|
|
(5 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML15121A899 | | | number = ML15121A899 |
| | issue date = 05/01/2015 | | | issue date = 05/01/2015 |
| | title = Arkansas Nuclear One, Units 1 and 2 - NRC Security Inspection Report 05000313/2015403 and 05000368/2015403 | | | title = NRC Security Inspection Report 05000313/2015403 and 05000368/2015403 |
| | author name = Haire M S | | | author name = Haire M |
| | author affiliation = NRC/RGN-IV/DRS/PSB-1 | | | author affiliation = NRC/RGN-IV/DRS/PSB-1 |
| | addressee name = Browning J | | | addressee name = Browning J |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:" " May 1, 2015 | | {{#Wiki_filter:UNITED STATES May 1, 2015 |
|
| |
|
| Mr. Jeremy Browning, Site Vice President
| | ==SUBJECT:== |
| | | ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000313/2015403 AND 05000368/2015403 |
| Arkansas Nuclear One Entergy Operations, Inc.
| |
| | |
| 1448 SR 333 Russellville, AR 72802-0967
| |
| | |
| SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000313/2015403 AND 05000368/2015403 | |
|
| |
|
| ==Dear Mr. Browning:== | | ==Dear Mr. Browning:== |
| On March 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Arkansas Nuclear One, Unit s 1 and 2, and the NRC inspector discussed the results of this inspection with Mr. D. James, Director, Regulatory Recovery, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report. | | On March 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Arkansas Nuclear One, Units 1 and 2, and the NRC inspector discussed the results of this inspection with Mr. D. James, Director, Regulatory Recovery, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report. |
|
| |
|
| No NRC-identified or self-revealing findings were identified during this inspection. However, the inspector documented a licensee-identified violati on which was determined to be of very low security significance in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. | | No NRC-identified or self-revealing findings were identified during this inspection. However, the inspector documented a licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy. |
|
| |
|
| If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; and the NRC resident inspector at Arkansas Nuclear One, Units 1 and 2. | | If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; and the NRC resident inspector at Arkansas Nuclear One, Units 1 and 2. |
|
| |
|
| In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). | | In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). |
| | |
| In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for
| |
| | |
| your response.
| |
| | |
| Sincerely,/RA/
| |
| Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety
| |
| | |
| Docket Nos. 50-313; 50-368
| |
|
| |
|
| License Nos. DPR-51; NPF-6
| | In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. |
|
| |
|
| Nonpublic
| | Sincerely, |
| | | /RA/ |
| ===Enclosure:===
| | Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-313; 50-368 License Nos. DPR-51; NPF-6 Nonpublic Enclosure: |
| NRC Inspection Report 05000313/2015403; 05000368/2015403 | | NRC Inspection Report 05000313/2015403; 05000368/2015403 w/Attachment: Supplemental Information cc w/encl: |
| | | Mr. Jonathan Laplante Senior Manager, Security Operations Entergy Operations, Inc. |
| ===w/Attachment:===
| |
| Supplemental Information | |
| | |
| cc w/encl: Mr. Jonathan Laplante Senior Manager, Security Operations Entergy Operations, Inc. | |
|
| |
|
| 1340 Echelon Parkway Jackson, MS 39286-1995 cc w/o encl: | | 1340 Echelon Parkway Jackson, MS 39286-1995 cc w/o encl: |
| Electronic Distribution | | Electronic Distribution ML15121A899 Entire Report: Non-Sensitive Publicly Available Keyword: |
| | | SUNSI Review Complete Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 By: J. Buchanan NRC-002 Cover Letter Only: Non-Sensitive Publicly Available Keyword: |
| ML15121A899 Entire Report: SUNSI Review Complete By: J. Buchanan Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: MD 3.4 Non-Public A.3 NRC-002 Cover Letter Only: | | SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By: J. Buchanan NRC-002 OFFICE PSI:PSB1 C:PSB1 C:DRP/E C:PSB1 NAME JBuchanan MHaire NO'Keefe MHaire SIGNATURE /RA/ /RA/ /RA/ /RA/ |
| SUNSI Review Complete By: J. Buchanan Non-Sensitive Sensitive Publicly Available Non-Publicly Available Keyword: SUNSI Review Complete NRC-002 OFFICE PSI:PSB1 C:PSB1 C:DRP/E C:PSB1 NAME JBuchanan MHaire NO'Keefe MHaire SIGNATURE /RA/ /RA/ /RA/ /RA/ DATE 4/29/15 4/29/15 4/30/15 5/1/15 Letter to Jeremy Browning from Mark S. Haire, dated May 1, 2015 | | DATE 4/29/15 4/29/15 4/30/15 5/1/15 Letter to Jeremy Browning from Mark S. Haire, dated May 1, 2015 SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000313/2015403 AND 05000368/2015403 Distribution w/enclosure: |
| | | Security Specialist/NSIR (Eric.Wharton@nrc.gov) |
| SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000313/2015403 AND 05000368/2015403 Distribution w/enclosure | |
| : Security Specialist/NSIR (Eric.Wharton@nrc.gov)
| |
| Security Specialist/NSIR (Niry.Simonian@nrc.gov) | | Security Specialist/NSIR (Niry.Simonian@nrc.gov) |
| Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) | | Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov) |
| Security Specialist/NSI R (Douglas.Garner@nrc.gov) Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov) | | Security Specialist/NSIR (Douglas.Garner@nrc.gov) |
| | Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov) |
| Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov) | | Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov) |
| Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) Senior Resident Inspector (Brian.Tindell@nrc.gov) ANO Administrative Assistant (Gloria.Hatfield@nrc.gov) | | Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov) |
| Distribution w/o enclosure | | Senior Resident Inspector (Brian.Tindell@nrc.gov) |
| : Regional Administrator (Marc.Dapas@nrc.gov)
| | ANO Administrative Assistant (Gloria.Hatfield@nrc.gov) |
| Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) DRP Director (Troy.Pruett@nrc.gov) DRS Director (Anton.Vegel@nrc.gov) | | Distribution w/o enclosure: |
| | Regional Administrator (Marc.Dapas@nrc.gov) |
| | Deputy Regional Administrator (Kriss.Kennedy@nrc.gov) |
| | DRP Director (Troy.Pruett@nrc.gov) |
| | DRS Director (Anton.Vegel@nrc.gov) |
| DRS Deputy Director (Jeff.Clark@nrc.gov) | | DRS Deputy Director (Jeff.Clark@nrc.gov) |
| DRP Deputy Director (Ryan.Lantz@nrc.gov) | | DRP Deputy Director (Ryan.Lantz@nrc.gov) |
| Senior Resident Inspector (Brian.Tindell@nrc.gov) | | Senior Resident Inspector (Brian.Tindell@nrc.gov) |
| | | Resident Inspector (Matt.Young@nrc.gov) |
| Resident Inspector (Matt.Young@nrc.gov) Resident Inspector (Abin.Fairbanks@nrc.gov) | | Resident Inspector (Abin.Fairbanks@nrc.gov) |
| Branch Chief, DRP/E (Neil.OKeefe@nrc.gov) | | Branch Chief, DRP/E (Neil.OKeefe@nrc.gov) |
| Senior Project Engineer, DRP/E (Nick.Taylor@nrc.gov) | | Senior Project Engineer, DRP/E (Nick.Taylor@nrc.gov) |
| Project Engineer, DRP/E (Thomas.Farina@nrc.gov) | | Project Engineer, DRP/E (Thomas.Farina@nrc.gov) |
| Project Engineer, DRP/E (Brian.Correll@nrc.gov) Project Engineer, DRP/E (Jackson.Choate@nrc.gov) ANO Administrative Assistant (Gloria.Hatfield@nrc.gov) | | Project Engineer, DRP/E (Brian.Correll@nrc.gov) |
| | Project Engineer, DRP/E (Jackson.Choate@nrc.gov) |
| | ANO Administrative Assistant (Gloria.Hatfield@nrc.gov) |
| Public Affairs Officer (Victor.Dricks@nrc.gov) | | Public Affairs Officer (Victor.Dricks@nrc.gov) |
| Public Affairs Officer (Lara.Uselding@nrc.gov) | | Public Affairs Officer (Lara.Uselding@nrc.gov) |
| | | Project Manager (Andrea.George@nrc.gov) |
| Project Manager (Andrea.George@nrc.gov) | |
| | |
| Team Leader, DRS/TSB (Don.Allen@nrc.gov) | | Team Leader, DRS/TSB (Don.Allen@nrc.gov) |
| ACES (R4Enforcement.Resource@nrc.gov) RITS Coordinator (Marisa.Herrera@nrc.gov) | | ACES (R4Enforcement.Resource@nrc.gov) |
| | RITS Coordinator (Marisa.Herrera@nrc.gov) |
| Regional Counsel (Karla.Fuller@nrc.gov) | | Regional Counsel (Karla.Fuller@nrc.gov) |
| Technical Support Assistant (Loretta.Williams@nrc.gov) | | Technical Support Assistant (Loretta.Williams@nrc.gov) |
| Congressional Affairs Officer (Jenny.Weil@nrc.gov) RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) RIV/ETA: OEDO (Michael.Waters@nrc.gov) | | Congressional Affairs Officer (Jenny.Weil@nrc.gov) |
| | RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) |
| | RIV/ETA: OEDO (Michael.Waters@nrc.gov) |
| }} | | }} |
|
---|
Category:Inspection Report
MONTHYEARIR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 IR 05000313/20244042024-08-29029 August 2024 Cybersecurity Inspection Report 05000313/2024404 and 05000368/2024404 IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230102023-09-20020 September 2023 Biennial Problem Identification and Resolution Inspection Report 05000313/2023010 and 05000368/2023010 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 IR 05000313/20220062023-03-0101 March 2023 Annual Assessment Letter for Arkansas Nuclear One Units 1 and 2 (Report 05000313/2022006 and 05000368/2022006) IR 05000313/20220042023-01-26026 January 2023 Integrated Inspection Report 05000313/2022004 and 05000368/2022004 - 4th Quarter IR 05000313/20220032022-11-0909 November 2022 Integrated Inspection Report 05000313/2022003 and 05000368/2022003 and Exercise of Enforcement Discretion ML22301A1532022-11-0909 November 2022 Notice of Violation NRC Inspection Report 05000313/2022011 and 05000368/2022011 IR 05000313/20220112022-11-0909 November 2022 Notice of Violation NRC Inspection Report 05000313/2022011 and 05000368/2022011 ML22308A1912022-11-0606 November 2022 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000313/2023401 and 05000368/2023401 IR 05000313/20224012022-10-20020 October 2022 Security Baseline Inspection Report 05000313/2022401 and 05000368/2022401 IR 05000313/20220502022-09-26026 September 2022 Special Inspection Reactive Report 05000313 2022050 and 05000368 2022050 Cover Letter Only ML22208A1282022-08-0404 August 2022 (2nd Quarter) Inspection Report 2022 002 IR 05000313/20224032022-06-23023 June 2022 Security Baseline Inspection Report 05000313/2022403 and 05000368/2022403 IR 05000313/20223012022-06-15015 June 2022 NRC Examination Report 05000313/2022301 IR 05000313/20210132022-05-17017 May 2022 License Renewal Phase 4 Inspection Report 05000313/2021013 IR 05000313/20220012022-05-10010 May 2022 Integrated Inspection Report 05000313/2022001 and 05000368/2022001 IR 05000313/20220102022-03-14014 March 2022 Triennial Fire Protection Inspection Report 05000313/2022010 and 05000368/2022010 IR 05000313/20210062022-03-0202 March 2022 Annual Assessment Letter for Arkansas Nuclear One, Units 1 & 2 (Report 05000313/2021006 and 05000368/2021006) ML22047A2702022-02-23023 February 2022 Security Baseline Inspection Report 05000313/2022403 and 05000368/2022403 IR 05000313/20210042022-02-0404 February 2022 Integrated Inspection Report 05000313/2021004 and 05000368/2021004 ML22011A0992022-01-14014 January 2022 IR 2021012 EOI CO3 IR 05000313/20210102022-01-13013 January 2022 Biennial Problem Identification and Resolution Inspection Report 05000313/2021010 and 05000368/2021010 IR 05000313/20210032021-11-0505 November 2021 Integrated Inspection Report 05000313/2021003 and 05000368/2021003 IR 05000313/20210112021-09-23023 September 2021 Design Basis Assurance Inspection (Teams) Inspection Report 05000313/2021011 and 05000368/2021011 IR 05000313/20214012021-08-10010 August 2021 Security Baseline Inspection Report 05000313/2021401 and 05000368/2021401 IR 05000313/20210022021-08-0909 August 2021 Integrated Inspection Report 05000313/2021002 and 05000368/2021002 IR 05000368/20213012021-05-17017 May 2021 NRC Examination Report 05000368/2021301 IR 05000313/20210012021-05-0606 May 2021 Integrated Inspection Report 05000313/2021001 and 05000368/2021001 ML21095A3162021-04-13013 April 2021 ANO 2021402-Non SGI Rcl 2024-09-09
[Table view] Category:Letter
MONTHYEARML24295A1202024-10-21021 October 2024 Relief Request ANO2-RR-24-001, Half-Nozzle Repair of Reactor Vessel Closure Head Penetration 71 IR 05000368/20253012024-09-0909 September 2024 Notification of NRC Initial Operator Licensing Examination 05000368/2025301 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000313/20240112024-09-0505 September 2024 Comprehensive Engineering Team Inspection Report 05000313/2024011 and 05000368/2024011 IR 05000313/20244042024-08-29029 August 2024 Cybersecurity Inspection Report 05000313/2024404 and 05000368/2024404 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24198A0722024-08-21021 August 2024 Correction to Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b IR 05000313/20240052024-08-21021 August 2024 Updated Inspection Plan for Arkansas Nuclear One – Units 1 and 2 (Report 05000313/2024005, 05000368/2024005) ML24220A2642024-08-20020 August 2024 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment ML24185A1522024-08-13013 August 2024 Issuance of Amendment Nos. 334, 235, and 215, Respectively, to Revise TSs to Adopt TSTF-205 IR 05000313/20240022024-08-0606 August 2024 Integrated Inspection Report 05000313/2024002 and 05000368/2024002 ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24101A1792024-06-25025 June 2024 Issuance of Amendment No. 333 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24143A0632024-05-22022 May 2024 Notification of Inspection (NRC Inspection Report 05000368/2024003) and Request for Information IR 05000313/20240012024-05-0808 May 2024 Integrated Inspection Report 05000313/2024001 and 05000368/2024001 ML24128A2472024-05-0808 May 2024 Project Manager Assignment ML24017A2982024-04-18018 April 2024 Summary of Regulatory Audit Regarding the License Amendment Request to Revise Technical Specifications to Adopt TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML24107A0282024-04-17017 April 2024 Notification of Comprehensive Engineering Team Inspection (05000313/2024011 and 05000368/2024011) and Request for Information IR 05000313/20243012024-04-16016 April 2024 NRC Examination Report 05000313/2024301 ML24086A5412024-04-10010 April 2024 Authorization of Request for Alternative ANO1-ISI-037 Regarding Extension of Reactor Vessel Inservice Inspection Interval IR 05000313/20244022024-04-0808 April 2024 Security Baseline Inspection Report 05000313/2024402 and 05000368/2024402 (Full Report) ML24089A2262024-03-29029 March 2024 Entergy Response to Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Exams ML24075A1712024-03-15015 March 2024 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) ML24074A2892024-03-14014 March 2024 Proof of Financial Protection (10 CFR 140.15) ML24031A6442024-03-14014 March 2024 Issuance of Amendment No. 282 to Modify Technical Specification 3.3.1, Reactor Pressure System (RPS) Instrumentation, Turbine Trip Function on Low Control Oil Pressure ML24102A1342024-03-12012 March 2024 AN1-2024-03 Post Exam Submittal IR 05000313/20230062024-02-28028 February 2024 Annual Assessment Letter for Arkansas Nuclear One- Units 1 and 2 Report 05000313/2023006 and 05000368/2023006 IR 05000313/20230042024-02-0808 February 2024 Integrated Inspection Report 05000313/2023004 and 05000368/2023004 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023002 ML24012A0502024-02-0202 February 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0054 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 – Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 – Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle 2024-09-09
[Table view] |
Text
UNITED STATES May 1, 2015
SUBJECT:
ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000313/2015403 AND 05000368/2015403
Dear Mr. Browning:
On March 18, 2015, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at Arkansas Nuclear One, Units 1 and 2, and the NRC inspector discussed the results of this inspection with Mr. D. James, Director, Regulatory Recovery, and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
No NRC-identified or self-revealing findings were identified during this inspection. However, the inspector documented a licensee-identified violation which was determined to be of very low security significance in this report. The NRC is treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2.a of the Enforcement Policy.
If you contest the violation or significance of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001; with copies to the Regional Administrator, Region IV; the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington DC 20555-0001; and the NRC resident inspector at Arkansas Nuclear One, Units 1 and 2.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRCs "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Mark S. Haire Chief, Plant Support Branch 1 Division of Reactor Safety Docket Nos. 50-313; 50-368 License Nos. DPR-51; NPF-6 Nonpublic Enclosure:
NRC Inspection Report 05000313/2015403; 05000368/2015403 w/Attachment: Supplemental Information cc w/encl:
Mr. Jonathan Laplante Senior Manager, Security Operations Entergy Operations, Inc.
1340 Echelon Parkway Jackson, MS 39286-1995 cc w/o encl:
Electronic Distribution ML15121A899 Entire Report: Non-Sensitive Publicly Available Keyword:
SUNSI Review Complete Sensitive Non-Publicly Available MD 3.4 Non-Public A.3 By: J. Buchanan NRC-002 Cover Letter Only: Non-Sensitive Publicly Available Keyword:
SUNSI Review Complete Sensitive Non-Publicly Available SUNSI Review Complete By: J. Buchanan NRC-002 OFFICE PSI:PSB1 C:PSB1 C:DRP/E C:PSB1 NAME JBuchanan MHaire NO'Keefe MHaire SIGNATURE /RA/ /RA/ /RA/ /RA/
DATE 4/29/15 4/29/15 4/30/15 5/1/15 Letter to Jeremy Browning from Mark S. Haire, dated May 1, 2015 SUBJECT: ARKANSAS NUCLEAR ONE, UNITS 1 AND 2 - NRC SECURITY INSPECTION REPORT 05000313/2015403 AND 05000368/2015403 Distribution w/enclosure:
Security Specialist/NSIR (Eric.Wharton@nrc.gov)
Security Specialist/NSIR (Niry.Simonian@nrc.gov)
Chief, Security Performance Evaluation Branch/NSIR (Clay.Johnson@nrc.gov)
Security Specialist/NSIR (Douglas.Garner@nrc.gov)
Branch Chief, RI DRS/PSB1 (Anthony.Dimitriadis@nrc.gov)
Branch Chief, RII DRS/PSB1 (Binoy.Desai@nrc.gov)
Branch Chief, RIII DRS/PSB (Steven.Orth@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Distribution w/o enclosure:
Regional Administrator (Marc.Dapas@nrc.gov)
Deputy Regional Administrator (Kriss.Kennedy@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
Senior Resident Inspector (Brian.Tindell@nrc.gov)
Resident Inspector (Matt.Young@nrc.gov)
Resident Inspector (Abin.Fairbanks@nrc.gov)
Branch Chief, DRP/E (Neil.OKeefe@nrc.gov)
Senior Project Engineer, DRP/E (Nick.Taylor@nrc.gov)
Project Engineer, DRP/E (Thomas.Farina@nrc.gov)
Project Engineer, DRP/E (Brian.Correll@nrc.gov)
Project Engineer, DRP/E (Jackson.Choate@nrc.gov)
ANO Administrative Assistant (Gloria.Hatfield@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Public Affairs Officer (Lara.Uselding@nrc.gov)
Project Manager (Andrea.George@nrc.gov)
Team Leader, DRS/TSB (Don.Allen@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Technical Support Assistant (Loretta.Williams@nrc.gov)
Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Michael.Waters@nrc.gov)