that preserved public health and safety 11Wolf Creek Generating Station Assessment ResultsJanuary 1 | | * Ove ra ll c o n c lu s io n : Wo lf Cre e k Nu c le a r Op e ra tin g Co rp o ra tio n o p e ra te d Wo lf Cre e k Ge n e ra tin g S ta tio n in a m a n n e r th a t p re s e rve d p u b lic h e a lth a n d s a fe ty 10 Wo lf Cre e k Ge n e ra tin g S ta tio n As s e s s m e n t Re s u lts J a n u a ry 1 - De c e m b e r 31, 2012 |
| -December 31, 2012Wolf Creek Generating Station entered the Degraded Cornerstone Action Matrix (Column 3) | | * Wo lf Cre e k Ge n e ra tin g S ta tio n e n te re d th e De g ra d e d Co rn e rs to n e Ac tio n Ma trix (Co lu m n 3) |
| -Yellow finding for maintenance that affected safety-related equipment not implemented in accordance with procedures | | - Ye llo w fin d in g fo r m a in te n a n c e th a t a ffe c te d s a fe ty-re la te d e q u ip m e n t n o t im p le m e n te d in a c c o rd a n c e with p ro c e d u re s |
| -White performance indicator due to emergency diesel generator failures 12Wolf Creek Generating StationAnnual Assessment SummaryJanuary 1 | | - Wh ite pe rfo rm a n c e in d ic a to r d u e to e m e rg e n c y d ie s e l g e n e ra to r fa ilu re s 11 Wo lf Cre e k Ge n e ra tin g S ta tio n An n u a l As s e s s m e n t S u m m a ry J a n u a ry 1 - De c e m b e r 31, 2012 |
| -December 31, 2012Current Status: | | * Cu rre n t S ta tu s : |
| -The Yellow finding was promptly corrected before the plant restarted | | - Th e Ye llo w fin d in g wa s p ro m p tly c o rre c te d b e fo re th e p la n t re s ta rte d |
| -Extensive corrective actions to improve diesel reliability in the recent outage | | - Exte n s ive c o rre c tive a c tio n s to im p ro ve d ie s e l re lia b ility in th e re c e n t o u ta g e 12 Enclosure |
|
| |
|
| Enclosure 13Future InspectionsA Supplemental NRC Inspection completed in March for actions to address the White Performance Indicator NRC plans a larger Supplemental Team Inspection to review the actions to address the Yellow findingFollow-up inspection of progress on substantive cross
| | Wo lf Cre e k Ge n e ra tin g S ta tio n An n u a l As s e s s m e n t S u m m a ry Fu tu re In s p e c tio n s |
| -cutting issues will be performed concurrent with the Supplemental Team InspectionWolf Creek Generating Station Annual Assessment Summary 14January 1 | | * A S u p p le m e n ta l NRC In s p e c tio n c o m p le te d in Ma rc h fo r a c tio n s to a d d re s s th e Wh ite P e rfo rm a n c e In d ic a to r |
| -December 31, 2012Current substantive cross-cutting issues-Thoroughness of problem evaluation | | * NRC p la n s a la rg e r S u p p le m e n ta l Te a m In s p e c tio n to re vie w th e a c tio n s to a d d re s s th e Ye llo w fin d in g |
| -Appropriateness and timeliness of corrective actions | | * Fo llo w-u p in s p e c tio n o f p ro g re s s o n s u b s ta n tive c ro s s -c u ttin g is s u e s will b e p e rfo rm e d c o n c u rre n t with th e S u p p le m e n ta l Te a m In s p e c tio n 13 Wo lf Cre e k Ge n e ra tin g S ta tio n An n u a l As s e s s m e n t S u m m a ry J a n u a ry 1 - De c e m b e r 31, 2012 |
| -Conservative decision | | * Cu rre n t s u b s ta n tive c ro s s -c u ttin g is s u e s |
| -making-Completeness and accuracy of design information, procedures and work instructionsWolf Creek Generating Station Annual Assessment Summary 15Licensee Response and RemarksMatthew SunseriPresident and Chief Executive OfficerWolf Creek Nuclear Operating Corporation | | - Th o ro u g h n e s s o f p ro b le m e va lu a tio n |
| | - Ap p ro p ria te n e s s a n d tim e lin e s s o f c o rre c tive a c tio n s |
| | - Co n s e rva tive d e c is io n -m a kin g |
| | - Co m p le te n e s s a n d a c c u ra c y o f d e s ig n in fo rm a tio n , |
| | p ro c e d u re s a n d wo rk in s tru c tio n s 14 Lic e n s e e Re s p o n s e a n d Re m a rks Ma tth e w S u n s e ri P re s id e n t a n d Ch ie f Exe c u tive Offic e r Wo lf Cre e k Nu c le a r Op e ra tin g Co rp o ra tio n 15 Enclosure |
|
| |
|
| Enclosure 16NRC Closing RemarksKriss KennedyDirector Division of Reactor ProjectsNRC Region IV 17Open to the PublicThe NRC places a high priority on keeping the public and stakeholders informed of its activities. At www.nrc.gov, you can:
| | NRC Clo s in g Re m a rks Kris s Ke n n e d y Dire c to r Divis io n o f Re a c to r P ro je c ts NRC Re g io n IV 16 Op e n to th e P u b lic |
| -Find public meeting dates and transcripts; | | * Th e NRC p la c e s a h ig h p rio rity o n ke e p in g th e p u b lic a n d s ta ke h o ld e rs in fo rm e d o f its a c tivitie s . |
| -Read NRC testimony, speeches, press releases, and policy decisions; and | | * At www.n rc .g o v, yo u c a n : |
| -Access the agency's Electronic Reading Room to find NRC publications and documents. | | - Fin d p u b lic m e e tin g d a te s a n d tra n s c rip ts ; |
| 18Contacting the NRCReport an emergency
| | - Re a d NRC te s tim o n y, s p e e c h e s , p re s s re le a s e s , |
| -(301) 816-5100 (call collect)Report a safety concern | | a n d p o lic y d e c is io n s ; a n d |
| -(800) 695-7403 -Allegation@nrc.govGeneral information or questions | | - Ac c e s s th e a g e n c ys Ele c tro n ic Re a d in g Ro o m to fin d NRC p u b lic a tio n s a n d d o c u m e n ts . |
| -www.nrc.gov | | 17 Co n ta c tin g th e NRC |
| -Select "What We Do" for Public Affairs | | * Re p o rt a n e m e rg e n c y |
| | - (301) 816-5100 (c a ll c o lle c t) |
| | * Re p o rt a s a fe ty c o n c e rn |
| | - (800) 695-7403 |
| | - Alle g a tio n @n rc .g o v |
| | * Ge n e ra l in fo rm a tio n o r q u e s tio n s |
| | - www.n rc .g o v |
| | - S e le c t Wh a t We Do fo r P u b lic Affa irs 18 Enclosure |
|
| |
|
| Enclosure Actions in Response to the Japan Nuclear AccidentActions in response to Japan Nuclear Accident Website: http://www.nrc.gov/japan/japan
| | Ac tio n s in Re s p o n s e to th e J a p a n Nu c le a r Ac c id e n t |
| -info.htmlMailbox for comments on staff actions: JLD_Public.Resource@nrc.govOffice of Public Affairs Point of Contact: OPA.resource@nrc.govor 301-415-8200 19 NRC Social Media ChannelsBlog:http://public | | * Ac tio n s in re s p o n s e to J a p a n Nu c le a r Ac c id e n t We b s ite : h ttp ://www.n rc .g o v/ja p a n /ja p a n -in fo .h tm l |
| -blog.nrc-gateway.gov/Flickr:http://www.flickr.com/photos/nrcgov/Twitter:https://twitter.com/#!/nrcgovYouTube: http://www.youtube.com/user/NRCgovRSS:http://www.nrc.gov/public | | * Ma ilb o x fo r c o m m e n ts o n s ta ff a c tio n s : |
| -involve/listserver.html#rss 20 21Reference SourcesReactor Oversight Process
| | J LD_P u b lic .Re s o u rc e @n rc .g o v |
| -http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.htmlPublic Electronic Reading Room | | * Offic e o f P u b lic Affa irs P o in t o f Co n ta c t: |
| -http://www.nrc.gov/reading | | OP A.re s o u rc e @n rc .g o v o r 301-415-8200 19 NRC S o c ia l Me d ia Ch a n n e ls |
| -rm.htmlPublic Document Room 800-397-4209 (Toll Free) | | * Blo g : h ttp ://p u b lic -b lo g .n rc -g a te wa y.g o v/ |
| | * Flic kr: h ttp ://www.flic kr.c o m /p h o to s /n rc g o v/ |
| | * Twitte r: h ttp s ://twitte r.c o m /#!/n rc g o v |
| | * Yo u Tu b e : h ttp ://www.yo u tu b e .c o m /u s e r/NRCg o v |
| | * RS S : h ttp ://www.n rc .g o v/p u b lic - |
| | in vo lve /lis ts e rve r.h tm l#rs s 20 Re fe re n c e S o u rc e s |
| | * Re a c to r Ove rs ig h t P ro c e s s |
| | - h ttp ://www.n rc .g o v/NRR/OVERS IGHT/AS S ES S /in d e x.h tm l |
| | * P u b lic Ele c tro n ic Re a d in g Ro o m |
| | - h ttp ://www.n rc .g o v/re a d in g -rm .h tm l |
| | * P u b lic Do c u m e n t Ro o m 800-397-4209 (To ll Fre e ) |
| | 21 Enclosure |
|
| |
|
| Enclosure Questions or Comments?
| | Qu e s tio n s o r Co m m e n ts ? |
| 22}} | | 22 Enclosure}} |
|
---|
Category:Letter
MONTHYEARML24025A0992024-01-25025 January 2024 Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML24018A0792024-01-22022 January 2024 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed Nshcd and Opportunity for a Hearing (EPID L-2024-LLA-0007) (Letter) ML24018A1382024-01-18018 January 2024 Inservice Inspection Request for Information ML24018A2482024-01-18018 January 2024 License Amendment Request to Modify the Implementation Date of License Amendment No. 238 IR 05000482/20230042024-01-11011 January 2024 Integrated Inspection Report 05000482/2023004 ML23356A0722024-01-0404 January 2024 Supplemental Information Needed for Acceptance of Requested Licensing Actions Exemption from Specific 10 CFR Part 73N Requirements (EPID L-2023-LLE-0048) (Redacted Version) WO 23-0002, Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-0082023-12-26026 December 2023 Operating Corp., Summary of Actions Implemented for EA-18-165, Confirmatory Order, NRC Inspection Report 05000482/2019010 and NRC Investigation Report 4-2018-008 ML23348A3662023-12-18018 December 2023 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000482 2024012) and Request for Information ML23334A2502023-11-30030 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23299A2662023-11-29029 November 2023 Issuance of Amendment No. 238 Modified Implementation Date of License Amendment No. 237 ML23331A4972023-11-27027 November 2023 Supplement to License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23325A2112023-11-20020 November 2023 Submittal of Request for Exemption from Specific Provisions in 10 CFR 73.55 ML23320A2772023-11-16016 November 2023 License Amendment Request to Revise Ventilation Filter Testing Program Criteria in Technical Specification 5.5.11.b and Administrative Correction of Absorber in Technical Specification 5.5.11 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV ML23305A3472023-11-0101 November 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) ML23292A3592023-10-19019 October 2023 License Amendment Request to Modify the 90-Day Implementation of License Amendment No. 237 ML23292A3572023-10-19019 October 2023 Operating Corporation, Request for Correction in Response to Issuance of Amendment No. 237 and Corresponding Safety Evaluation ML23277A2772023-10-11011 October 2023 Regulatory Audit Summary Concerning Review of Request Number CI3R-01 for Proposed Alternative Inspection Frequency for Containment Unbonded Post Tensioning System Components ML23284A2392023-10-11011 October 2023 NRC Initial Operator Licensing Examination Approval 05000482/2023301 ML23276B4552023-10-0303 October 2023 Technical Specification 5.6.8 Post Accident Monitoring (PAM) Report ML23264A8682023-09-21021 September 2023 Independent Spent Fuel Storage Installation Registration of Dry Storage Canister WC-EOS-37PTH-008-B4L, WC-EOS-37PTH-007-B4L, and WC-EOS-37PTH-002-B4L ML23256A2062023-09-14014 September 2023 Withdrawal of Requested Licensing Action Exemption from Specific 10 CFR Part 73 Requirements ML23165A2502023-08-31031 August 2023 Issuance of Amendment No. 237 Request for Deviation from Fire Protection Requirements ML23243A0002023-08-31031 August 2023 Wolf Generating Station - Withdrawal of Request for Exemption from Specific 10 CFR Part 73 Requirements IR 05000482/20230052023-08-23023 August 2023 Updated Inspection Plan for Wolf Creek Nuclear Operating Corporation, Unit 1 (Report 05000482/2023005) - Mid-Cycle Letter 2023 ML23232A0012023-08-19019 August 2023 Revision of One Procedure That Implements the Radiological Emergency Response Plan (Rerp). Includes EPP 06-009, Rev. 13 ML23221A3932023-08-0909 August 2023 Submittal of Request for Exemption from Specific 10 CFR Part 73 Requirements ML23220A4222023-08-0808 August 2023 Supplement to License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements ML23201A1212023-08-0707 August 2023 Issuance of Amendment No. 236 Revision to Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements ML23130A2902023-07-26026 July 2023 Issuance of Amendment No. 235 Revision to Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections IR 05000482/20230022023-07-11011 July 2023 Integrated Inspection Report 05000482/2023002 ML23167A0042023-06-26026 June 2023 Audit Plan to Support Review of Request for Alternative Containment Inservice Inspection Frequency IR 05000482/20234012023-06-21021 June 2023 Security Baseline Inspection Report 05000482/2023401 ML23171B1312023-06-20020 June 2023 Additional Supplement to License Amendment Request to Adopt TSTF-577-A, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML23151A4162023-05-31031 May 2023 Revision of One Form That Implements the Radiological Emergency Response Plan (RERP) for Wolf Creek Generating Station (WCGS) ET 23-0006, CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components2023-05-17017 May 2023 CFR 50.55a Request Number CI3R-01 for the Third Containment Inservice Inspection Program Interval for Proposed Alternative Frequency to Containment Unbonded Post-Tensioning System Components WO 23-0014, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23132A1532023-05-12012 May 2023 Transmittal of 2022 Annual Financial Reports WM 23-0009, Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)2023-05-10010 May 2023 Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) ML23135A1172023-05-0808 May 2023 Redacted Version of Revision 36 to Updated Safety Analysis Report ML23117A2112023-04-27027 April 2023 Annual Exposure Report (2022) ML23117A1342023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report Report 46 2024-01-04
[Table view] Category:Meeting Summary
MONTHYEARML23303A2182023-11-0606 November 2023 Summary of October 16, 2023, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a License Amendment Request to Adopt TSTF-505 for Wolf Creek Generating Station, Unit 1 ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22011A0862022-01-11011 January 2022 Summary of January 10, 2022, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a License Amendment Request to Use Portable Lighting for Wolf Creek Generating Station, Unit 1 ML21333A1312021-12-0707 December 2021 Summary of Meeting with Wolf Creek Nuclear Operating Corporation Diesel Generator Completion Time License Amendment Request for Wolf Creek Generating Station ML21200A1102021-07-21021 July 2021 Summary of July 13, 2021, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation Regarding a Temporary Emergency Preparedness Exercise Exemption Request ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21127A1322021-05-11011 May 2021 Summary of April 16, 2021, Conference Call with Representatives of Wolf Creek Generating Station Regarding the Spring 2021 Steam Generator Tube Inspections ML20332A0422020-12-0101 December 2020 Summary of November 19, 2020, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation an Emergency Response Organization Staffing License Amendment Request ML20332A0462020-11-30030 November 2020 Summary of November 18, 2020, Pre-Submittal Teleconference with Wolf Creek Nuclear Operating Corporation a Risk-Informed Generic Safety Issue (GSI)-191 License Amendment Request ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML19143A4182019-05-21021 May 2019 Summary of Public Meeting with Wolf Creek Nuclear Operation Corporation ML19140A4742019-05-20020 May 2019 Closed Meeting with Wolf Creek Nuclear Operating Corporation to Conduct a Mediation Session Regarding Falsification of Documentation Associated with Licensee Maintenance Activities ML18313A2542018-11-16016 November 2018 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation Regarding License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses for Wolf Creek Generating Station ML17276B4892017-10-23023 October 2017 9/25/17 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation Regarding the Proposed LAR for Change in Emergency Plan Staff Augmentation Response Times for Wolf Creek Generating Station (CAC No. MG0174; EPID L-2017-LRM-001 ML16271A4822016-09-27027 September 2016 Summary of Regulatory Conference to Discuss Safety Significance of Wolf Creek Generating Station Emergency Generator Excitation Diode Apparent Violation ML16250A1652016-09-0909 September 2016 8/25/16 Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Amendment Request to Transition to Westinghouse Analyses Methodologies and Alternate Source Term at Wolf Creek Generating Station ML16243A5132016-09-0101 September 2016 Summary of August 25, 2016, Public Meeting with Wolf Creek Nuclear Operating Corporation and Amerenue Regarding a Proposed Application for a New Technical Specification for the Class 1E Electrical Equipment Air Conditioning System (MF8118 a ML16106A1742016-04-22022 April 2016 Summary of Meeting with Wolf Creek Nuclear Operating Company to Discuss the Generic Safety Issue (GSI)-191 Testing Plan/Fiber Penetration and Head Loss Testing Approach for Wolf Creek Generating Station ML15182A0952015-06-30030 June 2015 Summary of Annual Assessment Meeting with Wolf Creek Nuclear Operating Corporation (WCNOC) Regarding Wolf Creek Generating Station 2014 Performance ML14188C4812014-07-0707 July 2014 Summary of Annual Assessment Meeting with Wolf Creek Generating Station ML14134A1842014-05-14014 May 2014 Summary of Public Meeting to Discuss an Apparent Violation Identified at Wolf Creek Generating Station ML14038A3852014-02-0606 February 2014 1/22/2014 - Summary of Public Meeting to Discuss Corrective Actions Implemented to Address the Chilling Effect Letter ML13221A2132013-08-12012 August 2013 8/7/2013 - Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13221A2152013-08-12012 August 2013 7/30/2013 - Summary of Preapplication Meeting with Wolf Creek Nuclear Operating Company to Discuss Proposed Transition to Westinghouse Methodologies for Core Design and Non-LOCA Safety Analyses at Wolf Creek Generating Station ML13121A4892013-05-0101 May 2013 End of Cycle Meeting Summary 4-18-13 ML13077A0732013-04-0101 April 2013 Summary of 2/28/13 and 3/11/13 Conference Calls with Licensee and Its Contractors Ongoing Steam Generator Tube Inspection Activities During Refueling Outage 19 ML12355A6922012-12-20020 December 2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corp Re Improved Station Performance ML12276A2652012-11-0101 November 2012 Meeting Summary with Wolf Creek Nuclear Operating Corporation to Discuss Transition from Current to NRC-Approved Westinghouse Methodologies for Performing the Core Design and Non-LOCA Safety Analysis at Wolf Creek ML12191A1742012-07-0909 July 2012 6/25/2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML12191A1462012-07-0606 July 2012 6/26/2012 - Summary of Public Meeting to Discuss Performance of Wolf Creek Nuclear Operating Corporation ML13246A3802012-05-0808 May 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Tuesday, May 8, 2012 ML1207601012012-03-16016 March 2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML13246A3782012-02-16016 February 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Thursday, February 16, 2012 ML13246A3772012-01-31031 January 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Tuesday, January 31, 2012 ML13246A3762012-01-23023 January 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Monday, January 23, 2012 ML12011A1012012-01-19019 January 2012 Summary of Meeting with NEI and to Address Di&C Issues ML13246A3742012-01-17017 January 2012 Email from M. King, NRR on Ioeb Clearinghouse Screening Summary for Tuesday, January 17, 2012 ML1110104292011-04-11011 April 2011 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Wolf Creek Generating Station Performance for the NRC Inspection Period Ending December 31, 2010 ML1024506282010-09-0202 September 2010 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML1013404892010-05-14014 May 2010 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Wolf Creek Generating Station Performance for the NRC Inspection Period from January 1 Through December 31, 2009 ML0933805662009-12-17017 December 2009 Summary of Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss NRC Requests for Additional Information on Generic Letter 2004-02 Sent 7/31/2009 and 8/27/2009, Respectively ML0933702032009-12-0303 December 2009 Summary of Public Meeting for Wolf Creek Generating Station ML0924607142009-09-28028 September 2009 Summary of Meeting with Union Electric Co., and Wolf Creek, to Discuss Draft Requests for Additional Information on GL 2004-02 for Callaway, Unit 1, and Wolf Creek ML0911205282009-04-21021 April 2009 Summary of Annual Performance Assessment Meeting for Wolf Creek Generating Station ML0902102062009-01-23023 January 2009 Summary of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Changes to Post Fire Shutdown Unresolved Items Analysis Methods Pre-Application for Wolf Creek Generating Station ML0829607972008-10-22022 October 2008 Summary of Meeting with Wolf Creek, Discussing Several Initiatives Being Implemented to Improve Plant Performance ML0817706682008-06-25025 June 2008 Summary of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Several Initiatives That Were Being Implemented to Improve Plant Performance at Wolf Creek ML0813606472008-06-10010 June 2008 05/01/2008-Summary of Public Meeting on Safety Evaluation Report with Open Items Regarding the Wolf Creek Generating Station License Renewal Review ML0812803052008-05-0808 May 2008 Summary of Conference Call with Wolf Creek Nuclear Operating Corporation Spring 2008 Steam Generator Tube Inspections During Refueling Outage 16 at Wolf Creek Generating Station ML0807904692008-04-10010 April 2008 Summary of Teleconference with Wolf Creek Nuclear Operating Corporation, Ameren Union Electric Company for Callaway Plant, and Performance Contracting, Inc. Containment Sump Head Loss Testing 2023-11-06
[Table view] Category:Slides and Viewgraphs
MONTHYEARML23275A1712023-10-16016 October 2023 October 16, 2023, Licensee Pre-submittal Meeting Slides - License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505-A, Revision 2 for Wolf Creek Generating Station ML21333A1512021-11-29029 November 2021 Pre-Submittal Meeting Slides License Amendment Request Addressing Portable Lighting for Operator Manual Actions ML20310A2232020-11-19019 November 2020 Slides for ERO Staffing pre-submittal Public Teleconference November 19, 2020 (L-2020-LRM-0104) IR 05000482/20174072017-12-22022 December 2017 Summary of Closed Regulatory Conference to Discuss Wolf Creek, Unit 1, Security Inspection Report 05000482/2017407 ML16236A0952016-08-25025 August 2016 and Wolf Creek Generating Station - August 25, 2016, Class 1E Electrical Equipment Air Conditioning System Pre-Application Meeting ML16236A0972016-08-25025 August 2016 Operating Corporation - August 25, 2016, Core Design and Safety System Analysis Methodology Transition License Amendment Request Revised ML16095A0782016-04-12012 April 2016 Slides for the WCGS Meeting Discussion 4/12/16 ML14188C4812014-07-0707 July 2014 Summary of Annual Assessment Meeting with Wolf Creek Generating Station ML14134A1842014-05-14014 May 2014 Summary of Public Meeting to Discuss an Apparent Violation Identified at Wolf Creek Generating Station ML14038A3852014-02-0606 February 2014 1/22/2014 - Summary of Public Meeting to Discuss Corrective Actions Implemented to Address the Chilling Effect Letter ML13218A0212013-08-0707 August 2013 Licensee Slides, 08/07/13 Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13219A1932013-08-0707 August 2013 Licensee Slides (Final), 08/07/13 Preapplication Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Long-Term Corrective Actions for Water Hammer Events in the Essential Service Water System at Wolf Creek ML13205A2142013-07-30030 July 2013 Operating Corporation - Slides for Pre-application Meeting on 7/30/13 - Core Design and Safety Analysis Methodology Transition License Amendment Request for Wolf Creek Generating Station ML13121A4892013-05-0101 May 2013 End of Cycle Meeting Summary 4-18-13 ML12263A3622012-09-20020 September 2012 Pre-application Meeting Slide Core Design and Safety Analysis Methodology Transition License Amendment Request TAC No. ME9495) ML12191A1742012-07-0909 July 2012 6/25/2012 Summary of Public Meeting with Wolf Creek Nuclear Operating Corporation ML1110104292011-04-11011 April 2011 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Wolf Creek Generating Station Performance for the NRC Inspection Period Ending December 31, 2010 ML1016901162010-06-16016 June 2010 6/16/2010 Construction Reactor Oversight Process Category 2 Public Meeting Handout: Meeting Slides (Enforcement Cases) ML1013404892010-05-14014 May 2010 Summary of Annual Performance Assessment Meeting with Wolf Creek Nuclear Operating Corporation to Discuss the Wolf Creek Generating Station Performance for the NRC Inspection Period from January 1 Through December 31, 2009 ML0933702032009-12-0303 December 2009 Summary of Public Meeting for Wolf Creek Generating Station ML0933801482009-11-20020 November 2009 Licensee Handouts from November 20, 2009, Public Meeting with Union Electric Company and Wolf Creek Nuclear Operating Company to Discuss GL 2004-02 Response Rai'S ML0913300232009-05-13013 May 2009 Meeting Slides, Successful Licensing of the Als Fpga Based Safety Related I&C Platform ML0912600762009-05-0606 May 2009 Lessons Learned Using Digital I&C Interim Staff Guidance Workshop Application of ISG-4 During Wolf Creek and Oconee Reviews ML0912600692009-05-0606 May 2009 Lessons Learned Using Digital I&C Interim Staff Guidance Workshop ML0902102422009-01-15015 January 2009 Licensee Slides, January 15, 2009, Category 1 Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Changes to Post Fire Shutdown Unresolved Items Analysis Methods Pre-Application for Wolf Creek Generating Station ML0834700222008-12-11011 December 2008 Slides, Category 2 Public Meeting Digital Instrumentation and Control Steering Committee M080717, M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection2008-07-17017 July 2008 M080717-Commission Briefing Slides/Exhibits Briefing on Fire Protection ML0817706682008-06-25025 June 2008 Summary of Meeting with Wolf Creek Nuclear Operating Corporation to Discuss Several Initiatives That Were Being Implemented to Improve Plant Performance at Wolf Creek ML0813606472008-06-10010 June 2008 05/01/2008-Summary of Public Meeting on Safety Evaluation Report with Open Items Regarding the Wolf Creek Generating Station License Renewal Review ML0721102382007-07-24024 July 2007 Performanc Contracting, Inc.'S Powerpoint Slide, Proposed Wolf Creek/Callaway Test Configuration ML0720601382007-07-17017 July 2007 Slides from Meeting Between NRC Staff and Wolf Creek Panel Enclosures 2 to 3, Advanced Fea Crack Growth Calculations for Evaluation of PWR Pressurizer Nozzle Dissimilar Metal Weld Circumferential Pwscc. ML0719303772007-07-11011 July 2007 Handouts (NRC and Licensee) for Meeting with Representatives of Wolf Creek Nuclear Operating Corporation ML0718606902007-06-19019 June 2007 06/19-20/2007 Slides,Fabrication Records Review, from Category 2 Public Meeting Between the NRC Staff and the Expert Panel for the Wolf Creek Advanced Finite Element Analyses (Fea) ML0716203882007-06-0101 June 2007 06/01/07 - Presentation Material, Advanced Fea Crack Growth Calculations for Evaluation of PWR Pressurizer Nozzle Dissimilar Metal Weld Circumferential Pwscc. ML0733409182007-05-31031 May 2007 05/31/2007 Presentation by J. Cudsworth NRC Treatment of Issues Other than Category 2 Issues for License Renewal ML0713703642007-05-17017 May 2007 Handout for Meeting with Wolf Creek Nuclear Operating Corporation on the Licensee'S Application for the Main Steam and Feedwater Isolation System (Msfis) Modification ML0713506512007-05-0808 May 2007 Slides, Category 2 Public Meeting with NEI on the Implications of the Wolf Creek Dissimilar Metal Weld Inspections. ML0713506532007-05-0808 May 2007 Slides, Recommendations for Critical Flaw Size Calculations (in Wolf Creek Advanced Fea Project). ML0713603732007-05-0101 May 2007 Enclosure-1 05/01/2007 Dominion Engineering Presentation Advanced Fea Crack Growth Calculations for Evaluation of PWR Pressurizer Nozzle Dissimilar Metal Weld Circumferential Pwscc. ML0713603962007-05-0101 May 2007 Enclosure 2-05/01/2007 Engineering Mechanics Corporation of Columbus Presentation, NRC Welding Residual Stress Solutions as Generated by Battelle and Emc2. ML0701601892006-12-19019 December 2006 12/19/2006, Viewgraphs from Meeting with Wolf Creek Generating Station to Discuss License Renewal Process and Environmental Scoping ML0635603462006-11-30030 November 2006 November 30, 2006 NRC Presentation Slides: Wolf Creek Flaw Evaluation ML0635603582006-11-30030 November 2006 Industry Presentation Slides: MRP-139 Analysis Basis ML0632100802006-11-16016 November 2006 Industry Presentations: Nov. 16, 2006 Public Meeting ML0632100772006-11-16016 November 2006 NRC Presentation: NRC Perspective on Wolf Creek Inspection Results ML0622804372006-08-16016 August 2006 Handouts from Wolf Creek Nuclear Operating Corporation and from Union Electric Company for Meeting with NRC on the Main Steam Isolation Valve (MSIV) Operability Determination ML0618000292006-06-28028 June 2006 Handout for June 28, 2006, Meeting with Representatives of Wolf Creek Nuclear Operating Corporation for Wolf Creek Generating Station on the Main Steam and Feedwater Isolation System (Msfis) Controls Replacement Project ML0615106012006-05-23023 May 2006 EPRI HRA Users Group Review of Draft NUREG-1842 ML0617902332006-03-0808 March 2006 RIC 2006 Presentation - W3D - Maurice E. Dingler - GSI 191 ML0516705662005-06-16016 June 2005 Summary of Annual Performance Assessment Meeting with NRC Re Oversight Process and Safety Performance at Wolf Creek Generating Station 2023-10-16
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I V 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 May 1, 2013 Matthew W. Sunseri, President and Chief Executive Officer Wolf Creek Nuclear Operating Corporation P.O. Box 411 Burlington, KS 66839
SUBJECT:
SUMMARY
OF PUBLIC MEETING TO DISCUSS PERFORMANCE OF WOLF CREEK NUCLEAR OPERATING CORPORATION
Dear Mr. Sunseri:
On April 18, 2013, members of the NRC staff met with representatives of Wolf Creek Nuclear Operating Corporation in New Strawn, KS to discuss the results of the yearly performance assessment of Wolf Creek Generating Station. A copy of the NRCs presentation is included as .
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC web site at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room).
Sincerely,
/RA/
Neil OKeefe, Chief Project Branch B Division of Reactor Projects Docket No.: 50-482 License No.: NPF-42
Enclosures:
- 1. Presentation Slides
M Sunseri Electronic distribution by RIV:
Regional Administrator (Art.Howell@nrc.gov)
Acting Deputy Regional Administrator (Robert.Lewis@nrc.gov)
DRP Director (Kriss.Kennedy@nrc.gov)
Acting DRP Deputy Director (Michael.Scott@nrc.gov)
DRS Director (Tom.Blount@nrc.gov)
Acting DRS Deputy Director (Jeff.Clark@nrc.gov)
Senior Resident Inspector (Charles.Peabody@nrc.gov)
Branch Chief, DRP/B (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/B (Mike.Bloodgood@nrc.gov)
Project Engineer, DRP/B (David.You@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Fred.Lyon@nrc.gov)
Branch Chief, DRS/TSB (Ray.Kellar@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV/ETA: OEDO (Doug.Huyck@nrc.gov)
File Located: R:\_REACTORS\_WC\2013 ADAMS:
SUNSI Rev Compl. Yes No ADAMS Yes No Reviewer Initials MRB Publicly Avail Yes No Sensitive Yes No Sens. Type Initials MRB RIV/SPE:DRP/B C:DRP/B MRBloodgood CFOKeefe
/RA/ /RA/
5/1/13 5/1/13 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax
Wo lf Cre e k Ge n e ra tin g S ta tio n 2012 An n u a l As s e s s m e n t Me e tin g Nu c le a r Re g u la to ry Co m m is s io n - Re g io n IV Bu rlin g to n , KS Ap ril 18, 2013 1
Ag e n d a
- Ove rvie w o f In s p e c tio n P ro c e s s
- Dis c u s s io n o f P la n t P e rfo rm a n c e Re s u lts
- P u b lic Co m m e n ts a n d Qu e s tio n s 2
NRC S ta ff
- Kris s Ke n n e d y, Dire c to r, Divis io n o f Re a c to r P ro je c ts , NRC Re g io n IV
- Ch a rle s P e a b o d y, S e n io r Re s id e n t In s p e c to r a t Wo lf Cre e k 3
Enclosure
NRC P e rfo rm a n c e Go a ls
- S a fe ty: En s u re a d e q u a te p ro te c tio n o f p u b lic h e a lth a n d s a fe ty a n d th e e n viro n m e n t.
- S e c u rity: En s u re a d e q u a te p ro te c tio n in th e s e c u re u s e a n d m a n a g e m e n t o f ra d io a c tive m a te ria ls .
4 Re a c to r Ove rs ig h t P ro c e s s Strategic Performance Areas Safety Cornerstones Performance Indicator Baseline Inspection Results Results Significance Significance Threshold Threshold Action Matrix Regulatory Response 5
S ig n ific a n c e Th re s h o ld P e rfo rm a n c e In d ic a to rs Gre e n : On ly Ba s e lin e In s p e c tio n Wh ite : In c re a s e s NRC o ve rs ig h t Ye llo w: In c re a s e s NRC o ve rs ig h t Re d : In c re a s e s NRC o ve rs ig h t In s p e c tio n Fin d in g s Gre e n : Ve ry lo w s a fe ty is s u e Wh ite : Lo w to m o d e ra te s a fe ty is s u e Ye llo w: S u b s ta n tia l s a fe ty is s u e Re d : Hig h s a fe ty is s u e 6
Enclosure
Ac tio n Ma trix Co n c e p t Licensee Regulatory Degraded Multiple/Rep. Unacceptable Response Response Cornerstone Degraded Performance Cornerstone In c re a s in g S a fe ty S ig n ific a n c e In c re a s in g NRC In s p e c tio n Effo rts In c re a s in g NRC/Lic e n s e e Ma n a g e m e n t In vo lve m e n t In c re a s in g Re g u la to ry Ac tio n s 7
Wo lf Cre e k Ge n e ra tin g S ta tio n In s p e c tio n Ac tivitie s J a n u a ry 1 - De c e m b e r 31, 2012
- Ba s e lin e In s p e c tio n - ~ 7500 h o u rs
- Re s id e n t in s p e c to rs o n s ite d a ily
- Re g io n a l in s p e c to rs fro m Arlin g to n , TX
- Ma in te n a n c e
- Op e ra tio n s
- En g in e e rin g
- Ra d ia tio n P ro te c tio n
- S e c u rity
- Em e rg e n c y P re p a re d n e s s 8
Wo lf Cre e k Ge n e ra tin g S ta tio n In s p e c tio n Ac tivitie s J a n u a ry 1 - De c e m b e r 31, 2012
- Ba s e lin e In s p e c tio n s
- Au g m e n te d In s p e c tio n
- Fo llo w-u p Au g m e n te d In s p e c tio n
- P ro b le m Id e n tific a tio n a n d Re s o lu tio n Te a m In s p e c tio n 9
Enclosure
Wo lf Cre e k Ge n e ra tin g S ta tio n An n u a l As s e s s m e n t S u m m a ry J a n u a ry 1 - De c e m b e r 31, 2012
- Ove ra ll c o n c lu s io n : Wo lf Cre e k Nu c le a r Op e ra tin g Co rp o ra tio n o p e ra te d Wo lf Cre e k Ge n e ra tin g S ta tio n in a m a n n e r th a t p re s e rve d p u b lic h e a lth a n d s a fe ty 10 Wo lf Cre e k Ge n e ra tin g S ta tio n As s e s s m e n t Re s u lts J a n u a ry 1 - De c e m b e r 31, 2012
- Wo lf Cre e k Ge n e ra tin g S ta tio n e n te re d th e De g ra d e d Co rn e rs to n e Ac tio n Ma trix (Co lu m n 3)
- Ye llo w fin d in g fo r m a in te n a n c e th a t a ffe c te d s a fe ty-re la te d e q u ip m e n t n o t im p le m e n te d in a c c o rd a n c e with p ro c e d u re s
- Wh ite pe rfo rm a n c e in d ic a to r d u e to e m e rg e n c y d ie s e l g e n e ra to r fa ilu re s 11 Wo lf Cre e k Ge n e ra tin g S ta tio n An n u a l As s e s s m e n t S u m m a ry J a n u a ry 1 - De c e m b e r 31, 2012
- Th e Ye llo w fin d in g wa s p ro m p tly c o rre c te d b e fo re th e p la n t re s ta rte d
- Exte n s ive c o rre c tive a c tio n s to im p ro ve d ie s e l re lia b ility in th e re c e n t o u ta g e 12 Enclosure
Wo lf Cre e k Ge n e ra tin g S ta tio n An n u a l As s e s s m e n t S u m m a ry Fu tu re In s p e c tio n s
- A S u p p le m e n ta l NRC In s p e c tio n c o m p le te d in Ma rc h fo r a c tio n s to a d d re s s th e Wh ite P e rfo rm a n c e In d ic a to r
- NRC p la n s a la rg e r S u p p le m e n ta l Te a m In s p e c tio n to re vie w th e a c tio n s to a d d re s s th e Ye llo w fin d in g
- Fo llo w-u p in s p e c tio n o f p ro g re s s o n s u b s ta n tive c ro s s -c u ttin g is s u e s will b e p e rfo rm e d c o n c u rre n t with th e S u p p le m e n ta l Te a m In s p e c tio n 13 Wo lf Cre e k Ge n e ra tin g S ta tio n An n u a l As s e s s m e n t S u m m a ry J a n u a ry 1 - De c e m b e r 31, 2012
- Cu rre n t s u b s ta n tive c ro s s -c u ttin g is s u e s
- Th o ro u g h n e s s o f p ro b le m e va lu a tio n
- Ap p ro p ria te n e s s a n d tim e lin e s s o f c o rre c tive a c tio n s
- Co n s e rva tive d e c is io n -m a kin g
- Co m p le te n e s s a n d a c c u ra c y o f d e s ig n in fo rm a tio n ,
p ro c e d u re s a n d wo rk in s tru c tio n s 14 Lic e n s e e Re s p o n s e a n d Re m a rks Ma tth e w S u n s e ri P re s id e n t a n d Ch ie f Exe c u tive Offic e r Wo lf Cre e k Nu c le a r Op e ra tin g Co rp o ra tio n 15 Enclosure
NRC Clo s in g Re m a rks Kris s Ke n n e d y Dire c to r Divis io n o f Re a c to r P ro je c ts NRC Re g io n IV 16 Op e n to th e P u b lic
- Th e NRC p la c e s a h ig h p rio rity o n ke e p in g th e p u b lic a n d s ta ke h o ld e rs in fo rm e d o f its a c tivitie s .
- At www.n rc .g o v, yo u c a n :
- Fin d p u b lic m e e tin g d a te s a n d tra n s c rip ts ;
- Re a d NRC te s tim o n y, s p e e c h e s , p re s s re le a s e s ,
a n d p o lic y d e c is io n s ; a n d
- Ac c e s s th e a g e n c ys Ele c tro n ic Re a d in g Ro o m to fin d NRC p u b lic a tio n s a n d d o c u m e n ts .
17 Co n ta c tin g th e NRC
- Re p o rt a n e m e rg e n c y
- (301) 816-5100 (c a ll c o lle c t)
- Re p o rt a s a fe ty c o n c e rn
- (800) 695-7403
- Alle g a tio n @n rc .g o v
- Ge n e ra l in fo rm a tio n o r q u e s tio n s
- www.n rc .g o v
- S e le c t Wh a t We Do fo r P u b lic Affa irs 18 Enclosure
Ac tio n s in Re s p o n s e to th e J a p a n Nu c le a r Ac c id e n t
- Ac tio n s in re s p o n s e to J a p a n Nu c le a r Ac c id e n t We b s ite : h ttp ://www.n rc .g o v/ja p a n /ja p a n -in fo .h tm l
- Ma ilb o x fo r c o m m e n ts o n s ta ff a c tio n s :
J LD_P u b lic .Re s o u rc e @n rc .g o v
- Offic e o f P u b lic Affa irs P o in t o f Co n ta c t:
OP A.re s o u rc e @n rc .g o v o r 301-415-8200 19 NRC S o c ia l Me d ia Ch a n n e ls
- Blo g : h ttp ://p u b lic -b lo g .n rc -g a te wa y.g o v/
- Flic kr: h ttp ://www.flic kr.c o m /p h o to s /n rc g o v/
- Twitte r: h ttp s ://twitte r.c o m /#!/n rc g o v
- Yo u Tu b e : h ttp ://www.yo u tu b e .c o m /u s e r/NRCg o v
- RS S : h ttp ://www.n rc .g o v/p u b lic -
in vo lve /lis ts e rve r.h tm l#rs s 20 Re fe re n c e S o u rc e s
- Re a c to r Ove rs ig h t P ro c e s s
- h ttp ://www.n rc .g o v/NRR/OVERS IGHT/AS S ES S /in d e x.h tm l
- P u b lic Ele c tro n ic Re a d in g Ro o m
- h ttp ://www.n rc .g o v/re a d in g -rm .h tm l
- P u b lic Do c u m e n t Ro o m 800-397-4209 (To ll Fre e )
21 Enclosure
Qu e s tio n s o r Co m m e n ts ?
22 Enclosure