ML15197A327: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 07/24/2015
| issue date = 07/24/2015
| title = Audio Recording of June 29, 2015 Public Meeting with Paul Gunter Et. Al., Regarding Their 10 CFR 2.206 Petition Requesting Enforcement Action
| title = Audio Recording of June 29, 2015 Public Meeting with Paul Gunter Et. Al., Regarding Their 10 CFR 2.206 Petition Requesting Enforcement Action
| author name = Chereskin A N
| author name = Chereskin A
| author affiliation = NRC/NRR/DORL/LPLI-1
| author affiliation = NRC/NRR/DORL/LPLI-1
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000333
| docket = 05000333
| license number = DPR-059
| license number = DPR-059
| contact person = Chereskin A N
| contact person = Chereskin A
| case reference number = TAC ME8189
| case reference number = TAC ME8189
| document type = Memoranda, Note to File incl Telcon Record, Verbal Comm
| document type = Memoranda, Note to File incl Telcon Record, Verbal Comm
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:July 24, 2015 MEMORANDUM TO: Note To File  
{{#Wiki_filter:July 24, 2015 MEMORANDUM TO: Note To File FROM:                   Alexander N. Chereskin, Project Manager /RA/
 
Plant Licensing Branch I-1 Division of Operating Reactor Licensing
FROM:   Alexander N. Chereskin, Project Manager  
/RA/   Plant Licensing Branch I-1 Division of Operating Reactor Licensing


==SUBJECT:==
==SUBJECT:==
AUDIO RECORDING OF JUNE 29, 2015, PUBLIC MEETING WITH PAUL GUNTER ET. AL., REGARDING THEIR 10 CFR 2.206 PETITION REQUESTING ENFORCEMENT ACTION AGAINST THE JAMES A.
AUDIO RECORDING OF JUNE 29, 2015, PUBLIC MEETING WITH PAUL GUNTER ET. AL., REGARDING THEIR 10 CFR 2.206 PETITION REQUESTING ENFORCEMENT ACTION AGAINST THE JAMES A.
FITZPATRICK NUCLEAR POWER PLANT (TAC NO. ME8189)
FITZPATRICK NUCLEAR POWER PLANT (TAC NO. ME8189)
On June 29, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff met with Beyond Nuclear, et. al. (the petitioners), where the petitioners presented supplemental information to the NRC Petition Review Board (PRB) in accordance with Management Directive 8.11, "Review Process for 10 CFR 2.206 Petitions.This was in support of the petitioners' 2.206 petition regarding containment ventilation at the James A. Fitzpatrick Nuclear Power Plant. This meeting was held at NRC Headquarters, One Whit e Flint North, 11555 Rockville Pike, Rockville, Maryland. A summary of this meeting can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15197A356.
On June 29, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff met with Beyond Nuclear, et. al. (the petitioners), where the petitioners presented supplemental information to the NRC Petition Review Board (PRB) in accordance with Management Directive 8.11, Review Process for 10 CFR 2.206 Petitions. This was in support of the petitioners 2.206 petition regarding containment ventilation at the James A. Fitzpatrick Nuclear Power Plant. This meeting was held at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. A summary of this meeting can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15197A356.
Availability of CD for the NRC Public Meeting Copies of the CD containing the audio recordings of the June 29, 2015, public meeting are available from the NRC Public Document Room (PDR). The NRC PDR may be contacted at:
Availability of CD for the NRC Public Meeting Copies of the CD containing the audio recordings of the June 29, 2015, public meeting are available from the NRC Public Document Room (PDR). The NRC PDR may be contacted at:
* Internet: http://www.nrc.gov/reading-rm/contact-pdr.html
* Internet: http://www.nrc.gov/reading-rm/contact-pdr.html
Line 33: Line 31:
* Facsimile: 301-415-3548
* Facsimile: 301-415-3548
* U.S. Mail: NRC, PDR, 01 F1 3, Washington, DC 20555
* U.S. Mail: NRC, PDR, 01 F1 3, Washington, DC 20555
* Onsite visit to the PDR: One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland 20852 (opposite the White Flint Metro subway station on the Red Line) Docket No. 50-333  
* Onsite visit to the PDR: One White Flint North, 11555 Rockville Pike (first floor),
Rockville, Maryland 20852 (opposite the White Flint Metro subway station on the Red Line)
Docket No. 50-333


==Enclosure:==
==Enclosure:==
As stated  
As stated


ML15197A327 OFFICE NRR/DORL/LPLI-1/PM NRR/DORL/LPLI-1/LANRR/DORL/LPLI-1/BC (A) NAME AChereskin KGoldstein MDudek DATE 7/24/2015 7/24/2015 7/24/2015}}
ML15197A327 OFFICE               NRR/DORL/LPLI-1/PM         NRR/DORL/LPLI-1/LA      NRR/DORL/LPLI-1/BC (A)
NAME                     AChereskin                   KGoldstein                   MDudek DATE                       7/24/2015                 7/24/2015                   7/24/2015}}

Latest revision as of 10:08, 31 October 2019

Audio Recording of June 29, 2015 Public Meeting with Paul Gunter Et. Al., Regarding Their 10 CFR 2.206 Petition Requesting Enforcement Action
ML15197A327
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/24/2015
From: Alexander Chereskin
Plant Licensing Branch 1
To:
Division of Operating Reactor Licensing
Chereskin A
References
TAC ME8189
Download: ML15197A327 (2)


Text

July 24, 2015 MEMORANDUM TO: Note To File FROM: Alexander N. Chereskin, Project Manager /RA/

Plant Licensing Branch I-1 Division of Operating Reactor Licensing

SUBJECT:

AUDIO RECORDING OF JUNE 29, 2015, PUBLIC MEETING WITH PAUL GUNTER ET. AL., REGARDING THEIR 10 CFR 2.206 PETITION REQUESTING ENFORCEMENT ACTION AGAINST THE JAMES A.

FITZPATRICK NUCLEAR POWER PLANT (TAC NO. ME8189)

On June 29, 2015, the U.S. Nuclear Regulatory Commission (NRC) staff met with Beyond Nuclear, et. al. (the petitioners), where the petitioners presented supplemental information to the NRC Petition Review Board (PRB) in accordance with Management Directive 8.11, Review Process for 10 CFR 2.206 Petitions. This was in support of the petitioners 2.206 petition regarding containment ventilation at the James A. Fitzpatrick Nuclear Power Plant. This meeting was held at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. A summary of this meeting can be found in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML15197A356.

Availability of CD for the NRC Public Meeting Copies of the CD containing the audio recordings of the June 29, 2015, public meeting are available from the NRC Public Document Room (PDR). The NRC PDR may be contacted at:

  • Telephone: 1-800-397-4209 or 301-415-4737
  • TDD (for the hearing impaired): 1-800-635-4512
  • Facsimile: 301-415-3548
  • Onsite visit to the PDR: One White Flint North, 11555 Rockville Pike (first floor),

Rockville, Maryland 20852 (opposite the White Flint Metro subway station on the Red Line)

Docket No. 50-333

Enclosure:

As stated

ML15197A327 OFFICE NRR/DORL/LPLI-1/PM NRR/DORL/LPLI-1/LA NRR/DORL/LPLI-1/BC (A)

NAME AChereskin KGoldstein MDudek DATE 7/24/2015 7/24/2015 7/24/2015