Letter Sequence Other |
---|
|
|
MONTHYEARML0200301552002-01-25025 January 2002 Memo to W.D. Beckner Closure of FitzPatrick Beyond Scope Issues (Bsis) BSI-F12 (Tac No. MB2710) Project stage: Other 2002-01-25
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al ML21285A1492021-10-22022 October 2021 Audit Plan in Support of Review of License Amendment Requests Regarding 50.69/TSFT-505 ML21056A5452021-03-30030 March 2021 Memorandum to File: Final Environmental Assessment and Finding of No Significant Impact for Initial and Updated Decommissioning Funding Plans for FitzPatrick ISFSI ML20038A2692020-02-11011 February 2020 Sensitive Unclassified Non-Safeguards Information Review of 2019 Final Safety Analysis Report Change Pages ML19099A2672019-04-16016 April 2019 Use of Encryption Software for Electronic Transmission of Safeguards Information ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML16336A4992017-01-18018 January 2017 Notice of Significant Licensing Action ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML15197A3272015-07-24024 July 2015 Audio Recording of June 29, 2015 Public Meeting with Paul Gunter Et. Al., Regarding Their 10 CFR 2.206 Petition Requesting Enforcement Action ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML12290A2872012-11-0808 November 2012 Final Fitzpatrick Rotating Quadrants TIA Response ML13022A3542012-04-0505 April 2012 from Bhalchandra Vaida to George Wilson: G20120172/EDATS: OEDO-2012-0147 - Forthcoming Meeting with Petitioners, Beyond Nuclear Et Al, Requesting Action Under 10 CFR 2.206 ML12095A1712012-04-0505 April 2012 G20120172/EDATS-OEDO-2012-0147-ME8189-Meeting Notice-1st Meeting with Petitioners ML13017A3572012-04-0505 April 2012 from R1DRPMail Resource to Sam Mccarver: FW Fitzpatrick G20120172/EDATS ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1115704052011-06-0606 June 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Implementation of Quality Oversight and Verification Programs at Entergy Sites Including Actions Being Taken to Enhance Effectiveness ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1107504052011-03-21021 March 2011 Notice of Meeting with Entergy Operations, Inc., to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML0927301372009-10-0909 October 2009 Safety Evaluation by the Office of Nuclear Reactor Regulation Corporate Restructuring Conversion of Companies and Stock Split-Off by Entergy Nuclear Operations, Inc and Subsidiaries ML0917301322009-06-25025 June 2009 06/07-11/2009-Report on Trip to the Institute of Electrical and Electronics Engineers Stationary Battery Committee Meeting in Rohnert Park, CA ML0913405542009-05-14014 May 2009 Summary of Annual Assessment Open-House Public Meeting with Nine Mile Point and FitzPatrick ML0808000342008-03-24024 March 2008 Docketing of Slides Presentations to ACRS Full Committee Meeting Pertaining to License Renewal Application of the James A. Fitzpatrick Nuclear Power Plant ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0806700322008-02-19019 February 2008 Status Report and Proposed Schedule for FitzPatrick License Renewal at Full Committee Meeting on March 6, 2008 ML0803601492008-02-14014 February 2008 Advisory Committee for Reactor Safeguards Review of the James A. FitzPatrick Nuclear Power Plant, License Renewal Application - Safety Evaluation Report ML0801402662008-02-0808 February 2008 Audit Q&A Database for FitzPatrick Nuclear Plant Aging Mgmt Programs, Aging Mgmt Reviews, and Time-Limited Aging Analyses - Audit Team'S Evaluation of the Applicant'S Responses ML0801505342008-01-24024 January 2008 01/11/2008 Summary of a Telephone Conference Call Between the NRC and Entergy Nuclear Operations, Inc., Concerning the 115kV AC Power Supply Connection Pertaining to the James A. FitzPatrick Nuclear Power Plant License Renewal Application ML0720000582007-07-26026 July 2007 7/18/07 Public Meeting Summary on the Reactor Oversight Process ML0717803562007-07-12012 July 2007 Summary of Telephone Conference Call Held on June 7, 2007, (FitzPatrick) ML0711504622007-05-0707 May 2007 Trip Report Summarizing March 27, 2007 Visit to James A. FitzPatrick Nuclear Power Plant Regarding the License Renewal Environmental Review ML0706702272007-03-15015 March 2007 Summary of Telephone Conference Calls Held on January 31, 2007 and February 13, 2007, Between the U.S. NRC and Entergy Nuclear Operations, Inc., Pertaining to the James A. Fitzpatrick Nuclear Power Plant, LRA ML0706702662007-03-14014 March 2007 Summary of Telephone Conference Call Held on March 5, 2007, Between the NRC and Entergy Nuclear Operations, Inc., Concerning Draft Request for Additional Information Pertaining to the James A. Fitzpatrick Nuclear Power Plant, LRA ML0634502502006-12-19019 December 2006 November 2006 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 ML0627801872006-10-23023 October 2006 Memorandum - Audit and Review Plan for Plant Aging Management Reviews and Programs, and Time-Limited Aging Analyses for the James A. Fitzpatrick Power Plant ML0626803552006-09-25025 September 2006 10/12/2006 Notice of Forthcoming Meeting to Discuss the License Renewal Process and Environmental Scoping for James A. Fitzpatrick Nuclear Power Plant, License Renewal Application Review ML0615806052006-06-0707 June 2006 06/26/2006 Forthcoming Pre-application Meeting with Entergy Nuclear Operations, Inc. on the License Renewal Application for James A. Fitzpatrick Nuclear Power Plant ML0600300802006-02-17017 February 2006 Transmittal of Final ASP Analyses (August 14, 2003 Grid Disturbance Events) ML0601201072006-01-27027 January 2006 Final Response to Task Interface Agreement 2005-10 Related to Operability Determination on Through-Wall Cracking of a Torus ML0506104872005-03-23023 March 2005 Draft Information Memo - May 1, 2005 Thru May 27, 2005 ML0433603982005-01-0404 January 2005 November 2004, Memo., from Brian W. Sheron, Nrr/Adpt to Luis A. Reyes, Nrc/Edo, Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 ML0410507202004-03-31031 March 2004 Memo from D. Burch to File: RI-97-A-0126, Regarding FitzPatrick ML0405806902004-02-27027 February 2004 Transmittal of Preliminary ASP Analyses for Peer Review (August 14, 2003 Grid Event) ML0215803662002-06-0606 June 2002 Memo to R. Bellamy, RGN-I from: M. Tokar Subject: Region I Independent Spent Fuel Storage Installation Inspection Plans Attachment: Sfpo Comments to Region I Integrated Inspection Plans ML0207804562002-03-20020 March 2002 Memo, Draft Information for March 1 to March 15, 2002 ML0207704622002-03-20020 March 2002 Attachment Draft Information for March 1 to March 15, 2002 Requests for Additional Lnformation ML0200301552002-01-25025 January 2002 Memo to W.D. Beckner Closure of FitzPatrick Beyond Scope Issues (Bsis) BSI-F12 (Tac No. MB2710) NRC Generic Letter 1989-111989-06-30030 June 1989 NRC Generic Letter 1989-011: Resolution of Generic Issue 101 Boiling Water Reactor Water Level Redundancy 2021-03-30
[Table view] Category:Safety Evaluation
MONTHYEARML24276A1332024-10-17017 October 2024 Issuance of Amendment No. 357 Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules, Revision-4, and Administrative Changes ML24207A0192024-10-0909 October 2024 SE Addendum Related to the License Amendment No. 338 for Implementation of the Alternative Source Term (DPO-2021-001) ML24165A0382024-09-0404 September 2024 Issuance of Amendment No. 356 Update Fuel Handling Accident Analysis ML24136A1162024-06-26026 June 2024 Issuance of Amendment No. 355 Revise Technical Specifications Section 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML24068A0532024-03-28028 March 2024 Issuance of Amendment No. 354 Revise Technical Specifications Section 3.3.1.2, Source Range Monitors Instrumentation ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23114A2522023-04-28028 April 2023 Request to Use a Provision of a Later Edition of the ASME Boiler & Pressure Vessel Code, Section XI ML22223A1412022-09-0101 September 2022 Issuance of Amendment No. 353 Adoption of TSTF - 505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B ML22196A0612022-08-23023 August 2022 Issuance of Amendment No. 352 Adoption of 10 CFR 50.69 Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML22166A4302022-07-15015 July 2022 Issuance of Amendment No. 351 Removal of Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation ML22126A1962022-05-27027 May 2022 Issuance of Amendment No. 350 Adoption of TSTF-264, Revision 0 ML22090A0862022-04-29029 April 2022 Amendments to Adopt TSTF-541,Rev.2,Add Exceptions to Surveillance Requirements for Valves,Dampers Locked in Actuated Position ML22094A0012022-04-15015 April 2022 Constellation Energy Generation, LLC - Proposed Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles (Epids L-2021-LLR-0057 and L-2021-LLR-0058) ML21364A0432022-02-28028 February 2022 Issuance of Amendment No. 348 Revising Surveillance Requirement 3.5.1.6 Involving Recirculation Pump Discharge Valves ML21347A0382022-01-13013 January 2022 Issuance of Amendments to Revise Reactor Coolant Leakage Requirements ML21300A3552021-11-16016 November 2021 Issuance of Amendment No. 345 Adoption of TSTF-582 ML21277A2482021-11-16016 November 2021 Letter with Enclosure 4, Safety Evaluation for Transfer of Licenses and Draft Conforming License Amendments (Public Version) ML21230A2062021-09-0303 September 2021 Proposed Alternative to Use ASME OM Code Case OMN-28 ML21131A1272021-08-0909 August 2021 Issuance of Amendment No. 343 Modifications to Technical Specification 3.6.1.3, Primary Containment Isolation Valves (Pcivs) ML21216A2202021-08-0505 August 2021 Proposed Alternative to Eliminate Certain Documentation Requirements for Pressure Retaining Bolting ML21166A1682021-06-25025 June 2021 ML21162A0422021-06-14014 June 2021 Issuance of Amendment No. 342, One Time Extension of Completion Times to Support Residual Heat Removal Pump Motor Replacement (Emergency Circumstances) ML21049A3552021-04-28028 April 2021 Issuance of Amendment No. 341 Adoption of TSTF-478, Revision 2, BWR Technical Specification Changes That Implement the Revised Rule for Combustible Gas Control ML21033A5302021-04-0101 April 2021 Issuance of Amendments to Adopt Technical Specifications Task Force TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML21028A6732021-02-0303 February 2021 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L-2020-LLR-011 ML20287A1302020-11-0505 November 2020 Review of Quality Assurance Program Changes ML20269A2002020-09-30030 September 2020 Request to Use a Provision of Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI (EPID L2020-LLR-0117 ML20169A5102020-08-20020 August 2020 Issuance of Amendment No. 339 Changes to Technical Specifications Related to Primary Containment Hydrodynamic Loads ML20140A0702020-07-21021 July 2020 Issuance of Amendment No. 338 Application of Alternative Source Term for Calculating Loss-of-Coolant Accident Dose Consequences ML20141L6362020-07-10010 July 2020 Issuance of Amendments Based on TSTF-427,Allowance for Nontechnical Specification Barrier Degradation on Supported System Operability,Rev 2 ML20134H9402020-07-0808 July 2020 Issuance of Amendments Revising the High Radiation Area Administrative Controls ML20094G9032020-06-0202 June 2020 Issuance of Amendment No. 335 Adoption of TSTF-372, Addition of LCO 3.0.8, 'Inoperability of Snubbers' ML20021A0702020-04-0606 April 2020 Issuance of Amendments to Delete License Conditions for Decommissioning Trusts ML20024C6612020-03-0202 March 2020 Issuance of Amendment No. 332 Adopt TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2, Using the Consolidated Line Item Improvement Process ML19295G7832019-12-19019 December 2019 Issuance of Amendment No. 331 Regarding Change to Technical Specifications to Remove Ultimate Heat Sink Bar Rack Heaters ML19269C5342019-09-27027 September 2019 Proposed Alternative to Use Encoded Phased Array Ultrasonic Examination Techniques ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML19176A0332019-08-28028 August 2019 Issuance of Amendments to Adopt TSTF-564, Safety Limit MCPR ML19189A0842019-08-19019 August 2019 Issuance of Amendment No. 326 Adoption of TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month ML19192A2442019-07-18018 July 2019 Proposed Alternative to Use ASME Code Cases N-878 and N-880 ML19157A2032019-07-11011 July 2019 Issuance of Amendment No. 325 Reactivity Anomalies Surveillance ML19135A4442019-06-21021 June 2019 Issuance of Relief Request I4R-22 Relief from the Requirements of the ASME Code ML19098A0342019-04-30030 April 2019 Units 1 and 2; Limerick, Units 1 and 2; Peach Bottom, Units 2 and 3, and Quad Cities, Units 1 and 2 - Revision to Approved Alternative to Use BWR Vessel and Internal Proj Guidelins ML18360A6352019-02-25025 February 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4464; EPID No. L-2014-JLD-0049) ML18304A3652019-01-16016 January 2019 2. Issuance of Amendments to Revise the Average Power Range Monitor Requirements ML18289A4322018-11-28028 November 2018 Issuance of Amendment No. 323 Revision to the Emergency Action Level Schemes Pursuant to NEI 99-01, Revision 6 ML18214A7062018-09-19019 September 2018 Issuance of Amendment No. 322, Revise Technical Specification 2.1.1, Reactor Core Sls, to Change Cycle 24 Safety Limit Minimum Critical Power Ratio Numeric Values ML18206A2822018-08-0202 August 2018 Issuance of Amendments to Relocate the Staff Qualification Requirements ML18180A3722018-07-19019 July 2018 Issuance of Amendment No. 319, Revise Technical Specification Surveillance Requirement 3.6.4.1.3 to Allow Opening of Inner and Outer Secondary Containment Access Openings (CAC MG0239; EPID L-2017-LLA-0298) ML18039A8542018-05-30030 May 2018 Relief Requests I5R-02, I5R-03, I5R-04 from ASME Code Requirements for Reactor Vessel Internals, Ferretic Piping Repair/Replacement, and RPV Flange Welds, 5th 10-Year Inservice Inspection Interval (MG0116-MG0118; L-2017-LLR-0083 to 0085) 2024-09-04
[Table view] |
Text
January 25, 2002 MEMORANDUM TO: William D. Beckner, Chief Technical Specification Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation FROM: Guy S. Vissing, Senior Project Manager, Section 1 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
CLOSURE OF FITZPATRICK BEYOND SCOPE ISSUES (BSIs) BSI-F12, (TAC NO. MB2710)
By letter dated May 31, 2001, Entergy Nuclear Operations, Inc. presented new changes to revise the proposed Improved Technical Specifications (ITS) 3.3.7.3, Emergency Service Water System Instrumentation. Such changes are beyond scope for the conversion of the James A. FitzPatrick Nuclear Power Plant (JAFNPP) Technical Specifications to the improved standard technical specifications (STS) format, and constitute JAFNNP beyond-scope-issue (BSI) BSI-F12. The STS format is provided by NUREG-1433, Revision 1, Standard Technical Specifications, General Electric Plants BWR/4, dated April 1995. The NRC staff has completed its review of the subject BSI and has determined that the proposed changes in instrumentation setpoint values are acceptable. The attachment provides the necessary safety evaluation to close out the subject BSI and TAC.
Docket No. 50-333
Attachment:
As stated
January 25, 2002 MEMORANDUM TO: William D. Beckner, Chief Technical Specification Branch Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation FROM: Guy S. Vissing, Senior Project Manager, Section 1 /RA/
Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
CLOSURE OF FITZPATRICK BEYOND SCOPE ISSUES (BSIs) BSI-F12, (TAC NO. MB2710)
By letter dated May 31, 2001, Entergy Nuclear Operations, Inc. presented new changes to revise the proposed Improved Technical Specifications (ITS) 3.3.7.3, Emergency Service Water System Instrumentation. Such changes are beyond scope for the conversion of the James A. FitzPatrick Nuclear Power Plant (JAFNPP) Technical Specifications to the improved standard technical specifications (STS) format, and constitute JAFNNP beyond-scope-issue (BSI) BSI-F12. The STS format is provided by NUREG-1433, Revision 1, Standard Technical Specifications, General Electric Plants BWR/4, dated April 1995. The NRC staff has completed its review of the subject BSI and has determined that the proposed changes in instrumentation setpoint values are acceptable. The attachment provides the necessary safety evaluation to close out the subject BSI and TAC.
Docket No. 50-333
Attachment:
As stated DISTRIBUTION:
PUBLIC ACRS RYoung PDI-1R/F GVissing SLittle LRaghavan OGC NLe Accession Number: ML020030155 *EXCEL 678 OFFICE PDI-1/PM PDI-1/LA EEIB/DE PDI-1/SC(A) SPLB/SC NAME GVissing SLittle ECMarinos JMunday JTatum DATE 01/10/02 01/10/02 01/14/02 01/16/02 01/18/02*
OFFICIAL RECORD COPY
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION IMPROVED TECHNICAL SPECIFICATION CONVERSION LICENSE AMENDMENT BEYOND SCOPE ISSUES ENTERGY NUCLEAR OPERATIONS, INC.
JAMES A. FITZPATRICK NUCLEAR POWER PLANT DOCKET NO. 50-333
1.0 INTRODUCTION
By letter dated May 31, 2001, the Entergy Nuclear Operations, Inc. presented new changes to revise the proposed Improved Technical Specifications (ITS) 3.3.7.3, Emergency Service Water System Instrumentation. Such changes are beyond scope for the conversion of the James A. Fitzpatrick Nuclear Power Plant (JAFNPP) Technical Specifications to the improved standard technical specifications (STS) format, and constitute JAFNNP beyond-scope-issue (BSI) F12. The STS format is provided by NUREG-1433, Revision 1, Standard Technical Specifications, General Electric Plants BWR/4, dated April 1995.
2.0 BACKGROUND
The purpose of the emergency service water system (ESWS) instrumentation is to initiate appropriate responses from the system to ensure the ESWS safe shutdown loads are cooled following a design-basis accident or transient coincident with a loss of preferred power. The ESWS may be initiated by either automatic or manual means. Upon receipt of a loss of power signal or an emergency core cooling system (ECCS) initiation signal, the emergency diesel generators (EDGs) will start, which in turn starts the associated ESWS pump. Each ESWS pump will automatically pump lake water to the associated EDG cooler. The remaining ESWS loads will be automatically cooled when the associated ESWS supply header isolation valve opens and the associated ESWS minimum flow valve closes. In addition, the ESWS pumps will automatically start in response to the ESWS instrumentation initiation logic.
ESWS instrumentation provided inputs by pressure switches that sense reactor building closed loop cooling water (RBCLCW) pump discharge pressure. Four channels of ESWS instrumentation are provided as input to two one-out-of-two twice initiation logics. Each channel consists of a pressure sensor and switch that compares measured input signals with pre-established setpoints. When the setpoint is exceeded, the channel outputs a RBCLCW pump discharge initiation signal to both ESWS initiation logic circuits.
Attachment
3.0 EVALUATION The following proposed ITS changes have been determined to be beyond the scope of the conversion to the STS format for JAFNPP:
+ Proposed ITS 3.3.7.3 LCO section of the Bases was changed to be consistent with the licensees changes to their response for the staffs request for additional information (RAI), numbered 3.3.1.1-1.
+ To be consistent with other similar discussion of changes (DOC) revised by the licensee, the designation of the revision for the engineering standards manual referenced in DOC-M1 has been deleted.
As revised by the licensee, the part of the proposed ITS 3.3.7.3 LCO section in the Bases follows:
The trip set point is derived from the analytic limit and accounts for all worst case instrumentation uncertainties as appropriate (e.g., drift, process effects, calibration uncertainties, and severe environmental errors (for channels that must function in harsh environments as defined by 10 CFR 50.49)). The trip setpoints derived in this manner provide adequate protection because all expected uncertainties are accounted for. The Allowable Value is then derived from the trip setpoint by accounting for normal effects that would be seen during periodic surveillance or calibration. These effects are instrumentation uncertainties observed during normal operation (e.g., drift and calibration uncertainties).
The staff reviewed the above LCO changes in the ITS Bases and determined that the changes were consistent with the licensees response to RAI 3.3.1.1-1 and reflect technically accurate information. Therefore, the staff finds the ITS LCO changes to be acceptable. The licensees response to RAI 3.3.1.1-1 provides a detailed explanation of trip setpoints, allowable values, and analytical limits, as they related to instrumentation uncertainties.
In DOC-M1, the licensee referenced New York Power Authority Engineering Standards Manual, IES-3A, Instrument Loop Accuracy and Setpoint Calculation Methodology. To be consistent with other similar DOC revisions, the licensee deleted the revision designation for this engineering standards manual; however, the content of the referenced engineering standards manual remains unchanged. This is an administrative change and the staff finds the change acceptable.
4.0 CONCLUSION
Based on the above evaluation, the staff concludes that the changes to the proposed ITS 3.3.7.3 are acceptable.
Principal Contributor: R. Young Date: January 25, 2002