ML091340554
| ML091340554 | |
| Person / Time | |
|---|---|
| Site: | Nine Mile Point, FitzPatrick |
| Issue date: | 05/14/2009 |
| From: | Glenn Dentel Reactor Projects Branch 1 |
| To: | NRC Region 1 |
| Dentel, G RGN-I/DRP/BR1/610-337-5233 | |
| References | |
| Download: ML091340554 (3) | |
Text
May 14, 2009 MEETING
SUMMARY
LICENSEE:
CONSTELLATION ENERGY AND ENTERGY NUCLEAR NORTHEAST FACILITY:
NINE MILE POINT NUCLEAR STATION AND JAMES A. FITZPATRICK NUCLEAR STATION
SUBJECT:
SUMMARY
OF THE APRIL 2009 ANNUAL ASSESSMENT OPEN-HOUSE PUBLIC MEETING On April 30, 2009, at 2:30 p.m., the NRC conducted an Annual Assessment Open-House Meeting at the Scriba Town Hall in Oswego, NY. The NRC conducted the open house meeting to discuss the NRCs assessment of the safety performance of the Nine Mile Point and James A. FitzPatrick Nuclear Stations for the calendar year 2008.
A notice of the open-house meeting was issued on April 6, 2009, and was posted on the NRCs external (public) web page (ADAMS Accession No. ML090960217).
The NRC presented poster boards and was available to discuss its assessment of the safety performance of Nine Mile Point and James A. FitzPatrick Nuclear Stations for the period of January 1 through December 31, 2008, as documented in our letters dated March 4, 2009 (ADAMS Accession No. ML090630173 for Nine Mile Point Nuclear Station and ML090630638 for FitzPatrick Nuclear Station). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Nine Mile Point and James A. FitzPatrick Nuclear Stations can be found on the NRC's web site at:www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Constellation and Entergy employees and members of the public attended the open-house and were offered the opportunity to speak with the NRC staff regarding Constellations and Entergys safety performance and the role of the agency in ensuring safe plant operations.
Sincerely,
/RA/
Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Attachments: List of Attendees
The NRC presented poster boards and was available to discuss its assessment of the safety performance of Nine Mile Point and James A. FitzPatrick Nuclear Stations for the period of January 1 through December 31, 2008, as documented in our letters dated March 4, 2009 (ADAMS Accession No. ML090630173 for Nine Mile Point Nuclear Station, and ML090630638 for FitzPatrick Nuclear Station). The NRC poster boards presented included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Nine Mile Point and James A. FitzPatrick Nuclear Stations can be found on the NRC's web site at:www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Constellation and Entergy employees and members of the public attended the open-house and were offered the opportunity to speak with the NRC staff regarding Constellations and Entergys safety performance and the role of the agency in ensuring safe plant operations.
Sincerely,
/RA/
Glenn T. Dentel, Chief Projects Branch 1 Division of Reactor Projects Attachments: List of Attendees Distribution:
S. Collins, RA M. Dapas, ORA D. Lew, DRP J. Clifford, DRP G. Dentel, DRP N. Perry, DRP J. Hawkins, DRP S. Ibarrola, DRP E. Knutson, DRP K. Kolek, DRP S. Campbell, OEDO D. Dempsey, DRP H. Chernoff, NRR E. Lee, NRR R. Guzman, NRR D. Pickett, NRR SUNSI REVIEW COMPLETE:___GTD__________ (Reviewers Initials) ML091340554 After declaring this document An Official Agency Record it will be released to the Public.
Document Name: S:\\ROP-9 EOC REVIEW\\BRANCH 1\\NMP 2009 AA MEETING
SUMMARY
.DOC To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP RI/DRP NAME JHawkins/ MG for GDentel/ GTD MGray/MG DATE 05/14/09 05/13 /09 05/ 14/09
A-1 LIST OF ATTENDEES NINE MILE POINT NUCLEAR STATION APRIL 2009 ANNUAL ASSESSMENT OPEN-HOUSE MEETING THURSDAY, APRIL 30, 2009 NAME TITLE ORGANIZATION Terry Syrell Licensing Director Constellation Energy Jill Lyon Sr. Communications Consultant Constellation Energy Carey Fleming Senior Counsel Constellation Energy Bill Byrne Manager, Nuclear Safety & Security Constellation Energy George Wrobel NMP3 LAPM UniStar Stephen Geier Vice President, New Nuclear Plant Projects UniStar Tommy Holden Communications Entergy Ed Stronski Citizen Tom Gurdziel Citizen Pete Dietrich Site Vice President Entergy