Letter Sequence Other |
---|
|
Results
Other: ML12079A036, ML12095A224, ML12095A225, ML12095A226, ML12095A227, ML12095A228, ML12095A229, ML12095A230, ML12095A231, ML12095A251, ML12095A252, ML12095A253, ML12095A254, ML12095A255, ML12095A257, ML12095A258, ML12095A259, ML12095A260, ML12095A274, ML12095A275, ML12095A276, ML12095A347, ML12095A348, ML12095A349, ML12095A350, ML12095A353, ML12095A354, ML12095A370, ML12095A371, ML12095A372, ML12095A373, ML12095A374, ML12095A375, ML12095A376, ML12096A059, ML12096A060, ML12096A061, ML12096A062, ML12096A227, ML12101A089, ML12101A090, ML12101A091, ML12101A092, ML12101A093, ML12101A094, ML12101A095, ML12101A096, ML12101A097, ML12101A098, ML12101A099... further results
|
MONTHYEARML12074A0322012-03-0909 March 2012 G20120172/EDATS: OEDO-2012-0147 - Paul Gunter 2.206 Petition & Letter 2.206 - Fitzpatrick Emergency Enforcement Petitions Project stage: Request ML12079A0362012-03-13013 March 2012 G20120172/EDATS: OEDO-2012-0147 - Paul Gunter E-mail Treatment of FitzPatrick Emergency Enforcement Petition, March 9, 2012 Project stage: Other ML1228303422012-03-13013 March 2012 G20120172, EDATS: OEDO-2012-0147, E-mail to Mr. Gunter to Acknowledge the Receipt of the Petition Project stage: Other ML13017A3552012-03-15015 March 2012 from Bhalchandra Vaida to Joseph Pechacek: Fitzpatrick Emergency Enforcement Project stage: Other ML13162A6312012-03-22022 March 2012 from Andrea Russell to Brice Bickett: Action for Your Review/Comment Project stage: Other ML13022A2922012-03-22022 March 2012 from Andrea Russell to Samson Lee: FYI-G20120172 (Fitzpatrick 2.206): Supplements and New Co-Petitioner Project stage: Other ML1228303322012-03-27027 March 2012 G20120172, EDATS: OEDO-2012-0147, E-mail to Petitioner - Communication of Prb'S Decision on the Request for Immediate Action Project stage: Other ML13162A6322012-03-27027 March 2012 from Andrea Russell to Samson Lee: FYI-G20120172 Project stage: Other ML13162A6332012-03-29029 March 2012 from Brice Bickett to Bhalchandra Vaidya: Re PRB Decision on Request for Immediate Action Project stage: Other ML12095A2272012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12101A1442012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3532012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2252012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML13162A7422012-04-0303 April 2012 from Andrea Russell to Samson Lee: Update-G20120172 Project stage: Other ML12095A3472012-04-0303 April 2012 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3732012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2602012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2542012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3482012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A2282012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2512012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A2262012-04-0303 April 2012 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2522012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML13022A2932012-04-0303 April 2012 from Bhalchandra Vaidy to Jessica Azulay: Re PRB Decision Project stage: Other ML12095A3702012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A2572012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3502012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3542012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2582012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3712012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2242012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A3492012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3752012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2552012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A3742012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2592012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2532012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A3762012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - e-mail from Additional Co-Petitioner Project stage: Other ML12095A2312012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A3722012-04-0303 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2302012-04-0404 April 2012 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2752012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12096A0612012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12096A2272012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12101A1452012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2742012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12096A0622012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2292012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12095A2762012-04-0404 April 2012 ME8189 -G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other ML12096A0592012-04-0404 April 2012 ME8189 - G20120172/EDATS: OEDO-2012-0147 - E-mail from Additional Co-Petitioner Project stage: Other 2012-03-27
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24298A1382024-10-24024 October 2024 Final RAI for FitzPatrick JAFP-24-0047 (L-2024-LLA-0134) ML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24156A1072024-06-0404 June 2024 NRR E-mail Capture - (External_Sender) Supplement for FitzPatrick TS 3.4.2-2 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24060A0512024-02-28028 February 2024 NRR E-mail Capture - FitzPatrick - Final Arcb RAI Regarding Amendment to Update the Fuel Handling Accident Analysis ML24033A0542024-02-0101 February 2024 NRR E-mail Capture - FitzPatrick - Final HFE RAI Regarding Amendment to Update the Fuel Handling Accident Analysis ML24024A1372024-01-24024 January 2024 NRR E-mail Capture - Final Snsb RAI Regarding FitzPatrick Amendment to Modify Safety Relief Valves Setpoint Lower Tolerance ML24017A1112024-01-17017 January 2024 NRR E-mail Capture - Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-529, Clarifyuse and Applicaion Rules, Revision 4 ML23264A7992023-09-21021 September 2023 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC – Fleet Request – License Amendment Request to Adopt TSTF-580, Revision 1 ML23261C3982023-09-0808 September 2023 Acceptance Review of Amendment to Update the Fuel Handling Accident Analysis ML23244A2662023-09-0101 September 2023 Acceptance of Requested Licensing Action Amendment Request to Modify Surveillance Requirement 3.4.3.1, Safety Relief Valves Setpoint Lower Tolerance ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23194A1822023-08-0303 August 2023 Acceptance Review for LAR Re SRM 3.3.1.2 ML23163A2292023-06-12012 June 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-580, Revision 1 ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI NRC-2100-2022, EN 55999 Valcor Coil Shell Assemblies Final Notification (004)2022-09-12012 September 2022 EN 55999 Valcor Coil Shell Assemblies Final Notification (004) NRC 2110-2022, EN 55999 - Valcor Engineering Corporation (009)2022-07-18018 July 2022 EN 55999 - Valcor Engineering Corporation (009) ML22124A2672022-05-0404 May 2022 Request for Additional Information for James A. FitzPatrick Nuclear Power Plant TSTF-505 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22063A4742021-11-29029 November 2021 Acceptance of Requested Licensing Action License Amendment Request to Eliminate Selected Response Time Testing ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21246A2112021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-505 ML21246A2072021-09-0303 September 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt 10 CFR 50.69 ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21187A0522021-07-0606 July 2021 Fitz RAI Regarding FitzPatrick Amendment Request to Modify SR 3.5.1.6 ML21246A2142021-06-23023 June 2021 Acceptance of Requested Licensing Action Regarding License Amendment Request to Adopt TSTF-264 ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21144A1072021-05-17017 May 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-582 ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21014A5112021-01-12012 January 2021 Acceptance of Requested Licensing Action License Amendment Request to Adopt TSTF-545 Revision 3 ML20352A2752020-12-17017 December 2020 Request for Additional Information Regarding FitzPatrick Primary Containment Isolation Valve Amendment Request ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting ML20294A0372020-10-19019 October 2020 Request for Additional Information Primary Containment Isolation Valve License Amendment Request ML20266G3032020-09-22022 September 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Request to Use Paragraph IWA-5120 of the 2017 Edition of the ASME B&PV Code, Section XI ML20217L3882020-08-0404 August 2020 Acceptance of Requested Licensing Action License Amendment Request to Modify Primary Containment Isolation Valve TS (EPID L-2020-LLA-0145) (E-Mail) ML20204A9692020-07-22022 July 2020 Acceptance of Requested Licensing Action License Amendment Request to Adopt-TSTF-478 Revision 2 ML20122A2302020-05-0101 May 2020 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of Fleet License Amendment Request to Adopt TSTF-566 ML20066L3682020-03-0505 March 2020 Request for Additional Information: License Amendment Request for Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment 2024-09-06
[Table view] |
Text
Vaidya, Bhalchandra From: Andrew Molloy [awmolloy@landsnail.com]
Sent: Tuesday, April 03, 2012 10:12 PM To: Vaidya, Bhalchandra
Subject:
In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York Mr. James Borchardt Executive Director for Operations U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 VIA email to Bhalchandra K. Vaidya, NRC Petition Manager In the Matter of the James A. FitzPatrick Nuclear Plant in Scriba, New York
Dear Mr. Borchardt:
I wish to co-petition with the Alliance for a Green Economy and Beyond Nuclear's March 9, 2012 emergency enforcement petition to suspend the operation of the James A. FitzPatrick Nuclear Plant.
. The FitzPatrick plant is the only GE Mark I boiling water reactor in the US that did not install a Direct Torus Vent System as requested by the NRC in 1989 and instead, to save money, relies upon a "pre-existing" venting system that is not fully hardened against a severe accident.
In deciding not to install such a vent, the FitzPatrick operator and the NRC relied upon assumptions that now place public health and safety at an undue risk.
. The hydrogen explosions at the Fukushima reactors show the dangers and unacceptable consequences posed by the current FitzPatrick severe accident venting plan, since the plan was approved on the assumptions that venting would prevent containment failure, and that there are "no likely" ignition sources along the vent path. Neither of these assumptions was correct during the Fukushima nuclear catastrophe.
. Subsequent to the Fukushima accident, the NRC inspected FitzPatrick and identified a "vulnerability, in that current procedures do not address hydrogen considerations" during a severe accident.
Therefore, I request NRC immediately suspend the FitzPatrick operating license until the following emergency enforcement actions are approved by the NRC:
- 1) Public hearings should be held on the continued operation of Entergy Nuclear Operations' Fitzpatrick plant and the adequacy of its plan to vent through a pre-existing path into the adjacent Standby Gas Treatment System building, blowing off the double doors to release a radiological accident to the outside environment at ground level. The public must be afforded due process to address the unacceptable risks to public health and safety posed by the FitzPatrick severe accident plan.
- 2) Entergy Nuclear Operations should publicly document for independent review its post-Fukushima re-analysis for the reliability and capability of the FitzPatrick pre-existing containment vent system.
. The analysis should include the reassessment of all assumptions regarding the reliability of the pre-existing containment venting and specifically address non-conservative assumptions behind the cost-benefit analysis used to justify not installing a fully hardened vent system.
I
-It should also include a reassessment of the assumption of "no likely ignition points" during emergency venting that would otherwise present catastrophic consequences associated with the detonation of hydrogen gas and the release of radioactivity generated during a severe accident.
I wish the NRC to process my request using the 2.206 process, and I understand that under this process, the contents of this message and my identity will be made public.
The Alliance for a Green Economy is my point of contact for this petition, and their organizer, Jessica Azulay, will keep me informed about the developments of the petition and the opportunity to participate in a public meeting with the NRC Petition Review Board.
Thank you Andrew Molloy 120 Stinard Ave Syracuse, NY 13207 2